Method, device, equipment and medium for increasing capacity of thermal power unit

By obtaining new energy production simulation data, determining the probability and time period of continuous small output of new energy, gradually increasing the capacity of thermal power units, solving the problem of waste of resources caused by excessive capacity increase and inability to accurately determine the capacity increase, achieving the optimal The capacity configuration of thermal power units improves the economy and reliability of the power system.

CN117996841BActive Publication Date: 2024-12-06EAST CHINA BRANCH OF STATE GRID CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311542421.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-17
Publication Date
2024-12-06
Estimated Expiration
2043-11-17

AI Technical Summary

Technical Problem

In the prior art, the method of increasing the capacity of thermal power units leads to waste of resources and the inability to accurately determine the capacity of thermal power, especially when a large amount of power shortage caused by continuous small output of new energy, the energy storage and storage equipment is limited and difficult to be effective. Alleviate supply inadequate.

Method used

By obtaining the basic data set of new energy production simulation in the target area, counting the power shortage, determining the probability and period of continuous small output of new energy, using the preset step length to increase the thermal power unit capacity, performing production simulation calculations until the power shortage is required Changes to reach the target power, calculate and output the thermal power unit to increase the capacity.

Benefits of technology

From the perspective of probability statistics, analyzing the frequency of continuous small output of new energy, providing artificially controllable and measurable evaluation methods, avoiding excessive configuration of unit capacity and waste of resources, achieving optimal thermal power unit capacity configuration, and improving the power system Economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117996841B_ABST
    Figure CN117996841B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of new energy power management, and proposes a method, device, equipment and medium for increasing the capacity of a thermal power unit, wherein the method includes: obtaining a basic data set of production simulation of new energy in the target area throughout the year; performing production simulation calculations and counting the power shortage throughout the year; determining the probability of continuous low output of new energy according to the time series output data of new energy and the power shortage throughout the year; determining the period of continuous low output of new energy and the target power required to improve the power shortage according to the probability of continuous low output of new energy; increasing the capacity of the thermal power unit with a preset step length, and using the increased capacity of the thermal power unit to perform production simulation calculations, counting the changes in the power shortage during the period of continuous low output of new energy, until the change in the power shortage reaches the target power; calculating and outputting the increased capacity of the thermal power unit. This technical solution avoids excessive configuration of unit capacity and waste of resources.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present application relates to the field of new energy power management technology, and in particular to a method, device, equipment and medium for increasing the capacity of a thermal power unit. [Background technology]

[0002] As the construction of new power systems progresses, the penetration rate of new energy sources continues to increase, and the power and electricity balance characteristics of power systems have undergone major changes. In this context, ensuring reliable power supply and ensuring the effective consumption of new energy sources are the top priorities of the planning of power grids, power sources and other systems. In order to ensure the power and electricity balance of the system under the new situation, planning decision-making agencies often need to carry out production simulation calculations with long time scales and fine time granularity in combination with the planning target boundaries. At present, production simulation technology generally searches for feasible solutions within the established research time scale and granularity, based on goals such as economy or optimal consumption of new energy sources, and considers the complex operation constraints of sources, networks, loads and storages, and finally feedbacks the operating status of sources, networks, loads and storages at each moment. Production simulation technology can reflect the power balance status of the system at each hour, fully expose the shortage of power supply, summarize and count the monthly and annual power balance status, and accurately locate the distribution period and dominant factors of power shortage.

[0003] Based on the power supply security issues reflected by the production simulation calculation results, sensitivity analysis can be carried out and improvement measures can be proposed. Generally, for the problem of power shortage, power transfer can be achieved by adding pumped storage, energy storage and other equipment to fill the gap. However, for a large number of long-term power shortages caused by factors such as continuous low output of new energy, pumped storage and energy storage are often difficult to effectively alleviate the problem of insufficient supply due to the limitation of working hours or overall capacity. At this time, conventional units such as thermal power can be added to fill the power shortage. At present, the unit capacity increase method based on production simulation technology generally adds sufficient units for the power shortage to maximize the solution to the problem of insufficient supply. However, this will lead to excessive resource allocation and poor economic benefits; at the same time, due to the randomness of new energy output, the power shortage caused by it is also random, so excessive configuration of conventional units to deal with small or extremely small probability power shortages will further deteriorate the economic efficiency of the planning scheme, which is also inconsistent with the development route of the new power system. [Summary of the invention]

[0004] The embodiments of the present application provide a method, device, equipment and medium for increasing the capacity of a thermal power unit, aiming to solve technical problems in related technologies such as waste of resources caused by excessive increase in unit capacity and inability to accurately determine the increased capacity.

[0005] In a first aspect, an embodiment of the present application provides a method for increasing the capacity of a thermal power unit, comprising:

[0006] Acquire a basic data set of new energy production simulation for the target area throughout the year, wherein the basic data set of production simulation includes the new energy time series output data and other source-grid-load-storage calculation boundary data for the target area throughout the year;

[0007] Perform production simulation calculations based on the production simulation basic data set to calculate the annual power shortage situation;

[0008] Determine the probability of a continuous low output of new energy according to the new energy time-series output data and the annual power shortage situation;

[0009] According to the probability of occurrence of continuous low output of the new energy, determine the time period of occurrence of continuous low output of the new energy and the target power required to improve the power shortage;

[0010] Increasing the capacity of the thermal power unit with a preset step length, and using the increased capacity of the thermal power unit to perform production simulation calculations, and counting the change in the power shortage during the period when the renewable energy continuously has a small output, until the change in the power shortage reaches the target power;

[0011] Calculate and output the additional capacity of thermal power units.

[0012] In one embodiment, optionally, the new energy time-series output data includes wind power output data and photovoltaic output data, and the data structure is a series, and the other source-grid-load-storage calculation boundary data includes at least one of the following: thermal power data, hydropower data, nuclear power data, pumped storage data, energy storage data, load data, interconnection line technical parameter data, as well as spare capacity data and network topology data.

[0013] In one embodiment, optionally, determining the probability of occurrence of a continuous low output of new energy sources according to the new energy time-series output data and the annual power shortage situation includes:

[0014] Based on the new energy time series output data, starting from the first moment of the year, the frequency and probability of the occurrence of continuous low output of new energy for h hours within the 8760 hours of the whole year are traversed and counted to obtain the probability set of continuous low output of new energy.

[0015] In one embodiment, optionally, the following formula is used to obtain the probability set of occurrence of continuous low output of the new energy source:

[0016]

[0017]

[0018]

[0019] P={p1,p2,…,p h ,…}

[0020] Among them, r t+τ represents the output of new energy at the time t+τ; k represents the criterion for determining low output of new energy; h represents the statistical range of continuous low output; x t Indicates the occurrence flag of new energy small output from time t to time t+h, which is 1 or 0, representing the occurrence or non-occurrence of this situation respectively; f h and p h They represent the frequency and probability of the occurrence of low output of renewable energy for h consecutive hours, and P represents p h The probability set of continuous small output of new energy is formed.

[0021] In one embodiment, optionally, according to the probability of occurrence of the continuous low output of the new energy, determining the time period of occurrence of the continuous low output of the new energy and the target power required to improve the power shortage includes:

[0022] Find the target new energy continuous low output situation with a probability greater than a preset probability from the new energy continuous low output occurrence probability set, and determine the corresponding new energy continuous low output occurrence time period;

[0023] According to the time period when the new energy source has continuous low output and the preset power shortage improvement standard, the target power quantity required to improve the power shortage is determined.

[0024] In one embodiment, optionally, the capacity of the thermal power unit is increased with a preset step size, and the increased capacity of the thermal power unit is used to perform production simulation calculations, and statistics are kept on the change of the power shortage during the period when the new energy source has a continuous low output, until the change of the power shortage reaches the target power, including:

[0025] Increasing the capacity of the thermal power unit with a preset step size, and updating the production simulation basic data set;

[0026] Use the updated production simulation basic data set to perform production simulation calculations to obtain updated annual power shortage conditions;

[0027] Determine the power shortage change value between the updated power and the original power during the period of continuous low output of the new energy;

[0028] When the power shortage change value does not reach the target power, the capacity of the thermal power unit continues to be increased at a preset step size until the power shortage change reaches the target power.

[0029] In one embodiment, optionally, calculating and outputting the additional capacity of the thermal power unit includes:

[0030] Counting the number of times the capacity of the thermal power unit is increased;

[0031] According to the number of increases and the preset step length, the additional capacity of the thermal power unit is determined and output, wherein the additional capacity of the thermal power unit is equal to the product of the number of increases and the preset step length.

[0032] In a second aspect, an embodiment of the present application provides a device for increasing the capacity of a thermal power unit, comprising:

[0033] An acquisition module, used to acquire a target power grid line diagram;

[0034] A simplification module, used to simplify and abstract the target power grid circuit diagram according to preset simplification and abstraction rules to obtain a simplified circuit diagram;

[0035] A first determination module is used to determine, for a fault current calculation task, a first weight calculation function corresponding to each line in the simplified line diagram, so as to obtain a fault calculation adjacency matrix corresponding to the simplified line diagram;

[0036] A second determination module is used to determine, for a fixed value setting calculation task, a second weight calculation function to determine a second weight value corresponding to each line in the simplified line diagram, so as to obtain a fixed value setting calculation adjacency matrix corresponding to the simplified line diagram;

[0037] A first calculation module, used for calculating the first modularity evaluation quality value of each node in the simplified circuit diagram under different partition conditions according to the fault calculation adjacency matrix and the graph group detection modularity calculation formula;

[0038] A second calculation module is used to calculate the second modularity evaluation quality value of each node in the simplified circuit diagram under different partition conditions according to the fixed value setting calculation adjacency matrix and the graph group detection modularity calculation formula;

[0039] The third calculation module is used to determine the first grid node partition result corresponding to the fault current calculation task according to the first modularity evaluation quality value, and determine the second grid node partition result corresponding to the constant value setting calculation task according to the second modularity evaluation quality value, so as to calculate the corresponding fault current calculation result and constant value setting calculation result according to the first grid node partition result and the second grid node partition result.

[0040] In a third aspect, a computer device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned method for increasing the capacity of a thermal power unit when executing the computer program.

[0041] In a fourth aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned method for increasing the capacity of a thermal power unit are implemented.

[0042] In the scheme implemented by the above thermal power unit capacity increase method, device, equipment and medium, a production simulation basic data set of new energy for the whole year of the target area is obtained, wherein the production simulation basic data set includes the new energy time series output data of the target area for the whole year and other source network load storage calculation boundary data; production simulation calculation is performed according to the production simulation basic data set to count the power shortage situation throughout the year; according to the new energy time series output data and the power shortage situation throughout the year, the probability of continuous low output of new energy is determined; according to the probability of continuous low output of new energy, the time period of continuous low output of new energy and the target power required to improve the power shortage are determined; the capacity of the thermal power unit is increased with a preset step size, and the increased capacity of the thermal power unit is used to perform production simulation calculation, and the change of power shortage in the time period of continuous low output of new energy is counted until the change of power shortage reaches the target power; the increased capacity of the thermal power unit is calculated and output. In the present invention, combined with production simulation technology and considering the natural properties of new energy, the optimal thermal power unit capacity configuration scheme can be determined in combination with the power shortage problem under a specific probability. This method analyzes the frequency of continuous low output of renewable energy from a probabilistic and statistical perspective, and provides a human-controllable and measurable evaluation method to guide power supply planning, thus avoiding excessive configuration of unit capacity and waste of resources.

Brief Description of the Drawings

[0043] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0044] Figure 1 A schematic flow chart of a method for increasing the capacity of a thermal power unit according to an embodiment of the present application is shown.

[0045] Figure 2 A schematic flow chart of step S105 in a method for increasing the capacity of a thermal power unit according to an embodiment of the present application is shown.

[0046] Figure 3 A normalized wind power output curve for the whole year in Province A according to an embodiment of the present application is shown.

[0047] Figure 4 A normalized photovoltaic output curve for the whole year in Province A according to an embodiment of the present application is shown.

[0048] Figure 5 A schematic diagram showing the frequency of no output of new energy in various time periods according to an embodiment of the present application is shown.

[0049] Figure 6 A schematic diagram showing the probability of no output of new energy in various time periods according to an embodiment of the present application is shown.

[0050] Figure 7 A block diagram of a device for increasing the capacity of a thermal power unit according to an embodiment of the present application is shown.

[0051] Figure 8 A schematic structural diagram of a computer device according to an embodiment of the present application is shown.

[0052] Fig. 9 Another structural schematic diagram of a computer device according to an embodiment of the present application is shown. [Specific implementation method]

[0053] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0054] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0055] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0056] In conjunction with the accompanying drawings, some embodiments of the present application are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0057] See also Figure 1 , Figure 1 A schematic flow chart of a method for increasing the capacity of a thermal power unit according to an embodiment of the present application is shown. The method for increasing the capacity of a thermal power unit is used to solve technical problems in related technologies such as waste of resources caused by excessive capacity increase of the unit and inability to accurately determine the increased capacity.

[0058] like Figure 1 As shown, according to a method for increasing the capacity of a thermal power unit according to an embodiment of the present application, the process includes:

[0059] Step S101, obtaining a production simulation basic data set of new energy in the target area throughout the year, wherein the production simulation basic data set includes the target area's new energy time series output data and other source-grid-load-storage calculation boundary data throughout the year;

[0060] In one embodiment, optionally, the new energy time-series output data includes wind power output data and photovoltaic output data, and the data structure is a series, and the other source-grid-load-storage calculation boundary data includes at least one of the following: thermal power data, hydropower data, nuclear power data, pumped storage data, energy storage data, load data, interconnection line technical parameter data, as well as spare capacity data and network topology data.

[0061] The data sampling period may be 1 hour.

[0062] Step S102, performing production simulation calculations based on the production simulation basic data set to calculate the power shortage situation throughout the year;

[0063] Based on the production simulation basic data set, production simulation calculations were carried out to count the power shortages throughout the year and displayed in the form of an 8760-hour curve as follows:

[0064] e=[e1,e2,…,e t ,e t+1 ,…,e 8760 ] (1)

[0065] In the formula, e t is the power shortage of the system at time t; e is e t Arrange the numbers in order of time.

[0066] Step S103, determining the probability of a continuous low output of new energy according to the new energy time series output data and the annual power shortage situation;

[0067] Set h to 1, 2, ..., 720, etc., and based on the renewable energy time series output data, start from the first moment and traverse and count the frequency and probability of renewable energy low output for h consecutive hours within the range of 8760 hours, as shown in formulas (2)-(5):

[0068]

[0069]

[0070]

[0071] P={p1,p2,…,p h ,…} (5)

[0072] Among them, r t+τ represents the output of new energy at the time t+τ; k represents the criterion for determining low output of new energy; h represents the statistical range of continuous low output; x tIndicates the occurrence flag of new energy small output from time t to time t+h, which is 1 or 0, representing the occurrence or non-occurrence of this situation respectively; f h and p h They represent the frequency and probability of the occurrence of low output of renewable energy for h consecutive hours, and P represents p h The probability set of continuous small output of new energy is formed.

[0073] Step S104, determining the time period of continuous low output of new energy and the target power required to improve the power shortage according to the probability of continuous low output of new energy;

[0074] In one embodiment, optionally, step S104 includes:

[0075] Find out the target new energy continuous low output situation with a probability greater than a preset probability from the new energy continuous low output occurrence probability set, and determine the corresponding new energy continuous low output occurrence time period;

[0076] According to the time period when the new energy source has continuous low output and the preset electricity shortage improvement standard, the target electricity quantity required to improve the electricity shortage is determined.

[0077] Based on the probability set P of continuous low output of new energy and the experience of experts, the power shortage problem to be solved is selected. Taking the probability of continuous low output of new energy for a hours as b% as an example, it is necessary to count the time period Ω corresponding to the continuous low output of new energy for a hours h | h=a , as shown in formula (6):

[0078] Ω h | h=a ={1-5,500-504,7604-7608,…} (6)

[0079] At the same time, the time period Ω needs to be set h | h=6 The target α for improving the power shortage is, for example, if the power shortage needs to be reduced by 50%, α is 0.5.

[0080] Step S105, increasing the capacity of the thermal power unit with a preset step length, and using the increased capacity of the thermal power unit to perform production simulation calculations, and counting the change in the power shortage during the period when the new energy continuously has a small output, until the change in the power shortage reaches the target power;

[0081] like Figure 2 As shown, in one embodiment, optionally, step S105 includes:

[0082] Step S201, increasing the capacity of the thermal power unit with a preset step length, and updating the production simulation basic data set;

[0083] Step S202, using the updated production simulation basic data set to perform production simulation calculations to obtain updated annual power shortage conditions;

[0084] Step S203, determining the power shortage change value between the updated power and the original power during the period of continuous low output of the new energy source;

[0085] Step S204: when the power shortage change value does not reach the target power, continue to increase the capacity of the thermal power unit at a preset step size until the power shortage change reaches the target power.

[0086] With a fixed step size, such as 50MW, the capacity of the thermal power unit is increased and the basic data set is updated. The production simulation calculation is carried out again to calculate Ω h If the internal power shortage is improved and the established target α is reached, jump to step S106; otherwise, continue to increase the capacity of the thermal power unit and perform production simulation calculation again until the target α is reached.

[0087] Step S106, calculating and outputting the additional capacity of the thermal power unit.

[0088] In one embodiment, optionally, step S106 includes:

[0089] Counting the number of times the capacity of the thermal power unit is increased;

[0090] According to the number of increases and the preset step length, the additional capacity of the thermal power unit is determined and output, wherein the additional capacity of the thermal power unit is equal to the product of the number of increases and the preset step length.

[0091] In this embodiment, the additional capacity of the thermal power unit can be determined according to the product of the number of times the capacity of the thermal power unit is increased and the preset step size. In this way, the additional capacity of the thermal power unit is the optimal configuration plan to deal with the power gap caused by continuous small output of new energy under a specific probability.

[0092] The above technical solution of the present invention is described in detail below with a specific embodiment.

[0093] Taking Province A in the 2030 planning of the Northwest Power Grid as an example, statistics are collected on the situation of long-term continuous low output of renewable energy, and the power gap is made up by increasing the allocation of thermal power. Figure 3 and Figure 4 shown.

[0094] In Province A, the wind power output is less than 0.1 (output as a percentage of installed capacity) in the 1 hour, 2 hours, 3 hours to 720 hours period, and the frequency of photovoltaic power output is as follows: Figure 5 As shown, the corresponding probability is Figure 6As shown. It can be found that the main distribution period of the probability of low wind power output is in the range of [1,20] hours, with the maximum continuous no output of 44 hours; because there is no light at night, photovoltaic power generation has a periodic no output phenomenon, because the photovoltaic no output is significantly higher than the low wind power output, the main distribution period is in the range of [1,15] hours; the probability distribution corresponding to the situation of low wind power output and photovoltaic no output is similar to the probability distribution corresponding to the situation of low wind power output, but significantly lower than the probability level corresponding to the latter. In this case, the main distribution period is in the range of [1,13] hours.

[0095] Judging from the corresponding probability levels in each time period, the probability of low wind or no output within 1 hour is the highest, about 6.5%, the probability of low wind or no output for 5 consecutive hours is about 2%, the probability of low wind or no output for 7 consecutive hours is about 1%, and the probability of low wind or no output for 10 consecutive hours is about 0.3%.

[0096] Taking the probability of 2% of new energy output for 5 consecutive hours as the control condition, the corresponding situation shows that the power shortage is about 1157GWh. If the thermal power capacity increases by 5000MW, the power shortage will drop to 585GWh, about 50% of the basic solution. If it increases by 12000MW, the power shortage will drop to 274GWh, about 25% of the basic solution. If it increases by 20000MW, the power shortage will drop to 70GWh, about 5% of the basic solution. Therefore, if the power gap improvement targets are 0.5, 0.25, and 0.05 respectively, 5000, 12000, and 20000MW of thermal power will be required respectively.

[0097] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0098] Figure 7 A block diagram of a device for increasing the capacity of a thermal power unit according to an embodiment of the present application is shown.

[0099] like Figure 7 As shown, in a second aspect, an embodiment of the present application provides a thermal power unit capacity increasing device 70, comprising:

[0100] An acquisition module 71 is used to acquire a production simulation basic data set of new energy in a target area throughout the year, wherein the production simulation basic data set includes the target area's new energy time series output data and other source-grid-load-storage calculation boundary data throughout the year;

[0101] A calculation module 72, configured to perform production simulation calculations based on the production simulation basic data set and calculate the annual power shortage situation;

[0102] The first determination module 73 is used to determine the probability of a continuous low output of new energy according to the new energy time series output data and the annual power shortage situation;

[0103] The second determination module 74 is used to determine the period of occurrence of continuous low output of new energy and the target power required to improve the power shortage according to the probability of occurrence of continuous low output of new energy;

[0104] The processing module 75 is used to increase the capacity of the thermal power unit with a preset step size, and use the increased capacity of the thermal power unit to perform production simulation calculations, and count the changes in the power shortage during the period when the new energy source has a continuous low output, until the change in the power shortage reaches the target power;

[0105] The output module 76 is used to calculate and output the additional capacity of the thermal power unit.

[0106] In one embodiment, optionally, the new energy time-series output data includes wind power output data and photovoltaic output data, and the data structure is a series, and the other source-grid-load-storage calculation boundary data includes at least one of the following: thermal power data, hydropower data, nuclear power data, pumped storage data, energy storage data, load data, interconnection line technical parameter data, as well as spare capacity data and network topology data.

[0107] In one embodiment, optionally, the first determining module is used to:

[0108] Based on the new energy time series output data, starting from the first moment of the year, the frequency and probability of the occurrence of continuous low output of new energy for h hours within the 8760 hours of the whole year are traversed and counted to obtain the probability set of continuous low output of new energy.

[0109] In one embodiment, optionally, the following formula is used to obtain the probability set of occurrence of continuous low output of the new energy source:

[0110]

[0111]

[0112]

[0113] P={p1,p2,…,p h ,…}

[0114] Among them, r t+τ represents the output of new energy at the time t+τ; k represents the criterion for determining low output of new energy; h represents the statistical range of continuous low output; x t Indicates the occurrence flag of new energy small output from time t to time t+h, which is 1 or 0, representing the occurrence or non-occurrence of this situation respectively; fh and p h They represent the frequency and probability of the occurrence of low output of renewable energy for h consecutive hours, and P represents p h The probability set of continuous small output of new energy is formed.

[0115] In one embodiment, optionally, the second determining module includes:

[0116] A time period determination unit, used to find out the target new energy continuous low output situation with a probability greater than a preset probability from the new energy continuous low output occurrence probability set, and determine the corresponding new energy continuous low output occurrence time period;

[0117] The power determination unit is used to determine the target power required to improve the power shortage according to the period of continuous low output of the new energy and the preset power shortage improvement standard.

[0118] In one embodiment, optionally, the processing module includes:

[0119] An updating unit, used for increasing the capacity of the thermal power unit with a preset step size and updating the production simulation basic data set;

[0120] A calculation unit, used for performing production simulation calculation using the updated production simulation basic data set to obtain an updated annual power shortage situation;

[0121] A change determination unit, used to determine a power shortage change value between the updated power and the original power during a period of continuous low output of the new energy;

[0122] The increment unit is used to continue to increase the capacity of the thermal power unit at a preset step size when the change value of the power shortage does not reach the target power until the change of the power shortage reaches the target power.

[0123] In one embodiment, optionally, the output module includes:

[0124] A statistical unit, used for counting the number of times the capacity of the thermal power unit is increased;

[0125] The output unit is used to determine and output the increased capacity of the thermal power unit according to the number of increases and the preset step length, wherein the increased capacity of the thermal power unit is equal to the product of the number of increases and the preset step length.

[0126] For the specific definition of the thermal power unit capacity increase device, please refer to the definition of the thermal power unit capacity increase method mentioned above, which will not be repeated here. Each module in the above-mentioned thermal power unit capacity increase device can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0127] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 8 As shown. The computer device includes a processor, a memory, a network interface and a database connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile and / or volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external client via a network connection. When the computer program is executed by the processor, the functions or steps on the service side of a method for increasing the capacity of a thermal power unit are realized.

[0128] In one embodiment, a computer device is provided. The computer device may be a client, and its internal structure diagram may be as follows: Fig. 9 As shown. The computer device includes a processor, a memory, a network interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external server through a network connection. When the computer program is executed by the processor, the functions or steps on the client side of a method for increasing the capacity of a thermal power unit are realized.

[0129] It should be understood that the processor may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. Among them, the general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.

[0130] The computer device of the embodiment of the present application exists in various forms, including but not limited to:

[0131] (1) Mobile communication devices: These devices are characterized by their mobile communication functions and their main purpose is to provide voice and data communications. These terminals include: smart phones (such as iPhone), multimedia phones, functional phones, and low-end phones.

[0132] (2) Ultra-mobile personal computer devices: These devices fall into the category of personal computers, have computing and processing capabilities, and generally also have mobile Internet access features. These terminals include: PDA, MID and UMPC devices, such as iPad.

[0133] (3) Portable entertainment devices: These devices can display and play multimedia content. They include audio and video players (such as iPods), handheld game consoles, e-books, as well as smart toys and portable car navigation devices.

[0134] (4) Server: A device that provides computing services. The server consists of a processor, hard disk, memory, system bus, etc. The server is similar to a general computer architecture, but because it needs to provide highly reliable services, it has higher requirements in terms of processing power, stability, reliability, security, scalability, and manageability.

[0135] (5) Other electronic devices with data interaction functions.

[0136] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the method described in the first aspect of the embodiment is implemented when the processor executes the computer program.

[0137] It should be noted that the above functions or steps that can be implemented by the computer-readable storage medium or electronic device can refer to the relevant description in the aforementioned method embodiment. To avoid repetition, they will not be described one by one here.

[0138] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0139] It should be understood that, although the terms first, second, etc. may be used to describe the setting unit in the embodiments of the present application, these setting units should not be limited to these terms. These terms are only used to distinguish the setting units from each other. For example, without departing from the scope of the embodiments of the present application, the first setting unit may also be referred to as the second setting unit, and similarly, the second setting unit may also be referred to as the first setting unit.

[0140] The word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.

[0141] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0142] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional units.

[0143] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0144] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A method for increasing the capacity of a thermal power unit, characterized in that: The method comprises: Obtaining a production simulation basic data set of new energy for the entire year in the target area, wherein the production simulation basic data set includes the target area's annual new energy time-series output data and other source-grid-load-storage calculation boundary data, the new energy time-series output data includes wind power output data and photovoltaic output data, and the data structure is a series, and the other source-grid-load-storage calculation boundary data includes at least one of the following: thermal power data, hydropower data, nuclear power data, pumped storage data, energy storage data, load data, tie line technical parameter data, and spare capacity data and network topology data; Perform production simulation calculations based on the production simulation basic data set to calculate the annual power shortage situation; Determine the probability of a continuous low output of new energy according to the new energy time-series output data and the annual power shortage situation; According to the probability of occurrence of continuous low output of the new energy, determine the time period of occurrence of continuous low output of the new energy and the target power required to improve the power shortage; Increasing the capacity of the thermal power unit with a preset step length, and using the increased capacity of the thermal power unit to perform production simulation calculations, and counting the change in the power shortage during the period when the renewable energy continuously has a small output, until the change in the power shortage reaches the target power; Calculate and output the additional capacity of thermal power units; Wherein, according to the new energy time-series output data and the annual power shortage situation, the probability of the occurrence of the continuous low output of new energy is determined, including: Based on the new energy time series output data, the frequency and probability of the occurrence of continuous h hours of new energy low output within the range of 8760 hours throughout the year are traversed and counted from the first moment of the year, and the probability set of continuous low output of new energy is obtained; The following formula is used to obtain the probability set of continuous low output of the new energy: P={p1,p2,…,p h ,…} Among them, r t+τ represents the output of new energy at the time t+τ; k represents the criterion for determining low output of new energy; h represents the statistical range of continuous low output; x t Indicates the occurrence flag of new energy small output from time t to time t+h, which is 1 or 0, representing the occurrence or non-occurrence of this situation respectively; f h and p h They represent the frequency and probability of the occurrence of low output of renewable energy for h consecutive hours, and P represents p h The probability set of continuous small output of new energy is formed.

2. The method according to claim 1, characterized in that According to the probability of occurrence of continuous low output of new energy, determine the period of occurrence of continuous low output of new energy and the target power required to improve the power shortage, including: Find out the target new energy continuous low output situation with a probability greater than a preset probability from the new energy continuous low output occurrence probability set, and determine the corresponding new energy continuous low output occurrence time period; According to the time period when the new energy source has continuous low output and the preset electricity shortage improvement standard, the target electricity quantity required to improve the electricity shortage is determined.

3. The method according to claim 1, characterized in that The capacity of the thermal power unit is increased with a preset step size, and the increased capacity of the thermal power unit is used to perform production simulation calculations, and the change of the power shortage during the period when the renewable energy continuously has a small output is counted until the change of the power shortage reaches the target power, including: Increasing the capacity of the thermal power unit with a preset step size, and updating the production simulation basic data set; Use the updated production simulation basic data set to perform production simulation calculations to obtain updated annual power shortage conditions; Determine the power shortage change value between the updated power and the original power during the period of continuous low output of the new energy; When the power shortage change value does not reach the target power, the capacity of the thermal power unit continues to be increased at a preset step size until the power shortage change reaches the target power.

4. The method according to claim 1, characterized in that: Calculate and output the additional capacity of thermal power units, including: Counting the number of times the capacity of the thermal power unit is increased; According to the number of increases and the preset step length, the additional capacity of the thermal power unit is determined and output, wherein the additional capacity of the thermal power unit is equal to the product of the number of increases and the preset step length.

5. A device for increasing the capacity of a thermal power unit, characterized in that: include: An acquisition module is used to acquire a production simulation basic data set of new energy for the entire year of the target area, wherein the production simulation basic data set includes the target area's annual new energy time-series output data and other source-grid-load-storage calculation boundary data, the new energy time-series output data includes wind power output data and photovoltaic output data, and the data structure is a series, and the other source-grid-load-storage calculation boundary data includes at least one of the following: thermal power data, hydropower data, nuclear power data, pumped storage data, energy storage data, load data, tie line technical parameter data, and spare capacity data and network topology data; A calculation module, used for performing production simulation calculations based on the production simulation basic data set, and calculating the power shortage situation throughout the year; A first determination module is used to determine the probability of a continuous low output of new energy according to the new energy time series output data and the annual power shortage situation; The second determination module is used to determine the time period of continuous low output of new energy and the target power required to improve the power shortage according to the probability of continuous low output of the new energy; a processing module, configured to increase the capacity of the thermal power unit by a preset step size, and use the increased capacity of the thermal power unit to perform production simulation calculations, and to count changes in the power shortage during the period when the new energy source has a continuous low output, until the change in the power shortage reaches the target power; Output module, used to calculate and output the additional capacity of thermal power units; Wherein, the first determination module is used for: Based on the new energy time series output data, the frequency and probability of the occurrence of continuous h hours of new energy low output within the range of 8760 hours throughout the year are traversed and counted from the first moment of the year, and the probability set of continuous low output of new energy is obtained; The following formula is used to obtain the probability set of continuous low output of the new energy: P={p1,p2,…,p h ,…} Among them, r t+τ represents the output of new energy at the time t+τ; k represents the criterion for determining low output of new energy; h represents the statistical range of continuous low output; x t Indicates the occurrence flag of new energy small output from time t to time t+h, which is 1 or 0, representing the occurrence or non-occurrence of this situation respectively; f h and p h They represent the frequency and probability of the occurrence of low output of renewable energy for h consecutive hours, and P represents p h The probability set of continuous small output of new energy is formed.

6. A computer device, characterized in that: include: at least one processor; and, a memory communicatively coupled to the at least one processor; The memory stores instructions executable by the at least one processor, wherein the instructions are configured to execute the method according to any one of claims 1 to 4.

7. A computer-readable storage medium, characterized in that: Computer executable instructions are stored, and the computer executable instructions are used to execute the method according to any one of claims 1 to 4.