A warning method for urban building deformation

By combining terrain modeling and building structure modeling, using BIM software and drone technology, real-time monitoring and alarming of building deformation is achieved, which solves the problem of ineffective monitoring and alarming in existing technologies and improves monitoring efficiency and safety. sex.

CN118133410BActive Publication Date: 2024-10-01SHENZHEN URBAN TRANSPORT PLANNING CENT CO LTD

Patent Information

Application Number
CN202410551371.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2024-10-01
Estimated Expiration
2044-05-07

AI Technical Summary

Technical Problem

Existing technology cannot effectively monitor and warn of building deformation, especially during the construction stage, and cannot grasp the structural changes and potential safety hazards of the building in real time.

Method used

By combining terrain modeling and building structure modeling, BIM software is used to generate drone measurement routes, collect spatial position data, and update them simultaneously in the BIM model. Compare the initial and updated positions to obtain building deformation results, from points, lines, and Alarms are carried out in three dimensions, and drone technology and BIM models are used to achieve real-time monitoring and alarms.

Benefits of technology

It realizes real-time monitoring and alarming of building deformation, improves monitoring efficiency, reduces costs, can effectively monitor long-term stable deformation trends and occasional deformation, and provides component-dimensional alarms through cluster analysis and finite element analysis to ensure the safety of the building structure. Safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118133410B_ABST
    Figure CN118133410B_ABST
Patent Text Reader

Abstract

The present invention proposes an alarm method for urban building deformation, which belongs to the technical field of building deformation monitoring. It includes: S1. Obtaining a building BIM model by combining terrain modeling with building structure modeling; S2. Determining measuring points through three dimensions of points, lines and surfaces; S3. Considering the building BIM model as the initial state of the building, using BIM software to generate a drone measurement route, and using the drone to collect spatial position data, while the collected data is synchronously updated to the BIM model; the position data obtained by the initial BIM model is used as a reference, and compared with the updated building position to obtain the building deformation result; S4. According to the building deformation result, alarms are respectively issued from three dimensions of points, lines and surfaces. The present invention uses BIM software and models and drone technology to achieve real-time monitoring and updating of the positions of all measuring points on the building, selects corresponding measuring points from three dimensions of points, lines and surfaces, improves monitoring efficiency and reduces implementation costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an alarm method for urban building deformation, belonging to the technical field of building deformation monitoring. Background Art

[0002] Urban buildings include many types of buildings and structures, which play an important role in the development of cities. In order to ensure the safety of urban buildings, it is particularly important to monitor building deformation, grasp the structural changes of buildings in real time, and promptly discover potential safety hazards of buildings.

[0003] Building Information Modeling (BIM) is a digital method for building design, construction and operation management. It achieves data integration and collaboration throughout the life cycle by creating and maintaining visualization and information models of building projects. In urban construction, the application of BIM covers multiple stages and fields: Planning stage: BIM can be used for urban planning to help planners visualize the overall structure and development direction of the city. Through BIM, planners can simulate the effects of different planning schemes and evaluate their impact, so as to make more scientific and reasonable planning decisions. Design stage: Architects use BIM software to create building models, which contain various data such as geometric information, structure, electromechanical equipment, etc. of the building. BIM can promote collaboration between design teams, improve design efficiency, and reduce conflicts and errors. Construction stage: During the construction process, BIM can be used to generate construction plans, coordinate construction processes, and improve the efficiency of engineering construction. BIM models can be used as a visualization tool for construction management to help construction personnel better understand the design intent and ensure that construction is carried out according to the design. Operation and maintenance stage: BIM supports the management and operation of building facilities. After the building is completed, the BIM model can be used for maintenance management, including the repair, update and replacement of equipment. Implementing BIM can improve the efficiency of buildings and reduce operating costs during the operation phase. Data sharing and collaboration: The BIM model is a digital platform containing a large amount of information. All parties involved can collaborate in real time on the same model to reduce information loss and misunderstanding. BIM promotes data integration at all stages of design, construction, and operation, providing more comprehensive and accurate information for decision-making. Overall, the application of BIM in urban construction helps to improve efficiency, reduce costs, reduce errors, and promote collaborative work among participants at all stages. With the continuous development of technology, the application of BIM in urban construction will become more in-depth and extensive.

[0004] To this end, the invention of the invention with the publication number of CN113743727A and the invention name of a building monitoring method based on BIM proposes a platform maintenance management module to manage and maintain the platform system, including the management of platform user accounts, the management of permissions and modules, and the recording of platform operation error logs. The target building is constructed according to the construction drawings of the building construction, and during the construction process, the building data of the constructed part is collected at the construction site to construct the building construction drawings, and according to the constructed construction drawings; the method forms the standards and methods for the protection of ancient buildings in the whole process based on BIM technology, explores a method for lightweight display of BIM models, realizes the construction and monitoring management of ancient building projects, and is different from the current mainstream C / S architecture. A complex ancient building project BIM platform based on B / S architecture is built to realize real-time data monitoring of ancient buildings, providing strong technical guarantee for the smooth completion of ancient building projects. This patent only monitors the building in the construction stage, and only monitors the construction progress monitoring, and cannot realize the effective monitoring of building deformation, nor can it warn of deformation. Summary of the invention

[0005] A brief overview of the present invention is provided below in order to provide a basic understanding of certain aspects of the present invention. It should be understood that this overview is not an exhaustive overview of the present invention. It is not intended to identify key or important parts of the present invention, nor is it intended to limit the scope of the present invention. Its purpose is merely to present certain concepts in a simplified form as a prelude to a more detailed description discussed later.

[0006] In view of this, in order to solve the problem of lack of effective monitoring and alarm technology for building deformation in the prior art, the present invention provides a monitoring method for urban building displacement based on BIM.

[0007] Solution 1: A method for warning of urban building deformation, comprising the following steps:

[0008] S1. Obtain the building BIM model by combining terrain modeling with building structure modeling;

[0009] S2. Determine the measuring points by three dimensions: point, line and surface;

[0010] S3. Consider the building BIM model as the initial state of the building, use BIM software to generate a drone measurement route, and use the drone to collect spatial position data, and the collected data is synchronously updated to the BIM model; the position data obtained from the initial BIM model is used as a reference and compared with the updated building position to obtain the building deformation result;

[0011] S4. According to the building deformation results, alarms are issued from three dimensions: point, line and surface.

[0012] Preferably, S1 specifically comprises the following steps:

[0013] S11. Obtain DEM data of the area surrounding the building through satellite images, import the DEM data into the building information model, and generate a preliminary terrain model of the area surrounding the building;

[0014] S12. Obtain Insar data of the area surrounding the building;

[0015] S13. Find the location of the building structure or facility structure from the DEM data, obtain the building structure height or facility structure height data, and subtract the building structure height or facility structure height data;

[0016] S14. Get the latest ground height data :

[0017] ;

[0018] in, It represents the settlement deformation of the area around the S building obtained by Insar data. Positive values ​​indicate rise, while negative values ​​indicate settlement.

[0019] S15. Input the latest ground height data as the actual ground height of the area surrounding the S building into the building information model to complete the terrain modeling of the building and the surrounding area;

[0020] S16. Perform building modeling based on building structure data, calibrate the spatial coordinate system of the building information model, and obtain the longitude, latitude and height information of all points of interest in the building information model;

[0021] S17. Assign specific properties to components, including component material, yield limit, elastic modulus, material density, bending section coefficient and torsional section coefficient.

[0022] Preferably, S2 specifically includes: simple measuring points: simple measuring points are the measurements of corresponding points, including the entire building and ground settlement monitoring points;

[0023] Component measurement points: Component measurement points are the measurements of corresponding lines, including horizontal component measurement points and vertical component measurement points;

[0024] Vertical components: The support cross section of the entire building is divided into two parts, the upper and lower parts, and the statistics function in the BIM software is used to count all the components. The weight of the upper part of the component is analyzed by force. All components of the same fault are quantized to form a simple multi-support force model to analyze the components. The stress characteristics of the component are analyzed, the axial force of the component and the shear deformation of the vertical component are analyzed, and the corresponding dangerous points are found at the edge of the shear layer and where the cross-sectional size changes; the component connection, end point and corresponding dangerous point are the measuring points;

[0025] Horizontal member:

[0026] Analyze the bending characteristics of the component: Use the bending section coefficient of the component to find the dangerous section and dangerous point of the component through force analysis, and use the dangerous point and the two end points of the component as measurement points;

[0027] Analyze the torsion resistance of the horizontal section: Use the torsion section coefficient property of the component to find the dangerous point of the torsion section, and use the dangerous point and the end point as the measuring point;

[0028] Cross-sectional measuring points: Use finite element analysis software to analyze the distribution of normal stress and shear stress in vertical and horizontal sections, find the corresponding stress concentration area, and then determine the measuring points from the concentrated area. Specifically, by calculating the stress concentration coefficient of each point, that is, the ratio of the peak stress to the stress without stress concentration, find the point with the largest stress concentration coefficient in the stress concentration area, which is the measuring point.

[0029] Preferably, S3 specifically includes the following steps:

[0030] S31. Determination of the UAV data collection route;

[0031] S32. Determine the distance measurement node by determining the route of the drone measuring the point of interest A in the building information model;

[0032] S33. Calculate the deformation of the point of interest and update the position data;

[0033] S34. Set up deformation alarm for drone measurement.

[0034] Preferably, the method for determining the drone data collection route is:

[0035] ;

[0036] in, Show route With tangent The vertical distance between Measure the tangent line to point A for the route parallel lines; represents the radius of the inscribed circle of the interest point B in the building section; represents the radius of the inscribed circle of the interest point A in the building section;

[0037] The distance measurement node is determined by determining the route of the drone to measure the point of interest A in the building information model, and the method is:

[0038] Select and The two measuring points form an equilateral triangle with the route measurement interest A. and The distance between two measuring points , get and Initial spatial position coordinates of the two measuring points and ;

[0039] Generate a route with known spatial location information of all points of interest and output it to the UAV control system to control the UAV to measure the actual building and obtain and Actual measurement results of two measuring points and , and the angles between the two survey lines and the flight path and ;

[0040] The deformation of the point of interest is calculated by: The deformation of the point of interest is calculated by: The point is deformed to Point, get triangle The lengths of the three sides, , and According to the three-side theorem, and Two measuring points determined location;

[0041] The method for updating the position data is to construct a triangle in the BIM model. Same model, aligned again and Two measuring points and the corresponding angle, that is, find the corresponding Location and Point location data , complete the update of spatial location information;

[0042] Set the deformation alarm for drone measurement by introducing the initial position point of the route measurement interest point A Parameters of route triangulation deformation parameters have:

[0043] ;

[0044] in, for The area of for exist The area of ​​the perpendicular projection triangle of the plane;

[0045] Set the threshold to 0.5. When the parameter route triangulation deformation parameter of the measuring point is less than the threshold, an alarm is triggered, indicating that the point of interest is deformed.

[0046] Preferably, S3 specifically includes the following steps:

[0047] S41. Point dimension alarm based on the time series of the measuring points, including the alarm of the absolute value of vertical settlement and the alarm of the changing trend of the measuring points;

[0048] S42. Perform line dimension alarms, including stress component alarms and functional component alarms;

[0049] S43. Provide surface dimension warnings, including the stress interface and the section with the greatest influence;

[0050] Preferably, an alarm for the absolute value of vertical settlement: the vertical settlement is obtained by selecting the position time series of the highest plane measuring point of the building, calculating the average height change, and obtaining the change of the absolute value of the vertical settlement of the building;

[0051] Alarm of measuring point change trend: Use k-Means clustering method to cluster the measuring points in the three-dimensional space in BIM software, starting from the measuring point with the largest RTDP value, and improve the clustering performance through the error sum of the clustering results, and finally get the clustering results after each data update; after each data update, the similarity of the two clustering results before and after is determined by adjusting the Rand coefficient ARI parameter, which is:

[0052] ;

[0053] Among them, e represents the number of point pairs that belong to the same cluster in both classification results, b represents the number of point pairs that belong to the same cluster in the latter classification result but not in the former classification result, c represents the number of point pairs that belong to the same cluster in the former classification result but not in the latter classification result, and f represents the number of point pairs that do not belong to the same cluster in the former classification result; the larger the ARI value, the closer the two classification results are, otherwise the more different they are; after the data is updated and the cluster analysis of the spatial position of the measuring points is completed, if the ARI value is greater than the deformation threshold, the building as a whole has a stable deformation trend. In the BIM software, the three directions of X / Y / Z are split and the absolute values ​​of the deformation are calculated respectively. The absolute value of the deformation is judged according to the direction threshold in the corresponding direction. If it is greater than the threshold, an alarm is required, otherwise no alarm is required; the smaller the ARI value, the more sporadic deformation of the building occurs. Compare the two classification results, find the measuring points with different classifications, and analyze the deformation;

[0054] Alarm for stressed components: Monitor the real-time position of endpoints and dangerous points of deformation-prone sections, update the deformation of components in real time in the BIM model, and then compare the deformation of dangerous points under the limit state conditions of the components in the finite element analysis software. If the ratio of the deformation that has occurred to the deformation under the limit condition exceeds the threshold , then an alarm is issued for the stressed component;

[0055] Functional component alarm: Functional components are measured every 0.5 days, and a size threshold is added for each component. When the monitored size exceeds the threshold, an alarm is issued.

[0056] Preferably, the warning of the stress-bearing section: according to the update result of the measuring point data, the stress concentration of the stress-bearing section is analyzed with the help of BIM software, and the strain energy density parameter in mechanics is introduced, which is:

[0057] ;

[0058] Where W represents the strain energy density, represents the stress in the region, Indicates the strain in the area; for cross-sections of materials with critical strain energy density, an alarm is determined by the strain energy density; otherwise, it is necessary to analyze the distribution diagram of the strain energy density in the structure in the finite element analysis software and make a judgment based on expert experience.

[0059] Warning of the most influential section: Analyze whether there is stress concentration in the section and the influence of the largest section on other sections; introduce the average strain energy density parameter, which is:

[0060] ;

[0061] in, represents the average strain energy density parameter, represents the area at the area block v, and N represents the number of all area blocks. In the BIM model, the strain energy density parameters on the section are evenly distributed by adjusting the material of each section or adding external fixing methods, and the strain energy density changes of other sections are analyzed. Since the danger of each section depends on the maximum strain energy density value, after implementing the corresponding measures, the change value of the maximum strain energy density of each section is calculated, that is:

[0062] ;

[0063] in, represents the number of building sections, Represents the mth section The cross-sectional importance parameters of and Respectively before and after the implementation of the measures The maximum strain energy density on the cross section; find the cross section with the largest cross section importance parameter, which is the cross section with the greatest influence on the deformation monitoring of the entire building.

[0064] Solution 2: An electronic device includes a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the urban building deformation alarm method described in Solution 1 are implemented.

[0065] Solution three: A computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the urban building deformation alarm method described in Solution one.

[0066] The beneficial effects of the present invention are as follows:

[0067] 1. The present invention uses BIM software and models and drone technology to achieve real-time monitoring and updating of the positions of all measuring points on the building, and selects corresponding measuring points from three dimensions: point, line (component) and surface (section), thereby improving monitoring efficiency and reducing implementation costs;

[0068] 2. The alarm in the measurement point dimension of the present invention can effectively monitor the long-term stable deformation trend of the building, monitor the deformation amount at all times, and monitor the occasional excessive deformation measurement points. Through the clustering method, the calculation of each point is avoided, and the behavior of multiple points can be aggregated to uniformly analyze the deformation trend of the entire building measurement point;

[0069] 3. The present invention effectively integrates the recording of component attribute data by BIM software, and with the help of finite element analysis software, divides the component dimension alarm into two types: force-bearing components and functional components, which is in line with the actual situation of building deformation monitoring;

[0070] 4. The present invention introduces strain energy density parameters in the warning of cross-sectional dimensions, with the goal of avoiding cracks caused by cross-sectional deformation, analyzing the stress concentration of the cross-sectional area, and performing cross-sectional force warning. At the same time, by proposing cross-sectional importance parameters, the cross-sectional area with the greatest influence is discovered, providing strong support for the implementation method of controlling building deformation in practice. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0072] Figure 1 The present invention is a flow chart of an alarm method for urban building deformation;

[0073] Figure 2 It is a schematic diagram of component analysis;

[0074] Figure 3Update schematics for building data;

[0075] Figure 4 This is a schematic diagram of actual drone measurement. DETAILED DESCRIPTION

[0076] In order to make the technical solutions and advantages of the embodiments of the present invention more clearly understood, the exemplary embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.

[0077] Example 1: Reference Figure 1-Figure 4 This embodiment describes an alarm method for urban building deformation. With the help of BIM modeling technology, it is constructed from three aspects: BIM modeling, determining measuring points, and data updating. BIM modeling is the basis of the present invention, so as to facilitate the data updating of BIM model, realize the monitoring of building structure, and transmit the monitoring data back to BIM software, so as to realize the monitoring of building structure and multi-dimensional alarm functions in BIM software. In the BIM modeling stage, considering the settlement factor of the terrain itself, the displacement monitoring of the building involves vertical settlement. Therefore, in addition to BIM modeling of the building structure, it is also necessary to model the terrain around the building, which specifically includes the following steps:

[0078] S1. Obtain the building BIM model by combining terrain modeling with building structure modeling;

[0079] The displacement monitoring of buildings involves vertical settlement, which requires modeling the terrain around the building and considering the settlement of the terrain itself. Therefore, the building BIM model includes terrain model and building modeling, which specifically includes the following steps:

[0080] S11. Obtain DEM data of the area surrounding the building through satellite images, import the DEM data into the building information model, and generate a preliminary terrain model of the area surrounding the building;

[0081] S12. Obtain Insar data of the area surrounding the building;

[0082] Insar data can be obtained through the Satellite Data Management Center. Insar data within one year can be obtained. Compared with DEM data, Insar data has higher accuracy and more accurate depiction of ground subsidence.

[0083] S13. Find the location of the building structure or facility structure from the DEM data, obtain the building structure height or facility structure height data, and subtract the building structure height or facility structure height data to remove the influence of the building structure or facility structure height itself; that is, the DEM height of the building S area is The height value of the surrounding area of ​​building S monitored by DEM is , then the actual ground height of building S is ;

[0084] The height of the building structure can be obtained from the annual inspection report data of the building and surrounding buildings and important facilities;

[0085] S14. Get the latest ground height data :

[0086] ;

[0087] in, It represents the settlement deformation of the area around the S building obtained by Insar data. Positive values ​​indicate rise, while negative values ​​indicate settlement.

[0088] S15. Input the latest ground height data as the actual ground height of the area surrounding the S building into the building information model to complete the terrain modeling of the building and the surrounding area;

[0089] S16. Perform building modeling based on building structure data, calibrate the spatial coordinate system of the building information model, and obtain the longitude, latitude and height information of all points of interest in the building information model;

[0090] The control points of the input model are used to calibrate the spatial coordinate system of the building information model of the building and the terrain, and the method of obtaining the building information model containing the longitude, latitude and height information of each point is as follows: the longitude and latitude of a building structure or a fixed point around the building is obtained by total station or more accurate satellite positioning, and input into the building information model as a reference point; there is at least one control point;

[0091] Specifically, the latitude, longitude and height information of each point of the building can be directly obtained from the building information model.

[0092] Model the building structure according to the architectural drawings, and complete the building appearance modeling according to the building images or photos; add the attributes of the spatial position sequence to the building nodes, and record the changes of each spatial position; obtain the spatial longitude and latitude of all points of interest, including longitude, latitude and altitude, through the terrain model and the theoretical building structure on the drawings, that is, the position sequence of point A of the route measurement point of interest The three values ​​of the initial position are: ,in, Indicates longitude, Indicates latitude, Indicates the height; if the data is updated each time, the position sequence is updated In fact, the initial position space longitude, latitude and height of each point on the building model that has completed BIM modeling are directly obtained from the BIM software.

[0093] S17. Assign specific properties to the components, including component material, yield limit, elastic modulus, material density, bending section coefficient and torsional section coefficient;

[0094] S2. Determine the measuring points by three dimensions: point, line and surface;

[0095] Simple measuring points: Simple measuring points are the measurements of corresponding points, including the entire building and ground settlement monitoring points;

[0096] Component measurement points: Component measurement points are the measurements of corresponding lines, including horizontal component measurement points and vertical component measurement points;

[0097] Vertical Members: Reference Figure 2 , vertical member , with components The support section is used as a reference to divide the entire building into two parts, and then the statistical function in the BIM software is used to count all the components. The weight of the upper component is output to the force analysis software and will be combined with the component All components of the same fault are quantified, and finally a simple force model with multiple supports is formed to analyze the components. The stress characteristics of vertical components require analysis of the axial force of the components and the shear deformation of the vertical components. Focus on the edge of the shear layer and the change of the cross-sectional size, and find the corresponding dangerous points, i.e., the measuring points (as well as the connection points and end points of the components), specifically:

[0098] By component The support cross section of the entire building is divided into two parts, the upper and lower parts, and the statistics function in the BIM software is used to count all the components. The weight of the upper part of the component is analyzed by force. All components of the same fault are quantized to form a simple multi-support force model to analyze the components. The stress characteristics of the component are analyzed, the axial force of the component and the shear deformation of the vertical component are analyzed, and the corresponding dangerous points are found at the edge of the shear layer and where the cross-sectional size changes; the component connection, end point and corresponding dangerous point are the measuring points;

[0099] Horizontal components: Horizontal components need to analyze the bending characteristics of the components, use the bending section coefficient of the components, and then find the dangerous sections and dangerous points of the components through force analysis, and use the dangerous points and the two ends of the components as measuring points. In addition, horizontal components also need to analyze the torsion resistance of the horizontal section, use the torsion section coefficient properties of the components, find the dangerous points of the torsion section, and use these dangerous points and endpoints as measuring points, specifically:

[0100] Analyze the bending characteristics of the component: Use the bending section coefficient of the component to find the dangerous section and dangerous point of the component through force analysis, and use the dangerous point and the two end points of the component as measurement points;

[0101] Analyze the torsion resistance of the horizontal section: Use the torsion section coefficient property of the component to find the dangerous point of the torsion section, and use the dangerous point and the end point as the measuring point;

[0102] Cross-sectional measuring points: Use finite element analysis software to analyze the distribution of normal stress and shear stress in vertical and horizontal sections, find the corresponding stress concentration area, and then determine the measuring points from the concentrated area; specifically, by calculating the stress concentration coefficient of each point, that is, the ratio of the peak stress to the stress without stress concentration, find the point with the largest stress concentration coefficient in the stress concentration area, which is the measuring point.

[0103] S3. The building BIM model is regarded as the initial state of the building, and the drone measurement route is generated using BIM software, and the drone is used to collect spatial position data, and the collected data is synchronously updated to the BIM model; the position data obtained by the initial BIM model is used as a reference, and compared with the updated building position to obtain the building deformation result; based on the modeling process, the initial spatial position information of the building's points of interest can be obtained. In theory, the position sequence Y of each point can be obtained in real time in the BIM model. But in fact, due to the errors in the construction process of the building itself, the ground subsidence caused by underground activities and other factors, the building will eventually have a position "deformation" during its use period. Since these "deformations" will affect the structural safety and service life of the building itself, it is necessary to monitor the "deformation" of the building. Nowadays, there are some methods for monitoring the "deformation" of buildings, such as annual inspections of building structures and building safety assessments, but because the assessment process is complicated and the cycle is long, it is often maintained at a frequency of once a year or once every six months, but this is far from enough for the monitoring of important buildings such as those in earthquake zones, coastal areas, and CBDs. Therefore, the present invention is based on modeling and uses drones to monitor the "deformation" of buildings. The specific steps include:

[0104] S31. Determination of the UAV data collection route; For the route measurement point of interest A, the point for deformation monitoring and data update, first, obtain its initial position The location data is , then, refer to Figure 2 As shown in the figure, a drone equipped with a rangefinder is used to measure the point of interest A on the route. The drone first determines the route in the BIM model, and then measures point A based on the set route. For the accuracy of the measurement, the route uses a line parallel to the tangent line of point A. , including routes With tangent The vertical distance between Several factors need to be considered: first, get as close to the building and the measurement point as possible, and second, avoid collisions with protruding parts of the building. Therefore, find point B with the largest inscribed circle in the building. The difference between the radius of the inscribed circle of point B and point A is the route. With tangent The vertical distance between , that is: the method is:

[0105] ;

[0106] in, Show route With tangent The vertical distance between Measure the tangent line to point A for the route parallel lines; represents the radius of the inscribed circle of the interest point B in the building section; represents the radius of the inscribed circle of the interest point A in the building section;

[0107] S32. By determining the drone route of the collection point A in the building information model, and then determining the distance measurement node, that is, the drone pauses to measure the distance of the measurement point, refer to Figure 3 As shown in the figure, since the actual measurement point will be "deformed", two measurement points are needed to determine the actual position of point A by triangulation, that is, The location coordinates of the UAV are determined by determining the route to measure the point of interest A in the building information model, and the distance measurement node is determined by:

[0108] Select and The two measuring points form an equilateral triangle with the route measurement interest A. and The distance between two measuring points , get and Initial spatial position coordinates of the two measuring points and ;

[0109] Generate a route with known spatial location information of all points of interest and output it to the UAV control system to control the UAV to measure the actual building and obtain and Actual measurement results of two measuring points and , and the angles between the two survey lines and the flight path and ;

[0110] The deformation of the point of interest is calculated by: The deformation of the point of interest is calculated by: The point is deformed to Point, get triangle The lengths of the three sides, , and According to the three-side theorem, and Two measuring points determined location;

[0111] S33 calculates the deformation of the point of interest and updates the position data; the method for calculating the deformation of the point of interest is to refer to Figure 4 As shown, the route measurement interest point A is changed from the initial position The point is "deformed" to Point, get triangle The lengths of the three sides, , and According to the three-side theorem, and Two measuring points determined location;

[0112] The method for updating the location data is to construct a triangle in the building information model (BIM model). Same model, aligned again and Two measuring points and the corresponding angle, that is, find the corresponding Location and Point location data , The location data of the point is directly obtained from the BIM software to complete the update of the spatial location information;

[0113] S34. Set the deformation alarm for drone measurement by introducing the initial position point of the route measurement interest point A Parameters of route triangulation deformation parameters have:

[0114] ;

[0115] in, for The area of for exist The area of ​​the perpendicular projection triangle of the plane;

[0116] Set the threshold to 0.5. When the parameter route triangulation deformation parameter of the measuring point is less than the threshold, an alarm is triggered, indicating that the point of interest is deformed.

[0117] S4. According to the building deformation results, alarms are issued from three dimensions: point, line and surface.

[0118] S41. Point dimension alarms based on the time series of the measuring points, including alarms of the absolute value of vertical settlement and alarms of the changing trend of the measuring points;

[0119] Alarm of absolute value of vertical settlement: vertical settlement is obtained by selecting the position time series of the highest plane measuring point of the building, calculating the average height change, and obtaining the change of the absolute value of vertical settlement of the building;

[0120] Alarm of measuring point change trend: Since the deformation of the building itself has many external and internal causes, deformation is a random behavior and does not have an obvious trend. For coastal areas or reclamation areas, although ground subsidence has an obvious trend, for safety monitoring, if the trend of all measuring points is completely unified and the value of the change is too large, an alarm will also be triggered. Therefore, the cluster analysis method is used to perform cluster analysis on all measuring points in the three-dimensional space in the BIM software. Specifically, the k-Means clustering method is used to cluster the measuring points in the three-dimensional space in the BIM software, starting from the measuring point with the largest RTDP value, and the clustering performance is improved by the error sum of the clustering results, and finally the clustering results after each data update are obtained. Starting from the measuring point with the largest position deformation, the initial measuring point position is changed each time, and then the error sum of the clustering results of each test is calculated. By finding the result with the smallest error sum of squares, that is, the result with the best clustering effect, the clustering results after each data update are finally obtained. After each data update, the similarity of the clustering results before and after is determined by adjusting the Rand coefficient ARI parameter, as follows:

[0121] ;

[0122] Among them, e represents the number of point pairs that belong to the same cluster in both classification results, b represents the number of point pairs that belong to the same cluster in the latter classification result but not in the former classification result, c represents the number of point pairs that belong to the same cluster in the former classification result but not in the latter classification result, and f represents the number of point pairs that do not belong to the same cluster in the former classification result; the larger the ARI value, the closer the two classification results are, otherwise the more different they are; after the data is updated and the cluster analysis of the spatial position of the measuring points is completed, if the ARI value is greater than the deformation threshold, the building as a whole has a stable deformation trend, and then in the BIM software, the three directions of X / Y / Z are split to calculate the absolute value of each deformation respectively, and the judgment is made according to the absolute value of the deformation and the threshold value in the corresponding direction. If it is greater than the threshold, an alarm is required, otherwise no alarm is required; the smaller the ARI value, the more it means that the building deformation has an occasional deformation, and then the two classification results are compared, and the measuring points with different classifications are found to analyze the deformation; the smaller the ARI value, the greater the difference between the two clustering results, and the difference must be increased due to multiple occasional deformations. Therefore, it is necessary to find measuring points with different classifications, analyze the deformation size of each measuring point one by one, and find single measuring points with larger (smaller) deformation. It is precisely because of the existence of these measuring points that the two clustering results are quite different.

[0123] When the two clustering results are quite different, it is necessary to analyze and classify different measuring points one by one to find the occasional ones (the measuring points with deformation conditions that are very different from other surrounding measuring points).

[0124] The direction threshold can be obtained through experiments.

[0125] The thresholds in the X and Y directions may be 0.0005l, where l represents the length of the structure in this direction, and the threshold in the Z direction may be 200mm;

[0126] Point-dimensional alarms are used to prevent long-term stable deformation trends and monitor deformation magnitude at all times, and to monitor measurement points that are too deformed occasionally. Clustering avoids point-by-point calculations, and can aggregate the behaviors of multiple points to uniformly analyze the deformation trends of the entire building measurement points.

[0127] S42. Perform line dimension alarms, including stress component alarms and functional component alarms;

[0128] Alarm for stressed components: Since the selection of the measurement points of stressed components is originally obtained through stress analysis, the real-time positions of the endpoints and the dangerous points of the deformation dangerous sections are monitored, and the deformation of the components is updated in real time in the BIM model. Then, by comparing the deformation of the dangerous points under the limit state conditions of the components in the finite element analysis software, if the ratio of the deformation that has occurred to the deformation under the limit condition exceeds the threshold , then an alarm is issued for the stressed component;

[0129] The limit state conditions are: the material yields;

[0130] Threshold It is determined according to different materials, and 0.78 is usually used.

[0131] Functional component alarm: Since components are the smallest basic units of BIM software and BIM modeling, in addition to analyzing the stress of the building structure, it is also necessary to analyze the functional properties of the components, that is, the impact of the components on the performance of the building. Functional components generally refer to components that realize basic functions such as water supply and power supply of buildings. These components have clear size regulations and have extremely high requirements for deformation such as bending and breaking. Functional components are measured every 0.5 days, and a size threshold is added for each component. When the size exceeds the threshold, an alarm is issued.

[0132] S43. Alarms are issued in the surface dimension, including the stress interface and the section with the greatest influence. The stress section alarm refers to the alarm caused by excessive deformation of the section due to the change in the stress state of the section itself. The section with the greatest influence is derived from the section to the entire building, because the building is composed of stress sections, and because the sections from bottom to top of the building are hierarchical and related to each other, it is necessary to connect all sections and analyze the section with the greatest influence among all deformed sections.

[0133] Warning of the stressed section: Whether the stressed section is deformed by horizontal displacement or vertical settlement, the uneven deformation of the component itself and the material properties will lead to stress concentration in some areas of the section, and excessive stress concentration will cause cracks in the area, endangering the safety of the section and the building itself. Therefore, according to the updated results of the measurement point data, the stress concentration of the stressed section is analyzed with the help of BIM software, and the strain energy density parameter in mechanics is introduced, which is:

[0134] ;

[0135] Where W represents the strain energy density, represents the stress in the region, Indicates the strain in the area; for cross-sections of materials with critical strain energy density, an alarm is determined by the strain energy density; otherwise, it is necessary to analyze the distribution diagram of the strain energy density in the structure in the finite element analysis software, especially the area with local high peak values, and make judgments based on expert experience.

[0136] Warning of the most influential section: In the overall building analysis process, the most influential section should be the section that has the greatest impact on the deformation of other sections; therefore, analyze whether there is stress concentration in the section and the influence of the largest section on other sections; introduce the average strain energy density parameters:

[0137] ;

[0138] in, represents the average strain energy density parameter, represents the area at the area block v, and N represents the number of all area blocks. In the BIM model, the strain energy density parameters on the section are evenly distributed by adjusting the material of each section or adding external fixing methods, and the strain energy density changes of other sections are analyzed. Since the danger of each section depends on the maximum strain energy density value, after implementing the corresponding measures, the change value of the maximum strain energy density of each section is calculated, that is:

[0139] ;

[0140] in, represents the number of building sections, Represents the mth section The cross-sectional importance parameters of and Respectively before and after the implementation of the measures The maximum strain energy density on the cross section; find the cross section with the largest cross section importance parameter, which is the cross section with the greatest influence on the deformation monitoring of the entire building.

[0141] Definitions of abbreviations in the present invention:

[0142] DEM, Digital Elevation Model: digital elevation model;

[0143] RTDP, Route Triangle Deviation Parameter: Route triangle deformation parameter.

[0144] Embodiment 2: The computer device of the present invention may be a device including a processor and a memory, such as a single chip microcomputer including a central processing unit, etc. Moreover, the processor is used to implement the steps of the above-mentioned urban building deformation alarm method when executing the computer program stored in the memory.

[0145] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0146] The memory may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0147] Embodiment 3: Computer readable storage medium embodiment.

[0148] The computer-readable storage medium of the present invention can be any form of storage medium that can be read by a processor of a computer device, including but not limited to non-volatile memory, volatile memory, ferroelectric memory, etc. A computer program is stored on the computer-readable storage medium. When the processor of the computer device reads and executes the computer program stored in the memory, the steps of the above-mentioned urban building deformation alarm method can be implemented.

[0149] The computer program includes computer program code, which may be in source code form, object code form, executable file or some intermediate form, etc. The computer readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer readable medium may be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer readable media do not include electric carrier signals and telecommunication signals.

[0150] Although the present invention has been described according to a limited number of embodiments, it will be apparent to those skilled in the art, with the benefit of the above description, that other embodiments may be envisioned within the scope of the invention thus described. In addition, it should be noted that the language used in this specification is selected primarily for readability and teaching purposes, rather than for explaining or defining the subject matter of the present invention. Therefore, many modifications and variations will be apparent to those skilled in the art without departing from the scope and spirit of the appended claims. The disclosure of the present invention is illustrative, not restrictive, with respect to the scope of the present invention, which is defined by the appended claims.

Claims

1. A method for warning of urban building deformation, characterized in that: The following steps are involved: S1. Obtain the building BIM model by combining terrain modeling with building structure modeling; S2. Determine the measuring points by three dimensions: point, line and surface; S3. Treat the building BIM model as the initial state of the building, use BIM software to generate drone measurement routes, and use drones to collect spatial position data, and the collected data is synchronously updated to the BIM model; The position data obtained from the initial BIM model is used as a reference and compared with the updated building position to obtain the building deformation result; S4. According to the building deformation results, alarms are issued from three dimensions: point, line and surface; Among them, S1 specifically includes the following steps: S11. Obtain DEM data of the area surrounding the building through satellite images, import the DEM data into the building information model, and generate a preliminary terrain model of the area surrounding the building; S12. Obtain Insar data of the area surrounding the building; S13. Find the location of the building structure or facility structure from the DEM data, obtain the building structure height or facility structure height data, and subtract the building structure height or facility structure height data; S14. Get the latest ground height data : ; in, It represents the settlement deformation of the area around the S building obtained by Insar data. Positive values ​​indicate rise, while negative values ​​indicate settlement. represents the DEM height of the building S area, It indicates the height value around the S building monitored by DEM; S15. Input the latest ground height data as the actual ground height of the area surrounding the S building into the building information model to complete the terrain modeling of the building and the surrounding area; S16. Perform building modeling based on building structure data, calibrate the spatial coordinate system of the building information model, and obtain the longitude, latitude and height information of all points of interest in the building information model; S17. Assign specific properties to components, including component material, yield limit, elastic modulus, material density, bending section coefficient and torsional section coefficient.

2. The method for warning of urban building deformation according to claim 1, characterized in that: The measuring points include: Simple measuring points are the measurements of corresponding points, including building overall measuring points and ground settlement measuring points; Component measuring points are the measurements of corresponding lines, including horizontal component measuring points and vertical component measuring points; Vertical components The support cross section of the entire building is divided into two parts, the upper and lower parts, and the statistics function in the BIM software is used to count all the components. The weight of the upper part of the component is analyzed by force. All components of the same fault are quantized to form a simple multi-support force model to analyze the components. The stress characteristics of the component are analyzed, the axial force of the component and the shear deformation of the vertical component are analyzed, and the corresponding dangerous points are found at the edge of the shear layer and where the cross-sectional size changes; the component connection points, end points and corresponding dangerous points are used as vertical component measurement points; The horizontal component measuring points include a first horizontal component measuring point and a second horizontal component measuring point; Analyze the bending characteristics of the component, use the bending section coefficient of the component, find the dangerous section and dangerous point of the component through force analysis, and use the dangerous point and the two end points of the component as the first horizontal component measurement point; Analyze the torsion resistance of the horizontal section, use the torsion section coefficient properties of the component to find the dangerous point of the torsion section, and use the dangerous point and the end point as the second horizontal component measurement point; Finite element analysis software is used to analyze the distribution of normal stress and shear stress in vertical and horizontal sections, find the corresponding stress concentration areas, and then determine the cross-sectional measurement points from the concentrated areas.

3. The method for warning of urban building deformation according to claim 1, characterized in that: S3 specifically includes the following steps: S31. Determination of the UAV data collection route; S32. Determine the distance measurement node by determining the route of the drone measuring the point of interest A in the building information model; S33. Calculate the deformation of the point of interest and update the position data; S34. Set up deformation alarm for drone measurement.

4. The method for warning of urban building deformation according to claim 3, characterized in that: The steps to determine the route for drone data collection include: ; in, Show route With tangent The vertical distance between Measure the tangent line to point A for the route parallel lines; represents the radius of the inscribed circle of the interest point B in the building section; represents the radius of the inscribed circle of the interest point A in the building section; The steps of determining the distance measurement node of the drone route for measuring the interest point A in the building information model include: Select and The two measuring points form an equilateral triangle with the route measurement interest A. and The distance between two measuring points , get and Initial spatial position coordinates of the two measuring points and ; Generate a route with known spatial location information of all points of interest and output it to the UAV control system to control the UAV to measure the actual building and obtain and Actual measurement results of two measuring points and , and the angles between the two survey lines and the flight path and ; The steps of calculating the deformation of the interest point include: measuring the interest point A from the initial position The point is deformed to Point, get triangle The lengths of the three sides, , and According to the three-side theorem, and Two measuring points determined location; The steps to update the location data include: In the BIM model, construct a triangle Same model, aligned again and Two measuring points and the corresponding angle, that is, find the corresponding Location and Point location data , complete the update of spatial location information; The steps for setting up the deformation alarm for drone measurement include: introducing the initial position point of the route measurement interest point A Parameters of route triangulation deformation parameters have: ; in, for The area of for exist The area of ​​the perpendicular projection triangle of the plane; Set the threshold to 0.

5. When the parameter route triangulation deformation parameter of the measuring point is less than the threshold, an alarm is triggered, indicating that the point of interest is deformed.

5. The method for warning of urban building deformation according to claim 1, characterized in that: S4 specifically includes the following steps: S41. Point dimension alarm based on the time series of the measuring points, including the alarm of the absolute value of vertical settlement and the alarm of the changing trend of the measuring points; S42. Perform line dimension alarms, including stress component alarms and functional component alarms; S43. Issue surface dimension alarms, including stress interface alarms and alarms for the sections with the greatest influence.

6. The method for warning of urban building deformation according to claim 5, characterized in that: The alarm steps of the absolute value of vertical settlement include: the vertical settlement is obtained by selecting the position time series of the highest plane measuring point of the building, calculating the average height change, and obtaining the change of the absolute value of the vertical settlement of the building; The alarm steps for the trend of measuring point changes include: clustering the measuring points in the three-dimensional space in the BIM software using the k-Means clustering method, starting from the measuring point with the largest RTDP value, improving the clustering performance through the error sum of the clustering results, and finally obtaining the clustering results after each data update; after each data update, the similarity of the two clustering results before and after is determined by adjusting the Rand coefficient ARI parameter, which is: ; Among them, e represents the number of point pairs that belong to the same cluster in both classification results, b represents the number of point pairs that belong to the same cluster in the latter classification result but not in the former classification result, c represents the number of point pairs that belong to the same cluster in the former classification result but not in the latter classification result, and f represents the number of point pairs that do not belong to the same cluster in the former classification result; the larger the ARI value, the closer the two classification results are, otherwise the more different they are; after the data is updated and the cluster analysis of the spatial position of the measuring points is completed, if the ARI value is greater than the deformation threshold, the building as a whole has a stable deformation trend. In the BIM software, the three directions of X / Y / Z are split and the absolute values ​​of the deformation are calculated respectively. The absolute value of the deformation is judged according to the direction threshold in the corresponding direction. If it is greater than the threshold, an alarm is required, otherwise no alarm is required; the smaller the ARI value, the more sporadic deformation of the building occurs. Compare the two classification results, find the measuring points with different classifications, and analyze the deformation; The stress component alarm steps include: monitoring the real-time position of the endpoint and the dangerous point of the deformation dangerous section, updating the deformation of the component in real time in the BIM model, and then comparing the deformation of the dangerous point under the limit state condition of the component in the finite element analysis software. If the ratio of the deformation that has occurred to the deformation under the limit condition exceeds the threshold , then an alarm is issued for the stressed component; The functional component alarm step includes: measuring the functional component once every 0.5 days, adding a size threshold for each component, and issuing an alarm when the monitored size exceeds the threshold.

7. The method for warning of urban building deformation according to claim 5, characterized in that: The warning steps of the stress-bearing section include: updating the results according to the measurement point data, analyzing the stress concentration of the stress-bearing section with the help of BIM software, and introducing the strain energy density parameters in mechanics, which are: ; Where W represents the strain energy density, represents the stress in the region, Indicates the strain in the area; for cross sections with critical strain energy density materials, an alarm is given based on the strain energy density; otherwise, it is necessary to analyze the distribution diagram of the strain energy density in the structure in the finite element analysis software and make a judgment based on expert experience; The warning steps for the most influential section include: analyzing whether there is stress concentration in the section and the influence of the largest section on other sections; introducing the average strain energy density parameter, which is: ; in, represents the average strain energy density parameter, represents the area at the area block v, and N represents the number of all area blocks. In the BIM model, the strain energy density parameters on the section are evenly distributed by adjusting the material of each section or adding external fixing methods, and the strain energy density changes of other sections are analyzed. Since the danger of each section depends on the maximum strain energy density value, after implementing the corresponding measures, the change value of the maximum strain energy density of each section is calculated, that is: ; in, represents the number of building sections, Represents the mth section The cross-sectional importance parameters of and Respectively before and after the implementation of the measures The maximum strain energy density on the cross section; find the cross section with the largest cross section importance parameter, which is the cross section with the greatest influence on the deformation monitoring of the entire building.

8. An electronic device, characterized in that: The method comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the urban building deformation alarm method as described in any one of claims 1 to 7 when executing the computer program.

9. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed by a processor, the method for warning of urban building deformation as described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Building monitoring method based on BIM

    CN113743727A

  • Bridge monitoring method

    CN108645360A

  • A 3D city modeling method based on BIM and GIS

    CN109410327A

  • Urban infrastructure deformation monitoring method based on high-resolution PS-InSAR

    CN115494501A

  • Dynamic display method and system for deformation monitoring of hydraulic structure, terminal and medium

    CN116858178A

Cited By

  • Point cloud and HBIM fused cultural relic and ancient building structure deformation quantitative diagnosis method

    CN121430483A