Robot handling scheduling method and system for warehousing logistics

By identifying task types and generating characteristics, establishing the matching function relationship between robots and tasks, and optimizing scheduling strategies, the problem of inflexible scheduling of warehousing and logistics robots is solved, and automated real-time scheduling and efficient handling are realized.

CN118246687BActive Publication Date: 2024-11-05CHINA NAT BUILDING MATERIAL INVESTMENT LOGISTICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410438713.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2024-11-05
Estimated Expiration
2044-04-12

AI Technical Summary

Technical Problem

The existing warehousing and logistics robots are inflexible in scheduling, which affects operating efficiency, especially when facing temporary tasks, it is difficult to effectively schedule.

Method used

By connecting the task management platform and the robot management platform, identify task types, extract elements of dynamic tasks, generate task scheduling characteristics and robot work characteristics, establish matching function relationships, build optimization spaces, and optimize scheduling strategies to match robots and tasks.

Benefits of technology

It realizes automated real-time scheduling, improves handling efficiency and accuracy, and enhances scheduling flexibility and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118246687B_ABST
    Figure CN118246687B_ABST
Patent Text Reader

Abstract

The present invention discloses a robot handling and scheduling method and system for warehousing logistics, which relates to the field of warehousing technology. The method includes: obtaining warehousing scheduling tasks for attribute identification and determining task types; extracting dynamic tasks for element extraction and obtaining task execution types, scheduling target positions, task time periods, and basic cargo information; extracting according to preset feature dimensions and obtaining task scheduling features; matching task execution types, basic cargo information, and robot basic information to determine matching robot information sets and obtain robot working features; establishing a matching function relationship between task scheduling features and robot working features, and constructing an optimization space with the goal of minimizing static task scheduling loss values; determining environmental restriction information according to the scheduling target position, setting constraints to schedule and optimize scheduling tasks, and obtaining scheduling strategies for feedback. The technical effects of achieving automated real-time scheduling and improving handling efficiency are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of warehousing technology, and in particular to a robot handling and scheduling method and system for warehousing logistics. Background Art

[0002] In warehousing and logistics tasks, the introduction of robot handling and scheduling is one of the key technologies to achieve warehouse automation and improve logistics efficiency. Existing warehousing and logistics robots usually perform warehousing and logistics handling based on preset handling routes or action modes. When faced with inserted temporary tasks, there are technical problems such as inflexible scheduling and low operating efficiency. Summary of the invention

[0003] The present invention provides a robot handling scheduling method and system for warehousing logistics, so as to solve the technical problems of inflexible scheduling and affecting operation efficiency in the prior art, and achieve the technical effects of automated real-time scheduling and improved handling efficiency.

[0004] In a first aspect, the present invention provides a robot handling scheduling method for warehousing logistics, wherein the method comprises:

[0005] Connect to the task management platform, obtain the warehouse scheduling task, identify the attributes of the warehouse scheduling task, and determine the task type, which includes static tasks and dynamic tasks. The static task is a fixed task, and the dynamic task is a randomly inserted task;

[0006] Extract dynamic tasks to extract elements and obtain task execution type, scheduling target location, task time period, and basic cargo information;

[0007] According to the task execution type, scheduling target location, task time period, and basic cargo information, extraction is performed according to preset feature dimensions to obtain task scheduling features;

[0008] Connecting to the robot management platform, matching the task execution type, cargo basic information and robot basic information, determining a matching robot information set, the robot information set including robot identity information, task status, and positioning information, performing feature extraction on the matching robot information set, wherein the extracted feature dimension corresponds to the preset feature dimension, and obtaining the robot working feature;

[0009] Establishing a matching function relationship between the task scheduling characteristics and the robot working characteristics, and constructing an optimization space with the goal of minimizing the static task scheduling loss value;

[0010] Environmental restriction information is determined according to the scheduling target position, constraint conditions are set, the constraint conditions are added to the optimization space, scheduling optimization is performed on the scheduling task, and the scheduling strategy is obtained for feedback.

[0011] In this method, fixed tasks and temporary tasks are distinguished by extracting scheduling tasks and identifying their attributes. Then, the dynamic tasks are extracted and the acquired elements are analyzed to generate task scheduling features and robot working features. Next, the robot basic information is matched using the task execution type and the basic information of the goods. The method of dynamic task identification and matching robot information set is adopted to improve the flexibility and efficiency of task scheduling. By comprehensively considering the task characteristics, robot working characteristics and environmental restriction information, an optimization model for task scheduling and robot matching is established to achieve intelligent matching and optimal scheduling of warehouse scheduling tasks, thereby improving the efficiency and accuracy of warehouse management.

[0012] In a second aspect, the present invention further provides a robot handling and scheduling system for warehousing logistics, wherein the system comprises:

[0013] A task parsing module, which is used to connect to the task management platform, obtain warehouse scheduling tasks, identify the attributes of the warehouse scheduling tasks, and determine the task types. The task types include static tasks and dynamic tasks. The static tasks are fixed tasks, and the dynamic tasks are randomly inserted tasks.

[0014] A dynamic element extraction module is used to extract dynamic tasks for element extraction, and obtain task execution type, scheduling target location, task time period, and basic cargo information;

[0015] A scheduling feature extraction module, which is used to extract task scheduling features according to the task execution type, scheduling target location, task time period, and basic cargo information according to preset feature dimensions;

[0016] A matching and working feature module, wherein the matching and working feature module is used to connect to the robot management platform, match the task execution type, the basic information of the cargo and the basic information of the robot, determine a matching robot information set, the robot information set includes robot identity information, task status, and positioning information, perform feature extraction on the matching robot information set, wherein the extracted feature dimension corresponds to the preset feature dimension, and obtain the robot working feature;

[0017] An optimization configuration module, wherein the optimization configuration module is used to establish a matching function relationship between the task scheduling characteristics and the robot working characteristics, and to construct an optimization space with the goal of minimizing the static task scheduling loss value;

[0018] The constraint scheduling module is used to determine the environmental restriction information according to the scheduling target position, set the constraint conditions, add the constraint conditions to the optimization space, perform scheduling optimization on the scheduling task, and obtain the scheduling strategy for feedback.

[0019] The present invention discloses a robot handling scheduling method and system for warehousing logistics, including: connecting to a task management platform, acquiring warehousing scheduling tasks, identifying attributes of the warehousing scheduling tasks, and determining task types, wherein the task types include static tasks and dynamic tasks; extracting dynamic tasks for element extraction, and obtaining task execution types, scheduling target positions, task time periods, and basic cargo information; extracting according to preset feature dimensions based on the task execution type, scheduling target position, task time period, and basic cargo information, and obtaining task scheduling features; connecting to a robot management platform, matching task execution types, basic cargo information, and robot basic information, and determining a matching robot information set, wherein the robot information set includes robot identity information, task status, and positioning information, and extracting features from the matching robot information set to obtain robot working features; establishing a matching function relationship between task scheduling features and robot working features, and constructing an optimization space with the goal of minimizing static task scheduling loss values; determining environmental restriction information based on the scheduling target position, setting constraints, adding the constraints into the optimization space, performing scheduling optimization on the scheduling tasks, and obtaining scheduling strategies for feedback. The robot handling and scheduling method and system for warehousing logistics disclosed in the present invention solve the technical problems of inflexible scheduling and affecting operation efficiency, and achieve the technical effects of automated real-time scheduling and improved handling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a flow chart of the robot handling and scheduling method for warehousing logistics of the present invention;

[0021] Figure 2 It is a schematic diagram of the structure of the robot handling and scheduling system for warehousing logistics of the present invention.

[0022] Explanation of the reference numerals: task analysis module 11, dynamic element extraction module 12, scheduling feature extraction module 13, matching and work feature module 14, optimal configuration module 15, constraint scheduling module 16. DETAILED DESCRIPTION

[0023] Some terms involved in the embodiments of the present invention are explained in advance below.

[0024] Robot: refers to an automated device that usually has mobility and a certain degree of intelligence. It can walk autonomously inside the warehouse according to pre-set programs or instructions and complete logistics tasks such as cargo handling and stacking. These robots are usually equipped with sensing devices such as sensors and cameras, which can sense the surrounding environment, avoid obstacles, avoid collisions, and efficiently complete cargo handling and other tasks inside the warehouse according to the tasks remotely issued by the dispatching system.

[0025] The technical solution provided in the embodiments of the present invention is to solve the technical problems of inflexible scheduling and affecting operation efficiency in the prior art. The overall idea adopted is as follows:

[0026] First, connect to the task management platform to obtain the warehouse scheduling task. Then, identify the attributes of the warehouse scheduling task and determine the task type, which includes static tasks and dynamic tasks. Then, extract the dynamic task for element extraction to obtain the task execution type, scheduling target location, task time period, and basic cargo information. Then, extract according to the preset feature dimensions based on the task execution type, scheduling target location, task time period, and basic cargo information to obtain the task scheduling features. Then, connect to the robot management platform, match the task execution type, basic cargo information, and robot basic information to determine the matching robot information set, which includes robot identity information, task status, and positioning information. Then, extract the features of the matching robot information set to obtain the robot working features. Then, establish the matching function relationship between the task scheduling features and the robot working features, and construct the optimization space with the goal of minimizing the static task scheduling loss value. Finally, determine the environmental restriction information based on the scheduling target location, set the constraints, add the constraints to the optimization space, perform scheduling optimization on the scheduling task, and obtain the scheduling strategy for feedback.

[0027] The above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods of the specification to better understand the above technical solution. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments of the present invention. It should be understood that the present invention is not limited to the example embodiments used only to explain the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. In addition, it should be noted that, for the convenience of description, only the parts related to the present invention are shown in the drawings, rather than all of them. Embodiment 1

[0028] Figure 1 The figure is a flow chart of a robot handling and scheduling method for warehousing logistics according to the present invention; wherein the robot handling and scheduling method for warehousing logistics includes:

[0029] Connect to the task management platform, obtain the warehouse scheduling task, identify the attributes of the warehouse scheduling task, and determine the task type, which includes static tasks and dynamic tasks. The static task is a fixed task, and the dynamic task is a randomly inserted task;

[0030] Optionally, first, connect to the task management platform through API or other means to obtain information on warehouse scheduling tasks. The task management platform is used to obtain and manage logistics and handling orders of target warehouse scenarios in real time and generate warehouse scheduling tasks that are updated in real time.

[0031] Optionally, a warehouse scheduling task refers to a task for planning and arranging the storage, movement, sorting, and other operations of items in a warehouse in a warehouse management system. For example, it includes operations such as warehousing, outbound, transfer, and inventory of goods.

[0032] Optionally, the warehouse scheduling task also includes factors such as the quantity, type, priority, and destination of the goods that need to be scheduled.

[0033] Optionally, after obtaining the storage scheduling task, attribute recognition is performed on the obtained storage scheduling task to determine the type of the task. Specifically, the task type includes two types: static task and dynamic task.

[0034] Static tasks are fixed tasks whose execution time, execution location and other attributes are relatively fixed. In other words, static tasks are handling tasks that existed at the previous moment and whose task status has not changed, such as periodic inventory and warehouse transfer tasks. For example, static tasks are identified by comparing them with warehouse scheduling tasks at the previous moment. The key is to determine that the execution attributes of the tasks will not change.

[0035] Dynamic tasks are randomly inserted tasks, and their execution time, execution location and other attributes are random. In other words, dynamic tasks include newly added transport tasks that did not exist at the previous moment and transport tasks that existed at the previous moment and whose task attributes have changed.

[0036] Extract dynamic tasks to extract elements and obtain task execution type, scheduling target location, task time period, and basic cargo information;

[0037] Optionally, elements are extracted from dynamic tasks. The elements of dynamic tasks include: task execution type, which refers to the specific execution method of the task, such as warehousing, outbound storage, and transfer, etc.; scheduling target location, which refers to the location where the task needs to be executed, such as shelf number, cargo location number or specific area; task time period, which refers to the time period constraint for task execution, including start time and end time; basic cargo information, which refers to basic information related to the cargo, such as cargo number, name, quantity, quality, packaging form, handling requirements (such as no rolling, limited number of stacking layers, front side facing up), etc.

[0038] According to the task execution type, scheduling target location, task time period, and basic cargo information, extraction is performed according to preset feature dimensions to obtain task scheduling features;

[0039] Optionally, preset feature dimensions refer to various attributes and features that are pre-defined in the task scheduling process to describe the task, and can be used for various features of task scheduling. Preset feature dimensions include the task execution type, scheduling target location, task time period, and part or all of the basic information of the goods. Preset feature dimensions need to be defined according to specific warehouse scheduling tasks and requirements.

[0040] By defining and extracting these characteristic dimensions, it helps to better describe and distinguish different types of tasks, and facilitates the understanding of task elements in subsequent task scheduling and optimization processes.

[0041] In some embodiments, according to the task execution type, the scheduling target location, the task time period, and the basic information of the cargo, extraction is performed according to the preset feature dimensions to obtain the task scheduling features, including:

[0042] Obtain adjustment parameters for the robot handling scheduling task, which are parameter information that the robot needs to adjust accordingly according to the task when performing the handling task, including moving speed, path navigation, load-bearing capacity, execution time and operation mode;

[0043] Taking each parameter dimension in the adjustment parameters as the preset feature dimension;

[0044] An aggregation center is set based on the preset feature dimensions, and a correlation is calculated for the task execution type, scheduling target location, task time period, and basic cargo information. The dimension information is merged according to the correlation to obtain an aggregation result of the parameters of each dimension, and feature parameters are extracted from the aggregation result to obtain the task scheduling feature.

[0045] Optionally, obtain parameter information that needs to be adjusted according to the task when the robot performs the handling task, so as to control and manage the robot's handling scheduling tasks more accurately and effectively. Among them, the moving speed refers to the moving speed of the robot when performing the handling task, including the starting and ending acceleration, and the speed setting during the straight and turning movement. Path navigation includes path planning algorithms and navigation parameters to ensure that the robot can reach the destination safely and quickly along the specified path. The load-bearing capacity refers to the maximum weight that the robot can carry in the handling task. This parameter affects whether the robot can complete the handling task and the stability during the handling process. The execution time refers to the time required for the robot to perform the handling task, including the time required for each step of the entire process from the start of the task to the completion of the task. The operation mode refers to the working mode of the robot when performing the handling task, which may include autonomous mode, cloud control mode, fusion mode, etc.

[0046] Optionally, first, each parameter dimension in the adjustment parameter is used as the preset feature dimension. Then, an aggregation center is set to calculate the correlation between the task execution type, the scheduling target location, the task time period, and the basic information of the goods. Then, the dimension information is merged according to the correlation to obtain the aggregation result of each dimension parameter. Finally, the feature parameter is extracted from the aggregation result to obtain the task scheduling feature.

[0047] Optionally, based on correlation coefficients, mutual information, etc., correlation calculations are performed on attributes such as task execution type, scheduling target location, task time period, basic cargo information, etc., to determine their correlations with each preset feature dimension, and obtain multiple correlations.

[0048] Optionally, based on the calculated multiple associations, each attribute information is merged to obtain an aggregated result of each dimensional parameter, and the calculated association is used as a weight to perform weighted aggregation on each attribute information to obtain an aggregated result of each dimensional parameter.

[0049] Optionally, feature parameters are extracted from the aggregation results to form a task scheduling feature based on the aggregation results. Exemplarily, the task scheduling feature is represented as a feature vector to facilitate subsequent task scheduling analysis.

[0050] Connecting to the robot management platform, matching the task execution type, cargo basic information and robot basic information, determining a matching robot information set, the robot information set including robot identity information, task status, and positioning information, performing feature extraction on the matching robot information set, wherein the extracted feature dimension corresponds to the preset feature dimension, and obtaining the robot working feature;

[0051] Among them, the robot management platform refers to a software system or platform used to manage and monitor warehouse logistics robots. For example, the robot management platform is used for task allocation, monitoring and status tracking, remote control and adjustment, fault diagnosis and maintenance, safety management, etc.

[0052] In some embodiments, the task execution type, cargo basic information and robot basic information are matched to determine a matching robot information set, including:

[0053] Obtain basic information about the robot, including robot model, mode, load space parameters, and load-bearing parameters;

[0054] According to the task execution type, the task operation is obtained, and matched with the robot model and mode to obtain a first-level matching result;

[0055] According to the basic information of the cargo, the single volume, single weight, and stacking threshold are obtained, and matched with the loading space parameters and load-bearing parameters of the robot in the first-level matching result to obtain a matching robot, and the robot identity information, task status, and positioning information of the matching robot are extracted to generate the matching robot information set.

[0056] Optionally, the operations to be performed are determined based on the execution type of the task. These operations are then matched with the robot models and modes to determine which robots are suitable for performing these operations. This may involve considerations of the robot's function, speed, accuracy, and other aspects. The robots under the preferred robot management platform have category identifications, and robots of different categories are adapted to different tasks, and the category identifications change adaptively based on the target warehousing scenario and task time point. For example, during the time sequence of reduced inbound and outbound orders at night or in the off-season, the number of robots with inventory identification and warehouse transfer identification increases relatively.

[0057] Optionally, the basic information of the goods, such as unit volume, unit weight, palletizing threshold, etc., is matched with the robot's load space parameters and load-bearing parameters in the first-level matching results. Then, it can be determined which robots have sufficient space and load-bearing capacity to carry these goods. Through the above steps, the task requirements and robot capabilities can be effectively matched, so as to determine the most suitable robot for performing the task, providing support for task scheduling and execution.

[0058] In some embodiments, extracting features from the matching robot information set includes:

[0059] Based on the robot identity information, a system tracking code is obtained, and based on the system tracking code, the task status and positioning information of the task currently being performed by the robot are retrieved, wherein the task status includes task completion degree, current task execution operation, and task time period;

[0060] Feature extraction is performed according to preset feature dimensions based on the task completion degree, current task execution operation, task time period, and positioning information to obtain the robot working characteristics.

[0061] Optionally, based on the robot identity information, a system tracking code is obtained. The system tracking code refers to the identification code of the robot in the robot management platform, which includes logic codes and hardware codes, such as the system number, robot SN code, network address code, etc.

[0062] Optionally, the system tracking code is stored in a mapping table in the robot management platform, which establishes a mapping relationship between the robot identity information and the system tracking code, thereby realizing unique identification and recognition of the robot.

[0063] Optionally, the system tracking code is used to communicate with the robot management platform, and data query operations are performed based on corresponding instruction statements to retrieve the task status and positioning information of the robot's current task. Then, relevant information such as task completion, current task execution operation, and task time cycle are extracted from the acquired task status information. Among them, task completion refers to the progress of task completion, which can be based on the handling sequence, estimated time, and the proportion of the path completion length; the current task execution operation refers to the robot's ongoing handling sequence, such as empty drive addressing, cargo identification, loading, navigation movement, avoidance, unloading, etc.; the task time cycle is the estimated task duration determined based on the robot's working characteristics and historical transport logs.

[0064] Through the above steps, the status information of the robot's current task can be obtained based on the robot's identity information and system tracking code, providing support for task scheduling and monitoring.

[0065] Optionally, based on the task completion, current task execution operation, task time cycle, and positioning information, feature extraction is performed to map different operations, task time cycle information, location coordinates, and other information into different feature values, and the above features are combined to form the robot's working characteristics. Feature extraction through the above steps helps the subsequent scheduling system, model, etc. to understand the robot's characteristics.

[0066] Establishing a matching function relationship between the task scheduling characteristics and the robot working characteristics, and constructing an optimization space with the goal of minimizing the static task scheduling loss value;

[0067] Among them, according to the correspondence between the task scheduling characteristics and the robot working characteristics, a functional relationship is established to obtain a matching functional relationship, which is used to describe the mapping relationship between the robot working characteristics and the task scheduling characteristics. In other words, the matching functional relationship specifies what kind of scheduling task is suitable for what kind of robot to handle.

[0068] In some embodiments, a matching function relationship between the task scheduling feature and the robot working feature is established, and an optimization space is constructed with the goal of minimizing the static task scheduling loss value, including:

[0069] Establishing a corresponding relationship between the task scheduling characteristics and the robot working characteristics, and fitting the robot working characteristics to complete the functional relationship of the task scheduling characteristics;

[0070] Constructing an energy loss function and a time loss function for inserting the matching robot into a dynamic task, combining the energy loss function and the time loss function according to weights, and constructing a loss evaluation function;

[0071] Taking the minimization of the loss evaluation function as the optimization goal, the matching robot selection scheme is optimized based on the functional relationship between the robot working characteristics and the task scheduling characteristics.

[0072] Optionally, a correspondence between task scheduling features and robot working features is established. First, according to the specific requirements of task scheduling features and robot working features, the feature dimensions that need to be matched and fitted are determined, such as task execution type, scheduling target location, task time period, basic cargo information, etc. Then, historical task scheduling data and robot working data are collected, including task execution status, robot working status, task completion time, etc. Next, feature extraction is performed on the collected data to extract feature information related to task scheduling and robot work. Then, based on the extracted feature information, a correspondence between task scheduling features and robot working features is established, including a model method and an association analysis method. Preferably, a machine learning algorithm is used for model training, and the functional relationship between task scheduling features and robot working features is obtained by fitting by learning the feature information related to task scheduling and robot work.

[0073] Furthermore, the energy loss function considers the total energy consumed by the robot in the process of performing the task, and is estimated based on factors such as the robot's action and movement. For example, factors such as the robot's speed, acceleration, and load can be considered. The time loss function considers the total time consumed by the robot in the process of performing the task, including estimation based on factors such as the actual time of task execution and the robot's movement speed. The loss evaluation function is a function that combines the energy loss function and the time loss function according to the weights to comprehensively evaluate the loss of the robot when inserting a dynamic task.

[0074] Optionally, the minimization of the loss evaluation function is taken as the optimization goal, that is, it is hoped to find a robot selection scheme that minimizes the loss of task scheduling. Specifically, the established functional relationship and loss evaluation function are used to optimize the robot selection scheme and find the optimal robot selection scheme to minimize the loss of task scheduling. First, the loss evaluation function is defined as the optimization goal. Based on the functional relationship of the task scheduling characteristics completed by the robot working characteristics, an optimization model is established, and a suitable optimization algorithm is selected for solving. Commonly used optimization algorithms include genetic algorithms, particle swarm algorithms, simulated annealing algorithms, etc. Finally, a robot selection scheme that minimizes the loss evaluation function is found. Through the above steps, the optimization of the robot selection scheme based on minimizing the loss evaluation function can be achieved, thereby improving the overall work efficiency of the robot and the accuracy of task scheduling.

[0075] Environmental restriction information is determined according to the scheduling target position, constraint conditions are set, the constraint conditions are added to the optimization space, scheduling optimization is performed on the scheduling task, and the scheduling strategy is obtained for feedback.

[0076] The environmental restriction information includes environmental obstacle information, environmental space restriction information, control signal interference area information and other related restriction conditions. Adding these restriction conditions to the optimization space can ensure that the obtained scheduling strategy meets the requirements of the actual environment.

[0077] In some embodiments, determining environmental restriction information according to the scheduling target location includes:

[0078] Determine the target location and destination location of the cargo to be transported according to the dispatch target location;

[0079] Based on the warehouse electronic map, a path is planned for the target location of the transported goods and the transport destination location to obtain a path solution set;

[0080] Extracting path environment features from the path plan set to obtain environmental obstacles, environmental space constraints, and control signal interference areas;

[0081] According to the restriction strength of the environmental obstacles, environmental space restrictions, and control signal interference areas, the path plan set is screened and a preferred path is set. The preferred path is the path with the smallest restriction strength. Based on the environmental obstacles, environmental space restrictions, and control signal interference areas existing in the preferred path, the environmental restriction information is obtained and the preferred path is marked.

[0082] Optionally, perform path planning based on the warehouse electronic map and obtain a path solution set: First, import the warehouse electronic map into the path planning system. Then, according to the task requirements, identify and mark the coordinates of the starting and destination locations of the goods on the warehouse map. Next, select a suitable path planning algorithm, including A* algorithm, Dijkstra algorithm, RRT algorithm, etc. Then, based on the selected one or more path planning algorithms, perform iterative path planning, obtain multiple planned paths, and store them as a path solution set;

[0083] Optionally, the path plan set is screened based on the restriction strength of environmental obstacles, environmental space restrictions, and control signal interference areas. Preferably, the restriction strength of the path plan set is rated based on the restriction frequency and restriction degree, and the path plan set is serialized based on the evaluation results, and the path plan at the front of the sequence is selected as the preferred path. Among them, the restriction strength rating of the path plan set based on the restriction frequency and restriction degree includes setting the restriction strength for each environmental feature according to the actual situation and task requirements. For example, for environmental obstacles, the restriction strength is set according to its size and position; for environmental space restrictions, the restriction strength can be set according to the channel width and height; for control signal interference areas, the restriction strength can be set according to the interference strength.

[0084] Optionally, when the restriction strength of any one of the environmental obstacles, environmental space restrictions, and control signal interference areas is greater than a preset restriction strength control threshold or exceeds the task requirements, the corresponding path plan will be eliminated. For example, the environmental space restrictions on the path do not meet the external dimensions of the transported object in the task requirements.

[0085] Through the above steps, the path plan set can be extracted from environmental features and path screening can be performed to obtain the optimal path plan in the current environment. This ensures the high availability of the generated path plan and reduces the impact of environmental restrictions on the efficiency of warehouse logistics.

[0086] In some embodiments, the method further comprises:

[0087] According to the task time period of the dynamic task and the task tolerance time of the matching robot's static task, an adaptation time period of the matching robot is obtained;

[0088] Based on the adaptation time period of the matching robot, the dynamic task is decomposed into time periods to determine the matching robots corresponding to each time period;

[0089] Dynamically assign tasks to the matching robots corresponding to each time and obtain a collaborative scheduling solution;

[0090] Performing loss value evaluation on the collaborative scheduling scheme to obtain an optimal collaborative scheduling scheme, wherein the optimal collaborative scheduling scheme is a collaborative scheduling scheme with the smallest total loss value;

[0091] Based on the loss value, the scheduling strategy is determined from the collaborative scheduling plan and the robot optimization plan for feedback.

[0092] Optionally, the task tolerance time of the static task is the allowed suspension time of the current static task, or in other words, the acceptable delay window of the current static task, within which the matching robot can process the dynamic task.

[0093] Optionally, the task time period is decomposed into multiple time periods, and the robot is matched according to the robot's adaptive time period. Exemplarily, the time period of the dynamic task is divided into multiple sub-periods, and then corresponding matching robots are assigned to different sub-periods. Through the above method, the split processing of dynamic tasks is realized, which helps to make full use of the fragmented handling capabilities of the target warehousing scene and the robot management platform, and improve the efficiency of warehousing and logistics operations.

[0094] Optionally, dynamic task allocation within the matching robot category is performed according to the matching robot corresponding to each time point. In other words, dynamic tasks are allocated to robot individuals in the matching robot category that have task processing capabilities and task processing windows, ensuring that each task is executed within its adaptation time period.

[0095] Optionally, the above collaborative scheduling schemes are evaluated for loss values, and during the evaluation process, a collaborative scheduling scheme with the smallest total loss value is found. Exemplarily, the acquisition of the above collaborative scheduling scheme with the smallest total loss value is achieved through an optimization algorithm, such as a genetic algorithm, a simulated annealing algorithm, and the like.

[0096] In summary, the robot handling and scheduling method for warehousing logistics provided by the present invention has the following technical effects:

[0097] By connecting to the task management platform, the warehouse scheduling task is obtained, the attribute of the warehouse scheduling task is identified, and the task type is determined. The task type includes static tasks and dynamic tasks; the dynamic task is extracted for element extraction, and the task execution type, scheduling target location, task time period, and basic cargo information are obtained; according to the task execution type, scheduling target location, task time period, and basic cargo information, the task scheduling characteristics are obtained according to the preset feature dimension; the robot management platform is connected, and the task execution type, basic cargo information and robot basic information are matched to determine the matching robot information set. The robot information set includes robot identity information, task status, and positioning information, and the matching robot information set is extracted to obtain the robot working characteristics; a matching function relationship between the task scheduling characteristics and the robot working characteristics is established, and an optimization space is constructed with the minimum static task scheduling loss value as the goal; the environmental restriction information is determined according to the scheduling target location, the constraint conditions are set, and the constraint conditions are added to the optimization space, and the scheduling task is optimized, and the scheduling strategy is obtained for feedback. The robot handling scheduling method and system for warehousing logistics disclosed in the present invention solves the technical problems of inflexible scheduling and affecting operation efficiency, and realizes the technical effects of automated real-time scheduling and improving handling efficiency. Embodiment 2

[0098] Figure 2 Schematic diagram of the structure of the robot handling and dispatching system for warehousing logistics of the present invention. For example, Figure 1 The flowchart of the robot handling scheduling method for warehousing logistics of the present invention can be shown as follows: Figure 2 The structure shown is implemented.

[0099] Based on the same concept as the robot handling and scheduling method for warehousing logistics in the above embodiment, the present invention also provides a robot handling and scheduling system for warehousing logistics, including:

[0100] The task parsing module 11 is used to connect to the task management platform, obtain the warehouse scheduling task, identify the attributes of the warehouse scheduling task, and determine the task type. The task type includes static tasks and dynamic tasks. The static tasks are fixed tasks, and the dynamic tasks are randomly inserted tasks.

[0101] The dynamic element extraction module 12 is used to extract dynamic tasks for element extraction, and obtain the task execution type, scheduling target location, task time period, and basic cargo information;

[0102] The scheduling feature extraction module 13 is used to extract the task scheduling features according to the task execution type, the scheduling target location, the task time period, and the basic information of the goods according to the preset feature dimensions;

[0103] The matching and working feature module 14 is used to connect to the robot management platform, use the task execution type, cargo basic information and robot basic information to match, determine the matching robot information set, the robot information set includes robot identity information, task status, positioning information, perform feature extraction on the matching robot information set, wherein the extracted feature dimension corresponds to the preset feature dimension, and obtain the robot working feature;

[0104] The optimization configuration module 15 is used to establish a matching function relationship between the task scheduling characteristics and the robot working characteristics, and to construct an optimization space with the goal of minimizing the static task scheduling loss value;

[0105] The constraint scheduling module 16 is used to determine the environmental restriction information according to the scheduling target position, set the constraint conditions, add the constraint conditions to the optimization space, perform scheduling optimization on the scheduling task, and obtain the scheduling strategy for feedback.

[0106] Among them, the scheduling feature extraction module 13 includes:

[0107] An adjustment parameter determination unit is used to obtain adjustment parameters of the robot handling scheduling task, wherein the adjustment parameters are parameter information that the robot needs to adjust accordingly according to the task when performing the handling task, including moving speed, path navigation, load-bearing capacity, execution time and operation mode;

[0108] A preset feature dimension unit, used to use each parameter dimension in the adjustment parameter as the preset feature dimension;

[0109] The task scheduling feature unit is used to set an aggregation center based on the preset feature dimension, calculate the correlation between the task execution type, scheduling target location, task time period, and basic cargo information, merge the dimensional information according to the correlation to obtain the aggregation result of each dimensional parameter, and extract feature parameters from the aggregation result to obtain the task scheduling feature.

[0110] Among them, the matching and working feature module 14 includes:

[0111] A basic information acquisition unit is used to acquire basic information of the robot, including robot model, mode, load space parameters, and load-bearing parameters;

[0112] A primary matching unit, used to obtain a task operation according to the task execution type, match it with the robot model and mode, and obtain a primary matching result;

[0113] The robot matching unit is used to obtain the single volume, single weight, and stacking threshold according to the basic information of the goods, match them with the load space parameters and load-bearing parameters of the robot in the first-level matching result, obtain the matching robot, extract the robot identity information, task status, and positioning information of the matching robot, and generate the matching robot information set.

[0114] The matching and working feature module 14 further includes:

[0115] A current task retrieving unit, used to obtain a system tracking code based on the robot identity information, and retrieve the task status and positioning information of the robot's current task based on the system tracking code, wherein the task status includes task completion degree, current task execution operation, and task time period;

[0116] The working feature unit is used to extract features according to preset feature dimensions based on the task completion degree, current task execution operation, task time period, and positioning information to obtain the robot working features.

[0117] Among them, the optimal configuration module 15 includes:

[0118] A functional relationship fitting unit, used to establish a corresponding relationship between the task scheduling characteristics and the robot working characteristics, and to fit the robot working characteristics to complete the functional relationship of the task scheduling characteristics;

[0119] A loss evaluation function unit is used to construct an energy loss function and a time loss function of the matching robot to insert into the dynamic task, and to combine the energy loss function and the time loss function according to the weights to construct a loss evaluation function;

[0120] A scheme optimization unit is used to optimize the matching robot selection scheme based on the functional relationship between the robot working characteristics and the task scheduling characteristics by taking the minimization of the loss evaluation function as the optimization goal.

[0121] Among them, the constraint scheduling module 16 includes:

[0122] A target position unit, used to determine a target position for transporting goods and a transport destination position according to the dispatch target position;

[0123] A path planning unit, used to plan a path for the target location and the destination location of the transported goods based on the warehouse electronic map, and obtain a path plan set;

[0124] A path environment feature extraction unit, used to extract path environment features from the path solution set, and obtain environmental obstacles, environmental space restriction conditions, and control signal interference areas;

[0125] A path plan screening unit is used to screen the path plan set according to the restriction strength of the environmental obstacles, environmental space restrictions, and control signal interference areas, set a preferred path, and the preferred path is the path with the smallest restriction strength. Based on the environmental obstacles, environmental space restrictions, and control signal interference areas existing in the preferred path, the environmental restriction information is obtained, and the preferred path is marked.

[0126] In some implementations, the optimal configuration module 15 further includes:

[0127] An adaptation time acquisition unit, used for acquiring an adaptation time period of the matching robot according to a task time period of the dynamic task and a task tolerance time of the matching robot's static task;

[0128] A time decomposition unit, used to time-decompose the dynamic task based on the adaptation time period of the matching robot, and determine the matching robot corresponding to each time;

[0129] A collaborative scheduling unit is used to dynamically assign tasks to the matching robots corresponding to each time and obtain a collaborative scheduling solution;

[0130] A collaborative loss value evaluation unit, used to evaluate the loss value of the collaborative scheduling scheme to obtain an optimal collaborative scheduling scheme, wherein the optimal collaborative scheduling scheme is a collaborative scheduling scheme with the smallest total loss value;

[0131] A scheduling strategy feedback unit is used to determine the scheduling strategy from the collaborative scheduling plan and the robot optimization plan based on the loss value and provide feedback.

[0132] It should be understood that the embodiments mentioned in this specification focus on their differences from other embodiments. The specific embodiments in the aforementioned embodiment one are also applicable to the robot handling and scheduling system for warehousing logistics described in embodiment two. For the sake of brevity of the specification, they will not be further elaborated here.

[0133] It should be understood that the embodiments disclosed in the present invention and the above description can enable those skilled in the art to use the present invention to implement the present invention. At the same time, the present invention is not limited to the above-mentioned embodiments. It should be understood that those skilled in the art can still modify the technical solutions recorded in the above-mentioned embodiments, or replace some of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.

Claims

1. A robot handling and scheduling method for warehousing logistics, characterized in that: The method comprises: Connect to the task management platform, obtain the warehouse scheduling task, identify the attributes of the warehouse scheduling task, and determine the task type, which includes static tasks and dynamic tasks. The static task is a fixed task, and the dynamic task is a randomly inserted task; Extract dynamic tasks to extract elements and obtain task execution type, scheduling target location, task time period, and basic cargo information; According to the task execution type, scheduling target location, task time period, and basic cargo information, extraction is performed according to preset feature dimensions to obtain task scheduling features; Connecting to the robot management platform, matching the task execution type, cargo basic information and robot basic information, determining a matching robot information set, the robot information set including robot identity information, task status, and positioning information, performing feature extraction on the matching robot information set, wherein the extracted feature dimension corresponds to the preset feature dimension, and obtaining the robot working feature; Establishing a matching function relationship between the task scheduling characteristics and the robot working characteristics, and constructing an optimization space with the goal of minimizing the static task scheduling loss value; Determine environmental restriction information according to the scheduling target position, set constraint conditions, add the constraint conditions to the optimization space, perform scheduling optimization on the scheduling task, and obtain scheduling strategy for feedback; According to the task execution type, scheduling target location, task time period, and basic cargo information, extraction is performed according to preset feature dimensions to obtain task scheduling features, including: Obtain adjustment parameters for the robot handling scheduling task, which are parameter information that the robot needs to adjust accordingly according to the task when performing the handling task, including moving speed, path navigation, load-bearing capacity, execution time and operation mode; Taking each parameter dimension in the adjustment parameters as the preset feature dimension; An aggregation center is set based on the preset feature dimension, and the correlation degree of the task execution type, the scheduling target location, the task time period, and the basic information of the goods is calculated. The dimension information is merged according to the correlation degree to obtain the aggregation result of the parameters of each dimension, and the feature parameter of the aggregation result is extracted to obtain the task scheduling feature; Establish a matching function relationship between the task scheduling characteristics and the robot working characteristics, and construct an optimization space with the goal of minimizing the static task scheduling loss value, including: Establishing a corresponding relationship between the task scheduling characteristics and the robot working characteristics, and fitting the robot working characteristics to complete the functional relationship of the task scheduling characteristics; Constructing an energy loss function and a time loss function for inserting the matching robot into a dynamic task, combining the energy loss function and the time loss function according to weights, and constructing a loss evaluation function; Taking the minimization of the loss evaluation function as the optimization goal, optimizing the matching robot selection scheme based on the functional relationship between the robot working characteristics and the task scheduling characteristics; Determining environmental restriction information according to the scheduling target position includes: Determine the target location and destination location of the cargo to be transported according to the dispatch target location; Based on the electronic warehouse map, a path is planned for the target location of the transported goods and the transport destination location to obtain a path solution set; Extracting path environment features from the path plan set to obtain environmental obstacles, environmental space constraints, and control signal interference areas; According to the restriction strength of the environmental obstacles, environmental space restrictions, and control signal interference areas, the path plan set is screened and a preferred path is set. The preferred path is the path with the smallest restriction strength. Based on the environmental obstacles, environmental space restrictions, and control signal interference areas existing in the preferred path, the environmental restriction information is obtained and the preferred path is marked.

2. The method according to claim 1, characterized in that The task execution type, cargo basic information and robot basic information are matched to determine a matching robot information set, including: Obtain basic information about the robot, including robot model, mode, load space parameters, and load-bearing parameters; According to the task execution type, the task operation is obtained, and matched with the robot model and mode to obtain a first-level matching result; According to the basic information of the cargo, the single volume, single weight, and stacking threshold are obtained, and matched with the loading space parameters and load-bearing parameters of the robot in the first-level matching result to obtain a matching robot, and the robot identity information, task status, and positioning information of the matching robot are extracted to generate the matching robot information set.

3. The method according to claim 2, characterized in that Extracting features from the matching robot information set includes: Based on the robot identity information, a system tracking code is obtained, and based on the system tracking code, the task status and positioning information of the task currently being performed by the robot are retrieved, wherein the task status includes task completion degree, current task execution operation, and task time period; Feature extraction is performed according to preset feature dimensions based on the task completion degree, current task execution operation, task time period, and positioning information to obtain the robot working characteristics.

4. The method according to claim 1, characterized in that The method further comprises: According to the task time period of the dynamic task and the task tolerance time of the matching robot's static task, an adaptation time period of the matching robot is obtained; Based on the adaptation time period of the matching robot, the dynamic task is decomposed into time periods to determine the matching robots corresponding to each time period; Dynamically assign tasks to the matching robots corresponding to each time and obtain a collaborative scheduling solution; Performing loss value evaluation on the collaborative scheduling scheme to obtain an optimal collaborative scheduling scheme, wherein the optimal collaborative scheduling scheme is a collaborative scheduling scheme with the smallest total loss value; Based on the loss value, the scheduling strategy is determined from the collaborative scheduling plan and the robot optimization plan for feedback.

5. A robot handling and dispatching system for warehousing logistics, characterized in that: The system comprises: A task parsing module, which is used to connect to the task management platform, obtain warehouse scheduling tasks, identify the attributes of the warehouse scheduling tasks, and determine the task types. The task types include static tasks and dynamic tasks. The static tasks are fixed tasks, and the dynamic tasks are randomly inserted tasks. A dynamic element extraction module is used to extract dynamic tasks for element extraction, and obtain task execution type, scheduling target location, task time period, and basic cargo information; A scheduling feature extraction module, which is used to extract task scheduling features according to the task execution type, scheduling target location, task time period, and basic cargo information according to preset feature dimensions; A matching and working feature module, wherein the matching and working feature module is used to connect to the robot management platform, match the task execution type, the basic information of the cargo and the basic information of the robot, determine a matching robot information set, the robot information set includes robot identity information, task status, and positioning information, perform feature extraction on the matching robot information set, wherein the extracted feature dimension corresponds to the preset feature dimension, and obtain the robot working feature; An optimization configuration module, wherein the optimization configuration module is used to establish a matching function relationship between the task scheduling characteristics and the robot working characteristics, and to construct an optimization space with the goal of minimizing the static task scheduling loss value; A constraint scheduling module, which is used to determine environmental restriction information according to the scheduling target position, set constraint conditions, add the constraint conditions to the optimization space, perform scheduling optimization on the scheduling task, and obtain scheduling strategy for feedback; Among them, the scheduling feature extraction module includes: An adjustment parameter determination unit is used to obtain adjustment parameters of the robot handling scheduling task, wherein the adjustment parameters are parameter information that the robot needs to adjust accordingly according to the task when performing the handling task, including moving speed, path navigation, load-bearing capacity, execution time and operation mode; A preset feature dimension unit, used to use each parameter dimension in the adjustment parameter as the preset feature dimension; A task scheduling feature unit is used to set an aggregation center based on the preset feature dimension, calculate the correlation between the task execution type, the scheduling target location, the task time period, and the basic information of the goods, merge the dimension information according to the correlation to obtain the aggregation result of the parameters of each dimension, and extract the feature parameters from the aggregation result to obtain the task scheduling feature; The optimization configuration module includes: A functional relationship fitting unit, used to establish a corresponding relationship between the task scheduling characteristics and the robot working characteristics, and to fit the robot working characteristics to complete the functional relationship of the task scheduling characteristics; A loss evaluation function unit is used to construct an energy loss function and a time loss function of the matching robot to insert into the dynamic task, and to combine the energy loss function and the time loss function according to the weights to construct a loss evaluation function; A scheme optimization unit, used for optimizing the matching robot selection scheme based on the functional relationship between the robot working characteristics and the task scheduling characteristics, with the minimum loss evaluation function as the optimization target; The constraint scheduling module includes: A target position unit, used to determine a target position for transporting goods and a transport destination position according to the dispatch target position; A path planning unit, used to plan a path for the target location and the destination location of the transported goods based on the warehouse electronic map, and obtain a path plan set; A path environment feature extraction unit, used to extract path environment features from the path solution set, and obtain environmental obstacles, environmental space restriction conditions, and control signal interference areas; A path plan screening unit is used to screen the path plan set according to the restriction strength of the environmental obstacles, environmental space restrictions, and control signal interference areas, set a preferred path, and the preferred path is the path with the smallest restriction strength. Based on the environmental obstacles, environmental space restrictions, and control signal interference areas existing in the preferred path, the environmental restriction information is obtained, and the preferred path is marked.