A power grid infrastructure project evaluation and optimization system

Through the grid infrastructure project evaluation and optimization system, the entropy weight method, hierarchy method and correction weight are used to solve the problem of lack of accuracy in the evaluation optimization in the existing technology, and a more accurate and efficient grid infrastructure project evaluation is achieved, taking into account the economy and society. and the environment.

CN118211720BActive Publication Date: 2024-11-15STATE GRID ELECTRIC POWER ECONOMIC RES INST IN NORTHERN HEBEI TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410388351.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-11-15
Estimated Expiration
2044-04-01

AI Technical Summary

Technical Problem

The existing grid infrastructure project evaluation method cannot accurately consider the comprehensive economic, social and environmental impacts, resulting in a lack of accuracy in evaluation optimization.

Method used

A power grid infrastructure project evaluation and optimization system was designed, including index determination module, weight setting module and optimization module. Through entropy weight method, hierarchical analysis method and correction weight, the weights of each evaluation parameter are determined, and alternative construction is carried out based on the evaluation rules. The plan is evaluated and optimized, and the optimal construction plan is output.

Benefits of technology

It improves the accuracy and processing speed of evaluation optimization, and can take into account economic, social and environmental factors more comprehensively to ensure the scientificity and reliability of the evaluation results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118211720B_ABST
    Figure CN118211720B_ABST
Patent Text Reader

Abstract

The present invention provides a power grid infrastructure project evaluation and optimization system, belonging to the field of power grid infrastructure. The system includes: an index determination module, a weight setting module, an evaluation module and an optimization module; the index determination module is used to determine multiple evaluation parameters of the infrastructure project to be built, and the evaluation parameters at least include project type indicators, investment evaluation indicators and load evaluation indicators; the weight setting module is used to set the weight of each evaluation parameter, and the weight of each evaluation parameter is determined based on the first weight, the second weight and the correction weight; the correction weight is determined based on the active power and reactive capacity of the area where each alternative construction scheme is located in a preset historical period, and the infrastructure project to be built has multiple alternative construction schemes; the evaluation module is used to evaluate multiple alternative construction schemes for the infrastructure project to be built based on evaluation rules, multiple evaluation parameters and the weights of each evaluation parameter; the optimization module is used to output the optimal construction scheme from multiple alternative construction schemes. The present invention can improve the accuracy of evaluation optimization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid infrastructure, and in particular to a power grid infrastructure project evaluation and optimization system. Background Art

[0002] As a basic pillar industry of the national economy, electricity is the logistics of various industries. Grid construction projects are not only related to the normal life and production and operation activities of residents and enterprises, but also have an important and far-reaching impact on the development of the regional economy and the sustainable, stable and healthy development of the entire society.

[0003] With the rapid economic development and the increase in electricity demand, the number of power grid infrastructure projects has gradually increased, and the evaluation of power grid infrastructure projects is a key link in the implementation of power grid infrastructure projects. In the traditional evaluation process of power grid infrastructure projects, the maximum economic benefit of power grid enterprises is usually used as the objective function. However, the investment benefits of power grid infrastructure projects should not be limited to economic benefits, but also take into account the comprehensive impact of power grid investment on society and the environment.

[0004] At present, the evaluation methods used for power grid infrastructure projects mainly rely on the experience of experts in related fields for evaluation, which may lead to a lack of accuracy in the evaluation optimization of power grid infrastructure projects. Summary of the invention

[0005] The embodiment of the present invention provides a power grid infrastructure project evaluation optimization system to solve the problem that the current evaluation system cannot accurately evaluate infrastructure projects.

[0006] In a first aspect, an embodiment of the present invention provides a power grid infrastructure project evaluation and optimization system, including an indicator determination module, a weight setting module, an evaluation module and an optimization module;

[0007] An indicator determination module is used to determine multiple evaluation parameters of the infrastructure project to be constructed, wherein the evaluation parameters include at least a project type indicator, an investment evaluation indicator, and a load evaluation indicator;

[0008] A weight setting module is used to set the weight of each evaluation parameter. The weight of each evaluation parameter is determined based on the first weight, the second weight and the modified weight; the first weight is determined based on the entropy weight method, the second weight is determined based on the hierarchical analysis method, and the modified weight is determined based on the active power and reactive capacity of the area where each alternative construction plan is located in a preset historical period. There are multiple alternative construction plans for the infrastructure project to be built;

[0009] An evaluation module, for evaluating multiple alternative construction plans for a capital construction project based on evaluation rules, multiple evaluation parameters and weights of each evaluation parameter;

[0010] The optimization module is used to output the best construction plan from multiple alternative construction plans.

[0011] In a possible implementation, the indicator determination module includes a photovoltaic site selection module, a wind power site selection module, a thermal power site selection module, a hydropower site selection module and a power supply line site selection module, and the indicator determination module is used to select a corresponding site selection module based on the project type of the infrastructure project to be constructed and output a project type indicator corresponding to the project type of the infrastructure project to be constructed based on the geographical location of each alternative construction plan;

[0012] The investment evaluation indicators include the power supply population, total electricity consumption and transmission and distribution costs in the area where the alternative construction plan is located within the past N years;

[0013] The load assessment indicators include the installed capacity, regional gross generation value, fixed asset investment, electricity consumption of the primary industry structure, electricity consumption of the secondary industry structure and electricity consumption of the tertiary industry structure in the region where the alternative construction plans are located within the past N years.

[0014] In one possible implementation, the evaluation parameters output by the photovoltaic site selection module include the terrain, solar radiation intensity, air quality, temperature, humidity and wind speed of the area where the alternative construction plan is located;

[0015] The evaluation parameters output by the wind power infrastructure module include the terrain, wind direction, wind speed, temperature, humidity and distance from residential areas in the area where the alternative construction plan is located;

[0016] The evaluation parameters output by the hydropower infrastructure module include the topography of the area where the alternative construction plan is located, the distance from the residential area, the water quality and the water flow;

[0017] The evaluation parameters output by the thermal power infrastructure module include wind direction in the area where the alternative construction plan is located, distance from residential areas, water supply, and distance from trunk transportation lines;

[0018] The evaluation parameters output by the power supply line module include the topography, geology and width of the line corridor in the area where the alternative construction plan is located.

[0019] In one possible implementation, the correction weight is determined based on inputting the active power and reactive capacity of the area where the alternative construction plan is located in a preset historical period into a weight correction model. The weight correction model is used to normalize the acquired active power and reactive capacity and then reproject them on the time axis respectively, and the correction weight is determined based on the sum of the reprojected active power and reactive power in the preset historical period.

[0020] In a possible implementation, the weight correction model is:

[0021]

[0022] Among them, α i is the modified weight of the i-th evaluation index, N is the total number of time periods in the preset historical period, P j is the active power corresponding to the jth historical period, M j is the reactive capacity corresponding to the jth historical period.

[0023] In a possible implementation, the weight of the evaluation parameter is obtained by correcting the first weight, the second weight, and the corrected weight based on a preset correction formula.

[0024] In a possible implementation, the preset correction formula is:

[0025]

[0026] Among them, y i is the corrected weight of the i-th evaluation index, w i is the first weight of the i-th evaluation index, β i is the second weight of the i-th evaluation index, α i is the modified weight of the i-th evaluation index.

[0027] In a possible implementation, the evaluation module is used to output the value of each evaluation parameter of each alternative construction scheme based on each alternative construction scheme and each evaluation parameter;

[0028] The evaluation rule is that for any alternative construction plan, the score of the target evaluation parameter is determined based on the product of the value of the target evaluation parameter of the alternative construction plan and the weight of the target evaluation parameter, and the score of the alternative construction plan is determined based on the sum of the scores of all target evaluation parameters.

[0029] In a possible implementation, the optimization module includes an evaluation score module, an analysis result module, and an optimization data module;

[0030] An evaluation score module for determining the alternative construction plan with the highest score based on the scores of all alternative construction plans;

[0031] An analysis result module is used to determine the investment amount of the alternative construction plan based on the alternative construction plan;

[0032] The optimization data module is used to determine the optimized evaluation parameters based on the scores of each target evaluation parameter in the evaluation module when the investment amount of the highest-scoring alternative construction plan exceeds a preset amount threshold.

[0033] In a possible implementation, the optimization data module is used to optimize the numerical value corresponding to the target evaluation parameter with the lowest score among all target evaluation parameters so that the investment amount of the alternative construction plan with the highest score is less than or equal to a preset amount threshold.

[0034] The present invention provides a power grid infrastructure project evaluation and optimization system. By setting an index determination module, only the relevant parameters of each alternative construction plan need to be input into the index determination module, and the value of each evaluation parameter can be quickly and accurately extracted. All the evaluation parameters extracted by the index determination module are input into the weight setting module to determine the weight corresponding to each evaluation parameter. In addition, the present invention takes into account that the current weight setting method only considers the influence of the values ​​of each evaluation parameter and ignores the influence of the installation intensity. Therefore, a correction weight is added to the weight. The correction weight is determined based on active power and reactive capacity, so that the influence of the installation intensity can be considered in the weight, further improving the accuracy of the weight. Finally, the optimized infrastructure project can be directly output through the optimization module. The power grid infrastructure project evaluation and optimization system provided by the present invention can not only improve the processing speed of evaluation optimization, but also improve the accuracy of evaluation optimization. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0036] Figure 1 It is a structural diagram of a power grid infrastructure project evaluation and optimization system provided by an embodiment of the present invention;

[0037] Figure 2 is a schematic diagram of the structure of an indicator determination module provided in an embodiment of the present invention;

[0038] Figure 3 It is a schematic diagram of the structure of the optimization module provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0039] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0040] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0041] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.

[0042] Figure 1 A schematic diagram of the structure of a power grid infrastructure project evaluation and optimization system provided by an embodiment of the present invention is described in detail as follows:

[0043] A power grid infrastructure project evaluation and optimization system 100 includes an indicator determination module 110, a weight setting module 120, an evaluation module 130, and an optimization module 140. The power grid infrastructure project evaluation and optimization system in the present application can evaluate a variety of infrastructure projects, and can also evaluate mixed infrastructure projects. The infrastructure projects can be photovoltaic infrastructure projects, wind power infrastructure projects, thermal power infrastructure projects, hydropower infrastructure projects, and power supply line infrastructure projects.

[0044] The indicator determination module 110 is used to determine multiple evaluation parameters of the infrastructure project to be constructed, and the evaluation parameters at least include a project type indicator, an investment evaluation indicator, and a load evaluation indicator.

[0045] The weight setting module 120 is used to set the weight of each evaluation parameter. The weight of each evaluation parameter is determined based on the first weight, the second weight and the modified weight. The first weight is determined based on the entropy weight method, the second weight is determined based on the hierarchical analysis method, and the modified weight is determined based on the active power and reactive capacity of the area where the alternative construction plan is located in a preset historical period. There are multiple alternative construction plans for the infrastructure project.

[0046] The evaluation module 130 is used to evaluate multiple alternative construction plans for the infrastructure project based on evaluation rules, multiple evaluation parameters and weights of each evaluation parameter.

[0047] The optimization module 140 is used to output the best construction plan from multiple alternative construction plans.

[0048] In some embodiments, Figure 2 As shown, in order to evaluate a variety of infrastructure projects, a corresponding module is set for each infrastructure project. The indicator determination module 110 includes a photovoltaic site selection module, a wind power site selection module, a thermal power site selection module, a hydropower site selection module and a power supply line site selection module. The indicator determination module is used to select a corresponding site selection module based on the project type of the infrastructure project to be constructed and output a project type indicator corresponding to the project type of the infrastructure project to be constructed.

[0049] In this embodiment, the project type of the infrastructure project to be constructed is input into the indicator determination module, and the indicator determination module can output the corresponding project type indicator based on the input project type, and determine the value of the corresponding evaluation parameter according to the construction address in each alternative construction plan.

[0050] When the project type is a photovoltaic infrastructure project, the evaluation parameters output by the photovoltaic site selection module include the terrain, solar radiation intensity, air quality, temperature, humidity and wind speed of the area where the alternative construction plan is located.

[0051] When the project type is a wind power infrastructure project, the evaluation parameters output by the wind power infrastructure module include the terrain, wind direction, wind speed, temperature, humidity and distance from residential areas in the area where the alternative construction plan is located.

[0052] When the project type is a hydropower infrastructure project, the evaluation parameters output by the hydropower infrastructure module include the terrain of the area where the alternative construction plan is located, the distance from the residential area, the water quality and the water flow.

[0053] When the project type is a thermal power infrastructure project, the evaluation parameters output by the thermal power infrastructure module include the wind direction in the area where the alternative construction plan is located, the distance from the residential area, the water supply, and the distance from the main transportation lines.

[0054] When the project type is a power line infrastructure project, the evaluation parameters output by the power line module include the topography, geology and width of the line corridor of the area where the alternative construction scheme is located.

[0055] After the project type is determined, the project type and the geographical location of each alternative construction plan are input into the indicator determination module, and the numerical value corresponding to the project type indicator of each alternative construction plan can be output.

[0056] In some embodiments, the investment evaluation index includes the power supply population, total power consumption and transmission and distribution costs in the region where the alternative construction plan is located in the past N years. The investment evaluation index can be used to evaluate the expected investment returns of each alternative infrastructure project. The investment evaluation index is selected from multiple indicators based on the principal component analysis method and will not be repeated here.

[0057] The load assessment indicators include the installed capacity, regional gross generation value, fixed asset investment, electricity consumption of the primary industry structure, electricity consumption of the secondary industry structure, and electricity consumption of the tertiary industry structure in the region where the alternative construction plan is located within the past N years. The load assessment indicators can be used to evaluate the predicted power supply load of each alternative infrastructure project. The load assessment indicators are also selected from multiple indicators based on the principal component analysis method, which will not be repeated here.

[0058] The indicator determination module 110 is used to output the power supply population, total electricity consumption and transmission and distribution costs in the area where the alternative construction scheme is located within the past N years, the installed capacity, regional gross generation value, fixed asset investment, electricity consumption of the primary industry structure, electricity consumption of the secondary industry structure and electricity consumption of the tertiary industry structure in the area where the alternative construction scheme is located within the past N years, and the value of the project type indicator based on the project type based on the project type.

[0059] In some embodiments, the correction weight is determined based on inputting the active power and reactive capacity of the area where the alternative construction plan is located in a preset historical period into the weight correction model.

[0060] In this embodiment, the weight correction model is used to normalize the acquired active power and reactive capacity and reproject them on the time axis, and determine the correction weight based on the sum of the reprojected active power and reactive power in the preset historical period. The normalized active power and reactive capacity of each year are projected onto the horizontal axis with the year as the coordinate, and the vertical axis is the normalized active power and reactive capacity.

[0061] Active power is of great significance in power systems and electrical engineering. It is the foundation of the power system and is used to maintain the operation of power equipment and meet people's electricity needs. Active power plays a vital role in the planning, design, operation and maintenance of power systems.

[0062] Reactive capacity is an important factor in the stable operation of the power grid. When the load in the power grid changes, the change in reactive capacity can be controlled by adjusting devices such as inverters, thereby ensuring the safe and reliable operation of the power system.

[0063] The correction weights determined by active power and reactive capacity can characterize the intensity of increasing grid infrastructure projects in the area where the alternative construction plans are located, so that the weights obtained only by the data of various evaluation indicators can be corrected, so that the factor of construction intensity is added to the weight, thereby more accurately evaluating and optimizing infrastructure projects.

[0064] Exemplarily, the weight modification model may be:

[0065]

[0066] Among them, α i is the modified weight of the i-th evaluation index, N is the total number of time periods in the preset historical period, P j is the active power corresponding to the jth historical period, M j is the reactive capacity corresponding to the jth historical period.

[0067] In some embodiments, the weight of the evaluation parameter is obtained by correcting the first weight, the second weight and the corrected weight based on a preset correction formula.

[0068] In this embodiment, the preset correction formula is:

[0069]

[0070] Among them, y i is the corrected weight of the i-th evaluation index, w i is the first weight of the i-th evaluation index, β i is the second weight of the i-th evaluation index, α i is the modified weight of the i-th evaluation index.

[0071] The first weight is determined based on the entropy weight method, and the second weight is determined based on the hierarchical analysis method.

[0072] The analytic hierarchy process is to decompose the decision problem into different hierarchical structures in the order of the overall goal, sub-goals of each level, evaluation criteria and specific alternative investment plans, and then use the method of solving the eigenvector of the judgment matrix to obtain the priority weight of each element of each level to an element of the previous level, and finally recursively merge the final weight of each alternative plan to the overall goal by the weighted sum method. The one with the largest final weight is the optimal plan. However, there are fewer quantitative data and more qualitative components in the analytic hierarchy process. Due to the small amount of quantitative data, the weights obtained have certain deviations.

[0073] In some embodiments, the evaluation module 130 is used to output the values ​​of the evaluation parameters of each alternative construction scheme based on each alternative construction scheme and each evaluation parameter.

[0074] In this embodiment, the evaluation rule is that for any alternative construction plan, the score of the target evaluation parameter is determined based on the product of the numerical value of the target evaluation parameter of the alternative construction plan and the weight of the target evaluation parameter, and the score of the alternative construction plan is determined based on the sum of the scores of all target evaluation parameters.

[0075] That is, after determining the data of each evaluation indicator and the weight corresponding to each evaluation indicator, the score of each evaluation parameter can be summed up to obtain the score of the alternative construction plan.

[0076] In some embodiments, Figure 3 As shown, the optimization module 140 includes an evaluation score module, an analysis result module, and an optimization data module.

[0077] The evaluation score module is used to determine the alternative construction plan with the highest score based on the scores of all alternative construction plans.

[0078] The analysis result module is used to determine the investment amount of the alternative construction plan based on the alternative construction plan.

[0079] The optimization data module is used to determine the optimized evaluation parameters based on the scores of each target evaluation parameter in the evaluation module when the investment amount of the highest-scoring alternative construction plan exceeds the preset amount threshold. When the investment amount of the highest-scoring alternative construction plan does not exceed the preset amount threshold, the highest-scoring alternative construction plan is directly output.

[0080] In this embodiment, the optimization data module is used to optimize the numerical value corresponding to the target evaluation parameter with the lowest score among all target evaluation parameters, so that the investment amount of the alternative construction plan with the highest score is less than or equal to a preset amount threshold.

[0081] During the optimization process, the optimization data module selects the evaluation parameter with the smallest score, and makes adjustments based on the value of the evaluation parameter and the value range of the evaluation parameter in the optimization data module, so that the investment amount after optimization is within the preset amount threshold.

[0082] The present invention provides a power grid infrastructure project evaluation and optimization system. By setting an index determination module, only the relevant parameters of each alternative construction plan need to be input into the index determination module, and the value of each evaluation parameter can be quickly and accurately extracted. All the evaluation parameters extracted by the index determination module are input into the weight setting module to determine the weight corresponding to each evaluation parameter. In addition, the present invention takes into account that the current weight setting method only considers the influence of the values ​​of each evaluation parameter and ignores the influence of the installation intensity. Therefore, a correction weight is added to the weight. The correction weight is determined based on active power and reactive capacity, so that the influence of the installation intensity can be considered in the weight, further improving the accuracy of the weight. Finally, the optimized infrastructure project can be directly output through the optimization module. The power grid infrastructure project evaluation and optimization system provided by the present invention can not only improve the processing speed of evaluation optimization, but also improve the accuracy of evaluation optimization.

[0083] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0084] Those of ordinary skill in the art will appreciate that the templates, units, and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0085] If the module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, it can realize the tasks of the above-mentioned various power grid infrastructure project evaluation and optimization systems. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory, random access memory, electrical carrier signal, telecommunication signal and software distribution medium.

[0086] Those skilled in the art can understand that all or part of the modules in the above system can be implemented by hardware related to program instructions. The aforementioned program can be stored in a computer-readable storage medium. When the program is executed, the steps of the above method embodiments are executed; and the aforementioned storage medium includes: ROM, RAM, disk or optical disk and other media that can store program codes.

[0087] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A power grid infrastructure project evaluation and optimization system, It is characterized in that It includes indicator determination module, weight setting module, evaluation module and optimization module; The indicator determination module is used to determine multiple evaluation parameters of the infrastructure project to be constructed, and the evaluation parameters include at least a project type indicator, an investment evaluation indicator, and a load evaluation indicator; wherein the indicator determination module includes a photovoltaic site selection module, a wind power site selection module, a thermal power site selection module, a hydropower site selection module, and a power supply line site selection module; the indicator determination module is used to select a corresponding site selection module based on the project type of the infrastructure project to be constructed and output a project type indicator corresponding to the project type of the infrastructure project to be constructed based on the geographical location of each alternative construction plan; The weight setting module is used to set the weight of each evaluation parameter, and the weight of each evaluation parameter is determined based on the first weight, the second weight and the modified weight; the first weight is determined based on the entropy weight method, the second weight is determined based on the hierarchical analysis method, and the modified weight is determined based on the active power and reactive capacity of the area where the alternative construction plan is located in the preset historical period. The weight correction model is used to normalize the acquired active power and reactive capacity and reproject them on the time axis respectively, and the modified weight is determined based on the sum of the active power and reactive power after reprojection in the preset historical period, and the infrastructure project has multiple alternative construction plans; The evaluation module is used to evaluate multiple alternative construction plans for the infrastructure project based on the evaluation rules, the multiple evaluation parameters and the weights of the evaluation parameters; The optimization module is used to output the optimal construction plan from the multiple alternative construction plans; Wherein, the weight correction model is: = ; Among them, α i is the modified weight of the i-th evaluation index, N is the total number of time periods in the preset historical period, P j is the active power corresponding to the jth historical period, M j is the reactive capacity corresponding to the jth historical period.

2. The power grid infrastructure project evaluation and optimization system according to claim 1, It is characterized in that The investment evaluation indicators include the power supply population, total power consumption and transmission and distribution costs in the area where the alternative construction plan is located within the past N years; The load assessment indicators include the installed capacity, regional gross generation value, fixed asset investment, electricity consumption of the primary industry structure, electricity consumption of the secondary industry structure and electricity consumption of the tertiary industry structure in the region where the alternative construction plans are located within the past N years.

3. The power grid infrastructure project evaluation and optimization system according to claim 2, It is characterized in that The evaluation parameters output by the photovoltaic site selection module include the terrain, solar radiation intensity, air quality, temperature, humidity and wind speed of the area where the alternative construction plan is located; The evaluation parameters output by the wind power infrastructure module include the terrain, wind direction, wind speed, temperature, humidity and distance from residential areas in the area where the alternative construction plan is located; The evaluation parameters output by the hydropower infrastructure module include the terrain of the area where the alternative construction plan is located, the distance from the residential area, the water quality and the water flow; The evaluation parameters output by the thermal power infrastructure module include the wind direction, distance from residential areas, water supply and distance from main transportation lines in the area where the alternative construction plan is located; The evaluation parameters output by the power supply line module include the topography, geology and width of the line corridor of the area where the alternative construction plan is located.

4. The power grid infrastructure project evaluation and optimization system according to claim 1, It is characterized in that The weight of the evaluation parameter is obtained by correcting the first weight, the second weight and the corrected weight based on a preset correction formula.

5. The power grid infrastructure project evaluation and optimization system according to claim 4, It is characterized in that The preset correction formula is: y i = ; Among them, y i is the corrected weight of the i-th evaluation index, w i is the first weight of the i-th evaluation index, β i is the second weight of the i-th evaluation index, α i is the modified weight of the i-th evaluation index.

6. The power grid infrastructure project evaluation and optimization system according to claim 1, It is characterized in that The evaluation module is used to output the values ​​of the evaluation parameters of each alternative construction scheme based on each alternative construction scheme and each evaluation parameter; The evaluation rule is that for any alternative construction plan, the score of the target evaluation parameter is determined based on the product of the value of the target evaluation parameter of the alternative construction plan and the weight of the target evaluation parameter, and the score of the alternative construction plan is determined based on the sum of the scores of all the target evaluation parameters.

7. The power grid infrastructure project evaluation and optimization system according to claim 6, It is characterized in that The optimization module includes an evaluation score module, an analysis result module and an optimization data module; The evaluation score module is used to determine the alternative construction plan with the highest score based on the scores of all alternative construction plans; The analysis result module is used to determine the investment amount of the alternative construction plan based on the alternative construction plan; The optimization data module is used to determine the optimized evaluation parameters based on the scores of each target evaluation parameter in the evaluation module when the investment amount of the alternative construction plan with the highest score exceeds a preset amount threshold.

8. The power grid infrastructure project evaluation and optimization system according to claim 7, It is characterized in that The optimization data module is used to optimize the numerical value corresponding to the target evaluation parameter with the lowest score among all the target evaluation parameters, so that the investment amount of the alternative construction plan with the highest score is less than or equal to the preset amount threshold.