A gas flow control system and control method for in-situ leaching uranium

By designing the in-situ uranium gas flow control system and using sensors and control components to adjust the flow control valve, the problem of pressure fluctuations caused by backflow in the liquid injection pipeline was solved and the efficiency of uranium mining operations was improved.

CN118167256BActive Publication Date: 2024-10-11BEIJING RESEARCH INSTITUTE OF CHEMICAL ENGINEERING AND METALLURGY +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410344505.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-10-11
Estimated Expiration
2044-03-25

AI Technical Summary

Technical Problem

In the in-situ uranium leaching process, backflow in the liquid injection pipeline causes large fluctuations in gas injection pressure, affecting operating efficiency. It is difficult to effectively control gas flow with existing technology.

Method used

A gas flow control system for in-ground leaching of uranium is designed, including a gas mass flow controller, a gas inlet component, an automatic drainage component, a gas outlet component and a control component. The pressure information and liquid level information are collected through sensors, and the control component is used Adjust the opening of the flow control valve to achieve precise control of gas flow and prevent backflow in the liquid injection pipeline.

Benefits of technology

It effectively avoids backflow interference caused by pressure fluctuations in the liquid injection pipeline, improves the efficiency of in-situ uranium mining, and ensures continuous gas injection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118167256B_ABST
    Figure CN118167256B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of flow control for in-situ uranium leaching, and relates to a gas flow control system for in-situ uranium leaching and a control method thereof, wherein the system comprises a gas mass flow controller, a gas inlet component, an automatic liquid drainage component, a gas outlet component, a control component and a pressure acquisition component; the gas inlet component is connected to the outlet of the gas mass flow controller; the automatic liquid drainage component is used to discharge reflux liquid; the gas outlet component is used to prevent reflux in the injection pipeline; the control component is electrically connected to the gas mass flow controller, the gas outlet component and the automatic liquid drainage component; the pressure acquisition component comprises a first sensor and a second sensor, the first sensor is arranged between the automatic liquid drainage component and the gas inlet component, and the second sensor is arranged between the injection pipeline and the gas outlet component. The control component of the present invention realizes the fine regulation of the flow control valve, and avoids the interference of the large fluctuation of the pressure of the intake system on the gas injection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of in-situ uranium leaching flow control, and in particular to a gas flow control system and a control method thereof for in-situ uranium leaching. Background Art

[0002] In-situ uranium leaching is the main mining process for natural uranium in my country, and the CO2+O2 in-situ uranium leaching process is currently the main one. In this process, oxygen and carbon dioxide gases need to be added to the injection system. Therefore, the stability, accurate measurement and control of the gas flow are very important. In the existing technology, the backflow of the injection pipeline will cause a large fluctuation in pressure, making it impossible to inject the gas normally and continuously, resulting in low efficiency of in-situ uranium leaching. Therefore, there is an urgent need for an in-situ uranium leaching gas flow control system and a control method thereof to effectively avoid the interference of the large pressure fluctuation caused by the backflow of the injection pipeline on the in-situ uranium leaching gas injection. Summary of the invention

[0003] The purpose of the present invention is to provide a gas flow control system and a control method for in-situ leaching of uranium to improve the above problems. In order to achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0004] On the one hand, the present application provides a gas flow control system for in-situ leaching of uranium, the system comprising: a gas mass flow controller, a gas inlet component, an automatic drainage component, a gas outlet component, a control component and a pressure acquisition component; the gas inlet component is connected to the outlet of the gas mass flow controller; the automatic drainage component is connected to the outlet of the gas inlet component, and the automatic drainage component is used to discharge reflux liquid; the gas outlet component is arranged between the automatic drainage component and the injection pipeline, and the gas outlet component is used to prevent reflux in the injection pipeline; the control component is electrically connected to the gas mass flow controller, the gas outlet component and the automatic drainage component; the pressure acquisition component comprises a first sensor and a second sensor, the first sensor is arranged between the automatic drainage component and the gas inlet component, and the second sensor is arranged between the injection pipeline and the gas outlet component.

[0005] Furthermore, the gas inlet assembly includes a pressure-stabilizing valve, an inlet stop valve and a first one-way valve, the inlet of the pressure-stabilizing valve is connected to the gas mass flow controller, the outlet of the pressure-stabilizing valve is connected to the inlet stop valve, the inlet stop valve is arranged between the first one-way valve and the pressure-stabilizing valve, and the first one-way valve is arranged between the automatic drain assembly and the inlet stop valve.

[0006] Furthermore, the automatic drainage component includes a drainage buffer tank, a liquid level meter and a flow control valve, the gas inlet of the drainage buffer tank is connected to the gas inlet component, the lower outlet of the drainage buffer tank is provided with a flow control valve, and the liquid level meter is arranged in the drainage buffer tank.

[0007] Furthermore, the gas outlet assembly includes a solenoid valve and a second one-way valve, the second one-way valve is arranged between the liquid injection pipeline and the automatic liquid drainage assembly, and the solenoid valve is arranged between the second one-way valve and the automatic liquid drainage assembly.

[0008] On the other hand, the present application provides a method for controlling gas flow rate in in-situ leaching of uranium, the method comprising:

[0009] Acquiring first pressure information and second pressure information;

[0010] Calculating according to the first pressure information and the second pressure information to obtain third pressure information;

[0011] Determine whether the third pressure information is greater than a pressure threshold, and obtain a first determination result;

[0012] Determine whether to close the solenoid valve according to the first judgment result.

[0013] Further, after determining whether to close the solenoid valve according to the first judgment result, the method further includes:

[0014] Acquiring liquid level information, wherein the liquid level information includes the liquid level of the reflux liquid in the drainage buffer tank;

[0015] Calculating according to the liquid level height information and the total height of the drainage buffer tank to obtain first information, wherein the first information is the ratio of the reflux liquid height to the total height of the drainage buffer tank;

[0016] The opening degree of the flow control valve is determined according to the third pressure information and the first information.

[0017] Further, determining the opening of the flow control valve according to the third pressure information and the first information includes:

[0018] Obtaining first threshold information, where the first threshold information is 0;

[0019] Determine whether the third pressure information is greater than the first threshold information, and obtain a second determination result;

[0020] Determine whether the first information is less than a liquid level threshold, and obtain a third determination result;

[0021] When the second judgment result is that the third pressure information is greater than the first threshold information and the first information is less than the liquid level threshold, a first control command is sent, where the first control command is used to adjust the opening of the flow control valve to 0.

[0022] Further, determining the opening of the flow control valve according to the third pressure information and the first information includes:

[0023] Determine whether the third pressure information is less than the first threshold information, and obtain a fourth determination result;

[0024] Determine whether the first information is greater than a liquid level threshold, and obtain a fifth determination result;

[0025] When the fourth judgment result is that the third pressure information is less than the first threshold information and the fifth judgment result is that the first information is greater than the liquid level threshold, a second control command is sent, and the second control command is used to adjust the flow control valve opening to 1.

[0026] Further, determining the opening of the flow control valve according to the third pressure information and the first information includes:

[0027] determining whether the third pressure information is greater than the pressure threshold, and obtaining a sixth determination result;

[0028] Determine whether the first information is equal to a liquid level threshold, and obtain a seventh determination result;

[0029] When the sixth judgment result is that the third pressure information is greater than the pressure threshold and the seventh judgment result is that the first information is equal to the liquid level threshold, a third control command is sent, and the third control command is used to adjust the flow control valve opening to 0.01.

[0030] Further, determining the opening of the flow control valve according to the third pressure information and the first information includes:

[0031] Determine whether the third pressure information is greater than the first threshold information and less than the pressure threshold, to obtain an eighth determination result;

[0032] Determine whether the first information is greater than the liquid level threshold, and obtain a ninth determination result;

[0033] When the eighth judgment result is that the third pressure information is greater than the first threshold information and less than the pressure threshold, and the ninth judgment result is that the first information is greater than the liquid level threshold, the opening of the flow control valve is calculated according to the first information to obtain the opening information;

[0034] A fourth control command is sent according to the opening information, where the fourth control command is used to adjust the opening of the flow control valve.

[0035] The beneficial effects of the present invention are:

[0036] The present invention electrically connects a gas mass flow controller, a gas outlet component and an automatic liquid discharge component through a control component, thereby realizing integrated remote and on-site control on the basis of accurately measuring and controlling the gas flow. In addition, the control component is used to finely control the flow regulating valve in the automatic liquid discharge component, thereby improving the liquid discharge accuracy, effectively avoiding the interference of the reflux caused by the large fluctuation of the pressure of the injection pipeline on the gas injection of in-situ uranium leaching, and improving the operation efficiency of in-situ uranium leaching.

[0037] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0039] Figure 1 It is a schematic diagram of the structure of the gas flow control system for in-situ leaching uranium described in an embodiment of the present invention.

[0040] Markings in the figure: 1. Gas mass flow controller; 2. Pressure regulating valve; 3. Inlet stop valve; 4. First one-way valve; 5. First sensor; 6. Liquid level meter; 7. Solenoid valve; 8. Second one-way valve; 9. Second sensor; 10. Liquid injection pipeline; 11. Liquid discharge buffer tank; 12. Flow control valve; 13. Control component. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0042] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0043] Example 1

[0044] like Figure 1 As shown, this embodiment provides a gas flow control system for in-situ leaching of uranium, the system comprising: a gas mass flow controller 1, a gas inlet component, an automatic drainage component, a gas outlet component, a control component 13 and a pressure acquisition component; the gas inlet component is connected to the outlet of the gas mass flow controller 1; the automatic drainage component is connected to the outlet of the gas inlet component, and the automatic drainage component is used to discharge the refluxed liquid; the gas outlet component is arranged between the automatic drainage component and the injection pipeline 10, and the gas outlet component is used to prevent the injection pipeline from reflux; the control component 13 is electrically connected to the gas mass flow controller 1, the gas outlet component and the automatic drainage component; the pressure acquisition component comprises a first sensor 5 and a second sensor 9, the first sensor 5 is arranged between the automatic drainage component and the gas inlet component, and the second sensor 9 is arranged Between the liquid injection pipeline 10 and the gas outlet component, in the present embodiment, the gas enters the automatic liquid discharge component after passing through the gas mass flow controller 1, the gas inlet component and the first sensor 5, and is then injected into the liquid injection pipeline 10 through the gas outlet component and the second sensor 9. When reflux occurs in the liquid injection pipeline 10, the refluxed liquid enters the automatic liquid discharge component through the second sensor and the gas outlet component and is discharged. The present invention electrically connects the gas mass flow controller, the gas outlet component and the automatic liquid discharge component through the control component 13 to realize integrated remote and on-site control. In addition, the control component 13 is used to finely control the flow regulating valve in the automatic liquid discharge component, which effectively avoids the interference of the reflux caused by the large pressure fluctuation of the liquid injection pipeline 10 on the gas injection of in-situ uranium leaching, thereby improving the operation efficiency of in-situ uranium leaching.

[0045] It should be noted that the control component 13 includes a circuit component, a touch screen controller, a serial port output circuit and a host computer, wherein the circuit component is electrically connected to the touch screen controller, the touch screen controller is electrically connected to the serial port output circuit, the host computer is electrically connected to the serial port output circuit, the circuit component is used to collect and process analog signals, and the serial port output circuit and the host computer are used to generate control signals.

[0046] In a specific embodiment of the present disclosure, the gas inlet assembly includes a pressure-stabilizing valve 2, an inlet stop valve 3 and a first one-way valve 4, the inlet of the pressure-stabilizing valve 2 is connected to the gas mass flow controller 1, the outlet of the pressure-stabilizing valve 2 is connected to the inlet stop valve 3, the inlet stop valve 3 is arranged between the first one-way valve 4 and the pressure-stabilizing valve 2, and the first one-way valve 4 is arranged between the automatic drainage assembly and the inlet stop valve 3.

[0047] In a specific embodiment of the present disclosure, the automatic drainage component includes a drainage buffer tank 11, a liquid level meter 6 and a flow control valve 12. The gas inlet of the drainage buffer tank 11 is connected to the gas inlet component, and the lower outlet of the drainage buffer tank 11 is provided with a flow control valve 12. The liquid level meter 6 is arranged in the drainage buffer tank 11. When reflux occurs, the reflux liquid enters the drainage buffer tank 11, and its liquid level is recorded by the liquid level meter 6. When the reflux liquid level reaches the set alarm level, the alarm interruption program is triggered, and the control program of the touch screen main controller included in the control component 13 determines whether the normal pressure difference is exceeded according to the pressure values ​​of the first sensor 5 and the second sensor 9, and determines the opening of the flow control valve 12 based on the value of the pressure difference, so as to realize the refined control of the system and ensure that the gas can still be continuously injected into the process of in-situ leaching uranium under the condition of pressure fluctuation.

[0048] In a specific embodiment of the present disclosure, the gas outlet component includes a solenoid valve 7 and a second one-way valve 8. The second one-way valve 8 is arranged between the injection pipe 10 and the automatic drainage component. The solenoid valve 7 is arranged between the second one-way valve 8 and the automatic drainage component. When backflow occurs, the solenoid valve 7 is adjusted according to the pressure difference between the first sensor 5 and the second sensor 9, so that the entire system can operate stably and reliably.

[0049] Example 2

[0050] This embodiment provides a method for controlling gas flow rate in in-situ leaching of uranium, the method comprising:

[0051] Step S1, obtaining first pressure information and second pressure information;

[0052] In this step, the first sensor 5 collects the first pressure information between the gas inlet component and the automatic liquid discharge component and records it as P1, and the second sensor 9 collects the second pressure information between the gas outlet component and the liquid injection pipe 10 and records it as P2.

[0053] Step S2, performing calculation according to the first pressure information and the second pressure information to obtain third pressure information;

[0054] In this step, the first pressure information is subtracted from the second pressure information to obtain the third pressure information, ie, the pressure difference.

[0055] Step S3, determining whether the third pressure information is greater than a pressure threshold, and obtaining a first determination result;

[0056] In this step, the pressure threshold is 0.01 MPa.

[0057] Step S4: determine whether to close the solenoid valve 7 according to the first judgment result.

[0058] In this step, whether the gas addition is normal is judged based on P1-P2. When P1-P2>0.01MPa, the gas addition is normal; when P1-P2 is between 0-0.01MPa, the gas addition is in the warning range, triggering the alarm interrupt program, and the control component 13 issues a yellow alarm to remind the system of the gas injection risk; when P1-P2<0, the control component 13 issues a red alarm and closes the solenoid valve 7.

[0059] After step S4, step S5, step S6 and step S7 are also included, which specifically include:

[0060] Step S5, obtaining liquid level information, wherein the liquid level information includes the liquid level of the reflux liquid in the drainage buffer tank 11;

[0061] Step S6, calculating according to the liquid level height information and the total height of the drainage buffer tank 11 to obtain first information, wherein the first information is the ratio of the reflux liquid height to the total height of the drainage buffer tank 11;

[0062] Step S7: determining the opening degree of the flow control valve 12 according to the third pressure information and the first information.

[0063] The step S7 also includes step S701, step S702, step S703 and step S704, which specifically include:

[0064] Step S701, obtaining first threshold information, where the first threshold information is 0;

[0065] Step S702: determine whether the third pressure information is greater than the first threshold information, and obtain a second determination result;

[0066] Step S703, determining whether the first information is less than a liquid level threshold, and obtaining a third determination result;

[0067] Step S704: When the second judgment result is that the third pressure information is greater than the first threshold information and the first information is less than the liquid level threshold, a first control command is sent, wherein the first control command is used to adjust the opening of the flow control valve 12 to 0.

[0068] In this embodiment, the liquid level threshold is 0.5. When the first information, i.e., H1 / H2<0.5 and P1-P2>0, the opening of the flow control valve 12 is adjusted to 0. At this time, the pressure at the first sensor 5 is greater than the pressure at the second sensor 9, and the liquid level height of the drainage buffer tank 11 has not reached the warning height. The reflux liquid will not be input into the gas inlet assembly to pollute the gas mass flow controller 1. It should be noted that H1 is the reflux liquid height, and H2 is the total height of the drainage buffer tank 11.

[0069] The step S7 also includes step S705, step S706 and step S707, which specifically include:

[0070] Step S705, determining whether the third pressure information is less than the first threshold information, and obtaining a fourth determination result;

[0071] Step S706, determining whether the first information is greater than a liquid level threshold, and obtaining a fifth determination result;

[0072] Step S707: When the fourth judgment result is that the third pressure information is less than the first threshold information and the fifth judgment result is that the first information is greater than the liquid level threshold, send a second control command, wherein the second control command is used to adjust the opening of the flow control valve 12 to 1.

[0073] In this embodiment, when H1 / H2>0.5, the alarm interrupt program is triggered. At this time, the opening of the flow control valve 12 is determined according to the value of P1-P2. When P1-P2<0, it means that the liquid in the drainage buffer tank 11 is very likely to be input into the gas inlet component and pollute the gas mass flow controller 1. Therefore, at this time, the control component 13 sends a control instruction to the solenoid valve 7, and sends a second control command to the flow control valve 12 to drain the liquid at the maximum opening. When the drainage buffer tank 11 is drained to the preset lower limit liquid level, the flow control valve 12 is controlled to be closed. When the P1-P2 value is within the normal range, the solenoid valve 7 is controlled to be opened to resume normal gas injection.

[0074] The step S7 also includes step S708, step S709 and step S710, which specifically include:

[0075] Step S708, determining whether the third pressure information is greater than the pressure threshold, and obtaining a sixth determination result;

[0076] Step S709, determining whether the first information is equal to a liquid level threshold, and obtaining a seventh determination result;

[0077] Step S710: When the sixth judgment result is that the third pressure information is greater than the pressure threshold and the seventh judgment result is that the first information is equal to the liquid level threshold, send a third control command, wherein the third control command is used to adjust the flow control valve opening to 0.01.

[0078] In this embodiment, when P1-P2 is greater than 0.01MPa and H1 / H2=0.5, the flow control valve 12 is controlled to discharge liquid at a minimum opening of 0.01, and gas injection is continued during the entire drainage process, thereby avoiding the problem of low efficiency of uranium in leaching due to lack of gas injection during uranium in situ leaching, and effectively improving the efficiency of uranium in situ leaching.

[0079] The step S7 also includes step S711, step S712, step S713 and step S714, which specifically include:

[0080] Step S711, determining whether the third pressure information is greater than the first threshold information and less than the pressure threshold, to obtain an eighth determination result;

[0081] Step S712, determining whether the first information is greater than the liquid level threshold, and obtaining a ninth determination result;

[0082] Step S713: when the eighth judgment result is that the third pressure information is greater than the first threshold information and less than the pressure threshold and the ninth judgment result is that the first information is greater than the liquid level threshold, calculate the opening of the flow control valve 12 according to the first information to obtain the opening information;

[0083] In this step, the specific process of calculating the opening of the flow control valve 12 according to the first information is as follows:

[0084] ξ=10*(H1 / H2-0.5) / 3

[0085] In the above formula, ξ is the opening information, H1 and H2 are the reflux liquid height and the total height of the drainage buffer tank 11 respectively.

[0086] Step S714 : Send a fourth control command according to the opening information, where the fourth control command is used to adjust the opening of the flow control valve 12 .

[0087] In this embodiment, when 0<P1-P2≤0.01MPa and H1 / H2 is greater than 0.5, since the injection pressure is high and low at this time, in order to prevent the pressure fluctuation from causing the liquid in the drainage buffer tank 11 to be input into the gas inlet assembly, the opening of the flow control valve 12 is determined according to the first information to effectively control the discharge speed of the liquid in the drainage buffer tank 11, thereby ensuring that the gas mass flow controller 1 is not contaminated.

[0088] In the present invention, by finely controlling the flow control valve 12, the gas is continuously injected into the in-situ uranium leaching process as much as possible while ensuring that the gas inlet assembly is not contaminated by the reflux liquid, so as to improve the operating efficiency of in-situ uranium leaching.

[0089] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0090] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

[0092] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A gas flow control system for in-situ leaching of uranium, characterized in that: include: Gas mass flow controller (1); A gas inlet assembly, the gas inlet assembly being connected to an outlet of the gas mass flow controller (1); An automatic liquid discharge component, the automatic liquid discharge component is connected to the outlet of the gas inlet component, and the automatic liquid discharge component is used to discharge the reflux liquid; a gas outlet assembly, the gas outlet assembly being arranged between the automatic liquid discharge assembly and the liquid injection pipeline (10), the gas outlet assembly being used to prevent backflow of the liquid injection pipeline (10); A control component (13), the control component (13) being electrically connected to the gas mass flow controller (1), the gas outlet component and the automatic liquid discharge component; as well as A pressure collection component, the pressure collection component comprising a first sensor (5) and a second sensor (9), the first sensor (5) being arranged between the automatic liquid discharge component and the gas inlet component, and the second sensor (9) being arranged between the liquid injection pipeline (10) and the gas outlet component; The gas outlet assembly comprises a solenoid valve (7) and a second one-way valve (8), a second one-way valve (8) is arranged between the liquid injection pipeline (10) and the automatic liquid discharge assembly, and the solenoid valve (7) is arranged between the second one-way valve (8) and the automatic liquid discharge assembly.

2. The gas flow control system for in-situ leaching of uranium according to claim 1, characterized in that: The gas inlet component comprises a pressure-stabilizing valve (2), an inlet stop valve (3) and a first one-way valve (4); the inlet of the pressure-stabilizing valve (2) is connected to the gas mass flow controller (1); the outlet of the pressure-stabilizing valve (2) is connected to the inlet stop valve (3); the inlet stop valve (3) is arranged between the first one-way valve (4) and the pressure-stabilizing valve (2); and the first one-way valve (4) is arranged between the automatic liquid discharge component and the inlet stop valve (3).

3. The gas flow control system for in-situ leaching of uranium according to claim 1, characterized in that: The automatic liquid discharge component comprises a liquid discharge buffer tank (11), a liquid level meter (6) and a flow control valve (12); the gas inlet of the liquid discharge buffer tank (11) is connected to the gas inlet component; the lower outlet of the liquid discharge buffer tank (11) is provided with a flow control valve (12); and the liquid level meter (6) is arranged in the liquid discharge buffer tank (11).

4. A method for controlling the gas flow rate of uranium in situ leaching, using the gas flow rate control system for uranium in situ leaching as claimed in any one of claims 1 to 3, characterized in that: The following steps are involved: Acquiring first pressure information and second pressure information; Calculating according to the first pressure information and the second pressure information to obtain third pressure information; Determine whether the third pressure information is greater than a pressure threshold, and obtain a first determination result; Determine whether to close the solenoid valve (7) according to the first judgment result.

5. The method for controlling the gas flow rate of in-situ leaching uranium according to claim 4, characterized in that: After determining whether to close the solenoid valve according to the first judgment result, the method further includes: Acquiring liquid level information, wherein the liquid level information includes the liquid level of the reflux liquid in the drainage buffer tank (11); Calculating according to the liquid level height information and the total height of the drainage buffer tank (11) to obtain first information, wherein the first information is the ratio of the reflux liquid height to the total height of the drainage buffer tank (11); The opening degree of the flow control valve (12) is determined according to the third pressure information and the first information.

6. The method for controlling the gas flow rate of in-situ leaching uranium according to claim 5, characterized in that: Determining the opening of the flow control valve according to the third pressure information and the first information includes: Obtaining first threshold information, where the first threshold information is 0; Determine whether the third pressure information is greater than the first threshold information, and obtain a second determination result; Determine whether the first information is less than a liquid level threshold, and obtain a third determination result; When the second judgment result is that the third pressure information is greater than the first threshold information and the first information is less than the liquid level threshold, a first control command is sent, wherein the first control command is used to adjust the opening of the flow control valve (12) to 0.

7. The method for controlling the gas flow rate of in-situ leaching uranium according to claim 5, characterized in that: Determining the opening of the flow control valve according to the third pressure information and the first information includes: Determine whether the third pressure information is less than the first threshold information, and obtain a fourth determination result; Determine whether the first information is greater than a liquid level threshold, and obtain a fifth determination result; When the fourth judgment result is that the third pressure information is less than the first threshold information and the fifth judgment result is that the first information is greater than the liquid level threshold, a second control command is sent, and the second control command is used to adjust the opening of the flow control valve (12) to 1.

8. The method for controlling the gas flow rate of in-situ leaching uranium according to claim 5, characterized in that: Determining the opening of the flow control valve according to the third pressure information and the first information includes: determining whether the third pressure information is greater than the pressure threshold, and obtaining a sixth determination result; Determine whether the first information is equal to a liquid level threshold, and obtain a seventh determination result; When the sixth judgment result is that the third pressure information is greater than the pressure threshold and the seventh judgment result is that the first information is equal to the liquid level threshold, a third control command is sent, and the third control command is used to adjust the flow control valve opening to 0.

01.

9. The method for controlling the gas flow rate of in-situ leaching uranium according to claim 5, characterized in that: Determining the opening of the flow control valve according to the third pressure information and the first information includes: Determine whether the third pressure information is greater than the first threshold information and less than the pressure threshold, to obtain an eighth determination result; Determine whether the first information is greater than a liquid level threshold, and obtain a ninth determination result; When the eighth judgment result is that the third pressure information is greater than the first threshold information and less than the pressure threshold, and the ninth judgment result is that the first information is greater than the liquid level threshold, the opening of the flow control valve (12) is calculated according to the first information to obtain the opening information; A fourth control command is sent according to the opening information, wherein the fourth control command is used to adjust the opening of the flow control valve (12).