A smart factory management and control method and system based on digital twins

By building a digital twin model in the smart factory control system, real-time collection and analysis of operational information solves the problem of lack of abnormality early warning in the existing technology, enables timely processing of equipment and production status, and ensures the stability and efficiency of the production process. .

CN117991731BActive Publication Date: 2024-10-01ANHUI TONGXINYUAN TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311868973.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-10-01
Estimated Expiration
2043-12-28

AI Technical Summary

Technical Problem

The existing smart factory control system lacks early warning and timely processing of abnormal situations in applying digital twin technology, which affects production targets and causes production overdues.

Method used

A smart factory management and control system based on digital twins is designed, including a model building module and an intelligent control module. By extracting the operation information of the target factory from historical data, a digital twin model is constructed, equipment and production operation information are collected in real time, and the calculation equipment and Production operation index, determine whether it is abnormal, and provide solutions through the intelligent terminal module.

Benefits of technology

Realize timely early warning and processing of equipment and production operation status, avoid the impact of equipment failure on production, and ensure the stability and efficiency of the production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117991731B_ABST
    Figure CN117991731B_ABST
Patent Text Reader

Abstract

The present invention discloses a smart factory management and control method and system based on digital twins, which relates to the field of digital twin factory control technology, and solves the technical problem that the digital twin model in the prior art is often only used for simple data mapping and status monitoring, lacks early warning and timely processing of abnormal situations, and once an abnormality occurs, it will affect the production target and cause production overdue; the model construction module of the present invention constructs a digital twin model of the target factory area based on operation information and operation index; the operation information of the target factory is collected in real time into the digital twin model through sensors, and the digital twin model outputs the operation index; the operation index is compared with the corresponding threshold to determine whether it is abnormal; if yes, the smart terminal module displays the operation abnormality and takes measures; if not, the smart terminal displays normal operation; the real-time monitoring and timely early warning of the target factory are realized, which helps to identify potential problems in advance, handle them in time, and optimize the production process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of digital twin factory control, and specifically relates to a smart factory management and control method and system based on digital twin. Background Art

[0002] With the rapid development of science and technology, intelligent manufacturing and smart factories have become important development directions of today's manufacturing industry.

[0003] Traditional factory control systems are often limited by physical space and equipment, and cannot achieve global optimization and real-time adjustment. In order to solve this problem, smart factory control systems have emerged. They use advanced technologies such as digital twins, big data, artificial intelligence, etc. to achieve intelligent, efficient, and automated control and management of factories. However, existing smart factory control systems still have some problems in applying digital twin technology. Digital twin models are often only used for simple data mapping and status monitoring, and lack early warning and timely processing of abnormal situations. Once an abnormality occurs, it will affect production goals and cause production overdue.

[0004] Therefore, the present invention proposes a smart factory management and control method and system based on digital twins. Summary of the invention

[0005] The present invention aims to solve at least one of the technical problems existing in the prior art; to this end, the present invention proposes a smart factory management and control method and system based on digital twins, which is used to solve the technical problem that the digital twin model in the prior art is often only used for simple data mapping and status monitoring, lacks early warning and timely processing of abnormal situations, and once an abnormality occurs, it will affect the production target and cause production overdue.

[0006] To achieve the above-mentioned purpose, a first aspect of the present invention provides a smart factory management and control system based on digital twins, including a model building module, and a data acquisition module and an intelligent control module connected thereto;

[0007] Model building module: extract the operation information of the target factory from historical data and analyze the operation index; build a digital twin model of the target factory based on the operation information and the operation index; the operation information includes environmental information, equipment operation information and production operation information; the operation index includes equipment operation index and production operation index;

[0008] Intelligent control module: collects the operating information of the target factory in real time through sensors and transmits it to the digital twin model; the digital twin model outputs the operating index to determine whether the operating index is abnormal; if so, it displays the operating abnormality and the intelligent terminal module gives a solution; if not, it displays the operating normal and the intelligent terminal module does not process; among them, operating abnormalities include equipment operating failures and production operating abnormalities.

[0009] Preferably, extracting the operation information of the target plant from the historical data includes:

[0010] Extract several groups of equipment operation information from historical data; extract corresponding environmental information based on several groups of equipment operation information; extract corresponding production operation information based on the equipment operation information and environmental information; wherein the equipment operation information includes: temperature, current and voltage; the environmental information includes temperature, humidity and light; the production operation information includes production efficiency and yield rate.

[0011] The present invention extracts equipment operation information, environmental information and production operation information from historical data in a one-to-one correspondence; it constitutes a data sequence for daily factory production, provides more realistic training data for the subsequent establishment of a digital twin model of the target factory, and ensures the accuracy of the establishment of the digital twin model.

[0012] Preferably, the equipment operation index includes:

[0013] Based on the equipment operation information, the equipment operation index Qj is calculated by the formula Qj=Σ(α×Tij+β×Aij+γ×Vij); wherein i represents the processing cycle, i=0, 1,…, N, j represents the equipment number, j=0, 1,…, M, and N and M are positive integers, Tij represents the temperature mean, Aij represents the current mean, and Vij represents the voltage mean; α, β, and γ are weight coefficients, and their values ​​are all greater than 0.

[0014] The present invention analyzes the equipment operation index based on the equipment operation information, which can timely reflect the operating status and performance of the equipment, and is conducive to timely discovering problems and taking corresponding measures; and the formula uses objective physical quantities, such as the mean of temperature, current and voltage, and weight coefficients, which can be obtained through measurement and calculation, avoiding the interference of subjective evaluation, and can also be used for analysis of different types of equipment.

[0015] Preferably, the production operation index includes:

[0016] Based on production efficiency and yield rate, the production operation index is calculated by the formula ZP=δ×LP+η×RP; where P represents the monitoring node, LP represents the production efficiency, and RP represents the yield rate; δ and η are weight coefficients, and both are greater than 0.

[0017] Preferably, the step of constructing a digital twin model of the target plant based on the operation information and the operation index includes:

[0018] Step 1: Extract the plan view of the target plant from the database; construct a framework model of the target plant through the plan view;

[0019] Step 2: Build a 3D model of the equipment through the CAD model; place the 3D model of the equipment in the framework model of the target plant area according to the placement position of the equipment in the plan;

[0020] Step 3: Use the operation information as standard input data and the operation index as standard output data to train the framework model of the target plant; obtain the digital twin model of the target plant through training.

[0021] The present invention constructs a framework model by using a plan view extracted from a database, and then constructs a 3D model of the equipment in combination with a CAD model, and places the model in the framework model of the target plant to achieve integration of the plant and the equipment. The framework model of the target plant is trained by using operating information as standard input data and operating index as standard output data. A digital twin model of the target plant is obtained through training, which truly reflects the actual production situation of the factory and facilitates viewing and management of the operating status of the entire factory.

[0022] Preferably, the determining whether the operation index is abnormal includes:

[0023] Compare the device operation index with the device operation index threshold to determine whether the device operation index exceeds the device operation index threshold; if yes, display the device operation failure; if no, display the device operation normal;

[0024] The production operation index is compared with the production operation index threshold to determine whether the production index exceeds the production operation index threshold; if yes, it indicates that the production operation is normal; if no, it indicates that the production operation is abnormal.

[0025] Preferably, the equipment operation index threshold includes:

[0026] Extract a number of equipment abnormality information from historical data, and divide them into k groups according to the abnormality type, and each group includes a number of processing cycles for different abnormality types. Perform average processing on the abnormality information of each group, and calculate the equipment operation index threshold S through the formula S=ΣQk / (P+1); where k=0, 1, ..., P; Qk is the abnormal operation index, Qk=α×Tk+β×Ak+γ×Vk; Tk represents the temperature mean, Ak represents the current mean, and Vk represents the voltage threshold;

[0027] It should be noted that the abnormality types include temperature abnormality, current abnormality, voltage abnormality, temperature current abnormality, temperature voltage abnormality, current voltage abnormality, and both temperature current and voltage abnormality;

[0028] A second aspect of the present invention provides a smart factory management and control method based on digital twins, characterized in that it includes the following steps:

[0029] Step 1: Build a digital twin model of the target plant based on operation information and operation index;

[0030] Step 2: The operating information of the target factory is collected in real time through sensors into the digital twin model, and the digital twin model outputs the operating index;

[0031] Step 3: Compare the operation index with the corresponding threshold to determine whether it is abnormal; if yes, the intelligent terminal module displays abnormal operation and takes measures; if no, the intelligent terminal displays normal operation.

[0032] Compared with the prior art, the present invention has the following beneficial effects:

[0033] 1. The present invention extracts equipment abnormality information from historical data, divides it according to abnormality types, and calculates the abnormal operation index corresponding to each abnormality type; based on each abnormal operation index, a comprehensive analysis is performed to obtain the equipment operation index threshold; by calculating the abnormal operation index corresponding to each abnormal type, the abnormal state of the equipment can be quantitatively evaluated; and the operation conditions of the equipment under various abnormal types are comprehensively considered, and the obtained equipment operation index threshold is more representative and has reference value; by setting the equipment operation index threshold, an early warning of the equipment operation status can be achieved; problems can be discovered and handled in a timely manner to avoid the impact of equipment failures on production.

[0034] 2. The present invention constructs a digital twin model of the target plant based on operating information and operating index; collects the operating information of the target factory in real time into the digital twin model through sensors, and the digital twin model outputs the operating index; compares the operating index with the corresponding threshold to determine whether it is abnormal; if so, the intelligent terminal module displays the operating abnormality and takes measures; if not, the intelligent terminal displays that the operation is normal; by constructing a digital twin model of the target plant, the actual operating conditions of the target factory can be truly simulated, and based on the operating information collected in real time by sensors, the operating index can be accurately output, thereby realizing timely early warning and processing of the target factory, which helps to identify potential problems in advance and optimize the production process. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0036] Figure 1 It is a system principle block diagram of the present invention;

[0037] Figure 2 The figure is a flowchart of the method of the present invention. DETAILED DESCRIPTION

[0038] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] See also Figure 1-Figure 2 , the first aspect of the present invention provides a smart factory management and control system based on digital twins, including a model building module, and a data acquisition module and an intelligent control module connected thereto;

[0040] The model building module extracts the operation information of the target factory from the historical data and analyzes the operation index; builds the digital twin model of the target factory based on the operation information and the operation index; wherein the operation information includes environmental information, equipment operation information and production operation information; the operation index includes equipment operation index and production operation index;

[0041] Specifically, several groups of equipment operation information are extracted from historical data; corresponding environmental information is extracted based on several groups of equipment operation information; corresponding production operation information is extracted based on the equipment operation information and environmental information; wherein the equipment operation information includes: temperature, current and voltage; the environmental information includes temperature, humidity and light; the production operation information includes production efficiency and yield rate.

[0042] The digital twin model of the target plant is constructed based on the operation information and operation index. The construction steps are as follows:

[0043] Step 1: Extract the plan view of the target plant from the database; construct a framework model of the target plant through the plan view;

[0044] Step 2: Build a 3D model of the equipment through the CAD model; place the 3D model of the equipment in the framework model of the target plant area according to the placement position of the equipment in the plan;

[0045] Step 3: Use the operation information as standard input data and the operation index as standard output data to train the framework model of the target plant; obtain the digital twin model of the target plant through training.

[0046] The equipment operation index is calculated as follows:

[0047] Based on the equipment information, the equipment operation index Qj is calculated by the formula Qj=Σ(α×Tij+β×Aij+γ×Vij); wherein i represents the processing cycle, i=0, 1,…, N, j represents the equipment number, j=0, 1,…, M, and N and M are positive integers, Tij represents the temperature mean, Aij represents the current mean, and Vij represents the voltage mean; α, β, and γ are weight coefficients, and their values ​​are all greater than 0.

[0048] For example, a battery production factory is equipped with temperature sensors, current sensors, and voltage sensors to obtain equipment information. Assume that each production line has two devices for production, the information processing cycle is set to 1 minute, and 5 sets of equipment information are collected within 1 minute. The following is an analysis of the first processing cycle of a production line equipment.

[0049] Device 0: Temperature (54, 58, 51, 62, 65) °C; Current (207, 213, 312, 334, 345) A; Voltage (223, 225, 233, 235, 249) V;

[0050] Device 1: Temperature (68, 65, 71, 78, 84) °C; Current (389, 368, 421, 435, 458) A; Voltage (410, 428, 394, 416, 510);

[0051] Assume that the weight coefficients α = 0.4, β = 0.3, γ = 0.3;

[0052] According to the formula Qj = α × Tij + β × Aij + γ × Vij, the operation index Qj of each device can be calculated:

[0053] Device 0: T10 = (54 + 58 + 51 + 62 + 65) / 5 = 58 ° C; A10 = (207 + 213 + 312 + 334 + 345) / 5 = 282.2A; V10 = (223 + 225 + 233 + 235 + 249) / 5 = 335.4V;

[0054] Q0=0.4×58+0.3×282.2+0.3×233=177.76;

[0055] Device 1: T11 = (68 + 65 + 71 + 78 + 84) / 5 = 73.2 ° C; A11 = (323 + 345 + 421 + 410 + 385) / 5 = 394.2A; V11 = (410 + 428 + 394 + 416 + 510) / 5 = 431.6V;

[0056] Q1=0.4×73.2+0.3×394.2+0.3×431.6=277.02;

[0057] According to the calculation results, the operating index of device 0 is 177.76, and the operating index of device 2 is 277.02.

[0058] The operation index calculation method can be used to analyze the device operation index threshold, including:

[0059] Extract a number of equipment abnormality information from historical data, and divide them into k groups according to the abnormality type, and each group includes a number of processing cycles for different abnormality types. Perform average processing on the abnormality information of each group, and calculate the equipment operation index threshold S through the formula S=ΣQk / (P+1); where k=0, 1, ..., P; Qk is the abnormal operation index, Qk=α×Tk+β×Ak+γ×Vk; Tk represents the temperature mean, Ak represents the current mean, and Vk represents the voltage threshold;

[0060] It should be noted that the abnormality types include temperature abnormality, current abnormality, voltage abnormality, temperature and current abnormality, temperature and voltage abnormality, current and voltage abnormality, and both temperature, current and voltage abnormality.

[0061] For example: suppose that several groups of abnormal device information of different abnormal types are extracted from historical data, among which the temperature abnormal group is marked as 0, the current abnormal group is marked as 1, the voltage abnormal group is marked as 2, the temperature and current abnormal group is marked as 3, the temperature and voltage abnormal group is marked as 4, the current and voltage abnormal group is marked as 5, and the temperature, current and voltage abnormal group is marked as 6; the temperature threshold is 50-70℃, the current threshold is 200-310A, and the voltage threshold is 200-310V; the weight coefficients α=0.4, β=0.3, γ=0.3;

[0062] Assume that the temperature anomaly group is calculated as follows: T0 = 85°C, A0 = 260A, V0 = 250V; then Q0 = 0.4 × 85 + 0.3 × 260 + 0.3 × 250 = 187;

[0063] Abnormal current group: T1 = 60°C, A1 = 375A, V1 = 264V; then Q1 = 0.4 × 60 + 0.3 × 375 + 0.3 × 264 = 215.7;

[0064] Abnormal voltage group: T2 = 62°C, A2 = 275A, V2 = 332V; then Q2 = 0.4 × 62 + 0.3 × 275 + 0.3 × 332 = 206.9;

[0065] Abnormal temperature and current group: T3 = 95°C, A3 = 412A, V3 = 306V; then Q3 = 0.4 × 95 + 0.3 × 412 + 0.3 × 306 = 253.4;

[0066] Abnormal temperature and voltage group: T4 = 103°C, A4 = 276A, V4 = 462V; then Q4 = 0.4×103+0.3×276+0.3×462=262.6;

[0067] Abnormal current and voltage group: T5 = 61°C, A5 = 396A, V5 = 427V; then Q4 = 0.4 × 61 + 0.3 × 396 + 0.3 × 427 = 271.3;

[0068] Abnormal temperature, current and voltage group: T6 = 105°C, A6 = 415A, V6 = 512V; then Q6 = 0.4×105+0.3×415+0.3×512=320.1;

[0069] In summary, S=ΣQk / 7=(187+215.7+206.9+253.4+262.6+271.3+320.1) / 7=245.29, that is, the equipment operation index threshold is 245.29.

[0070] Among them, the production operation index includes:

[0071] Based on production efficiency and yield rate, the production anomaly index is calculated by the formula ZP = δ × LP + η × RP; where P represents the monitoring node, LP represents the production efficiency, and RP represents the yield rate; δ and η are weight coefficients, and both are greater than 0;

[0072] It should be noted that the processing cycle is any node of the production cycle, that is, half or one third of the production cycle, etc. The production efficiency and yield rate are calculated from the output produced between the start of production and the monitoring node.

[0073] For example, suppose a production line has a production cycle of 10 hours and is expected to produce 1,000 batteries. At halfway through the production cycle, 450 batteries are produced. Among them, 250 batteries are of good quality. Extract the production efficiency and yield rate of this node; production efficiency LP = 450 / 5 / 100 = 0.9, yield rate RP = 250 / 450 / 100 = 0.5; where δ = 0.5, η = 0.5;

[0074] Through the formula ZP=δ×LP+η×RP=0.5×0.9+0.5×0.5=0.7, the production operation index is calculated to be 0.7.

[0075] The intelligent control module collects the operation information of the target factory in real time through sensors, transmits it to the digital twin model, and outputs the operation index; among them, the equipment operation index Qj is compared with the equipment operation index threshold S to determine whether the equipment operation index Qj exceeds the equipment operation index threshold S; if yes, it displays that the equipment operation is faulty; if no, it displays that the equipment is operating normally; the production operation index ZP is compared with the production operation index threshold to determine whether the production index exceeds the production operation index threshold; if yes, it displays that the production operation is normal; if no, it displays that the production operation is abnormal.

[0076] For example, based on the above embodiment, the operation indexes of two devices in a production line are Q0=177.76, Q1=277.02, and S=245.29 respectively; by comparison, it can be seen that device 0 operates normally, and device 1 operates faultily;

[0077] Based on the above embodiment, ZP=0.7; if the preset threshold value of the production operation index is 1, the production operation is abnormal; if the preset threshold value of the production operation index is 0.5, the production operation is normal.

[0078] When equipment operation failure or production operation failure occurs, the intelligent terminal module notifies the management personnel to repair the equipment or adjust the production strategy.

[0079] For example: based on the above embodiment, the production operation index ZP=0.7, and the preset threshold value of the production operation index is 1, then the production operation is abnormal; the management personnel adjust the production speed to V=(1000-450) / 5=110 pieces / h, and strengthen the control of product quality by adjusting the environmental conditions to make it suitable for battery production, and conduct regular training for employees to improve their skills and operating levels to ensure that they can operate as required.

[0080] Part of the data in the above formula is calculated by removing the dimension and taking its numerical value. The formula is a formula closest to the actual situation obtained by software simulation of a large amount of collected data; the preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained through simulation of a large amount of data.

[0081] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A smart factory management and control system based on digital twins, characterized in that: It includes a model building module, and a data acquisition module and an intelligent control module connected thereto; Model building module: extract the operation information of the target factory from historical data and analyze the operation index; build a digital twin model of the target factory based on the operation information and the operation index; the operation information includes environmental information, equipment operation information and production operation information; the operation index includes equipment operation index and production operation index; Intelligent control module: collects the operation information of the target factory in real time through sensors and transmits it to the digital twin model; the digital twin model outputs the operation index to determine whether the operation index is abnormal; if yes, it will display the operation abnormality and the intelligent terminal module will give a solution; if no, it will display the operation normal and the intelligent terminal module will not process it; among them, the operation abnormality includes equipment operation failure and production operation abnormality; The determining whether the operation index is abnormal includes: Compare the device operation index with the device operation index threshold to determine whether the device operation index exceeds the device operation index threshold; if yes, display the device operation failure; if no, display the device operation normal; Compare the production operation index with the production operation index threshold to determine whether the production index exceeds the production operation index threshold; if yes, it indicates that the production operation is normal; if no, it indicates that the production operation is abnormal; The device operation index threshold includes: Several equipment abnormality information is extracted from historical data and divided into k groups according to the abnormality type, and each group includes several processing cycles for different abnormality types. The abnormal information of each group is averaged and the equipment operation index threshold S is calculated by the formula S=ΣQk / (P+1); wherein k=0, 1, ..., P; Qk is the abnormal operation index, Qk=α×Tk+β×Ak+γ×Vk; Tk represents the temperature mean, Ak represents the current mean, Vk represents the voltage threshold, α, β, γ are weight coefficients, and all of them are greater than 0.

2. According to the digital twin-based smart factory management and control system of claim 1, it is characterized in that: The step of extracting the operation information of the target plant from the historical data includes: Extract several groups of equipment operation information from historical data; extract corresponding environmental information based on several groups of equipment operation information; extract corresponding production operation information based on the equipment operation information and environmental information; wherein the equipment operation information includes: temperature, current and voltage; the environmental information includes temperature, humidity and light; the production operation information includes production efficiency and yield rate.

3. According to the digital twin-based smart factory management and control system of claim 1, it is characterized in that: The equipment operation index includes: Based on the equipment operation information, the equipment operation index Qj is calculated by the formula Qj=Σ(α×Tij+β×Aij+γ×Vij); wherein i represents the processing cycle, i=0, 1,…, N, j represents the equipment number, j=0, 1,…, M, and N and M are positive integers, Tij represents the temperature mean, Aij represents the current mean, and Vij represents the voltage mean; α, β, and γ are weight coefficients, and their values ​​are all greater than 0.

4. According to the digital twin-based smart factory management and control system of claim 1, it is characterized in that: The production operation index includes: Based on production efficiency and yield rate, the production operation index is calculated by the formula ZP=δ×LP+η×RP; where P represents the monitoring node, LP represents the production efficiency, and RP represents the yield rate; δ and η are weight coefficients, and both are greater than 0.

5. The digital twin-based smart factory management and control system according to claim 1 is characterized in that: The digital twin model of the target factory is constructed based on the operation information and the operation index, including: Step 1: Extract the plan view of the target plant from the database; construct a framework model of the target plant through the plan view; Step 2: Build a 3D model of the equipment through the CAD model; place the 3D model of the equipment in the framework model of the target plant area according to the placement position of the equipment in the plan; Step 3: Use the operation information as standard input data and the operation index as standard output data to train the framework model of the target plant; obtain the digital twin model of the target plant through training.

6. A smart factory management and control method based on digital twins, used to run a smart factory management and control system based on digital twins as described in any one of claims 1 to 5, characterized in that: The following steps are involved: Step 1: Build a digital twin model of the target plant based on operation information and operation index; Step 2: The operating information of the target factory is collected in real time through sensors into the digital twin model, and the digital twin model outputs the operating index; Step 3: Compare the operation index with the corresponding threshold to determine whether it is abnormal; If yes, the intelligent terminal module displays abnormal operation and takes measures; No, the smart terminal displays that it is running normally.