A second lining slipform construction method for vehicle tunnel

Through the structural steel splicing sliding form frame and jack system, combined with the infrared range finder and hydraulic system, the complex and unstable problems of traditional wooden formwork construction are solved, and the flatness and dimensional accuracy of the second lining of the horizontal tunnel of the vehicle are achieved, shortening the time and improve construction efficiency.

CN118148667BActive Publication Date: 2024-10-25JIANGXI PROVINCIAL TRANSPORTATION ENG GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410239214.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2024-10-25
Estimated Expiration
2044-03-04

AI Technical Summary

Technical Problem

The traditional wooden formwork construction in the secondary lining of the horizontal tunnel is complicated to set up and dismantle, takes a long time, is highly unstable, and is easily affected by the humid environment, causing deformation and corrosion, affecting the quality and stability of the lining.

Method used

Structural steel is spliced ​​into a sliding form frame, and a jack system and monitoring components are installed to ensure normal pressure through an infrared range finder. The hydraulic jack system drives the sliding form frame to move, and concrete pouring is completed section by section to ensure the flatness and dimensional accuracy of the lining.

Benefits of technology

It reduces dimensional deviations and surface unevenness, improves construction quality control, shortens the construction period and human resource requirements, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118148667B_ABST
    Figure CN118148667B_ABST
Patent Text Reader

Abstract

The invention discloses a second lining slipform construction method for a vehicle-carrying cross tunnel, which relates to the field of tunnel construction and comprises the following steps: step one, preparation and installation, according to specific needs and design requirements, I-shaped structural steel is assembled and spliced ​​into a slipform frame by high-strength bolts, and then a jack system is installed on the slipform frame, step two, starting the jacks, the jack systems of the two side forms and the jack system of the top form, step three, lining pouring construction, pouring concrete into the formwork evenly and densely, ensuring that the mix ratio and pouring method of the concrete meet the design requirements, and taking necessary vibration measures to ensure the quality and uniformity of the concrete, step four, two-stage lining pouring, pouring concrete at the second lining position, the application reduces the problems of dimensional deviation and surface unevenness, and at the same time reduces the steps of building and dismantling the formwork, saving construction time and human resources, which helps to shorten the construction period and improve construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention mainly relates to the technical field of tunnel construction, and specifically to a secondary lining slipform construction method for a vehicle-carrying transverse tunnel. Background Art

[0002] With the development of highway traffic and the acceleration of urbanization in my country, the construction of tunnels has become a necessary transportation infrastructure. With the continuous advancement of tunnel construction, the choice of construction method is crucial to the efficiency and quality of the project.

[0003] In the past, wooden formwork construction was often used in the construction of the secondary lining of the vehicle tunnel. However, this traditional construction method has some obvious disadvantages and limitations. The process of setting up and dismantling the wooden formwork is relatively complicated and time-consuming. The wooden formwork needs to be spliced, adjusted and fixed, and this process requires a lot of human resources and time. Therefore, wooden formwork construction may lead to an extension of the construction period, increasing the construction period and cost. The wooden formwork itself has deformation and instability, which may lead to inaccurate geometry of the lining, dimensional deviation and surface unevenness. This is an important issue for tunnel projects that require strict control of construction quality. Wooden boards are easily affected by humid environments, resulting in reduced durability. In a humid tunnel environment, wooden formwork is easily eroded by factors such as humidity, corrosion and insect infestation, causing deformation, rot or damage, which has a negative impact on the quality and stability of the lining. Summary of the invention

[0004] Based on this, the purpose of the present invention is to provide a secondary lining slipform construction method for a vehicle-carrying cross tunnel to solve the technical problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A secondary lining slipform construction method for a vehicle tunnel comprises the following steps:

[0007] Step 1: Preparation and installation. According to specific needs and design requirements, assemble and splice the I-shaped structural steel into a sliding formwork frame through high-strength bolts, then install the jack system on the sliding formwork frame, and connect the top formwork and the two side forms to the ends of the jack system. Finally, install the L-shaped plates in the two sets of monitoring components on the columns and the second beam through the driving components, connect the monitoring components located on the second beam with the U-shaped connecting block, and the U-shaped connecting block is installed with the second beam through the rotating component;

[0008] Step 2: Start the jacks, the jack systems of the two side molds and the jack system of the top mold, so that the top mold and the two side molds fit closely with the second lining surface of the cross hole, ensuring the geometric shape and size symbol requirements of the lining, and the infrared rangefinder works to monitor the distance between the two side molds and the top mold to ensure that the jack pressure is normal;

[0009] Step 3: Lining pouring construction: pour the concrete evenly and densely into the formwork, ensure that the concrete mix ratio and pouring method meet the design requirements, and take necessary vibration measures to ensure the quality and uniformity of the concrete. After the first section of concrete reaches the design strength, start the jack system to retract the side formwork and top formwork on both sides, and then push the sliding formwork to the second section of the lining position to ensure accurate fit with the first section construction area to ensure the continuity and quality of the lining;

[0010] Step 4: Second-stage lining pouring: Pour concrete at the second lining position, using similar operating steps to the first stage to ensure the uniformity and density of the concrete.

[0011] Specifically, the technical solution is that a plurality of the structural steels are assembled into columns, a first beam and a second beam, the two ends of the first beam are fixedly connected to the columns, the second beam is located above the first beam, the jack system is composed of a plurality of hydraulic jacks, and the plurality of hydraulic jacks are respectively installed on the outer side walls of two columns, the top of the first beam and the top of the second beam, the second beam is fixedly connected to the first beam through the jack system, the jack system is respectively fixedly connected to the top mold and the two side molds, and the two ends of the top mold are fixedly connected to the ends of the two side molds through high-strength bolts;

[0012] The monitoring component includes an L-shaped plate, a mounting plate is fixedly installed on the short end face of the L-shaped plate, an infrared rangefinder is embedded in the center of the mounting plate, a long end face of the L-shaped plate is symmetrically provided with a slide groove matching the end face of the structural steel, a protection box is fixedly installed at the center of a side of the L-shaped plate away from the slide groove, a driving component is provided inside the protection box and the L-shaped plate, the execution end of the driving component abuts against the end face of the structural steel, a fixing block is welded to the side wall of the long end face of the L-shaped plate, a plug-in rod is welded to one side of the fixing block, the U-shaped connecting block is in contact with the bottom end of the second beam, a plug-in groove matching the plug-in rod is symmetrically provided on the top of one side of the U-shaped connecting block, and the mounting component of the U-shaped connecting block is clamped and fixed to the extending end of the second beam.

[0013] Specifically, the technical solution of the present invention is as follows: the driving assembly includes an active cavity opened in an L-shaped plate, both sides of the active cavity are connected with the slide groove, a rotating shaft is rotatably installed at the center of the active cavity, one end of the rotating shaft passes through the active cavity and extends into the protective box, a driving gear is fixedly installed on the outer wall of the rotating shaft located in the active cavity, both sides of the driving gear are meshedly connected with outer tooth plates, support plates are welded to the opposite ends of the two outer tooth plates, and the end faces of the two support plates are tightly abutted against the extended ends of the structural steel.

[0014] Specifically, the inner walls on both sides of the movable cavity are provided with T-shaped grooves, and the outer walls of the two outer tooth plates are welded with T-shaped sliders at one end away from the support plate. The two T-shaped sliders are located in the T-shaped grooves and are slidably connected, and the end faces of the two support plates are bonded with rubber pads.

[0015] Specifically, the other end of the rotating shaft is rotatably connected to the cavity wall of the movable cavity, and a worm gear is fixedly installed on the outer wall of the rotating shaft located in the protective box. A worm is meshingly connected to one side of the worm gear, one end of the worm is rotatably connected to the wall of the protective box, and the other end of the worm passes through the protective box and is welded with a rotating handle.

[0016] The technical solution is specific in that both side walls of the U-shaped connecting block are provided with movable grooves on one side close to the second cross beam, and both movable grooves are provided with square sleeves, and push plates are slidably penetrated through the top ends of the two square sleeves, and the lower surfaces of the two push plates are in contact with the extended ends of the second cross beam, and a rotating assembly is provided in the bottom of the U-shaped connecting block, and the execution end of the rotating assembly is connected to the square sleeve.

[0017] Specifically, the rotating component includes a cavity opened at the bottom of the U-shaped connecting block, a rotating shaft is rotatably installed at the center of the cavity, the bottom end of the rotating shaft passes through the U-shaped connecting block and is welded with a handle, a driving wheel is fixedly installed on the outer wall of the rotating shaft, driven wheels are meshingly connected on both sides of the driving wheel, and threaded rods are fixedly passed through the centers of the two driven wheels, and the threaded ends of the two threaded rods are located in the movable grooves.

[0018] The technical solution is specific, the outer walls of the two square sleeves are in contact with the groove walls of the movable groove, the bottom ends of the two square sleeves are sleeved on the threaded end of the threaded rod, the upper surfaces of the two push plates are symmetrically welded with limit sliders, the top of the square sleeve is located in the groove through which the push plate passes, and a slideway matching the limit slider is provided, the top of the outer walls on both sides of the U-shaped connecting block is provided with a through groove connected to the movable groove, the end faces of the two push plates are located in the through groove and a pull rope is fixedly connected at the center, and the two pull ropes are located on the outside of the U-shaped connecting block.

[0019] Specifically, an iron plate is fixedly mounted on the end of each of the plug-in rods, and magnets are embedded in the bottoms of the two plug-in slots, and the magnets are connected to the iron plate by magnetic adsorption.

[0020] Specifically, the length of the structural steel is 1.5 meters.

[0021] In summary, the present invention mainly has the following beneficial effects: the slipform construction method of the present application can ensure the flatness and dimensional accuracy of the lining, reduce the problems of dimensional deviation and surface unevenness, facilitate quality control and inspection during the advancement process, and make necessary adjustments and repairs to ensure that the construction quality meets the standards, while reducing the steps of building and dismantling the formwork, saving construction time and human resources, which helps to shorten the construction period and improve construction efficiency;

[0022] First, the structural steel is fixed with high-strength bolts to form columns, the first beam and the second beam, and then the sliding formwork frame is assembled with high-strength bolts. The jack system is installed on the sliding formwork frame, and the top form and the two side forms are connected to the jack system. Then, the L-shaped plates of one set of monitoring components are fixed on the two columns through the driving component, and the L-shaped plates of another set of monitoring components are inserted into the plug-in slots of the U-shaped connecting block through the plug-in rods, and fixed by the magnetic adsorption of the magnet and the iron plate. Then, the U-shaped connecting block is installed on the second beam under the action of the rotating component to complete the fixation;

[0023] Then the sliding formwork frame is driven to move by the walking system. After moving to the designated position, the jacks of the top formwork and the two side forms are started, so that the top formwork and the two side forms are closely attached to the second lining surface. At the same time, the infrared rangefinder works to perform infrared distance detection on the top formwork and the two side forms to avoid the movement of the top formwork and the two side forms due to the reduction of the jack pressure, thus ensuring the safety of construction.

[0024] Then pour concrete into the formwork and vibrate it. When the concrete reaches the designed strength, start the jack system, retract the two side formworks and the top formwork, and then push the sliding formwork frame to the second lining position through the walking system. Re-fix the top formwork and the two side formworks to ensure that they fit the concrete again. Then, follow the above steps to repeat the construction process of formwork installation, concrete pouring, hydraulic formwork relaxation and sliding, and hydraulic formwork fixing to complete the second lining work section by section. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 is a step diagram of the present invention;

[0026] Figure 2 It is a construction process flow chart of the present invention;

[0027] Figure 3 It is a cross-sectional schematic diagram of the present invention;

[0028] Figure 4 It is an enlarged view of point A of the present invention;

[0029] Figure 5 It is a schematic diagram of the monitoring component of the present invention;

[0030] Figure 6This is a schematic diagram of a U-shaped connection block of the present invention;

[0031] Figure 7 It is a cross-sectional view of the driving assembly and the rotating assembly of the present invention.

[0032] Description of the drawings: 1. Sliding formwork frame; 101. Column; 102. First crossbeam; 103. Second crossbeam; 2. Top form; 3. Side form; 4. Jack system; 5. Structural steel; 6. High-strength bolts; 7. Monitoring assembly; 701. L-shaped plate; 7011. Slideway; 702. Mounting plate; 7021. Infrared rangefinder; 703. Fixing block; 7031. Connecting rod; 7032. Iron plate; 704. Protective box; 8. Driving assembly; 801. Active cavity; 8011. T-shaped slideway; 802. Rotating shaft; 803. Driving gear Wheel; 804, worm wheel; 805, worm; 806, turning handle; 807, supporting plate; 808, outer tooth plate; 8081, T-shaped slider; 9, U-shaped connecting block; 901, moving groove; 902, square sleeve; 903, push plate; 9031, limit slider; 9032, pull rope; 904, through groove; 10, rotating component; 1001, cavity; 1002, rotating shaft; 1003, handle; 1004, driving wheel; 1005, driven wheel; 1006, threaded rod; 11, plug-in slot; 1101, magnet. DETAILED DESCRIPTION

[0033] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0034] The following describes an embodiment of the present invention based on its overall structure.

[0035] Example

[0036] See also Figures 1 to 7 As shown, a sliding form construction method for the secondary lining of a vehicle tunnel comprises the following steps:

[0037] Step 1, preparation and installation. According to specific needs and design requirements, assemble and splice the I-shaped structural steel 5 into a sliding formwork frame 1 through high-strength bolts 6, then install the jack system 4 on the sliding formwork frame 1, and connect the top form 2 and the two side forms 3 to the ends of the jack system 4. Finally, install the L-shaped plates 701 in the two sets of monitoring components 7 on the columns 101 and the second beam 103 through the driving components 8, and connect the monitoring components 7 located on the second beam 103 to the U-shaped connecting block 9, and the U-shaped connecting block 9 is installed with the second beam 103 through the rotating component 10;

[0038] Step 2: Start the jacks, the jack systems 4 of the two side molds 3 and the jack system 4 of the top mold 2, so that the top mold 2 and the two side molds 3 are closely fitted to the two lining surfaces of the cross hole, ensuring the geometric shape and size symbol requirements of the lining, and the infrared rangefinder 7021 works to monitor the distance between the two side molds 3 and the top mold 2 to ensure that the jack pressure is normal;

[0039] Step 3: Lining pouring construction: pour the concrete evenly and densely into the formwork, ensure that the concrete mix ratio and pouring method meet the design requirements, and take necessary vibration measures to ensure the quality and uniformity of the concrete. After the first section of concrete reaches the design strength, start the jack system 4 to retract the side formwork 3 and top formwork 2 on both sides, and then push the sliding formwork frame 1 to the second section lining position to ensure accurate fit with the first section construction area to ensure the continuity and quality of the lining;

[0040] Step 4: Second-stage lining pouring: Pour concrete at the second lining position, using similar operating steps to the first stage to ensure the uniformity and density of the concrete.

[0041] Construction process:

[0042] Construction preparation → Fixing of lining formwork → Construction of the first section of lining → Separation of formwork from concrete → Advancement of formwork → Construction of the second section of lining.

[0043] This method intends to use customized fixed restraining steel plates to ensure the uniformity of the effective length of the steel strands and to ensure that the steel strands are not affected by external factors and are not rusted, thereby saving materials and ensuring quality.

[0044] The walking system in this application adopts the existing technology, lays rails according to the length of the on-site cross-hole, slides the slipform frame 1 on the rails, uses a motor to drive the movement of the slipform frame 1, and drives the entire slipform system through the motor equipped with the first section of the slipform frame 1, and all electrical components in the article are controlled by an external controller.

[0045] See also Figures 3 to 7 As shown, the length of the structural steel 5 is 1.5 meters, which can adapt to lining sections of different lengths. Several structural steels 5 are assembled into a column 101, a first beam 102 and a second beam 103. Both ends of the first beam 102 are fixedly connected to the column 101. The second beam 103 is located above the first beam 102. The jack system 4 is composed of a plurality of hydraulic jacks, which are respectively installed on the outer walls of the two columns 101, the top of the first beam 102 and the top of the second beam 103. The second beam 103 is fixedly connected to the first beam 102 through the jack system 4. The jack system 4 is fixedly connected to the top mold 2 and the two side molds 3 respectively. Both ends of the top mold 2 are fixedly connected to the ends of the two side molds 3 through high-strength bolts 6.

[0046] The monitoring component 7 includes an L-shaped plate 701, a mounting plate 702 is fixedly mounted on the short end face of the L-shaped plate 701, an infrared rangefinder 7021 is embedded in the center of the mounting plate 702, a slide groove 7011 matching the end face of the structural steel 5 is symmetrically opened on the long end face of the L-shaped plate 701, a protective box 704 is fixedly mounted at the center of a side of the L-shaped plate 701 away from the slide groove 7011, a driving component 8 is arranged inside the protective box 704 and the L-shaped plate 701, the execution end of the driving component 8 is in contact with the end face of the structural steel 5, and the long end face of the L-shaped plate 701 A fixing block 703 is welded to the side wall, a plug-in rod 7031 is welded to one side of the fixing block 703, the U-shaped connecting block 9 is in contact with the bottom end of the second beam 103, and a plug-in slot 11 matching the plug-in rod 7031 is symmetrically opened on the top of one side of the U-shaped connecting block 9, and an iron plate 7032 is fixedly installed at the end of each plug-in rod 7031, and magnets 1101 are embedded in the bottom of the two plug-in slots 11, and the magnets 1101 are magnetically adsorbed and connected to the iron plate 7032, and the mounting parts of the U-shaped connecting block 9 are clamped and fixed to the extended end of the second beam 103.

[0047] First, multiple structural steels 5 are spliced ​​with high-strength bolts 6 to form columns 101, first beams 102 and second beams 103, and then they are spliced ​​with high-strength bolts 6 to form a sliding formwork frame 1. The jack system 4 is installed on the sliding formwork frame 1, and the top form 2 and two side forms 3 are connected to the jack system 4. Then, an L-shaped plate 701 of a set of monitoring components 7 is installed on the column 101, so that the slide groove 7011 is sleeved on the extended end of the structural steel 5. Then, the staff rotates the driving component 8 to move the execution end of the driving component 8 to the inner wall of the extended end of the structural steel 5. The monitoring components 7 are tightly abutted to complete the installation of the monitoring components 7 on the column 101, and then another set of monitoring components 7 is inserted into the plug-in slot 11 of the U-shaped connecting block 9 through the plug-in rod 7031, so that the magnet 1101 is magnetically connected with the iron plate 7032, and the monitoring components 7 and the U-shaped connecting block 9 are fixed. Then, the U-shaped connecting block 9 together with the two monitoring components 7 are installed at the bottom of the second crossbeam 103, so that the infrared rangefinder 7021 of the monitoring component 7 faces the top mold 2, and then the staff clamps and fixes the U-shaped connecting block 9 and the extended end of the second crossbeam 103 through the rotating component 10;

[0048] Then, the external controller starts the walking system to drive the sliding formwork frame 1 to move along the laid rails. After moving to the designated position, the jack system is started to make the top formwork 2 and the two side forms 3 fit closely to the second lining surface. At the same time, the infrared rangefinder 7021 works to perform infrared distance detection on the top formwork 2 and the two side forms 3 to avoid the top formwork 2 and the two side forms 3 from moving due to the reduction of the jack pressure, thereby ensuring construction safety.

[0049] Then pour concrete into the formwork and vibrate it. When the concrete reaches the designed strength, start the jack system 4, retract the two side formworks 3 and the top formwork 2, and push the sliding formwork frame 1 to the second lining position through the walking system. Then re-fix the top formwork 2 and the two side formworks 3 to ensure that they are re-fitted with the concrete. Then, according to the above steps, repeat the construction process of formwork installation, concrete pouring, hydraulic formwork relaxation and sliding, and hydraulic formwork fixing to complete the lining work of the second lining section by section.

[0050] Therefore, the slipform construction method can ensure the flatness and dimensional accuracy of the lining, reduce the problems of dimensional deviation and surface unevenness, facilitate quality control and inspection during the advancement process, and make necessary adjustments and repairs to ensure that the construction quality meets the standards. At the same time, it reduces the steps of setting up and dismantling the formwork, saving construction time and human resources, which helps to shorten the construction period and improve construction efficiency.

[0051] See also Figure 4 , Figure 5 and Figure 7 As shown, the driving assembly 8 includes an active cavity 801 opened in the L-shaped plate 701, both sides of the active cavity 801 are connected to the slide groove 7011, a rotating shaft 802 is rotatably installed at the center of the active cavity 801, one end of the rotating shaft 802 passes through the active cavity 801 and extends into the protective box 704, a driving gear 803 is fixedly installed on the outer wall of the rotating shaft 802 located in the active cavity 801, both sides of the driving gear 803 are meshed and connected with outer track tooth plates 808, the opposite ends of the two outer track tooth plates 808 are welded with support plates 807, the end faces of the two support plates 807 are tightly abutted against the extended end of the structural steel 5, and the inner walls on both sides of the active cavity 801 are opened. A T-shaped slide groove 8011 is provided, and a T-shaped slider 8081 is welded on one end of the outer wall of the two outer tooth plates 808 away from the support plate 807. The two T-shaped sliders 8081 are both located in the T-shaped slide groove 8011 and are slidably connected. The end faces of the two support plates 807 are bonded with rubber pads. The other end of the rotating shaft 802 is rotatably connected to the cavity wall of the movable cavity 801. The outer wall of the rotating shaft 802 located in the protective box 704 is fixedly installed with a worm gear 804, and a worm 805 is meshingly connected to one side of the worm gear 804. One end of the worm 805 is rotatably connected to the box wall of the protective box 704, and the other end of the worm 805 passes through the protective box 704 and is welded with a handle 806.

[0052] The staff rotates the handle 806 manually or with a wrench, and the handle 806 drives the worm 805 to rotate, and the worm 805 drives the meshing worm wheel 804 to rotate, and the worm wheel 804 drives the penetrating shaft 802 to rotate, and drives the driving gear 803 to rotate synchronously through the shaft 802, and the rotating driving gear 803 drives the meshing outer tooth plates 808 on both sides to move laterally, and the two outer tooth plates 808 drive the support plate 807 and the T-shaped slider 8081 to move, and the T-shaped slider 8081 slides along the T-shaped slide groove 8011 to limit the outer tooth plates 808, and the two support plates 807 are respectively tightly abutted against the inner walls of the extended ends of the structural steel in the slide groove 7011, and the friction force and the firmness of the installation can be improved by the rubber pad, and the driving form of the worm 805 and the worm wheel 804 can be locked to further ensure the firmness.

[0053] See also Figure 4 , Figure 6 and Figure 7 As shown, both side walls of the U-shaped connection block 9 are provided with moving grooves 901 on one side close to the second cross beam 103, and both moving grooves 901 are provided with square sleeves 902, and both top ends of the two square sleeves 902 are slidably penetrated with push plates 903, and the lower surfaces of the two push plates 903 are in contact with the extended ends of the second cross beam 103, and a rotating assembly 10 is provided in the bottom of the U-shaped connection block 9, and the execution end of the rotating assembly 10 is connected to the square sleeves 902;

[0054] The rotating assembly 10 includes a cavity 1001 opened at the bottom of the U-shaped connecting block 9, a rotating shaft 1002 is rotatably installed at the center of the cavity 1001, the bottom end of the rotating shaft 1002 passes through the U-shaped connecting block 9 and is welded with a handle 1003, a driving wheel 1004 is fixedly installed on the outer wall of the rotating shaft 1002, and driven wheels 1005 are meshed and connected on both sides of the driving wheel 1004, and threaded rods 1006 are fixedly penetrated at the center of the two driven wheels 1005, and the threaded ends of the two threaded rods 1006 are located in the moving groove 901, and the outer walls of the two square sleeves 902 are both in contact with the moving groove 90 1, the bottom ends of the two square sleeves 902 are sleeved on the threaded ends of the threaded rod 1006, the upper surfaces of the two push plates 903 are symmetrically welded with limit sliders 9031, the top of the square sleeve 902 is located in the groove through which the push plate 903 passes, and a slideway matching the limit slider 9031 is opened, and the top of the outer wall on both sides of the U-shaped connecting block 9 is provided with a through groove 904 connected to the movable groove 901, the end faces of the two push plates 903 are located in the through groove 904 and a pull rope 9032 is fixedly connected at the center, and the two pull ropes 9032 are located on the outside of the U-shaped connecting block 9.

[0055] After the bottom of the U-shaped surface of the U-shaped connecting block 9 contacts the bottom end of the second crossbeam 103, the staff manually pushes the push plate 903 in the through groove 904, so that the push plate 903 moves along the groove penetrated by the square sleeve 902 under the action of the limit slider 9031 and the slideway, so that the push plate 903 contacts the inner wall of the extended end of the structural steel 5 when it moves downward, and the U-shaped surface is matched to achieve clamping installation, and then the handle 1003 is rotated manually or with a wrench, and the handle 1003 drives the driving wheel 1004 to rotate through the rotating shaft 1002, and the driving wheel 1004 drives the two sides The meshing driven wheels 1005 rotate, and the two rotating driven wheels 1005 drive the threaded rod 1006 to rotate, so that the square sleeves 902 in the two movable grooves 901 move downward following the rotation of the threaded rod 1006 under the restriction of the inner wall of the groove, and the downward moving square sleeves 902 drive the extended push plate 903 to move downward until the lower surface of the end of the push plate 903 is in close contact with the inner wall of the extended end of the structural steel 5, completing the clamping installation of the U-shaped connecting block 9, thereby facilitating the installation of the two L-shaped plates 701 on the second beam 103, and the installation is more convenient.

[0056] The working principle of the present invention is:

[0057] First, multiple structural steels 5 are spliced ​​with high-strength bolts 6 to form columns 101, first beams 102 and second beams 103, and then they are spliced ​​with high-strength bolts 6 to form a sliding formwork frame 1. The jack system 4 is installed on the sliding formwork frame 1, and the top form 2 and two side forms 3 are connected to the jack system 4. Then, an L-shaped plate 701 of a set of monitoring components 7 is installed on the column 101, so that the slide groove 7011 is sleeved on the extended end of the structural steel 5. Then, the staff manually or using a wrench rotates the handle 806, the handle 806 drives the worm 805 to rotate, and the worm 805 drives the meshing worm gear 804 rotates, the worm gear 804 drives the rotating shaft 802 to rotate, and the rotating shaft 802 drives the driving gear 803 to rotate synchronously, and the rotating driving gear 803 drives the outer track tooth plates 808 meshing on both sides to move horizontally, and the two outer track tooth plates 808 drive the support plate 807 and the T-shaped slider 8081 to move, and the T-shaped slider 8081 slides along the T-shaped slide groove 8011 to limit the outer track tooth plates 808, and the two support plates 807 are respectively tightly abutted against the inner wall of the extended end of the structural steel in the slide groove 7011, completing the installation of the monitoring component 7 on the column 101;

[0058] Then, another set of monitoring components 7 is inserted into the plug-in slot 11 of the U-shaped connecting block 9 through the plug-in rod 7031, so that the magnet 1101 is magnetically connected to the iron plate 7032, and the monitoring component 7 is fixed to the U-shaped connecting block 9. Then, the U-shaped connecting block 9 is installed with two monitoring components 7 at the bottom of the second crossbeam 103, so that the bottom of the U-shaped surface contacts the bottom end of the second crossbeam 103. Then, the staff manually pushes the push plate 903 in the through groove 904, so that the push plate 903 moves along the groove penetrated by the square sleeve 902 under the action of the limit slider 9031 and the slideway, so that the push plate 903 contacts the inner wall of the extended end of the structural steel 5 when it moves downward later. The U-shaped surface is combined to achieve clamping installation, and then the handle 1003 is rotated manually or with a wrench. The handle 1003 drives the driving wheel 1004 to rotate through the rotating shaft 1002, and the driving wheel 1004 drives the driven wheels 1005 engaged on both sides to rotate. The two rotating driven wheels 1005 drive the threaded rod 1006 to rotate, so that the square sleeves 902 in the two movable grooves 901 move downward following the rotation of the threaded rod 1006 under the restriction of the inner wall of the groove, and the downward moving square sleeve 902 drives the extended push plate 903 to move downward until the lower surface of the end of the push plate 903 is in close contact with the inner wall of the extended end of the structural steel 5, completing the clamping installation of the U-shaped connecting block 9;

[0059] Then, the external controller starts the walking system to drive the sliding formwork frame 1 to move along the laid rails. After moving to the designated position, the jack system is started to make the top formwork 2 and the two side forms 3 fit closely to the second lining surface. At the same time, the infrared rangefinder 7021 works to perform infrared distance detection on the top formwork 2 and the two side forms 3 to avoid the top formwork 2 and the two side forms 3 from moving due to the reduction of the jack pressure, thereby ensuring construction safety.

[0060] Then pour concrete into the formwork and vibrate it. When the concrete reaches the designed strength, start the jack system 4, retract the two side formworks 3 and the top formwork 2, and then push the sliding formwork frame 1 to the second lining position through the walking system, re-fix the top formwork 2 and the two side formworks 3 to ensure that they are re-fitted with the concrete. Then, according to the above steps, repeat the construction process of formwork installation, concrete pouring, hydraulic formwork relaxation and sliding, and hydraulic formwork fixing to complete the lining work of the second lining section by section.

[0061] Although an embodiment of the present invention has been shown and described, this specific embodiment is merely an explanation of the present invention and is not a limitation of the invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contributions as needed without departing from the principles and purpose of the present invention. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.

Claims

1. A sliding form construction method for the secondary lining of a vehicle tunnel, characterized in that: The following steps are involved: Step 1: Preparation and installation. According to specific needs and design requirements, I-shaped structural steel (5) is assembled and spliced ​​into a sliding formwork frame (1) through high-strength bolts (6), and then the jack system (4) is installed on the sliding formwork frame (1), and the top form (2) and the two side forms (3) are connected to the ends of the jack system (4). Finally, the L-shaped plates (701) in the two sets of monitoring components (7) are installed on the columns (101) and the second beam (103) through the driving components (8), and the monitoring components (7) located on the second beam (103) are connected to the U-shaped connecting block (9), and the U-shaped connecting block (9) is installed with the second beam (103) through the rotating component (10); Step 2: Start the jacks, the jack systems (4) of the two side molds (3) and the jack system (4) of the top mold (2), so that the top mold (2) and the two side molds (3) are closely fitted to the second lining surface of the horizontal hole, ensuring that the geometric shape and size symbol requirements of the lining are met, and the infrared rangefinder (7021) works to monitor the distance between the two side molds (3) and the top mold (2), ensuring that the jack pressure is normal; Step 3: Lining pouring construction: pour concrete evenly and densely into the formwork, ensure that the concrete mix ratio and pouring method meet the design requirements, and take vibration measures to ensure the quality and uniformity of the concrete. After the first section of concrete reaches the design strength, start the jack system (4) to retract the side formwork (3) and top formwork (2) on both sides, and then push the sliding formwork frame (1) to the second section of the lining position to ensure that it fits accurately with the first section construction area to ensure the continuity and quality of the lining; Step 4: Second stage lining pouring: pour concrete at the second stage lining position, adopt similar operation steps as the first stage to ensure the uniformity and density of the concrete; The monitoring component (7) comprises an L-shaped plate (701), a mounting plate (702) is fixedly mounted on the short end face of the L-shaped plate (701), an infrared rangefinder (7021) is embedded in the center of the mounting plate (702), a slide groove (7011) matching the end face of the structural steel (5) is symmetrically opened on the long end face of the L-shaped plate (701), a protection box (704) is fixedly mounted at the center of a side of the L-shaped plate (701) away from the slide groove (7011), and a driving component is arranged inside the protection box (704) and the L-shaped plate (701). (8), the execution end of the driving assembly (8) is in contact with the end face of the structural steel (5), a fixing block (703) is welded to the side wall of the long end face of the L-shaped plate (701), a plug-in rod (7031) is welded to one side of the fixing block (703), the U-shaped connecting block (9) is in contact with the bottom end of the second cross beam (103), a plug-in groove (11) matching the plug-in rod (7031) is symmetrically opened on the top of one side of the U-shaped connecting block (9), and the mounting component of the U-shaped connecting block (9) is clamped and fixed to the extended end of the second cross beam (103); The driving assembly (8) comprises an active cavity (801) provided in an L-shaped plate (701), both sides of the active cavity (801) are connected to the slide groove (7011), a rotating shaft (802) is rotatably mounted at the center of the active cavity (801), one end of the rotating shaft (802) passes through the active cavity (801) and extends into the protective box (704), a driving gear (803) is fixedly mounted on the outer wall of the rotating shaft (802) located in the active cavity (801), both sides of the driving gear (803) are meshedly connected with outer tooth plates (808), and opposite ends of the two outer tooth plates (808) are welded with support plates (807), and the end faces of the two support plates (807) are tightly abutted against the extended ends of the structural steel (5); A rotating assembly (10) is provided at the bottom of the U-shaped connecting block (9), and an execution end of the rotating assembly (10) is connected to the square sleeve (902); the rotating assembly (10) comprises a cavity (1001) opened at the bottom of the U-shaped connecting block (9), a rotating shaft (1002) is rotatably mounted at the center of the cavity (1001), a handle (1003) is welded to the bottom end of the rotating shaft (1002) passing through the U-shaped connecting block (9), a driving wheel (1004) is fixedly mounted on the outer wall of the rotating shaft (1002), driven wheels (1005) are meshingly connected to the two sides of the driving wheel (1004), threaded rods (1006) are fixedly penetrated at the centers of the two driven wheels (1005), and the threaded ends of the two threaded rods (1006) are located in the movable groove (901).

2. A secondary lining slipform construction method for a vehicle tunnel according to claim 1, characterized in that: A plurality of the structural steels (5) are assembled into a column (101), a first beam (102) and a second beam (103); both ends of the first beam (102) are fixedly connected to the column (101); the second beam (103) is located above the first beam (102); the jack system (4) is composed of a plurality of hydraulic jacks; the plurality of hydraulic jacks are respectively installed on the outer walls of the two columns (101), the top of the first beam (102) and the top of the second beam (103); the second beam (103) is fixedly connected to the first beam (102) via the jack system (4); the jack system (4) is respectively fixedly connected to the top mold (2) and the two side molds (3); and both ends of the top mold (2) are fixedly connected to the ends of the two side molds (3) via high-strength bolts (6).

3. The secondary lining slipform construction method of a vehicle tunnel according to claim 1 is characterized in that: The inner walls on both sides of the movable cavity (801) are provided with T-shaped grooves (8011), the outer walls of the two outer toothed plates (808) are welded with T-shaped sliders (8081) at one end away from the support plate (807), the two T-shaped sliders (8081) are located in the T-shaped grooves (8011) and are slidably connected, and the end surfaces of the two support plates (807) are bonded with rubber pads.

4. A secondary lining slipform construction method for a vehicle tunnel according to claim 1, characterized in that: The other end of the rotating shaft (802) is rotatably connected to the cavity wall of the movable cavity (801); a worm wheel (804) is fixedly mounted on the outer wall of the rotating shaft (802) located inside the protective box (704); a worm (805) is meshingly connected to one side of the worm wheel (804); one end of the worm (805) is rotatably connected to the wall of the protective box (704); and the other end of the worm (805) passes through the protective box (704) and is welded with a rotating handle (806).

5. The secondary lining slipform construction method for a vehicle tunnel according to claim 2 is characterized in that: Both side walls of the U-shaped connecting block (9) are provided with movable grooves (901) on one side close to the second cross beam (103), and both movable grooves (901) are provided with square sleeves (902). The top ends of the two square sleeves (902) are slidably penetrated by push plates (903), and the lower surfaces of the two push plates (903) are in contact with the extended end of the second cross beam (103).

6. A secondary lining slipform construction method for a vehicle tunnel according to claim 5, characterized in that: The outer walls of the two square sleeves (902) are in contact with the groove walls of the movable groove (901), the bottom ends of the two square sleeves (902) are sleeved on the threaded end of the threaded rod (1006), the upper surfaces of the two push plates (903) are symmetrically welded with limit sliders (9031), the top of the square sleeve (902) is located in the groove through which the push plate (903) passes, and a slideway matching the limit slider (9031) is opened, and the top of the outer walls on both sides of the U-shaped connecting block (9) are opened with a through groove (904) communicating with the movable groove (901), the end faces of the two push plates (903) are located in the through groove (904) and are fixedly connected with a pull rope (9032) at the center, and the two pull ropes (9032) are located on the outside of the U-shaped connecting block (9).

7. A secondary lining slipform construction method for a vehicle tunnel according to claim 2, characterized in that: An iron plate (7032) is fixedly mounted on the end of each plug-in rod (7031), and magnets (1101) are embedded in the bottoms of the two plug-in slots (11), and the magnets (1101) are connected to the iron plate (7032) by magnetic adsorption.

8. The secondary lining slipform construction method for a vehicle tunnel according to claim 2 is characterized in that: The length of the structural steel (5) is 1.5 meters.