Pile diameter design method for horizontal high-pressure jet grouting piles in soft surrounding rock of tunnel

CN118313029BActive Publication Date: 2024-11-15CHENGDU UNIVERSITY OF TECHNOLOGY
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410250259.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-11-15
Estimated Expiration
2044-03-05

AI Technical Summary

Technical Problem

The existing technology lacks theoretical basis for the design of horizontal high-pressure rotary spray pile diameters in weak surrounding rock tunnels, which makes it difficult to optimize the pile quality and construction cost, and the small pile diameter may lead to deformation of surrounding rocks and safety accidents.

Method used

By collecting the hydrogeological conditions and basic mechanical parameters of the tunnel site area, a horizontal high-pressure spin-spray pile reinforcement model with different pile diameters was established using numerical simulation, and the surrounding rock reinforcement effect and beam arch effect were judged, combining the pile quality and construction cost to determine a reasonable degree The value range of pile diameter.

Benefits of technology

The reasonable design of horizontal high-pressure rotary spray piles in weak surrounding rock tunnels has been achieved, which reduces slurry loss and material waste, avoids safety accidents, and improves reinforcement effect and construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118313029B_ABST
    Figure CN118313029B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of tunnel engineering, and provides a pile diameter design method for horizontal high-pressure rotary jet grouting piles in soft surrounding rock of a tunnel, comprising the following steps: step 1: collecting hydrogeological conditions and basic mechanical parameters of the tunnel site; step 2: preliminarily estimating the range of pile diameter values; step 3: using numerical simulation to establish a horizontal high-pressure rotary jet grouting pile reinforcement model with different pile diameters; step 4: judging whether the surrounding rock reinforcement effect is met; step 5: judging whether the horizontal high-pressure rotary jet grouting pile exerts a beam arch effect; step 6: judging whether the maximum tensile stress exceeds the ultimate tensile strength of the pile body; step 7: counting the pile diameter value conditions that meet the requirements, and comprehensively comparing and selecting to determine the pile diameter value. The present invention can better determine the pile diameter, greatly reduce material waste while ensuring the rotary jet grouting pile reinforcement effect, and can also avoid safety accidents caused by too small a pile diameter.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel engineering, in particular to a pile diameter design method for horizontal high-pressure jet grouting piles in soft surrounding rocks of tunnels. Background Art

[0002] Horizontal high-pressure rotary jet piles are often used in soft rock tunnels because of their simple process, good bearing characteristics and anti-seepage and water blocking capabilities. Horizontal high-pressure rotary jet piles are a type of high-pressure rotary jet grouting. High-pressure slurry cuts the soil to form a slurry consolidation body, which can form an annular rotary jet arch around the tunnel, playing a role similar to a water-stop curtain and stratum pre-reinforcement, and greatly limiting the deformation of the tunnel. Based on the characteristics of the Liangshan Tunnel of the Xiamen-Shenzhen Railway, the fault is deeply buried, the surrounding rock is rich in water and weak, the rock mass is broken, and the rock quality is uneven, the horizontal high-pressure rotary jet pile reinforcement scheme is adopted to solve the technical problems of the large amount of water in the Liangshan Tunnel fault and the soft and broken rock and soil, and verify the feasibility of the horizontal high-pressure rotary jet pile in the soft rock tunnel. Horizontal high-pressure rotary jet piles have strong applicability in soft strata, but there is little research on the design of technical parameters. Some scholars have comprehensively considered factors such as stratum properties, strength of the consolidation body, stiffness, chemical shrinkage and creep, and proposed the best layout scheme for different stratum distributions by establishing a two-dimensional numerical model. However, there is insufficient research on the influence of jet grouting pile reinforcement design parameters on the surrounding rock reinforcement effect. Some scholars have also used a two-dimensional analytical method to optimize the design parameters of horizontal high-pressure jet grouting piles, and proposed a method for determining the optimal shape and minimum structural thickness of the jet grouting piles. However, due to the use of a two-dimensional analytical model, only the effect of the two-dimensional arch effect of the jet grouting pile on the structural stability is considered, and the longitudinal beam structure of the jet grouting pile is ignored. The reinforcement effect and the design parameters of the pile diameter are not optimized, which has little guidance for actual engineering applications.

[0003] Studies have shown that horizontal high-pressure jet grouting piles have high applicability in soft strata such as sandy soil strata and fully weathered rocks. The reinforced body formed by them has the functions of anti-seepage and sand blocking, which greatly improves the properties of the strata. The researchers have recognized the applicability and application effect of horizontal high-pressure jet grouting piles in sandy soil strata. When the pile quality is poor or the load is large, the pile diameter should be increased accordingly. Too small a pile diameter will cause the horizontal high-pressure jet grouting pile body to deform, and there will be a gap of slurry that is not fully engaged between the piles. The jet grouting pile body cannot form a stable beam-arch structure, resulting in poor surrounding rock reinforcement effect, and even fracture and damage due to excessive internal tensile stress. On the contrary, if the pile quality, stress conditions and surrounding rock reinforcement effect of the pile body are good, and the pile body strength is still partially redundant, the pile diameter should be reduced accordingly to control the construction cost. The pile diameter is the key to the quality and construction cost of the jet grouting pile, but at present, the parameter value of the horizontal high-pressure jet grouting pile diameter in soft surrounding rock tunnels is still based on experience and lacks theoretical basis. The traditional empirical method can only make a preliminary range estimate, and it is difficult to adjust the pile diameter according to different stratum lithology and surrounding rock loads. Summary of the invention

[0004] The content of the present invention is to provide a pile diameter design method for horizontal high-pressure rotary jet piles in soft surrounding rock of tunnels, which can greatly reduce unnecessary slurry loss and material waste, avoid safety accidents such as surrounding rock deformation or support system collapse caused by too small pile diameter, ensure the pile quality of horizontal high-pressure rotary jet piles, and ensure the reinforcement effect of horizontal high-pressure rotary jet piles in soft surrounding rock of tunnels.

[0005] The pile diameter design method of the horizontal high-pressure jet grouting pile of soft surrounding rock in a tunnel according to the present invention comprises the following steps:

[0006] Step 1: Collect the hydrogeological conditions and basic mechanical parameters of the tunnel site;

[0007] Step 2: Preliminary estimate of the range of pile diameter;

[0008] Step 3: Use numerical simulation to establish a horizontal high-pressure jet grouting pile reinforcement model with different pile diameters;

[0009] Step 4: Determine whether the surrounding rock reinforcement effect is met;

[0010] Step 5: Determine whether the horizontal high-pressure jet grouting piles exert the beam arch effect;

[0011] Step 6: Determine whether the maximum tensile stress exceeds the ultimate tensile strength of the pile;

[0012] Step 7: Count the pile diameter conditions that meet the requirements and determine the pile diameter through comprehensive comparison.

[0013] Preferably, in step 1, specifically:

[0014] Understand the engineering geological conditions of the tunnel site area and obtain the hydrogeological conditions related to the tunnel. Based on engineering survey data or on-site drilling sampling, measure the basic mechanical parameters of the tunnel surrounding rock, including the elastic modulus, Poisson's ratio, gravity, cohesion, and friction angle of the rock and soil, grouting body, initial support, and jet grouting pile body. Obtain the groundwater pressure in the tunnel site area through water pressure monitoring equipment, and conduct precipitation tests on the tunnel surface to obtain the permeability coefficient of the surrounding rock, providing calculation parameters for subsequent numerical simulations.

[0015] Preferably, in step 2, specifically:

[0016] 2.1. Estimate the quality of piles;

[0017] Based on the basic mechanical parameters of the surrounding rock, groundwater pressure and permeability coefficient measured in step 1, the quality of the horizontal high-pressure jet grouting piles is estimated by analogy with the existing engineering practice experience; when the groundwater pressure in the tunnel site is low, the larger the surrounding rock permeability coefficient and the better the slurry permeability, the better the pile quality; if the groundwater pressure is high, the smaller the surrounding rock permeability coefficient and the worse the slurry permeability, the worse the pile quality;

[0018] 2.2. Adjust the construction parameters that affect the quality of pile formation;

[0019] The construction parameters that affect the quality of horizontal high-pressure rotary jet grouting piles mainly include: slurry type, injection pressure, rotation speed, and lifting speed. Therefore, the construction parameters suitable for the stratum are selected based on the geological conditions, groundwater pressure and permeability coefficient of the tunnel site. If the groundwater pressure of the stratum is high and the permeability coefficient of the surrounding rock is small, the quality of horizontal high-pressure rotary jet grouting piles can be ensured by changing the slurry type, increasing the injection pressure, increasing the rotation speed, and reducing the lifting speed.

[0020] 2.3. Based on the construction experience and construction parameters, evaluate the quality of pile formation and preliminarily determine the range of pile diameter parameters. If the pile formation quality is poor, expand the range of pile diameter parameters. If good pile formation quality can be achieved, narrow the range of pile diameter parameters.

[0021] Preferably, in step 3, specifically:

[0022] 3.1. The stratum numerical model of the soft surrounding rock of the corresponding tunnel is established by using Midas GTS numerical simulation software. In order to reduce the influence of the model boundary effect, the size of the stratum numerical model is set to be no less than 3 to 5 times the tunnel radius on the left and right sides of the tunnel outer contour, and no less than 2 to 3 times the tunnel height on the upper and lower sides of the tunnel. The excavation direction of the tunnel is taken as the positive direction of the Y axis, the outer normal direction of the surface is taken as the positive direction of the Z axis, and the right direction of the horizontal plane is taken as the positive direction of the X axis. The model is simplified, the surrounding rock obeys the Moore-Coulomb criterion, and solid units are used for simulation, the initial support is simulated by plate units, and the jet grouting pile body is simulated by beam units. The constitutive model obeys the elastic constitutive model. The sprayed concrete and steel arch frame together form a bearing structure. According to the principle of simplified compressive stiffness, the elastic modulus of the steel frame is converted to the elastic modulus of the shotcrete lining, so that the initial support is simplified into a curved shell structure with attributes. The simplified formula is shown in the following formula:

[0023]

[0024] Where: E is the elastic modulus of shotcrete after conversion; E 0 is the elastic modulus of the original shotcrete; S g is the cross-sectional area of ​​the steel arch; E g is the elastic modulus of the steel arch; S c is the cross-sectional area of ​​shotcrete;

[0025] 3.2. Apply constraints in the X direction to the side units of the model, constraints in the Y direction to the front and rear units, constraints in the X, Y, and Z directions to the bottom unit, and no constraints to the top surface, but set the internal deadweight stress; calculate the surrounding rock load using the Bill Bowman modified formula, and apply the groundwater pressure to the upper end face of the tunnel surrounding rock to simulate and calculate the vertical surrounding rock load. The formula is as follows:

[0026]

[0027] Where: γ is the soil layer density; H is the depth of the boundary between deep and shallow burial;

[0028]

[0029] a is half of the tunnel span; c is the cohesion of the surrounding rock; is the internal friction angle; h is the tunnel height;

[0030] 3.3. Select the Thermal Analysis module in the GTS software, and use the construction stage assistant to activate or deactivate the boundary conditions, initial support, horizontal high-pressure jet grouting piles and face surrounding rock mesh model according to the construction process, and set up the process of simulating tunnel excavation and support.

[0031] Preferably, in step 4, specifically:

[0032] Through step 3, different construction stages are selected to obtain the effects of surrounding rock stress and settlement under different pile diameters. The changes before and after reinforcement are compared and analyzed, and it is determined whether the set working conditions meet the reserved deformation required by the specification, so as to determine whether the pile length value meets the surrounding rock reinforcement effect criterion; if the set pile diameters meet the requirements, the pile diameter value with better reinforcement effect is selected, otherwise the pile diameter value that does not meet the requirements is excluded.

[0033] Preferably, in step 5, specifically:

[0034] 5.1. Analyze the distribution of bending moment and shear force of piles under the vertical load of surrounding rock at different construction stages in the numerical model. If the bending moment and shear force of a single pile have a distribution law of transmission from the front end to the rear end, the horizontal high-pressure jet grouting pile will play a beam effect, otherwise it will not play a beam effect;

[0035] 5.2. Perform axial force analysis on the pile. If the axial forces of the pile at the crown, spandrel and side wall in the horizontal direction transfer the load from the crown to the side walls on both sides, and under the action of the overlying load, the pile at the crown and spandrel produces bending deformation, so that the pile is tensile and its axial stress is positive, while the side wall is compressed under the stress transfer and the axial stress is negative, then the horizontal high-pressure jet grouting pile exerts an arch effect, otherwise it does not exert an arch effect;

[0036] 5.3. Based on steps 5.1 and 5.2, determine whether the piles in the model have a beam-arch effect.

[0037] Preferably, in step 6, specifically:

[0038] The maximum tensile stress of the arch pile is analyzed to determine whether there is a single pile with a maximum tensile stress value exceeding the ultimate tensile strength in the design working condition; if it exceeds the ultimate tensile strength, the pile is damaged and the beam-arch effect fails, and the pile diameter value under this working condition is excluded; if it is less than the ultimate tensile strength, the pile diameter value under this working condition will be retained and the next step of determination will be entered.

[0039] Preferably, in step 7, specifically:

[0040] 7.1. Comparing the changes in the vertical stress of the surrounding rock before and after the horizontal high-pressure jet grouting pile reinforcement, if the jet grouting pile exerts a beam effect, the load on the reinforced single pile body will be transmitted from the front end to the rear end in the longitudinal direction; if the jet grouting pile exerts an arch effect, the stress of the surrounding rock after reinforcement will be significantly lower than that of the unreinforced surrounding rock, and the surrounding rock stress will be transmitted from the arch crown to the arch spandrel and side wall;

[0041] 7.2. Obtain the range of pile diameters for each working condition that satisfies the beam-arch effect, and collect the corresponding vertical settlement and stress values ​​of the surrounding rock, as well as the pile stress value of a single pile according to the numerical simulation working condition;

[0042] 7.3. To ensure the continuous effect of the beam-arch effect, the horizontal high-pressure jet grouting pile must be able to bear the stratum load and groundwater pressure, so that the maximum tensile stress value of a single pile is less than the ultimate tensile strength of the horizontal high-pressure jet grouting pile; if the pile stress is greater than the ultimate tensile strength, the pile diameter value of this working condition is discarded; if the pile stress is less than the ultimate tensile strength, the next step of comparative analysis is carried out;

[0043] 7.4. Judge the integrated data. The surrounding rock settlement and deformation should be controlled within the safe range. If the surrounding rock settlement exceeds the safe range, the corresponding pile diameter value is excluded. Otherwise, the working condition is retained for the next step of judgment.

[0044] 7.5. After the above judgment, the remaining pile diameter is the design parameter of the horizontal high-pressure jet grouting pile that meets the soft surrounding rock tunnel. Then, the construction technology and cost factors are comprehensively considered to compare the schemes and determine the appropriate pile diameter.

[0045] The method of the invention is based on four basic criteria: pile quality, surrounding rock reinforcement effect, stress mode of forming "beam arch effect" and stress condition of pile body, and comprehensively considers stratum lithology, groundwater pressure, surrounding rock strength, surrounding rock load, construction technology and cost factors, so as to determine a reasonable range of pile diameter values, provide more reasonable guidance for the pile diameter design of horizontal high-pressure rotary jet grouting piles, improve the applicability of horizontal high-pressure rotary jet grouting pile method in soft surrounding rock of tunnels, and its actual application value is significantly better than the pile diameter design method relying on engineering experience. The influence of different pile diameters of horizontal high-pressure rotary jet grouting piles on the surrounding rock reinforcement effect is fully considered, and the pile diameter design method of horizontal high-pressure rotary jet grouting piles is deeply optimized. While ensuring the reinforcement effect of rotary jet grouting piles, material waste is greatly reduced, and safety accidents caused by too small pile diameter can be avoided. It is of great significance to ensure the construction safety of tunnels with soft surrounding rocks and reduce engineering costs. A complete technical system is provided for the pile diameter selection of horizontal high-pressure rotary jet grouting piles with soft surrounding rocks of tunnels, which is used to solve the problem that the pile diameter design method of horizontal high-pressure rotary jet grouting piles in the past did not fully consider the harmonious unity of economic benefits and reinforcement effects, and improve the applicability of horizontal high-pressure rotary jet grouting pile method in tunnels with soft surrounding rocks. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a flow chart of a pile diameter design method for horizontal high-pressure jet grouting piles in soft surrounding rock of a tunnel in Example 1;

[0047] Figure 2 This is a diagram of the diameter of the horizontal high-pressure jet grouting piles in numerical simulation in Example 1;

[0048] Figure 3 Schematic diagram of the three-dimensional numerical model in Example 1;

[0049] Figure 4 This is a schematic diagram of the horizontal high-pressure jet grouting pile arch structure in Example 1;

[0050] Figure 5 It is a schematic diagram of the longitudinal force of the horizontal high-pressure jet grouting pile reinforcement in Example 1;

[0051] Figure 6 The vertical stress cloud diagram of the surrounding rock before reinforcement in Example 2;

[0052] Figure 7 Schematic diagram of vertical settlement of surrounding rock before reinforcement in Example 2;

[0053] Figure 8 It is the vertical stress cloud diagram of the surrounding rock after reinforcement in Example 2;

[0054] Fig. 9 Schematic diagram of vertical settlement of surrounding rock after reinforcement in Example 2;

[0055] Fig.10 is the shear force diagram of the vault pile in Example 2;

[0056] Fig.11 Schematic diagram of the bending moment of the arch pile in Example 2;

[0057] FIG12( a ) is a diagram of the axial stress of the pile vault in Example 2;

[0058] FIG12( b ) is a diagram of the axial stress of the pile spandrel in Example 2;

[0059] FIG12( c ) is a diagram of the axial stress of the pile side wall in Example 2;

[0060] FIG13( a) is a diagram showing the maximum bending stress distribution of a 60 cm diameter arch jet grouting pile in Example 2;

[0061] FIG13( b) is a diagram showing the maximum bending stress distribution of a 70 cm diameter arch jet grouting pile in Example 2;

[0062] Fig.14 Schematic diagram of the reinforcement effect of different pile diameters in Example 2. DETAILED DESCRIPTION

[0063] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the embodiments are only for explaining the present invention and are not intended to limit it.

[0064] Example 1

[0065] like Figure 1 As shown, this embodiment provides a pile diameter design method for horizontal high-pressure jet grouting piles in soft surrounding rock of a tunnel, which includes the following steps:

[0066] Step 1: Collect the hydrogeological conditions and basic mechanical parameters of the tunnel site;

[0067] Specifically:

[0068] Understand the engineering geological conditions of the tunnel site area and obtain the hydrogeological conditions related to the tunnel. Based on engineering survey data or on-site drilling sampling, measure the basic mechanical parameters of the tunnel surrounding rock, including the elastic modulus, Poisson's ratio, gravity, cohesion, and friction angle of the rock and soil body, grouting body, initial support, and rotary jet pile body. Obtain the groundwater pressure in the tunnel site through water pressure monitoring equipment, and conduct precipitation tests on the tunnel surface to obtain the permeability coefficient of the surrounding rock, providing calculation parameters for subsequent numerical simulations. This embodiment is suitable for tunnels with weak surrounding rocks, all of which are tunnels with poor surrounding rock mechanical properties. If the formation conditions do not meet the requirements, other more suitable methods should be used to design the parameters of the horizontal high-pressure rotary jet pile diameter.

[0069] Step 2: Preliminary estimate of the range of pile diameter;

[0070] Specifically:

[0071] 2.1. Estimate the quality of piles;

[0072] The mechanism of high-pressure jet grouting is to cut and mix the soil layer through high-pressure jetting, and then the slurry diffuses and fills the surrounding rock to form a consolidation body with a certain strength, where the diameter of the consolidation body is the diameter of the pile (see Figure 2 ), especially for strata with large overburden pressure and dense soil, pile parameters are more sensitive to the control of pile quality. Therefore, the pile quality of horizontal high-pressure jet grouting piles is estimated by analogy with existing engineering practice experience through the basic mechanical parameters of the surrounding rock, groundwater pressure and permeability coefficient. When the groundwater pressure in the tunnel site is low, the larger the surrounding rock permeability coefficient, the better the slurry permeability, the better the pile quality; if the groundwater pressure is high, the smaller the surrounding rock permeability coefficient, the worse the slurry permeability, the worse the pile quality.

[0073] 2.2. Adjust the construction parameters that affect the quality of pile formation;

[0074] There are many construction parameters involved in jet grouting, such as slurry type, injection pressure, rotation speed, and lifting speed. Any change in any of these factors may lead to poor quality of the piles and affect the selection of a reasonable range of pile diameters. When estimating the quality of horizontal high-pressure jet grouting, the process parameters that can be achieved on the construction site should be determined based on the basic mechanical parameters of the surrounding rock, groundwater pressure, and permeability coefficient. Since this embodiment is applicable to soft surrounding rocks, high-strength or functional slurries such as quick-setting and early-strength cement slurries, high-strength cement slurries, and impermeability cement slurries are generally used; the injection pressure can be calculated using the Bernoulli equation v 2The calculation shows that ρ is the slurry fluid density and v is the fluid velocity, indicating that the injection pressure will be affected by the surrounding rock permeability and groundwater pressure; the fluid density of the slurry is jointly affected by the slurry type, the surrounding rock permeability and the groundwater pressure; the fluid velocity is determined by the rotation speed and lifting speed of the jet grouting pile; if the groundwater pressure of the formation is high and the surrounding rock permeability is small, the construction parameters suitable for the formation can be selected by changing the slurry type, increasing the injection pressure, increasing the rotation speed, and reducing the lifting speed to ensure the pile quality of the horizontal high-pressure jet grouting pile.

[0075] 2.3. Based on the construction experience and construction parameters, evaluate the quality of pile formation and whether the theoretical pile diameter can be formed, and consider whether the range of pile diameter needs to be expanded or reduced. If the estimated pile quality is poor, expand the range of designed pile diameter. If good pile quality can be achieved, reduce the range of pile diameter to ensure the pile quality and reinforcement effect of horizontal high-pressure jet grouting piles.

[0076] Step 3: Use numerical simulation to establish a horizontal high-pressure jet grouting pile reinforcement model with different pile diameters;

[0077] Specifically:

[0078] 3.1. Midas GTS numerical simulation software is used to establish the stratum numerical model of the soft surrounding rock of the corresponding tunnel. In order to reduce the influence of the model boundary effect, the size of the stratum numerical model is set to the left and right dimensions of the tunnel outer contour not less than 3 to 5 times the tunnel radius, and the size of the stratum above and below the tunnel is not less than 2 to 3 times the tunnel height. The model grid size and stratum model are detailed in Figure 3 ; The forward direction of tunnel excavation is taken as the positive direction of the Y axis, the outer normal direction of the surface is taken as the positive direction of the Z axis, and the right direction of the horizontal plane is taken as the positive direction of the X axis; the model is simplified, the surrounding rock obeys the Moore-Coulomb criterion, and solid units are used for simulation, the initial support is simulated by plate units, and the jet grouting pile body is simulated by beam units. The constitutive model obeys the elastic constitutive model; the sprayed concrete and the steel arch frame together form the bearing structure. According to the principle of simplified compressive stiffness, the elastic modulus of the steel frame is converted to the elastic modulus of the shotcrete lining, so that the initial support is simplified into a curved shell structure with attributes. The simplified formula is shown in the following formula:

[0079]

[0080] Where: E is the elastic modulus of shotcrete after conversion (MPa); E 0 is the elastic modulus of the original shotcrete (MPa); S g is the cross-sectional area of ​​the steel arch (m 2 );E g is the elastic modulus of the steel arch (MPa); S c is the cross-sectional area of ​​shotcrete (m 2 );

[0081] 3.2. Apply constraints in the X direction to the side units of the model, constraints in the Y direction to the front and rear units, constraints in the X, Y, and Z directions to the bottom unit, and no constraints to the top unit but set internal deadweight stress; calculate the surrounding rock load using the Bill Bowman modified formula, and apply groundwater pressure to the upper end face of the tunnel surrounding rock to simulate and calculate the vertical surrounding rock load. The formula is as follows:

[0082]

[0083] Where: γ is the soil layer density; H is the depth of the boundary between deep and shallow burial;

[0084]

[0085] a is half of the tunnel span; c is the cohesion of the surrounding rock; is the internal friction angle; h is the tunnel height;

[0086] 3.3. Select the Thermal Analysis module in the GTS software, and use the construction stage assistant to activate or deactivate the boundary conditions, initial support, horizontal high-pressure jet grouting piles and face surrounding rock mesh model according to the construction process, and set up the process of simulating tunnel excavation and support.

[0087] Step 4: Determine whether the surrounding rock reinforcement effect is met;

[0088] Specifically:

[0089] Through step 3, different construction stages are selected to obtain the effects of surrounding rock stress and settlement under working conditions of different pile diameters, and the changes before and after reinforcement are compared and analyzed, and it is judged whether the set working conditions meet the reserved deformation (8-12 cm) required by the "Technical Specifications for Highway Tunnel Construction" (JTGT 3660-2020), so as to judge whether the pile length value meets the surrounding rock reinforcement effect criterion; if the set pile diameters meet the requirements, the pile diameter parameter range with better reinforcement effect is selected, otherwise the pile diameter values ​​that do not meet the requirements are excluded.

[0090] Step 5: Determine whether the horizontal high-pressure jet grouting piles exert the "beam arch effect";

[0091] Horizontal high-pressure jet grouting piles are piles that are consolidated with soil by jet grouting. The arch structure formed by jet grouting prevents deformation of the surrounding rock in the horizontal direction, and transmits the upper load to the rear end of the pile in the vertical direction, forming a reinforced support structure with a "beam-arch effect". Therefore, whether the designed pile diameter parameters can exert the "beam-arch effect" is an important criterion.

[0092] Specifically:

[0093] 5.1. According to the distribution of bending moment and shear force of the pile body under the vertical load of the surrounding rock at different construction stages in the numerical model, it is judged whether the horizontal high-pressure jet grouting pile plays a "beam effect"; the pile body force of the jet grouting pile can be regarded as a semi-infinite length elastic foundation beam, and its mechanical model is as follows: Figure 5 As shown in the figure, the stress characteristic of the elastic foundation beam is to transfer the load on the upper part to the rear half along the longitudinal direction. If the bending moment and shear force of a single pile body have a distribution law of being transferred from the front end to the rear end, the horizontal high-pressure jet grouting pile will play a "beam effect", otherwise it will not play a "beam effect";

[0094] 5.2. Perform axial force analysis on the pile. If the axial forces of the pile at the crown, spandrel and side wall in the horizontal direction transfer the load from the crown to the side walls on both sides, and under the action of the overlying load, the pile at the crown and spandrel produces bending deformation, so that the pile is tensile and its axial stress is positive, while the side wall is compressed under the stress transfer and the axial stress is negative, then the horizontal high-pressure jet grouting pile exerts an arch effect, otherwise it does not exert an arch effect;

[0095] 5.3. Based on steps 5.1 and 5.2, determine whether the piles in the model exert the "beam-arch effect".

[0096] Step 6: Determine whether the maximum tensile stress exceeds the ultimate tensile strength of the pile;

[0097] Analyze the stress conditions of a single pile to ensure that the pile will not break due to insufficient stress, resulting in failure of the "beam-arch effect".

[0098] Specifically:

[0099] Among the four parts of the arch, spandrel, side wall and arch foot, the arch pile bears the largest vertical load. Therefore, the maximum tensile stress of the arch pile should be analyzed to determine whether there is a situation in the design working condition where the maximum tensile stress value of a single pile exceeds the ultimate tensile strength value; if it exceeds the ultimate tensile strength, the pile body is destroyed and the "beam-arch effect" fails, then the pile diameter value of this working condition will be excluded; if it is less than the ultimate tensile strength, the pile diameter value of this working condition will be retained and the next step of determination will be entered.

[0100] Step 7: Count the pile diameter values ​​that meet the requirements and determine the pile diameter value through comprehensive comparison;

[0101] According to the above steps, the working conditions of different pile diameters are judged in turn, and the working conditions that meet the four criteria of pile quality, "beam-arch effect" of the pile body after reinforcement, pile body stress condition and surrounding rock reinforcement effect are counted. The optimal horizontal high-pressure rotary jet pile diameter is further determined by comprehensively considering factors such as construction technology and cost.

[0102] Specifically:

[0103] 7.1. Since the change of the pile diameter of the horizontal high-pressure jet grouting pile cannot change the properties of the overlying surrounding rock, it can only be judged by whether the "beam-arch effect" is exerted. By comparing the changes in the vertical stress of the surrounding rock before and after the horizontal high-pressure jet grouting pile reinforcement, if the jet grouting pile exerts the "beam effect", the load on the single pile body is transmitted from the front end to the rear end in the longitudinal direction; if the "arch effect" is exerted, the stress of the surrounding rock after reinforcement will be significantly lower than the stress of the unreinforced surrounding rock, and the surrounding rock stress will be transmitted from the arch crown to the arch shoulder and side wall;

[0104] 7.2. Obtain the range of pile diameters for each working condition that satisfies the “beam-arch effect”, and collect the corresponding vertical settlement and stress values ​​of the surrounding rock, as well as the pile stress value of a single pile according to the numerical simulation working condition;

[0105] 7.3. To ensure the continuous effect of the "beam arch effect", the horizontal high-pressure jet grouting pile must be able to meet the requirements of bearing the stratum load and groundwater pressure, so that the maximum tensile stress value of a single pile is less than the ultimate tensile strength of the horizontal high-pressure jet grouting pile; if the pile body stress is greater than the ultimate tensile strength, the pile diameter value of this working condition is discarded; if the pile body stress is less than the ultimate tensile strength, the next step of comparative analysis is carried out;

[0106] 7.4. Judge the integrated data and refer to the reserved deformation (8-12 cm) required by the Technical Specifications for Highway Tunnel Construction (JTGT 3660-2020). The surrounding rock settlement deformation should be controlled below 8 cm. If the surrounding rock settlement exceeds 8 cm, the corresponding pile diameter is excluded. Otherwise, the pile diameter is retained for the next step of judgment.

[0107] 7.5. After the above judgment, the remaining pile diameter is the design parameter of the horizontal high-pressure jet grouting pile that meets the soft surrounding rock tunnel. Then, the construction technology and cost factors are comprehensively considered to compare the schemes and determine the optimal pile diameter.

[0108] Technical theoretical basis

[0109] The horizontal high-pressure jet grouting pile support structure can be regarded as a beam in the longitudinal direction; in the transverse direction, the mutual engagement between the pile bodies can be regarded as an arch ( Figure 4 ). Under the synergistic effect of the longitudinal and transverse beam-arches, a "beam-arch effect" is formed, which reinforces and supports the overlying rock and soil, transfers the longitudinal arch pile surrounding rock load from the front end to the rear end, and disperses the surrounding rock load to the arch, spandrel and both sides of the side wall in the transverse direction, effectively limiting the release of surrounding rock stress and arch settlement, thereby ensuring the stability of the tunnel surrounding rock.

[0110] Before excavation, the two ends of the horizontal high-pressure rotary jet pile arch canopy structure can be approximately considered as fixed end supports. After the tunnel is excavated, the rotary jet piles at the excavation end are exposed to the air. At this time, the support method of the excavation end changes. Under the support of steel support, steel grid, and sprayed concrete, the primary support structure plays an elastic support role for the rotary jet piles at the excavation end. At this time, the horizontal high-pressure rotary jet piles can be regarded as a beam with an elastic support at the front end and a fixed end support at the rear end in the longitudinal direction ( Figure 5 ). When the load is too large, it is very easy to cause the pile body to deform or break, resulting in the failure of the horizontal high-pressure rotary jet pile. Therefore, the choice of pile diameter is particularly important. The larger the pile diameter, the greater the vertical load the pile body can withstand. However, when the pile diameter increases to the critical value, the pile body strength will no longer be improved. Instead, it will increase the deadweight and construction cost of the pile body, causing hidden hazards and unnecessary waste of resources. If the pile diameter is too small, the bite thickness between the pile bodies will be insufficient, making it difficult to exert the "beam arch effect" and water-stop reinforcement effect, and it may cause serious deformation or even collapse of the support system due to the low bearing capacity of the pile body. The design of the pile diameter parameters of the horizontal high-pressure rotary jet pile needs to comprehensively consider the quality of the pile, the stress condition of the pile body, the reinforcement effect of the surrounding rock and the construction cost, and puts forward high requirements for the reasonable design of the pile diameter parameters.

[0111] The present embodiment aims to solve the problem of reasonable value selection of pile diameter parameters for advance reinforcement of soft surrounding rock of tunnel with horizontal high-pressure rotary jet piles, compares the surrounding rock deformation before and after reinforcement of horizontal high-pressure rotary jet piles, and based on the pile quality and surrounding rock reinforcement effect, takes the stress mode of whether the pile body exerts the "beam-arch effect" after reinforcement and the stress condition of the pile body as the basic criterion, comprehensively considers the stratum lithology, groundwater pressure, surrounding rock strength, surrounding rock load, construction technology and cost factors, analyzes the improvement effect of horizontal high-pressure rotary jet piles with different pile diameters on the settlement of the tunnel vault and the stress characteristics of the vault reinforcement area, and provides a reasonable pile diameter design method for horizontal high-pressure rotary jet pile reinforcement, so as to solve the problem that there is no perfect theoretical design method for the reinforcement application of horizontal high-pressure rotary jet pile method in tunnel with soft surrounding rock and special surrounding rock tunnel at this stage. The proposal of this embodiment can greatly reduce unnecessary slurry loss and material waste, avoid safety accidents such as surrounding rock deformation or support system collapse caused by too small pile diameter, ensure the pile quality of horizontal high-pressure rotary jet piles, and ensure the reinforcement effect of horizontal high-pressure rotary jet piles in soft surrounding rocks of tunnels. It provides guidance for the construction design of pile diameter of horizontal high-pressure rotary jet piles in similar projects in the future, and is of great significance to improving the practicability and economy of horizontal high-pressure rotary jet piles.

[0112] Example 2

[0113] This embodiment fully describes the technical solution in conjunction with the Tertiary water-rich semi-diagenetic tunnel, and applies the numerical simulation method to the pile diameter design of the horizontal high-pressure jet grouting pile method in the soft surrounding rock of the tunnel, as follows:

[0114] (1) Obtain basic geological information of the construction area

[0115] The engineering geological conditions and hydrogeological conditions are determined based on the geological survey report in the early stage of tunnel construction. The tunnel passes through the Tertiary semi-diagenetic sandstone and is covered by fully weathered granite. The rock is soft, the diagenetic strength is low, the rock mass is broken, the cementation ability is poor, the water retention is strong, it is easy to soften in water and becomes quicksand, and the self-stabilization ability is extremely poor. Basic mechanical tests were carried out on site to test the five parameters of elastic modulus, Poisson's ratio, gravity, cohesion, and internal friction angle of the two types of strata. The parameters of traditional semi-diagenetic and fully weathered granite strata are shown in Table 1 below.

[0116] Table 1 Parameters of different formations

[0117]

[0118] According to the geological survey report and groundwater pressure monitoring in the early stage of construction, the groundwater pressure at the tunnel face reached 300-400 kPa, and the stratum permeability coefficient was 8.5×10 -4 cm / s, and there is seasonal valley water flow around the tunnel. Due to the large drop in the mountain and the steep slope of the terrain, surface water recharges the groundwater through the fault fracture zone in the left front of the tunnel. The tunnel is a typical water-rich soft surrounding rock.

[0119] (2) Determine the design parameters and estimated pile diameter range

[0120] The design parameters of horizontal high-pressure jet grouting piles in similar projects are shown in Table 2. The pile diameter is generally 50-70cm, the pile spacing is generally 30-60cm, the overlap length is generally 3m, and the pile length is generally 10-30m. According to the on-site conditions, the construction process is determined as follows: grouting pressure 30-40MPa, rotation speed 12-18r / min, lifting speed 15-25cm / min. Affected by groundwater, the coagulation effect of ordinary cement slurry is not good, and cement-water glass double liquid slurry is adopted with a mix ratio of 1:1:1. Combined with the typical tertiary semi-diagenetic properties, basic mechanical parameters and groundwater conditions, it can be seen that the quality of horizontal high-pressure jet grouting piles is relatively general. Therefore, according to the characteristics of the water-rich and weak surrounding rock of the tunnel, the range of pile diameter should be expanded to 60cm-80cm to ensure the reinforcement effect of the horizontal high-pressure jet grouting pile body.

[0121] Table 2 Statistical table of design parameters of horizontal high-pressure jet grouting piles in typical tunnels

[0122]

[0123] Based on the design parameters of the jet grouting piles in the above-mentioned tunnel and the pile quality of the traditional empirical method, the pile body parameters were initially selected as follows: pile diameter range 60cm~80cm, pile length 10m, bite thickness 25cm, overlap length 3m, and the intermediate cycle jet grouting pile was taken as the research object. The specific working condition settings are shown in Table 3.

[0124] Table 3 Design table for different working conditions

[0125]

[0126] (3) Establishing numerical model and simulating excavation

[0127] Midas GTS software was used to numerically simulate and establish the corresponding tunnel model. In this tunnel, three steps of excavation were used, with a single advance of 1m, a maximum excavation span of about 14m, and a height of about 10m. The soil on both sides of the tunnel numerical model was 40m each, and the soil on the upper and lower sides was 45m each. The longitudinal excavation length was 24-50m, and the groundwater pressure was uniformly 300kPa based on the field test results. The surrounding rock obeyed the Moore-Coulomb criterion and was simulated by solid units; the primary support was simulated by plate units, and the jet grouting pile was simulated by beam units. The constitutive models all obeyed the elastic constitutive model. The tunnel numerical model was established as follows Figure 3 As shown. In the specific embodiment, it is assumed that all materials are homogeneous, continuous and isotropic to simplify the calculation. According to the reinforcement mechanism of horizontal high-pressure jet grouting piles, the sprayed concrete and the steel arch frame together form a bearing structure. The elastic modulus of the steel frame is converted to the elastic modulus of the shotcrete lining according to the principle of simplified compressive stiffness, so that the initial support is simplified into a curved shell structure with attributes, forming a structure as shown in FIG. Figure 4 The arch shed structure and longitudinal beam structure are shown.

[0128] For small-span tunnels under various levels of soft surrounding rock conditions, the calculation method recommended by the tunnel specification is more reasonable and safe, but for soft large-span tunnels, the results are relatively small and unsafe. The Bill Bowman formula comprehensively considers the tunnel size (width, height), rock mass properties (friction angle, cohesion), tunnel burial depth and surrounding rock weight, and can more comprehensively reflect the influence of various factors. Therefore, the Bill Bowman modified formula with appropriately increased collapse arch calculation height and boundary height is used to calculate the surrounding rock load. Combined with the groundwater pressure value obtained from the monitoring tunnel, the vertical load value of the tunnel's surrounding rock is obtained. The formula is as follows:

[0129]

[0130] Where: γ is the soil layer density; H is the depth of the boundary between deep and shallow burial;

[0131]

[0132] a is half of the tunnel span; c is the cohesion of the surrounding rock; is the internal friction angle; h is the tunnel height;

[0133] The self-weight stress was further added to the model, and the simulation calculation was performed for working condition 6 to obtain the surrounding rock stress and settlement cloud diagram of the tunnel excavation without reinforcement of horizontal high-pressure jet grouting piles in this stratum ( Figure 6 , Figure 7 ).Depend on Figure 6 It can be seen that the stress distribution of the surrounding rock of the tunnel contour is relatively uniform, about 700-850 kPa. This part of the surrounding rock stress eventually acts on the tunnel support, causing a huge load on the tunnel primary support. Figure 7 It can be seen that the maximum settlement of the tunnel surrounding rock occurs at the arch crown, with the maximum settlement reaching 44.47cm; the maximum settlement at the left and right arch shoulders reaches 37.51cm, and the maximum settlement at the left and right side walls reaches 23.93cm, all of which do not meet the reserved deformation recommended by the specification, indicating that under the unsupported working condition, the initial support alone cannot effectively control the settlement of the tunnel surrounding rock. The initial support of the tunnel will inevitably fail due to excessive settlement. The tunnel settlement deformation is too large, and geological disasters are very likely to occur. The tunnel surrounding rock needs to be supported in advance.

[0134] (4) Horizontal high-pressure jet grouting pile support under simulation conditions of different pile diameters

[0135] The vertical stress and vertical settlement cloud diagrams of the surrounding rock after reinforcement were obtained by numerical simulation of working conditions 1 to 5. Since the distribution laws of surrounding rock settlement and stress under different working conditions are relatively similar, only the values ​​have slight differences. The vertical settlement of the surrounding rock arch of working conditions 1 to 5 is 7.75cm, 7.96cm, 7.89cm, 7.80cm, and 7.82cm, respectively. The influence of changing the pile diameter on the settlement of the tunnel surrounding rock is small. The surrounding rock stress in the arch area of ​​working conditions 1 to 5 is 158.19kPakPa, 156.55kPa, 157.64kPa, 157.38kPa, and 155.29kPa, respectively. The surrounding rock stress is less affected by the change of pile diameter. The location with the largest reduction in surrounding rock settlement and stress before and after reinforcement is the arch. The pile body at the arch will be subject to a larger vertical load. It is necessary to focus on the analysis of the force on the arch pile body to avoid pile body rupture due to the design of too small pile diameter.

[0136] (5) Criteria for pile stress

[0137] After meeting the surrounding rock reinforcement effect criterion, it is necessary to further analyze the stress conditions of the pile body itself. Taking the minimum pile diameter condition 1 as an example, the pile body has a bending moment and shear force on the top of the pile body after reinforcement. Fig.10 , Fig.11As shown in the figure. As can be seen from the figure, the overall performance of the pile shear force is negative in the supported section, then gradually increases, is positive in the unsupported section and reaches the maximum value, and finally drops sharply and tends to 0 in the unexcavated section. The overall law is first increased and then decreased; while the bending moment shows a law of first decreasing in the reverse direction and then increasing in the positive direction, then decreasing along the axial direction and finally increasing in the reverse direction and decreasing to 0. The maximum bending moment is located in the excavated unsupported section, which is mainly positive bending moment. The longitudinal distribution law of bending moment and shear force along the pile body shows that under the action of disturbed surrounding rock load, the pile body exerts a beam effect and transfers part of the vertical load to the rear end, thereby limiting the deformation of the surrounding rock. The shear force and bending moment results show that the jet grouting pile body can effectively exert a beam effect in the longitudinal direction and transfer the surrounding rock load to the rear end. Through the axial force stress diagrams of the pile body at different positions in Figure 12 (a), Figure 12 (b), and Figure 12 (c), it can be clearly observed that the horizontal high-pressure jet grouting pile exerts an "arch effect" in the surrounding rock. The axial stress on the pile body gradually decreases from the arch crown to the arch shoulder, side wall, and arch foot, and the arch crown and arch shoulder are under tension, while the side wall is under compression. The horizontal high-pressure jet grouting pile plays a synergistic role of beam and arch as a whole, but it will also cause the arch pile body to be overloaded when the tensile stress exceeds the tensile strength, which destroys the "beam-arch effect".

[0138] According to the shear force and bending moment distribution of the pile body, the front end of the pile body is prone to large deformation, which leads to axial stress in the cross section. Since the tensile strength of the horizontal high-pressure jet grouting pile is much lower than the compressive strength, when the axial stress is generated, the pile body will be destroyed by tension first. Therefore, whether the tensile stress in the cross section exceeds its tensile strength can be used as the pile body stress criterion. Figure 13 (a) and Figure 13 (b) are the maximum bending stress distribution diagrams of the arch jet grouting piles with different pile diameters. It can be seen from the figure that the maximum bending stress decreases with the increase of the pile diameter.

[0139] (6) Comprehensive criterion for the diameter of horizontal high-pressure jet grouting piles

[0140] The surrounding rock reinforcement effects and pile stress results of working conditions 1 to 5 are comprehensively compared. Fig.14 As shown. Fig.14 It can be seen that the increase in pile diameter under each working condition has no significant effect on the change of surrounding rock settlement and stress, but all meet the construction safety standards. The increase in pile diameter will reduce the maximum bending stress of the pile body. If the ultimate tensile strength of the horizontal high-pressure rotary jet pile is 600kPa, the pile body stress reaches the ultimate tensile strength value when the pile diameter is 60cm. When the pile diameter exceeds 70cm, the maximum bending stress of the pile body no longer has a significant change range. The larger the pile diameter, the more difficult it is to pile, the more complicated the construction process, and it is difficult to achieve the expected effect. The construction cost is greatly increased. Therefore, considering the lithology of the Tertiary semi-diagenetic rock, formation water pressure, surrounding rock reinforcement effect and construction cost, through numerical simulation and comparative analysis, it is concluded that the design parameters of the horizontal high-pressure rotary jet pile of the tunnel should be controlled between 65cm and 70cm.

[0141] The present invention and its embodiments are described schematically above, which is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. Therefore, if a person skilled in the art is inspired by it and creatively designs a structure and an embodiment similar to the technical solution without departing from the purpose of the invention, they shall all fall within the protection scope of the present invention.

Claims

1. The pile diameter design method of horizontal high-pressure jet grouting piles in soft surrounding rock of tunnels is characterized by: The following steps are involved: Step 1: Collect the hydrogeological conditions and basic mechanical parameters of the tunnel site; Step 2: Preliminary estimate of the range of pile diameter; In step 2, specifically: 2.

1. Estimate the quality of piles; Based on the basic mechanical parameters of the surrounding rock, groundwater pressure and permeability coefficient measured in step 1, the quality of the horizontal high-pressure jet grouting piles is estimated by analogy with the existing engineering practice experience; when the groundwater pressure in the tunnel site is low, the larger the surrounding rock permeability coefficient and the better the slurry permeability, the better the pile quality; if the groundwater pressure is high, the smaller the surrounding rock permeability coefficient and the worse the slurry permeability, the worse the pile quality; 2.

2. Adjust the construction parameters that affect the quality of pile formation; The construction parameters that affect the quality of horizontal high-pressure jet grouting piles mainly include: slurry type, injection pressure, rotation speed, and lifting speed. Therefore, the construction parameters suitable for the stratum are selected based on the geological conditions, groundwater pressure and permeability coefficient of the tunnel site. If the groundwater pressure of the stratum is high and the surrounding rock permeability coefficient is small, the quality of horizontal high-pressure jet grouting piles can be ensured by changing the slurry type, increasing the injection pressure, increasing the rotation speed, and reducing the lifting speed. 2.

3. Based on the construction experience and construction parameters, evaluate the quality of pile formation and preliminarily determine the range of pile diameter parameters. If the pile formation quality is poor, expand the range of pile diameter parameters; if good pile formation quality can be achieved, narrow the range of pile diameter parameters. Step 3: Use numerical simulation to establish a horizontal high-pressure jet grouting pile reinforcement model with different pile diameters; In step 3, specifically: 3.

1. The stratum numerical model of the soft surrounding rock of the corresponding tunnel is established by using Midas GTS numerical simulation software. In order to reduce the influence of the model boundary effect, the size of the stratum numerical model is set to be no less than 3 to 5 times the tunnel radius on the left and right sides of the tunnel outer contour, and no less than 2 to 3 times the tunnel height on the upper and lower sides of the tunnel. The excavation direction of the tunnel is taken as the positive direction of the Y axis, the direction of the outer normal of the surface is taken as the positive direction of the Z axis, and the right direction of the horizontal plane is taken as the positive direction of the X axis. The model is simplified, the surrounding rock obeys the Moore-Coulomb criterion, and solid units are used for simulation, the initial support is simulated by plate units, and the jet grouting pile body is simulated by beam units. The constitutive model obeys the elastic constitutive model. The sprayed concrete and steel arch frame together form a bearing structure. According to the principle of simplified compressive stiffness, the elastic modulus of the steel frame is converted to the elastic modulus of the shotcrete lining, so that the initial support is simplified into a curved shell structure with attributes. The simplified formula is shown in the following formula: Where: E is the elastic modulus of the converted shotcrete; E0 is the elastic modulus of the original shotcrete; S g is the cross-sectional area of ​​the steel arch; E g is the elastic modulus of the steel arch; S c is the cross-sectional area of ​​shotcrete; 3.

2. Apply constraints in the X direction to the side units of the model, constraints in the Y direction to the front and rear units, constraints in the X, Y, and Z directions to the bottom unit, and no constraints to the top surface, but set the internal deadweight stress; calculate the surrounding rock load using the Bill Bowman modified formula, and apply the groundwater pressure to the upper end face of the tunnel surrounding rock to simulate and calculate the vertical surrounding rock load. The formula is as follows: Where: γ is the soil layer density; H is the depth of the boundary between deep and shallow burial; a is half of the tunnel span; c is the cohesion of the surrounding rock; is the internal friction angle; h is the tunnel height; 3.

3. Select the ThermalAnalysis module in the GTS software, and use the construction phase assistant to activate or deactivate the boundary conditions, primary support, horizontal high-pressure jet grouting piles and face surrounding rock mesh model according to the construction process, and set up the process of simulating tunnel excavation and support; Step 4: Determine whether the surrounding rock reinforcement effect is met; In step 4, specifically: By selecting different construction stages in step 3, the effects of surrounding rock stress and settlement under different pile diameters are obtained, and the changes before and after reinforcement are compared and analyzed, and it is determined whether the set working conditions all meet the reserved deformation required by the specification, so as to determine whether the pile diameter value meets the surrounding rock reinforcement effect criterion; if the set pile diameters all meet the requirements, the pile diameter parameter range with better reinforcement effect is selected, otherwise the pile diameter values ​​that do not meet the requirements are excluded; Step 5: Determine whether the horizontal high-pressure jet grouting piles exert the beam arch effect; In step 5, specifically: 5.

1. Analyze the distribution of bending moment and shear force of piles under the vertical load of surrounding rock at different construction stages in the numerical model. If the bending moment and shear force of a single pile have a distribution law of transmission from the front end to the rear end, the horizontal high-pressure jet grouting pile will play a beam effect, otherwise it will not play a beam effect; 5.

2. Perform axial force analysis on the pile. If the axial forces of the pile at the crown, spandrel and side wall in the horizontal direction transfer the load from the crown to the side walls on both sides, and under the action of the overlying load, the pile at the crown and spandrel produces bending deformation, so that the pile is tensile and its axial stress is positive, while the side wall is compressed under the stress transfer and the axial stress is negative, then the horizontal high-pressure jet grouting pile exerts an arch effect, otherwise it does not exert an arch effect; 5.

3. Based on steps 5.1 and 5.2, determine whether the piles in the model play a beam-arch effect; Step 6: Determine whether the maximum tensile stress exceeds the ultimate tensile strength of the pile; In step 6, specifically: Analyze the maximum tensile stress of the arch pile to determine whether the maximum tensile stress of a single pile exceeds the ultimate tensile strength in the design working condition; if it exceeds the ultimate tensile strength, the pile is destroyed and the beam arch effect fails, and the pile diameter value under this working condition is excluded; if it is less than the ultimate tensile strength, the pile diameter value under this working condition is retained and the next step is to be determined; Step 7: Count the pile diameter conditions that meet the requirements and determine the pile diameter through comprehensive comparison.

2. The pile diameter design method for horizontal high-pressure jet grouting piles in soft surrounding rock of a tunnel according to claim 1 is characterized by: In step 1, specifically: Understand the engineering geological conditions of the tunnel site area and obtain the hydrogeological conditions related to the tunnel; based on engineering survey data or on-site drilling sampling, determine the basic mechanical parameters of the tunnel surrounding rock, including the elastic modulus, Poisson's ratio, density, cohesion, and friction angle of the rock and soil body, grouting body, initial support, and rotary jet pile body; obtain the groundwater pressure in the tunnel site area through water pressure monitoring equipment; conduct precipitation tests on the tunnel surface to obtain the permeability coefficient of the surrounding rock, and provide calculation parameters for subsequent numerical simulations.

3. The pile diameter design method of horizontal high-pressure jet grouting piles in soft surrounding rock of tunnel according to claim 2 is characterized by: In step 7, specifically: 7.

1. Comparing the changes in the vertical stress of the surrounding rock before and after the horizontal high-pressure jet grouting pile reinforcement, if the jet grouting pile exerts a beam effect, the load on the reinforced single pile body will be transmitted from the front end to the rear end in the longitudinal direction; if the jet grouting pile exerts an arch effect, the stress of the surrounding rock after reinforcement will be significantly lower than that of the unreinforced surrounding rock, and the surrounding rock stress will be transmitted from the arch crown to the arch spandrel and side wall; 7.

2. Obtain the pile diameter values ​​under various working conditions that satisfy the beam-arch effect, and collect the vertical settlement and stress values ​​of the surrounding rock, as well as the pile stress value of a single pile according to the numerical simulation results; 7.

3. To ensure the continuous effect of the beam-arch effect, the horizontal high-pressure jet grouting pile must be able to bear the stratum load and groundwater pressure, so that the maximum tensile stress value of a single pile is less than the ultimate tensile strength of the horizontal high-pressure jet grouting pile; if the pile stress is greater than the ultimate tensile strength, the pile diameter parameter value of this working condition is discarded; if the pile stress is less than the ultimate tensile strength, the next step of comparative analysis is carried out; 7.

4. Judge the integrated data. The surrounding rock settlement and deformation should be controlled within the safe range. If the surrounding rock settlement exceeds the safe range, the corresponding pile diameter value range is excluded. Otherwise, the working condition is retained for the next step of judgment. 7.

5. After the above judgment, the remaining pile diameter is the design parameter of the horizontal high-pressure jet grouting pile that meets the soft surrounding rock tunnel. Then, the construction technology and cost factors are comprehensively considered to compare the schemes and determine the appropriate pile diameter.

Citation Information

Patent Citations

  • Tunnel initial support design method based on safety factor method

    CN108222969A

  • Railway tunnel expansive rock tunnel structure design method based on strength-stiffness double control

    CN112832809A

  • Pile length determination method for tunnel shallow-buried weak surrounding rock surface reinforcement through high-pressure jet grouting pile method

    CN114109394A

  • Laminated rock mass different-dip-angle beam arch type tunnel initial lining structure and design method