A cofferdam structure for pile foundation construction

By using a T-shaped chute and slider structure during pile foundation construction, combined with a driving and locking mechanism, the cofferdam is sealed and easily disassembled and assembled, and the existing technology problems of sealing and disassembly and assembly of the cofferdam structure are solved. problems and improve construction efficiency and effect.

CN118309092BActive Publication Date: 2024-10-11SHANGHAI XIAOCHONG CONSTR ENG CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410742934.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2024-10-11
Estimated Expiration
2044-06-11

AI Technical Summary

Technical Problem

The cofferdam structure in the existing pile foundation construction has problems in terms of sealing and difficulty in disassembly and assembly. Water will leak if the seal is not tight, and installation and disassembly will be difficult if the seal is tight.

Method used

It adopts a T-shaped chute and slider structure, and realizes the tight insertion and release of the sealing plate through the driving mechanism and locking mechanism. The movable gap and the trigger block are used to drive the sealing plate into the sealing groove. The support frame is supported and disassembled through the snap-in assembly. Ensure the tightness of the cofferdam and easy disassembly and assembly.

Benefits of technology

It effectively reduces the water leakage of the cofferdam, simplifies the installation and disassembly process, and improves the sealing effect and operation convenience of the cofferdam.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118309092B_ABST
    Figure CN118309092B_ABST
Patent Text Reader

Abstract

The present application discloses a cofferdam structure for pile foundation construction, which relates to the field of pile foundation construction, and includes a plurality of pile bodies, T-shaped slide grooves and T-shaped sliders are respectively arranged on both sides of the pile body, sealing grooves and sealing plates are arranged on both sides of the pile body, a trigger block is arranged in the pile body, a driving mechanism is arranged in the pile body, a locking mechanism is arranged in the pile body, a hanging plate is arranged on the pile body, and a supporting frame is placed on the hanging plate. The present application utilizes the driving mechanism and the locking mechanism, and when the cofferdam is installed, the movable gap between the T-shaped slider and the T-shaped slide groove is convenient for plugging and assembling the two pile bodies, and when the two pile bodies are assembled, the trigger block abuts against the triggering driving mechanism, and the driving mechanism drives the pile body to move and makes the sealing plate tightly plugged into the sealing groove, thereby sealing the connection between the two pile bodies, and when the cofferdam is disassembled, the supporting frame is removed from the hanging plate, and the locking mechanism releases the lock on the trigger block, so that the sealing plate is released from the tight plugging with the sealing groove, so that the cofferdam can be disassembled smoothly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of pile foundation construction, and in particular to a cofferdam structure for pile foundation construction. Background Art

[0002] The cofferdam structure in pile foundation construction is a temporary retaining facility. During pile foundation construction, the cofferdam structure can effectively isolate the construction area from the external environment, prevent water from entering the construction area, and provide a stable working platform for construction.

[0003] Most of the existing cofferdam structures are made of multiple steel sheet piles. During the pile insertion operation, adjacent steel sheet piles are connected by locking joints. The waterproofing of the cofferdam is mainly achieved by sealing the locking joints between the steel sheet piles. When the locking joints between the steel sheet piles are not tightly sealed, the cofferdam will leak; when the locking joints between the steel sheet piles are tightly sealed, the friction between the locking joints of adjacent steel sheet piles is large, making the installation and removal of the steel sheet piles more difficult. Summary of the invention

[0004] In order to facilitate the disassembly and assembly of the cofferdam while reducing water leakage of the cofferdam, the present application provides a cofferdam structure for pile foundation construction.

[0005] The present application provides a cofferdam structure for pile foundation construction that adopts the following technical solution:

[0006] A cofferdam structure for pile foundation construction comprises a plurality of pile bodies, one side of the pile body is provided with a T-shaped slide groove, the other side is provided with a T-shaped slider for sliding along the horizontal direction, the T-shaped slider of one pile body is provided in the T-shaped slide groove of another pile body for sliding along the vertical direction, and there is a movable gap between the T-shaped slider and the T-shaped slide groove, a sealing groove is provided on the side wall of the pile body close to the T-shaped slide groove, a sealing plate is fixedly provided on the other side, a trigger block is provided on the bottom wall of the pile body located at the sealing groove, a driving mechanism is provided in the side of the pile body close to the sealing plate, and when the T-shaped slider of one pile body is fully inserted into the T-shaped slide groove of the other pile body, the trigger block abuts against the T-shaped slide groove, and the trigger block abuts against the T-shaped slide groove. A contact trigger driving mechanism is provided, wherein the driving mechanism drives one pile body to move toward another pile body and enables the sealing plate to be tightly inserted into the sealing groove, and an avoidance groove for accommodating the trigger block is provided on the side wall of the sealing plate; a locking mechanism for limiting and fixing the trigger block is provided in the pile body, and a hanging plate connected to the locking mechanism is provided on the side of the pile body close to the inside of the cofferdam structure, and support frames are placed on multiple hanging plates. When the support frames are removed from the hanging plates, the support frames release the locking mechanism of the trigger block, the trigger block moves and releases the trigger driving mechanism, and the driving mechanism drives one pile body to move toward a direction away from the other pile body.

[0007] By adopting the above technical solution, when installing the cofferdam, the T-shaped slider of one pile body is slidably installed in the T-shaped slide groove of another pile body. Since there is a movable gap between the T-shaped slider and the T-shaped slide groove, the two pile bodies can be smoothly plugged and assembled. When the T-shaped slider is fully inserted into the T-shaped slide groove, the trigger block abuts against the trigger drive mechanism, and the drive mechanism drives the pile body to move and the sealing plate is tightly plugged into the sealing groove, so that the connection between the two pile bodies can be sealed. After the cofferdam is assembled, the support frame is placed on the hanging plate so that the support frame supports the cofferdam structure. When disassembling the cofferdam, the support frame is removed from the hanging plate. At this time, the locking mechanism releases the lock on the trigger block, and the trigger block moves and releases the trigger drive mechanism, so that the sealing plate is released from the tight plug-in state with the sealing groove, so that the cofferdam can be smoothly disassembled.

[0008] Preferably, the driving mechanism includes a first rack, a second rack, a first gear, a second gear and a third gear, the first rack being slidably disposed in a sealing plate and a pile body, an end portion of the first rack extending out of the sealing plate away from a side wall of the pile body, the second rack being fixedly disposed on a side wall of a T-shaped slider close to the first rack, the first gear and the second gear being both rotatably disposed in the pile body and meshing with each other, the second gear meshing with the second rack, the third gear being coaxially fixedly disposed on the first gear and meshing with the first rack, the diameter of the third gear being larger than the diameter of the first gear, and when the T-shaped slider of one pile body is completely inserted into the T-shaped slide groove of another pile body, the trigger block abuts against the end portion of the first rack and pushes the first rack to move toward the pile body.

[0009] By adopting the above technical solution, when the T-shaped slider is fully inserted into the T-shaped slide groove, the trigger block pushes the first rack to move toward the pile body, the first rack drives the second gear to rotate through the first gear and the third gear, and the second gear rotates on the second rack. Since the second rack is fixed on the T-shaped slider, the second gear drives the pile body to move toward the direction close to the other pile body, so that the sealing plate is inserted into the sealing groove, thereby being able to seal the connection of the cofferdam structure.

[0010] Preferably, two sealing grooves are provided along the width direction of the T-shaped slide groove, two sealing plates are provided along the width direction of the T-shaped slide block, and the two sealing plates are respectively located in the two sealing grooves.

[0011] By adopting the above technical solution, when the two pile bodies are assembled, the two sealing plates are tightly inserted into the two sealing grooves, thereby further making it difficult for the cofferdam to leak.

[0012] Preferably, the driving mechanism is arranged in multiple on both sides of the pile body close to the two sealing plates, and the pile body is rotatably provided with a first synchronization shaft and a second synchronization shaft on both sides in the width direction of the T-shaped slider, the first synchronization shaft is fixedly penetrated with multiple first gears and third gears, and the second synchronization shaft is fixedly penetrated with multiple second gears.

[0013] By adopting the above technical solution, when the pile body is assembled, multiple driving mechanisms jointly drive the pile body to move, thereby making the movement of the pile body more stable. At the same time, the first synchronization shaft makes the multiple first gears and the third gears rotate synchronously, and the second synchronization shaft makes the multiple second gears rotate synchronously, thereby further improving the stability of the pile body movement.

[0014] Preferably, a first elastic member is provided in the pile body, and the first elastic member is located at a side of the first rack away from the sealing plate and abuts against an end of the first rack.

[0015] By adopting the above technical solution, when the T-shaped slider is inserted into the T-shaped slide groove, the first elastic member pushes the first rack to move toward the other pile body, so that the side walls of the two pile bodies close to each other are not easy to contact, which further facilitates the assembly of the cofferdam.

[0016] Preferably, the locking mechanism includes a slide plate and a locking block, the trigger block is slidably arranged in the pile body, the slide plate is slidably arranged in the pile body along a direction perpendicular to the movement of the trigger block, a locking groove is opened on the side wall of the slide plate close to the trigger block, the end of the trigger block is located in the locking groove, the end of the slide plate close to the inside of the cofferdam passes through the pile body, the hanging plate is fixedly arranged on the end of the slide plate close to the inside of the cofferdam, the locking block is placed on the hanging plate, the two ends of the locking block abut the hanging plate and the pile body and lock the slide plate, the slide locks the trigger block through the locking groove, and the support frame is placed in a plurality of locking blocks, when the support frame is removed from the hanging plate, the support frame drives the locking block to separate from the hanging plate through the clamping assembly, the slide plate moves and releases the lock of the trigger block.

[0017] By adopting the above technical solution, when the cofferdam is installed, the locking block locks the slide plate through the hanging plate, and the slide plate locks the trigger block through the locking groove, so that the trigger block can trigger the driving mechanism. When the cofferdam is dismantled, the supporting frame is first disassembled and removed, and the supporting frame drives the locking block to separate from the hanging plate through the clamping assembly, so that the locking block releases the lock on the slide plate, and then releases the lock on the trigger block. When the pile body is pulled out, the sealing plate of one pile body will not be tightly inserted in the sealing groove of the other pile body, thereby facilitating the pulling out of the pile body.

[0018] Preferably, the clamping assembly includes two non-return racks and a second elastic member, the two non-return racks are respectively slidably arranged in the two side walls of the supporting frame, the two second elastic members are arranged in the supporting frame and abut the non-return racks, a mounting groove for placing the supporting frame is formed in the locking block, and the locking block is located on the opposite side walls of the mounting groove and has non-return tooth grooves, when the supporting frame is placed in the mounting groove of the locking block, the non-return rack moves through the non-return tooth groove, and when the supporting frame is removed from the hanging plate, the second elastic member pushes the non-return rack to be clamped and fixed in the non-return tooth groove.

[0019] By adopting the above technical solution, when the supporting frame is installed in the locking block, the non-return rack slides in the supporting frame, so that the non-return rack can move through the non-return tooth groove, thereby enabling the supporting frame to be installed in the installation groove; when the supporting frame is disassembled, the second elastic member pushes the non-return rack to be clamped and fixed in the non-return tooth groove; when the supporting frame is disassembled, the locking block is driven to move by the non-return rack, so that the locking block is disassembled together with the supporting frame, thereby being able to release the lock on the trigger block.

[0020] Preferably, a lever is provided on the non-return rack, a waist-shaped hole is provided in the support frame, the lever is slidably arranged in the waist-shaped hole along the moving direction of the non-return rack, and the top end of the lever extends to the outside of the support frame.

[0021] By adopting the above technical solution, when the support frame is disassembled, the two levers are moved, and the levers drive the check rack to move toward the inside of the support frame, so that the check rack disengages from the check tooth groove, thereby enabling the locking block to be removed from the support frame and installed on the hanging plate again, so that the trigger block can be locked again, making it easier for the pile body to be assembled again.

[0022] Preferably, a sealing strip is embedded on the bottom wall of the pile body located in the sealing groove, and when the sealing plate is tightly inserted into the sealing groove, the end wall of the sealing plate presses against the sealing strip.

[0023] By adopting the above technical solution, after the two pile bodies are formed, the sealing plate of one pile body is pressed against the sealing strip in the sealing groove of the other pile body, thereby achieving a better sealing effect of the sealing plate.

[0024] In summary, the present application includes at least one of the following beneficial technical effects:

[0025] 1. When installing the cofferdam, the driving mechanism and the locking mechanism are used to slide the T-shaped slider of one pile body into the T-shaped slot of the other pile body. Since there is a movable gap between the T-shaped slider and the T-shaped slot, the two pile bodies can be smoothly plugged and assembled. When the T-shaped slider is fully inserted into the T-shaped slot, the trigger block abuts against the trigger driving mechanism, and the driving mechanism drives the pile body to move and the sealing plate is tightly plugged into the sealing slot, so that the connection between the two pile bodies can be sealed. When disassembling the cofferdam, the supporting frame is removed from the hanging plate. At this time, the locking mechanism releases the lock of the trigger block, and the trigger block moves and releases the trigger driving mechanism, so that the sealing plate is released from the tight plugging state with the sealing slot, so that the cofferdam can be smoothly disassembled.

[0026] 2. With the help of the clamping assembly, when the support frame is installed in the locking block, the non-return rack slides in the support frame, so that the non-return rack can move through the non-return tooth groove, so that the support frame can be installed in the installation groove. When the support frame is disassembled, the second elastic member pushes the non-return rack to be clamped and fixed in the non-return tooth groove. When the support frame is disassembled, the locking block is driven to move by the non-return rack, so that the locking block is disassembled together with the support frame, thereby releasing the lock of the trigger block;

[0027] 3. By using the sealing strip, after the two pile bodies are formed, the sealing plate of one pile body is pressed against the sealing strip in the sealing groove of the other pile body, thereby making the sealing effect of the sealing plate better. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the overall structure of the cofferdam structure used for pile foundation construction in this application;

[0029] Figure 2 The cofferdam structure for pile foundation construction in this application is a schematic diagram of a single pile body with a sealing plate prominently displayed;

[0030] Figure 3 The cofferdam structure for pile foundation construction of this application is a partial structural cross-sectional view highlighting the driving mechanism;

[0031] Figure 4 The cofferdam structure for pile foundation construction in this application is a schematic diagram of a single pile body highlighting the sealing groove;

[0032] Figure 5 The cofferdam structure for pile foundation construction of this application is a partial structural cross-sectional view highlighting the locking mechanism;

[0033] Figure 6 For this application Figure 5 The enlarged schematic diagram at A in the middle;

[0034] Figure 7The cofferdam structure for pile foundation construction of this application is an exploded cross-sectional view of part of the structure highlighting the snap-in components.

[0035] 1. The support frame is provided with a plurality of locking members, each of which is provided with a plurality of locking members. The plurality of locking members are provided with a plurality of locking members, each of which is provided with a plurality of locking members. The plurality of locking members are provided with a plurality of locking members. DETAILED DESCRIPTION

[0036] The following is combined with Figure 1-Figure 7 This application is described in further detail.

[0037] The embodiment of the present application discloses a cofferdam structure for pile foundation construction.

[0038] Reference Figure 1 and Figure 2 A cofferdam structure for pile foundation construction includes a plurality of pile bodies 1, a T-shaped slide groove 2 is provided on one side wall of the pile body 1 in the vertical direction, a T-shaped slider 3 is installed on the other side wall, the T-shaped slider 3 is slidably installed in the T-shaped slide groove 2 in the vertical direction, and there is a movable gap between the T-shaped slider 3 and the T-shaped slide groove 2. The plurality of pile bodies 1 are connected to form a cofferdam through the T-shaped slider 3 and the T-shaped slide groove 2, and the four pile bodies 1 located at the four corners of the cofferdam are L-shaped, and the movable gap between the T-shaped slider 3 and the T-shaped slide groove 2 facilitates the smooth insertion and combination of two pile bodies 1.

[0039] Reference Figure 2 and Figure 3 A sealing groove 4 is provided on the side wall of the pile body 1 close to the T-shaped slide groove 2 and on both sides of the width direction of the T-shaped slide groove 2 in the vertical direction, and a sealing plate 5 is fixedly installed on the side wall of the pile body 1 close to the T-shaped slider 3 and on both sides of the width direction of the T-shaped slider 3 in the vertical direction. When two pile bodies 1 are assembled, the sealing plate 5 of one pile body 1 is installed in the sealing groove 4 of the other pile body 1, so as to seal the connection between the two pile bodies 1. The T-shaped slider 3 is slidably installed in the pile body 1 in the horizontal direction, and two driving mechanisms 7 are installed on the pile body 1 at each sealing plate 5, and the driving mechanism 7 is located in the pile body 1 and is connected to the T-shaped slider 3 in a transmission manner.

[0040] Reference Figure 4 , Figure 5 and Figure 6 , the pile body 1 is located in each sealing groove 4 and two trigger blocks 6 are slidably installed, and the four trigger blocks 6 are respectively located in the middle upper part and the middle lower part of the pile body 1. Two locking mechanisms 8 are installed in the pile body 1, and two L-shaped hanging plates 9 connected to the locking mechanisms 8 are installed on the side wall of each pile body 1 close to the inside of the cofferdam. Support skeletons 10 are placed on the two circles of hanging plates 9 inside the cofferdam. The support skeleton 10 supports the cofferdam, making the cofferdam structure more stable. At the same time, the two locking mechanisms 8 are respectively located in the middle upper part and the middle lower part of the pile body 1 and lock the four trigger blocks 6, so that the trigger blocks 6 are fixed in the pile body 1.

[0041] Reference Figure 3 Specifically, the driving mechanism 7 includes a first rack 71, a third gear 75, a plurality of second racks 72, a first gear 73 and a second gear 74. Two avoidance grooves 26 are provided in the side wall of the sealing plate 5 away from the pile body 1. The first rack 71 is slidably installed in the pile body 1 and the sealing plate 5 along the horizontal direction. Two first synchronous shafts 11 are rotatably installed in the pile body 1 corresponding to the two sealing plates 5. The third gear 75 is fixedly installed on the first synchronous shaft 11 and meshes with the first rack 71. A plurality of first gears 73 are fixedly installed on the first synchronous shaft 11, and the diameter of the first gear 73 is smaller than the diameter of the third gear 75.

[0042] Reference Figure 3 and Figure 6 , multiple second racks 72 are fixedly mounted on the side wall of the T-shaped slider 3 located in the pile body 1, two second synchronous shafts 12 are rotatably mounted in the pile body 1 corresponding to the two sealing plates 5, multiple second gears 74 are fixedly mounted on the second synchronous shaft 12 and mesh with the multiple second racks 72, and the multiple second gears 74 mesh with the multiple first gears 73. The end of the first rack 71 away from the pile body 1 extends into the avoidance groove 26, the bottom of the end wall of the first rack 71 is formed with a first chamfer 20, and the top of the end wall of the trigger block 6 is formed with a second chamfer 21.

[0043] When two pile bodies 1 are combined, the two sealing plates 5 of one pile body 1 are inserted into the two sealing grooves 4 of the other pile body 1. At this time, the four trigger blocks 6 are respectively located in the four avoidance grooves 26, and the sealing plates 5 are not tightly inserted in the sealing grooves 4, so that the pile bodies 1 can slide and insert more smoothly. When the two pile bodies 1 are about to be combined, the first pile body 1 drives the four first racks 71 to move downward and approach the four trigger blocks 6. The first chamfer 20 of the first rack 71 slides against the second chamfer 21 of the trigger block 6. Under the action of the first chamfer 20 and the second chamfer 21, the four trigger blocks 6 push the four first racks 71 to move toward the inside of the pile body 1.

[0044] Reference Figure 3The four first racks 71 drive the two first synchronous shafts 11 to rotate through the four third gears 75, the two second synchronous shafts 12 drive the multiple first gears 73 to rotate, the multiple first gears 73 then drive the multiple second gears 74 to rotate, and the second gear 74 rotates on the second rack 72. Since the second rack 72 is fixed on the T-shaped slider 3, the second gear 74 drives the pile body 1 to move toward another pile body 1 through the second synchronous shaft 12, and the pile body 1 drives the sealing plate 5 to be tightly inserted into the sealing groove 4 of the other pile body 1, so that when the pile body 1 is assembled, the adjacent pile bodies 1 can be sealed, so that the cofferdam structure is not prone to leakage.

[0045] Four first elastic members 13 are installed in the pile body 1. The four first elastic members 13 are respectively located at one end of the four first racks 71 away from the first chamfer 20. In the present application, the first elastic member 13 can be selected as a spring, and the two ends of the first elastic member 13 respectively abut against the end of the first rack 71 and the inner wall of the pile body 1. During the sliding assembly of the pile body 1, the first elastic member 13 pushes the first rack 71 to move away from the pile body 1, so that during the assembly of the two pile bodies 1, the sealing plate 5 is not easy to be inserted tightly into the sealing groove 4, thereby reducing the inconvenience of assembling the pile body 1.

[0046] Reference Figure 4 Sealing strips 19 are fixedly embedded on both sides of the pile body 1 in the width direction of each sealing groove 4. When the sealing plate 5 is tightly inserted into the sealing groove 4, the end wall of the sealing plate 5 presses against the sealing strip 19, thereby making the sealing effect of the sealing plate 5 better.

[0047] Reference Figure 5 and Figure 6 Specifically, the locking mechanism 8 includes a slide plate 81 and a locking block 82. The slide plate 81 is slidably installed in the pile body 1 along the horizontal direction, and the slide plate 81 is perpendicular to the trigger block 6. The end of the slide plate 81 close to the inside of the cofferdam passes through the pile body 1, and the hanging plate 9 is fixedly installed at the end of the slide plate 81 close to the inside of the cofferdam. The locking block 82 is placed on the hanging plate 9, and the opposite side walls of the locking block 82 abut against the hanging plate 9 and the pile body 1 respectively.

[0048] Reference Figure 6 Two locking grooves 14 are formed on the side wall of the slide plate 81 close to the trigger block 6, and the side wall of the locking groove 14 away from the hanging plate 9 forms an inclined wall 24 toward the hanging plate 9. The end of the trigger block 6 close to the slide plate 81 and located on the side away from the hanging plate 9 forms a third chamfer 23. When the locking block 82 is placed on the hanging plate 9, the end of the trigger block 6 is located in the locking groove 14 of the slide plate 81, and the locking block 82 limits the slide plate 81 through the hanging plate 9. The inclined wall 24 of the slide plate 81 located in the locking groove 14 abuts against the third chamfer 23 of the trigger block 6 and limits the trigger block 6, so that the limiting block is fixed in the pile body 1 and can trigger the first rack 71 to move.

[0049] Reference Figure 7 The locking block 82 is U-shaped, and a mounting groove 17 is formed in the locking block 82. The support frame 10 is placed in the mounting groove 17 of the locking block 82, and the support frame 10 is connected to the locking block 82 through the clamping assembly 15. When the cofferdam structure is dismantled, the support frame 10 is removed from the hanging plate 9, and the support frame 10 drives the locking block 82 to separate from the hanging plate 9 through the clamping assembly 15, so that the sliding plate 81 is unlocked, and then the trigger block 6 is unlocked.

[0050] During the pulling out process of the pile body 1, the trigger block 6 is unlocked and can move inside the pile body 1, and the first elastic member 13 pushes the first rack 71 to move away from the pile body 1, so that one pile body 1 moves away from the other pile body 1, thereby releasing the sealing plate 5 from the tight plug-in state with the sealing groove 4, and the cofferdam can be disassembled smoothly.

[0051] The clamping assembly 15 includes two non-return racks 151 and a second elastic member 152. A plurality of receiving grooves 25 are provided on the bottom wall of the support frame 10. When the support frame 10 is mounted on the hanging plate 9, the locking block 82 is located in the receiving groove 25. The two non-return racks 151 are slidably mounted in the side walls of the support frame 10 away from each other along the width direction of the support frame 10. The two second elastic members 152 are both mounted in the support frame 10, and the two ends of the two second elastic members 152 abut against the non-return racks 151 and the inner wall of the support frame 10, respectively.

[0052] The locking block 82 is provided with a non-return tooth groove 16 on both opposite side walls of the installation groove 17. When the support frame 10 is installed in the locking block 82, the non-return rack 151 slides in the support frame 10, so that the non-return rack 151 can move through the non-return tooth groove 16, thereby enabling the support frame 10 to be installed in the installation groove 17; when the support frame 10 is disassembled, the second elastic member 152 pushes the non-return rack 151 to be clamped and fixed in the non-return tooth groove 16, and when the support frame 10 is disassembled, the non-return rack 151 drives the locking block 82 to move, so that the locking block 82 is disassembled together with the support frame 10, thereby unlocking the trigger block 6.

[0053] A lever 18 is fixedly installed in the middle of the top wall of the non-return rack 151, and a plurality of waist-shaped holes 27 are opened on the support frame 10 corresponding to the plurality of levers 18. The lever 18 is slidably installed in the waist-shaped hole 27 along the moving direction of the non-return rack 151, and the top end of the lever 18 passes through the waist-shaped hole 27 and extends to the outside of the support frame 10. When the support frame 10 is completely disassembled, the two levers 18 are moved toward each other, and the levers 18 drive the non-return rack 151 to move toward the inside of the support frame 10, so that the non-return rack 151 is disengaged from the non-return tooth groove 16, so that the locking block 82 can be removed from the support frame 10. The locking block 82 is installed on the hanging plate 9 again, and the trigger block 6 can be locked again, so that the pile body 1 can be assembled again.

[0054] The implementation principle of a cofferdam structure for pile foundation construction in the embodiment of the present application is as follows: a plurality of pile bodies 1 are connected to form a cofferdam through a T-shaped slider 3 and a T-shaped slide groove 2, and the movable gap between the T-shaped slider 3 and the T-shaped slide groove 2 facilitates the smooth plug-in combination of two pile bodies 1. When two pile bodies 1 are combined, the two sealing plates 5 of one pile body 1 are inserted into the two sealing grooves 4 of the other pile body 1. At this time, the four trigger blocks 6 are respectively located in the four avoidance grooves 26, and the sealing plates 5 are not tightly plugged into the sealing grooves 4, so that the pile bodies 1 are more smoothly slid and plugged. When the two pile bodies 1 are about to be combined, the first pile body 1 drives the four first racks 71 to move downward and approach the four trigger blocks 6, and the first chamfer 20 of the first rack 71 slides against the second chamfer 21 of the trigger block 6. Under the action of the first chamfer 20 and the second chamfer 21, the four trigger blocks 6 push the four first racks 71 to move toward the inner direction of the pile body 1. The four first racks 71 drive the two first synchronous shafts 11 to rotate through the four third gears 75, the two second synchronous shafts 12 drive the multiple first gears 73 to rotate, the multiple first gears 73 drive the multiple second gears 74 to rotate, and the second gears 74 rotate on the second rack 72, so that the pile body 1 moves toward another pile body 1, and the pile body 1 drives the sealing plate 5 to be tightly plugged into the sealing groove 4 of another pile body 1, so that when the pile body 1 is assembled, the adjacent pile bodies 1 can be sealed, so that the cofferdam structure is not prone to water leakage. During the process of pulling out the pile body 1, the trigger block 6 releases the locking state and can move in the pile body 1, and the first elastic member 13 pushes the first rack 71 to move away from the pile body 1, so that one pile body 1 moves away from another pile body 1, so that the sealing plate 5 is released from the tight plugging state with the sealing groove 4, and the cofferdam can be disassembled smoothly.

[0055] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A cofferdam structure for pile foundation construction, comprising a plurality of pile bodies (1), characterized in that: A T-shaped slide groove (2) is provided on one side of the pile body (1), and a T-shaped slider (3) is provided on the other side for sliding in the horizontal direction. The T-shaped slider (3) of one pile body (1) is provided in the T-shaped slide groove (2) of the other pile body (1) for sliding in the vertical direction, and there is a movable gap between the T-shaped slider (3) and the T-shaped slide groove (2). A sealing groove (4) is provided on the side wall of the pile body (1) close to the T-shaped slide groove (2), and a sealing plate (5) is fixedly provided on the other side. A trigger block (6) is provided on the bottom wall of the pile body (1) located at the sealing groove (4), and a driving mechanism (7) is provided in the side of the pile body (1) close to the sealing plate (5). When the T-shaped slider of one pile body (1) is moved, the trigger block (6) is provided. (3) When the trigger block (6) is completely inserted into the T-shaped slide groove (2) of the other pile body (1), the trigger block (6) abuts against the trigger driving mechanism (7), and the driving mechanism (7) drives one pile body (1) to move toward the other pile body (1) and makes the sealing plate (5) tightly inserted into the sealing groove (4), and the side wall of the sealing plate (5) is provided with an avoidance groove (26) for accommodating the trigger block (6); a locking mechanism (8) for limiting and fixing the trigger block (6) is arranged in the pile body (1), and a hanging plate (9) connected to the locking mechanism (8) is arranged on the side of the pile body (1) close to the inside of the cofferdam structure, and a plurality of the hanging plates (9) are placed on a support frame (10), and when the support frame When the frame (10) is removed from the hanging plate (9), the supporting frame (10) releases the locking mechanism (8) from locking the trigger block (6), the trigger block (6) moves and releases the trigger driving mechanism (7), and the driving mechanism (7) drives one pile body (1) to move in a direction away from the other pile body (1); the driving mechanism (7) comprises a first rack (71), a second rack (72), a first gear (73), a second gear (74) and a third gear (75), the first rack (71) is slidably arranged in the sealing plate (5) and the pile body (1), the end of the first rack (71) protrudes out of the side wall of the sealing plate (5) away from the pile body (1), and the second rack (72) is fixed The first gear (73) and the second gear (74) are both rotatably arranged in the pile body (1) and meshed with each other, the second gear (74) meshes with the second gear (72), the third gear (75) is coaxially fixedly arranged on the first gear (73) and meshed with the first gear (71), the diameter of the third gear (75) is larger than the diameter of the first gear (73), when the T-shaped slider (3) of one pile body (1) is completely inserted into the T-shaped slide groove (2) of the other pile body (1), the trigger block (6) abuts against the end of the first gear (71) and pushes the first gear (71) to move toward the inside of the pile body (1);The locking mechanism (8) comprises a slide plate (81) and a locking block (82); the trigger block (6) is slidably arranged in the pile body (1); the slide plate (81) is slidably arranged in the pile body (1) along a direction perpendicular to the movement of the trigger block (6); a locking groove (14) is provided on the side wall of the slide plate (81) close to the trigger block (6); the end of the trigger block (6) is located in the locking groove (14); the end of the slide plate (81) close to the inside of the cofferdam passes through the pile body (1); the hanging plate (9) The locking block (82) is fixedly arranged on one end of the slide plate (81) close to the inside of the cofferdam, and is placed on the hanging plate (9). The two ends of the locking block (82) abut against the hanging plate (9) and the pile body (1) and lock the slide plate (81). The slide plate (81) locks the trigger block (6) through the locking groove (14). The support frame (10) is placed in a plurality of locking blocks (82). When the support frame (10) is removed from the hanging plate (9), the support frame (10) is locked through the clamping assembly (15). The locking block (82) is driven to detach from the hanging plate (9), and the sliding plate (81) moves and releases the lock on the trigger block (6). The clamping assembly (15) comprises two non-return racks (151) and a second elastic member (152). The two non-return racks (151) are respectively slidably arranged in the two side walls of the support frame (10). The two second elastic members (152) are arranged in the support frame (10) and abut against the non-return racks (151). The locking block (82) is formed with a space for placing The mounting groove (17) of the support frame (10) is provided with anti-return tooth grooves (16) on opposite side walls of the locking block (82) located on the mounting groove (17). When the support frame (10) is placed in the mounting groove (17) of the locking block (82), the anti-return rack (151) moves through the anti-return tooth groove (16). When the support frame (10) is removed from the hanging plate (9), the second elastic member (152) pushes the anti-return rack (151) to be clamped and fixed in the anti-return tooth groove (16).

2. A cofferdam structure for pile foundation construction according to claim 1, characterized in that: Two sealing grooves (4) are provided along the width direction of the T-shaped slide groove (2), two sealing plates (5) are provided along the width direction of the T-shaped slide block (3), and the two sealing plates (5) are respectively located in the two sealing grooves (4).

3. A cofferdam structure for pile foundation construction according to claim 2, characterized in that: The driving mechanism (7) is provided with a plurality of gears along both sides of the pile body (1) close to the two sealing plates (5); the pile body (1) is provided with a first synchronous shaft (11) and a second synchronous shaft (12) on both sides in the width direction of the T-shaped slider (3) for rotation; the first synchronous shaft (11) is fixedly provided with a plurality of first gears (73) and third gears (75); the second synchronous shaft (12) is fixedly provided with a plurality of second gears (74).

4. A cofferdam structure for pile foundation construction according to claim 1, characterized in that: A first elastic member (13) is arranged in the pile body (1), and the first elastic member (13) is located on a side of the first rack (71) away from the sealing plate (5) and abuts against an end of the first rack (71).

5. A cofferdam structure for pile foundation construction according to claim 1, characterized in that: The non-return rack (151) is provided with a lever (18), a waist-shaped hole (27) is provided in the support frame (10), the lever (18) is slidably arranged in the waist-shaped hole (27) along the moving direction of the non-return rack (151), and the top end of the lever (18) extends to the outside of the support frame (10).

6. A cofferdam structure for pile foundation construction according to claim 2, characterized in that: The pile body (1) is located on the bottom wall of the sealing groove (4) and is embedded with a sealing strip (19). When the sealing plate (5) is tightly inserted into the sealing groove (4), the end wall of the sealing plate (5) presses against the sealing strip (19).

Citation Information

Patent Citations

  • Larsen steel sheet pile perpendicularity locking device

    CN113914296A

  • River-crossing bridge pile foundation construction cofferdam structure and erecting method

    CN114960708A

  • Steel sheet pile cofferdam and mounting method thereof

    CN116905535A

  • Water conservancy construction cofferdam device

    CN211773797U

  • Larsen steel sheet pile convenient to install

    CN216474957U