A multi-objective random optimization cross-year cascade hydropower station optimization scheduling method and system

Through the multi-objective stochastic optimization method, combined with the goals of supply adequacy and peak shaving capacity, a coupled optimization dispatching model of ladder hydropower stations is constructed, which solves the problems of low reliability and low efficiency of hydropower station dispatching in the existing technology and achieves more efficient water supply. Resource management and power supply stability.

CN118036925BActive Publication Date: 2024-10-22NANJING TECH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410030177.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2024-10-22
Estimated Expiration
2044-01-09

AI Technical Summary

Technical Problem

Existing hydropower station optimization dispatch methods have low reliability, low accuracy and low efficiency, and it is difficult to take into account the economic dispatch of ladder hydropower stations and the uncertainty of the incoming water side, making multi-objective optimal dispatch difficult.

Method used

The multi-objective stochastic optimization method is used to establish the ladder hydropower station system framework, analyze the coupling effect, set two optimization goals of supply adequacy and peak regulation capacity, build a system coupling optimization dispatch model through the coupling effect and membership function, and calculate the model coupling constraints. Carry out optimal dispatch of hydropower stations and consider the impact of uncertainty on the incoming water side.

Benefits of technology

It improves the understanding of the complex coupling relationships between hydropower stations, improves the stability and efficiency of water resource utilization and power supply, enhances the robustness and adaptability of the system, and can better cope with uncertainty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118036925B_ABST
    Figure CN118036925B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method and system, which relates to the technical field of hydropower station optimization scheduling, including establishing a cascade hydropower station system framework, analyzing the coupling effect of the cascade hydropower station system operation; setting two types of optimization targets based on the hydropower station demand, and establishing the membership function of the two; constructing a coupled optimization scheduling model of the cascade hydropower station system and calculating the model coupling constraints through the coupling effect and the membership function of the two; analyzing the influence of uncertainty on the incoming water side of the cascade hydropower station system, and performing hydropower station optimization scheduling. The method of the present invention improves the stability and efficiency of power supply by establishing a corresponding membership function; optimizes the hydropower resource configuration of the entire system by constructing a coupled optimization scheduling model; and considers the uncertainty on the incoming water side by performing hydropower station optimization scheduling, introducing a random optimization method, so that the hydropower station can better cope with uncertainty and improve the robustness of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hydropower station optimization dispatching, and in particular to a multi-objective random optimization cross-year cascade hydropower station optimization dispatching method and system. Background Art

[0002] There is a coupling effect of time and space among the hydropower stations in the cascade hydropower stations, which is a complex planning problem. It is of great significance to study the multi-objective optimization scheduling of cascade hydropower stations under the influence of different temporal and spatial water inflows.

[0003] Previous studies usually only focused on the economic dispatch of cascade hydropower stations, and few studies focused on the coupling mechanism model and the impact of uncertainty on the incoming water side. A significant shortcoming in the current research field of hydropower stations is that although a large number of studies have focused on the economic dispatch of cascade hydropower stations, the impact of coupling mechanism models and uncertainty on the incoming water side has been generally ignored. The limitations of this research method are mainly reflected in the insufficient modeling and analysis of the complex coupling relationship and energy conversion process between hydropower stations, as well as the lack of effective prediction and management of the uncertainty of the water volume and speed changes flowing into the hydropower station. In addition, over-emphasizing economic benefits while ignoring environmental impacts, water resource sustainability and social responsibility has limited the comprehensiveness of hydropower station operations. Existing technologies have limitations in predicting long-term or short-term hydrological changes in the context of extreme weather events and climate change. When discussing the impact of coupling mechanism models and uncertainties on the water supply side, we need to recognize the profound impact of these two factors on the scheduling strategy and overall efficiency of hydropower stations. The coupling mechanism model involves the interactions and dependencies between hydropower stations, how the operation of one site affects the performance of other sites and the allocation of water resources. This interdependence requires us to understand and model these relationships more accurately to optimize the performance of the entire system. At the same time, uncertainties on the water supply side, including seasonal changes, extreme weather events and the impact of long-term climate change, pose significant challenges to the operation strategy of hydropower stations. This uncertainty requires more advanced prediction models and flexible management strategies to ensure the efficient operation of power stations under unstable environmental conditions. Therefore, a comprehensive and accurate understanding of these complex factors is crucial to achieving the optimization of hydropower station scheduling. Summary of the invention

[0004] In view of the above-mentioned problems, the present invention is proposed.

[0005] Therefore, the technical problem solved by the present invention is: the existing optimization scheduling method of hydropower stations has low reliability, low precision, and low efficiency, and how to take into account the economic scheduling problem of cascade hydropower stations and the uncertainty influence of their coupling mechanism model and the incoming water side, and solve the problem of optimization scheduling of cascade hydropower stations under multiple objectives.

[0006] To solve the above technical problems, the present invention provides the following technical solutions: a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method, comprising establishing a cascade hydropower station system framework, analyzing the coupling effect of the cascade hydropower station system operation; setting two types of optimization objectives based on the demand of the hydropower station, and establishing the membership function of the two; constructing a coupled optimization scheduling model of the cascade hydropower station system and calculating the model coupling constraints through the coupling effect and the membership function of the two; analyzing the influence of uncertainty on the water inlet side of the cascade hydropower station system, and performing optimal scheduling of the hydropower station.

[0007] As a preferred scheme of the multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method described in the present invention, wherein: the establishment of the cascade hydropower station system framework includes establishing the cascade hydropower station system framework based on the main water inlet source hydropower station, the main water outlet side hydropower station, the trunk hydropower station group and the branch hydropower station group.

[0008] As a preferred scheme of the multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method described in the present invention, wherein: the coupling effect includes the coupling relationship between hydropower stations in the cascade hydropower station system, and the coupling relationship includes time coupling and space coupling; time coupling means that different hydropower stations contain reservoirs in different time periods, the reservoirs have a water storage effect, and the water flow of the hydropower station contains a delay; space coupling means that different hydropower stations are coupled through water inlet, water outlet, and water inlet in the same time period, and the hydropower stations are cascaded with each other for joint optimization operation. Inside the cascade hydropower station, the reservoir in each hydropower station temporarily stores or releases water to deal with the delay effect of water delivery between different hydropower stations; when allocating the water outlet and water storage capacity of the hydropower station, the allocation standard is adjusted based on the reservoir capacity, power generation capacity, local demand, and environmental impact. In a single river basin, the hydropower stations coordinate with each other, and the water volume regulation of the upstream hydropower station controls the power generation capacity of the downstream power station.

[0009] As a preferred scheme of the multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method described in the present invention, the two types of optimization objectives set include analyzing the total residual load and the residual load peak-to-valley difference based on the demand of the hydropower station through the two indicators of supply sufficiency and peak-shaving capacity, and setting two types of optimization objectives, supply sufficiency as objective one, and peak-shaving capacity as objective two.

[0010] The objective function of supply adequacy is expressed as:

[0011]

[0012] Among them, min F1 means the total amount of system residual load is minimized, T is the total time scale of the optimized scheduling, T is one day, I is the total number of hydropower stations, P L,t is the load demand in period t of a day, P i,t is the net water discharge of hydropower station i in period t.

[0013] The objective function of target 2 peak load regulation capability is expressed as:

[0014]

[0015] Among them, min F2 means that the peak-to-valley difference of the system residual load is minimized.

[0016] As a preferred solution of the multi-objective random optimization cross-year cascade hydropower station optimization scheduling method described in the present invention, wherein: the establishment of the membership function of the two includes that the order of magnitude of target one is higher than that of target two, the optimization relationship between target one and target two is balanced, the order of magnitude of the two targets is normalized to the same range by using the membership function, and the membership boundaries of the two objective functions are set, which are expressed as:

[0017]

[0018]

[0019] in, and are the maximum and minimum boundaries of the target after membership conversion, and are the maximum and minimum boundaries of the second objective after membership degree conversion. maxF1 is the worst case of objective one, including the worst water resource supply adequacy. maxF2 is the worst case of objective two, including the worst peak-shaving capacity of cascade hydropower stations. and The adjustment coefficients for the maximum and minimum values ​​of target one are 0.9 and 1.2 respectively. The adjustment coefficient for target two is processed in the same way as target one.

[0020] Based on the membership boundary, the membership functions of the two objective functions are constructed, which can be expressed as:

[0021]

[0022]

[0023] Among them, u(F1) is the membership function of target one, and u(F2) is the membership function of target two.

[0024] As a preferred solution of the multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method described in the present invention, wherein: the construction of the coupled optimization scheduling model of the cascade hydropower station system and the calculation of the model coupling constraints include constructing the coupled optimization scheduling model of the cascade hydropower station system through the coupling effect and the membership function of the two, which is expressed as:

[0025] min F=λ1u(F1)+λ2u(F2)

[0026] Among them, λ1 and λ2 are the weight factors of objective 1 and objective 2, and the weights are positively correlated with the importance of the objective function; the model coupling constraints include the output limit of the hydropower unit, the coupling relationship of the reservoir capacity, the reservoir capacity limit, the water flow delay, and the unit power generation flow limit; the total output of the hydropower unit group at any time does not exceed the load of the system, which is expressed as:

[0027]

[0028] For each hydropower station, there are upper and lower limits for the output of the hydropower units, which can be expressed as:

[0029]

[0030] in, and They represent the upper and lower limits of the output of hydropower unit i respectively; each hydropower unit has an output power limit during the power generation process. The power generation process involves water resources, and the water resources are subject to flow restrictions during the flow process. The constraint of the unit power generation flow restriction is expressed as:

[0031]

[0032] in, and They represent the upper and lower limits of the power generation flow of hydropower unit i respectively; the constraint on the overall output of each hydropower station is expressed as:

[0033]

[0034] in, and They represent the upper and lower limits of the Y output of the hydropower station respectively; the constraints of the reservoir in each hydropower station include the coupling constraints of the reservoir in each period, the upper and lower limit constraints of the reservoir capacity, and the head and tail capacity constraints of the reservoir, which are expressed as:

[0035] V Y,t =V Y,t-1 +(R Y,t -Q Y,t )Δt

[0036]

[0037] V Y,0 =V Y,in

[0038] V Y,T =V Y,out

[0039] Among them, V Y,t represents the capacity of the Y reservoir of the hydropower station, and Respectively represent the upper and lower limits of the capacity of the Y reservoir of the hydropower station, V Y,0 With V Y,T They represent the capacity of the Y reservoir of the hydropower station at the initial moment and the capacity of the Y reservoir of the hydropower station at the final moment, V Y,in With V Y,out They represent the capacity setting value of the Y reservoir of the hydropower station at the initial moment and the capacity setting value of the Y reservoir of the hydropower station at the final moment respectively; the downstream flow is constrained, which is expressed as:

[0040]

[0041]

[0042] Among them, Q Y,t represents the discharge flow of hydropower station Y, and They represent the upper and lower limits of the discharge flow of hydropower station Y, s Y,t Represents the abandoned water flow of hydropower station Y.

[0043] As a preferred scheme of the multi-objective random optimization cross-year cascade hydropower station optimization scheduling method described in the present invention, wherein: the optimization scheduling of the hydropower station includes the impact of uncertainty on the water inlet side of the cascade hydropower station system, performing case analysis with normal distribution as probability distribution, and performing optimization scheduling of the hydropower station.

[0044] The example includes four operation scenarios. Scenario 1 includes target 1 optimization, and the objective function is only set to minimize the total amount of remaining load.

[0045] Scenario 2 includes optimizing objective 2, and the objective function is only set to minimize the peak-to-valley difference of the remaining load.

[0046] Scenario three includes multi-objective optimization under the combination of objective one and objective two, and setting a comprehensive optimization mode for the two objectives.

[0047] Scenario 4 includes adding uncertainty optimization on the incoming water side to the multi-objective optimization framework of Scenario 3 and performing random optimization.

[0048] Another object of the present invention is to provide a multi-objective random optimization cross-year cascade hydropower station optimization scheduling system, which can construct a coupled optimization scheduling model of the cascade hydropower station system and calculate the model coupling constraints through the coupling effect and the membership function of the two, thereby solving the problem of low accuracy in the current hydropower station optimization scheduling.

[0049] As a preferred solution of the multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling system described in the present invention, it includes: a coupling analysis module, an optimization target setting module, a function analysis module, and an optimization scheduling module; the coupling analysis module is used to establish a system framework of a cascade hydropower station and analyze the coupling effect of the operation of the cascade hydropower station system; the optimization target setting module is used to set two types of optimization targets based on the needs of the hydropower station and establish the membership function of the two; the function analysis module is used to construct a coupled optimization scheduling model of the cascade hydropower station system and calculate the model coupling constraints through the coupling effect and the membership function of the two; the optimization scheduling module is used to analyze the uncertainty impact on the water inlet side of the cascade hydropower station system and perform optimal scheduling of the hydropower station.

[0050] A computer device includes a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method.

[0051] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of a multi-objective stochastic optimization method for optimizing the scheduling of a multi-year cascade hydropower station.

[0052] Beneficial effects of the present invention: The multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided by the present invention realizes a comprehensive understanding of the complex coupling relationship between hydropower stations, improves the utilization rate of water resources, and better understands and predicts the mutual influence between hydropower stations by constructing a system framework including the water inlet source, the main water outlet side, the trunk and branch hydropower station groups; by setting two optimization goals of supply adequacy and peak-shaving capacity, and establishing corresponding membership functions, the optimization between multiple objectives is weighed, which can not only meet the supply stability of the whole system, but also realize peak shaving and valley filling on the load side, thereby improving the stability and efficiency of power supply; by constructing a coupled optimization scheduling model of the cascade hydropower station system and calculating the model coupling constraints, it is helpful to realize the coordinated operation between hydropower stations and optimize the hydropower resource allocation of the whole system; by analyzing the influence of uncertainty on the water inlet side of the cascade hydropower station system, the hydropower station is optimized and scheduled, and the uncertainty on the water inlet side is considered, which increases the complexity of prediction and scheduling of the hydropower station system, and introduces a random optimization method, so that the hydropower station can better cope with uncertainty, and improves the robustness and adaptability of the system. The present invention achieves better results in terms of efficiency, accuracy and reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0054] Figure 1 An overall flow chart of a multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method provided for the first embodiment of the present invention.

[0055] Figure 2 A framework diagram of a cascade hydropower station according to a multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method provided for the second embodiment of the present invention.

[0056] Figure 3 A mode 1 hydropower station downstream flow diagram of a multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0057] Figure 4 A mode 1 hydropower station total power generation output diagram of a multi-objective stochastic optimization cross-year step hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0058] Figure 5 A curve diagram of the reservoir capacity optimization of a hydropower station in mode 1 of a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0059] Figure 6 A comparison curve diagram of the original load of the system and the remaining load after optimization in Mode 1 of a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0060] Figure 7 A mode 2 hydropower station downstream flow diagram of a multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0061] Figure 8 A mode 2 hydropower station total power generation output diagram of a multi-objective stochastic optimization cross-year step hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0062] Fig. 9 A mode 2 hydropower station reservoir capacity optimization curve diagram of a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0063] Fig.10A comparison curve diagram of the original load of the mode 2 system and the residual load after optimization of a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0064] Fig.11 A mode 3 hydropower station downstream flow diagram of a multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0065] Fig.12 A mode 3 hydropower station total power generation output diagram of a multi-objective stochastic optimization cross-year step hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0066] Fig.13 A mode 3 hydropower station reservoir capacity optimization curve diagram of a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0067] Fig.14 A comparison curve diagram of the original load of the mode 3 system and the residual load after optimization of a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0068] Fig.15 A mode 4 hydropower station downstream flow diagram of a multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0069] Fig.16 A mode 4 hydropower station total power generation output diagram of a multi-objective stochastic optimization cross-year step hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0070] Fig.17 A mode 4 hydropower station reservoir capacity optimization curve diagram of a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0071] Fig.18 A comparison curve diagram of the original load of the mode 4 system and the residual load after optimization of a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method provided in the second embodiment of the present invention.

[0072] Fig.19 The second embodiment of the present invention provides a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method, which adjusts the weight factors to obtain the optimization solution set diagram of two objectives.

[0073] Fig. 20 An overall flow chart of a multi-objective stochastic optimization cross-year cascade hydropower station optimization dispatching system provided for the third embodiment of the present invention. DETAILED DESCRIPTION

[0074] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0075] Example 1

[0076] Reference Figure 1 , which is an embodiment of the present invention, provides a multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method, comprising:

[0077] S1: Establish the system framework of cascade hydropower stations and analyze the coupling effect of cascade hydropower station system operation.

[0078] Furthermore, the system framework of the cascade hydropower station is established, including the system framework of the cascade hydropower station based on the main source of water inflow, the main water outlet side hydropower station, the trunk hydropower station group and the branch hydropower station group.

[0079] It should be noted that the coupling effect includes the coupling relationship between hydropower stations in the cascade hydropower station system, and the coupling relationship includes time coupling and space coupling; time coupling means that different hydropower stations contain reservoirs at different time periods, and the reservoirs have a water storage effect, and the water flow of the hydropower station contains a delay; space coupling means that different hydropower stations are coupled through water inflow, outflow, and incoming water at the same time period, and the hydropower stations are cascaded with each other for joint optimization operation. Inside the cascade hydropower station, the reservoir in each hydropower station temporarily stores or releases water to deal with the delay effect of water delivery between different hydropower stations; when allocating the water output and water storage capacity of the hydropower station, the allocation standard is adjusted based on the reservoir capacity, power generation capacity, local demand, and environmental impact. In a single river basin, the hydropower stations coordinate with each other, and the water volume regulation of the upstream hydropower station controls the power generation capacity of the downstream power station.

[0080] It should also be noted that there is a coupling relationship between the water inflow and outflow of each hydropower station, and there is a time delay effect in time. Each hydropower station needs to flexibly allocate its own water output, water storage, etc. The core of the optimized dispatching of hydropower stations lies in the comprehensive consideration of the dispatching standards, the linkage relationship between hydropower stations and the necessity of flexible dispatching. The dispatching standards are usually based on multiple factors such as reservoir capacity, power generation capacity, local demand and environmental impact, and are adjusted with changes in seasons, weather and grid demand. In a river basin, multiple hydropower stations need to coordinate with each other. The water volume regulation of upstream hydropower stations directly affects the power generation capacity of downstream power stations. This linkage relationship is crucial to the efficiency and reliability of the entire system. Flexible dispatching, that is, the ability to quickly respond to load changes and maintain grid stability, is the key to improving energy efficiency and reducing environmental impact. To achieve this goal, advanced forecasting technology, real-time data analysis and comprehensive management strategies are required. At the same time, the dispatching of hydropower stations should also Consider environmental and social factors, ensure sustainable management of water resources and environmental protection, balance economic benefits with the healthy development of ecosystems and local communities, and jointly optimize operations to optimize the overall water supply, minimize system water abandonment, and make full use of the system's water resources. Under the framework of the cascade hydropower station system, multiple hydropower stations have temporal and spatial coupling effects. The spatial coupling is reflected in the fact that multiple hydropower stations can be coupled through water inflow, outflow, and incoming water in the same period. The temporal coupling is reflected in the fact that different hydropower stations have reservoirs inside at different times, which have a certain water storage effect. At the same time, each hydropower station needs to consider the delay of water flow. Compared with the operation of each hydropower station alone, the cascade of hydropower stations can reduce water abandonment and fully improve the utilization rate of water resources. Inside the cascade hydropower station, each hydropower station has a reservoir of a certain capacity, which can temporarily store or release water, which can alleviate the delay effect of water delivery between different hydropower stations.

[0081] S2: Based on the demand of hydropower stations, two types of optimization objectives are set and their membership functions are established.

[0082] Furthermore, two types of optimization goals are set, including analyzing the total residual load and the peak-to-valley difference of the residual load based on the demand of the hydropower station through the two indicators of supply sufficiency and peak-shaving capacity, and setting two types of optimization goals, supply sufficiency as goal one and peak-shaving capacity as goal two.

[0083] The objective function of supply adequacy is expressed as:

[0084]

[0085] Among them, min F1 means the total amount of system residual load is minimized, T is the total time scale of the optimized scheduling, T is one day, I is the total number of hydropower stations, P L,t is the load demand in period t of a day, P i,t is the net water discharge of hydropower station i in period t.

[0086] The objective function of target 2 peak load regulation capability is expressed as:

[0087]

[0088] Among them, min F2 means that the peak-to-valley difference of the system residual load is minimized.

[0089] It should be noted that the establishment of the membership function of the two includes that the order of magnitude of target one is higher than that of target two, the optimization relationship between target one and target two is balanced, the order of magnitude of the two targets is normalized to the same range by using the membership function, and the membership boundaries of the two objective functions are set, which can be expressed as:

[0090]

[0091]

[0092] in, and are the maximum and minimum boundaries of the target after membership conversion, and are the maximum and minimum boundaries of the second objective after membership degree conversion. maxF1 is the worst case of objective one, including the worst water resource supply adequacy. maxF2 is the worst case of objective two, including the worst peak-shaving capacity of cascade hydropower stations. and The adjustment coefficients for the maximum and minimum values ​​of target one are 0.9 and 1.2 respectively. The adjustment coefficient for target two is processed in the same way as target one.

[0093] Based on the membership boundary, the membership functions of the two objective functions are constructed, which can be expressed as:

[0094]

[0095]

[0096] Among them, u(F1) is the membership function of target one, and u(F2) is the membership function of target two.

[0097] It should also be noted that for the problem of cascade hydropower stations, two factors usually need to be considered: the utilization rate of water resources is as high as possible and the use of water resources to achieve peak shaving and valley filling, that is, to give full play to the peak-shaving capacity and reduce the burden on the large power grid. On the basis of the above-mentioned membership function model, the values ​​of the two optimization objective functions can be limited to the range of 0-1, which well balances the relationship between the two. By setting the two optimization goals of supply adequacy and peak-shaving capacity, and establishing the corresponding membership function, the quantification and optimization of the operation objectives of the hydropower station are achieved. This step enables the hydropower station to meet the electricity demand while minimizing the remaining load and peak-to-valley difference, thereby improving the stability and efficiency of the power supply.

[0098] S3: Through the coupling effect and the membership functions of the two, a coupled optimization scheduling model of the cascade hydropower station system is constructed and the model coupling constraints are calculated.

[0099] Furthermore, the coupled optimization dispatching model of the cascade hydropower station system is constructed and the coupling constraints of the model are calculated, including the coupling effect and the membership function of the two, to construct the coupled optimization dispatching model of the cascade hydropower station system, which is expressed as:

[0100] min F=λ1u(F1)+λ2u(F2)

[0101] Among them, λ1 and λ2 are the weight factors of target one and target two, and the weights are positively correlated with the importance of the objective function.

[0102] It should be noted that the model coupling constraints include hydropower unit output limitation, reservoir capacity coupling relationship, reservoir capacity limitation, water flow delay, and unit power generation flow limitation.

[0103] The total output of the hydropower group at any time does not exceed the system load, which can be expressed as:

[0104]

[0105] For each hydropower station, there are upper and lower limits for the output of the hydropower units, which can be expressed as:

[0106]

[0107] in, and They represent the upper and lower limits of the output of hydropower unit i respectively.

[0108] Each hydropower unit has an output power limit during the power generation process. The power generation process involves water resources, and the water resources are subject to flow restrictions during the flow process. The constraint of the unit power generation flow restriction is expressed as:

[0109]

[0110] in, and They represent the upper and lower limits of the power generation flow of hydropower unit i respectively.

[0111] The constraint on the overall output of each hydropower station is expressed as:

[0112]

[0113] in, and They represent the upper and lower limits of the output of hydropower station Y respectively.

[0114] The constraints of the reservoir in each hydropower station include the coupling constraints of the reservoir in each period, the upper and lower limit constraints of the reservoir capacity, and the head and tail capacity constraints of the reservoir, which can be expressed as:

[0115] V Y,t =V Y,t-1 +(R Y,t -Q Y,t )Δt

[0116]

[0117] V Y,0 =V Y,in

[0118] V Y,T =V Y,out

[0119] Among them, V Y,t represents the capacity of the Y reservoir of the hydropower station, and Respectively represent the upper and lower limits of the capacity of the Y reservoir of the hydropower station, V Y,0 With V Y,T They represent the capacity of the Y reservoir of the hydropower station at the initial moment and the capacity of the Y reservoir of the hydropower station at the final moment, V Y,in With V Y,out They respectively represent the capacity setting value of the Y reservoir of the hydropower station at the initial moment and the capacity setting value of the Y reservoir of the hydropower station at the final moment.

[0120] The downstream flow is constrained as follows:

[0121]

[0122]

[0123] Among them, Q Y,t represents the discharge flow of hydropower station Y, and They represent the upper and lower limits of the discharge flow of hydropower station Y, s Y,t Represents the abandoned water flow of hydropower station Y.

[0124] It should also be noted that since the role of hydropower units in the entire power system is auxiliary regulation, the system is still dominated by thermal power generation. Therefore, the total output of the hydropower unit group at any time cannot exceed the load of the system. For each hydropower station, there are upper and lower limits on the output of each hydropower unit, which is similar to thermal power units. Unlike thermal power units, hydropower units have almost no constraints on the climbing rate during operation.

[0125] S4: Analyze the impact of uncertainty on the water inlet side of the cascade hydropower station system and optimize the scheduling of the hydropower stations.

[0126] Furthermore, the optimal scheduling of hydropower stations includes the impact of uncertainty on the water inlet side of the cascade hydropower station system, and a case analysis is performed with normal distribution as the probability distribution to perform optimal scheduling of the hydropower station; the case includes four operating scenarios, scenario one includes optimizing target one, and the objective function is only set to minimize the total amount of remaining load; scenario two includes optimizing target two, and the objective function is only set to minimize the peak-to-valley difference of the remaining load; scenario three includes multi-objective optimization under the combination of target one and target two, and setting a comprehensive optimization mode for the two targets; scenario four includes adding uncertainty optimization on the water inlet side to the multi-objective optimization framework of scenario three, and performing random optimization.

[0127] It should be noted that, considering the influence of uncertainty on the water supply side, an example analysis was carried out with normal distribution as the probability distribution, which shows that the proposed model can not only achieve the stability of supply well, but also reduce the peak-to-valley difference of load, and can achieve optimal scheduling under the environment of water supply uncertainty.

[0128] Example 2

[0129] Reference Figure 2-Figure 19 , which is an embodiment of the present invention, provides a multi-objective random optimization cross-year cascade hydropower station optimization scheduling method. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.

[0130] First, in order to analyze the feasibility of the model proposed in the present invention, four operation scenarios are set up, namely, scenario 1: target 1 optimization, that is, the objective function is only set to minimize the total amount of remaining load, scenario 2: target 2 optimization, that is, the objective function is only set to minimize the peak-to-valley difference of the remaining load, scenario 3: multi-objective optimization under comprehensive consideration of target 1 and target 2, that is, a comprehensive optimization mode that weighs the two objectives, scenario 4: uncertainty optimization considering the water side on the multi-objective optimization framework of scenario 3, that is, random optimization.

[0131] Reference for coupling relationship between hydropower stations within cascade hydropower stations Figure 2There are 10 hydropower stations in total, and the upper and lower limits of the output of the hydropower units in each period are 15MW and 0MW respectively; the initial storage capacity of the reservoir is 210.12*10 5 Cubic meters, the final storage capacity is 210.06*10 5 Cubic meters, the minimum and maximum storage capacities are 38.5*10 5 Cubic meters, 252.2*10 5 Cubic meters, the minimum and maximum discharge flows are 200 and 3000 cubic meters per second respectively. The number of hydropower units in each hydropower station is 3, 3, 4, 3, 5, 5, 4, 3, 2, 2.

[0132] The total amount of residual load of the system and the peak-to-valley difference of the residual load of the system under the four scenarios are shown in Table 1.

[0133] Table 1 The total residual load and peak-to-valley difference of the system

[0134]

[0135]

[0136] From the reference table 1, it can be obtained that the total amount of residual load of the system in scenario 1 is optimized to the minimum, which is 15781.86MW, but the peak-to-valley difference of the residual load is still large, which is 643.65MW. In this scenario, the water supply stability of the system is fully guaranteed, but its peak-shaving capacity is not brought into play; similarly, for the optimization of scenario 2, the optimization results of the total amount of residual load and the peak-to-valley difference of the residual load are 16088.15MW and 255.65MW respectively, indicating that the peak-shaving capacity of the system is fully mobilized in this scenario, but the optimization of water supply is ignored; the total amount of residual load and the peak-to-valley difference of residual load in scenario 3 are not optimized. The optimization results of the peak-to-valley difference are 15781.86MW and 350.00MW respectively, indicating that the multi-objective optimization in this scenario can balance the two objectives and fully consider the system's water supply capacity and peak-shaving capacity; in scenario 4, the optimization results of the total remaining load and the peak-to-valley difference of the remaining load are 15788.06MW and 259.45MW respectively. Compared with scenario 3, the uncertainty of water inflow considered in scenario 4 has brought challenges to the water supply capacity of the cascade hydropower station, resulting in an increase in the total remaining load of the system. In this scenario, the cascade hydropower stations in this area need to focus on ensuring their water supply capacity.

[0137] Reference Figures 3 to 18 Comparison of the original system load and the optimized residual load, the total output of the hydropower units, the downstream flow, and the reservoir capacity optimization curve under four scenarios.

[0138] Reference Figures 3 to 6:The comparison between the original load and the remaining load after optimization shows that in scenario 1, the water supply optimization of the cascade hydropower station in each period is different. The reason is that in this scenario, the system optimization goal is to minimize the total remaining load of the system, which requires the cascade hydropower station to optimize the water discharge in each period at different times. The water discharge in each period is related to the interactive water volume and the incoming water volume of the coupled hydropower station, which makes the optimization value of the load reduction in each period different. The total power output of the hydropower station and the optimization curve of the load reduction correspond to each period, which shows the effectiveness of the result. It can be analyzed from the optimization curve of the hydropower station reservoir that the hydropower station reservoir has initial and final capacity requirements. The capacity change shows that the hydropower station reservoir has the phenomenon of water storage and water discharge. The optimization trend is roughly from 7:00 to 13:00, it shows a significant increase, and from 13:00 to 17:00, it shows a significant decrease. There is a small range of fluctuation in the remaining intervals, which is due to the coupling of the hydropower unit groups within the cascade hydropower station.

[0139] Same as scenario 1 analysis, refer to Figures 7-10 : According to the original load and the optimized residual load curve, the peak-to-valley difference of the residual load curve is optimized to the minimum. According to the characteristic analysis of the original load curve, the optimization process is roughly to supply the load in the two peak intervals as much as possible, thereby reducing the peak-to-valley difference and utilizing the peak-shaving capacity of the cascade hydropower station. According to the total output of the hydropower units, it can be seen that there is a large output from 6:00 to 15:00 and from 19:00 to 21:00. Consistent with the above analysis, according to the reservoir capacity optimization curve, the system reservoir has been storing water from 0:00 to 6:00, and the system reservoir is discharging water from 6:00 to 12:00. The reason is that from 6:00, the system faces the first peak load section, and the reservoir needs to cooperate with the hydropower units to discharge water.

[0140] Reference Figures 11 to 14 :According to the comparison between the original load and the residual load curve after optimization, the peak-to-valley difference of the residual load curve is larger than that of scenario 2, and the peak base plane is higher, but there is a "deep drop" in the load in several periods in the middle. The reason is that the cascade hydropower station needs to balance the optimization of the two objective functions in this scenario. Although the peak-shaving capacity is sacrificed in the "deep drop" section, a certain water supply capacity is exerted. Compared with the optimization curve of the total output of the hydropower unit and the reservoir capacity, the curve has a higher floating frequency than scenario 1 and scenario 2. The reason is the optimization result of the cascade hydropower station when looking for the "deep water supply" interval.

[0141] Reference Figures 15 to 18 : The analysis of scenario 4 is similar to that of scenario 3, both of which belong to the category of multi-objective optimization. The difference is that scenario 4 involves the uncertainty factor of water inflow, which will not be repeated here.

[0142] In order to illustrate the robustness of the multi-objective membership optimization model established by the present invention, the weight factors in the multi-objective optimization model are changed respectively, and the optimal solution set of the two objectives is obtained by optimization. Fig.19 .

[0143] Reference Fig.19 : When optimization target 1 decreases, optimization target 2 will increase, and this process is nonlinear, which means that this model does not have an optimal solution but an optimal solution set. At the same time, the orders of magnitude of the two objective optimization values ​​are different. By changing the weight factor, the changes of the two can be effectively changed. The robustness of the proposed membership function multi-objective optimization is verified. Therefore, our invention is creative.

[0144] Example 3

[0145] Reference Fig. 20 , which is an embodiment of the present invention, provides a multi-objective random optimization cross-year cascade hydropower station optimization scheduling system, including a coupling analysis module, an optimization target setting module, a function analysis module, and an optimization scheduling module.

[0146] The coupling analysis module is used to establish the system framework of the step hydropower station and analyze the coupling effect of the step hydropower station system operation; the optimization target setting module is used to set two types of optimization targets based on the needs of the hydropower station and establish the membership function of the two; the function analysis module is used to construct the coupled optimization scheduling model of the step hydropower station system and calculate the model coupling constraints through the coupling effect and the membership function of the two; the optimization scheduling module is used to analyze the impact of uncertainty on the water inlet side of the cascade hydropower station system and perform optimal scheduling of the hydropower station.

[0147] If the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0148] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0149] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering, or processing in another suitable manner as necessary, and then stored in a computer memory.

[0150] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc. It should be noted that the above embodiments are only used to illustrate the technical solution of the present invention and are not limited. Although the present invention is described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

[0151] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A multi-objective random optimization cross-year cascade hydropower station optimization scheduling method, characterized in that: include: Establish a system framework for cascade hydropower stations and analyze the coupling effects of cascade hydropower station system operation; Establishing the system framework of cascade hydropower stations includes establishing the system framework of cascade hydropower stations based on the main source of water inflow, the main water outlet hydropower stations, the trunk hydropower station group and the branch hydropower station group; The coupling effect includes the coupling relationship between hydropower stations in the cascade hydropower station system, and the coupling relationship includes time coupling and space coupling; Time coupling means that different hydropower stations contain reservoirs at different time periods, the reservoirs have water storage effects, and the water flow of the hydropower station has time delay; Spatial coupling means that different hydropower stations are coupled through water inflow, outflow and incoming water in the same period. Hydropower stations are cascaded to perform joint optimization operation. Within the cascade hydropower station, the reservoirs in each hydropower station temporarily store or release water to deal with the delayed effect of water delivery between different hydropower stations. When allocating the water output and water storage of hydropower stations, the allocation standards are adjusted based on reservoir capacity, power generation capacity, local demand, and environmental impact. In a single basin, hydropower stations coordinate with each other, and the water volume regulation of upstream hydropower stations controls the power generation capacity of downstream stations; Based on the demand of hydropower stations, two types of optimization objectives are set and their membership functions are established; Two types of optimization goals are set, including analyzing the total residual load and the peak-to-valley difference of residual load based on the demand of hydropower stations through the two indicators of supply adequacy and peak-shaving capacity, setting two types of optimization goals, supply adequacy as goal one, and peak-shaving capacity as goal two; The objective function of supply adequacy is expressed as: Among them, min F1 means the total amount of system residual load is minimized, T is the total time scale of the optimized scheduling, T is one day, I is the total number of hydropower stations, P L,t is the load demand in period t of a day, P i,t is the net water discharge of hydropower station i in period t; The objective function of target 2 peak load regulation capability is expressed as: Among them, min F2 means that the peak-to-valley difference of the system residual load is minimized; The membership functions of the two objectives are established, including that the order of magnitude of objective one is higher than that of objective two, and the optimization relationship between objective one and objective two is balanced. The order of magnitude of the two objectives is normalized to the same range using the membership function, and the membership boundaries of the two objective functions are set, which can be expressed as: in, and are the maximum and minimum boundaries of the target after membership conversion, and are the maximum and minimum boundaries of the second objective after membership degree conversion. maxF1 is the worst case of objective one, including the worst water resource supply adequacy. maxF2 is the worst case of objective two, including the worst peak-shaving capacity of cascade hydropower stations. and The adjustment coefficients for the maximum and minimum values ​​of target one are 0.9 and 1.2 respectively. The adjustment coefficients for target two are processed in the same way as target one. Based on the membership boundary, the membership functions of the two objective functions are constructed, which can be expressed as: Among them, u(F1) is the membership function of target one, and u(F2) is the membership function of target two; Through the coupling effect and the membership function of the two, the coupled optimization dispatching model of the cascade hydropower station system is constructed and the coupling constraints of the model are calculated; Analyze the impact of uncertainty on the incoming water side of the cascade hydropower station system and optimize the dispatch of the hydropower station; Constructing the coupled optimal dispatching model of the cascade hydropower station system and calculating the model coupling constraints includes constructing the coupled optimal dispatching model of the cascade hydropower station system through the coupling effect and the membership function of the two, which is expressed as: min F=λ1u(F1)+λ2u(F2) Among them, λ1 and λ2 are the weight factors of target 1 and target 2, and the weights are positively correlated with the importance of the objective function; The model coupling constraints include hydropower unit output limit, reservoir capacity coupling relationship, reservoir capacity limit, water flow delay, and unit power generation flow limit; The total output of the hydropower group at any time does not exceed the system load, which can be expressed as: For each hydropower station, there are upper and lower limits for the output of the hydropower units, which can be expressed as: in, and They represent the upper and lower limits of the output of hydropower unit i respectively; Each hydropower unit has an output power limit during the power generation process. The power generation process involves water resources, and the water resources are subject to flow restrictions during the flow process. The constraint of the unit power generation flow restriction is expressed as: in, and They represent the upper and lower limits of the power generation flow of hydropower unit i respectively; The constraint on the overall output of each hydropower station is expressed as: in, and They represent the upper and lower limits of the output of hydropower station Y respectively; The constraints of the reservoir in each hydropower station include the coupling constraints of the reservoir in each period, the upper and lower limit constraints of the reservoir capacity, and the head and tail capacity constraints of the reservoir, which can be expressed as: V Y,t =V Y,t-1 +(R Y,t -Q Y,t )Δt V Y,0 =V Y,in V Y,T =V Y,out Among them, V Y,t represents the capacity of the Y reservoir of the hydropower station, and Respectively represent the upper and lower limits of the capacity of the Y reservoir of the hydropower station, V Y,0 With V Y,T They represent the capacity of the Y reservoir of the hydropower station at the initial moment and the capacity of the Y reservoir of the hydropower station at the final moment, V Y,in With V Y,out They represent the capacity setting value of the Y reservoir of the hydropower station at the initial moment and the capacity setting value of the Y reservoir of the hydropower station at the final moment respectively; The downstream flow is constrained as follows: Among them, Q Y,t represents the discharge flow of hydropower station Y, and They represent the upper and lower limits of the discharge flow of hydropower station Y, s Y,t Represents the abandoned water flow of hydropower station Y.

2. The multi-objective random optimization cross-year cascade hydropower station optimization scheduling method according to claim 1 is characterized in that: The optimization scheduling of the hydropower station includes performing case analysis on the uncertainty impact on the water inlet side of the cascade hydropower station system using normal distribution as probability distribution to optimize the scheduling of the hydropower station; The calculation example includes four operation scenarios. Scenario 1 includes performing objective 1 optimization, and the objective function is only set to minimize the total amount of remaining load; Scenario 2 includes optimizing objective 2, where the objective function is only set to minimize the peak-to-valley difference of the remaining load; Scenario 3 includes multi-objective optimization under the combination of objective 1 and objective 2, and setting a comprehensive optimization mode for the two objectives; Scenario 4 includes adding uncertainty optimization on the incoming water side to the multi-objective optimization framework of Scenario 3 and performing random optimization.

3. A system using the multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method as claimed in any one of claims 1 to 2, characterized in that: Including coupling analysis module, optimization target setting module, function analysis module, optimization scheduling module; The coupling analysis module is used to establish a system framework for cascade hydropower stations and analyze the coupling effects of cascade hydropower station system operation; The optimization target setting module is used to set two types of optimization targets based on the needs of the hydropower station and establish the membership function of the two; The function analysis module is used to construct a coupled optimization scheduling model for a step hydropower station system and calculate the model coupling constraints through the coupling effect and the membership functions of the two; The optimization scheduling module is used to analyze the impact of uncertainty on the water inlet side of the cascade hydropower station system and perform optimal scheduling of the hydropower station.

4. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method described in any one of claims 1 to 2 are implemented.

5. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the multi-objective stochastic optimization cross-year cascade hydropower station optimization scheduling method described in any one of claims 1 to 2 are implemented.