Coal mine water hazard holographic source modal early warning method and system based on GIS base
Through the GIS-based coal mine water damage holographic early warning system, a comprehensive early warning digital base and a real-time calculation system are constructed, which solves the problem of inversion and early warning of the original parameters of coal mine water damage, and achieves accurate early warning and effective prevention and control of coal mine water damage.
Patent Information
- Application Number
- CN202410400423.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-04-03
AI Technical Summary
Existing technology cannot realize all-round real-time inversion of the original parameters of coal mine water damage, relevant analysis modal analysis and advance warning, cannot accurately identify and manage the factors causing coal mine water damage, and lacks effective early warning and prevention support.
A holographic early warning system for coal mine water damage is built based on the GIS base, including a comprehensive early warning digital base, dynamic data access, real-time calculation and spatial analysis services, establishing an alarm threshold library, performing source parameter calculation and inversion, and achieving real-time alarm and advance warning.
It has achieved accurate early warning of water damage in coal mines, identified disaster factors in advance, provided transparent management and effective prevention and control support, and improved the ability to predict and prevent water damage accidents.
Smart Images

Figure CN118273768B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water hazard early warning and prevention, and in particular relates to a coal mine water hazard holographic original modal early warning method and system based on a GIS base. Background Art
[0002] As we all know, most mines have complex hydrogeological conditions, especially coal mines are seriously threatened by mine water hazards. With the continuous increase in the depth of coal resource mining, water hazards, as one of the major disasters in coal mines, are becoming more and more hidden and difficult to survey. Water accidents are becoming more and more prominent, and it is more difficult to accurately warn, predict and effectively prevent and control them. Over the years, in order to significantly reduce the personal injury and property losses caused by mine water hazards, provide a safe and healthy working environment for the majority of miners, and effectively solve the technical problems of accurate survey of coal mine water hazard factors, scientific evaluation of water hazard threats, advance prediction and effective prevention of water hazard accidents, many experts and scholars have invested a lot of time and energy, and proposed a series of new technologies and methods in different sub-fields, and obtained some new results, but there are still the following deficiencies: Due to the many factors affecting coal mine water hazards and the complex mechanism of water inrush, the existing technology cannot realize the all-round real-time inversion of coal mine water hazard source parameters, correlation analysis, monthly modal analysis, and advance warning calculation, nor can it realize the advance identification, transparent management, and accurate warning of coal mine water hazard factors, let alone provide technical support for the effective prevention and control of coal mine water hazards. Summary of the invention
[0003] In view of the defects of the prior art, the present invention provides a coal mine water hazard holographic origin modal early warning method and system based on a GIS base, which can effectively solve the above problems.
[0004] The technical solution adopted by the present invention is as follows:
[0005] The present invention provides a coal mine water hazard holographic origin modal early warning method based on a GIS base, comprising the following steps: Step 1, constructing a coal mine water hazard holographic all-round early warning GIS digital base, including: formulating contour lines of coal mine topography, stratum coal seams, aquifers, aquicludes, boreholes, faults, collapse columns, coal pillars, water-rich areas, water-gushing areas, stop mining lines, prohibited mining lines, slow mining lines, sensors, shaft and tunnel engineering, and hydrogeological geographic information system graphic specifications, entity model specifications and attribute data specifications of mining faces and goafs, and constructing a coal mine water hazard holographic all-round early warning GIS digital base;
[0006] Step 2, developing a holographic and omnidirectional dynamic data access system, through which the measured monitoring data of the monitoring system related to mine hydrology and water hazards are dynamically and real-time connected to the coal mine water hazard holographic and omnidirectional early warning GIS digital base; wherein the measured monitoring data includes data space information, location information and attribute information;
[0007] Step 3, establishing a real-time computing system, which converts the actual monitoring data measured by a number of real sensors into important water hazard characteristic parameters of key areas related to mine water hazards in real time by adding virtual sensors and computing methods;
[0008] Step 4: Establish a spatial analysis service computing system, which analyzes the important water hazard characteristic parameters to obtain the correlation between the disaster-causing factors of coal mine water hazards and the terrain information, meteorological information, geological information and production information of the entire coal mine, and provides a complete spatial analysis function for realizing accurate early warning of coal mine water hazards;
[0009] Step 5: Establish and automatically update the coal mine water hazard alarm and warning threshold library, use hydrological anomaly records, hydrogeological environment assessment, production process parameters and water hazard prevention and control requirements, and use historical big data analysis technology to determine various alarm thresholds and various graded warning thresholds, and formulate rules for the software system to automatically update the water hazard alarm and warning threshold library based on historical records and the degree of water hazard impact;
[0010] Step 6, calculation and inversion of coal mine water hazard origin and modal warning parameters: based on the coal mine water hazard holographic all-round warning GIS digital base, the measured monitoring data, the important water hazard characteristic parameters obtained by the real-time computing system, the analysis results obtained by the spatial analysis service computing system, and the coal mine water hazard alarm and warning threshold library, the coal mine water hazard origin parameters are calculated, inverted and modally analyzed, and advanced warning calculations are performed to obtain advanced warning information;
[0011] Step 7: Build a coal mine water hazard holographic modal early warning GIS platform to realize real-time alarm, modal analysis, advance warning, and information release, push and query of coal mine water hazards.
[0012] The present invention provides a coal mine water hazard holographic origin modal early warning system based on a GIS base, comprising a coal mine water hazard holographic all-round early warning GIS digital base, a holographic and all-round dynamic data access system, a real-time computing system, a spatial analysis service computing system, a coal mine water hazard alarm warning threshold library, a calculation and inversion module for coal mine water hazard origin and modal early warning parameters, and a coal mine water hazard holographic modal early warning GIS platform.
[0013] The coal mine water hazard holographic source modal early warning method and system based on the GIS base provided by the present invention has the following advantages:
[0014] The present invention provides a holographic origin modal early warning method and system for coal mine water hazards based on a GIS base, which develops a coal mine water hazard holographic modal early warning GIS platform by constructing a coal mine water hazard GIS digital base, a holographic and omnidirectional dynamic data access subsystem, a real-time computing service subsystem, a spatial analysis service computing subsystem, a water hazard alarm warning threshold library management and update subsystem, and a water hazard origin and modal early warning parameter calculation and inversion system, to achieve real-time alarm, modal analysis, advance warning of coal mine water hazards, and display, positioning, release, and push of information, thereby providing an effective solution for accurate early warning of coal mine water hazards. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A schematic diagram of the architecture of the coal mine water hazard holographic origin modal early warning system based on the GIS base provided by the present invention. DETAILED DESCRIPTION
[0016] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0017] Combination Figure 1 The present invention provides a coal mine water hazard holographic source modal early warning method based on a GIS base, comprising the following steps:
[0018] Step 1, construct a digital base for holographic and all-round early warning GIS for coal mine water hazards, including: formulating contour lines of coal mine topography, stratum coal seams, aquifers, impermeable layers, boreholes, faults, collapse columns, coal pillars, water-rich areas, water-gushing areas, stop mining lines, prohibited mining lines, slow mining lines, sensors, shaft and tunnel engineering, and hydrogeological geographic information system graphic specifications, entity model specifications and attribute data specifications for mining faces and goafs, and constructing a digital base for holographic and all-round early warning GIS for coal mine water hazards;
[0019] The coal mine water hazard holographic all-round early warning GIS digital base is based on 2DGIS, 3DGIS and 4DGIS technologies. By optimizing their functions, formulating technical specifications for layer management, element drawing and attribute configuration, a coal mine water hazard holographic all-round early warning GIS digital base integrating 2DGIS, 3DGIS and 4DGIS is built to meet the needs of water hazard monitoring and early warning. The coal mine water hazard holographic all-round early warning GIS digital base has the following characteristics:
[0020] 1) The coal mine water hazard holographic all-round early warning GIS digital base supports both C / S and B / S dual-architecture modes. The C / S mode is used for daily maintenance, and the B / S mode is used for information display, query, positioning, analysis, alarm, early warning, simulation and emergency dispatch. Among them, 2DGIS graphics can be automatically converted into SVG vector format for publication, and 3D models can be automatically converted into WEBGL for publication. Through attribute association, it can be published as two-dimensional and three-dimensional WEBGIS;
[0021] 2) Adopting the fusion technology of 2DGIS, 3DGIS and 4DGIS, daily maintenance takes the borehole, terrain, stratum floor contour, isopach, fault intersection, working face, goaf, water-rich area boundary and shaft-tunnel relationship in the C / S mode of 2DGIS as the operation object combined with attribute configuration, and the background automatically builds the 3D model of the relevant objects of borehole, terrain, stratum, structure, shaft-tunnel, chamber and water-rich area. By integrating the production information and the time factor of monitoring data, the real-time update of 2D graphics and 3D models is completed, thus reflecting the four-dimensional dynamic change characteristics of full-time and space information;
[0022] 3) For any specified plane coordinate point P (x, y), using 2DGIS or 3DGIS technology, it is possible to vertically query and calculate the terrain from the terrain surface to the deepest mining depth of the mine, as well as the floor elevation, thickness and inter-layer spacing of each coal seam, aquifer and impermeable layer;
[0023] 4) For any plane coordinate point P(x,y) in a tunnel, excavation face or mining face, the elevation and thickness of the coal seam floor of the plane coordinate point P(x,y) and the occurrence and the closest distance of the surrounding rock formations, faults, fold axes, coal pillars, water-rich areas, water accumulation lines, stop-mining lines, and forbidden-mining lines can be calculated using 2DGIS or 3DGIS technology;
[0024] 5) Using 2DGIS or 3DGIS technology, spatial simulation of water inrush and well flooding and optimization calculation of spatial disaster avoidance routes can be performed;
[0025] 6) To facilitate routine maintenance and updating of 2DGIS, the graphic specifications stipulate that geometric elements should be used for drawing, including points, lines, polylines, splines or polylines; for the tunneling head and the mining face, point symbols and straight lines are used respectively, and the 3D model is automatically updated each time the position is updated by simply dragging;
[0026] 7) Configure relevant standard attribute data structures for various pixel objects of GIS. For 2DGIS or 3DGIS, all pixel objects are associated with static attributes and dynamic attributes, providing complete spatiotemporal information support for spatial analysis, hidden attribute inversion, alarm and early warning calculations.
[0027] Step 2, developing a holographic and omnidirectional dynamic data access system, through which the measured monitoring data of the monitoring system related to mine hydrology and water hazards are dynamically and real-time connected to the coal mine water hazard holographic and omnidirectional early warning GIS digital base; wherein the measured monitoring data includes data space information, location information and attribute information;
[0028] The measured monitoring data that can be dynamically accessed in real time includes production, detection, testing, testing, and monitoring data; the specific features are:
[0029] 1) Access to all measured monitoring data of monitoring systems related to mine hydrology and water hazards, including rainfall monitoring, surface water flow monitoring, surface water level monitoring, surface water velocity monitoring, surface water flow section monitoring, water level and water temperature monitoring of long observation holes, water inflow monitoring, drainage monitoring, water quality monitoring, surface subsidence monitoring, mine pressure monitoring, ground stress monitoring, separation monitoring, rock movement monitoring, microseismic monitoring, drainage pressure and drainage volume monitoring of drainage projects, drainage pressure and drainage volume monitoring of water discharge projects, water level, depth reduction and flow monitoring of pumping tests. All the measured monitoring data accessed have three-dimensional coordinate information, time information, parameter dimensions and their environmental size parameters for data conversion;
[0030] 2) For mining projects, if there are automatic monitoring facilities, the position, section, advancement speed, support parameters, and goaf filling method and filling rate information of the working face can be dynamically accessed; if there are no automatic monitoring facilities, the manual measurement and measurement data can be dynamically input and converted into the position, section, and mining height data of the working face, so as to achieve accurate spatial positioning and reveal the stratum boundary information;
[0031] 3) For water quality data, water quality parameters are collected through the water quality online monitoring system, including temperature, pH value, residual chlorine, conductivity, and turbidity; at the same time, mine water quality test indicators are added to the aquifer and water gushing point attributes of various water-rich areas, including temperature, turbidity, pH, conductivity, solidified matter, total hardness, K + 、Na + , Ca 2+ Mg 2+ , Cl - 、SO4 2- 、HCO3 - , CO2, O2, Rn, NO3 and isotopes;
[0032] 4) For ground and underground drilling projects, it is necessary to access the opening coordinates of each borehole, the formation name, depth, length, lithology, conductivity, gamma, artificial gamma and inclinometric information of each section;
[0033] 5) For water exploration and drainage projects, access the opening coordinates of each water exploration and drainage borehole, the formation name, depth, length, lithology, conductivity, gamma, artificial gamma and inclinometric information of each section;
[0034] 6) For the pumping test, access the opening position, well depth, diameter, aquifer name, water-rich area name, static water level of each test well, as well as the real-time data and historical records of flow rate and water level drawdown during the pumping test;
[0035] 7) For geophysical exploration projects, access the coordinates of the detection base point, the azimuth and inclination of the starting line of each scanning surface, the azimuth and inclination of the ending line, the scanning depth, and the resistivity, wave velocity, gamma, artificial gamma and other radioactive parameters at each point or line on the scanning surface;
[0036] 8) For aquifers, it is necessary to access the average stable static water level, water temperature, permeability coefficient, influence radius of different regions and seasons, as well as the dynamic water level, flow direction, flow pattern and dynamic water quality test parameters of each measuring point;
[0037] 9) For the coal seam roof and floor and impermeable layer, it is necessary to configure the elastic model, compressive strength, density, cohesion, internal friction angle, Poisson's ratio, pressure coefficient, dynamic failure time mechanical parameters, as well as the change values of the caving zone, fracture zone, bending zone, floor failure depth, stress peak and position during the advancement of the working face.
[0038] Step 3, establishing a real-time computing system, which converts the actual monitoring data measured by a number of real sensors into important water hazard characteristic parameters of key areas related to mine water hazards in real time by adding virtual sensors and computing methods;
[0039] Preprocessing is performed on the measured monitoring data accessed by the dynamic data access system, including:
[0040] 1) For different sensors, according to their type, installation location, installation method, sensitivity and system error calibration results, set the time window, obtain the average value of the monitoring data within the time window through filtering and anti-drift technology, and then convert the average value of the monitoring data into a practical value through the correction formula;
[0041] 2) Add virtual sensors and calculation formulas to perform real-time calculations on dimensional conversion of monitoring data;
[0042] 3) Add or reduce virtual sensors and calculation formulas, define the real-time calculation formulas for the working face, mining area, water inflow point and the whole mine water inflow according to the mine water flow network and water flow path, and use the monitoring value or conversion value to calculate the water inflow of each working face, mining area and the whole mine in real time, as well as the drainage volume of each water tank and the drainage volume of the drainage project;
[0043] 4) Using the geological model and its mechanical parameters, the fracture circle radius and compression circle radius of each microseismic event are calculated in real time, so as to track the evolution and formation process of the water channel, calculate the pressure cycle and pressure intensity of the working face roof in real time, and predict the next pressure position or time of the working face, the bottom plate damage depth and the height of the lifting zone, as well as the height of the roof caving zone and fracture zone.
[0044] The radius of the fracture circle and the radius of the compression circle of the microseismic event are calculated in the following way:
[0045] Assuming that the location of the monitored microseismic event is W (x, y, z), the released energy is E, E is converted into the explosion volume of TNT explosives, and then the mechanical properties of the formation where the point W (x, y, z) is located are obtained by using GIS analysis and attribute query functions, so as to calculate the radius of the fracture circle and the radius of the compression circle generated by the microseismic event. The specific process is as follows:
[0046] 1) Using the released energy E, the formula Get the charge weight G;
[0047] 2) Using charge weight G and charge density ρ0, the formula Get the charge volume V;
[0048] 3) Using the charge volume V, the formula Get the charge radius R b ;
[0049] 4) Use the formula Get the radius R of the compression circle c ;
[0050] Where: D-detonation velocity; ρ s - rock density; C p - longitudinal wave velocity; σ c -compressive strength; σ0 is an intermediate variable, and the calculation formula is:
[0051] 5) Use the following formula to get the radius of the crack circle R p :
[0052]
[0053] Where: μ-Poisson's ratio of surrounding rock; λ is the first intermediate variable, and the calculation formula is: μ is the Poisson's ratio of the surrounding rock; a is the second intermediate variable, and the calculation formula is: P2a is the third intermediate variable, and the calculation formula is P2=0.5ρ0D 2 ρ s / (ρ s C p +ρ0D);
[0054] The radius of the crack circle R is calculated from this p .
[0055] Step 4: Establish a spatial analysis service computing system, which analyzes the important water hazard characteristic parameters to obtain the correlation between the disaster-causing factors of coal mine water hazards and the terrain information, meteorological information, geological information and production information of the entire coal mine, and provides a complete spatial analysis function for realizing accurate early warning of coal mine water hazards;
[0056] In step 4, the correlation between the disaster-causing factors of coal mine water hazards and the terrain information, meteorological information, geological information and production information of the entire coal mine is obtained, providing a complete spatial analysis function for realizing accurate early warning of coal mine water hazards, specifically:
[0057] 1) Spatial distance analysis
[0058] For any spatial point Q(x,y,z), especially any spatial point in the tunneling head or mining face, the spatial distance analysis function is used to calculate the shortest distance from the spatial point Q(x,y,z) to any fault intersection line, fault intersection surface, coal pillar line, stop mining line, water accumulation line, slow mining line, and forbidden mining line, providing background services for the dangerous distance warning of the mining face;
[0059] There are two cases for spatial distance analysis:
[0060] (3) Calculate the plane distance from the plane point P(x,y) of the spatial point Q(x,y,z) to the nearest point J(x1,y1) of the fault intersection line, fault intersection surface, coal pillar line, mining stop line, water accumulation line, slow mining line, and mining ban line, and then use the elevation attributes of the bottom plate contour lines and the strike attributes of the fault intersection lines in the two-dimensional graphics of the coal mine water hazard holographic all-round early warning GIS digital base to calculate the bottom plate elevation z1 corresponding to point J(x1,y1), thereby calculating the true slope distance from the spatial point Q(x,y,z) to point J(x1,y1);
[0061] (4) For fault planes, coal pillars, and waterlogged areas with three-dimensional models, the distance calculation method from a spatial point to a surface is used to directly calculate the shortest distance from a spatial point Q (x, y, z) to the three-dimensional surface of the fault plane, coal pillar, or waterlogged area;
[0062] 2) Analysis of stratigraphic relationships
[0063] Using the graphic specifications, entity model specifications and attribute data specifications developed in step 1, for any plane point P(x,y) in any mined coal seam, especially any plane point in the tunneling head or mining face, the layer analysis function is used to quickly calculate the floor elevation and thickness of the coal seam at this point, as well as the floor elevation and thickness of each impermeable layer and aquifer downward, and the floor elevation and thickness of each impermeable layer and aquifer upward, until the corresponding ground elevation. At the same time, the layer relationship between the coal seam and the stratum is analyzed to provide background services for the three-map-double prediction method and the five-map-double prediction method in water hazard early warning;
[0064] Among them: Use one of the following two methods to obtain the bottom elevation and thickness of a certain stratum C corresponding to the plane point P (x, y):
[0065] (3) Using the contour elevation attributes of the bottom plate contour layer of layer C in the two-dimensional GIS map, the bottom plate elevation corresponding to point P (x, y) is calculated using contour search and distance weighted interpolation algorithm;
[0066] (4) Using the thickness contour attribute of the thickness contour layer of the stratum C in the two-dimensional GIS map, the thickness corresponding to the point P (x, y) is calculated using the contour search and distance weighted interpolation algorithm;
[0067] 3) Analysis of formation occurrence and working face morphology
[0068] Using standardized GIS graphics, given any polygonal plane area W, the bottom plate elevation and thickness, regional area, average thickness, dip and dip parameters of any stratum at the boundary point of the polygonal plane area W are calculated; similarly, the mining depth, dip, oblique length, and advancement distance from the last to the current position and mining volume parameters of any excavation face and mining face are calculated;
[0069] Among them, the polygonal plane area W of any working surface, the digital base and the layer relationship analysis method are used to calculate the bottom plate elevation and thickness corresponding to the boundary points of the polygonal plane area W, and the coordinate values of the boundary points of the polygonal plane area W can be obtained, which are expressed as: (x1, y1, z1, h1), (x2, y2, z2, h2), ..., (x n ,y n ,z n ,h n ); where x1, y1, z1, h1 represent the 3D coordinates and thickness of the first boundary point, x2, y2, z2, h2 represent the 3D coordinates and thickness of the second boundary point, and so on. n ,y n ,z n ,h n Represents the three-dimensional coordinates and thickness of the nth boundary point;
[0070] Then, the bottom plate elevation contour lines in the polygonal plane area W are obtained by interpolation, and then the area, average thickness, inclination and dip angle of the area are calculated; then, the topographic contour lines and the strike and dip direction angles of each working face are used to obtain the mining depth, dip angle and oblique length;
[0071] 4) Flood simulation and disaster avoidance route analysis
[0072] By using the drawing specifications and attribute information of the tunnel connection relationship layer, for any given water inrush point T, the entire well flooding process starting from the water inrush point T is simulated according to the spatial analysis and network analysis algorithms, and the tunnels flooded by the water flow are recorded. Then, the escape route of any point in the well tunnel is given. This function can also provide decision support for the formulation of emergency plans for water inrush;
[0073] 5) Watershed and fold analysis
[0074] Using the terrain contour layer and the aquifer floor contour layer, the ridge and valley runoff lines in the topography and the syncline and anticline axes of the aquifer are calculated through watershed and fold analysis, providing a decision-making basis for surface water monitoring and flood prevention and early warning, as well as underground aquifer water level monitoring and water inflow prediction;
[0075] Among them, the method of finding the intersection of parallel straight lines and contour lines is used to calculate the sequence of intersection points of each line, and then the concave-convex connection method is used to trace the ridge and valley runoff routes in the topography and the syncline and anticline axes of the aquifer;
[0076] 6) Auxiliary analysis technology
[0077] Spatial analysis also includes distance measurement, area calculation, shortest path analysis, and continuous calculation services of horizontal distance, slope distance, height difference, and orientation of any multi-point sequence of strata and shafts.
[0078] Step 5: Establish and automatically update the coal mine water hazard alarm and warning threshold library, use hydrological anomaly records, hydrogeological environment assessment, production process parameters and water hazard prevention and control requirements, and use historical big data analysis technology to determine various alarm thresholds and various graded warning thresholds, and formulate rules for the software system to automatically update the water hazard alarm and warning threshold library based on historical records and the degree of water hazard impact;
[0079] Step 5 is as follows:
[0080] 1) For the real sensor real-time data of each installation location, the red, orange, yellow and blue four-level alarm thresholds are set with reference to the normal value range; the real sensor real-time data includes surface water flow, long-view hole water level, long-view hole water temperature, rainfall, gushing ditch flow, drainage pipeline flow, and water tank water level;
[0081] 2) For the real-time calculation data of the virtual sensor, the red, orange, yellow and blue four-level alarm thresholds are set with reference to the normal value range; the real-time calculation data of the virtual sensor includes the mine rainfall, the mine water inflow, the mine drainage, the total energy of microseismic, the working face roof pressure cycle, the pressure intensity, the next pressure position or pressure time, the bottom plate damage depth and the guide belt height, and the roof caving belt and fracture belt height;
[0082] 3) According to the geological strata, structural geological environment, hydrogeological environment, mining technology and advance detection conditions of different working faces, set the red, orange, yellow and blue four-level warning thresholds of the spatial calculation length of the up and down, front and back, left and right distances from geological structures, water-rich areas, protective coal pillars, stop mining lines, prohibited mining lines, mining lines, stress concentration areas and gas accumulation areas;
[0083] 4) According to the pressure coefficient obtained from the test of the upper and lower impermeable layers of the working face, the red, orange, yellow and blue four-level warning thresholds are set according to the ratio of the water inrush coefficient to the pressure coefficient.
[0084] Step 6, calculation and inversion of coal mine water hazard origin and modal warning parameters: based on the coal mine water hazard holographic all-round warning GIS digital base, the measured monitoring data, the important water hazard characteristic parameters obtained by the real-time computing system, the analysis results obtained by the spatial analysis service computing system, and the coal mine water hazard alarm and warning threshold library, the coal mine water hazard origin parameters are calculated, inverted and modally analyzed, and advanced warning calculations are performed to obtain advanced warning information;
[0085] In step 6, the modal analysis is performed including:
[0086] 1) Correlation analysis
[0087] On the basis of GIS, according to the production progress and location information of the mining face, various monitoring data related to water hazards and historical curve big data, the correlation analysis algorithm is used to continuously calculate the correlation between the water inflow and rainfall at each location, the correlation between the water inflow and the excavation footage and the mining area at each location, the correlation between the water inflow and the water level drop of each aquifer, the correlation between the water inflow and the exploration and release volume, the correlation between the drainage volume and the water inflow, the correlation between the water inflow and the mine pressure stress, the correlation between the water inflow and the microseismic energy density, and the correlation between the water quality of each water inflow point and the water quality of each aquifer rich area; Among them, the correlation analysis algorithm can handle the lag time, including calculating the lag time between the peak value of the water inflow and the peak value of the rainfall, or obtaining that the water inflow at a certain location is weakly correlated or uncorrelated with the rainfall, so that the rainfall monitoring value can be used to predict the water inflow at each location in advance, providing a basis for decision-making on drainage and water hazard prevention and control;
[0088] If the correlation analysis between water inflow and rainfall includes:
[0089] Assume that the rainfall sequence in the analyzed time interval is Q = {x0(1), x0(2), ..., x0(n0)}, and the water inflow sequence is P = {y0(1), y0(2), ..., y0(n0)}, and take an integer n < n0; where: x0(1), x0(2), ..., x0(n0) are the values of the 1st to n0th rainfall; y0(1), y0(2), ..., y0(n0) are the values of the 1st to n0th water inflow;
[0090] For i = 1, 2, ..., (n0-n), and j = 0, 1, ..., (n0-ni), we get the subsequence Q i and subsequence P j :
[0091] Q i ={x(1),x(2),…,x(n)}={x0(i),x0(i+1),…,x0(i + n)}
[0092] P j ={y(1),y(2),…,y(n)}={y0(i+j),x0(i+j+1),…,x0(i+j+n)}
[0093] Calculate the subsequence Q i The mean And the subsequence P j The mean
[0094] Using the following formula, we get the subsequence Q i and subsequence P j The covariance A of the subsequence Q i The variance B and subsequence P j The variance C is:
[0095]
[0096] Using the following formula, we get the subsequence Q i and subsequence P j The correlation coefficient X ij :
[0097] Thus, the correlation index g between the rainfall series Q and the water inflow series P is calculated:
[0098] g=min{X ij |i=1,2,…,(n0-n).j=0,1,…,(n0-ni)}
[0099] If g<0.2, it means no correlation; if 0.2≦g<0.4, it means weak correlation; if 0.4≦g<0.6, it means moderate correlation; if g≧0.6, it means strong correlation;
[0100] 2) Trend forecast analysis
[0101] For any historical data monitored by real sensors or virtual sensors, as well as environmental and meteorological change factors, exponential smoothing, grey theory or artificial neural network big data analysis algorithms are used, combined with correlation analysis results, to predict the values that the sensor monitoring parameters may reach in multiple time periods in the future, including: water inflow prediction at each location, water level prediction of aquifers, drainage prediction, and height and depth prediction of damage to the top and bottom plates of the working face, providing a basis for water early warning and flood control decision-making;
[0102] For water inflow prediction, the methods of quadratic exponential smoothing, grey prediction or artificial neural network prediction include:
[0103] (1) Secondary exponential smoothing method:
[0104] The water flow sequence of a water inflow location N periods before the prediction period is {x(1), x(2), …, x(N)}. The quadratic exponential smoothing algorithm is used to predict the Nth period. + The water inflow in M periods Among them, M is the period to be predicted starting from N periods, and the method is:
[0105] Let α be the final trend weight coefficient, 0.2 < α < 0.7, then the calculation method is:
[0106] Let the initial value be: y u (0) = x(1), y v (0) = x(1); where y u (0) is the initial value used to calculate the smoothed intermediate sequence; y v (0) is the initial value used to calculate the secondary smoothing intermediate sequence
[0107] s = 1 to N, execute the following loop:
[0108] y u (s) = αx(s) + (1-α)y u (s-1);
[0109] y v (s) = αy u (s)+(1-α)y v (s-1);
[0110] This gives a smoothed intermediate sequence y u(1),y u (2),...,y u (N); Secondary smoothed intermediate sequence y v (1),y v (2),...,y v (N);
[0111] Use the following formula to calculate the fitting coefficient a and the fitting coefficient b:
[0112] a=2y u (N)-y v (N)
[0113]
[0114] According to the formula The water inflow in the N+Mth period is predicted
[0115] In the present invention, in order to achieve better prediction effect of the quadratic exponential smoothing method, the value of α is adaptively adjusted using the aquifer pumping test results and rainfall monitoring records. For example, when the aquifer is in a stable flow and the rainfall fluctuation is not large, α can be 0.3, and when the aquifer is in an unsteady flow or the rainfall fluctuation is large, α can be 0.6.
[0116] (2) Grey prediction method:
[0117] For the water inflow at the inflow point in the water-rich area or aquifer without rainfall for a long time or frequent recharge, the following grey prediction method is used for prediction:
[0118] Step A: GM(1,1) modeling
[0119] Step A1: Record the original water inflow data sequence as: x (0) ={x (0) (I)}, where, I=1,2,...,K;
[0120] According to the formula Get the first-order cumulative sequence x (1) ={x (1) (I)}, where, I=1,2,...,K;
[0121] Step A2: Calculate the coefficient vector of the differential equation
[0122]
[0123] in:
[0124]
[0125] Y=(x(0) (2) x (0) (3) … x (0) (K) T
[0126] in:
[0127] B: Find the coefficient matrix of the least squares linear equations of the differential equation coefficients of the GM(1,1) model;
[0128] Y: the right-hand coefficient vector of the least squares linear equation system for finding the coefficients of the GM(1,1) model differential equation;
[0129] a0: the first coefficient of the differential equation;
[0130] u0: the second coefficient of the differential equation;
[0131] Step A3: Get the differential equation dynamic model Get the differential equation time response function Where, t=0,1,...,(N-1);
[0132] Therefore, according to the differential equation time response function, the back-substitution value is obtained
[0133] According to the following formula, the restored value of each original water inflow data is obtained
[0134] Step B: Residual GM(1,1) modeling
[0135] Step B1: Find the first-order cumulative sequence x obtained in step A1 (1) The residual ε between (I) and the restored value of the original water inflow data obtained in step A3 (0) (I) This gives the residual sequence ε (0) (1),ε (0) (2),...,ε (0) (K);
[0136] Step B2: If the minimum value in the residual sequence If it is less than 0, the horizontal axis will be moved down Get a non-negative residual sequence, that is If it is not less than 0, then directly set in, represents non-negative residual;
[0137] Step B3: Use Replace the first-order cumulative sequence x in step A1 (1) ={x (1)(I)}, establish the residual GM(1,1) model, and obtain the back-substitution calculation value Further restore value
[0138] Step B4: If the horizontal axis is moved down in step B2, the restored value Move the horizontal axis up Right now: Get the corrected restoration value Otherwise, restore the value directly As a corrected restoration value
[0139] Step B5: Use the following formula, using the modified reduction value Correction Get the corrected value
[0140]
[0141] Step B6: Check whether the accuracy meets the requirements. If not, use replace Repeat the residual modeling until it meets the requirements; assuming that m0 residual modeling is performed, the calculated value of the original water inflow data is for:
[0142]
[0143] Step C: Prediction:
[0144] After step A and step B, the final differential equation time response function is output Using the differential equation time response function, input the time t value to be predicted and get the predicted value
[0145] (3) Artificial neural network prediction method:
[0146] The characteristic of artificial neural network prediction of water inflow lies in the selection of input factors. Taking the prediction of water inflow of a mining face as an example, the input factors for the prediction of water inflow of a mining face are the monitoring values of daily water inflow x(1), x(2), ..., x(n) on the n dates before the prediction date plus the cumulative advancement distance D of the working face, the annual cumulative rainfall Q, and the date R (a 4-digit integer of the month and day, which cannot contain the year), a total of n+3 input factors, and the output is the daily water inflow of the predicted day, thus taking into account the water inflow law of the working face, as well as the changes in the spatial position, advancement speed, seasonal climate and rainfall of the working face; and with the continuous accumulation of monitoring data samples of the working face, the model training accuracy is continuously improved, so that the accuracy of the prediction will also be continuously improved;
[0147] For any prediction item, the quadratic exponential smoothing method, grey prediction and artificial neural network prediction can be used simultaneously. Finally, the most appropriate prediction method can be adaptively selected through error analysis between the actual monitoring value and various prediction values.
[0148] 3) Water inflow modal warning
[0149] The water inflow situation warning mainly uses the historical data obtained by the virtual sensors of mine water inflow, mining area water inflow or working face water inflow, and refers to the previous similar geological conditions, correlation analysis and trend prediction results, as well as the possibility of water inrush and water seepage in the future period and the degree of danger to safe production, to establish the corresponding modal warning curve model, and realize blue, yellow, orange and red graded warnings according to the relative relationship between the modal warning curve model and the current water inflow monitoring value;
[0150] 4) Danger distance warning
[0151] According to the current position of the mining face on the GIS graphics, through the spatial analysis algorithm, the dangerous distance of the nearest aquifer and water-rich area above the working face, the dangerous distance of the nearest aquifer and water-rich area below the working face, the dangerous distance of the nearest aquifer and water-rich area around the working face, and the nearest distance from the mining face to the fault, collapse column, protective coal pillar, fold axis, stop mining line, warning line, water accumulation line, slow mining area, and forbidden mining area are searched, and blue, yellow, orange and red graded warnings are implemented according to the warning indicators;
[0152] 5) Water conductivity warning of roof and bottom plates
[0153] According to the monitoring or calculated values of the floor damage depth, lifting zone height, caving zone, fracture zone, bending zone and surface subsidence corresponding to the current position of the mining face on the GIS graphics, the degree of damage to the roof and floor aquicludes and the thickness of the effective aquicludes are analyzed in combination with the source layer, energy and density of microseismic monitoring. Then, according to the location and water-richness of each water-rich area and the water quality parameters of the water-rich area and the water-gushing point, the possibility of water conduction in the roof and floor is calculated to achieve blue, yellow, orange and red graded warnings;
[0154] 6) Double coefficient warning
[0155] According to the current position of the mining face on the GIS graphics and the position and water level monitoring of the long observation holes of each aquifer, the water level distribution and water pressure distribution of each aquifer are inverted in real time, especially the water pressure of the top and bottom water of the working face. The thickness of the top and bottom water-proof layer of the working face is calculated using the spatial analysis function. The thickness of the top and bottom water-proof layer of the working face is then calculated using the bottom plate damage depth, the height of the guide belt, the caving zone, and the fracture zone. The effective water-proof thickness, or the damage coefficient of the top and bottom water-proof layer of the working face is calculated using the microseismic monitoring results, thereby calculating the water inrush coefficient Ts of the top and bottom water. According to the ratio of the water inrush coefficient Ts to the corresponding pressure coefficient Ds, blue, yellow, orange and red graded warnings are implemented;
[0156] 7) Analysis and early warning of water source
[0157] For the water inflow volume and water quality monitoring and analysis results of any water inflow point, the MSIM multi-source water outflow identification model is used to identify the proportion of each water source in the water inflow volume of the water inflow point based on the water quality monitoring and water quality analysis data of water-rich areas and aquifers. According to the change of the proportion, especially for water sources whose proportion changes from zero to large, blue, yellow, orange and red graded warnings are implemented according to the speed of change of the proportion;
[0158] 8) Water detection warning
[0159] According to the current position of the mining face on the GIS graphics, the spatial analysis technology is used to search for the water-rich areas and water-richness around the working face. Then, based on the actual records of the water exploration and release project and the spatial position of each borehole, the spatial relationship between the water exploration project and the excavation face is calculated. If there is a suspicious water-rich area in front of the excavation face and no advance exploration is carried out, a blue, yellow, orange and red graded warning is implemented according to the distance from the water exploration project to the excavation face;
[0160] 9) Multi-factor credit enhancement warning
[0161] Based on the graded warning results of six factors, the warning value corresponding to blue is 0.2, the warning value corresponding to yellow is 0.4, the warning value corresponding to orange is 0.6, the warning value corresponding to red is 0.8, and the warning value that does not reach the blue warning level is 0; the multi-factor comprehensive warning value is calculated using the credit enhancement method, and a four-color comprehensive warning is issued according to the comprehensive warning value according to 0.2, 0.4, 0.6 and 0.8.
[0162] Step 7: Build a coal mine water hazard holographic modal early warning GIS platform to realize real-time alarm, modal analysis, advance warning, and information release, push and query of coal mine water hazards.
[0163] Step 7 is specifically as follows: to achieve advanced identification and transparent management of coal mine water hazard-causing factors, advanced and accurate early warning of coal mine water hazards, and to find the root cause of coal mine water hazards through the calculation and inversion of source and modal early warning parameters, so as to provide technical support for the effective prevention and control of coal mine water hazards.
[0164] The present invention also provides a coal mine water hazard holographic origin modal early warning system based on a GIS base, including a coal mine water hazard holographic and all-round early warning GIS digital base, a holographic and all-round dynamic data access system, a real-time computing system, a spatial analysis service computing system, a coal mine water hazard alarm and early warning threshold library, a calculation and inversion module for coal mine water hazard origin and modal early warning parameters, and a coal mine water hazard holographic modal early warning GIS platform.
[0165] An embodiment is described below:
[0166] The present invention provides a holographic origin and modal warning method and system for coal mine water hazards based on a GIS base. By constructing a coal mine water hazard GIS digital base construction and update subsystem, a holographic and omnidirectional dynamic data access subsystem, a real-time computing service subsystem, a spatial analysis service computing subsystem, a water hazard alarm warning threshold library management and update subsystem, and a water hazard origin and modal warning parameter calculation and inversion system, a coal mine water hazard holographic modal warning GIS platform is developed to achieve real-time alarm, modal analysis, advance warning, and information display, positioning, release, and push of coal mine water hazards. This provides an effective solution for accurate early warning of coal mine water hazards. Figure 1 An implementation framework of a coal mine water hazard holographic modal early warning GIS platform specifically includes the following steps:
[0167] Step 1: Build a digital GIS base for coal mine water hazards, formulate graphic specifications, entity model specifications and attribute data specifications for the hydrogeological geographic information system for coal mine topography, stratum coal seams, aquifers, impermeable layers, boreholes, faults, collapse columns, coal pillars, water-rich areas, water-gushing areas, and various contour lines, stop-mining lines, prohibited mining lines, slow-mining lines, sensors, shaft and tunnel engineering, as well as mining faces, goafs and other objects, and establish a holographic and all-round early warning GIS digital base for coal mine water hazards.
[0168] In order to make full use of all-time and space information and significantly reduce the maintenance workload of engineering and technical personnel, it is necessary to give full play to the general functions of GIS spatial analysis and network analysis, and to reflect the special technology of coal mine hydrological monitoring and early warning. This patent professionally optimizes the universal GIS technology from the kernel, and formulates the GIS technical specifications for coal mine water hazard monitoring and early warning. Based on 2DGIS, 3DGIS and 4DGIS technologies, by optimizing their functions, formulating technical specifications such as layer management, feature drawing and attribute configuration, a coal mine water hazard monitoring and early warning GIS service platform integrating 2DGIS, 3DGIS and 4DGIS is built to meet the needs of water hazard monitoring and early warning. The technical features of the water hazard monitoring and early warning GIS platform are:
[0169] 1) The flood monitoring and early warning GIS platform supports both C / S and B / S dual-architecture modes. The C / S mode is used for daily maintenance, and the B / S mode is used for information display, query, positioning, analysis, alarm, early warning, simulation and emergency dispatch. 2DGIS graphics can be automatically converted into SVG vector format for publication, and 3D models can be automatically converted into WEBGL for publication. Through attribute association, it can be published as two- and three-dimensional WEBGIS.
[0170] 2) The system uses the integration of 2DGIS, 3DGIS and 4DGIS. The daily maintenance uses the boreholes, terrain, stratum floor contours, isopach lines, fault intersections, working faces, goafs, water-rich area boundaries and shaft-tunnel relationships in the C / S mode of 2DGIS as the operation objects + attribute configuration. The background automatically models the three-dimensional models of the relevant objects such as boreholes, terrain, strata, structures, shafts, tunnels, chambers, water-rich areas, etc. By integrating production information and monitoring data time factors, the real-time update of two-dimensional graphics and three-dimensional models is completed, thereby reflecting the four-dimensional dynamic change characteristics of full-time and space information.
[0171] 3) For any specified plane coordinate point P (x, y), whether using 2DGIS or 3DGIS information, it is possible to vertically query and calculate the terrain from the terrain surface to the deepest mining depth of the mine, as well as the bottom plate elevation, thickness and inter-layer spacing of each coal seam, aquifer and impermeable layer.
[0172] 4) For any P(x,y) in any mining project such as in a tunnel, excavation face or mining face, whether using 2DGIS or 3DGIS information, it is guaranteed that the elevation and thickness of the coal seam floor at point P and the occurrence and the nearest distance of the surrounding rock formations, faults, fold axes, coal pillars, water-rich areas, water accumulation lines, stop-mining lines, and prohibited mining lines can be calculated.
[0173] 5) Whether using 2DGIS or 3DGIS information, spatial simulation of water inrush and well flooding and optimization calculation of spatial disaster avoidance routes are carried out.
[0174] 6) In order to facilitate the daily maintenance and update of 2DGIS by users, the graphics are drawn with the simplest geometric elements, such as points, lines, polylines, splines or polylines. In particular, the tunneling head and the mining surface are represented by point symbols and lines respectively. Each time the position can be updated by simply dragging, the 3D model is automatically updated.
[0175] 7) Configure relevant standard attribute data structures for various pixel objects of GIS. Whether it is 2DGIS or 3DGIS, all pixels in it can be associated with static attributes and dynamic attributes to provide complete spatiotemporal information support for spatial analysis, hidden attribute inversion, alarm and early warning calculations.
[0176] Based on this technology, a coal mine water hazard GIS digital base maintenance system was developed. This maintenance system can not only customize and modify water hazard warning GIS graphics, generate three-dimensional models of related objects such as boreholes, terrain, strata, structures, shafts, chambers, water-rich areas, and configure attribute data of related objects, but also convert two-dimensional GIS shapes into WEBGIS SVG format and three-dimensional models and attribute data and submit them to the water hazard warning data warehouse synchronously.
[0177] Step 2: Develop a holographic and all-round dynamic data access system to connect the real-time data of the coal mine hydrological monitoring system and the production, monitoring, geophysical exploration, geochemical exploration and water prevention and control engineering information related to mine water hazards, as well as the related spatial information, location information, attribute information and other dynamic data to the GIS digital base in real time.
[0178] The dynamic information that can be accessed includes production, detection, testing, analysis, monitoring, etc., specifically:
[0179] 1) It is necessary to access the real-time data of all monitoring systems related to mine hydrology and water hazards, including rainfall monitoring, surface water flow (or water level, flow velocity and water-passing section) monitoring, long observation hole water level and water temperature monitoring, water inflow monitoring, drainage monitoring, water quality monitoring, surface subsidence monitoring, mine pressure monitoring, ground stress monitoring, delamination monitoring, rock movement monitoring, microseismic monitoring, and drainage water pressure and drainage volume monitoring of drainage (release) projects, water level, drawdown and flow monitoring of pumping tests. All connected sensors must have three-dimensional coordinate information, time information, parameter dimensions and their environmental size parameters, so as to be used for various conversions, such as conversion of flow velocity and flow, conversion of pressure and pressure, etc.
[0180] 2) For mining projects, the location, section, advancement speed, support parameters, and goaf filling method and filling rate of the working face should be dynamically connected. If there are no automatic monitoring facilities, manual measurement and measuring data should also be dynamically entered and converted into data such as the location, section, and mining height of the working face, so as to achieve accurate spatial positioning and reveal stratigraphic boundary information.
[0181] 3) For water quality data, the general online water quality monitoring system can only collect a few simple water quality parameters such as temperature, pH value, residual chlorine, conductivity, and turbidity. If these parameters are not enough for accurate identification of water sources, it is necessary to add mine water quality test indicators to various water-rich areas (aquifers) and common water inflow point attributes, mainly including temperature, turbidity, pH, conductivity, solidified matter, total hardness, K + 、Na + , Ca 2+ Mg 2+ , Cl - 、SO4 2- 、HCO3 - , CO2, O2, Rn, NO3 and isotopes, etc.
[0182] 4) For ground and underground drilling projects, the coordinates of each borehole, the name of each section of the formation, depth, length, lithology, conductivity, gamma, artificial gamma, and inclinometer information must be connected.
[0183] 5) For water exploration (release) projects, access the coordinates of each water exploration and release borehole, the name of each section of the formation, depth, length, lithology, conductivity, gamma, artificial gamma, and inclinometer information.
[0184] 6) For the pumping test, it is necessary to access the real-time data and historical records of the opening position, well depth, diameter, aquifer (water-rich area) name, static water level of each test well, as well as the flow rate and water level drop during the pumping test.
[0185] 7) For geophysical exploration projects, it is necessary to access the coordinates of the detection base point, the azimuth and inclination of the starting line of each scanning surface, the azimuth and inclination of the ending line, the scanning depth, and the resistivity, wave velocity, gamma, artificial gamma and other radioactive parameters at each point or line on the scanning surface.
[0186] 8) For aquifers, it is necessary to access the average stable static water level, water temperature, permeability coefficient, influence radius of different regions and seasons, as well as the dynamic water level, flow direction, flow state and dynamic water quality test parameters of each measuring point.
[0187] 9) For the coal seam roof and floor and impermeable layer, it is necessary to configure the elastic model, compressive strength, density, cohesion, internal friction angle, Poisson's ratio, pressure coefficient, dynamic failure time and other mechanical parameters, as well as the caving zone, fracture zone, bending zone, floor failure depth, stress peak and position changes during the advancement of the working face.
[0188] In this solution, the dynamic data access system is developed into several background service applets, which are deployed on workstations related to data generation or monitoring subsystems to provide dynamic data for the flood warning data warehouse, including dynamic attributes of GIS graphics and models, forming a 4DGIS system.
[0189] Step 3, establish a real-time computing system, and convert the measured data measured by several real sensors into important water hazard characteristic parameters of key areas related to mine water hazards in real time by adding virtual sensors and their computing methods.
[0190] After accessing the monitoring systems related to mine hydrology and water hazards, which mainly include rainfall monitoring, surface water flow (or water level, flow velocity and water-passing section) monitoring, water level and water temperature monitoring of long observation holes, water inflow monitoring, drainage monitoring, water quality monitoring, surface rock movement monitoring, microseismic monitoring, and drainage (release) water volume detection of drainage (release) projects, spatial positions of each sensor and spatial positions of monitoring objects and other attribute information, some information cannot be directly used for hydrological related analysis and water hazard early warning analysis, such as water inflow monitoring. Generally, the real-time data monitored by the water inflow sensor are the ditch flow and pipeline flow at the sensor installation location, and do not represent the actual water inflow of each shaft, working face, mining area, water inflow point and mine. The following real-time calculations and conversions are required:
[0191] 1) For different sensors, a time window is set according to their type, installation location, installation method, sensitivity and system error calibration results. The average value of the monitoring data within the time window is obtained through filtering and anti-drift technology, and then the average value of the monitoring data is converted into a practical value through the correction formula.
[0192] 2) Add virtual sensors and calculation formulas to perform real-time calculations on dimensional conversion of some monitoring data. For example, the flow velocity of the ditch can be converted into the ditch flow rate based on the water-passing section, and the rainfall depth (mm) can be converted into rainfall amount (m3 / h) based on the well field area or rainfall range.
[0193] 3) Add or reduce virtual sensors and calculation formulas, define the real-time calculation formulas for the working face, mining area, water gushing points and the water gushing amount of the entire mine according to the mine's water flow network and water flow path, and use partial monitoring values or conversion values to calculate in real time the water gushing amount of each working face, mining area and the entire mine, as well as the drainage volume of each water tank and the drainage (release) volume of the drainage (release) project.
[0194] For example, Table 1 is a real-time calculation formula table of mine gushing and drainage in a certain mine. In the "Calculation Formula" column of the table, each item [.] is a real sensor number. When calculating, each item [.] is replaced with its corresponding real-time monitoring data field value. After the calculation is completed, the calculation result is filled in the real-time database record and field corresponding to the virtual sensor number.
[0195] Table 1 Real-time calculation table of mine gushing and drainage volume in XX coal mine
[0196]
[0197] 4) Using the geological model and its mechanical parameters, the fracture circle radius and compression circle radius of each microseismic event are calculated in real time, so as to track the evolution and formation process of the water channel, calculate the pressure cycle and pressure intensity of the working face roof in real time, and predict the next pressure position or time of the working face, the bottom plate damage depth and the height of the lifting zone, as well as the height of the roof caving zone and fracture zone.
[0198] In this scheme, the real-time computing system is developed into a background service program and deployed on the data service. According to the defined calculation model and calculation formula, the virtual monitoring values of all virtual sensors are calculated in real time and submitted to the water disaster warning data warehouse.
[0199] Step 4: Establish a spatial analysis service computing system to realize the rapid calculation of coordinates, elevation, thickness, distance, area, volume, buffer zone, watershed, network, topological relationship, etc., and provide computing services for spatial query, search and positioning, disaster simulation, disaster avoidance routes, alarm information, and early warning information.
[0200] The system can provide complete spatial analysis functions for accurate early warning of coal mine water hazards based on the correlation between the factors causing coal mine water hazards and the terrain information, meteorological information, geological information and production information of the entire coal mine. It mainly includes:
[0201] 1) Spatial distance analysis
[0202] For any spatial point Q (x, y, z), especially any spatial point in the tunneling head or mining face, the spatial distance analysis function can be used to calculate the shortest distance from the point to any fault intersection line, coal pillar line, stop mining line, water accumulation line, slow mining line, and prohibited mining line, providing background service calculation for dangerous distance warning of the mining face.
[0203] Spatial distance analysis distinguishes two cases:
[0204] The first method: You can find the nearest point J(x1,y1) and the plane distance from the plane point P(x,y) of Q(x,y,z) to the fault intersection line (surface), coal pillar line (coal pillar), stop mining line, water accumulation line, slow mining line, and prohibited mining line, and then use the elevation attributes of the bottom plate contour lines and the attitude attributes of the fault intersection lines in the two-dimensional graphics of the GIS base to find the bottom plate elevation z1 corresponding to point J(x1,y1), so that you can calculate the true slope distance from Q(x,y,z) to Q1(x1,y1,z1).
[0205] The second method: For fault planes, coal pillars, water accumulation areas, etc. with three-dimensional models, the distance method from spatial point to surface can be used to directly calculate the shortest distance from Q(x, y, z) to the surface of three-dimensional bodies such as fault planes, coal pillars, and water accumulation areas.
[0206] 2) Analysis of stratigraphic relationships
[0207] By using the layer naming, pixel drawing and attribute configuration specifications in Section 1, for any plane point P(x,y) in any mined coal seam, especially any plane point in the heading head or mining face, the stratigraphic analysis function can quickly calculate the floor elevation and thickness of the coal seam at this location, as well as the floor elevation and thickness of each impermeable layer and aquifer downward, and the floor elevation and thickness of each impermeable layer and aquifer upward, all the way to the corresponding ground elevation. At the same time, the stratigraphic relationship between these coal seams and strata can be analyzed, providing background service calculations for the "three-map-dual prediction method" and "five-map-dual prediction method" in water hazard early warning.
[0208] Here, the elevation and thickness of the bottom plate corresponding to a certain stratum C at the plane point P (x, y) can be calculated using one of the following two methods:
[0209] Using the contour elevation attributes of the bottom contour layer of layer C in the two-dimensional GIS map, the elevation z corresponding to point P (x, y) is calculated using contour search and distance weighted interpolation algorithm.
[0210] Using the thickness contour attribute of the thickness contour layer of the stratum C in the two-dimensional GIS map, the thickness h corresponding to the point P (x, y) is calculated using the contour search and distance weighted interpolation algorithm.
[0211] 3) Analysis of formation occurrence and working face morphology
[0212] Using the standardized GIS graphics specified in Section 1, given any polygonal plane area W, the analysis algorithm can calculate the floor elevation and thickness of any stratum at the boundary point of area W, as well as the area, average thickness, dip and dip angle and other occurrence parameters of the area. It can also calculate the mining depth, dip angle, inclined length, and the advancement distance and mining volume from the last time to the current position of any excavation face and mining face, which can save a lot of maintenance work.
[0213] For example, for any polygonal plane area W of a working face, the digital base and layer relationship analysis method can be used to calculate the floor elevation and thickness corresponding to the boundary points of W, and the (x1, y1, z1, h1), (x2, y2, z2, h2), ..., (xn, yn, zn, hn) of the boundary points of W can be obtained. Then, by interpolating the floor elevation contour lines within W, the regional area, average thickness, inclination and dip angle can be calculated. Then, using the terrain contour lines and the strike and dip direction angles of each working face, the excavation depth, dip angle and oblique length can be calculated.
[0214] 4) Flood simulation and disaster avoidance route analysis
[0215] Using the drawing specifications and attribute information of the tunnel connection relationship layer in Section 1, for any given water inrush point T, the spatial analysis and network analysis algorithms can simulate the entire well flooding process starting from the water inrush point T, and record the tunnels flooded by the water flow. Then, the escape route for any point in the well can be given. This function can also provide decision support for the formulation of emergency plans for water inrush.
[0216] 5) Watershed and fold analysis
[0217] Using the terrain contour layer and the aquifer bottom contour layer, the ridge and valley runoff routes in the topography and the syncline and anticline axes of the aquifer can be calculated through watershed and fold analysis, providing a decision-making basis for surface water monitoring and flood prevention and early warning, as well as underground aquifer water level monitoring and water inflow prediction.
[0218] For example, the intersection of a family of parallel lines and contour lines can be used to calculate the sequence of intersection points of each line, and then the concave-convex connection method can be used to trace the ridge and valley runoff routes in the topography and the syncline and anticline axes of the aquifer.
[0219] 6) Auxiliary analysis technology
[0220] The background spatial analysis also includes distance measurement, area calculation, shortest path analysis, and continuous calculation of horizontal distance, slope distance, height difference, and orientation of any multi-point sequence of strata and shafts.
[0221] In this solution, the spatial analysis system is developed into a background service program and deployed on the data service. All spatial analysis and calculation functions provide services to C / S and B / S client programs through the data exchange interface.
[0222] Step 5: Establish and automatically update the coal mine water hazard alarm and warning threshold library, use hydrological anomaly records, hydrogeological environmental assessments, production process parameters and departments at all levels to formulate water hazard prevention and control rules, and use historical big data analysis technology to determine the alarm thresholds and graded warning thresholds of various types and levels. According to historical records and the degree of water hazard impact, formulate rules for the software system to automatically update the water hazard alarm and warning threshold library.
[0223] Specifically include:
[0224] 1) For the real-time data of surface water flow, long-hole water level, long-hole water temperature, rainfall (depth), ditch flow, drainage pipe flow, water tank water level and other real-time sensor data at each installation location, the red, orange, yellow and blue four-level alarm thresholds are set with reference to the normal value range.
[0225] 2) For the real-time calculation data of virtual sensors such as mine rainfall, mine water inflow, mine drainage, total micro-seismic energy, working face roof pressure cycle, pressure intensity, next pressure position or pressure time, bottom plate damage depth and guide belt height, and roof caving zone and fracture zone height, the red, orange, yellow and blue four-level alarm thresholds are set with reference to the normal value range.
[0226] 3) According to the geological strata, structural geological environment, hydrogeological environment, mining technology and advance detection conditions of different working faces, set the red, orange, yellow and blue four-level warning thresholds of the spatial calculation lengths of the up and down, front and back, left and right distances from geological structures, water-rich areas, protective coal pillars, stop mining lines, prohibited mining lines, mining lines, stress concentration areas and gas accumulation areas.
[0227] 4) According to the pressure coefficient obtained from the test of the upper and lower impermeable layers of the working face, the red, orange, yellow and blue four-level warning thresholds are set according to the ratio of the water inrush coefficient to the pressure coefficient.
[0228] In this scheme, the alarm calculation of the coal mine water hazard alarm and warning threshold library is developed into a background service program, which is deployed on the data service to perform real-time alarm query and calculation, and submit the alarm information to the alarm warning information table.
[0229] Step 6: Calculation and inversion of the source and modal warning parameters of coal mine water hazards. Using the digital base data, monitoring data, real-time calculation data, and spatial service calculation methods of the hydrological GIS system, the calculation, inversion, and modal analysis of the source parameters of coal mine water hazards are realized, and advanced warning calculations are performed to provide warning information for the front-end warning platform. Specifically, it includes:
[0230] 1) Correlation analysis
[0231] On the basis of GIS, according to the production progress and location information of the mining face, various monitoring data related to water hazards and historical curves and other big data, the correlation analysis algorithm is used to continuously calculate the correlation between the water inflow and rainfall at each location, the correlation between the water inflow and the excavation footage and the mining area at each location, the correlation between the water inflow and the water level drop of each aquifer, the correlation between the water inflow and the exploration and release volume, the correlation between the drainage volume and the water inflow, the correlation between the water inflow and the mine pressure stress, the correlation between the water inflow and the microseismic energy density, and the correlation between the water quality of each water inflow point and the water quality of the water-rich area of each aquifer. It is worth noting that the correlation analysis algorithm we give can handle the lag time, for example, it can calculate the lag time between the peak value of the water inflow and the peak value of the rainfall, or it can be concluded that the water inflow at a certain location is weakly correlated or unrelated, so that the rainfall monitoring value can be used to predict the water inflow at each location in advance, providing a basis for decision-making on pumping and drainage and water hazard prevention and control.
[0232] 2) Trend forecast analysis
[0233] For any historical data monitored by a real sensor or virtual sensor, as well as environmental and meteorological change factors, big data analysis algorithms such as exponential smoothing, grey theory or artificial neural network, combined with the results of correlation analysis, can be used to predict the possible values of the sensor monitoring parameters in multiple time periods in the future, such as the water inflow prediction at each location, the water level prediction of the aquifer, the drainage prediction, and the height and depth prediction of the top and bottom plates of the working face, etc., which can provide a basis for water early warning and flood control decision-making.
[0234] 3) Water inflow modal warning
[0235] The water inflow situation warning mainly utilizes the historical data obtained by virtual sensors such as mine water inflow, mining area water inflow or working face water inflow, and refers to the previous similar geological conditions, correlation analysis and trend prediction results, as well as the possibility of water inrush and the degree of danger to safe production in the future. The corresponding modal warning curve model is established, and the blue, yellow, orange and red graded warnings are realized according to the relative relationship between the modal warning curve model and the current water inflow monitoring value.
[0236] 4) Danger distance warning
[0237] According to the current position of the mining face on the GIS graph, through the previous spatial analysis algorithm, we can search for the dangerous distance of the nearest aquifer and water-rich area above the working face, the dangerous distance of the nearest aquifer and water-rich area below the working face, the dangerous distance of the nearest aquifer and water-rich area around the working face, and the nearest distance from the mining face to the fault, collapse column, protective coal pillar, fold axis, stop mining line, warning line, water accumulation line, slow mining area, and prohibited mining area, and realize blue, yellow, orange and red graded warnings according to the warning indicators.
[0238] 5) Water conductivity warning of roof and bottom plates
[0239] According to the monitoring or calculated values of the bottom plate damage depth, lifting zone height, caving zone, fracture zone, bending zone and surface subsidence corresponding to the current position of the mining face on the GIS graphic, combined with the source layer, energy and density of microseismic monitoring, the degree of damage to the top and bottom plate aquicludes and the thickness of the effective aquicludes are analyzed, and then the possibility of water conduction in the top and bottom plates is calculated according to the location and water richness of each water-rich area and the water quality parameters of the water-rich area and the water gushing point, to achieve blue, yellow, orange and red graded warnings.
[0240] 6) Double coefficient (water burst coefficient) warning
[0241] According to the current position of the mining face on the GIS graph and the position and water level monitoring of the long observation holes of each aquifer, the water level (water pressure) distribution of each aquifer is inverted in real time, especially the water pressure of the top and bottom plate water of the working face. The thickness of the top and bottom plate aquiclude of the working face is calculated using the spatial analysis function. The thickness of the top and bottom plate aquiclude of the working face is then calculated using the bottom plate damage depth, the height of the lifting zone, the caving zone, and the fracture zone. The effective waterproof thickness of the top and bottom plate aquiclude of the working face is then calculated, or the damage coefficient of the top and bottom plate aquiclude of the working face is calculated using the microseismic monitoring results. In this way, the water inrush coefficient Ts of the top and bottom plate water and the ratio of the root distance water inrush coefficient Ts to the corresponding pressure coefficient Ds are calculated to achieve blue, yellow, orange and red graded warnings.
[0242] 7) Analysis and early warning of water source
[0243] For the water gushing volume of any gushing point as well as the results of water quality monitoring and analysis, the MSIM multi-source water output identification model is used to identify the proportion of each water source in the water gushing volume of the gushing point, based on the water quality monitoring and analysis data of water sources such as water-rich areas and aquifers. According to the changes in the proportion, especially for water sources whose proportion changes from nothing to something, or from small to large, blue, yellow, orange and red graded warnings are implemented according to the speed of change of the proportion.
[0244] 8) Water detection (release) warning
[0245] According to the current position of the mining face on the GIS graph, spatial analysis technology is used to search for water-rich areas and water-rich properties around the working face. Then, based on the actual records of the water exploration and release project (including geophysical data) and the spatial position of each borehole (including the scanning surface position of geophysical exploration), the spatial relationship between the water exploration project and the excavation face is calculated. If there is a suspected water-rich area in front of the excavation face and no advance exploration is carried out, blue, yellow, orange and red graded warnings are implemented based on the distance from the water exploration project to the excavation face (if there is no record of the water exploration project, the distance is considered to be infinite).
[0246] 9) Multi-factor credit enhancement warning
[0247] Based on the graded warning results of the above 6 factors 3) to 8), the warning value corresponding to blue is 0.2, the warning value corresponding to yellow is 0.4, the warning value corresponding to orange is 0.6, the warning value corresponding to red is 0.8, and the warning value that does not reach the blue warning level is 0. The multi-factor comprehensive warning value is calculated using the credit enhancement method, and a four-color comprehensive warning is performed according to the comprehensive warning value at 0.2, 0.4, 0.6 and 0.8.
[0248] In this scheme, the calculation and inversion of the origin and modal warning parameters of coal mine water hazards and the warning analysis are developed into a background service program, which is deployed on the data service to perform real-time query and calculation, and submit the warning information to the alarm warning information table.
[0249] Step 7, build a holographic modal early warning GIS platform for coal mine water hazards. Use the methods and techniques of steps 1 to 6 to build a holographic modal early warning GIS platform for coal mine water hazards to achieve real-time alarm, modal analysis, advance warning, and information release, push, and query of coal mine water hazards.
[0250] The platform includes coal mine water hazard GIS digital base construction and update subsystem, holographic and omnidirectional dynamic data access subsystem, real-time computing service subsystem, spatial analysis service computing subsystem, water hazard alarm warning threshold library management and update subsystem, water hazard source and modal warning parameter calculation and inversion, and through various warning calculations to achieve coal mine water hazard real-time alarm, modal analysis, advance warning and information display, positioning, release, push and step-by-step drilling query. The main feature of the platform is that it can achieve advanced identification and transparent management of coal mine water hazard-causing factors, advanced and accurate warning of coal mine water hazards, and can find the root cause of coal mine water hazard occurrence or not through the calculation and inversion of source and modal warning parameters, providing technical support for the effective prevention and control of coal mine water hazards.
[0251] The method and system of the present invention include: establishing a two-dimensional and three-dimensional geographic information system (GIS) technical specification for accurate early warning of coal mine water hazards, using which the temporal and spatial data such as topographic and geomorphic information, geological information, hydrological information, production information and mining damage information related to coal mines and water hazards can be integrated to form a digital base for the mine water hazard early warning platform, by integrating hydrological monitoring information and monitoring systems related to mine water hazards, and by defining and adding virtual sensors to calculate the hydrological parameters of key areas on the ground and underground in real time, using trend analysis, correlation analysis and Modal analysis calculates the intrinsic relationship between these hydrological parameters, and uses spatial analysis technology to realize real-time calculation of the mining face position and accurate inversion of intrinsic parameters such as water pressure, water level, roof and floor fragility and water blocking capacity. It further analyzes the changing modes of water sources, water diversion channels, water inflow and intrinsic parameters. Combined with the advance prediction of the distances to various hazardous sources and water hazard levels in all directions of the mining face, it completes holographic monitoring and advanced and accurate early warning of coal mine water hazards. By establishing a coal mine water hazard early warning GIS platform, it lays a technical foundation for accurate early warning and effective prevention and control of coal mine water hazards.
[0252] The present invention builds a coal mine water hazard holographic modal early warning GIS platform, which includes a coal mine water hazard GIS digital base construction and update subsystem, a holographic and omnidirectional dynamic data access subsystem, a real-time computing service subsystem, a spatial analysis service computing subsystem, a water hazard alarm warning threshold library management and update subsystem, and the calculation and inversion of water hazard origin and modal early warning parameters, and realizes the real-time alarm, modal analysis, advance warning and information display, positioning, release, push and step-by-step drilling query of coal mine water hazard through various early warning calculations. The main feature of the platform is that it can realize the advanced identification and transparent management of coal mine water hazard disaster factors, the advanced and accurate early warning of coal mine water hazard, and can find the root cause of coal mine water hazard occurrence or not through the calculation and inversion of origin and modal early warning parameters, providing technical support for the effective prevention and control of coal mine water hazard.
[0253] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be considered as the scope of protection of the present invention.
Claims
1. A holographic source modal early warning method for coal mine water hazards based on a GIS base, characterized in that: The following steps are involved: Step 1, construct a digital base for holographic and all-round early warning GIS for coal mine water hazards, including: formulating contour lines of coal mine topography, stratum coal seams, aquifers, impermeable layers, boreholes, faults, collapse columns, coal pillars, water-rich areas, water-gushing areas, stop mining lines, prohibited mining lines, slow mining lines, sensors, shaft and tunnel engineering, and hydrogeological geographic information system graphic specifications, entity model specifications and attribute data specifications for mining faces and goafs, and constructing a digital base for holographic and all-round early warning GIS for coal mine water hazards; Step 2, developing a holographic and omnidirectional dynamic data access system, through which the measured monitoring data of the monitoring system related to mine hydrology and water hazards are dynamically and real-time connected to the coal mine water hazard holographic and omnidirectional early warning GIS digital base; wherein the measured monitoring data includes data space information, location information and attribute information; Step 3, establishing a real-time computing system, which converts the actual monitoring data measured by a number of real sensors into important water hazard characteristic parameters of key areas related to mine water hazards in real time by adding virtual sensors and computing methods; Step 4: Establish a spatial analysis service computing system, which analyzes the important water hazard characteristic parameters to obtain the correlation between the disaster-causing factors of coal mine water hazards and the terrain information, meteorological information, geological information and production information of the entire coal mine, and provides a complete spatial analysis function for realizing accurate early warning of coal mine water hazards; Step 5: Establish and automatically update the coal mine water hazard alarm and warning threshold library, use hydrological anomaly records, hydrogeological environment assessment, production process parameters and water hazard prevention and control requirements, and use historical big data analysis technology to determine various alarm thresholds and various graded warning thresholds, and formulate rules for the software system to automatically update the water hazard alarm and warning threshold library based on historical records and the degree of water hazard impact; Step 6, calculation and inversion of coal mine water hazard origin and modal warning parameters: based on the coal mine water hazard holographic all-round warning GIS digital base, the measured monitoring data, the important water hazard characteristic parameters obtained by the real-time computing system, the analysis results obtained by the spatial analysis service computing system, and the coal mine water hazard alarm and warning threshold library, the coal mine water hazard origin parameters are calculated, inverted and modally analyzed, and advanced warning calculations are performed to obtain advanced warning information; Step 7: Build a coal mine water hazard holographic modal early warning GIS platform to realize real-time alarm, modal analysis, advance warning, and information release, push and query of coal mine water hazards.
2. According to the GIS base-based coal mine water hazard holographic source modal early warning method according to claim 1, it is characterized in that: The coal mine water hazard holographic all-round early warning GIS digital base is based on 2DGIS, 3DGIS and 4DGIS technologies. By optimizing the functions of the three technologies, the technical specifications for layer management, feature drawing and attribute configuration are formulated to build a coal mine water hazard holographic all-round early warning GIS digital base that integrates 2DGIS, 3DGIS and 4DGIS to meet the needs of water hazard monitoring and early warning. The coal mine water hazard holographic all-round early warning GIS digital base has the following characteristics: 1) The coal mine water hazard holographic all-round early warning GIS digital base supports both C / S and B / S dual-architecture modes. The C / S mode is used for daily maintenance, and the B / S mode is used for information display, query, positioning, analysis, alarm, early warning, simulation and emergency dispatch. Among them, 2DGIS graphics can be automatically converted into SVG vector format for publication, and 3D models can be automatically converted into WEBGL for publication. Through attribute association, it can be published as two-dimensional and three-dimensional WEBGIS; 2) Adopting the fusion technology of 2DGIS, 3DGIS and 4DGIS, daily maintenance takes the borehole, terrain, stratum floor contour, isopach, fault intersection, working face, goaf, water-rich area boundary and shaft-tunnel relationship in the C / S mode of 2DGIS as the operation object combined with attribute configuration, and the background automatically builds the 3D model of the relevant objects of borehole, terrain, stratum, structure, shaft-tunnel, chamber and water-rich area. By integrating the production information and the time factor of monitoring data, the real-time update of 2D graphics and 3D models is completed, thus reflecting the four-dimensional dynamic change characteristics of full-time and space information; 3) For any specified plane coordinate point P (x, y), using 2DGIS or 3DGIS technology, it is possible to vertically query and calculate the terrain from the terrain surface to the deepest mining depth of the mine, as well as the floor elevation, thickness and inter-layer spacing of each coal seam, aquifer and impermeable layer; 4) For any plane coordinate point P(x,y) in a tunnel, excavation face or mining face, the elevation and thickness of the coal seam floor of the plane coordinate point P(x,y) and the occurrence and the closest distance of the surrounding rock formations, faults, fold axes, coal pillars, water-rich areas, water accumulation lines, stop-mining lines, and forbidden-mining lines can be calculated using 2DGIS or 3DGIS technology; 5) Using 2DGIS or 3DGIS technology, spatial simulation of water inrush and well flooding and optimization calculation of spatial disaster avoidance routes can be performed; 6) To facilitate routine maintenance and updating of 2DGIS, the graphic specifications stipulate that geometric elements should be used for drawing, including points, lines, polylines, splines or polylines; for the tunneling head and the mining face, point symbols and straight lines are used respectively, and the 3D model is automatically updated each time the position is updated by simply dragging; 7) Configure relevant standard attribute data structures for various pixel objects of GIS. For 2DGIS or 3DGIS, all pixel objects are associated with static attributes and dynamic attributes, providing complete spatiotemporal information support for spatial analysis, hidden attribute inversion, alarm and early warning calculations.
3. The GIS-based coal mine water hazard holographic source modal early warning method according to claim 1 is characterized in that: The measured monitoring data that can be dynamically accessed in real time includes production, detection, testing, testing, and monitoring data; the specific features are: 1) Access to all measured monitoring data of monitoring systems related to mine hydrology and water hazards, including rainfall monitoring, surface water flow monitoring, surface water level monitoring, surface water velocity monitoring, surface water flow section monitoring, water level and water temperature monitoring of long observation holes, water inflow monitoring, drainage monitoring, water quality monitoring, surface subsidence monitoring, mine pressure monitoring, ground stress monitoring, separation monitoring, rock movement monitoring, microseismic monitoring, drainage pressure and drainage volume monitoring of drainage projects, drainage pressure and drainage volume monitoring of water discharge projects, water level, depth reduction and flow monitoring of pumping tests. All the measured monitoring data accessed have three-dimensional coordinate information, time information, parameter dimensions and their environmental size parameters for data conversion; 2) For mining projects, if there are automatic monitoring facilities, the position, section, advancement speed, support parameters, and goaf filling method and filling rate information of the working face can be dynamically accessed; if there are no automatic monitoring facilities, the manual measurement and measurement data can be dynamically input and converted into the position, section, and mining height data of the working face, so as to achieve accurate spatial positioning and reveal the stratum boundary information; 3) For water quality data, water quality parameters are collected through the water quality online monitoring system, including temperature, pH value, residual chlorine, conductivity, and turbidity; at the same time, mine water quality test indicators are added to the aquifer and water gushing point attributes of various water-rich areas, including temperature, turbidity, pH, conductivity, solidified matter, total hardness, K + 、Na + , Ca 2+ Mg 2+ , Cl - 、SO4 2- 、HCO3 - , CO2, O2, Rn, NO3 and isotopes; 4) For ground and underground drilling projects, it is necessary to access the opening coordinates of each borehole, the formation name, depth, length, lithology, conductivity, gamma, artificial gamma and inclinometric information of each section; 5) For water exploration and drainage projects, access the coordinates of each water exploration and drainage borehole, the formation name, depth, length, lithology, conductivity, gamma, artificial gamma and inclinometric information of each section; 6) For the pumping test, access the opening position, well depth, diameter, aquifer name, water-rich area name, static water level of each test well, as well as the real-time data and historical records of flow rate and water level drawdown during the pumping test; 7) For geophysical exploration projects, access the coordinates of the detection base point, the azimuth and inclination of the starting line of each scanning surface, the azimuth and inclination of the ending line, the scanning depth, and the resistivity, wave velocity, gamma, and artificial gamma at each point or line on the scanning surface; 8) For aquifers, it is necessary to access the average stable static water level, water temperature, permeability coefficient, influence radius of different regions and seasons, as well as the dynamic water level, flow direction, flow pattern and dynamic water quality test parameters of each measuring point; 9) For the coal seam roof and floor and impermeable layer, it is necessary to configure the elastic model, compressive strength, density, cohesion, internal friction angle, Poisson's ratio, pressure coefficient, dynamic failure time mechanical parameters, as well as the changing values of the caving zone, fracture zone, bending zone, floor failure depth, stress peak and position during the advancement of the working face.
4. The GIS-based coal mine water hazard holographic source modal early warning method according to claim 1 is characterized in that: Preprocessing is performed on the measured monitoring data accessed by the dynamic data access system, including: 1) For different sensors, according to their type, installation location, installation method, sensitivity and system error calibration results, set the time window, obtain the average value of the monitoring data within the time window through filtering and anti-drift technology, and then convert the average value of the monitoring data into a practical value through the correction formula; 2) Add virtual sensors and calculation formulas to perform real-time calculations on the dimensional conversion of monitoring data; 3) Add or reduce virtual sensors and calculation formulas, define the real-time calculation formulas for the working face, mining area, water inflow point and the whole mine water inflow according to the mine water flow network and water flow path, and use the monitoring value or conversion value to calculate the water inflow of each working face, mining area and the whole mine in real time, as well as the drainage volume of each water tank and the drainage volume of the drainage project; 4) Using the geological model and its mechanical parameters, the fracture circle radius and compression circle radius of each microseismic event are calculated in real time, so as to track the evolution and formation process of the water channel, calculate the pressure cycle and pressure intensity of the working face roof in real time, and predict the next pressure position or time of the working face, the bottom plate damage depth and the height of the lifting zone, as well as the height of the roof caving zone and fracture zone.
5. The GIS-based coal mine water hazard holographic source modal early warning method according to claim 4 is characterized in that: The radius of the fracture circle and the radius of the compression circle of the microseismic event are calculated in the following way: Assuming that the location of the monitored microseismic event is W (x, y, z), the released energy is E, E is converted into the explosion volume of TNT explosives, and then the mechanical properties of the formation where the point W (x, y, z) is located are obtained by using GIS analysis and attribute query functions, so as to calculate the radius of the fracture circle and the radius of the compression circle generated by the microseismic event. The specific process is as follows: 1) Using the released energy E, the formula Get the charge weight G; 2) Using charge weight G and charge density ρ0, the formula Get the charge volume V; 3) Using the charge volume V, the formula Get the charge radius R b ; 4) Use the formula Get the radius R of the compression circle c ; Where: D-detonation velocity; ρ s - rock density; C p - longitudinal wave velocity; σ c -compressive strength; σ0 is an intermediate variable, and the calculation formula is: 5) Use the following formula to get the radius of the crack circle R p : Among them: λ is the first intermediate variable, and the calculation formula is μ is the Poisson's ratio of the surrounding rock; a is the second intermediate variable, and the calculation formula is: P2 is the third intermediate variable, and the calculation formula is P2=0.5ρ0D 2 ρ s / (ρ s C p +ρ0D); The radius of the crack circle R is calculated from this p .
6. The GIS-based coal mine water hazard holographic source modal early warning method according to claim 1 is characterized in that: In step 4, the correlation between the disaster-causing factors of coal mine water hazards and the terrain information, meteorological information, geological information and production information of the entire coal mine is obtained, providing a complete spatial analysis function for realizing accurate early warning of coal mine water hazards, specifically: 1) Spatial distance analysis For any spatial point Q (x, y, z), including any spatial point in the tunneling head or mining face, the spatial distance analysis function is used to calculate the shortest distance from the spatial point Q (x, y, z) to any fault intersection line, fault intersection surface, coal pillar line, stop mining line, water accumulation line, slow mining line, and forbidden mining line, providing background services for dangerous distance warning of the mining face; There are two cases for spatial distance analysis: (1) Calculate the plane distance from the plane point P(x,y) of the spatial point Q(x,y,z) to the nearest point J(x1,y1) of the fault intersection line, fault intersection surface, coal pillar line, mining stop line, water accumulation line, slow mining line, and mining ban line, and then use the elevation attributes of the bottom plate contour lines and the strike attributes of the fault intersection lines in the two-dimensional graphics of the coal mine water hazard holographic all-round early warning GIS digital base to calculate the bottom plate elevation z1 corresponding to point J(x1,y1), thereby calculating the true slope distance from the spatial point Q(x,y,z) to point J(x1,y1); (2) For fault planes, coal pillars, and waterlogged areas with three-dimensional models, the distance calculation method from spatial point to surface is used to directly calculate the shortest distance from the spatial point Q (x, y, z) to the three-dimensional surface of the fault plane, coal pillar, or waterlogged area; 2) Analysis of stratigraphic relationships Using the graphic specifications, entity model specifications and attribute data specifications developed in step 1, for any plane point P(x,y) in any mined coal seam, including any plane point in the tunneling head or mining face, the layer analysis function is used to quickly calculate the floor elevation and thickness of the coal seam at this point, as well as the floor elevation and thickness of each impermeable layer and aquifer downward, and the floor elevation and thickness of each impermeable layer and aquifer upward, until the corresponding ground elevation. At the same time, the layer relationship between the coal seam and the stratum is analyzed to provide background services for the three-map-double prediction method and the five-map-double prediction method in water hazard early warning; Among them: Use one of the following two methods to obtain the bottom elevation and thickness of a certain stratum C corresponding to the plane point P (x, y): (1) Using the contour elevation attributes of the bottom plate contour layer of layer C in the two-dimensional GIS map, the bottom plate elevation corresponding to point P (x, y) is calculated using contour search and distance weighted interpolation algorithm; (2) Using the thickness contour attribute of the thickness contour layer of the stratum C in the two-dimensional GIS map, the thickness corresponding to the point P (x, y) is calculated using the contour search and distance weighted interpolation algorithm; 3) Analysis of formation occurrence and working face morphology Using standardized GIS graphics, given any polygonal plane area W, the bottom plate elevation and thickness, regional area, average thickness, dip and dip parameters of any stratum at the boundary point of the polygonal plane area W are calculated; similarly, the mining depth, dip, oblique length, and advancement distance from the last to the current position and mining volume parameters of any excavation face and mining face are calculated; Among them, the polygonal plane area W of any working surface, the digital base and the layer relationship analysis method are used to calculate the bottom plate elevation and thickness corresponding to the boundary points of the polygonal plane area W, and the coordinate values of the boundary points of the polygonal plane area W can be obtained, which are expressed as: (x1, y1, z1, h1), (x2, y2, z2, h2), ..., (x n ,y n ,z n ,h n ); where x1, y1, z1, h1 represent the 3D coordinates and thickness of the first boundary point, x2, y2, z2, h2 represent the 3D coordinates and thickness of the second boundary point, and so on. n ,y n ,z n ,h n Represents the three-dimensional coordinates and thickness of the nth boundary point; Then, the bottom plate elevation contour lines in the polygonal plane area W are obtained by interpolation, and then the area, average thickness, inclination and dip angle of the area are calculated; then, the topographic contour lines and the strike and dip direction angles of each working face are used to obtain the mining depth, dip angle and oblique length; 4) Flood simulation and disaster avoidance route analysis By using the drawing specifications and attribute information of the tunnel connection relationship layer, for any given water inrush point T, the entire well flooding process starting from the water inrush point T is simulated according to the spatial analysis and network analysis algorithms, and the tunnels flooded by the water flow are recorded. Then, the escape route of any point in the well tunnel is given. This function can also provide decision support for the formulation of emergency plans for water inrush; 5) Watershed and fold analysis Using the terrain contour layer and the aquifer floor contour layer, the ridge and valley runoff lines in the topography and the syncline and anticline axes of the aquifer are calculated through watershed and fold analysis, providing a decision-making basis for surface water monitoring and flood prevention and early warning, as well as underground aquifer water level monitoring and water inflow prediction; Among them, the method of finding the intersection of parallel straight lines and contour lines is used to calculate the sequence of intersection points of each line, and then the concave-convex connection method is used to trace the ridge and valley runoff routes in the topography and the syncline and anticline axes of the aquifer; 6) Auxiliary analysis technology Spatial analysis also includes distance measurement, area calculation, shortest path analysis, and continuous calculation services of horizontal distance, slope distance, height difference, and orientation of any multi-point sequence of strata and shafts.
7. The GIS-based coal mine water hazard holographic source modal early warning method according to claim 1 is characterized in that: Step 5 is as follows: 1) For the real sensor real-time data of each installation location, the red, orange, yellow and blue four-level alarm thresholds are set with reference to the normal value range; the real sensor real-time data includes surface water flow, long-view hole water level, long-view hole water temperature, rainfall, gushing ditch flow, drainage pipeline flow, and water tank water level; 2) For the real-time calculation data of the virtual sensor, the red, orange, yellow and blue four-level alarm thresholds are set with reference to the normal value range; the real-time calculation data of the virtual sensor includes the mine rainfall, the mine water inflow, the mine drainage, the total energy of microseismic, the working face roof pressure cycle, the pressure intensity, the next pressure position or pressure time, the bottom plate damage depth and the guide belt height, and the roof caving belt and fracture belt height; 3) According to the geological strata, structural geological environment, hydrogeological environment, mining technology and advance detection conditions of different working faces, set the red, orange, yellow and blue four-level warning thresholds of the spatial calculation length of the up and down, front and back, left and right distances from geological structures, water-rich areas, protective coal pillars, stop mining lines, prohibited mining lines, mining lines, stress concentration areas and gas accumulation areas; 4) According to the pressure coefficient obtained from the test of the upper and lower impermeable layers of the working face, the red, orange, yellow and blue four-level warning thresholds are set according to the ratio of the water inrush coefficient to the pressure coefficient.
8. The GIS-based coal mine water hazard holographic source modal early warning method according to claim 1 is characterized in that: In step 6, the modal analysis is performed including: 1) Correlation analysis On the basis of GIS, according to the production progress and location information of the mining face, various monitoring data related to water hazards and historical curve big data, the correlation analysis algorithm is used to continuously calculate the correlation between the water inflow and rainfall at each location, the correlation between the water inflow and the excavation footage and the mining area at each location, the correlation between the water inflow and the water level drop of each aquifer, the correlation between the water inflow and the exploration and release volume, the correlation between the drainage volume and the water inflow, the correlation between the water inflow and the mine pressure stress, the correlation between the water inflow and the microseismic energy density, and the correlation between the water quality of each water inflow point and the water quality of each aquifer rich area; Among them, the correlation analysis algorithm can handle the lag time, including calculating the lag time between the peak value of the water inflow and the peak value of the rainfall, or obtaining that the water inflow at a certain location is weakly correlated or uncorrelated with the rainfall, so that the rainfall monitoring value can be used to predict the water inflow at each location in advance, providing a basis for decision-making on drainage and water hazard prevention and control; If the correlation analysis between water inflow and rainfall includes: Assume that the rainfall sequence in the analyzed time interval is Q = {x0(1), x0(2), ..., x0(n0)}, and the water inflow sequence is P = {y0(1), y0(2), ..., y0(n0)}, and take an integer n < n0; where: x0(1), x0(2), ..., x0(n0) are the values of the 1st to n0th rainfall; y0(1), y0(2), ..., y0(n0) are the values of the 1st to n0th water inflow; For i = 1, 2, ..., (n0-n), and j = 0, 1, ..., (n0-ni), we get the subsequence Q i and subsequence P j : Q i ={x(1),x(2),…,x(n)}={x0(i),x0(i+1),…,x0(i+n)} P j ={y(1),y(2),…,y(n)}={y0(i+j),y0(i+j+1),…,y0(i+j+n)} Calculate the subsequence Q i The mean And the subsequence P j The mean Using the following formula, we get the subsequence Q i and subsequence P j The covariance A of the subsequence Q i The variance B and subsequence P j The variance C is: Using the following formula, we get the subsequence Q i and subsequence P j The correlation coefficient X ij : Thus, the correlation index g between the rainfall series Q and the water inflow series P is calculated: g=min{X ij |i=1,2,…,(n0-n).j=0,1,…,(n0-n-i)} If g<0.2, it means no correlation; if 0.2≦g<0.4, it means weak correlation; if 0.4≦g<0.6, it means moderate correlation; if g≧0.6, it means strong correlation; 2) Trend forecast analysis For any historical data monitored by real sensors or virtual sensors, as well as environmental and meteorological change factors, exponential smoothing, grey theory or artificial neural network big data analysis algorithms are used, combined with correlation analysis results, to predict the values that the sensor monitoring parameters may reach in multiple time periods in the future, including: water inflow prediction at each location, water level prediction of aquifers, drainage prediction, and height and depth prediction of damage to the top and bottom plates of the working face, providing a basis for water early warning and flood control decision-making; For water inflow prediction, the methods of quadratic exponential smoothing, grey prediction or artificial neural network prediction include: (1) Secondary exponential smoothing method: The water flow sequence of a water inflow location N periods before the prediction period is {x(1), x(2), …, x(N)}. The water inflow in the N+Mth period is predicted using the quadratic exponential smoothing algorithm. Among them, M is the period to be predicted starting from N periods, and the method is: Assume α is the final trend weight coefficient, 0.2<α<0.7, then the calculation method is: Let the initial value be: y u (0) = x(1), y v (0) = x(1); where y u (0) is the initial value used to calculate the smoothed intermediate sequence; y v (0) is the initial value used to calculate the secondary smoothing intermediate sequence s = 1 to N, execute the following loop: y u (s)=αx(s)+(1-α)y u (s-1); y v (s)=ay u (s)+(1-α)y v (s-1); This gives a smoothed intermediate sequence y u (1),y u (2),...,y u (N); Secondary smoothed intermediate sequence y v (1),y v (2),...,y v (N); Use the following formula to calculate the fitting coefficient a and the fitting coefficient b: a=2y u (N)-y v (N) According to the formula The water inflow in the N+M period is predicted (2) Grey prediction method: For the water inflow at the inflow point in the water-rich area or aquifer without rainfall for a long time or frequent recharge, the following grey prediction method is used for prediction: Step A: GM(1,1) modeling Step A1: Record the original water inflow data sequence as: x (0) ={x (0) (I)}, where, I=1,2,...,K; According to the formula Get the first-order cumulative sequence x (1) ={x (1) (I)}, where, I=1,2,...,K; Step A2: Calculate the coefficient vector of the differential equation in: Y=(x (0) (2)x (0) (3)…x (0) (K)) T in: B: Find the coefficient matrix of the least squares linear equations of the differential equation coefficients of the GM(1,1) model; Y: the right-hand coefficient vector of the least squares linear equation system for finding the coefficients of the GM(1,1) model differential equation; a0: the first coefficient of the differential equation; u0: the second coefficient of the differential equation; Step A3: Get the differential equation dynamic model Get the differential equation time response function Where, t=0,1,...,(N-1); Therefore, according to the differential equation time response function, the back-substitution value is obtained According to the following formula, the restored value of each original water inflow data is obtained I=1,2,...,K; Step B: Residual GM(1,1) modeling Step B1: Find the first-order cumulative sequence x obtained in step A1 (1) The residual between (I) and the restored value of the original water inflow data obtained in step A3 This gives the residual sequence ε (0) (1),ε (0) (2),...,ε (0) (K); Step B2: If the minimum value in the residual sequence If it is less than 0, the horizontal axis will be moved down Get a non-negative residual sequence, that is If it is not less than 0, then directly set in, represents non-negative residual; Step B3: Use Replace the first-order cumulative sequence x in step A1 (1) ={x (1) (I)}, establish the residual GM(1,1) model, and get the back-substitution calculation value Further restore value Step B4: If the horizontal axis is moved down in step B2, the restored value Move the horizontal axis up Right now: Get the corrected restoration value Otherwise, restore the value directly As a corrected restoration value Step B5: Use the following formula, using the modified reduction value Correction Get the corrected value Step B6: Check whether the accuracy meets the requirements. If not, use replace Repeat the residual modeling until it meets the requirements; assuming that m0 residual modeling is performed, the calculated value of the original water inflow data is for: Step C: Prediction: After step A and step B, the final differential equation time response function is output Using the differential equation time response function, input the time t value to be predicted and get the predicted value (3) Artificial neural network prediction method: For the prediction of water inflow at a mining face, the input factors are the daily water inflow x(1), x(2), ..., x(n) monitoring values of the n dates before the prediction date plus the cumulative advancement distance D of the face, the annual cumulative rainfall Q, and the date R, a total of n+3 input factors, and the output is the daily water inflow on the predicted day, which takes into account both the water inflow law of the face and the changes in the spatial position, advancement speed, seasonal climate and rainfall of the face. Moreover, with the continuous accumulation of monitoring data samples of the face, the model training accuracy continues to improve, so that the accuracy of the prediction will also continue to improve; For any prediction item, the quadratic exponential smoothing method, grey prediction and artificial neural network prediction can be used simultaneously. Finally, the most appropriate prediction method can be adaptively selected through error analysis between actual monitoring values and various prediction values. 3) Water inflow modal warning The modal warning of water inflow mainly uses the historical data obtained by the virtual sensors of mine water inflow, mining area water inflow or working face water inflow, and refers to the previous similar geological conditions, correlation analysis and trend prediction results, as well as the possibility of water inrush and water seepage in the future period and the degree of danger to safe production, to establish the corresponding modal warning curve model, and realize blue, yellow, orange and red graded warnings according to the relative relationship between the modal warning curve model and the current water inflow monitoring value; 4) Danger distance warning According to the current position of the mining face on the GIS graphics, through the spatial analysis algorithm, the dangerous distance of the nearest aquifer and water-rich area above the working face, the dangerous distance of the nearest aquifer and water-rich area below the working face, the dangerous distance of the nearest aquifer and water-rich area around the working face, and the nearest distance from the mining face to the fault, collapse column, protective coal pillar, fold axis, stop mining line, warning line, water accumulation line, slow mining area, and forbidden mining area are searched, and blue, yellow, orange and red graded warnings are implemented according to the warning indicators; 5) Water conductivity warning of roof and bottom plates According to the monitoring or calculated values of the floor damage depth, lifting zone height, caving zone, fracture zone, bending zone and surface subsidence corresponding to the current position of the mining face on the GIS graphics, the degree of damage to the roof and floor aquicludes and the thickness of the effective aquicludes are analyzed in combination with the source layer, energy and density of microseismic monitoring. Then, according to the location and water-richness of each water-rich area and the water quality parameters of the water-rich area and the water-gushing point, the possibility of water conduction in the roof and floor is calculated to achieve blue, yellow, orange and red graded warnings; 6) Double coefficient warning According to the current position of the mining face on the GIS graphics and the position and water level monitoring of the long observation holes of each aquifer, the water level distribution and water pressure distribution of each aquifer, the water pressure of the top and bottom plate water of the working face are inverted in real time. The thickness of the top and bottom plate water-proof layer of the working face is calculated using the spatial analysis function. The thickness of the top and bottom plate water-proof layer of the working face is then calculated using the bottom plate damage depth, the height of the lifting zone, the caving zone, and the fracture zone. The effective water-proof thickness, or the damage coefficient of the top and bottom plate water-proof layer of the working face is calculated using the microseismic monitoring results, thereby calculating the water inrush coefficient Ts of the top and bottom plate water. According to the ratio of the water inrush coefficient Ts to the corresponding pressure coefficient Ds, blue, yellow, orange and red graded warnings are implemented; 7) Analysis and early warning of water source For the water inflow at any water inflow point and the results of water quality monitoring and water quality analysis, the MSIM multi-source water outflow identification model is used to identify the proportion of each water source in the water inflow at the water inflow point based on the water quality monitoring and water quality analysis data of each water-rich area and aquifer. According to the change of the proportion, especially for water sources whose proportion changes from zero to one, from small to large, blue, yellow, orange and red graded warnings are implemented according to the speed of change of the proportion; 8) Water detection warning According to the current position of the mining face on the GIS graphics, the spatial analysis technology is used to search for the water-rich areas and water-richness around the working face. Then, based on the actual records of the water exploration and release project and the spatial position of each borehole, the spatial relationship between the water exploration project and the excavation face is calculated. If there is a suspicious water-rich area in front of the excavation face and no advance exploration is carried out, a blue, yellow, orange and red graded warning is implemented according to the distance from the water exploration project to the excavation face; 9) Multi-factor credit enhancement warning Based on the graded warning results of six factors, the warning value corresponding to blue is 0.2, the warning value corresponding to yellow is 0.4, the warning value corresponding to orange is 0.6, the warning value corresponding to red is 0.8, and the warning value that does not reach the blue warning level is 0; the multi-factor comprehensive warning value is calculated using the credit enhancement method, and a four-color comprehensive warning is issued according to the comprehensive warning value according to 0.2, 0.4, 0.6 and 0.
8.
9. The GIS-based coal mine water hazard holographic source modal early warning method according to claim 1 is characterized in that: Step 7 is specifically as follows: to achieve advanced identification and transparent management of coal mine water hazard-causing factors, advanced and accurate early warning of coal mine water hazards, and to find the root cause of coal mine water hazards through the calculation and inversion of source and modal early warning parameters, so as to provide technical support for the effective prevention and control of coal mine water hazards.
10. A coal mine water hazard holographic source modal early warning system based on GIS base, characterized in that: A holographic origin modal warning method for coal mine water hazards based on a GIS base is used to implement any one of claims 1-9, comprising a coal mine water hazard holographic and all-round warning GIS digital base, a holographic and all-round dynamic data access system, a real-time computing system, a spatial analysis service computing system, a coal mine water hazard alarm warning threshold library, a calculation and inversion module for coal mine water hazard origin and modal warning parameters, and a coal mine water hazard holographic modal warning GIS platform.
Citation Information
Patent Citations
Coal mining water inrush early warning method based on GIS technology
CN106453468A
Cited By
Mine intelligent disaster avoidance path planning method
CN121521123A
A method for intelligent disaster avoidance path planning in mines
CN121521123B
