A method for energy diagnosis of large public buildings
Through sensors, the temperature inside and outside the building is collected, the operation of fresh air systems and air conditioning equipment is analyzed, and diagnostic signals are generated, which solves the problem of untimely monitoring of energy consumption in large public buildings, and realizes specific diagnosis of energy consumption abnormalities and effective energy management. Reduced energy waste.
Patent Information
- Application Number
- CN202410576361.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-05-10
AI Technical Summary
The untimely monitoring of energy consumption in large public buildings is difficult to determine the causes of energy waste and energy consumption abnormalities. The existing technology cannot immediately detect abnormal operation of air conditioning equipment, resulting in huge waste of energy resources.
The temperature inside and outside the building is collected through sensors, the temperature difference is calculated and the operating power of the fresh air system is analyzed. Combined with the operation of the air conditioning equipment, diagnostic signals are generated to avoid energy waste. Coordinated supervision units, hysteresis supervision analysis units, energy consumption statistics management units and diagnostic analysis are used to adopt coordinated supervision units, hysteresis supervision and analysis units, energy consumption statistics management units and diagnostic analysis units. The unit conducts a comprehensive analysis to generate a diagnostic alarm signal.
Timely monitoring of energy consumption in large public buildings and specific diagnosis of abnormal causes, avoiding energy waste caused by conflicts between fresh air systems and temperature control equipment, timely detect abnormal operation of air conditioning equipment, and reducing energy waste.
Smart Images

Figure CN118258101B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of energy conservation in large buildings, and in particular to an energy diagnosis method for large public buildings. Background Art
[0002] As global climate change intensifies, the issue of carbon emissions becomes increasingly prominent, and effective management and analysis of carbon emissions data has become the key to the development of the industry. With the continuous improvement of economic levels and per capita consumption levels, in the field of large buildings, such as large shopping malls, commercial areas and other large buildings, the natural ventilation effect of such large buildings is not very good. In order to provide customers with a more comfortable environment, the mall needs to use mechanical methods to achieve air flow inside the mall. However, these mechanical methods will naturally consume a lot of energy, and the total amount of energy consumed per day is huge. If energy is not monitored and managed, it will easily cause a huge waste of resources;
[0003] At present, the energy diagnosis method for large public buildings in the prior art is generally to manually check the energy consumption regularly. This checking method can only regularly find out whether the total energy consumption in the previous period is normal, but cannot accurately understand the cause or location of abnormal energy consumption, and cannot monitor the energy consumption in real time. As a result, when there is abnormal energy consumption, a huge amount of energy has often been consumed, which is not conducive to energy conservation and emission reduction of large buildings.
[0004] In view of the above technical problems, this application proposes a solution. Summary of the invention
[0005] In the present invention, the operating power of the fresh air system is intelligently analyzed according to the temperature difference between the inside and outside of the building, and the actual operating power of the fresh air system is compared. The influence of the operation of the fresh air system on the temperature control equipment is judged according to the comparison result, so as to avoid the conflict between the operation of the fresh air system and the temperature control equipment and cause a large amount of energy waste. At the same time, according to the operating power of the air-conditioning equipment and the change of the indoor temperature, the follow-up change of the air-conditioning power and the room temperature is analyzed to ensure that the abnormality of the air-conditioning power adjustment function can be discovered in time, so as to solve the problems that the diagnosis and monitoring of energy consumption of large buildings is not timely enough and the diagnosis of the cause of abnormal energy consumption is not specific enough, and an energy diagnosis method for large public buildings is proposed.
[0006] The purpose of the present invention can be achieved through the following technical solutions:
[0007] An energy diagnosis method for a large public building, the method comprising the following steps:
[0008] Step 1: Use sensors to collect the internal and external temperatures of the building, calculate the temperature difference based on the collected internal and external temperatures, calculate the ratio of the calculated temperature difference to the preset temperature difference, analyze the ratio, and determine the appropriate operating power of the building's fresh air system based on the ratio;
[0009] Step 2: Obtain the actual operating power of the current fresh air system of the building, compare the actual operating power with the appropriate operating power, and generate a fresh air system working diagnostic signal based on the comparison result;
[0010] Step 3: Collect the temperature inside the building in real time, compare the collected result with the preset temperature of the air-conditioning equipment in the building, obtain the real-time temperature difference between the temperature inside the building and the preset temperature, and collect the operating power of the air-conditioning equipment in real time to obtain the real-time operating power, perform correlation analysis on the real-time operating power and the real-time temperature difference, and generate the regulation hysteresis of the air-conditioning equipment;
[0011] Step 4: Collect energy consumption of multiple air-conditioning devices in the building, record the acquired energy consumption as individual energy consumption, analyze the individual energy consumption, obtain the individuals with excessively high or low energy consumption, record them as abnormal individuals, and generate fault signals for the abnormal individuals;
[0012] Step 5: Conduct a comprehensive analysis of the fresh air system working diagnostic signal, the air conditioning equipment's adjustment hysteresis signal and the fault signal, and generate a diagnostic alarm signal based on the analysis results.
[0013] As a preferred embodiment of the present invention, it also includes an energy diagnosis system for a large public building, including a coordination supervision unit, a hysteresis supervision analysis unit, a diagnosis analysis unit, and an energy consumption statistics management unit;
[0014] The coordination and supervision unit is used to collect the internal and external temperatures of the building, calculate the temperature difference between the internal and external temperatures, analyze the temperature difference between the internal and external temperatures, and determine the appropriate operating power of the fresh air system;
[0015] The hysteresis monitoring and analysis unit is used to collect the temperature in the building in real time, calculate the real-time difference between the temperature and the preset temperature value, and analyze the regulation hysteresis of the air-conditioning equipment according to the real-time difference and the change of the power of the air-conditioning equipment;
[0016] The energy consumption statistics unit can perform energy consumption analysis on multiple air-conditioning devices in the building and mark abnormal individuals according to the analysis results, wherein the abnormal individuals include high-energy-consuming devices and low-energy-consuming devices;
[0017] The diagnostic analysis unit is used to perform comprehensive analysis on the signal and generate an alarm reminder for the received signal, and eliminate the alarm reminder according to the progress of the maintenance operation.
[0018] As a preferred embodiment of the present invention, when collecting the temperature outside the building, the coordination and supervision unit collects the temperature of the building's outer wall surface and the air temperature outside the building at the same time, assigns different weight coefficients to the temperature of the building's outer wall surface and the air temperature outside the building respectively, and obtains the temperature outside the building through a weighted average formula. The coordination and supervision unit sets a temperature collection point on each floor of the building, performs arithmetic averaging on the temperatures of all temperature collection points to obtain the temperature inside the building, calculates the temperature difference between the temperature outside the building and the temperature inside the building, and divides the temperature difference by a preset temperature difference threshold to obtain the temperature difference ratio. The coordination and supervision unit generates the operating power ratio of the fresh air system through formula analysis, obtains the maximum operating power of the fresh air system and the minimum operating power to ensure normal air conditions in the building, calculates the difference between the maximum operating power and the minimum operating power, and records the product of the difference and the operating power ratio of the fresh air system as the power increase value, and records the sum of the minimum operating power to ensure normal air conditions in the building and the power increase value as the appropriate operating power of the fresh air system.
[0019] As a preferred embodiment of the present invention, the coordination and supervision unit obtains the current actual operating power of the fresh air system in the building, compares the actual operating power with the minimum operating power to ensure normal air conditions in the building, and generates a fresh air system fault alarm if the actual operating power is less than the minimum operating power; if the actual operating power is greater than or equal to the minimum operating power, the difference between the actual operating power and the suitable operating power of the fresh air system is calculated; if the difference between the actual operating power and the suitable operating power is greater than a preset threshold, a fresh air system power deviation signal is generated; if the difference between the actual operating power and the suitable operating power is less than or equal to the preset threshold, a fresh air system power normal signal is generated.
[0020] As a preferred embodiment of the present invention, the hysteresis supervision analysis unit obtains the temperature in the building, calculates the difference between the temperature in the building and the preset temperature of the air-conditioning equipment, records it as the real-time load temperature, and records the collected operating power of the air-conditioning equipment in the building as the real-time power;
[0021] The hysteresis supervision and analysis unit uses time as the horizontal axis and the real-time load temperature and the real-time power as the vertical axis to draw the real-time temperature curve and the real-time power curve. The hysteresis supervision and analysis unit selects the trough points on the real-time temperature curve and the trough points on the real-time power curve from right to left, records the trough point on the real-time power curve closest to the trough point on the real-time temperature curve as the corresponding trough point, calculates the time difference between the trough point of the real-time temperature curve and the corresponding trough point on the real-time power curve, and records it as the hysteresis time;
[0022] The hysteresis supervision and analysis unit calculates and obtains multiple groups of hysteresis times, and compares the multiple groups of hysteresis times with the preset allowed time, records the hysteresis time less than or equal to the allowed time as a qualified hysteresis point, and records the hysteresis time greater than the allowed time as an unqualified hysteresis point. The hysteresis supervision and analysis unit counts the number of unqualified hysteresis points and calculates the proportion of unqualified hysteresis points in all hysteresis points, and records it as the unqualified proportion. If the unqualified proportion is greater than the preset standard value, an adjustment hysteresis signal is generated. If the unqualified proportion is less than or equal to the preset standard value, an adjustment normal signal is generated.
[0023] As a preferred embodiment of the present invention, when the energy consumption statistics management unit collects energy consumption of the air-conditioning equipment, the energy consumption of the air-conditioning equipment is collected in a fixed manner, and the collected energy consumption of each air-conditioning equipment is recorded as individual energy consumption. The energy consumption statistics management unit performs arithmetic averaging on all individual energy consumptions to obtain average energy consumption. The energy consumption statistics management unit calculates the difference between the individual energy consumption and the average energy consumption, and records the absolute value of the calculated difference as the individual difference. The energy consumption statistics management unit records the ratio of the individual difference to the average energy consumption as the individual difference ratio, and records the air-conditioning equipment whose individual difference ratio is greater than the preset ratio and whose individual energy consumption is higher than the average energy consumption as high energy consumption equipment, and records the air-conditioning equipment whose individual difference ratio is greater than the preset ratio and whose individual energy consumption is lower than the average energy consumption as low energy consumption equipment. The energy consumption statistics management unit regards the high energy consumption equipment and the low energy consumption equipment as abnormal individuals, and generates a fault signal to send to the diagnosis and analysis unit.
[0024] As a preferred embodiment of the present invention, after the diagnosis and analysis unit simultaneously obtains the power deviation signal and the fault signal of the fresh air system, it generates a diagnosis result of the power deviation of the fresh air system. After the maintenance of the power deviation of the fresh air system is completed, a fault elimination signal is manually input. After the diagnosis and analysis unit obtains the fault elimination signal, if the power deviation signal and the fault signal of the fresh air system disappear at the same time, no response is made. If the power deviation signal of the fresh air system disappears but the fault signal still exists, the individual air-conditioning device that generates the fault signal is displayed.
[0025] The diagnostic analysis unit obtains the maintenance completion signal by manual input. After obtaining the maintenance completion signal, the diagnostic analysis unit monitors the adjustment hysteresis signal or the adjustment normal signal again. If the adjustment hysteresis signal is received again, a maintenance failure signal is generated. If the adjustment normal signal is received, no response is made to ensure the completion rate of the maintenance and adjustment of the air-conditioning equipment.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] 1. In the present invention, in large buildings, temperature control and fresh air systems in the buildings consume huge amounts of energy, and there is a conflict between the fresh air system and the temperature control in the building. The operation of the fresh air system will accelerate the heat exchange inside and outside the building. Therefore, in the present invention, the operating power of the fresh air system is intelligently analyzed according to the temperature difference between the inside and outside of the building, and the actual operating power of the fresh air system is compared. The impact of the operation of the fresh air system on the temperature control equipment is judged based on the comparison results, thereby avoiding conflicts between the operation of the fresh air system and the temperature control equipment and causing a large amount of energy waste.
[0028] 2. In the present invention, when the air-conditioning equipment is in operation, the dynamic changes of the air-conditioning power and the room temperature are analyzed according to the changes in the operating power of the air-conditioning equipment and the indoor temperature, to ensure that any abnormalities in the air-conditioning power regulation capacity during operation can be discovered in time, thereby avoiding energy waste caused by long-term high-load operation of the air-conditioning.
[0029] 3. In the present invention, the energy consumption of multiple devices in a building is monitored, and standardized and differentiated analysis is performed based on the monitored energy consumption. When an abnormality occurs in the air-conditioning equipment in the building, it can be discovered in time, thus avoiding energy waste caused by long-term operation of high-energy-consuming equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0031] Figure 1 is a system block diagram of the present invention;
[0032] Figure 2 It is a system flow chart of the present invention. DETAILED DESCRIPTION
[0033] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Embodiment 1:
[0035] See also Figure 1 - Figure 2 As shown, a method for energy diagnosis of a large public building comprises the following steps:
[0036] Step 1: Use sensors to collect the internal and external temperatures of the building, calculate the temperature difference based on the collected internal and external temperatures, calculate the ratio of the calculated temperature difference to the preset temperature difference, analyze the ratio, and determine the appropriate operating power of the building's fresh air system based on the ratio;
[0037] Step 2: Obtain the actual operating power of the current fresh air system of the building, compare the actual operating power with the appropriate operating power, and generate a fresh air system working diagnostic signal based on the comparison result;
[0038] Step 3: Collect the temperature inside the building in real time, compare the collected result with the preset temperature of the air-conditioning equipment in the building, obtain the real-time temperature difference between the temperature inside the building and the preset temperature, and collect the operating power of the air-conditioning equipment in real time to obtain the real-time operating power, perform correlation analysis on the real-time operating power and the real-time temperature difference, and generate the regulation hysteresis of the air-conditioning equipment;
[0039] Step 4: Collect energy consumption of multiple air-conditioning devices in the building through the energy consumption statistics management unit, record the multiple energy consumptions obtained as individual energy consumptions, analyze the individual energy consumptions, obtain the individuals with too high or too low energy consumption, record them as abnormal individuals, generate fault signals for the abnormal individuals, and send the fault signals to the diagnosis and analysis unit;
[0040] Step 5: The diagnostic analysis unit conducts a comprehensive analysis of the fresh air system working diagnostic signal, the air conditioning equipment's adjustment hysteresis signal and the fault signal, and generates a diagnostic alarm signal based on the analysis results.
[0041] Embodiment 2:
[0042] See also Figure 1 - Figure 2 As shown, an energy diagnosis method for a large public building includes a coordination supervision unit, a hysteresis supervision analysis unit, a diagnosis analysis unit, an energy consumption statistics management unit, and a review optimization unit. When the coordination supervision unit collects the temperature outside the building, it collects the temperature T1 of the building's outer wall surface and the air temperature T2 outside the building, and assigns a weight coefficient a to the temperature T1 of the building's outer wall surface and a weight coefficient b to the air temperature T2 outside the building. The temperature T outside the building is obtained by calculating the weighted average formula. When the coordination and supervision unit collects the temperature in the building, it sets a temperature collection point on each floor of the building, takes the arithmetic average of the temperatures of all the temperature collection points, obtains the temperature t in the building, calculates the temperature difference t between the temperature outside the building T and the temperature inside the building, and divides the temperature difference by the preset temperature difference threshold to obtain the temperature difference ratio. The coordination and supervision unit generates the operating power ratio X of the fresh air system through formula analysis. Where t0 is the preset temperature difference threshold, q is the preset weight coefficient, the coordination supervision unit obtains the maximum operating power of the fresh air system and the minimum operating power to ensure normal air conditions in the building, calculates the difference between the maximum operating power and the minimum operating power, and records the product of the difference and the fresh air system operating power ratio X as the power increase value, and records the sum of the minimum operating power to ensure normal air conditions in the building and the power increase value as the appropriate operating power of the fresh air system, so that the fresh air system can ensure air circulation in the building to avoid oxygen deficiency or harmful gas enrichment in the building, and can also avoid excessive heat exchange between the inside and outside of the building due to excessive ventilation speed of the fresh air system when the temperature difference between the inside and outside is large;
[0043] The coordination and supervision unit obtains the current actual operating power of the fresh air system in the building, and compares the actual operating power with the minimum operating power to ensure normal air conditions in the building. If the actual operating power is less than the minimum operating power, a fresh air system fault alarm is generated. If the actual operating power is greater than or equal to the minimum operating power, the difference between the actual operating power and the appropriate operating power of the fresh air system is calculated. If the difference between the actual operating power and the appropriate operating power is greater than a preset threshold, a fresh air system power deviation signal is generated. If the difference between the actual operating power and the appropriate operating power is less than or equal to the preset threshold, a fresh air system power normal signal is generated.
[0044] The hysteresis supervision and analysis unit also performs arithmetic averaging on the temperatures collected by the temperature collection points on each floor of the building to obtain the temperature in the building, calculates the difference between the temperature in the building and the preset temperature of the air-conditioning equipment, and records it as the real-time load temperature, and records the collected operating power of the air-conditioning equipment in the building as the real-time power. The hysteresis supervision and analysis unit uses time as the horizontal axis and the real-time load temperature and real-time power as the vertical axis to draw the real-time temperature curve and the real-time power curve. The hysteresis supervision and analysis unit selects the trough points on the real-time temperature curve and the trough points on the real-time power curve from right to left, records the trough points on the real-time power curve closest to the trough points on the real-time temperature curve as the corresponding trough points, and calculates the trough points of the real-time temperature curve and the corresponding trough points on the real-time power curve. The time difference between the two points is recorded as the hysteresis time. The hysteresis supervision and analysis unit calculates and obtains multiple groups of hysteresis times, and compares the multiple groups of hysteresis times with the preset allowed time. The hysteresis time less than or equal to the allowed time is recorded as a qualified hysteresis point, and the hysteresis time greater than the allowed time is recorded as an unqualified hysteresis point. The hysteresis supervision and analysis unit counts the number of unqualified hysteresis points and calculates the proportion of unqualified hysteresis points in all hysteresis points, and records it as the unqualified proportion. If the unqualified proportion is greater than the preset standard value, an adjustment hysteresis signal is generated. If the unqualified proportion is less than or equal to the preset standard value, a normal adjustment signal is generated, thereby testing the automatic variable frequency adjustment capability of the air conditioner to avoid energy waste caused by continuous high-power operation of the air conditioner due to abnormal automatic adjustment capability of the air conditioner.
[0045] When the energy consumption statistics management unit collects energy consumption of the air-conditioning equipment, it collects energy consumption of the air-conditioning equipment in a cycle of 24 hours, and records the collected energy consumption of each air-conditioning equipment as individual energy consumption. The energy consumption statistics management unit performs arithmetic averaging on all individual energy consumptions to obtain average energy consumption. The energy consumption statistics management unit calculates the difference between the individual energy consumption and the average energy consumption, and records the absolute value of the calculated difference as the individual difference. The energy consumption statistics management unit records the ratio of the individual difference to the average energy consumption as the individual difference ratio, and records the air-conditioning equipment whose individual difference ratio is greater than the preset ratio and whose individual energy consumption is higher than the average energy consumption as high energy consumption equipment, and records the air-conditioning equipment whose individual difference ratio is greater than the preset ratio and whose individual energy consumption is lower than the average energy consumption as low energy consumption equipment. The energy consumption statistics management unit regards the high energy consumption equipment and the low energy consumption equipment as abnormal individuals, and generates a fault signal to send to the diagnosis and analysis unit.
[0046] Embodiment 2:
[0047] See also Figure 1 - Figure 2As shown, after the diagnosis and analysis unit obtains the fault alarm of the fresh air system, it reminds the management personnel by means of sound and light alarm. After the diagnosis and analysis unit obtains the power deviation signal and the fault signal of the fresh air system at the same time, it determines that the fault signal is caused by the power deviation of the fresh air system, then the diagnosis and analysis unit generates a diagnosis result of the power deviation of the fresh air system, and sends the diagnosis result to the management personnel. After the management personnel completes the maintenance of the power deviation of the fresh air system, they manually input the fault elimination signal. After obtaining the fault elimination signal, if the power deviation signal and the fault signal of the fresh air system disappear at the same time, the diagnosis and analysis unit does not respond. If the power deviation signal of the fresh air system disappears, but the fault signal still exists, the individual air-conditioning equipment that generates the fault signal is sent to the management personnel, and the management personnel repair the individual air-conditioning equipment with the fault.
[0048] After the diagnostic analysis unit obtains the adjustment hysteresis signal, it sends the adjustment hysteresis signal to the management personnel. After the management personnel maintain the air-conditioning equipment, they manually input the maintenance completion signal. After the diagnostic analysis unit obtains the maintenance completion signal, it monitors the adjustment hysteresis signal or the adjustment normal signal again. If the adjustment hysteresis signal is received again, a maintenance failure signal is generated. If the adjustment normal signal is received, no response is made to ensure the completion rate of the maintenance and adjustment of the air-conditioning equipment.
[0049] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for energy diagnosis of large public buildings, characterized in that: The method comprises the following steps: Step 1: Use sensors to collect the internal and external temperatures of the building, calculate the temperature difference based on the collected internal and external temperatures, calculate the ratio of the calculated temperature difference to the preset temperature difference, analyze the ratio, and determine the appropriate operating power of the building's fresh air system based on the ratio; Step 2: Obtain the actual operating power of the current fresh air system of the building, compare the actual operating power with the appropriate operating power, and generate a fresh air system working diagnostic signal based on the comparison result; Step 3: Collect the temperature inside the building in real time, compare the collected result with the preset temperature of the air-conditioning equipment in the building, obtain the real-time temperature difference between the temperature inside the building and the preset temperature, and collect the operating power of the air-conditioning equipment in real time to obtain the real-time operating power, perform correlation analysis on the real-time operating power and the real-time temperature difference, and generate the regulation hysteresis of the air-conditioning equipment; Step 4: Collect energy consumption of multiple air-conditioning devices in the building, record the acquired energy consumption as individual energy consumption, analyze the individual energy consumption, obtain the individuals with excessively high or low energy consumption, record them as abnormal individuals, and generate fault signals for the abnormal individuals; Step 5: Comprehensively analyze the fresh air system working diagnosis signal, the adjustment hysteresis signal and the fault signal of the air conditioning equipment, and generate a diagnosis alarm signal according to the analysis results; Also included is an energy diagnosis system for a large public building, including a coordination supervision unit, a hysteresis supervision analysis unit, a diagnosis analysis unit, and an energy consumption statistics management unit; The coordination and supervision unit is used to collect the internal and external temperatures of the building, calculate the temperature difference between the internal and external temperatures, analyze the temperature difference between the internal and external temperatures, and determine the appropriate operating power of the fresh air system; The hysteresis monitoring and analysis unit is used to collect the temperature in the building in real time, calculate the real-time difference between the temperature and the preset temperature value, and analyze the regulation hysteresis of the air-conditioning equipment according to the real-time difference and the change of the power of the air-conditioning equipment; The energy consumption statistics unit can perform energy consumption analysis on multiple air-conditioning devices in the building and mark abnormal individuals according to the analysis results, wherein the abnormal individuals include high-energy-consuming devices and low-energy-consuming devices; The diagnostic analysis unit is used to perform comprehensive analysis on the signal and generate an alarm reminder for the received signal, and eliminate the alarm reminder according to the progress of the maintenance operation; When the coordination and supervision unit collects the temperature outside the building, it collects the temperature of the building's outer wall surface and the air temperature outside the building at the same time, assigns different weight coefficients to the temperature of the building's outer wall surface and the air temperature outside the building respectively, and obtains the temperature outside the building through a weighted average formula. The coordination and supervision unit sets a temperature collection point on each floor of the building, performs arithmetic averaging on the temperatures of all temperature collection points to obtain the temperature inside the building, calculates the temperature difference between the temperature outside the building and the temperature inside the building, and divides the temperature difference by a preset temperature difference threshold to obtain the temperature difference ratio. The coordination and supervision unit generates the operating power ratio of the fresh air system through formula analysis, obtains the maximum operating power of the fresh air system and the minimum operating power to ensure normal air conditions in the building, calculates the difference between the maximum operating power and the minimum operating power, and records the product of the difference and the operating power ratio of the fresh air system as the power increase value, and records the sum of the minimum operating power to ensure normal air conditions in the building and the power increase value as the appropriate operating power of the fresh air system; The hysteresis monitoring and analysis unit obtains the temperature in the building, calculates the difference between the temperature in the building and the preset temperature of the air-conditioning equipment, records it as the real-time load temperature, and records the collected operating power of the air-conditioning equipment in the building as the real-time power; The hysteresis supervision and analysis unit uses time as the horizontal axis and the real-time load temperature and the real-time power as the vertical axis to draw the real-time temperature curve and the real-time power curve. The hysteresis supervision and analysis unit selects the trough points on the real-time temperature curve and the trough points on the real-time power curve from right to left, records the trough point on the real-time power curve closest to the trough point on the real-time temperature curve as the corresponding trough point, calculates the time difference between the trough point of the real-time temperature curve and the corresponding trough point on the real-time power curve, and records it as the hysteresis time; The hysteresis supervision and analysis unit calculates and obtains multiple groups of hysteresis times, and compares the multiple groups of hysteresis times with the preset allowed time, records the hysteresis time less than or equal to the allowed time as a qualified hysteresis point, and records the hysteresis time greater than the allowed time as an unqualified hysteresis point. The hysteresis supervision and analysis unit counts the number of unqualified hysteresis points and calculates the proportion of unqualified hysteresis points in all hysteresis points, and records it as the unqualified proportion. If the unqualified proportion is greater than the preset standard value, an adjustment hysteresis signal is generated. If the unqualified proportion is less than or equal to the preset standard value, an adjustment normal signal is generated.
2. The energy diagnosis method for a large public building according to claim 1, characterized in that: The coordination and supervision unit obtains the current actual operating power of the fresh air system in the building, and compares the actual operating power with the minimum operating power to ensure normal air conditions in the building. If the actual operating power is less than the minimum operating power, a fresh air system fault alarm is generated; if the actual operating power is greater than or equal to the minimum operating power, the difference between the actual operating power and the suitable operating power of the fresh air system is calculated; if the difference between the actual operating power and the suitable operating power is greater than a preset threshold, a fresh air system power deviation signal is generated; if the difference between the actual operating power and the suitable operating power is less than or equal to the preset threshold, a fresh air system power normal signal is generated.
3. The energy diagnosis method for a large public building according to claim 1, characterized in that: When the energy consumption statistics management unit collects energy consumption of the air-conditioning equipment, it collects the energy consumption of the air-conditioning equipment in a fixed manner, records the collected energy consumption of each air-conditioning equipment as individual energy consumption, performs arithmetic averaging on all individual energy consumptions to obtain average energy consumption, calculates the difference between individual energy consumption and average energy consumption, records the absolute value of the calculated difference as individual difference, records the ratio of individual difference to average energy consumption as individual difference ratio, records air-conditioning equipment whose individual difference ratio is greater than a preset ratio and whose individual energy consumption is higher than the average energy consumption as high energy consumption equipment, and records air-conditioning equipment whose individual difference ratio is greater than a preset ratio and whose individual energy consumption is lower than the average energy consumption as low energy consumption equipment, the energy consumption statistics management unit regards high energy consumption equipment and low energy consumption equipment as abnormal individuals, and generates a fault signal to send to the diagnosis and analysis unit.
4. The energy diagnosis method for a large public building according to claim 1, characterized in that: After the diagnosis and analysis unit simultaneously obtains the power deviation signal and the fault signal of the fresh air system, it generates a diagnosis result of the power deviation of the fresh air system. After the maintenance of the power deviation of the fresh air system is completed, a fault elimination signal is manually input. After the diagnosis and analysis unit obtains the fault elimination signal, if the power deviation signal and the fault signal of the fresh air system disappear at the same time, no response is made. If the power deviation signal of the fresh air system disappears but the fault signal still exists, the individual air-conditioning device that generates the fault signal is displayed; The diagnostic analysis unit obtains the maintenance completion signal by manual input. After obtaining the maintenance completion signal, the diagnostic analysis unit monitors the adjustment hysteresis signal or the adjustment normal signal again. If the adjustment hysteresis signal is received again, a maintenance failure signal is generated. If the adjustment normal signal is received, no response is made to ensure the completion rate of the maintenance and adjustment of the air-conditioning equipment.