Robust Dispatch Method and Device for Wind Power Uncertainty Considering Four-Variable Frequency Constraints

The wind power uncertainty robust dispatching method with four-variable frequency constraints solves the problem of difficulty in handling the lowest frequency constraint of wind turbines in the power system, improves frequency security and robustness, and reduces the total cost of power generation.

CN117996781BActive Publication Date: 2024-10-01TIANJIN UNIV
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410132410.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-10-01
Estimated Expiration
2044-01-31

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively handle the uncertainty of wind turbines in power systems with increased wind power penetration, especially the minimum frequency constraint, resulting in insufficient system frequency adjustment capabilities and difficulty in ensuring frequency security and robustness.

Method used

The wind power uncertainty robust dispatching method with four-variable frequency constraints is adopted. By constructing the objective function and the frequency minimum point constraint model, combined with the system frequency response model, the least squares piecewise linearization process is performed, and the designated constraint unit model is established and converted into wind power Uncertainty-robust unit portfolio model, analytically minimizing the total cost of power generation.

Benefits of technology

It ensures the safety of the lowest frequency point, improves wind power acceptance capacity and system robustness, and reduces the total cost of power generation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117996781B_ABST
    Figure CN117996781B_ABST
Patent Text Reader

Abstract

A robust dispatching method and device for wind power uncertainty considering four-variable frequency constraints. The method is based on a system frequency response model to obtain a four-variable frequency minimum point constraint model. The constraint is nonlinear with respect to the unit decision variables and is linearized using a least squares piecewise linearization method. Other constraint unit models in the unit combination are considered, and the minimum total power generation cost is taken as the goal to obtain a unit combination model considering the four-variable frequency minimum point constraint. Considering the uncertainty of wind power output, the wind power output is expressed as an uncertain set, and a wind power uncertainty robust unit combination model considering the four-variable frequency minimum point constraint is obtained, thereby improving the robustness of the model. Solve the unit combination day-ahead dispatching plan that minimizes the total cost. The present invention can ensure that the obtained dispatching plan has strong frequency security, and improves the wind power acceptance capacity with good robustness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a wind power uncertainty robust dispatching method and device considering four-variable frequency constraints, belonging to the technical field of power system operation and optimization. Background Art

[0002] The penetration rate of wind power in new power systems has increased significantly. Wind power output is difficult to predict and control, and has the characteristics of strong volatility, intermittency, randomness, and reverse peak regulation, making it difficult to accurately predict and control the output of wind turbines, and increasing the uncertainty of the system. With the increase in wind power penetration, the operation mode of the power grid has become more complex and changeable.

[0003] At present, there have been a lot of studies on the scheduling methods of unit combinations under uncertainty scenarios. According to the differences in uncertainty models, they can be divided into fuzzy optimization (FO), stochastic programming (SO) and robust optimization (RO). Fuzzy optimization has not yet formed an objective method for the selection of fuzzy membership functions to deal with wind power uncertainty, and can only rely on human subjective factors. The disadvantage of the stochastic programming method is that a large number of scenarios are usually required to achieve acceptable solution accuracy. The robust optimization method only requires the fluctuation range of the uncertainty parameters, and the solution obtained can meet all scenarios in the uncertainty set, and is widely used to solve optimization problems containing uncertain variables. Among them, the two-stage robust optimization model is widely used, but it is generally difficult to solve directly.

[0004] In addition, since the wind turbines themselves do not have synchronous inertia and frequency regulation capabilities, when a large number of wind turbines are connected to the system, the dynamic response characteristics of the system frequency will deteriorate, and the ability to resist power disturbances will be greatly reduced. The rapid increase in the penetration rate of renewable energy such as wind energy has brought new challenges to the operation of new power systems, which reduces the inertia of the system and leads to insufficient system frequency regulation capabilities. Therefore, it is necessary to consider frequency security constraints, especially the frequency minimum point constraints, in the unit combination of the power system. However, in the existing unit research considering the frequency minimum point constraint, the frequency minimum point constraint is mostly three independent variables, among which the power disturbance is generally a given value. A wind power uncertainty robust scheduling technology solution considering the four-variable frequency constraint is needed. Summary of the invention

[0005] To this end, the present invention provides a wind power uncertainty robust scheduling method and device considering four-variable frequency constraints to solve the uncertainty problem brought by wind power, and consider the frequency minimum point constraints of the four variables to ensure that the resulting scheduling scheme has strong frequency minimum point security, improve the wind power acceptance capacity to have better robustness.

[0006] In order to achieve the above object, the present invention provides the following technical solution: a wind power uncertainty robust scheduling method considering four-variable frequency constraints, comprising:

[0007] constructing an objective function, wherein the objective function aims to minimize the total cost of power generation of the power system;

[0008] A frequency minimum point constraint model with four variables is obtained by using a system frequency response model, and the frequency minimum point constraint model is linearized by using a least squares piecewise linearization method;

[0009] Establishing a designated constraint unit model according to the set constraint conditions, the designated constraint unit model includes a binary variable constraint model, a generator shortest operation / downtime constraint model, a generator set spinning standby constraint model, a generator set climbing limit constraint model, a generator set output constraint model, a system power balance constraint model and a transmission line power flow constraint model, combining the designated constraint unit model with the objective function and the frequency minimum point constraint model of the four variables to obtain a unit combination model including the frequency minimum point constraint parameters of the four variables;

[0010] The wind power output is represented as an uncertainty set, and according to the uncertainty set, the obtained unit commitment model including the four-variable frequency minimum point constraint parameter is converted into a wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameter;

[0011] The wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameters is analyzed, and the unit combination day-ahead dispatch scheme that minimizes the total power generation cost of the power system is obtained.

[0012] The present invention also provides a wind power uncertainty robust scheduling device considering four-variable frequency constraints, which adopts the above-mentioned wind power uncertainty robust scheduling method considering four-variable frequency constraints, including:

[0013] An objective function building module, used for building an objective function, wherein the objective function aims to minimize the total power generation cost of the power system;

[0014] A first model processing module is used to obtain a frequency minimum point constraint model with four variables by using a system frequency response model, and linearize the frequency minimum point constraint model by using a least squares piecewise linearization method;

[0015] The second model processing module is used to establish a specified constraint unit model according to the set constraint conditions, wherein the specified constraint unit model includes a binary variable constraint model, a generator shortest operation / downtime constraint model, a generator set spinning standby constraint model, a generator set ramp limit constraint model, a generator set output constraint model, a system power balance constraint model and a transmission line power flow constraint model, and the specified constraint unit model is combined with the objective function and the frequency minimum point constraint model of the four variables to obtain a unit commitment model including the frequency minimum point constraint parameters of the four variables;

[0016] A third model processing module is used to represent the wind power output as an uncertainty set, and convert the obtained unit commitment model including the four-variable frequency minimum point constraint parameter according to the uncertainty set into a wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameter;

[0017] The model analysis processing module is used to analyze the wind power uncertainty robust unit combination model including the four-variable frequency minimum point constraint parameters to obtain the unit combination day-ahead dispatching plan that minimizes the total power generation cost of the power system.

[0018] The present invention has the following advantages: constructing an objective function, wherein the objective function takes minimizing the total power generation cost of the power system as the goal; using a system frequency response model to obtain a frequency minimum point constraint model with four variables, and adopting a least squares piecewise linearization method to linearize the frequency minimum point constraint model; establishing a specified constraint unit model according to set constraint conditions, wherein the specified constraint unit model includes a binary variable constraint model, a generator shortest operation / downtime constraint model, a generator set rotating standby constraint model, a generator set climbing limit constraint model, a generator set output constraint model, a system power balance constraint model and a transmission line The power flow constraint model combines the specified constraint unit model with the objective function and the frequency minimum point constraint model with four variables to obtain a unit combination model including the frequency minimum point constraint parameters of the four variables; the wind power output is represented as an uncertain set, and the obtained unit combination model including the frequency minimum point constraint parameters of the four variables is converted into a wind power uncertainty robust unit combination model including the frequency minimum point constraint parameters of the four variables according to the uncertain set; the wind power uncertainty robust unit combination model including the frequency minimum point constraint parameters of the four variables is analyzed to obtain a unit combination day-ahead dispatching scheme that minimizes the total power generation cost of the power system. The present invention can ensure that the obtained dispatching scheme has strong frequency security, improves the wind power acceptance capacity, and has good robustness. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0020] Figure 1 A schematic flow chart of a wind power uncertainty robust scheduling method considering four-variable frequency constraints provided in an embodiment of the present invention;

[0021] Figure 2 A schematic diagram of a system frequency response model in a wind power uncertainty robust scheduling method considering four-variable frequency constraints provided in an embodiment of the present invention;

[0022] Figure 3 A schematic diagram of a heuristic least squares method flow in a wind power uncertainty robust scheduling method considering four-variable frequency constraints provided in an embodiment of the present invention;

[0023] Figure 4 A schematic diagram of a process for solving a two-stage RO model in a wind power uncertainty robust scheduling method considering four-variable frequency constraints provided in an embodiment of the present invention;

[0024] Figure 5 A schematic diagram of an improved IEEE RTS24 node system in a robust dispatching method for wind power uncertainty considering four-variable frequency constraints provided in an embodiment of the present invention;

[0025] Figure 6 The day-ahead output forecast value and fluctuation range of any wind farm provided in the embodiments of the present invention;

[0026] Figure 7 The total load power day-ahead forecast value provided in the embodiment of the present invention;

[0027] Figure 8 This is an architecture diagram of a wind power uncertainty robust scheduling device considering four-variable frequency constraints provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0028] The following is a description of the implementation of the present invention by specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] Example 1

[0030] See also Figure 1 Embodiment 1 of the present invention provides a robust dispatching method for wind power uncertainty considering four-variable frequency constraints, comprising the following steps:

[0031] S1. constructing an objective function, wherein the objective function aims to minimize the total power generation cost of the power system;

[0032] S2. Obtain a frequency minimum point constraint model with four variables by using the system frequency response model, and linearize the frequency minimum point constraint model by using a least squares piecewise linearization method;

[0033] S3. Establish a designated constraint unit model according to the set constraint conditions, wherein the designated constraint unit model includes a binary variable constraint model, a generator shortest operation / downtime constraint model, a generator set spinning standby constraint model, a generator set ramp limit constraint model, a generator set output constraint model, a system power balance constraint model, and a transmission line power flow constraint model; combine the designated constraint unit model with the objective function and the frequency minimum point constraint model of the four variables to obtain a unit combination model including the frequency minimum point constraint parameters of the four variables;

[0034] S4, expressing the wind power output as an uncertainty set, and converting the obtained unit commitment model including the four-variable frequency minimum point constraint parameters into a wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameters according to the uncertainty set;

[0035] S5. Analyze the wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameters to obtain the unit combination day-ahead dispatching plan that minimizes the total power generation cost of the power system.

[0036] In this embodiment, in step S1, the objective function of the model is established with the goal of minimizing the total cost of the power system. The expression of the objective function is:

[0037]

[0038] Where, T C is the total power generation cost of the system; T is the number of scheduling period periods; G is the set of all units in the system;

[0039] C gt is the power generation cost of unit g in period t, expressed as:

[0040] C gt =C u,g u gt +C d,g v gt +C f,g wgt +C m,g p gt (2)

[0041] In the formula, C u,g is the startup cost of unit g, C d,g is the shutdown cost of unit g, C f,g is the fixed cost of operating unit g, C m,g is the output cost of unit g; u gt is the start-up mark of unit g, v gt is the shutdown mark of unit g, w gt is the online mark of unit g, p gt is a continuous decision variable, which represents the planned active power output of unit g in period t.

[0042] In this embodiment, in step S2, based on the system frequency response model (SFR), a nonlinear four-variable frequency minimum point constraint model is obtained, and the nonlinear four-variable frequency minimum point constraint model is linearized.

[0043] For details, see Figure 2 According to the generalized system frequency response model (SFR), the system frequency response model (SFR) can represent the influence of each speed regulator on the system frequency control, assuming that the reheating time constant of all speed regulators in the system is the same, and based on Figure 2 The transfer function of the SFR system shown in the figure is combined with the transfer function of the system frequency response model to derive the constraint expressions of frequency change rate, frequency minimum point and steady-state frequency deviation:

[0044]

[0045] In the formula, f b is the rated frequency of the system, △P is the power disturbance of the system, T is the reheating time constant of the speed regulator, f lim , △f lim , △f ss,lim are the maximum allowable frequency change rate, the maximum frequency drop and the steady-state frequency deviation respectively; M, R h 、F h is the system average parameter;

[0046] K g is the mechanical power gain of the generator g, R g is the per unit value of the regulation coefficient of the generator g, F g is the proportion of the steam turbine power generation of generator g, H g is half the inertia time constant of the generator g, D is the frequency regulation effect coefficient of the load; ω n ξ is t z Intermediate variable of parameter, tz is the moment when the frequency reaches the lowest point, which is determined by ω n and the value of ξ.

[0047] Among them, M, R h 、F h are system average parameters. When considered in the unit combination model, they are linearly proportional to the number of online units at each moment. Formulas (6)-(8) are rewritten as the following formulas (12)-(14); Assuming that the system initial power disturbance △P is related to the maximum online unit output value and load fluctuation, consider taking △P as the larger value of the output proportion of the maximum capacity unit at each moment and the 10% load, as shown in formula (15).

[0048] Specifically, using the system average parameters M, R h 、F h It is linearly proportional to the number of online units at each moment, and formulas (6), (7), (8) are rewritten as:

[0049]

[0050] Specifically, the system power disturbance △P is taken as the larger value of the output proportion of the maximum capacity unit at each moment and the 10% load. The formula for determining the system power disturbance △P is:

[0051]

[0052] and,

[0053] x=[w gt ,u gt ,v gt ] T , y = [p gt ] T (16)

[0054] Assume that the function on the left side of the inequality sign of the frequency minimum point constraint formula (4) is f(X), where X = [R h ,F h ,M,△P] T ∈R 4 , the number of independent variables is four, and the frequency minimum point constraint model formula of the four variables is:

[0055]

[0056] According to formula (12)-formula (14), M, R h 、F h and the unit online decision variable w in the unit combination gt is related to the decision variable vector x; according to formula (15), △P is related to the unit output variable pgt It is related to the decision variable vector y. Therefore, the frequency minimum point constraint can affect the scheduling solution of the model, and the frequency minimum point expression in formula (17) is a nonlinear constraint and needs to be linearized.

[0057] In this embodiment, in step S2, based on a heuristic least squares piecewise linearization (PWL) method, the obtained four-variable frequency minimum point constraint is linearized.

[0058] Specifically, in the process of linearizing the frequency minimum point constraint model using a least squares piecewise linearization method;

[0059] The frequency minimum point constraint is expressed as:

[0060] f(X)=f(R h ,F h ,M,△P)≤△f lim (18)

[0061] Assume that the range of the independent variable X is f(X) is a nonlinear function with respect to X. f(X) is represented by a piecewise linearization (PWL) function. Let the number of partitions be m:

[0062]

[0063] Where c∈R 3 and b∈R are parameters to be determined. Assume that there are k ([R h ,F h ,M,△P],f(X)) form of function known points, in the range General The problem of fitting to f(X) is defined as:

[0064]

[0065] See also Figure 3 , a heuristic least squares piecewise linearization (PWL) method is used to deal with the linearization problem. Assuming the number of partitions is m = 3, we get:

[0066]

[0067] θ j =a 1,j R h +a 2,j M+a 3,j F h +a 4,j △P+a 5,j (twenty two)

[0068] In the formula, a 1,j、a 2,j 、a 3,j 、a 4,j 、a 5,j is the first-order linear coefficient obtained by the linearization algorithm;

[0069] definition:

[0070] t 1 =max{θ 1 ,θ 2},t 2 =max{t 1 ,θ 3} (twenty three)

[0071] In order to express the max function in linear form, a binary auxiliary variable σ is introduced 1 , σ 2 and a sufficiently large constant M', the frequency minimum point constraint formula (18) can be written as:

[0072]

[0073] The frequency safety constraint needs to be satisfied in all 24 time periods, so in the formula, t 1 ,t 2 ∈R 24 , σ 1 ,σ 2 ∈R 24 , the maximum frequency drop allowed by the system is △f lim is a given value; by combining formula (12)-formula (16), formula (22) and formula (24), the final frequency minimum point constraint formula (18) can be written as a linear form represented by a matrix:

[0074] B't+J'σ+f'≥0 (25)

[0075] Px+Ry+Bt+Jσ+f≥0 (26)

[0076] In the formula, t=[t 1 ,t 2 ] T ,σ=[σ 1 ,σ 2 ] T , where P, R, B, J, B', J' represent the coefficient matrices corresponding to the constraint condition (24), and f, f' represent the corresponding constant column vectors.

[0077] In this embodiment, in step S3, different constraint unit models are established according to the set constraint conditions, and a unit commitment model considering the four-variable frequency minimum point constraint is obtained.

[0078] Among them, the expression formula of the binary variable constraint model is:

[0079]

[0080] Formulas (27)-(29) specify the constraints that the three binary variables themselves must satisfy, where W init,g is the online status of the group at the initial time t=0; w gt and w g(t-1) are the 0-1 online variables of unit g at time t and t-1 respectively; u gt and v gt are the 0-1 startup and shutdown variables of unit g at time t; G is the set of all generator sets.

[0081] The expression formula of the generator shortest operation / stop time constraint model is:

[0082]

[0083] Where MUT g and MDT g They are the shortest operating time and shortest downtime of power generation respectively.

[0084] The expression formula of the generator set spinning reserve constraint model is:

[0085]

[0086] Where sup is the load spinning reserve rate, P max,g is the maximum output of unit g, D nt is the load of bus n at time t.

[0087] The expression formula of the generator set ramp limit constraint model is:

[0088]

[0089] In the formula, RU max,g is the climbing limit of unit g, RD max,g is the climbing and descending limit of unit g, P init,g is the output of group g at the initial time t=0;

[0090] The expression formula of the generator set output constraint model is:

[0091]

[0092] Where P max,g , P min,g are the maximum output and minimum output of unit g respectively;

[0093] The expression formula of the system power balance constraint model is:

[0094]

[0095] Where W wt is the output of fan w at time t, D nt is the load of bus n at time t, and the total power generation of the system is not less than the total load;

[0096] The expression formula of the power flow constraint model of the transmission line is:

[0097]

[0098] Where, FL max,l LSF is the maximum active power flow allowed by transmission line l. lg is the power transfer factor of the transmission line relative to the generator g, LSF ln is the load transfer factor of the transmission line relative to bus n, LSF lw is the power transfer factor of the transmission line relative to the wind turbine w. Formula (38) expresses the constraint on the active power flow of the transmission line in the form of an approximate DC power flow.

[0099] In this embodiment, in step S3, the specified constraint unit model is combined with the objective function to obtain a day-ahead unit commitment model, which is a mixed integer linear programming (MILP) model mathematically. The day-ahead unit commitment model is written in a compact form of matrix representation as follows:

[0100]

[0101] In the formula, c and b represent the corresponding cost coefficient vectors, x and y are optimization decision variables, and the specific expression is:

[0102]

[0103] Where N g is the total number of units, N T is the total number of time periods;

[0104] The day-ahead unit commitment model is combined with the frequency minimum point constraint model of the four variables shown in formulas (25)-(26), and the unit commitment model including the frequency minimum point constraint parameters of the four variables is obtained as follows:

[0105]

[0106] Wherein, the constraint Ex+Gy+Bt+Jσ+Dq≥h is obtained by combining the constraint Ex+Gy≥h in formula (26) and formula (39).

[0107] In this embodiment, in step S4, wind power is considered and the wind power output is represented by an uncertain set. In the robust unit commitment problem, the wind power uncertain set can be described from three aspects: output range, time smoothing effect, and spatial clustering effect. The wind power output is represented by an uncertain set as follows:

[0108]

[0109] Where W w,t is the wind power output value for dispatching decision, is the predicted value of wind power output, They are the upward and downward ranges of wind power fluctuation deviation from the predicted value; are the upward and downward adjustment factors of wind power output, which are binary variables, and q is a column vector composed of the two, i.e., an uncertain variable; Γ S is the space uncertainty budget, Γ T By budgeting for time uncertainty, conservatism can be controlled.

[0110] Among them, based on the above-mentioned wind power output uncertainty set and model (41), a two-stage robust (RO) model is constructed to find the day-ahead unit combination scheduling scheme with the minimum total cost when the uncertain variable q is in the worst scenario. The two-stage RO model is:

[0111]

[0112] in:

[0113] x=[w gt ,u gt ,v gt ] T , y = [p gt ] T (44)

[0114] The outer minimization is the first-stage problem, and the optimization variable is x; the inner maximum minimization is the second-stage problem, and the optimization variables are y and q. F(x,q) represents the feasible domain of the optimization variable y when a set of (x,q) is given, and its feasible domain is different under different uncertain variables q. For each given set of uncertain variables q, model (43) can be simplified into a deterministic optimization model, and the purpose of the max structure in the second-stage optimization problem of the two-stage RO model is to find the worst scenario that leads to the maximum operating cost.

[0115] In this embodiment, in step S5, the column and constraint generation (C&CG) algorithm is used to solve the above two-stage RO model, decouple the original problem, generate the main problem and the sub-problem for alternating solution. When solving the main problem, the variables and constraints related to the sub-problem are continuously added to the main problem, so as to obtain a more compact lower bound of the original objective function value and obtain a solution. The main problem and the sub-problem are respectively as shown in equation (45) and equation (46).

[0116]

[0117] In the formula, k represents the current number of iterations, y l represents the value of the subproblem after the lth iteration, Represents the value of the uncertain variable q in the worst scenario after the lth iteration.

[0118] The decoupled sub-problem model is:

[0119]

[0120] π is the dual variable corresponding to the constraint condition Ex+Gy+Bt+Jσ≥h-Dq, v and w are 0-1 auxiliary variables, and M' is a sufficiently large constant. The MILP form of the two-stage RO model is solved in Matlab using the Yalmip toolbox calling the Gurobi solver. The process is as follows Figure 4 shown.

[0121] See also Figure 5 , combined with specific implementation examples, the application effect of the technical solution of the present invention is analyzed:

[0122] First, the improved IEEE RTS24 node system is used as a test case to verify the effectiveness of the method proposed in this invention. The wiring diagram of the system is shown in Figure 5 As shown in Figure 1, it includes 26 thermal power units, 6 wind farms, 38 transmission lines and 2080MW peak load. There is a wind farm at each of nodes 3, 8, 12, 17, 19 and 21. It is assumed that the 6 wind farms are exactly the same. The day-ahead forecast value and fluctuation range of any wind farm output are as follows: Figure 6 , Figure 6 The two dotted lines in the middle are the fluctuation range of wind power output (15% above and below the predicted value), that is, the uncertainty range of wind power. The day-ahead predicted value of total load power is as follows: Figure 7 , the total wind power output forecast value peak value accounts for 31.2% of the load forecast value peak value. The frequency rating is set to f b =50Hz, the maximum allowable frequency drop is set to △f lim = 0.5Hz, with time uncertainty budget Γ S =4, spatial uncertainty budget Γ T= 6 as an example. In Matlab, the Yalmip toolbox is used to call the Gurobi solver to solve the example and obtain the day-ahead dispatch solution of 26 thermal power units.

[0123] Secondly, based on the system frequency response (SFR) model, a four-variable frequency minimum point constraint expression is obtained. The constraint is nonlinear with respect to the unit decision variables. Based on a heuristic least squares piecewise linearization (PWL) method, the four-variable frequency minimum point constraint is linearized.

[0124] Third, first establish a day-ahead unit combination model with the objective function of minimizing the total system cost. The constraints include binary variable related constraints, generator shortest running / downtime constraints, generator unit spinning standby constraints, generator unit climbing limit constraints, generator unit output constraints, system power balance constraints, and transmission line flow constraints. On this basis, a linearized four-variable frequency minimum point constraint is added to obtain a unit combination model that considers the four-variable frequency minimum point constraint.

[0125] Fourth, considering the uncertainty of wind power output, the wind power output is represented as an uncertainty set, and a two-stage robust optimization model is adopted to improve the model in the third step into a wind power uncertainty robust unit commitment model that considers the four-variable frequency minimum point constraint.

[0126] Fifth, the optimal solution of the model established in the first to fourth steps is used to obtain the day-ahead unit combination scheduling model, that is, to solve the model. For this two-stage RO model, the column and constraint generation (C&CG) algorithm is used to solve it, decouple the original problem, generate the main problem and sub-problems for alternating solution. When solving the main problem, the variables and constraints related to the sub-problems are continuously added to the main problem to obtain a more compact lower bound of the original objective function value and obtain the optimal solution. The final optimization results are shown in Tables 1, 2, and 3. In the spatial uncertain budget Γ S =4, time uncertainty budget Γ T =6, △P = maximum unit output ratio, comparing the models without frequency minimum point constraint, the models with three variables and the models with four variables, the frequency minimum point values ​​of 24 periods are shown in Table 1. It can be seen that in the case of no frequency minimum point constraint and the frequency minimum point constraint with three variables, the frequency minimum points of all periods are far less than 49.50Hz, and after adding the frequency minimum point constraint with four variables, they are all above 49.50Hz.

[0127] In order to verify that adding the frequency minimum constraint of four variables to the robust UC model will affect the dispatching solution of the largest unit in the unit output variable y, the model with the frequency minimum point constraint of three variables is compared with the model with the frequency minimum point constraint of four variables. The output of the largest unit (Unit 2 in this example) in the two dispatching schemes for 24 periods is listed in Table 2.

[0128] From Table 2, we can see that the 24 time periods p 2 The values ​​are all less than p 1 , indicating that after adding the frequency minimum point constraint of the four variables, the output of the largest unit (Unit 2 in this example result) in the unit output variable y is reduced, ensuring that the frequency minimum point of the system still meets the requirements after the sudden failure of the largest capacity unit at any time. In addition, the power generation costs of the three cases of no frequency minimum point constraint, three-variable frequency minimum point constraint and four-variable frequency minimum point constraint are compared, as shown in Table 3. After reducing the output of the largest capacity unit, the output of other smaller capacity units is used to compensate, and the total power generation cost increases from 316405 to 320878, an increase of only 1.4%.

[0129] Table 1: The lowest frequency value f when △P = maximum unit output ratio in three cases: no frequency minimum point constraint, three-variable frequency minimum point constraint, and four-variable frequency minimum point constraint 1 min 、f 2 min 、f 3 min contrast

[0130]

[0131] Table 2 Maximum output value p of a unit in two cases with frequency minimum point constraints of three variables and four variables 1 、p 2 contrast

[0132]

[0133] Table 3 Comparison of total power generation costs under three conditions

[0134]

[0135] In summary, the present invention constructs an objective function, wherein the objective function takes minimizing the total power generation cost of the power system as the goal; a frequency minimum point constraint model with four variables is obtained by using a system frequency response model, and the frequency minimum point constraint model is linearized by using a least squares piecewise linearization method; a specified constraint unit model is established according to the set constraint conditions, and the specified constraint unit model includes a binary variable constraint model, a generator shortest operation / downtime constraint model, a generator set spinning standby constraint model, a generator set climbing limit constraint model, a generator set output constraint model, a system power balance constraint model and a transmission line tide constraint model. The wind power output is represented as an uncertain set, and the obtained unit combination model including the four-variable frequency minimum point constraint parameter is converted into a wind power uncertainty robust unit combination model including the four-variable frequency minimum point constraint parameter according to the uncertain set; the wind power uncertainty robust unit combination model including the four-variable frequency minimum point constraint parameter is analyzed to obtain a unit combination day-ahead dispatching scheme that minimizes the total power generation cost of the power system. The present invention can ensure that the obtained dispatching scheme has strong frequency security, improves the wind power acceptance capacity, and has good robustness.

[0136] It should be noted that the method of the embodiment of the present disclosure can be performed by a single device, such as a computer or a server. The method of the present embodiment can also be applied in a distributed scenario and completed by multiple devices cooperating with each other. In the case of such a distributed scenario, one of the multiple devices can only perform one or more steps in the method of the embodiment of the present disclosure, and the multiple devices will interact with each other to complete the described method.

[0137] It should be noted that the above describes some embodiments of the present disclosure. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the above embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0138] Example 2

[0139] See also Figure 8 The embodiment of the present invention also provides a wind power uncertainty robust scheduling device considering four-variable frequency constraints, which adopts the wind power uncertainty robust scheduling method considering four-variable frequency constraints as described in any one of claims 1 to 9, including:

[0140] An objective function construction module 001 is used to construct an objective function, wherein the objective function aims to minimize the total power generation cost of the power system;

[0141] The first model processing module 002 is used to obtain a frequency minimum point constraint model with four variables by using the system frequency response model, and linearize the frequency minimum point constraint model by using a least squares piecewise linearization method;

[0142] The second model processing module 003 is used to establish a specified constraint unit model according to the set constraint conditions, wherein the specified constraint unit model includes a binary variable constraint model, a generator shortest operation / downtime constraint model, a generator set spinning standby constraint model, a generator set ramp limit constraint model, a generator set output constraint model, a system power balance constraint model and a transmission line power flow constraint model, and the specified constraint unit model is combined with the objective function and the frequency minimum point constraint model of the four variables to obtain a unit commitment model including the frequency minimum point constraint parameters of the four variables;

[0143] The third model processing module 004 is used to represent the wind power output as an uncertainty set, and convert the obtained unit commitment model including the four-variable frequency minimum point constraint parameter into a wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameter according to the uncertainty set;

[0144] The model analysis processing module 005 is used to analyze the wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameters to obtain a unit combination day-ahead dispatching plan that minimizes the total power generation cost of the power system.

[0145] It should be noted that the information interaction, execution process and other contents between the modules of the above-mentioned device are based on the same concept as the method embodiment in Example 1 of the present application, and the technical effects they bring are the same as those of the method embodiment of the present application. For specific contents, please refer to the description in the method embodiment shown in the previous part of the present application, and will not be repeated here.

[0146] Example 3

[0147] Embodiment 3 of the present invention provides a non-transitory computer-readable storage medium, in which program code for a robust scheduling method for wind power uncertainty considering four-variable frequency constraints is stored, and the program code includes instructions for executing the robust scheduling method for wind power uncertainty considering four-variable frequency constraints of embodiment 1 or any possible implementation thereof.

[0148] The computer-readable storage medium may be any available medium that can be accessed by a computer or a data storage device such as a server or a data center that includes one or more available media. The available medium may be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive (SSD)).

[0149] Example 4

[0150] Embodiment 4 of the present invention provides an electronic device, including: a memory and a processor;

[0151] The processor and the memory communicate with each other via a bus; the memory stores program instructions that can be executed by the processor, and the processor calls the program instructions to execute the wind power uncertainty robust scheduling method considering four-variable frequency constraints of Example 1 or any possible implementation thereof.

[0152] Specifically, the processor can be implemented by hardware or by software. When implemented by hardware, the processor can be a logic circuit, an integrated circuit, etc.; when implemented by software, the processor can be a general-purpose processor implemented by reading software codes stored in a memory. The memory can be integrated in the processor or can be located outside the processor and exist independently.

[0153] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instructions can be transmitted from a website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server or data center.

[0154] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, and optionally, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.

[0155] Although the present invention has been described in detail above by general description and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made on the basis of the present invention. Therefore, these modifications or improvements made on the basis of not departing from the spirit of the present invention all belong to the scope of protection claimed by the present invention.

Claims

1. A robust dispatching method for wind power uncertainty considering four-variable frequency constraints, characterized in that: include: constructing an objective function, wherein the objective function aims to minimize the total cost of power generation of the power system; A frequency minimum point constraint model with four variables is obtained by using a system frequency response model, and the frequency minimum point constraint model is linearized by using a least squares piecewise linearization method; Establishing a designated constraint unit model according to the set constraint conditions, the designated constraint unit model includes a binary variable constraint model, a generator shortest operation / downtime constraint model, a generator set spinning standby constraint model, a generator set climbing limit constraint model, a generator set output constraint model, a system power balance constraint model and a transmission line power flow constraint model, combining the designated constraint unit model with the objective function and the frequency minimum point constraint model of the four variables to obtain a unit combination model including the frequency minimum point constraint parameters of the four variables; The wind power output is represented as an uncertainty set, and according to the uncertainty set, the obtained unit commitment model including the four-variable frequency minimum point constraint parameter is converted into a wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameter; The wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameter is analyzed to obtain the unit combination day-ahead dispatching scheme that minimizes the total power generation cost of the power system. In the process of obtaining a four-variable frequency minimum point constraint model using the system frequency response model, the constraint expressions of frequency change rate, frequency minimum point and steady-state frequency deviation are derived by combining the transfer function of the system frequency response model: In the formula, f b is the rated frequency of the system, ΔP is the power disturbance of the system, T is the reheating time constant of the speed regulator, f lim , Δf lim , Δf ss,lim are the maximum allowable frequency change rate, the maximum frequency drop and the steady-state frequency deviation respectively; M, R h 、F h is the system average parameter; K g is the mechanical power gain of the generator g, R g is the per unit value of the regulation coefficient of the generator g, F g is the proportion of the steam turbine power generation of generator g, H g is half the inertia time constant of the generator g, D is the frequency regulation effect coefficient of the load; ω n ξ is t z Intermediate variable of parameter, t z is the moment when the frequency reaches the lowest point, t z By ω n and ξ are determined by the values; The power disturbance ΔP of the system is taken as the larger value of the output proportion of the maximum capacity unit at each moment and the 10% load; Assume that the function on the left side of the inequality sign of the frequency minimum point constraint formula (4) is f(X), where X = [R h ,F h ,M,ΔP] T ∈R 4 , the number of independent variables is four, and the frequency minimum point constraint model formula of the four variables is: Formula (17) is linearized.

2. The method for robust dispatching wind power under uncertainty considering four-variable frequency constraints according to claim 1, characterized in that: The expression of the objective function is: In the formula, TC is the total power generation cost of the system; T is the number of scheduling cycle periods; G is the set of all units in the system; C gt is the power generation cost of unit g in period t, expressed as: C gt =C u,g u gt +C d,g v gt +C f,g w gt +C m,g p gt (2) In the formula, C u,g is the startup cost of unit g, C d,g is the shutdown cost of unit g, C f,g is the fixed cost of operating unit g, C m,g is the output cost of unit g; u gt is the start-up mark of unit g, v gt is the shutdown mark of unit g, w gt is the online mark of unit g, p gt is a continuous decision variable, which represents the planned active power output of unit g in period t.

3. The method for robust dispatching wind power under uncertainty considering four-variable frequency constraints according to claim 2 is characterized in that: Using the system average parameters M, R h 、F h It is linearly proportional to the number of online units at each moment, and formulas (6), (7), (8) are rewritten as: The system power disturbance ΔP is taken as the larger value of the output proportion of the maximum capacity unit at each moment and the 10% load. The formula for determining the system power disturbance ΔP is: and, x=[w gt ,u gt ,v gt ] T ,y=[p gt ] T (16) Where D nt is the load of bus n at time t.

4. The method for robust dispatching wind power under uncertainty considering four-variable frequency constraints according to claim 3 is characterized in that: In the process of linearizing the frequency minimum point constraint model using a least squares piecewise linearization method; The frequency minimum point constraint is expressed as: f(X)=f(R h ,F h ,M,ΔP)≤Δf lim (18) Assume that the range of the independent variable X is f(X) is a nonlinear function with respect to X. f(X) is represented by a piecewise linearized PWL function. Let the number of partitions be m: Where c∈R 3 and b∈R are parameters to be determined. Assume that there are k ([R h ,F h ,M,ΔP],f(X)) form of function known point, in the range General The problem of fitting to f(X) is defined as: Assuming the number of partitions is m=3, we get: θ j =a 1,j R h +a 2,j M+a 3,j F h +a 4,j ΔP+a 5,j (22) In the formula, a 1,j 、a 2,j 、a 3,j 、a 4,j 、a 5,j is the first-order linear coefficient obtained by the linearization algorithm; definition: t1=max{θ1,θ2},t2=max{t1,θ3} (23) By introducing binary auxiliary variables σ1, σ2 and constant M', the frequency minimum point constraint formula (18) can be written as: Where t1,t2∈R 24 ,σ1,σ2∈R 24 , the maximum frequency drop allowed by the system is Δf lim is a given value; The final frequency minimum point constraint (18) is expressed in a linear form as a matrix: B't+J'σ+f'≥0 (25) Px+Ry+Bt+Jσ+f≥0 (26) Where t = [t1, t2] T ,σ=[σ1,σ2] T , where P, R, B, J, B', J' represent the coefficient matrices corresponding to the constraint condition (24), and f, f' represent the corresponding constant column vectors.

5. The method for robust dispatching wind power under uncertainty considering four-variable frequency constraints according to claim 4 is characterized in that: The expression formula of the binary variable constraint model is: Where W init,g is the online status of the group at the initial time t=0; w gt and w g(t-1) are the 0-1 online variables of unit g at time t and t-1 respectively; u gt and v gt is the 0-1 startup variable and shutdown variable of unit g at time t; G is the set of all generator sets; The expression formula of the generator shortest operation / stop time constraint model is: Where MUT g and MDT g They are the minimum operating time and minimum downtime of power generation, respectively; The expression formula of the generator set spinning reserve constraint model is: Where sup is the load spinning reserve rate, P max,g is the maximum output of unit g.

6. The method for robust dispatching wind power under uncertainty considering four-variable frequency constraints according to claim 5 is characterized in that: The expression formula of the generator set ramp limit constraint model is: In the formula, RU max,g is the climbing limit of unit g, RD max,g is the climbing and descending limit of unit g, P init,g is the output of group g at the initial time t=0; The expression formula of the generator set output constraint model is: Where P max,g , P min,g are the maximum output and minimum output of unit g respectively; The expression formula of the system power balance constraint model is: Where W wt is the output of fan w at time t, D nt is the load of bus n at time t, and the total power generation of the system is not less than the total load; The expression formula of the transmission line power flow constraint model is: Where FL max,l is the maximum active power flow allowed by transmission line l, LSF lg is the power transfer factor of the transmission line relative to the generator g, LSF ln is the load transfer factor of the transmission line relative to bus n, LSF lw is the power transfer factor of the transmission line relative to the wind turbine w.

7. The method for robust dispatching wind power under uncertainty considering four-variable frequency constraints according to claim 6 is characterized in that: The specified constraint unit model is combined with the objective function to obtain the day-ahead unit combination model. The day-ahead unit combination model is expressed in a compact form as follows: In the formula, c and b represent the corresponding cost coefficient vectors, x and y are optimization decision variables, and the specific expression is: Where N g is the total number of units, N T is the total number of time periods; The day-ahead unit commitment model is combined with the frequency minimum point constraint model of the four variables to obtain the unit commitment model including the frequency minimum point constraint parameters of the four variables: Where q is a column vector composed of the two, that is, an uncertain variable; the constraint Ex+Gy+Bt+Jσ+Dq≥h is obtained by combining the constraint Ex+Gy≥h in formula (26) and formula (39).

8. The method for robust dispatching wind power under uncertainty considering four-variable frequency constraints according to claim 7, characterized in that: The wind power output is expressed as an uncertain set: Where W w,t is the wind power output value for dispatching decision, is the predicted value of wind power output, They are the upward and downward ranges of wind power fluctuation deviation from the predicted value; are the upward and downward adjustment factors of wind power output, which are binary variables; Γ S is the space uncertainty budget, Γ T budget uncertainty for time; The unit commitment model including the four-variable frequency minimum point constraint parameters obtained according to the uncertainty set is converted into a wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameters as expressed by: Where: x=[w gt ,u gt ,v gt ] T ,y=[p gt ] T (44) F(x,q) represents the feasible region for optimizing the variable y given a set (x,q).

9. A wind power uncertainty robust dispatching device considering four-variable frequency constraints, adopting a wind power uncertainty robust dispatching method considering four-variable frequency constraints as claimed in any one of claims 1 to 8, characterized in that: include: An objective function building module, used for building an objective function, wherein the objective function aims to minimize the total power generation cost of the power system; A first model processing module is used to obtain a frequency minimum point constraint model with four variables by using a system frequency response model, and linearize the frequency minimum point constraint model by using a least squares piecewise linearization method; The second model processing module is used to establish a specified constraint unit model according to the set constraint conditions, wherein the specified constraint unit model includes a binary variable constraint model, a generator shortest operation / downtime constraint model, a generator set spinning standby constraint model, a generator set ramp limit constraint model, a generator set output constraint model, a system power balance constraint model and a transmission line power flow constraint model, and the specified constraint unit model is combined with the objective function and the frequency minimum point constraint model of the four variables to obtain a unit commitment model including the frequency minimum point constraint parameters of the four variables; A third model processing module is used to represent the wind power output as an uncertainty set, and convert the obtained unit commitment model including the four-variable frequency minimum point constraint parameter according to the uncertainty set into a wind power uncertainty robust unit commitment model including the four-variable frequency minimum point constraint parameter; The model analysis processing module is used to analyze the wind power uncertainty robust unit combination model including the four-variable frequency minimum point constraint parameters to obtain the unit combination day-ahead dispatching plan that minimizes the total power generation cost of the power system.

Citation Information

Patent Citations

  • Unit commitment optimization method considering dynamic frequency constraint under wind power integration

    CN112803486A

  • High-proportion wind power system optimization scheduling method considering air-conditioning load and frequency response

    CN113078639A

  • Linear frequency lowest point constraint obtaining method and device based on support vector machine

    CN114896858A

  • Frequency security constraint scheduling method with wind power frequency response support and analysis device

    CN115579907A

  • Unit commitment method considering security region of wind turbine generator with frequency response control

    US20230113872A1