Method for obtaining the fault resistance interval corresponding to the starting setting value in an ungrounded system

By constructing the mathematical relationship between zero-sequence voltage and fault resistance, and quantifying the corresponding relationship between the starting setting value and fault resistance, the problem of rough setting of the starting setting value in ungrounded systems is solved, and the rapid and effective identification and detection of single-phase grounding faults is achieved. The efficient start-up of the protection device avoids delays in fault handling and heavy losses.

CN118275819BActive Publication Date: 2024-10-18STATE GRID SICHUAN ELECTRIC POWER CORP ELECTRIC POWER RES INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410389172.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-10-18
Estimated Expiration
2044-04-02

AI Technical Summary

Technical Problem

The existing technology lacks a mathematical relationship to characterize the zero-sequence voltage startup setting and its reliable startup fault transition resistance interval in ungrounded systems, resulting in rough startup setting settings and inability to adapt to the distribution differences of different 10kV feeder-to-ground capacitances in different substations, resulting in If the starting value is too high, it cannot be started reliably, which may easily lead to delays in troubleshooting and cause significant losses of life and property.

Method used

By constructing the characterization relationship between zero-sequence voltage and fault resistance, mathematical methods are used to quantify the corresponding relationship between the starting setting value and the fault resistance identification interval, clarify the upper limit of the identifiable transition resistance of the starting setting value, and establish the zero-sequence voltage starting setting value and fault resistance The mathematical boundary between them guides production to set reasonable starting settings and improves the starting ability of the protection device.

Benefits of technology

It achieves rapid and effective identification of single-phase ground faults in ungrounded systems, improves the startup capability of the protection device, and avoids fault handling delays and heavy losses caused by excessive startup settings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118275819B_ABST
    Figure CN118275819B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for obtaining a fault resistance interval corresponding to a starting constant in an ungrounded system, and relates to the technical field of distribution network fault identification. The method comprises: constructing a characterization relationship between a starting constant of a zero-sequence voltage in a distribution system and a fault resistance to which it is adapted; building a bridge between a starting constant of a zero-sequence voltage and a fault resistance to which it is adapted, thereby bridging the problem that the traditional setting of the constant has no basis to rely on and relies only on insufficient experience in avoiding the initial asymmetry under normal system operation; in addition, for the first time, an analytical characterization method is adopted to quantify the mathematical relationship between the two, which can clearly guide the setting of protection parameters including the starting constant in production, reliably improve the starting capability of a fault line selection protection device including a primary and secondary integrated set, efficiently and sensitively realize rapid and effective identification of a single-phase grounding fault, and reliably realize rapid starting of a grounding fault analysis function, so as to avoid causing a larger range of significant and irreparable loss of life and property.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of distribution network fault identification, and more specifically, to a method for obtaining a fault resistance interval corresponding to a starting set value in an ungrounded system. Background Art

[0002] Among the types of distribution network faults, single-phase grounding faults account for a high proportion, and most of them are instantaneous, which often leads to the dilemma of "not being able to patrol the line" during on-site fault investigation. Therefore, how to improve the accuracy of single-phase grounding fault judgment in the field of grounding fault judgment has always been widely concerned; according to existing research, the key factors affecting the fault identification performance of the line selection device are mainly in two aspects: starting performance and judgment performance; Regarding the latter, after long-term research, a large number of scholars have proposed more than ten algorithms including the first half-wave and phase asymmetry methods based on the characteristics of grounding faults and steady-state faults, and the judgment system is relatively rich. As for the former, few scholars have quantified the starting ability under ungrounded systems, that is, how to characterize the relationship between the zero-sequence voltage starting constant and the upper and lower limits of the fault resistance; in existing research, the zero-sequence voltage starting constant is almost only set in combination with operating experience, that is, considering that the system imbalance under the ungrounded distribution network is generally not more than 4%, the zero-sequence voltage starting constant is set to avoid the zero-sequence voltage during normal operation of the system, but this method is obviously rough, and naturally blocks the bridge between the starting constant and the identifiable transition resistance. Summary of the invention

[0003] The purpose of the present invention is to provide a method for obtaining the fault resistance interval corresponding to the starting setting in an ungrounded system, to quantify the correspondence between the zero-sequence voltage starting setting and the fault resistance identification interval from a mathematical point of view, to quantitatively judge the upper limit capacity of the identifiable transition resistance corresponding to the starting setting, and to set a scientific starting setting in combination with the coverage of vegetation, trees, etc. when the line passes through the forest and grassland, so as to reliably control the first "start-up" before fault analysis.

[0004] The above technical objectives of the present invention are achieved through the following technical solutions:

[0005] In a first aspect, the present application provides a method for obtaining a fault resistance interval corresponding to a starting setting in an ungrounded system, comprising the following specific steps:

[0006] The characterization relationship between the starting setting value of the zero-sequence voltage in the distribution system and the fault resistance it adapts to is constructed. The characterization relationship is specifically as follows:

[0007] Among them, u i 2 +u r 2 =u 00 2;

[0008] In the formula, R al Indicates the fault resistance, U a0 It represents the A phase voltage of the three-phase voltage in the power distribution system, S represents the starting value of the zero-sequence voltage, u 00 Indicates the asymmetry of the power distribution system during normal operation, u r represents the real part of the asymmetry, u i The imaginary part of the asymmetry, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

[0009] The beneficial effects of the present invention are as follows: in the present scheme, there is a lack of mathematical relationship between the zero-sequence voltage starting setting and its reliable starting fault transition resistance interval in the ungrounded system, which often leads to the on-site setting of the starting setting in combination with the production operation experience, that is, considering the general situation that the system imbalance does not exceed 4% in the ungrounded mode, it is impossible to adapt to the distribution difference of the ground capacitance of different 10kV feeders in different substations, and even once caused the starting setting to be too high, and it is impossible to reliably start for high resistance, which ultimately leads to the delay of the best time for fault handling, resulting in a larger range of irreparable and significant loss of life and property; and from a mathematical perspective, the corresponding relationship between the zero-sequence voltage starting setting and the fault resistance identification interval is quantified, and the upper limit capacity of the identifiable transition resistance corresponding to the starting setting can be quantitatively judged, so as to clarify the mathematical boundary between the zero-sequence voltage starting setting and the highest fault resistance identification capacity it adapts to, so as to facilitate the production line to set a reasonable starting setting, reliably improve the starting capacity of the protection device, and efficiently and sensitively realize the rapid and effective identification of single-phase grounding faults.

[0010] In this scheme, a bridge is built between the zero-sequence voltage starting setting and its adaptive fault resistance, which makes up for the problem that the traditional setting of this setting has no basis and relies only on insufficient experience to avoid the initial asymmetry under normal system operation. In addition, for the first time, an analytical characterization method is used to quantify the mathematical relationship between the two, which can clearly guide the setting of protection parameters including the production setting starting setting, reliably improve the starting capability of fault line selection protection devices such as primary and secondary integrated sets, efficiently and sensitively realize the rapid and effective identification of single-phase grounding faults, and reliably realize the rapid startup of the grounding fault analysis function, so as to avoid causing larger-scale and irreparable major losses of life and property.

[0011] Based on the above technical solution, the present invention can also be improved as follows.

[0012] Furthermore, the above asymmetry is specifically:

[0013]

[0014] In the formula, u 00Indicates the asymmetry of the power distribution system during normal operation, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c It represents the capacitance parameter of phase C voltage to ground in three-phase voltage. e represents the operator, and its value is Wherein, j represents the sign of the imaginary part.

[0015] Furthermore, the above startup setting satisfies the first constraint condition, which is specifically:

[0016]

[0017] In the formula, u 00 It indicates the asymmetry of the power distribution system during normal operation, S indicates the starting value of the zero-sequence voltage, d al represents the damping rate under fault conditions, and j represents the sign of the imaginary part.

[0018] Furthermore, the damping rate under the above fault is specifically:

[0019]

[0020] Where, d al represents the damping rate under fault, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c Indicates the capacitance parameter of phase C voltage to ground in three-phase voltage, ω=2πf, T=50Hz, g al Represents the inverse of the fault resistance, R al represents the fault resistance, X c Represents capacitive reactance, U a0 Indicates the A-phase voltage of the three-phase voltage in the power distribution system, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

[0021] In a second aspect, the present application provides a system for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system, which is applied to a method for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system according to any one of the first aspects, including:

[0022] The first module is used to construct the characterization relationship between the starting setting value of the zero-sequence voltage in the distribution system and the fault resistance it adapts to. The characterization relationship is specifically:

[0023] Among them, u i 2 +u r 2 =u00 2 ;

[0024] In the formula, R al Indicates the fault resistance, U a0 It represents the A phase voltage of the three-phase voltage in the power distribution system, S represents the starting value of the zero-sequence voltage, u 00 Indicates the asymmetry of the power distribution system during normal operation, u r represents the real part of the asymmetry, u i The imaginary part of the asymmetry, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

[0025] Furthermore, in the first module above, the asymmetry is specifically:

[0026]

[0027] In the formula, u 00 Indicates the asymmetry of the power distribution system during normal operation, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c It represents the capacitance parameter of phase C voltage to ground in three-phase voltage. e represents the operator, and its value is Wherein, j represents the sign of the imaginary part.

[0028] Furthermore, in the first module, the startup constant satisfies the first constraint condition, and the first constraint condition is specifically:

[0029]

[0030] In the formula, u 00 It indicates the asymmetry of the power distribution system during normal operation, S indicates the starting value of the zero-sequence voltage, d al represents the damping rate under fault conditions, and j represents the sign of the imaginary part.

[0031] Furthermore, in the first module above, the damping rate under fault is specifically:

[0032]

[0033] Where, d al represents the damping rate under fault, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c Indicates the capacitance parameter of phase C voltage to ground in three-phase voltage, ω=2πf, T=50Hz, g al Represents the inverse of the fault resistance, Ral represents the fault resistance, X c Represents capacitive reactance, U a0 Indicates the A-phase voltage of the three-phase voltage in the power distribution system, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

[0034] In a third aspect, the present application provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements any one of the methods in the first aspect when executing the computer program.

[0035] In a fourth aspect, the present application provides a non-transitory computer-readable storage medium, which stores computer instructions, and the computer instructions enable a computer to execute any one of the methods in the first aspect.

[0036] Compared with the prior art, the present invention has at least the following beneficial effects:

[0037] In the present application, there is a lack of mathematical relationship between the zero-sequence voltage starting setting and its reliable starting fault transition resistance interval in the ungrounded system, which often leads to the on-site setting of the starting setting in combination with the production operation experience, that is, considering the general situation that the system imbalance does not exceed 4% in the ungrounded mode, it is impossible to adapt to the distribution differences of the ground capacitance of different 10kV feeders in different substations, and even once caused the starting setting to be too high, and it is impossible to reliably start for high resistance, which ultimately leads to the delay of the best time for fault handling, resulting in a larger range of irreparable and major losses of life and property; and quantifying the correspondence between the zero-sequence voltage starting setting and the fault resistance identification interval from a mathematical perspective, the upper limit capacity of the identifiable transition resistance corresponding to the starting setting can be quantitatively judged, so as to clarify the mathematical boundary between the zero-sequence voltage starting setting and the highest fault resistance identification capacity it adapts to, so as to facilitate the production line to set a reasonable starting setting, reliably improve the starting capacity of the protection device, and efficiently and sensitively realize the rapid and effective identification of single-phase grounding faults.

[0038] In the present application, a bridge is built between the zero-sequence voltage starting setting and its adaptive fault resistance, which makes up for the problem that the traditional setting of this setting has no basis and relies only on insufficient experience to avoid the initial asymmetry under normal system operation; in addition, an analytical characterization method is used for the first time to quantify the mathematical relationship between the two, which can clearly guide the setting of protection parameters including the production setting starting setting, reliably improve the starting capability of fault line selection protection devices such as primary and secondary integrated sets, efficiently and sensitively realize the rapid and effective identification of single-phase grounding faults, and reliably realize the rapid startup of the grounding fault analysis function, so as to avoid causing larger-scale and irreparable major losses of life and property. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0040] Figure 1 The relationship between the zero-sequence voltage and the fault damping rate in the ungrounded system provided in the embodiment of the present invention;

[0041] Figure 2 It is a zero-sequence voltage starting high-resistance resistance curve when the asymmetry of the power distribution system is 1.5% in an embodiment of the present invention;

[0042] Figure 3 It is a zero-sequence voltage starting high-resistance capability curve when the asymmetry of the power distribution system is 3.5% in an embodiment of the present invention;

[0043] Figure 4 The power distribution system in the embodiment of the present invention is capable of reliably starting the maximum transition resistance by setting the same zero-sequence voltage starting value to 5% under different capacities and currents;

[0044] Figure 5 It is a logarithmic variation curve of the zero-sequence voltage amplitude, the zero-sequence voltage amplitude mutation amount and the zero-sequence voltage phasor mutation amount in a large range of scales of the distribution system according to the embodiment of the present invention that changes with the fault damping rate;

[0045] Figure 6 It is a logarithmic variation curve of the zero-sequence voltage amplitude, the zero-sequence voltage amplitude mutation amount and the zero-sequence voltage phasor mutation amount in a small range scale of the distribution system in an embodiment of the present invention that changes with the fault damping rate. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0047] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0049] In the description of the embodiments of the present invention, "plurality" means at least 2.

[0050] Embodiment 1:

[0051] This embodiment provides a method for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system, including the following three steps:

[0052] S1. When the power distribution system is operating normally al = 0, the steady-state value of the zero-sequence voltage of the distribution system is determined by the error u 00 Therefore, the starting setting of the zero-sequence voltage only needs to avoid the asymmetry and add a sufficient margin; as for the transient zero-sequence voltage caused by operations such as opening and closing, the influence of the transient process can be eliminated through a certain delay algorithm.

[0053] Furthermore, assuming that the startup setting is set to SU a0 , then the ground fault d al The scope meets:

[0054]

[0055] in, is the asymmetry of the power distribution system during normal operation. d al is the damping rate under fault, and its value is The variable S is the set zero-sequence voltage starting constant threshold. According to traditional experience, this value needs to avoid the initial system asymmetry during normal system operation.

[0056] S2, asymmetry It is a phase quantity, and its direction is determined by the mutual size relationship of the three-phase capacitance to ground. It is obviously different for different distribution systems. For the same distribution system, as the network structure, operation mode and meteorological conditions change, the three-phase capacitance to ground also changes. Moreover, when a fault occurs in the ABC phases of the distribution system, the fault admittance and The phase relationship of is also significantly different; in the inequality in S1, when the fault impedance is small, that is, d al When it is very large, it can be ignored If the influence of is eliminated, the solution of the inequality is very simple; The magnitude and phase of d only have an effect at the limit impedance. al is much smaller than 1, so the inequality in S1 can be simplified to:

[0057] Furthermore, for the inequality: Can be defined in: Then, simplify it into the following form:

[0058]

[0059] S3, combined with the damping rate under fault The mathematical relationship between the fault resistance and the zero-sequence voltage starting setting can be further obtained as follows:

[0060]

[0061] Among them, U a0 is the A phase voltage among the three-phase voltage; I c is the maximum current capacity of the distribution system when a metallic ground fault occurs; S is the set zero-sequence voltage starting threshold; u r 、u i are the system asymmetry phasors The real and imaginary parts of

[0062] Furthermore, the mathematical relationship between the starting constant value of the zero-sequence voltage and the fault transition resistance (fault resistance) described in S3 is converted into an optimization problem, which can be solved with the help of optimization software such as Gurobi and Cplex, so as to obtain the upper and lower ranges of the identifiable fault transition resistance under the starting constant value of the zero-sequence voltage; in other words, R al The key to obtaining the maximum and minimum values ​​is Whether the value is minimum or maximum.

[0063] Further, obj: subject to you i 2 +u r 2 =u 00 2 ; For the above formula, u 00 is the amplitude of the asymmetry phase when the system is operating normally; As the target, the maximum and minimum values ​​can be obtained to obtain the startable fault resistance range under the preset zero-sequence voltage starting setting. In addition, it can be seen that under the same starting setting S, for different distribution systems, due to their significantly different asymmetry and capacitive current, the highest fault impedance that can be started is also significantly different.

[0064] Embodiment 2:

[0065] In this embodiment, the typical capacitor current I c = 10A distribution system as an example, take the phase electromotive force U a0=6kV, the key factor that determines the limit fault resistance is asymmetry; how big is the asymmetry of the system? According to relevant literature, the difference in capacitance between the three phases ABC and ground is the largest for the horizontally arranged towers of the medium-voltage distribution network, which can reach 10%. When a distribution system uses all such towers and does not transpose, the asymmetry is The theoretical maximum value is 3.5%. However, in reality, not all outgoing poles of a distribution network are arranged horizontally, and are usually transposed at the outgoing line or busbar.

[0066] Obviously, when u i = ±3.5%, u r = 0, The maximum and minimum values ​​can be obtained, which are That is to say, when The fault can start, and A partial failure can start Failure to start.

[0067] According to the above relationship, the adaptability curve of the zero-voltage starting algorithm to the fault transition resistance under typical asymmetry is listed as follows: Figure 1-Figure 6 As shown, Figure 1 is the relationship between zero-sequence voltage and fault damping rate, where it is expressed as the fluctuation of zero-sequence voltage of the system under different fault resistances when the neutral point is not grounded. In the figure, it is measured by the percentage of phase voltage. The larger the value, the more obvious the fault characteristics are. Usually, the smaller the damping rate, the weaker the fault characteristics are. Figure 2 The zero-sequence voltage starting high-resistance tolerance curve under the asymmetry of 1.5%, which expresses the fault resistance range that can be effectively started by taking the starting criterion constructed by the zero-sequence voltage threshold when the system imbalance is 1.5%. As the threshold value increases, its ability to reliably start high-resistance is also weaker; Figure 3 The zero-sequence voltage starting high-resistance tolerance curve under the asymmetry of 3.5%, which expresses the fault resistance range that can be effectively started by taking the starting criterion constructed by the zero-sequence voltage threshold when the system imbalance is 3.5%. As the threshold value increases, its ability to reliably start high-resistance is also weaker; Figure 4 The same zero-sequence voltage starting value of 5% is set for the distribution system under different currents to reliably start the maximum transition resistance. It is expressed as setting the same zero-sequence voltage starting threshold, i.e. 5%, for systems under different currents. As the current of the system increases, its ability to reliably start high resistance gradually decreases. Figure 5It is the logarithmic variation curve of the zero-sequence voltage amplitude, zero-sequence voltage amplitude mutation and zero-sequence voltage phasor mutation of the distribution system under a large range of scales with the change of fault damping rate. Among them, it is expressed to distinguish and compare the performance advantages and disadvantages of three different starting thresholds, and depicts the percentage of the three thresholds in the phase voltage under the fault damping rate with the horizontal axis as the percentage. The larger the value, the better the starting performance. Figure 6 is the logarithmic variation curve of the zero-sequence voltage amplitude, zero-sequence voltage amplitude mutation and zero-sequence voltage phasor mutation of the distribution system under a small scale with the change of fault damping rate, where it is expressed as Figure 5 On this basis, the performance differences of the three starting thresholds under the fault damping rate of 0.001-0.1 logarithmic coordinates are magnified for intuitive observation; it can be seen that the higher the balance of the system, the smaller the asymmetry, and the higher the transition resistance that the zero-voltage starting algorithm can tolerate; the set value that can be reliably started under typical asymmetry is generally between 5 and 10 kΩ, while the upper limit of the fault impedance that can be partially started increases with the smaller asymmetry, and the upper limit of the fault impedance that can be partially started decreases, and the difference between the two decreases with the increase of the starting set value.

[0068] Embodiment 3:

[0069] This embodiment provides a method for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system, including the following specific steps:

[0070] The characterization relationship between the starting setting value of the zero-sequence voltage in the distribution system and the fault resistance it adapts to is constructed. The characterization relationship is specifically as follows:

[0071] Among them, u i 2 +u r 2 =u 00 2 ;

[0072] In the formula, R al Indicates the fault resistance, U a0 It represents the A phase voltage of the three-phase voltage in the power distribution system, S represents the starting value of the zero-sequence voltage, u 00 Indicates the asymmetry of the power distribution system during normal operation, u r represents the real part of the asymmetry, u i The imaginary part of the asymmetry, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

[0073] Optionally, the above asymmetry is specifically:

[0074]

[0075] In the formula, u 00 Indicates the asymmetry of the power distribution system during normal operation, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c It represents the capacitance parameter of phase C voltage to ground in three-phase voltage. e represents the operator, and its value is Wherein, j represents the sign of the imaginary part.

[0076] Optionally, the above startup setting satisfies a first constraint condition, and the first constraint condition is specifically:

[0077]

[0078] In the formula, u 00 It indicates the asymmetry of the power distribution system during normal operation, S indicates the starting value of the zero-sequence voltage, d al represents the damping rate under fault conditions, and j represents the sign of the imaginary part.

[0079] Optionally, the damping rate under the above fault is specifically:

[0080]

[0081] Where, d al represents the damping rate under fault, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c Indicates the capacitance parameter of phase C voltage to ground in three-phase voltage, ω=2πf, f=50Hz, g al Represents the inverse of the fault resistance, R al represents the fault resistance, X c Represents capacitive reactance, U a0 Indicates the A-phase voltage of the three-phase voltage in the power distribution system, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

[0082] Embodiment 4:

[0083] The present application provides a system for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system, which is applied to a method for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system in any one of Embodiment 3, including:

[0084] The first module is used to construct the characterization relationship between the starting setting value of the zero-sequence voltage in the distribution system and the fault resistance it adapts to. The characterization relationship is specifically:

[0085] Among them, u i2 +u r 2 =u 00 2 ;

[0086] In the formula, R al Indicates the fault resistance, U a0 It represents the A phase voltage of the three-phase voltage in the power distribution system, S represents the starting value of the zero-sequence voltage, u 00 Indicates the asymmetry of the power distribution system during normal operation, u r represents the real part of the asymmetry, u i The imaginary part of the asymmetry, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

[0087] Optionally, in the first module above, the asymmetry is specifically:

[0088]

[0089] In the formula, u 00 Indicates the asymmetry of the power distribution system during normal operation, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c It represents the capacitance parameter of phase C voltage to ground in three-phase voltage. e represents the operator, and its value is Wherein, j represents the sign of the imaginary part.

[0090] Optionally, in the first module, the startup constant satisfies a first constraint condition, and the first constraint condition is specifically:

[0091]

[0092] In the formula, u 00 It indicates the asymmetry of the power distribution system during normal operation, S indicates the starting value of the zero-sequence voltage, d al represents the damping rate under fault conditions, and j represents the sign of the imaginary part.

[0093] Optionally, in the first module above, the damping rate under fault is specifically:

[0094]

[0095] Where, d al represents the damping rate under fault, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C cIndicates the capacitance parameter of phase C voltage to ground in three-phase voltage, ω=2πf, T=50Hz, g al Represents the inverse of the fault resistance, R al represents the fault resistance, X c Represents capacitive reactance, U a0 Indicates the A-phase voltage of the three-phase voltage in the power distribution system, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

[0096] Embodiment 5:

[0097] An embodiment of the present application provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements any one of the methods in Embodiment 3 when executing the computer program.

[0098] Embodiment 6:

[0099] An embodiment of the present application provides a non-transitory computer-readable storage medium, which stores computer instructions, and the computer instructions enable a computer to execute any one of the methods in Example 3.

[0100] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system, characterized in that: The specific steps include: A characterization relationship between the starting setting of the zero-sequence voltage in the power distribution system and the fault resistance to which it is adapted is constructed, and the characterization relationship is specifically as follows: Among them, u i 2 +u r 2 =u 00 2 ; In the formula, R al Indicates the fault resistance, U a0 It represents the A phase voltage of the three-phase voltage in the power distribution system, S represents the starting value of the zero-sequence voltage, u 00 Indicates the asymmetry of the power distribution system during normal operation, u r represents the real part of the asymmetry, u i The imaginary part of the asymmetry, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

2. The method for obtaining the fault resistance interval corresponding to the starting setting value in an ungrounded system according to claim 1, characterized in that: The asymmetry is specifically: In the formula, u 00 Indicates the asymmetry of the power distribution system during normal operation, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c It represents the capacitance parameter of phase C voltage to ground in three-phase voltage. e represents the operator, and its value is Wherein, j represents the sign of the imaginary part.

3. The method for obtaining the fault resistance interval corresponding to the starting setting value in an ungrounded system according to claim 1, characterized in that: The startup setting satisfies a first constraint condition, and the first constraint condition is specifically: In the formula, u 00 It indicates the asymmetry of the power distribution system during normal operation, S indicates the starting value of the zero-sequence voltage, d al represents the damping rate under fault conditions, and j represents the sign of the imaginary part.

4. The method for obtaining the fault resistance interval corresponding to the starting setting value in an ungrounded system according to claim 3, characterized in that: The damping rate under the fault is specifically: Where, d al represents the damping rate under fault, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c Indicates the capacitance parameter of phase C voltage to ground in three-phase voltage, ω=2πf, f=50Hz, g al Represents the inverse of the fault resistance, R al represents the fault resistance, X c Represents capacitive reactance, U a0 Indicates the A-phase voltage of the three-phase voltage in the power distribution system, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

5. A system for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system, applied to a method for obtaining a fault resistance interval corresponding to a starting setting value in an ungrounded system according to any one of claims 1 to 4, characterized in that: include: The first module is used to construct a characterization relationship between the starting setting of the zero-sequence voltage in the power distribution system and the fault resistance to which it is adapted, wherein the characterization relationship is specifically: Among them, u i 2 +u r 2 =u 00 2 ; In the formula, R al Indicates the fault resistance, U a0 It represents the A phase voltage of the three-phase voltage in the power distribution system, S represents the starting value of the zero-sequence voltage, u 00 Indicates the asymmetry of the power distribution system during normal operation, u r represents the real part of the asymmetry, u i The imaginary part of the asymmetry, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

6. The system for obtaining the fault resistance interval corresponding to the starting setting value in an ungrounded system according to claim 5, characterized in that: In the first module, the asymmetry is specifically: In the formula, u 00 Indicates the asymmetry of the power distribution system during normal operation, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c It represents the capacitance parameter of phase C voltage to ground in three-phase voltage. e represents the operator, and its value is Wherein, j represents the sign of the imaginary part.

7. The system for obtaining the fault resistance interval corresponding to the starting setting value in an ungrounded system according to claim 5, characterized in that: In the first module, the startup setting satisfies a first constraint condition, and the first constraint condition is specifically: In the formula, u 00 It indicates the asymmetry of the power distribution system during normal operation, S indicates the starting value of the zero-sequence voltage, d al represents the damping rate under fault conditions, and j represents the sign of the imaginary part.

8. The system for obtaining the fault resistance interval corresponding to the starting setting value in an ungrounded system according to claim 5, characterized in that: In the first module, the damping rate under the fault is specifically: Where, d al represents the damping rate under fault, C a Indicates the capacitance parameter of phase A voltage to ground in three-phase voltage, C b Indicates the capacitance parameter of phase B voltage to ground in three-phase voltage, C c Indicates the capacitance parameter of phase C voltage to ground in three-phase voltage, ω=2πf, f=50Hz, g al Represents the inverse of the fault resistance, R al represents the fault resistance, X c Represents capacitive reactance, U a0 Indicates the A-phase voltage of the three-phase voltage in the power distribution system, I c Indicates the maximum current capacity of the power distribution system when a metallic ground fault occurs.

9. An electronic device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the method according to any one of claims 1 to 4 is implemented when the processor executes the computer program.

10. A non-transitory computer-readable storage medium, characterized in that: The non-transitory computer-readable storage medium stores computer instructions, which enable a computer to execute the method of any one of claims 1-4.

Citation Information

Patent Citations

  • Method capable of realizing low-current route selection and fault location

    CN102798795A

  • Zero-sequence voltage starting setting method for arc suppression coil grounding system of distribution network

    CN115528661A