A simulation method and system for load of shield cutter cutting reinforced concrete pile foundation
By constructing a comprehensive simulation model of shield pile foundation, including PFC time step model and mechanical displacement model, and adjusting it in combination with actual feedback data, the problem of insufficient accuracy of load simulation of shield cutting reinforced concrete pile foundation is solved, and a higher level of simulation accuracy and robustness.
Patent Information
- Application Number
- CN202311527562.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-16
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-11-16
AI Technical Summary
In the prior art, the material properties and cutting process of reinforced concrete structures are complicated, and the soil sample factors are insufficient, resulting in insufficient accuracy in the simulation of pile foundation loads for shield cutting reinforced concrete.
The comprehensive simulation model of shield pile foundation, including PFC time step model, mechanical displacement model, calibrated soil mesoporosis parameter model, soil contact selection model and particle adhesion model, is adopted to obtain and compare shield pile foundations. Comprehensive load data and actual operation feedback data, analyze and adjust to improve simulation accuracy.
The simulation accuracy and objectivity of the load of the shield cutting reinforced concrete pile foundation is improved, ensuring that the simulation results are consistent with the actual situation, and enhancing the robustness of the simulation method.
Smart Images

Figure CN118246091B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shield cutting simulation, and in particular to a method and system for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation. Background Art
[0002] With the development of urban planning and construction, the demand and requirements for related technologies in the field of underground engineering are also rising. Underground projects, such as subways, tunnels, and bridge foundations, usually need to pass through reinforced concrete pile foundations. Traditional methods involve the removal or change of pile foundations, which is time-consuming and expensive. Therefore, there is a need for shield cutter cutting technology to complete underground projects while maintaining the integrity of the pile foundation, so that the simulation method of shield cutter cutting reinforced concrete pile foundations came into being, especially in urban underground foundation projects. This technology can be used in the construction of underground projects such as subway tunnels, bridge foundations, and sewage pipes. It can reduce construction costs, reduce the impact on the surrounding environment, and improve the efficiency of the project.
[0003] The existing simulation methods and systems for the load of reinforced concrete pile foundations cut by the shield cutter are realized through the following technologies, including: Structural mechanics and load analysis: It is necessary to understand the structural characteristics and bearing mechanics of reinforced concrete pile foundations. Finite element analysis: Finite element analysis is a numerical simulation method used to simulate the mechanical behavior of complex structures. Computer programming and simulation software: The development of simulation methods and systems requires computer programming and the use of related simulation software to build models, perform numerical analysis, and visualize simulation results. Monitoring technology: In actual engineering, monitoring technology for the shield cutting process and pile foundation load is also part of the background technology.
[0004] For example, the invention patent with announcement number: CN106066920B discloses a numerical analysis method for the influence of upper and lower overlapping tunnel shield construction on underpinning pile foundation, including: using FLAC3D finite difference software to simulate the underpinning pile foundation model under load, analyzing its settlement and deformation law, and then simulating the overlapping tunnel excavation process after the pile foundation underpinning, analyzing its influence on surface settlement and pile foundation displacement stress, and then performing single factor analysis and comparison on the excavation sequence, tunnel spacing, and the burial depth, pile diameter, and spacing of the underpinning pile foundation, analyzing the influence of different factors on the underpinning pile foundation, and finally obtaining the corresponding simulation values and pile foundation settlement and deformation trends.
[0005] For example, the invention patent with publication number: CN114935465A discloses a system for simulating the disturbance of existing pile foundations by shield construction, including: a model box, a model pile foundation and a model tunnel arranged inside the model box, and a micro pump, a data acquisition device, a servo loading device, a general operation control device, a centrifuge, a camera and a computer arranged outside the model box.
[0006] However, the inventors of this application found that the above technology has at least the following technical problems in the process of implementing the technical solution of the invention in the embodiment of this application:
[0007] In the prior art, the material properties of reinforced concrete structures and the cutterhead cutting process are very complex, and the soil sample factors considered in the simulation are always insufficient, which leads to the problem that the simulation accuracy of the shield cutting reinforced concrete pile foundation load cannot be improved. Summary of the invention
[0008] The embodiments of the present application provide a method and system for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation, thereby solving the problem in the prior art that the simulation accuracy of the load of a shield cutter head cutting a reinforced concrete pile foundation cannot be improved, and the effect of improving the simulation accuracy of the load of a shield cutter head cutting a reinforced concrete pile foundation is achieved.
[0009] An embodiment of the present application provides a method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation, comprising the following steps: obtaining shield pile foundation data, the shield pile foundation data including geological data, reinforced concrete pile foundation data, shield cutter head data, actual operation feedback data and historical problem type data sets; constructing a comprehensive simulation model of the shield pile foundation, the comprehensive simulation model of the shield pile foundation including a PFC time step model, a mechanical displacement model, a calibration soil meso-parameter model, a soil contact selection model and a particle adhesion model; obtaining the comprehensive load data of the shield cutting pile foundation calculated by the comprehensive evaluation model of the shield pile foundation, comparing the comprehensive load data of the shield cutting pile foundation with the actual operation feedback data, and analyzing and adjusting them.
[0010] Furthermore, the specific steps of comparing the comprehensive load data of the shield cutting pile foundation with the actual operation feedback data and analyzing and adjusting them are as follows: evaluation, comparison and judgment: comparing the comprehensive load data of the shield cutting pile foundation obtained by simulating and calculating the shield pile foundation comprehensive simulation model with the actual operation feedback data. If the difference between the two numerical values is outside the predefined error allowable range, it is judged that there is a problem with the shield pile foundation comprehensive simulation model, and all data obtained by simulating and calculating the shield pile foundation comprehensive simulation model are recorded as problem data of the shield pile foundation comprehensive simulation model; quantitative analysis: comparing and calculating the specific difference between the problem data of the shield pile foundation comprehensive simulation model and the corresponding actual operation feedback data through the relevant linear regression algorithm to obtain the difference problem data; analysis and judgment: according to Based on the results of quantitative analysis, the problem type corresponding to the difference problem data is identified through machine learning algorithm to obtain the problem type data set; comparative training: the data in the problem type data set is compared with the data in the historical problem type data set. If the two sets of compared data are the same, it is judged as a known problem, otherwise, it is judged as an unknown problem; adjustment method: the unknown problem data is added to the historical problem type data set, and the historical problem type data set is trained to obtain the corresponding adjustment method. According to the corresponding adjustment method, the shield pile foundation comprehensive simulation model is optimized; feedback optimization: the optimized shield pile foundation comprehensive simulation model is fed back to the historical problem type data set according to the actual operation feedback data for data training again.
[0011] Furthermore, the specific steps of constructing the comprehensive simulation model of shield pile foundation are as follows: constructing a PFC time step model to determine the PFC time step; constructing a mechanical displacement model to determine the law of particle force movement; constructing a soil contact selection model based on reinforced concrete pile foundation data to select the inter-particle contact model corresponding to the excavated soil, and constructing a calibration soil meso-parameter model based on geological data to calibrate the soil meso-parameters; updating the current model time, dynamically creating or deleting the contact force in the model according to the current entity position, and updating the contact force of each inter-particle contact model in the inter-particle contact model according to the mechanical displacement model; constructing a particle adhesion model, judging the comprehensive simulation of the shield pile foundation based on the comparison of the contact force of the cutter head simulation incision and the contact force of the particle adhesion model, and generating the comprehensive load data of the shield cutting pile foundation accordingly.
[0012] Furthermore, the specific calculation formula for determining the PFC time step is: Wherein, T represents the PFC time step, m represents the predefined mass of the PFC discrete element particle, I represents the predefined inertia tensor of the PFC discrete element particle, ktran and krot represent the predefined translational stiffness and rotational stiffness of the PFC discrete element particle, respectively. The entire simulation time is divided into several PFC time points according to the PFC time step, t0=1,2,...,t, t0 represents the number of the PFC time point, t represents the total number of the PFC time point, and e represents the natural constant.
[0013] Furthermore, the specific calculation formula for constructing the mechanical displacement model is: In the formula, a0=1, 2, ..., a, a0 represents the number of particles in PFC, a represents the total number of particles in PFC, The mechanical displacement formula of the a0th particle in PFC is: represents the net external force acting on the particle, represents the position vector of the a0th particle in PFC, represents the gravitational acceleration of the a0th particle in PFC, represents the mass of the a0th particle in PFC, represents the resultant moment acting on the a0th particle in PFC, represents the angular momentum of the a0th particle in PFC, represents the inertia tensor of the a0th particle in PFC, represents the angular velocity of the a0th particle in PFC.
[0014] Furthermore, the specific calculation formula for calibrating the soil mesoscopic parameter model is: In the formula, σ represents the index of calibrated soil micro-parameters, represents the number of particles generated by the soil, θ represents the pressure data of the Mohr strength envelope corresponding to the number of particles generated by the soil, C 径 Represents the predefined radius data of the soil particles, C 孔 The predefined porosity data of the particles representing the soil, C 密 Represents the predefined density data of the soil particles, P 尺 represents the predefined sample size data of the soil, μ represents the negative influence matching coefficient of the simulation computing power corresponding to the predefined sample size data of the soil, and They respectively represent the influence matching factors of the predefined radius data of soil particles, the predefined porosity data of soil particles, and the predefined density data of soil particles corresponding to the calibrated soil meso-parameter index, and e represents a natural constant. According to the comparison between the calibrated soil meso-parameter index and the predefined calibrated soil meso-parameter index, if they are outside the predefined error range, the predefined porosity data of soil particles, the predefined density data of soil particles, and the predefined sample size data of soil included in the calibrated soil meso-parameter index are adjusted again.
[0015] Furthermore, the specific steps of obtaining the inter-particle contact model corresponding to the selected excavated soil are: obtaining the macroscopic mechanical parameter data of the excavated soil when the shield cutter cuts the reinforced concrete pile, and obtaining the data for calibrating the microscopic parameters of the soil based on the data; evaluating the macroscopic mechanical parameter data of the soil to obtain the soil contact selection model, and the specific calculation formula of the soil contact selection model is: Where ζ represents the soil contact model selection coefficient, A 1 Indicates the tensile strength data of the soil, A 拉 Indicates the standard data of tensile strength of the predetermined soil, A 2 Represents the shear strength data of the soil, A 切 Represents the standard data of shear strength of predefined soil, A 3 Indicates the cohesive strength data of the soil, A 粘 represents the standard data of cohesive strength of predefined soil, ψ 1 , 2 and ψ 3 They represent the weight factors of the soil contact model selection coefficient corresponding to the tensile strength, shear strength and cohesive strength of the soil, respectively, and e represents a natural constant. The corresponding soil contact model is selected according to the soil contact model selection coefficient.
[0016] 9. Furthermore, the specific calculation formula for constructing the particle adhesion model is: In the formula, represents the adhesion force of the a0th particle at the t0th PFC time point, represents the maximum normal stress of the bonding force of the a0th particle at the t0th PFC time point, represents the maximum tangential stress of the bonding force of the a0th particle at the t0th PFC time point, represents the modulus of the normal force of the adhesion force of the a0th particle at the t0th PFC time point, represents the modulus of the tangential force of the bonding force of the a0th particle at the t0th PFC time point, represents the bending moment of the bonding force of the a0th particle at the t0th PFC time point, represents the torque of the adhesion force of the a0th particle at the t0th PFC time point, represents the value of the bonding contact plane area of the a0th particle at the t0th PFC time point, represents the moment of inertia of the bonding contact plane of the a0th particle at the t0th PFC time point, represents the polar moment of inertia of the bonding contact plane of the a0th particle at the t0th PFC time point, represents the contact radius of the bonding contact plane of the a0th particle at the t0th PFC time point, and β represents the contribution weight factor of each predefined moment.
[0017] Furthermore, the specific steps of generating the comprehensive load data of shield cutting pile foundation based on the above are: setting the simulated cutterhead parameters according to the shield cutterhead data, bringing the force and torque of the cutterhead simulated cutting particles into the mechanical displacement model, and obtaining the various simulation data of the particles at different PFC time points, and obtaining the various simulation data of the corresponding particles through the built-in function of the wall in PFC, and obtaining the cutterhead load data at different PFC time points, and also obtaining the comprehensive load data of the shield cutting pile foundation.
[0018] An embodiment of the present application provides a simulation system for the load of a shield cutter cutting a reinforced concrete pile foundation, and the simulation system for the load of a shield cutter cutting a reinforced concrete pile foundation includes a shield pile foundation acquisition module, a shield pile foundation comprehensive simulation module and a shield pile foundation analysis module: the shield pile foundation acquisition module is used to obtain shield pile foundation data, and the shield pile foundation data includes geological data, reinforced concrete pile foundation data, shield cutter data, actual operation feedback data and historical problem type data set; the shield pile foundation comprehensive simulation module is used to construct a shield pile foundation comprehensive simulation model, and the shield pile foundation comprehensive simulation model includes a PFC time step model, a mechanical displacement model, a calibration soil meso-parameter model, a soil contact selection model and a particle adhesion model; the shield pile foundation analysis module is used to obtain the shield cutting pile foundation comprehensive load data calculated by the shield pile foundation comprehensive evaluation model, and compare the shield cutting pile foundation comprehensive load data with the actual operation feedback data and analyze and adjust them.
[0019] An embodiment of the present application provides a computer-readable storage medium for storing a program, which, when executed by a processor, implements a method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation.
[0020] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0021] 1. The present invention uses a comprehensive simulation model of shield pile foundation including a PFC time step model, a mechanical displacement model, a calibration soil mesoscopic parameter model, a soil contact selection model and a particle adhesion model, and obtains the comprehensive load data of the shield cutting pile foundation from the comprehensive simulation model of the shield pile foundation, compares the comprehensive load data of the shield cutting pile foundation with the actual operation feedback data, analyzes and adjusts them, thereby achieving the effect of improving the simulation accuracy of the soil pile foundation load, and solves the problem in the prior art that the simulation accuracy of the shield cutting reinforced concrete pile foundation load cannot be improved.
[0022] 2. By constructing a comprehensive simulation model of shield pile foundation including PFC time step model, mechanical displacement model, calibration soil mesoscopic parameter model, soil contact selection model and particle adhesion model, the comprehensive simulation model of shield pile foundation is simulated by PFC discrete finite element simulation method, so as to obtain the comprehensive load data of shield cutting pile foundation, thereby achieving the objectivity of improving the simulation of shield cutting reinforced concrete pile foundation load.
[0023] 3. The simulation method is analyzed and adjusted by comparing the comprehensive load data of shield cutting pile foundation with the actual operation feedback data through evaluation and comparison, quantitative analysis, analytical judgment, comparative training, adjustment method and feedback optimization. The simulation method can be adjusted according to the specific actual working conditions, thereby improving the robustness of the simulation of the shield cutting reinforced concrete pile foundation load. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A flow chart of a method for simulating the load of a reinforced concrete pile foundation cut by a shield cutter head provided in an embodiment of the present application;
[0025] Figure 2 A schematic diagram of a box plot of the statistical analysis of the cutter head thrust provided in an embodiment of the present application;
[0026] Figure 3 A schematic diagram of a box plot of the statistical analysis of the cutter head torque provided in an embodiment of the present application;
[0027] Figure 4 A schematic diagram of the mohr strength envelope of silty clay ③-1b1-2 provided in the embodiment of the present application;
[0028] Figure 5 A schematic diagram of the mohr strength envelope of silty clay ④-3b1-2 provided in the embodiment of the present application;
[0029] Figure 6 A schematic diagram of the structure of a discrete element numerical model of shield cutting reinforced concrete provided in an embodiment of the present application;
[0030] Figure 7 A schematic diagram of the structure of a tool configuration drawing of a shield cutter head provided in an embodiment of the present application;
[0031] Figure 8 A schematic diagram of the structure of the contact groups in the PFC3D model after calling the Fish function provided in an embodiment of the present application;
[0032] Fig. 9 A schematic diagram of a simulated cutter head thrust change curve provided in an embodiment of the present application;
[0033] Fig.10 A schematic diagram of a simulated cutter disc torque variation curve provided in an embodiment of the present application. DETAILED DESCRIPTION
[0034] The embodiment of the present application solves the problem in the prior art that the simulation accuracy of the load caused by a shield cutting reinforced concrete pile foundation cannot be improved by providing a method and system for simulating the load caused by a shield cutter head cutting a reinforced concrete pile foundation. By constructing a comprehensive simulation model of the shield pile foundation and then comparing, analyzing and adjusting the model with actual operation feedback data, the simulation accuracy of the load caused by a shield cutting a reinforced concrete pile foundation is improved.
[0035] The technical solution in the embodiment of the present application is to solve the above problem that the simulation accuracy of the load of the reinforced concrete pile foundation cut by the shield cannot be improved. The overall idea is as follows:
[0036] Through the comprehensive simulation model of shield pile foundation including PFC time step model, mechanical displacement model, calibration soil mesoscopic parameter model, soil contact selection model and particle adhesion model, the comprehensive load data of shield cutting pile foundation was obtained, which was compared with the actual operation feedback data and analyzed and adjusted, so as to achieve the effect of improving the simulation accuracy of soil pile foundation load.
[0037] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0038] like Figure 1 As shown, it is a flow chart of a simulation method for the load of a shield cutter cutting a reinforced concrete pile foundation provided in an embodiment of the present application, the method comprising the following steps: obtaining shield pile foundation data, the shield pile foundation data comprising geological data, reinforced concrete pile foundation data, shield cutter data, actual operation feedback data and historical problem type data sets; constructing a comprehensive simulation model for a shield pile foundation, the comprehensive simulation model for a shield pile foundation comprising a PFC time step model, a mechanical displacement model, a calibration soil meso-parameter model, a soil contact selection model and a particle adhesion model; obtaining the comprehensive load data for a shield cutting pile foundation calculated by a comprehensive evaluation model for a shield pile foundation, comparing the comprehensive load data for a shield cutting pile foundation with the actual operation feedback data, and analyzing and adjusting the data.
[0039] Furthermore, the specific steps of comparing the comprehensive load data of shield cutting pile foundation with the actual operation feedback data and analyzing and adjusting them are as follows: Evaluation, comparison and judgment: comparing the comprehensive load data of shield cutting pile foundation obtained by simulating and calculating the comprehensive simulation model of shield pile foundation with the actual operation feedback data. If the difference between the two numerical values is outside the predefined error allowable range, it is judged that there is a problem with the comprehensive simulation model of shield pile foundation, and all data obtained by simulating and calculating the comprehensive simulation model of shield pile foundation are recorded as the problem data of the comprehensive simulation model of shield pile foundation; quantitative analysis: comparing and calculating the specific difference between the problem data of the comprehensive simulation model of shield pile foundation and the corresponding actual operation feedback data through the relevant linear regression algorithm, and obtaining the difference problem data; analysis and judgment: according to the quantitative Based on the results of quantitative analysis, the problem type corresponding to the difference problem data is identified through machine learning algorithm to obtain the problem type data set; comparative training: the data in the problem type data set is compared with the data in the historical problem type data set. If the two sets of compared data are the same, it is judged as a known problem, otherwise, it is judged as an unknown problem; adjustment method: the unknown problem data is added to the historical problem type data set, and the historical problem type data set is trained to obtain the corresponding adjustment method. According to the corresponding adjustment method, the shield pile foundation comprehensive simulation model is optimized; feedback optimization: the optimized shield pile foundation comprehensive simulation model is fed back to the historical problem type data set according to the actual operation feedback data for data training again.
[0040] In this embodiment, if Figure 2 As shown, it is a schematic diagram of the statistical analysis box-line diagram of the cutterhead thrust provided in the embodiment of the present application, which gives the numerical calculation data and measured data of the thrust. Since only the thrust generated by the cutterhead cutting into the soil and pile foundation is calculated in the numerical simulation, the friction resistance between the shield shell and the surrounding soil is ignored, so the numerically calculated thrust data is smaller than the measured data. Pile cutting sections I to VI are all used for examples, and the thrust means of pile cutting sections I to VI are 8713kN, 9875kN, 12305kN, and 13701kN, respectively, indicating that as the cross-sectional area of pile cutting increases, the mean value of the cutterhead thrust increases. The thrust interquartile range of pile cutting sections I to VI is 1240kN, 1396kN, 2004kN, and 2310kN, respectively, indicating that as the contact area of the cutterhead cutting pile increases, the main fluctuation range of the cutterhead thrust increases, which is because the increase in the number of pile cutting tools caused by the increase in the pile cutting area. The pile cutting sections II and VI where the cutterhead cuts the main reinforcement have more abnormal peaks than the other two pile cutting sections, indicating that the cutting of the main reinforcement of the pile foundation causes the cutterhead load to change dramatically; the cutterhead cuts the stirrups at the pile cutting section III, so there are a few abnormal peaks, and the cutterhead only cuts concrete at the pile cutting section I, so there are no abnormal peaks. Figure 3As shown, it is a schematic diagram of the statistical analysis box plot of the cutter disc torque provided in the embodiment of the present application, which gives the numerical calculation data and the measured data of the torque. It can be seen that the numerical calculation data is consistent with the measured data, which verifies the rationality of the numerical calculation. The average values of the cutter disc torque of the pile cutting sections Ⅰ to Ⅵ are 2404kN·m, 2644kN·m, 3232kN·m, and 3585kN·m, indicating that the average value of the cutter disc torque increases with the increase of the pile cutting cross-sectional area; the interquartile range of the torque of the pile cutting sections Ⅰ to Ⅵ is: 248kN·m, 300kN·m, 419kN·m, and 503kN·m, respectively, indicating that the main fluctuation range of the cutter disc torque increases with the increase of the pile cutting cross-sectional area. The distribution law of the abnormal peak value of the cutter disc torque is consistent with the thrust, but the number of abnormal torque peaks is more than the thrust. After multiple comparisons and adjustments of the data from simulation and actual feedback, the following general conclusions can be drawn: As the contact area of pile cutting increases, the cutterhead thrust, torque, unbalanced combined force and overturning moment all increase, and the main fluctuation range also increases. When the cutterhead cuts steel bars, especially main bars, the cutterhead load has many abnormal peaks, indicating that the cutterhead load changes dramatically due to cutting steel bars. As the advancement speed increases, the cutterhead thrust, torque, unbalanced force and overturning moment all increase. The cutterhead speed has little effect on the cutterhead load. As the offset distance of the pile foundation increases, the thrust shows a trend of gradually decreasing, while the torque, unbalanced force and overturning moment show a trend of first increasing and then decreasing. When cutting pile foundations, the shield should be cut in a "low penetration, high speed" pile grinding mode, that is, the advancement speed is reduced to reduce the penetration, thereby reducing the cutterhead load, and the speed can be kept normal. When the pile foundation offset distance is about 1.2m, the unbalanced force and overturning moment of the cutter head reach the maximum value. When cutting such pile foundations, attention should be paid to the unbalanced force of the cutter head, which may cause overturning. It is more appropriate to use the "low push speed" mode to cut the pile. The comprehensive simulation data is compared and analyzed with the actual shield pile foundation operation feedback data to ensure that the simulation results are consistent with the actual situation. There are also expansion steps: Data collection and collation: Collect actual shield pile foundation operation feedback data, including shield machine operation records, soil mechanical properties, underground structure conditions, etc. Obtain the original data for simulation, including formation information, shield machine parameters, cutter head design, etc. Organize and collate these data for comparison and analysis. Data preprocessing: For actual data and simulation data, data cleaning and preprocessing are performed, including removal of outliers, data interpolation, unit consistency, etc., to ensure data consistency and comparability. Model establishment: Based on actual data and simulation data, a suitable numerical model is established to simulate the behavior of shield pile foundations. This can include simulation tools such as finite element analysis and computational fluid dynamics. Comparison of simulation results: Run the simulation to obtain simulation results, including load distribution, underground displacement, stress distribution, etc. Compare the simulation results with the actual data, especially at key locations and time points.Quantitative analysis: Use appropriate statistical methods and analysis tools to quantitatively analyze the differences between the simulated data and the actual data. This can include root mean square error, correlation coefficient, etc. Identify differences and problems: Based on the results of quantitative analysis, identify the differences and problems between the simulated data and the actual data, including inconsistent load distribution, displacement deviation, stress anomaly, etc. Analyze the cause: Analyze the cause of the difference and consider whether it is caused by factors such as inaccurate model parameters, inaccurate soil property assumptions, and incorrect shield machine parameters. Adjust model parameters: If the model parameters are found to be inaccurate, adjust the model parameters based on the analysis results to make the simulation results closer to the actual situation. Simulation re-verification: Use the adjusted model parameters to re-simulate and generate new simulation results. Compare and verify: Compare and verify the new simulation results with the actual data again to ensure that the simulation results are more accurate. Iteration and optimization: If there are still differences, multiple iterations can be performed to continuously adjust the model and parameters until the simulation results are consistent with the actual data. Documentation and reporting: Record the simulation process, data comparison, adjustment steps and results, and generate detailed documents and reports for review and reference by the project team and relevant stakeholders. These steps will help obtain, compare and adjust the shield cutting pile foundation comprehensive load data to better reflect the actual underground conditions and engineering requirements. This will help improve the feasibility and success of the project.
[0041] Furthermore, the specific steps of constructing a comprehensive simulation model of shield pile foundation are as follows: constructing a PFC time step model to determine the PFC time step; constructing a mechanical displacement model to determine the law of particle force movement; constructing a soil contact selection model based on reinforced concrete pile foundation data to select the inter-particle contact model corresponding to the excavated soil, and constructing a calibration soil meso-parameter model based on geological data to calibrate the soil meso-parameters; updating the current model time, dynamically creating or deleting the contact force in the model according to the current entity position, and updating the contact force of each inter-particle contact model in the inter-particle contact model according to the mechanical displacement model; constructing a particle adhesion model, judging the comprehensive simulation of the shield pile foundation based on the comparison of the contact force of the cutterhead simulation incision and the contact force of the particle adhesion model, and generating the comprehensive load data of the shield cutting pile foundation accordingly.
[0042] In this embodiment, the discrete element method (DEM) is a method for performing explicit time-step iterative solutions based on Newton's laws of motion, and the particle flow method (PFC) is a type of discrete element method, and the particle flow method includes two modes: two-dimensional (PFC2D) and three-dimensional (PFC3D). The PFC model consists of entities, sheets, and contacts. Entities are divided into three categories: balls, clusters, and walls, where balls and clusters are collectively referred to as particles. The calculation process of the particle flow method can advance the model state in time by executing a series of calculation cycles. The present invention uses the entity model of the ball in the PFC model. Each calculation cycle is called a time step. The calculation process of the PFC time step mainly includes the following steps: ① Determine a valid and finite time step to ensure that the contacts between all entity units are retrieved in one time step to ensure the stability of the numerical model; ② Based on the laws of motion (Newton's laws of motion), update the position, velocity, acceleration, angular velocity and angular acceleration of each entity in the model according to the current time step and the forces and torques calculated in the previous time step; ③ Add the current time step to the model time at the end of the previous time step to update the model time; ④ Dynamically create and delete contacts in the model according to the position of the current entity; ⑤ Update the forces and torques between each contact in the model according to the force-displacement law of the contact model. In PFC, the force-displacement law is used to determine the magnitude of the contact force between two contacting entities, and the direction of the contact force is determined by the relative positions of the two entities, while the force-displacement law at each contact in the model is determined by the contact model of the contact. In PFC, the contact between entities is divided into two types: particle-particle (ball-ball) and particle-wall (ball-wall). The contacts involved in the discrete element numerical model of shield cutting reinforced concrete pile foundation can be divided into three categories: contact between discrete element particles and walls, contact between soil particles, and contact between reinforced concrete particles inside pile foundations. Different types of contact models need to be specified and assigned values when performing numerical calculations.
[0043] Furthermore, the specific calculation formula for determining the PFC time step is: Wherein, T represents the PFC time step, m represents the predefined mass of the PFC discrete element particle, I represents the predefined inertia tensor of the PFC discrete element particle, ktran and krot represent the predefined translational stiffness and rotational stiffness of the PFC discrete element particle, respectively. The entire simulation time is divided into several PFC time points according to the PFC time step, t0=1,2,...,t, t0 represents the number of the PFC time point, t represents the total number of the PFC time point, and e represents the natural constant.
[0044] In this embodiment, the automatic time step is the model stable time step automatically calculated by the PFC program, which is the minimum value determined by the motion constraint and the stiffness constraint. In the PFC discrete element model of the present invention, if the steel bar particle size is set to the actual steel bar diameter, the automatic time step calculated by the PFC program is approximately 1.25×10 -6 This is equivalent to the program iterating 8×10 in 1 second. 5 This will result in a very long calculation time for the model. For a specific PFC discrete element particle, a specific PFC time step can be calculated. It should be noted that the computational efficiency requirements of the PFC time step will also limit the requirements of the predefined parameters of the PFC discrete element particles. Therefore, the steel particle size is enlarged to the same size as the concrete particle size. At this time, the automatic time step calculated by the PFC program is about 3×10 -6 , and under the premise of ensuring that the calculation model does not oscillate, the fixed time step is set to 1.0×10 -6 , in order to reduce the model calculation time and improve the calculation efficiency, the middle time period between two PFC time points is the automatic time step.
[0045] Furthermore, the specific calculation formula for constructing the mechanical displacement model is: In the formula, a0=1, 2, ..., a, a0 represents the number of particles in PFC, a represents the total number of particles in PFC, The mechanical displacement formula of the a0th particle in PFC is: represents the net external force acting on the particle, represents the position vector of the a0th particle in PFC, represents the gravitational acceleration of the a0th particle in PFC, represents the mass of the a0th particle in PFC, represents the resultant moment acting on the a0th particle in PFC, represents the angular momentum of the a0th particle in PFC, represents the inertia tensor of the a0th particle in PFC, represents the angular velocity of the a0th particle in PFC.
[0046] In this embodiment, the motion of a single rigid particle in the PFC is determined by the resultant force and torque acting on it, which can be described by the translation of a point inside the particle and the rotation of the particle. The finite difference method is used to solve the translation equation and the rotation equation.
[0047] Furthermore, the specific calculation formula for calibrating the soil mesoscopic parameter model is: In the formula, σ represents the index of calibrated soil micro-parameters, represents the number of particles generated by the soil, θ represents the pressure data of the Mohr strength envelope corresponding to the number of particles generated by the soil, C 径 Represents the predefined radius data of the soil particles, C 孔 The predefined porosity data of the particles representing the soil, C 密 Represents the predefined density data of the soil particles, P 尺 represents the predefined sample size data of the soil, μ represents the negative influence matching coefficient of the simulation computing power corresponding to the predefined sample size data of the soil, and They respectively represent the influence matching factors of the predefined radius data of soil particles, the predefined porosity data of soil particles, and the predefined density data of soil particles corresponding to the calibrated soil meso-parameter index, and e represents a natural constant. According to the comparison between the calibrated soil meso-parameter index and the predefined calibrated soil meso-parameter index, if they are outside the predefined error range, the predefined porosity data of soil particles, the predefined density data of soil particles, and the predefined sample size data of soil included in the calibrated soil meso-parameter index are adjusted again.
[0048] In this embodiment, if the predefined sample size data of the soil body is too large, it will cause the simulation computing power to be overwhelmed. In order to ensure real-time performance, a standard simulation computing power is established to calculate the predefined sample size data of the largest soil body corresponding to the standard simulation computing power. If the simulation example corresponding to the predefined sample size data of the soil body exceeds the standard simulation computing power, the ratio of the excess part to unit 1 is used as the negative influence matching coefficient of the simulation computing power corresponding to the predefined sample size data of the soil body. The soil excavated during actual shield pile cutting is silty clay ③-1b1-2 and silty clay ④-3b1-2. The macroscopic mechanical parameters of the two are shown in the following table. Silty clay ③-1b1-2 and silty clay ④-3b1-2 are used for example only.
[0049]
[0050] The contact between clay particles is simulated using the Linear Contact Bond Model. The particle radius of the two soils is 9 cm, the particle porosity is 0.4, and the particle density is the actual density of the soil. In PFC3D, triaxial compression numerical tests are used to calibrate the microscopic parameters of the two soils. The soil sample size in the numerical model is 300 cm × 300 cm × 600 cm, and a total of 10610 particles are generated. The true triaxial numerical experimental model of the soil is as follows: Figure 3-6As shown. Use the servo command to set the confining pressure to 100kPa, 200kPa, and 300kPa, respectively, and obtain the stress-strain curve of the soil under different confining pressures. Draw the Mohr strength envelope from the peak strength of the soil under different confining pressures, and then obtain the internal friction angle and cohesion of the soil sample. Repeatedly change the mesoscopic parameter values, re-run the numerical experiment, compare the macroscopic mechanical properties obtained by numerical simulation with the target mechanical properties of the soil, and obtain the mesoscopic parameters that match the macroscopic mechanical properties of the material. Figure 4 As shown, it is a schematic diagram of the mohr strength envelope of silty clay ③-1b1-2 provided in the embodiment of the present application, as shown in Figure 5 The figure is a schematic diagram of the mohr strength envelope of silty clay ④-3b1-2 provided in the embodiment of the present application. The mesoscopic parameter calibration values of the two soil bodies are shown in the following table:
[0051]
[0052] The actual pile foundation is a C25 reinforced concrete bored pile with a diameter of 120 cm. The physical and mechanical parameters of C25 concrete are shown in the following table:
[0053]
[0054] The contact between concrete particles is simulated using the Linear Parallel Bond Model, with a particle radius of 4 cm, a particle porosity of 0.4, and a particle density equal to the actual density of concrete. Similarly, the calibration values of the concrete microscopic parameters are shown in the following table:
[0055]
[0056] For example, in actual working conditions, the main reinforcement is HRB400 threaded steel bar with a diameter of 25mm, and the stirrup is HRB300 steel bar with a diameter of 8mm. The physical and mechanical parameters of the main reinforcement and stirrup are shown in the following table:
[0057]
[0058] In PFC3D, uniformly arranged particles with zero interparticle gaps are used to simulate steel bars. The contact between particles is simulated using the Linear Parallel Bond Model. The particle radius of the main reinforcement and stirrups is 4 cm. The particle density is the actual density of the reinforcement. The effective modulus of the bond contact is the elastic modulus of the reinforcement. The linear contact stiffness ratio and the bond contact stiffness ratio are both 1.0. The friction coefficient between particles and the bond contact friction angle are both 0. The parallel bond tensile strength and cohesion are both the standard values of the yield strength of the reinforcement. In PFC3D, the axial tensile numerical test is used to calibrate the mesoscopic parameters of the reinforcement. Similarly, the calibration values of the mesoscopic parameters of the concrete reinforcement are shown in the following table:
[0059]
[0060] Furthermore, the specific steps for obtaining the inter-particle contact model corresponding to the excavated soil are as follows: obtaining the macroscopic mechanical parameter data of the excavated soil when the shield cutter cuts the reinforced concrete pile, and obtaining the data for calibrating the microscopic parameters of the soil based on the data; evaluating the macroscopic mechanical parameter data of the soil to obtain the soil contact selection model. The specific calculation formula of the soil contact selection model is: Where ζ represents the soil contact model selection coefficient, A 1 Indicates the tensile strength data of the soil, A 拉 Indicates the standard data of tensile strength of the predetermined soil, A 2 Represents the shear strength data of the soil, A 切 Represents the standard data of shear strength of predefined soil, A 3 Indicates the cohesive strength data of the soil, A 粘 represents the standard data of cohesive strength of predefined soil, ψ 1 , 2 and ψ 3 They represent the weight factors of the soil contact model selection coefficient corresponding to the tensile strength, shear strength and cohesive strength of the soil, respectively, and e represents a natural constant. The corresponding soil contact model is selected according to the soil contact model selection coefficient.
[0061] In this embodiment, the contact between discrete element particles and the wall can be simplified to the basic contact model in PFC - Linear Model, which describes the typical contact state between unbonded particles. The linear contact model divides the contact force into linear force and damping force: the linear force is generated by a linear spring with constant normal stiffness and tangential stiffness, and the linear spring provides linear elastic (no tension) behavior and friction behavior; the damping force is generated by the viscosity pot, and the viscosity of the viscosity pot is given by the normal and tangential critical damping ratio; the linear spring acts in parallel with the viscosity pot. The soil excavated when the shield cuts piles is two kinds of silty clay. Considering the bonding characteristics between clay particles, it is more appropriate to use the Linear Contact Bond Model to simulate the bonding contact between clay particles. The linear contact bond model in the unbonded state is equivalent to the linear contact model; the linear contact bond model in the bonded state is different from the linear contact model in the following ways: ① The linear force can be a tensile force; ② No sliding will occur (sliding may occur after the bond contact breaks); ③ The damper's no-tension mode is disabled, so the damper can be stretched; ④ The damper's sliding shear mode is disabled, so the damping force does not depend on the sliding state. Concrete is similar to rock and is a cementitious material. Therefore, the contact between concrete particles, between steel particles, and between concrete particles and steel particles can be simulated by the Linear Parallel Bond Model. It can be considered that there are two sets of springs, one set is a linear spring that can transmit pressure and shear force; the other set is a parallel bond spring that can transmit tension, pressure, shear force and torque. The normal and tangential contact forces between particles are generated by a certain overlap or relative sliding displacement, which corresponds to the mechanical behavior of coarse aggregate in concrete. The force and torque transmitted by the parallel bond spring correspond to the mechanical properties of the bonding material.
[0062] Furthermore, the specific calculation formula for constructing the particle adhesion model is: In the formula, represents the adhesion force of the a0th particle at the t0th PFC time point, represents the maximum normal stress of the bonding force of the a0th particle at the t0th PFC time point, represents the maximum tangential stress of the bonding force of the a0th particle at the t0th PFC time point, represents the modulus of the normal force of the adhesion force of the a0th particle at the t0th PFC time point, represents the modulus of the tangential force of the bonding force of the a0th particle at the t0th PFC time point, represents the bending moment of the bonding force of the a0th particle at the t0th PFC time point, represents the torque of the adhesion force of the a0th particle at the t0th PFC time point, represents the value of the bonding contact plane area of the a0th particle at the t0th PFC time point, represents the moment of inertia of the bonding contact plane of the a0th particle at the t0th PFC time point, represents the polar moment of inertia of the bonding contact plane of the a0th particle at the t0th PFC time point, represents the contact radius of the bonding contact plane of the a0th particle at the t0th PFC time point, and β represents the contribution weight factor of each predefined moment.
[0063] In this embodiment, the adhesion model of the particles is constructed from weight 8, and the adhesion of the particles is decomposed into the maximum normal stress and the maximum tangential stress. The contact force of the cutter blade during the simulation of the cutter disc parameters should be greater than the simulated adhesion of the particles, and the adhesion of the particles is decomposed into the maximum normal stress and the maximum tangential stress.
[0064] Furthermore, the specific steps for generating the comprehensive load data of shield cutting pile foundation are as follows: setting the simulated cutterhead parameters according to the shield cutterhead data, bringing the force and torque of the cutterhead simulated cutting particles into the mechanical displacement model, and obtaining the simulation data of the particles at different PFC time points, and obtaining the corresponding simulation data of the particles through the built-in wall function of PFC, and obtaining the cutterhead load data at different PFC time points, and also obtaining the comprehensive load data of the shield cutting pile foundation.
[0065] In this embodiment, the PFC3D discrete element numerical model is simulated and calculated based on actual working conditions. The following are examples for illustration. The pile foundation diameter is 1.2m, the pile foundation center is offset by 1.22m from the shield cutter center, the actual pile cutting propulsion speed is controlled at 5mm / min, and the cutter head speed is 1r / min. The size of the discrete element numerical model is an important factor affecting the accuracy of the analysis. Relevant research results show that when the ratio of the minimum size to the particle size in the discrete element numerical model is greater than 40, the change in the ratio of the model size to the particle size has basically no effect on the discrete element numerical calculation results. Therefore, based on the particle size, shield cutter head diameter and pile foundation diameter in the above parameter calibration, the size of the PFC3D discrete element numerical model of the present invention is determined to be 10m×10m×3.6m. There are 91,332 discrete element particles in total, such as Figure 6As shown, it is a schematic diagram of the structure of the discrete element numerical model of shield cutting reinforced concrete provided in the embodiment of the present application. The main process of establishing the discrete element numerical model of soil and reinforced concrete pile foundation in PFC3D of the present invention is as follows: ① Establishing the boundary wall on the surface of the model, filling soil particles in the closed wall, temporarily assigning a linear contact model between soil particles to perform particle dispersion and model balance, and applying servo pressure constraints to the upper surface and four side walls to solve the model to equilibrium; ② Delete the soil particles in the pile foundation position area, use the Fish language to generate evenly arranged main reinforcement particles, stirrup particles and concrete particles to form a pile foundation, and apply temporary constraints to the reinforced concrete particles, and solve to the model equilibrium under the servo pressure constraints; ③ Specify the contact model and assignment for all contacts between particles in the model, specify the soil particles as a linear contact bonding model, specify the reinforced concrete particles as a linear parallel bonding model, cancel the temporary constraints on the reinforced concrete particles, and solve to the model equilibrium under the servo pressure constraints. As shown Figure 7 As shown, it is a structural schematic diagram of the tool configuration drawing of the shield cutter disc provided in the embodiment of the present application. The shield machine used in the actual project on which the present invention is based is a composite earth pressure balance shield machine with a diameter of 6480 mm. The cutter disc opening rate is 40%, and the tool configuration is a central fishtail knife + tearing knife + heavy scraper. The PFC discrete element program provides many functions about walls, and the wall can be established by importing a three-dimensional geometric model. The present invention establishes a three-dimensional geometric model based on the tool configuration drawing of the shield cutter disc, and exports it to the ".st l" format. Then, the shield cutter disc wall model is established in PFC3D by importing the three-dimensional geometric model. The wall model of the shield cutter disc is as shown in FIG. Figure 3-10 When simulating the calculation, the rotation center of the cutter head wall is specified as the geometric center, and the actual cutting speed and rotation speed are given to the cutter head wall. Figure 8As shown, it is a schematic diagram of the structure of the contact groups in the PFC3D model after calling the Fish function provided by the embodiment of the present application. Because there are many contact types involved in the PFC3D discrete element model, it is difficult to implement the contact model specification and assignment with a single Contact-related command in PFC3D. In order to specify and assign the contact model more conveniently and accurately, the present invention uses the Fish function to group all contacts in the model, and then specifies the contact model and assigns values according to the contact group. The basic process of the Fish function is: ① Use the cotact.list() function to traverse all contact pointers; ② Use the contact.end1() function and the contact.end2() function to obtain the pointers of the particles at both ends of the contact respectively; ③ Use the ball.group() function to obtain the groups of the two particles at both ends of the contact respectively; ④ Use the contact.group() function to regroup the contacts according to the groups of the two particles. The load of the shield cutter head cutting reinforced concrete pile foundation can be obtained from the cutter head load. The two are loads in opposite directions. The cutter head load is obtained through the built-in wall function of PFC. The cutter head thrust refers to the propulsion resistance of the cutter head in the propulsion direction (Y direction), that is, the Y component of the overall contact force of the cutter head wall, which is obtained using the wa l l.force.contact.y() function. The cutter head unbalanced force refers to the force received in the cutter head plane (XZ coordinate plane), that is, the X component and Z component of the overall contact force of the cutter head wall, which are obtained using the wa ll.force.contact.x() and wa l l.force.contact.z() functions respectively. The cutter head torque is the Y component of the overall contact moment of the cutter head wall, which is obtained using the wa l l.moment.contact.y() function. The overturning moment of the cutterhead is the X- and Z-components of the overall contact moment of the cutterhead wall, which are obtained using the wall.moment.contact.x() and wall.moment.contact.z() functions respectively. The Table data type is used to record the cutterhead loads such as the cutterhead thrust, torque, unbalanced force and overturning moment, where the x value of the Table is the advancement distance of the cutterhead wall (obtained using the wall.position.y function). The calculation method of the above cutterhead load is compiled into a Fish function, which is called once every 1000 time steps using the Fish callback command to record the cutterhead load once.Since the cutter head wall cuts piles at a fixed advancement speed and rotation speed, the contact force of the cutter head wall changes abruptly in the initial stage of each pile cutting section. Therefore, only the data in the stable fluctuation stage of the curve (advance distance is between 10mm and 80mm) are selected for statistical analysis. The statistics in the box plot include maximum value, minimum value, upper and lower quartiles Q3 and Q1, mean, median and outliers. The interquartile range (IQR) is defined as the difference between the upper and lower quartiles (Q3-Q1). The interquartile range indicates the main fluctuation range of the cutter head load. The outlier is defined as a value less than Q1-1.5IQR or greater than Q3+1.5IQR. According to the specific working condition simulation, the pile cutting section VI with the most suitable cutting effect is taken as the analysis condition, such as. Fig. 9 As shown, it is a schematic diagram of the simulated cutter head thrust change curve provided by the embodiment of the present application. At this time, the thrust mean of the pile cutting section VI is 13701kN, and the thrust interquartile range of the pile cutting section VI is 2310kN, indicating that as the contact area of the cutter head pile cutting increases, the main fluctuation range of the cutter head thrust increases. This is because the increase in the pile cutting area leads to an increase in the number of pile cutting tools, indicating that cutting the main reinforcement of the pile foundation causes a drastic change in the cutter head load. The cutter head torque curve of the pile cutting section is comparable to the change trend of the cutter head thrust change curve, and the analysis method for torque is consistent with that for thrust, such as Fig.10 The figure shows a schematic diagram of a simulated cutter disc torque variation curve provided in an embodiment of the present application.
[0066] The simulation system for the load of a shield cutter head cutting a reinforced concrete pile foundation provided in the embodiment of the present application includes a shield pile foundation acquisition module, a shield pile foundation comprehensive simulation module and a shield pile foundation analysis module: the shield pile foundation acquisition module is used to obtain shield pile foundation data, the shield pile foundation data includes geological data, reinforced concrete pile foundation data, shield cutter head data, actual operation feedback data and historical problem type data set; the shield pile foundation comprehensive simulation module is used to construct a shield pile foundation comprehensive simulation model, the shield pile foundation comprehensive simulation model includes a PFC time step model, a mechanical displacement model, a calibration soil meso-parameter model, a soil contact selection model and a particle adhesion model; the shield pile foundation analysis module is used to obtain the shield cutting pile foundation comprehensive load data calculated by the shield pile foundation comprehensive evaluation model, and compare the shield cutting pile foundation comprehensive load data with the actual operation feedback data and analyze and adjust them.
[0067] The technical scheme in the above-mentioned embodiment of the present application has at least the following technical effects or advantages: relative to the numerical analysis method of the influence of upper and lower overlapping tunnel shield construction on the underpinning pile foundation announced with announcement number: CN106066920B, the embodiment of the present application constructs a comprehensive simulation model of the shield pile foundation and simulates it through the PFC discrete finite element simulation method, thereby obtaining the comprehensive load data of the shield cutting pile foundation, thereby achieving the improvement of the objectivity of the simulation of the shield cutting reinforced concrete pile foundation load; relative to the invention patent with publication number: CN114935465A, which discloses a system for simulating the disturbance of existing pile foundations by shield construction, the embodiment of the present application analyzes and adjusts the simulation method through the steps of evaluation and comparison judgment, quantitative analysis, analysis and judgment, comparison training, adjustment method and feedback optimization of the comprehensive load data of the shield cutting pile foundation and the actual operation feedback data, so that the simulation method can be adjusted according to the specific actual working conditions, thereby achieving the improvement of the robustness of the simulation of the shield cutting reinforced concrete pile foundation load.
[0068] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0069] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0070] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0071] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0072] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0073] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A simulation method for the load of a shield cutterhead cutting a reinforced concrete pile foundation. It is characterized in that include: Acquire shield pile foundation data, wherein the shield pile foundation data includes geological data, reinforced concrete pile foundation data, shield cutter head data, actual operation feedback data and historical problem type data set; Constructing a comprehensive simulation model of shield pile foundation, wherein the comprehensive simulation model of shield pile foundation includes a PFC time step model, a mechanical displacement model, a calibration soil mesoscopic parameter model, a soil contact selection model and a particle adhesion model; Obtain the comprehensive load data of the shield cutting pile foundation calculated by the comprehensive simulation model of the shield pile foundation, compare the comprehensive load data of the shield cutting pile foundation with the actual operation feedback data, and analyze and adjust; The specific steps of comparing, analyzing and adjusting the shield cutting pile foundation comprehensive load data with the actual operation feedback data are as follows: Evaluation and comparison judgment: Compare the shield pile foundation comprehensive load data obtained by simulating and calculating the shield pile foundation comprehensive simulation model with the actual operation feedback data. If the difference between the two values is outside the predefined error allowable range, it is judged that there is a problem with the shield pile foundation comprehensive simulation model, and all the data obtained by simulating and calculating the shield pile foundation comprehensive simulation model are recorded as the problem data of the shield pile foundation comprehensive simulation model; Quantitative analysis: The specific difference between the problem data of the shield pile foundation comprehensive simulation model and the corresponding actual operation feedback data is calculated by comparing the relevant linear regression algorithm to obtain the difference problem data; Analysis and judgment: Based on the results of quantitative analysis, the problem types corresponding to the difference problem data are identified through machine learning algorithms to obtain the problem type data set; Comparative training: Compare the data in the problem type data set with the data in the historical problem type data set. If the two sets of data are the same, it is judged as a known problem, otherwise, it is judged as an unknown problem. Adjustment method: Add historical problem type data sets to unknown problem data, and perform data training on the historical problem type data sets to obtain corresponding adjustment methods. According to the corresponding adjustment methods, the shield pile foundation comprehensive simulation model is optimized; Feedback optimization: Feedback the optimized shield pile foundation comprehensive simulation model to the historical problem type data set for data training again according to the actual operation feedback data; The specific steps of constructing the shield pile foundation comprehensive simulation model are: Constructing a PFC time step model to determine the PFC time step; Construct a mechanical displacement model to determine the laws of particle motion under force; According to the reinforced concrete pile foundation data, a soil contact selection model is constructed to select the inter-particle contact model corresponding to the excavated soil. According to the geological data, a soil meso-parameter calibration model is constructed to calibrate the soil meso-parameters. Update the current model time, dynamically create or delete the contact force in the model according to the current entity position, and update the contact force of each inter-particle contact model in the inter-particle contact model according to the mechanical displacement model; A particle adhesion model is constructed, and the comprehensive simulation of the shield pile foundation is judged based on the comparison between the cutter head simulated incision contact force and the contact force of the particle adhesion model, and the comprehensive load data of the shield cutting pile foundation is generated accordingly.
2. The method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation as claimed in claim 1, It is characterized in that The specific calculation formula for determining the PFC time step is: Where T represents the PFC time step, m represents the predefined mass of the PFC discrete element particle, I represents the predefined inertia tensor of the PFC discrete element particle, ktran and krot represent the predefined translational stiffness and rotational stiffness of the PFC discrete element particle, respectively. The entire simulation time is divided into several PFC time points according to the PFC time step, t 0 =1,2,...,t,t 0 represents the number of the PFC time point, t represents the total number of PFC time points, and e represents a natural constant.
3. The method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation as claimed in claim 1, It is characterized in that The specific calculation formula for constructing the mechanical displacement model is: In the formula, a 0 =1,2,...,a,a 0 represents the number of particles in PFC, a represents the total number of particles in PFC, Indicates the a in PFC 0 The mechanical displacement formula of a particle is: represents the net external force acting on the particle, Indicates the a in PFC 0 The position vector of each particle, Indicates the ath in PFC 0 The gravitational acceleration of a particle, Indicates the a in PFC 0 The mass of the particles, Indicates the effect on the PFC 0 The resultant moment on the particle, Indicates the a in PFC 0 The angular momentum of a particle, Indicates the a in PFC 0 The inertia tensor of a particle, Indicates the a in PFC 0 The angular velocity of a particle.
4. The method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation as claimed in claim 1, It is characterized in that The specific calculation formula for calibrating the soil mesoscopic parameter model is: In the formula, σ represents the index of calibrated soil micro-parameters, represents the number of particles generated by the soil, θ represents the pressure data of the Mohr strength envelope corresponding to the number of particles generated by the soil, C 径 Represents the predefined radius data of the soil particles, C 孔 The predefined porosity data of the particles representing the soil, C 密 Represents the predefined density data of the soil particles, P 尺 represents the predefined sample size data of the soil, μ represents the negative influence matching coefficient of the simulation computing power corresponding to the predefined sample size data of the soil, and They respectively represent the influence matching factors of the soil particle predefined radius data, the soil particle predefined porosity data, and the soil particle predefined density data corresponding to the calibration soil mesoscopic parameter index, and e represents a natural constant; According to the comparison between the calibrated soil meso-parameter index and the predefined calibrated soil meso-parameter index, if it is outside the predefined error range, the predefined porosity data of the soil particles, the predefined density data of the soil particles, the predefined radius data of the soil particles and the predefined sample size data of the soil included in the calibrated soil meso-parameter index are adjusted again.
5. The method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation as claimed in claim 1, It is characterized in that The specific steps of obtaining the inter-particle contact model corresponding to the excavated soil body are as follows: Obtain the macroscopic mechanical parameter data of the soil excavated when the shield cutter cuts the reinforced concrete pile, and obtain the data for calibrating the microscopic parameters of the soil based on this; The macroscopic mechanical parameter data of the soil are evaluated to obtain the soil contact selection model. The specific calculation formula of the soil contact selection model is: Where ζ represents the soil contact model selection coefficient, A 1 Indicates the tensile strength data of the soil, A 拉 Indicates the standard data of tensile strength of the predetermined soil, A 2 Represents the shear strength data of the soil, A 切 Represents the standard data of shear strength of predefined soil, A 3 Indicates the cohesive strength data of the soil, A 粘 represents the standard data of cohesive strength of predefined soil, ψ 1 , 2 and ψ 3 They represent the weight factors of the soil contact model selection coefficient corresponding to the tensile strength, shear strength and cohesive strength of the soil, respectively, and e represents a natural constant; Select the corresponding soil contact model according to the soil contact model selection coefficient.
6. The method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation as claimed in claim 1, It is characterized in that The specific calculation formula for constructing the particle adhesion model is: In the formula, Indicates that at t 0 The ath PFC time point 0 The adhesion of particles, Indicates that at t 0 The ath PFC time point 0 The maximum normal stress of the bonding force of each particle is Indicates that at t 0 The ath PFC time point 0 The maximum tangential stress of the bonding force of each particle is Indicates that at t 0 The ath PFC time point 0 The modulus of the normal force of the adhesion force between particles is, Indicates that at t 0 The ath PFC time point 0 The modulus of the tangential force of the bonding force of each particle is Indicates that at t 0 The ath PFC time point 0 The bending moment of the bonding force of each particle, Indicates that at t 0 The ath PFC time point 0 The torque of the bonding force of each particle, Indicates that at t 0 The ath PFC time point 0 The value of the area of the bonding contact plane of each particle, Indicates that at t 0 The ath PFC time point 0 The moment of inertia of the bonded contact plane of the particles, Indicates that at t 0 The ath PFC time point 0 The polar moment of inertia of the bonded contact plane of the particles, Indicates that at t 0 The ath PFC time point 0 is the contact radius of the bonding contact plane of each particle, and β represents the contribution weight factor of each predefined moment.
7. The method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation as claimed in claim 1, It is characterized in that The specific steps of generating the shield cutting pile foundation comprehensive load data are as follows: The simulated cutterhead parameters are set according to the shield cutterhead data, and the force and torque of the cutterhead simulating the cutting particles are brought into the mechanical displacement model to obtain the simulation data of the particles at different PFC time points. The corresponding simulation data of the particles are obtained through the built-in wall function of PFC, and the cutterhead load data at different PFC time points are obtained, as well as the comprehensive load data of the shield cutting pile foundation.
8. A system using the method for simulating the load of a shield cutter head cutting a reinforced concrete pile foundation as claimed in any one of claims 1 to 7, It is characterized in that The simulation system for the load of the shield cutter cutting reinforced concrete pile foundation includes a shield pile foundation acquisition module, a shield pile foundation comprehensive simulation module and a shield pile foundation analysis module: The shield pile foundation acquisition module is used to obtain shield pile foundation data, and the shield pile foundation data includes geological data, reinforced concrete pile foundation data, shield cutter head data, actual operation feedback data and historical problem type data set; The shield pile foundation comprehensive simulation module is used to construct a shield pile foundation comprehensive simulation model, which includes a PFC time step model, a mechanical displacement model, a calibration soil mesoscopic parameter model, a soil contact selection model and a particle adhesion model; the shield pile foundation analysis module is used to obtain the shield cutting pile foundation comprehensive load data calculated by the shield pile foundation comprehensive simulation model, compare the shield cutting pile foundation comprehensive load data with the actual operation feedback data, and analyze and adjust them.