A charging pile operation safety management and control system based on artificial intelligence
Through the charging pile operation safety control system based on artificial intelligence, comprehensive monitoring and intelligent processing of the operating status of the charging pile is achieved, the problem of charging pile operation risk assessment and low safety is solved, and the degree of intelligence of the charging pile and the power grid is improved. efficiency.
Patent Information
- Application Number
- CN202410341844.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-03-25
AI Technical Summary
It is difficult for the existing technology to achieve comprehensive monitoring and intelligent processing of the operating status of charging piles, and it is impossible to conduct comprehensive assessment and accurate feedback on the operating risks of charging piles, resulting in low operating safety and intelligence of charging piles.
Design a charging pile operation safety control system based on artificial intelligence, including a supervision platform, charging pile monitoring module, risk identification module, automatic control module, transportation and risk warning module, and identify charging pile operation data by real-time monitoring and analyzing the charging pile operation data. For failure or potential risks, generate dangerous information, issue early warnings and conduct automatic regulation, conduct adaptive operation adjustments, and conduct comprehensive assessment of the operating risks of charging piles.
The comprehensive monitoring and intelligent processing of the operating status of the charging pile is realized, and the operation safety and intelligence of the charging pile are improved. Through the energy-storage charging pile, energy is stored at low electricity bills or when the power grid is idle, the power is released at high electricity bills or use Electricity peaks can alleviate the load of the power grid and improve the efficiency of the power grid.
Smart Images

Figure CN118182244B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of charging pile operation supervision, and in particular to an artificial intelligence-based charging pile operation safety management and control system. Background Art
[0002] A charging pile is a device for charging electric vehicles. Its function is similar to that of a gas pump in a gas station. The charging pile can be fixed on the ground or on a wall. It can charge various types of electric vehicles according to different voltage levels. It has functions such as power metering, billing, communication, and control. According to the charging method, the charging pile can be divided into AC piles (slow charging piles) and DC piles (fast charging piles).
[0003] With the popularity of electric vehicles, charging piles are important supporting facilities for electric vehicles. Their operational safety and stability are of great significance to the development of the electric vehicle industry. At present, when operating safety management of charging piles, it is difficult to achieve comprehensive monitoring and intelligent processing of the operating status of charging piles, and it is impossible to comprehensively evaluate the operating risk level of charging piles and provide accurate feedback, which is not conducive to ensuring the operational safety of charging piles and has a low degree of intelligence.
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a charging pile operation safety management and control system based on artificial intelligence, which solves the problems that the prior art is difficult to achieve comprehensive monitoring and intelligent processing of the operating status of the charging pile, and is unable to comprehensively evaluate the operating risk level of the charging pile and provide accurate feedback, which is not conducive to ensuring the operating safety of the charging pile and has a low level of intelligence.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] An artificial intelligence-based charging pile operation safety management and control system includes a supervision platform, a charging pile monitoring module, a charging pile risk identification module, a charging pile automatic control module, a charging pile transportation risk assessment module and a charging pile risk warning module; the charging pile monitoring module monitors the charging pile in real time, collects various operation data of the charging pile and forms an operation data package, and sends the operation data package to the charging pile risk identification module via the supervision platform; the charging pile risk identification module uses an artificial intelligence algorithm to process and analyze the received operation data package, identifies the operation status of the charging pile, and determines whether there is a fault or potential risk. If there is a fault or potential risk, the corresponding danger information is generated, and the danger information is sent to the charging pile risk warning module and the charging pile automatic control module via the supervision platform;
[0008] The charging pile risk warning module issues a corresponding warning when receiving dangerous situation information. The charging pile automatic control module determines whether it is necessary to automatically make corresponding adjustments when receiving dangerous situation information. When it is determined that corresponding adjustments are needed, it generates corresponding adjustment instructions, and sends the corresponding adjustment instructions to the charging pile to make adaptive operation adjustments. The charging pile operation risk assessment module is used to set an assessment cycle, conduct a comprehensive assessment of the operation risk of the charging pile within the assessment cycle, generate a high-risk operation signal or a low-risk operation signal through analysis, and send the high-risk operation signal or the low-risk operation signal to the charging pile risk warning module via the supervision platform. The charging pile risk warning module issues a corresponding warning when it receives a high-risk operation signal.
[0009] Furthermore, the charging pile is an energy storage charging pile, which stores energy and replenishes electricity when the charging pile is idle, and discharges electricity when an electric vehicle is charging. The energy storage charging pile stores electricity in the energy storage battery when the electricity rate is low or the grid is idle, and releases the electricity when the electricity rate is high or the electricity consumption is at peak.
[0010] Furthermore, the working modes of the charging pile include battery PACK charging mode, DC fast charging gun charging mode, AC / DC inverter mode and traditional DC charging pile mode;
[0011] Among them, the battery PACK charging mode is realized by two methods, one of which is to attract the K1 and K2 circuits, and the other circuits are in the disconnected state, and use AC / DC to charge the battery PACK; the other is to attract the K4 circuit, and the other circuits are in the disconnected state, and use the DC charging pile to charge the battery PACK;
[0012] DC fast charging gun charging mode: K5 and K7 circuits are closed, other circuits are disconnected, and the battery PACK discharges to the external vehicle through DC / DC and DC fast charging gun;
[0013] AC / DC inverter mode: K1 and K3 circuits are closed, other circuits are disconnected, and the battery PACK discharges to the grid through AC / DC;
[0014] Traditional DC charging pile mode: K1, K6 and K7 circuits are energized, and other circuits are in the disconnected state. The battery PACK is bypassed and discharged to external vehicles through AC / DC, DC / DC and DC fast charging guns.
[0015] Furthermore, the specific operation process of the charging pile automatic control module is as follows:
[0016] Analysis and judgment: After receiving the danger information, the charging pile automatic control module analyzes and judges the danger information. Through the built-in algorithm and logic, it interprets the danger information, determines the nature and severity of the danger, and consults the historical data and configuration information of the charging pile to accurately determine the problem;
[0017] Formulation of intelligent processing strategies: Based on the results of analysis and judgment, formulate corresponding intelligent processing strategies, including adjusting the working parameters of the charging pile, switching the working mode and starting the emergency protection program;
[0018] Execute processing measures: Convert intelligent processing strategies into specific control instructions, where the control instructions involve power management, heat dissipation control and communication management; during the control execution process, monitor the processing effect in real time and adjust the control strategy as needed.
[0019] Furthermore, the specific operation process of the charging pile transportation risk assessment module includes:
[0020] Obtain all the dangerous information related to the charging pile within the evaluation period, mark the number of times the dangerous information is generated as the charging pile dangerous frequency value, collect the generation time of the corresponding dangerous information and mark it as the signal sending time, mark the interval between two adjacent groups of signal sending times as the signal interval time, calculate the average of all signal interval time to obtain the dangerous occurrence value, and mark the proportion of the number of signal interval time that does not exceed the preset signal interval time threshold within the evaluation period as the high-frequency detection value;
[0021] The number of times the operation is stopped due to a fault during the evaluation period is collected and marked as the charging pile stop analysis value, and the duration of the corresponding stop operation is marked as the pause duration value. All the pause duration values during the evaluation period are summed up to obtain the total pause table value, and the proportion of the number of pause duration values exceeding the preset pause duration threshold during the evaluation period is marked as the temporary operation high amplitude value;
[0022] The charging pile risk assessment value is obtained by numerically calculating the charging pile risk frequency value, risk occurrence value, high-frequency inspection value, charging pile stop analysis value, suspension total meter value and temporary operation high amplitude value, and the charging pile risk assessment value is numerically compared with the preset charging pile risk assessment threshold. If the charging pile risk assessment value exceeds the preset charging pile risk assessment threshold, a high risk operation signal is generated.
[0023] Furthermore, if the risk assessment value of the charging pile does not exceed the preset risk assessment threshold of the charging pile, the number of fires that occurred in the monitoring area where the charging pile is located and the number of collisions and impacts on the charging pile are obtained from the supervision platform and marked as fire detection values and collision detection values, respectively. In addition, the number of occurrences of high damage processes of the charging pile within the evaluation period is collected and compared with the collision detection value to obtain the high damage detection value;
[0024] The safety precaution inspection condition value of the charging pile during the assessment period is retrieved from the supervision platform, and the charging pile risk measurement value is obtained by numerically calculating the safety precaution inspection condition value, the charging pile risk assessment value, the fire inspection condition value, the collision inspection condition value and the high damage inspection condition value. The charging pile risk measurement value is numerically compared with the preset charging pile risk measurement threshold. If the charging pile risk measurement value exceeds the preset charging pile risk measurement threshold, a high risk operation signal is generated; if the charging pile risk measurement value does not exceed the preset charging pile risk measurement threshold, a low risk operation signal is generated.
[0025] Furthermore, the supervision platform is communicatively connected with the auxiliary monitoring module of the charging pile. The auxiliary monitoring module of the charging pile draws a circle with a radius of R1 with the charging pile as the center, and marks the drawn circular area as the monitoring area. The monitoring area is monitored in real time by a camera, and fire monitoring and collision impact monitoring are performed on the monitoring area. If there is a fire in the monitoring area or the charging pile is subjected to a collision impact, an auxiliary monitoring warning signal is generated, and the auxiliary monitoring warning signal is sent to the charging pile risk warning module via the supervision platform. The charging pile risk warning module issues a corresponding warning when it receives the auxiliary monitoring warning signal.
[0026] Furthermore, when the charging pile is subjected to a collision impact, the charging pile auxiliary monitoring module collects the duration of the collision impact on the charging pile and marks it as a collision condition value, as well as the average impact force data and the maximum impact force data received during the impact process and marks them as a charging pile collision condition value and a charging pile collision amplitude value;
[0027] The charging pile damage value is obtained by numerically calculating the collision table condition value, the charging pile collision condition value and the charging pile collision amplitude value, and the charging pile damage value is numerically compared with the preset charging pile damage threshold. If the charging pile damage value exceeds the preset charging pile damage threshold, the corresponding collision impact process is judged to be a charging pile high damage process, and the corresponding judgment information is sent to the supervision platform for storage.
[0028] Further, the supervision platform is connected in communication with the safety prevention performance decision module, which is used to evaluate the safety protection performance status of the charging pile within the evaluation period, mark the moment when the charging pile automatic control module determines that corresponding regulation needs to be made as the judgment moment, and mark the moment when the charging pile starts to make adaptive adjustments as the execution moment, mark the interval between the execution moment and the judgment moment as the execution interval, and mark the moment when the charging pile risk identification module receives the data packet as the packet receiving moment, mark the moment when the charging pile risk identification module completes the corresponding analysis as the analysis conclusion moment, and mark the interval between the analysis conclusion moment and the packet receiving moment as the analysis interval;
[0029] The execution value is obtained by averaging all the execution intervals in the evaluation period, the analysis value is obtained by averaging all the analysis intervals in the evaluation period, and the number of execution intervals exceeding the preset execution interval threshold in the evaluation period is marked as a non-good execution value, and the number of analysis intervals exceeding the preset analysis interval threshold in the evaluation period is marked as a non-good analysis value. The safety precaution inspection value is obtained by numerically calculating the execution value, the analysis value, the non-good execution value and the non-good analysis value, and the safety precaution inspection value of the charging pile is sent to the supervision platform for storage.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] 1. In the present invention, the charging pile is monitored in real time by the charging pile monitoring module, and various operation data of the charging pile are collected to form an operation data package. The charging pile risk identification module uses an artificial intelligence algorithm to process and analyze the received operation data package to determine whether there is a fault or potential risk. If there is a fault or potential risk, the corresponding danger information is generated. When the danger information is generated, the charging pile risk warning module issues a corresponding warning, and the charging pile automatic control module determines whether it is necessary to automatically make corresponding adjustments. When it is determined that corresponding adjustments are needed, the charging pile is adaptively adjusted to achieve comprehensive monitoring and intelligent processing of the operation status of the charging pile; and the charging pile is an energy storage charging pile, which stores electric energy in the energy storage battery when the electricity price is low or the power grid is idle, and releases the electric energy when the electricity price is high or the power consumption peak, thereby alleviating the power load restriction and rate difference problems on the power grid side, improving the power grid efficiency, and maximizing the satisfaction of social electricity demand;
[0032] 2. In the present invention, the monitoring area where the charging pile is located is monitored and analyzed through the charging pile auxiliary monitoring module, and the fire information and collision impact information are fed back in time, and the degree of damage caused to the charging pile by the corresponding collision impact is judged. The safety prevention performance decision module evaluates the safety protection performance status of the charging pile within the evaluation period to obtain the safety prevention inspection value, and provides data support for the analysis process of the charging pile transportation risk assessment module; and the charging pile transportation risk assessment module comprehensively evaluates the operation risk of the charging pile within the evaluation period, strengthens the safety supervision of the charging pile when generating a high-risk operation signal, reduces the existing safety hazards in operation, and ensures the safe and stable operation of the charging pile, with a high degree of intelligence. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;
[0034] Figure 1 This is a system block diagram of Embodiment 1 of the present invention;
[0035] Figure 2 This is a working principle diagram of a charging pile according to Embodiment 1 of the present invention;
[0036] Figure 3 This is a system block diagram of Embodiment 2 and Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] Embodiment 1: Figure 1 As shown, the present invention proposes an artificial intelligence-based charging pile operation safety management and control system, including a supervision platform, a charging pile monitoring module, a charging pile risk identification module, a charging pile automatic control module, a charging pile transportation risk assessment module and a charging pile risk warning module, and the supervision platform is communicatively connected with the charging pile monitoring module, the charging pile risk identification module, the charging pile automatic control module, the charging pile transportation risk assessment module and the charging pile risk warning module;
[0039] Among them, the charging pile monitoring module monitors the charging pile in real time, collects various operating data of the charging pile (including current, voltage, temperature, etc.) and forms a data package, and sends the data package to the charging pile risk identification module through the supervision platform; the charging pile risk identification module uses artificial intelligence algorithms to process and analyze the received data packages, identify the operating status of the charging pile, and determine whether there is a fault or potential risk. If there is a fault or potential risk, the corresponding danger information is generated, and the operating status and operating risk of the charging pile can be reasonably analyzed and fed back in real time, and the danger information is sent to the charging pile risk warning module and the charging pile automatic control module through the supervision platform;
[0040] The charging pile risk warning module issues a corresponding warning when receiving the dangerous information. The charging pile automatic control module determines whether it is necessary to automatically make corresponding adjustments when receiving the dangerous information. When it is determined that corresponding adjustments are necessary, it generates corresponding adjustment instructions and sends the corresponding adjustment instructions to the charging pile to make adaptive operation adjustments, so as to realize automatic and reasonable adjustment of the charging pile, reduce the existing safety hazards, ensure the safe operation of the charging pile, and have a high degree of intelligence. The specific operation process of the charging pile automatic control module is as follows:
[0041] Analysis and judgment: After receiving the danger information, the charging pile automatic control module analyzes and judges the danger information. Through the built-in algorithm and logic, it interprets the danger information, determines the nature and severity of the danger, and consults the historical data and configuration information of the charging pile to more accurately determine the problem;
[0042] Development of intelligent processing strategies: Based on the results of analysis and judgment, develop corresponding intelligent processing strategies, including adjusting the working parameters of the charging pile, switching the working mode, and starting the emergency protection program, etc. The purpose is to eliminate risks as much as possible or reduce their impact on the charging pile and users without interrupting the charging service;
[0043] Execute processing measures: Convert intelligent processing strategies into specific control instructions, where the control instructions involve multiple aspects such as power management, heat dissipation control and communication management; during the control execution process, monitor the processing effect in real time and adjust the control strategy as needed.
[0044] The charging pile transportation risk assessment module is used to set the assessment period, preferably, the assessment period is twenty-five days; the operation risk of the charging pile within the assessment period is comprehensively assessed, and a high-risk operation signal or a low-risk operation signal is generated through analysis, and the high-risk operation signal or the low-risk operation signal is sent to the charging pile risk warning module through the supervision platform. When the charging pile risk warning module receives the high-risk operation signal, it issues a corresponding warning to remind the management personnel to adjust the management and control strategy for the charging pile in time, strengthen the safety supervision of the charging pile in the future, reduce the existing safety hazards in operation, and ensure the safe and stable operation of the charging pile with a high degree of intelligence; the specific operation process of the charging pile transportation risk assessment module is as follows:
[0045] Obtain all the dangerous information related to the charging pile within the evaluation period, mark the number of times the dangerous information is generated as the charging pile dangerous frequency value, collect the generation time of the corresponding dangerous information and mark it as the signal sending time, mark the interval between two adjacent groups of signal sending times as the signal interval time, calculate the average of all signal interval time to obtain the dangerous situation value, and compare the signal interval time with the corresponding preset signal interval time threshold, and mark the number of signal interval time that does not exceed the preset signal interval time threshold within the evaluation period as the high-frequency detection value;
[0046] The number of times the charging pile stops running due to a fault during the evaluation period is collected and marked as the charging pile stop analysis value, and the duration of the corresponding stop operation is marked as the pause duration value, all the pause duration values during the evaluation period are summed up to obtain the total pause table value, and the pause duration value is numerically compared with the preset pause duration threshold, and the proportion of the number of pause duration values exceeding the preset pause duration threshold during the evaluation period is marked as the temporary operation high amplitude value;
[0047]
[0048] The charging pile risk frequency value XF, the risk occurrence value XL, the high-frequency detection value XK, the charging pile stop analysis value XW, the suspension total table value XQ and the temporary operation high amplitude value XF are numerically calculated to obtain the charging pile risk assessment value XP, wherein a1, a2, a3, a4, a5, a6 are preset proportional coefficients, and the values of a1, a2, a3, a4, a5, a6 are all positive numbers; and the larger the value of the charging pile risk assessment value XP, the worse the operating condition of the charging pile during the evaluation period; the charging pile risk assessment value XP is numerically compared with the preset charging pile risk assessment threshold value. If the charging pile risk assessment value XP exceeds the preset charging pile risk assessment threshold value, it indicates that the operating condition of the charging pile during the evaluation period is poor, and a high risk operation signal is generated.
[0049] Furthermore, if the charging pile risk assessment value XP does not exceed the preset charging pile risk assessment threshold, the number of fires and collisions in the monitoring area where the charging pile is located is obtained from the supervision platform and marked as fire detection value and collision detection value respectively, and the number of high damage processes of the charging pile in the evaluation period is collected and compared with the collision detection value to obtain the high damage detection value, and the supervision platform retrieves the safety precaution detection value of the charging pile in the evaluation period;
[0050] The safety precaution inspection value FY, charging pile risk assessment value XP, fire inspection value FK, collision inspection value FL and high damage inspection value FW are numerically calculated by the formula FX=ew1*FY+ew2*XP+(ew3*FK+ew4*FL) / 2+ew5*FW to obtain the charging pile risk measurement value FX, where ew1, ew2, ew3, ew4 and ew5 are preset proportional coefficients, and the values of ew1, ew2, ew3, ew4 and ew5 are all positive numbers; and the larger the value of the charging pile risk measurement value FX, the greater the operating safety hazard of the charging pile during the evaluation period;
[0051] The charging pile risk measurement value FX is numerically compared with the preset charging pile risk measurement threshold. If the charging pile risk measurement value FX exceeds the preset charging pile risk measurement threshold, it indicates that the operating safety hazard of the charging pile during the evaluation period is relatively large, and a high-risk operation signal is generated; if the charging pile risk measurement value FX does not exceed the preset charging pile risk measurement threshold, it indicates that the operating safety hazard of the charging pile during the evaluation period is relatively small, and a low-risk operation signal is generated.
[0052] Furthermore, if Figure 2 As shown, the charging pile is an energy storage charging pile, which stores energy and replenishes electricity when the charging pile is idle, and discharges electricity when an electric vehicle is charging. The energy storage charging pile stores electricity in the energy storage battery when the electricity rate is low or the grid is idle, and releases the electricity when the electricity rate is high or the electricity consumption peaks, thereby alleviating the power load restriction and rate difference problems on the grid side, meeting the function of interaction between electric vehicles and the grid (V2G mode), improving the efficiency of the grid, and maximizing the satisfaction of social electricity demand.
[0053] Specifically, there are four working modes of charging piles, including battery PACK charging mode, DC fast charging gun charging mode, AC / DC inverter mode and traditional DC charging pile mode;
[0054] Among them, the battery PACK charging mode is realized by two methods, one of which is to attract the K1 and K2 circuits, and the other circuits are in the disconnected state, and use AC / DC to charge the battery PACK; the other is to attract the K4 circuit, and the other circuits are in the disconnected state, and use the DC charging pile to charge the battery PACK;
[0055] DC fast charging gun charging mode: K5 and K7 circuits are closed, other circuits are disconnected, and the battery PACK discharges to the external vehicle through DC / DC and DC fast charging gun;
[0056] AC / DC inverter mode: K1 and K3 circuits are closed, and other circuits are disconnected. The battery PACK discharges to the grid through AC / DC, and can also operate off-grid;
[0057] Traditional DC charging pile mode: The K1, K6 and K7 circuits are energized, and the other circuits are in the disconnected state. The battery PACK is bypassed and discharged to external vehicles through AC / DC, DC / DC and DC fast charging guns to realize the traditional charging pile mode.
[0058] Embodiment 2: Figure 3 As shown, the difference between this embodiment and Embodiment 1 is that the supervision platform is communicatively connected with the charging pile auxiliary monitoring module, and the charging pile auxiliary monitoring module draws a circle with a radius R1 with the charging pile as the center, and preferably, R1 is not less than three meters; and the drawn circular area is marked as a monitoring area, and the monitoring area is monitored in real time by a camera, and the monitoring area is monitored for fire and collision impact; if there is a fire in the monitoring area or the charging pile is subjected to a collision impact, an auxiliary monitoring warning signal is generated, and the auxiliary monitoring warning signal is sent to the charging pile risk warning module via the supervision platform. When the charging pile risk warning module receives the auxiliary monitoring warning signal, it issues a corresponding warning to remind management personnel to check in time, thereby significantly improving the efficiency of emergency handling for the charging piles.
[0059] Furthermore, when the charging pile is subjected to a collision impact, the charging pile auxiliary monitoring module collects the duration of the collision impact on the charging pile and marks it as a collision condition value, as well as the average impact force data and the maximum impact force data received during the impact process and marks them as a charging pile collision condition value and a charging pile collision amplitude value; wherein, the larger the values of the collision condition value, the charging pile collision condition value and the charging pile collision amplitude value, the greater the damage caused to the charging pile by the corresponding collision impact;
[0060] The collision table value GK, the charging pile collision value GP and the charging pile collision amplitude value GF are numerically calculated by the formula GY=sy1*GK+(sy2*GP+sy3*GF) / 2 to obtain the charging pile damage value GY, wherein sy1, sy2 and sy3 are preset proportional coefficients, sy1>sy2>sy3>0; and the larger the value of the charging pile damage value GY, the greater the damage caused to the charging pile by the corresponding collision impact;
[0061] The charging pile damage value GY is numerically compared with the preset charging pile damage threshold. If the charging pile damage value GY exceeds the preset charging pile damage threshold, it indicates that the corresponding collision impact has caused greater damage to the charging pile. The corresponding collision impact process is judged as a charging pile high damage process, and the corresponding judgment information is sent to the supervision platform for storage, providing data support for the analysis process of the charging pile transportation risk assessment module to ensure the accuracy of its analysis results.
[0062] Embodiment 3: Figure 3 As shown, the difference between this embodiment and embodiment 1 and embodiment 2 is that the supervision platform is connected to the safety protection performance decision module in communication, and the safety protection performance decision module is used to evaluate the safety protection performance status of the charging pile within the evaluation period, mark the moment when the charging pile automatic control module determines that corresponding regulation needs to be made as the judgment moment, and mark the moment when the charging pile starts to be adaptively adjusted as the execution moment;
[0063] The interval between the execution time and the judgment time is marked as the execution interval time, and the time when the charging pile risk identification module receives the data packet is marked as the packet receiving time, the time when the charging pile risk identification module completes the corresponding analysis is marked as the analysis time, and the interval between the analysis time and the packet receiving time is marked as the analysis interval time; it should be noted that when the value of the execution interval time is large, it indicates that the reaction efficiency of the corresponding control execution is slow, and when the value of the analysis interval time is large, it indicates that the analysis efficiency of the corresponding analysis process is slow, which is not conducive to ensuring the safety of the charging pile;
[0064] The execution value is obtained by calculating the average of all the execution intervals in the evaluation period, the analysis value is obtained by calculating the average of all the analysis intervals in the evaluation period, and the number of execution intervals exceeding the preset execution interval threshold in the evaluation period is marked as a bad execution value, and the number of analysis intervals exceeding the preset analysis interval threshold in the evaluation period is marked as a bad analysis value;
[0065] By formula The table value ZF, the analysis table value ZW, the imperfect measurement value ZS and the imperfect analysis value ZP are numerically calculated to obtain the safety precaution inspection value FY, wherein hp1, hp2, hp3, and hp4 are preset proportional coefficients, and the values of hp1, hp2, hp3, and hp4 are all positive numbers; and the larger the value of the safety precaution inspection value FY is, the worse the safety precaution protection performance for the charging pile during the evaluation period; and the safety precaution inspection value FY of the charging pile is sent to the supervision platform for storage, to provide data support for the analysis process of the charging pile risk assessment module, so as to further ensure the accuracy of its analysis results.
[0066] The working principle of the present invention is as follows: when in use, the charging pile is monitored in real time through the charging pile monitoring module, and various operating data of the charging pile are collected to form an operation data package. The charging pile risk identification module uses an artificial intelligence algorithm to process and analyze the received operation data package to determine whether there is a fault or potential risk. If there is a fault or potential risk, the corresponding dangerous situation information is generated. When the dangerous situation information is generated, the charging pile risk warning module issues a corresponding warning, and the charging pile automatic control module determines whether it is necessary to automatically make corresponding adjustments. When it is determined that corresponding adjustments are needed, the charging pile is adaptively adjusted to achieve comprehensive monitoring and intelligent processing of the operating status of the charging pile, and the charging pile operation risk assessment module comprehensively evaluates the operating risk of the charging pile within the assessment period, and generates a high-risk operation signal or a low-risk operation signal through analysis. When a high-risk operation signal is generated, the charging pile risk warning module issues a corresponding warning to remind management personnel to adjust the management and control strategy of the charging pile in time, and subsequently strengthen the safety supervision of the charging pile, reduce the existing safety hazards in operation, and ensure the safe and stable operation of the charging pile with a high degree of intelligence.
[0067] The above formulas are all dimensionless and numerical calculations. The formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The preset parameters in the formula are set by technicians in this field according to actual conditions. The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the contents of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can understand and use the present invention well. The present invention is only limited by the claims and their full scope and equivalents.
Claims
1. An artificial intelligence-based charging pile operation safety management and control system, characterized in that: It includes a supervision platform, a charging pile monitoring module, a charging pile risk identification module, a charging pile automatic control module, a charging pile transportation risk assessment module and a charging pile risk warning module; the charging pile monitoring module monitors the charging piles in real time, collects various operation data of the charging piles and forms an operation data package, and sends the operation data package to the charging pile risk identification module via the supervision platform; The charging pile risk identification module uses artificial intelligence algorithms to process and analyze the received transport data packets, identify the operating status of the charging pile, and determine whether there is a fault or potential risk. If there is a fault or potential risk, it generates corresponding danger information and sends the danger information to the charging pile risk warning module and the charging pile automatic control module through the supervision platform; The charging pile risk warning module issues a corresponding warning when receiving the dangerous situation information. The charging pile automatic control module determines whether it is necessary to automatically make corresponding adjustments when receiving the dangerous situation information. When it is determined that corresponding adjustments are necessary, it generates corresponding adjustment instructions, and sends the corresponding adjustment instructions to the charging pile to make adaptive operation adjustments. The charging pile operation risk assessment module is used to set an assessment cycle, conduct a comprehensive assessment of the operation risk of the charging pile within the assessment cycle, generate a high-risk operation signal or a low-risk operation signal through analysis, and send the high-risk operation signal or the low-risk operation signal to the charging pile risk warning module via the supervision platform. The charging pile risk warning module issues a corresponding warning when receiving a high-risk operation signal. The specific operation process of the charging pile transportation risk assessment module includes: Obtain all the dangerous information related to the charging pile within the evaluation period, mark the number of times the dangerous information is generated as the charging pile dangerous frequency value, collect the generation time of the corresponding dangerous information and mark it as the signal sending time, mark the interval between two adjacent groups of signal sending times as the signal interval time, calculate the average of all signal interval time to obtain the dangerous occurrence value, and mark the proportion of the number of signal interval time that does not exceed the preset signal interval time threshold within the evaluation period as the high-frequency detection value; The number of times the operation is stopped due to a fault during the evaluation period is collected and marked as the charging pile stop analysis value, and the duration of the corresponding stop operation is marked as the pause duration value. All the pause duration values during the evaluation period are summed up to obtain the total pause table value, and the proportion of the number of pause duration values exceeding the preset pause duration threshold during the evaluation period is marked as the temporary operation high amplitude value; The charging pile risk assessment value is obtained by numerically calculating the charging pile risk frequency value, risk occurrence value, high frequency detection value, charging pile stop analysis value, suspension total meter value and temporary high amplitude value, and the charging pile risk assessment value is numerically compared with the preset charging pile risk assessment threshold. If the charging pile risk assessment value exceeds the preset charging pile risk assessment threshold, a high risk operation signal is generated; If the risk assessment value of the charging pile does not exceed the preset charging pile risk assessment threshold, the number of fires and collisions in the monitoring area where the charging pile is located is obtained from the supervision platform and marked as the fire inspection value and the collision inspection value respectively. The number of high damage processes of the charging pile during the evaluation period is collected and compared with the collision inspection value to obtain the high damage inspection value. The safety precaution inspection value of the charging pile during the evaluation period is retrieved from the supervision platform, and the charging pile risk measurement value is obtained by numerically calculating the safety precaution inspection value, the charging pile risk assessment value, the fire inspection value, the collision inspection value and the high damage inspection value. The charging pile risk measurement value is numerically compared with the preset charging pile risk measurement threshold. If the charging pile risk measurement value exceeds the preset charging pile risk measurement threshold, a high risk operation signal is generated; if the charging pile risk measurement value does not exceed the preset charging pile risk measurement threshold, a low risk operation signal is generated; The supervision platform is connected to the auxiliary monitoring module of the charging pile in communication. The auxiliary monitoring module of the charging pile draws a circle with a radius of R1 with the charging pile as the center, and marks the drawn circular area as the monitoring area. The monitoring area is monitored in real time through the camera, and the monitoring area is monitored for fire and collision impact. If there is a fire in the monitoring area or the charging pile is impacted by a collision, an auxiliary monitoring warning signal is generated, and the auxiliary monitoring warning signal is sent to the charging pile risk warning module via the supervision platform. The charging pile risk warning module issues a corresponding warning when receiving the auxiliary monitoring warning signal. When the charging pile is impacted by a collision, the charging pile auxiliary monitoring module collects the duration of the collision impact on the charging pile and marks it as the collision condition value, as well as the average impact force data and the maximum impact force data received during the impact process and marks them as the charging pile collision condition value and the charging pile collision amplitude value; The charging pile damage value is obtained by numerically calculating the collision table value, the charging pile collision condition value and the charging pile collision amplitude value, and the charging pile damage value is numerically compared with the preset charging pile damage threshold. If the charging pile damage value exceeds the preset charging pile damage threshold, the corresponding collision impact process is judged to be a charging pile high damage process, and the corresponding judgment information is sent to the supervision platform for storage; The supervision platform is connected in communication with the safety prevention performance decision module. The safety prevention performance decision module is used to evaluate the safety protection performance status of the charging pile within the evaluation period, mark the moment when the charging pile automatic control module determines that corresponding regulation needs to be made as the judgment moment, and mark the moment when the charging pile starts to make adaptive adjustments as the execution moment, mark the interval between the execution moment and the judgment moment as the execution interval, and mark the moment when the charging pile risk identification module receives the data packet as the packet receiving moment, mark the moment when the charging pile risk identification module completes the corresponding analysis as the analysis conclusion moment, and mark the interval between the analysis conclusion moment and the packet receiving moment as the analysis interval; The execution value is obtained by averaging all the execution intervals in the evaluation period, the analysis value is obtained by averaging all the analysis intervals in the evaluation period, and the number of execution intervals exceeding the preset execution interval threshold in the evaluation period is marked as a non-good execution value, and the number of analysis intervals exceeding the preset analysis interval threshold in the evaluation period is marked as a non-good analysis value. The safety precaution inspection value is obtained by numerically calculating the execution value, the analysis value, the non-good execution value and the non-good analysis value, and the safety precaution inspection value of the charging pile is sent to the supervision platform for storage.
2. According to the artificial intelligence-based charging pile operation safety management and control system of claim 1, it is characterized in that: The charging pile is an energy storage type charging pile, which stores energy and replenishes electricity when the charging pile is idle, and discharges electricity when the electric vehicle is charging. The energy storage type charging pile stores electricity in the energy storage battery when the electricity rate is low or the grid is idle, and releases the electricity when the electricity rate is high or the electricity consumption is peak.
3. According to the artificial intelligence-based charging pile operation safety management and control system of claim 2, it is characterized in that: The working modes of the charging pile include battery PACK charging mode, DC fast charging gun charging mode, AC / DC inverter mode and traditional DC charging pile mode; Among them, the battery PACK charging mode is realized by two methods, one of which is to attract the K1 and K2 circuits, and the other circuits are in the disconnected state, and use AC / DC to charge the battery PACK; the other is to attract the K4 circuit, and the other circuits are in the disconnected state, and use the DC charging pile to charge the battery PACK; DC fast charging gun charging mode: K5 and K7 circuits are closed, other circuits are disconnected, and the battery PACK discharges to the external vehicle through DC / DC and DC fast charging gun; AC / DC inverter mode: K1 and K3 circuits are closed, other circuits are disconnected, and the battery PACK discharges to the grid through AC / DC; Traditional DC charging pile mode: K1, K6 and K7 circuits are energized, and other circuits are in the disconnected state. The battery PACK is bypassed and discharged to external vehicles through AC / DC, DC / DC and DC fast charging guns.
4. According to the artificial intelligence-based charging pile operation safety management and control system of claim 1, it is characterized in that: The specific operation process of the charging pile automatic control module is as follows: Analysis and judgment: After receiving the danger information, the charging pile automatic control module analyzes and judges the danger information. Through the built-in algorithm and logic, it interprets the danger information, determines the nature and severity of the danger, and consults the historical data and configuration information of the charging pile to accurately determine the problem; Formulation of intelligent processing strategies: Based on the results of analysis and judgment, formulate corresponding intelligent processing strategies, including adjusting the working parameters of the charging pile, switching the working mode and starting the emergency protection program; Execute processing measures: Convert intelligent processing strategies into specific control instructions, where the control instructions involve power management, heat dissipation control and communication management; during the control execution process, monitor the processing effect in real time and adjust the control strategy as needed.