A regional integrated energy system coordination planning method and system

By analyzing real-time meteorological data and new energy energy supply model, adjusting the power generation power of thermoelectric equipment, the problems of low utilization rate and carbon emissions of new energy power generation equipment have been solved, and the goals of stable power supply and low carbon emissions have been achieved.

CN118195159BActive Publication Date: 2024-11-12LIANYUNGANG ZHIYUAN ELECTRIC POWER DESIGN CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410377084.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-11-12
Estimated Expiration
2044-03-29

AI Technical Summary

Technical Problem

The low equipment utilization rate of new energy power generation equipment leads to low carbon emissions and cannot meet the stability requirements of electricity consumption in the region.

Method used

By acquiring and analyzing real-time meteorological data, using meteorological estimate models and new energy energy supply estimation models, adjusting the power generation power of thermoelectric equipment, ensuring stable power supply and making full use of clean energy.

Benefits of technology

It improves the utilization rate of new energy power generation equipment, reduces carbon emissions, realizes stable estimation and prediction of electricity consumption, and ensures stable prefetching and power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118195159B_ABST
    Figure CN118195159B_ABST
Patent Text Reader

Abstract

The present application relates to a method, system, computer equipment, storage medium and computer program product for coordinated planning of regional integrated energy systems. The method comprises: obtaining real-time meteorological data within a first preset area, and calculating the real-time meteorological data through a preset meteorological prediction model to obtain a first meteorological forecast result; analyzing the first meteorological forecast result to obtain key influencing parameters; obtaining real-time meteorological parameter data within a second preset area according to the meteorological parameter type corresponding to the key influencing parameters; determining whether the rate of change of the real-time meteorological parameter data is greater than a warning threshold; if so, obtaining the real-time meteorological data within the first preset area again, and calculating the real-time meteorological data through a preset meteorological prediction model to obtain a second meteorological forecast result. The use of this method can improve the utilization rate of new energy power generation equipment and reduce carbon emissions from power generation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of meteorological forecasting, and in particular to a method, system, computer equipment, storage medium and computer program product for coordinated planning of a regional integrated energy system. Background Art

[0002] Since the development of the Second Industrial Revolution, electricity has penetrated into every corner of life and has become a basic necessity for human normal production and life.

[0003] Nowadays, the main methods of power generation include thermal power generation, hydropower generation and nuclear power. Although new clean energy power generation methods such as photovoltaics, wind power, and tidal power have begun to become active in people's attention with the carbon peak and carbon neutrality plans proposed by various countries, their actual power generation capacity is greatly affected by the climate and cannot meet the stability requirements of electricity consumption in the region. As a result, many areas with new energy power generation equipment such as photovoltaic power plants are in a shutdown state and the equipment utilization rate is low, resulting in carbon emissions related to power generation still at a low level. Summary of the invention

[0004] Based on this, it is necessary to provide a regional integrated energy system coordination planning method, device, computer equipment, computer-readable storage medium and computer program product that can improve the utilization rate of new energy power generation equipment and reduce carbon emissions from power generation in response to the above-mentioned technical problems.

[0005] In a first aspect, the present application provides a method for coordinated planning of a regional integrated energy system, the method comprising:

[0006] Acquire real-time meteorological data in a first preset area, and calculate the real-time meteorological data using a preset meteorological prediction model to calculate a first meteorological forecast result;

[0007] Analyze the first meteorological forecast results to obtain key influencing parameters;

[0008] Acquire real-time meteorological parameter data in a second preset area according to the meteorological parameter type corresponding to the key influencing parameter;

[0009] Determine whether the change rate of real-time meteorological parameter data is greater than the warning threshold;

[0010] If yes, then real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply;

[0011] If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain the new energy power supply and the thermal power supply.

[0012] In one embodiment, the specific steps of acquiring real-time meteorological data in a first preset area and calculating the real-time meteorological data using a preset meteorological prediction model to calculate a first meteorological forecast result include:

[0013] Acquiring real-time meteorological data in a first area at a first resolution;

[0014] The real-time meteorological data is input into the preset meteorological forecasting model for calculation to obtain the first meteorological forecasting result.

[0015] In one embodiment, the specific steps of analyzing the first meteorological forecast result to obtain key influencing parameters include:

[0016] Extracting the core meteorological type in the first meteorological forecast result;

[0017] According to the preset meteorological type-meteorological data association relationship, the key influencing parameters corresponding to the core meteorological type are obtained.

[0018] In one of the embodiments, according to the meteorological parameter type corresponding to the key influencing parameter, the specific step of obtaining the real-time meteorological parameter data in the second preset area includes: obtaining the real-time meteorological parameter data in the preset second area at a preset second resolution.

[0019] In one of the embodiments, the specific steps of determining whether the rate of change of the real-time meteorological parameter data is greater than the warning threshold include: obtaining and calculating the amount of change of the meteorological parameter data in two adjacent sampling periods;

[0020] Calculate the change rate of meteorological parameter data according to the change amount of meteorological parameter data;

[0021] Determine whether the calculated change rate of the meteorological parameter data is greater than a preset change rate threshold.

[0022] In one embodiment, the specific steps of obtaining the real-time meteorological data in the first preset area again and calculating the real-time meteorological data by using a preset meteorological prediction model to obtain the second meteorological forecast result include:

[0023] Acquiring real-time meteorological data in a first area at a first resolution;

[0024] The real-time meteorological data is input into a preset meteorological forecasting large model for calculation to obtain a second meteorological forecasting result.

[0025] In a second aspect, the present application also provides a regional integrated energy system coordination planning system, the system comprising:

[0026] A data sampling module, used to obtain real-time meteorological data in the first area and real-time meteorological parameter data in the second area;

[0027] A meteorological forecast module, used to calculate and output a first meteorological forecast result and a second meteorological forecast result according to real-time meteorological data, and to calculate a rate of change of real-time meteorological data;

[0028] The parameter analysis module is used to analyze the first meteorological forecast result to obtain key influencing parameters and to determine whether the change rate of the real-time meteorological parameter data is greater than the warning threshold.

[0029] In a third aspect, the present application further provides a computer device, the computer device comprising a memory and a processor, the memory storing a computer program, and the processor implementing the following steps when executing the computer program:

[0030] Acquire real-time meteorological data in a first preset area, and calculate the real-time meteorological data using a preset meteorological prediction model to calculate a first meteorological forecast result;

[0031] Analyze the first meteorological forecast results to obtain key influencing parameters;

[0032] Acquire real-time meteorological parameter data in a second preset area according to the meteorological parameter type corresponding to the key influencing parameter;

[0033] Determine whether the change rate of real-time meteorological parameter data is greater than the warning threshold;

[0034] If yes, then real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply;

[0035] If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain the new energy power supply and the thermal power supply.

[0036] In a fourth aspect, the present application further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0037] Acquire real-time meteorological data in a first preset area, and calculate the real-time meteorological data using a preset meteorological prediction model to calculate a first meteorological forecast result;

[0038] Analyze the first meteorological forecast results to obtain key influencing parameters;

[0039] Acquire real-time meteorological parameter data in a second preset area according to the meteorological parameter type corresponding to the key influencing parameter;

[0040] Determine whether the change rate of real-time meteorological parameter data is greater than the warning threshold;

[0041] If yes, then real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply;

[0042] If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain the new energy power supply and the thermal power supply.

[0043] In a fifth aspect, the present application further provides a computer program product, the computer program product comprising a computer program, and when the computer program is executed by a processor, the following steps are implemented:

[0044] Acquire real-time meteorological data in a first preset area, and calculate the real-time meteorological data using a preset meteorological prediction model to calculate a first meteorological forecast result;

[0045] Analyze the first meteorological forecast results to obtain key influencing parameters;

[0046] Acquire real-time meteorological parameter data in a second preset area according to the meteorological parameter type corresponding to the key influencing parameter;

[0047] Determine whether the change rate of real-time meteorological parameter data is greater than the warning threshold;

[0048] If yes, then real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply;

[0049] If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain the new energy power supply and the thermal power supply.

[0050] The above-mentioned regional integrated energy system coordination planning method, device, computer equipment, storage medium and computer program product, through this method, the power supply department can estimate the total electricity consumption of the day based on the statistical data of regional electricity consumption, and then make more accurate data estimation of the power generation of photovoltaic power generation equipment according to the actual meteorological changes, so as to adjust the power generation power of thermal power equipment, so as to make full use of clean energy and reduce carbon emissions under the premise of ensuring pre-taken stable power supply. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 An application environment diagram of a regional integrated energy system coordination planning method in one embodiment;

[0052] Figure 2 A schematic diagram of a flow chart of a method for coordinated planning of a regional integrated energy system in one embodiment;

[0053] Figure 3 is a flow chart of step S100 in one embodiment;

[0054] Figure 4 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0055] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0056] The regional integrated energy system coordination planning method provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be integrated on the server 104, or it can be placed on the cloud or other network servers. Among them, the terminal 102 can be but is not limited to various personal computers, laptops, smart phones, tablets, Internet of Things devices and portable wearable devices. The Internet of Things devices can be smart speakers, smart TVs, smart air conditioners, smart car-mounted devices, etc. Portable wearable devices can be smart watches, smart bracelets, head-mounted devices, etc. The server 104 can be implemented with an independent server or a server cluster consisting of multiple servers.

[0057] In one embodiment, Figure 2 As shown in the figure, a regional integrated energy system coordination planning method is provided. Figure 1 The server in the example is used to illustrate the following steps:

[0058] Step S100: acquiring real-time meteorological data in a first preset area, and calculating the real-time meteorological data using a preset meteorological prediction model to obtain a first meteorological forecast result.

[0059] Among them, the first preset area is the target area for high-resolution ensemble numerical weather forecasting, which can be completed by prior preset or selected in images such as maps through interactive devices (such as mouse, keyboard light); the preset meteorological forecast model is an algorithm model integrated in the system for meteorological forecasting through existing or real-time parameters, etc., in particular, existing open source or non-open source meteorological forecasting large models (such as FourCastNet, Pangu, GraphCast, etc.) can also be used to predict the results to obtain the first meteorological forecast result that this step aims to calculate.

[0060] The specific steps include:

[0061] Step S110: Acquire real-time meteorological data in a first area at a first resolution.

[0062] Among them, the first resolution is the resolution required for high-resolution ensemble numerical weather forecast for the target area, or in order to ensure the accuracy of the required high-resolution ensemble numerical weather forecast output, real-time meteorological data in the first area can be obtained at a first resolution higher than the numerical weather forecast resolution, and the types of meteorological data include but are not limited to wind force, wind direction, temperature, air humidity and other data.

[0063] Step S120: input the real-time meteorological data into a preset meteorological forecasting model to obtain a first meteorological forecasting result.

[0064] In this step, the real-time meteorological data is input as raw data into a preset meteorological forecast model to obtain a first meteorological forecast result. In the embodiment of the present application, the first meteorological forecast result also includes key meteorological data corresponding to the first area, and trend forecast results of the meteorological type. For example, for areas with photovoltaic power generation as the main function, the core key data include wind direction, sunshine data, cloud distribution data, etc. The trend forecast results include the influence of wind direction on the direction of clouds, and the influence of clouds on sunshine data, etc. The key meteorological data and trend forecast results can be inferred through numerical meteorological forecasts.

[0065] Step S200: Analyze the first meteorological forecast result to obtain key influencing parameters.

[0066] Among them, the key influencing parameters are some parameters in the numerical meteorological forecast that are related to the key meteorological data and trend forecast results. The key influencing parameters are the key parameters that affect the matching degree between the first meteorological forecast result and the actual meteorological detection data. If the changes in the key parameters match the changes in the actual meteorological data, the forecast results can be updated with a relatively low repeated forecast cycle. If the changes in the key parameters do not match the changes in the actual meteorological data, the meteorological forecast results need to be recalculated.

[0067] The specific steps of step S200 include:

[0068] Step S210: extracting the core meteorological type in the first meteorological forecast result.

[0069] Among them, the core meteorological type is part or all of the information and / or data of the aforementioned key meteorological data and meteorological type trend forecast results.

[0070] Step S220: According to the preset meteorological type-meteorological data association relationship, key influencing parameters corresponding to the core meteorological type are obtained.

[0071] Among them, the preset meteorological type-meteorological data association relationship is the preset relationship between meteorological data that is closely related to the meteorological type. The preset relationship is summarized and preset into the system by the system according to the meteorological characteristics, meteorological change laws, and related theories in the first prediction area, for example, the influence of wind direction on the direction of clouds, and the influence of clouds on sunshine data.

[0072] Step S300: acquiring real-time meteorological parameter data within a second preset area according to the meteorological parameter type corresponding to the key influencing parameter.

[0073] Among them, the second preset area is an area located adjacent to the first preset area and related to the climate of the first preset area, such as the wind direction source area, or the airflow source area, etc. The second preset area is an area based on the location of the first meteorological area, and is associated with the first meteorological forecast result and the core meteorological type.

[0074] The specific steps of step S300 include:

[0075] Step S310: Acquire real-time meteorological parameter data within a preset second area at a preset second resolution.

[0076] Among them, the second resolution is a resolution value lower than the first resolution, that is, by performing a second resolution lower than the first resolution on the second area, some meteorological data related to the first meteorological forecast result and the core meteorological type are collected in a targeted manner to obtain real-time meteorological parameter data. In this way, the resolution and frequency of collecting meteorological data can be reduced, that is, the cost of meteorological collection and monitoring can be reduced.

[0077] Step S400: Determine whether the change rate of the real-time meteorological parameter data is greater than the warning threshold.

[0078] Among them, the warning threshold is the system preset upper limit value of the meteorological parameter data change rate. Exceeding the warning threshold means that the change of meteorological parameter data in the second area is beyond expectations, which will have a greater impact on the meteorological data in the first area. The first meteorological forecast result obtained in the above steps does not have a high degree of credibility, and the meteorological forecast result in the first area needs to be updated.

[0079] The specific steps of step S400 include:

[0080] Step S410: Acquire and calculate the change in meteorological parameter data between two adjacent sampling periods.

[0081] Step S420: Calculate the change rate of the meteorological parameter data according to the change amount of the meteorological parameter data.

[0082] Step S430: Determine whether the calculated change rate of the meteorological parameter data is greater than a preset change rate threshold. The change rate of the meteorological parameter data can be calculated through the above steps, and by comparing the actual change rate with the preset change rate threshold, it can be determined whether the meteorological changes in the second area will have a significant impact on the meteorology in the first area.

[0083] Step S510: If yes, real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply.

[0084] In this step, since the meteorological changes in the second area that have a greater impact on the first meteorological forecast result will affect the power supply of new energy power generation equipment in the first area, such as wind power generation, photovoltaic power generation and other power generation equipment, it is necessary to re-estimate the key meteorological parameters in the first preset area. Taking photovoltaic power generation as an example, if the meteorological data such as wind direction and cloud layer in the second area deviate greatly from the predicted data, it will affect the actual power generation of the photovoltaic power generation equipment located in the first area. At this time, it is necessary to re-estimate the power generation of the photovoltaic power generation equipment and further calculate the power gap that needs to be made up by the thermal power generation equipment that can stably output electrical energy. Specifically, the embodiment of the present application also discloses a preset new energy supply estimation model used in the scenario of comprehensive use of photovoltaic power generation and traditional thermal power. The model equation is as follows:

[0085] E 火 =E 总 -nMS

[0086] Among them, E 总 is the estimated total electricity consumption in the region, E 火 is the estimated thermal power generation for the day, n is the energy conversion efficiency of the photovoltaic power generation equipment, M is the current solar radiation, and S is the total area of ​​the photovoltaic panels in the photovoltaic power generation equipment. 火 A redundancy factor is added before the power generation, and the redundancy factor is less than 1, so that the actual output power of the thermal power generation equipment is greater than the estimated total power consumption to cope with the actual power consumption fluctuations.

[0087] Step S520: If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain the new energy power supply and the thermal power supply.

[0088] Pick

[0089] In this step, if the change rate of the real-time meteorological parameter data is less than the warning threshold, since the meteorological changes in the second area will not have a significant impact on the first meteorological forecast results, the photovoltaic power generation can be estimated based on the first meteorological forecast results, and based on the estimated results of the photovoltaic power generation, the required thermal power supply is further calculated. The sum of the thermal power supply and the photovoltaic power generation is the total power generation for the day. Through this method, the power supply department can estimate the total electricity consumption for the day based on the statistical data of regional electricity consumption, and then make a more accurate data estimate of the power generation of the photovoltaic power generation equipment based on the actual meteorological changes, so as to adjust the power generation power of the thermoelectric equipment, so as to make full use of clean energy and reduce carbon emissions under the premise of ensuring stable pre-taken power supply.

[0090] Through the above steps, the real-time meteorological data in the first area is acquired and calculated in the same manner to complete the update of the meteorological forecast results. In summary, the low-resolution, low-value meteorological data in the second area is collected and monitored in real time, which reduces the burden of meteorological monitoring. Furthermore, after the change rate of the real-time meteorological parameter data in the second area exceeds the warning threshold, the real-time meteorological data in the first area is re-sampled to obtain new and more accurate prediction results.

[0091] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0092] Based on the same inventive concept, the embodiment of the present application also provides a regional integrated energy system coordination planning system for implementing the regional integrated energy system coordination planning method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more embodiments of the regional integrated energy system coordination planning system provided below can refer to the limitations of the regional integrated energy system coordination planning method above, and will not be repeated here.

[0093] In one embodiment, a regional integrated energy system coordination planning system is provided, comprising: a data sampling module, a weather forecasting module and a parameter analysis module, wherein:

[0094] A data sampling module, used to obtain real-time meteorological data in the first area and real-time meteorological parameter data in the second area;

[0095] A meteorological forecast module, used to calculate and output a first meteorological forecast result and a second meteorological forecast result according to real-time meteorological data, and to calculate a change rate of real-time meteorological data;

[0096] The parameter analysis module is used to analyze the first meteorological forecast result to obtain key influencing parameters and to determine whether the change rate of the real-time meteorological parameter data is greater than the warning threshold.

[0097] Each module in the above regional integrated energy system coordination planning system can be implemented in whole or in part by software, hardware and their combination. Each module can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to each module above.

[0098] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 4 As shown. The computer device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for coordinated planning of a regional integrated energy system is implemented.

[0099] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 4As shown. The computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a method for coordinated planning of a regional integrated energy system is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a button, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.

[0100] Those skilled in the art will understand that the structure shown in FIG. Y is merely a block diagram of a partial structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0101] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:

[0102] Step S100: acquiring real-time meteorological data in a first preset area, and calculating the real-time meteorological data using a preset meteorological prediction model to obtain a first meteorological forecast result.

[0103] The specific steps include:

[0104] Step S110: Acquire real-time meteorological data in a first area at a first resolution.

[0105] Step S120: input the real-time meteorological data into a preset meteorological forecasting model to obtain a first meteorological forecasting result.

[0106] Step S200: Analyze the first meteorological forecast result to obtain key influencing parameters.

[0107] The specific steps of step S200 include:

[0108] Step S210: extracting the core meteorological type in the first meteorological forecast result.

[0109] Step S220: According to the preset meteorological type-meteorological data association relationship, key influencing parameters corresponding to the core meteorological type are obtained.

[0110] Step S300: According to the meteorological parameter type corresponding to the key influencing parameter, obtain the real-time meteorological parameter data in the second preset area

[0111] The specific steps of step S300 include:

[0112] Step S310: Acquire real-time meteorological parameter data within a preset second area at a preset second resolution.

[0113] Step S400: Determine whether the change rate of the real-time meteorological parameter data is greater than the warning threshold.

[0114] The specific steps of step S400 include:

[0115] Step S410: Obtain and calculate the change amount of meteorological parameter data in two adjacent sampling periods;

[0116] Step S420: Calculating the change rate of the meteorological parameter data according to the change amount of the meteorological parameter data;

[0117] Step S430: Determine whether the calculated change rate of the meteorological parameter data is greater than a preset change rate threshold.

[0118] Step S510: If yes, real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply;

[0119] Step S520: If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply.

[0120] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0121] Step S100: acquiring real-time meteorological data in a first preset area, and calculating the real-time meteorological data using a preset meteorological prediction model to obtain a first meteorological forecast result.

[0122] The specific steps include:

[0123] Step S110: Acquire real-time meteorological data in a first area at a first resolution.

[0124] Step S120: input the real-time meteorological data into a preset meteorological forecasting model to obtain a first meteorological forecasting result.

[0125] Step S200: Analyze the first meteorological forecast result to obtain key influencing parameters.

[0126] The specific steps of step S200 include:

[0127] Step S210: extracting the core meteorological type in the first meteorological forecast result.

[0128] Step S220: According to the preset meteorological type-meteorological data association relationship, key influencing parameters corresponding to the core meteorological type are obtained.

[0129] Step S300: According to the meteorological parameter type corresponding to the key influencing parameter, obtain the real-time meteorological parameter data in the second preset area

[0130] The specific steps of step S300 include:

[0131] Step S310: Acquire real-time meteorological parameter data within a preset second area at a preset second resolution.

[0132] Step S400: Determine whether the change rate of the real-time meteorological parameter data is greater than the warning threshold.

[0133] The specific steps of step S400 include:

[0134] Step S410: Obtain and calculate the change amount of meteorological parameter data in two adjacent sampling periods;

[0135] Step S420: Calculating the change rate of the meteorological parameter data according to the change amount of the meteorological parameter data;

[0136] Step S430: Determine whether the calculated change rate of the meteorological parameter data is greater than a preset change rate threshold.

[0137] Step S510: If yes, real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply;

[0138] Step S520: If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply.

[0139] In one embodiment, a computer program product is provided, comprising a computer program, which, when executed by a processor, implements the following steps:

[0140] Step S100: acquiring real-time meteorological data in a first preset area, and calculating the real-time meteorological data using a preset meteorological prediction model to obtain a first meteorological forecast result.

[0141] The specific steps include:

[0142] Step S110: Acquire real-time meteorological data in a first area at a first resolution.

[0143] Step S120: input the real-time meteorological data into a preset meteorological forecasting model to obtain a first meteorological forecasting result.

[0144] Step S200: Analyze the first meteorological forecast result to obtain key influencing parameters.

[0145] The specific steps of step S200 include:

[0146] Step S210: extracting the core meteorological type in the first meteorological forecast result.

[0147] Step S220: According to the preset meteorological type-meteorological data association relationship, key influencing parameters corresponding to the core meteorological type are obtained.

[0148] Step S300: According to the meteorological parameter type corresponding to the key influencing parameter, obtain the real-time meteorological parameter data in the second preset area

[0149] The specific steps of step S300 include:

[0150] Step S310: Acquire real-time meteorological parameter data within a preset second area at a preset second resolution.

[0151] Step S400: Determine whether the change rate of the real-time meteorological parameter data is greater than the warning threshold.

[0152] The specific steps of step S400 include:

[0153] Step S410: Obtain and calculate the change amount of meteorological parameter data in two adjacent sampling periods;

[0154] Step S420: Calculating the change rate of the meteorological parameter data according to the change amount of the meteorological parameter data;

[0155] Step S430: Determine whether the calculated change rate of the meteorological parameter data is greater than a preset change rate threshold.

[0156] Step S510: If yes, real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply;

[0157] Step S520: If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply.

[0158] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0159] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0160] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for coordinated planning of regional integrated energy systems, characterized in that: The method comprises: Acquire real-time meteorological data in a first preset area, and calculate the real-time meteorological data using a preset meteorological prediction model to calculate a first meteorological forecast result, wherein the first preset area is a target area for high-resolution ensemble numerical weather forecasting; Analyze the first meteorological forecast results to obtain key influencing parameters; According to the meteorological parameter type corresponding to the key influencing parameter, real-time meteorological parameter data in a second preset area is obtained, wherein the second preset area is an area located near the first preset area and related to the climate of the first preset area; Determine whether the change rate of real-time meteorological parameter data is greater than the warning threshold; If so, real-time meteorological data in the first preset area is obtained again, and the real-time meteorological data in the first preset area obtained again is calculated by a preset meteorological prediction model to obtain a second meteorological forecast result, and the second meteorological forecast result is calculated by a preset new energy supply estimation model to obtain new energy power supply and thermal power supply; If not, the first meteorological forecast result is calculated by a preset new energy supply estimation model to obtain the new energy power supply and thermal power supply; The specific steps of analyzing the first meteorological forecast result to obtain key influencing parameters include: Extracting the core meteorological type in the first meteorological forecast result; According to the preset meteorological type-meteorological data association relationship, key influencing parameters corresponding to the core meteorological type are obtained; The specific steps of determining whether the change rate of the real-time meteorological parameter data is greater than the warning threshold include: Obtain and calculate the change in meteorological parameter data between two adjacent sampling periods; Calculate the change rate of meteorological parameter data according to the change amount of meteorological parameter data; Determine whether the calculated change rate of the meteorological parameter data is greater than a preset change rate threshold.

2. The method according to claim 1, characterized in that The specific steps of acquiring the real-time meteorological data in the first preset area and calculating the real-time meteorological data by using a preset meteorological prediction model to calculate the first meteorological forecast result include: Acquiring real-time meteorological data in a first area at a first resolution; The real-time meteorological data is input into the preset meteorological forecasting model for calculation to obtain the first meteorological forecasting result.

3. According to the method of claim 1, the specific step of obtaining the real-time meteorological parameter data in the second preset area according to the meteorological parameter type corresponding to the key influencing parameter comprises: Real-time meteorological parameter data within a preset second area is obtained at a preset second resolution.

4. The method according to claim 3, characterized in that The specific steps of re-obtaining the real-time meteorological data in the first preset area and calculating the re-obtained real-time meteorological data in the first preset area by using a preset meteorological prediction model to obtain a second meteorological forecast result include: Acquiring real-time meteorological data in a first area at a first resolution; The real-time meteorological data is input into a preset meteorological forecasting large model for calculation to obtain a second meteorological forecasting result.

5. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 4 are implemented.

6. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 4 are implemented.

7. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 4 are implemented.