A method and system for managing power generation settlement of photovoltaic power stations

Through the Internet of Things and blockchain technology, combined with the ARIMA prediction model, the efficiency and accuracy problems of photovoltaic power station power generation settlement management have been solved, intelligent and efficient power generation management has been achieved, and management efficiency and economic benefits have been improved.

CN118333342BActive Publication Date: 2024-10-25HUANENG JIANGSU COMPREHENSIVE ENERGY SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410752905.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-25
Estimated Expiration
2044-06-12

AI Technical Summary

Technical Problem

Existing photovoltaic power station power generation settlement management has problems such as inefficiency and error-prone. Especially in the context of large-scale and market-oriented reforms, it is difficult to meet the complexity and accuracy requirements of management.

Method used

IoT sensing equipment is used to collect power generation and power generation data in real time, preprocessed through edge computing, and the ARIMA time series analysis algorithm is used to build a power generation forecast model, adjust power generation plans and settlement management rules, and combine blockchain technology to record and Evaluate settlement data and optimize management strategies.

Benefits of technology

It improves the accuracy and fairness of power generation settlement, reduces labor costs, improves management efficiency, ensures data security and reliability, and dynamically adjusts power generation plans to improve economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118333342B_ABST
    Figure CN118333342B_ABST
Patent Text Reader

Abstract

The present invention discloses a power generation settlement management method and system for photovoltaic power stations, which relates to the field of energy settlement management, including transmitting collected data to edge computing equipment for preprocessing, using ARIMA time series analysis algorithm to build and train power generation prediction model, formulating power generation settlement management rules to generate settlement data within the cycle, and optimizing power generation settlement management strategy. The present invention uses ARIMA time series analysis algorithm to build a power generation prediction model, accurately predict future power generation, support the formulation of reasonable power generation plans and operation strategies; improve power generation efficiency and economic benefits by dynamically adjusting power generation plans; formulate power generation settlement management rules and use blockchain technology to record settlement data, improve the security and traceability of the settlement process, and improve settlement efficiency at the same time; optimize management strategies by analyzing and evaluating settlement process management results, improve management efficiency and power generation efficiency, and reduce management costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy settlement management, and in particular to a method and system for managing power generation settlement of a photovoltaic power station. Background Art

[0002] Photovoltaic power generation, as a clean and renewable energy form, has developed rapidly in recent years. According to statistics, by the end of 2023, the global photovoltaic power generation capacity has exceeded 2.5TW, and the annual power generation has exceeded 4 trillion kWh, which occupies a pivotal position in renewable energy power generation. With the continuous advancement of photovoltaic power generation technology, the construction and operation of photovoltaic power stations are becoming more and more large-scale and intelligent, which has put forward new requirements for the refined management and settlement of photovoltaic power generation.

[0003] The existing photovoltaic power generation settlement management mostly adopts the method of manual meter reading and summary statistics, which has problems such as low efficiency and easy errors. With the continuous expansion of the scale of photovoltaic power stations, this traditional management method has been difficult to meet actual needs. In addition, with the advancement of power market reform, the settlement of photovoltaic power generation involves multiple parties, such as power grid companies, power trading centers, power users, etc., and the complexity of management is further increased. Therefore, it is urgent to establish an intelligent and automated photovoltaic power generation settlement management method to improve management efficiency, reduce labor costs, and ensure the accuracy and fairness of settlement.

[0004] In response to the above problems, the present invention proposes a method and system for managing the settlement of power generation in photovoltaic power stations. Compared with traditional methods, this method can greatly improve management efficiency and reduce labor costs, while also ensuring the accuracy and fairness of settlement, providing better services for photovoltaic power station operators and power users; at the same time, this method can also be connected to the power trading system to provide convenient power generation settlement management services for power market participants. Summary of the invention

[0005] In view of the problems existing in the existing photovoltaic power station power generation settlement management, the present invention is proposed.

[0006] Therefore, the problem to be solved by the present invention is how to realize the intelligent and efficient management of the electricity generation settlement of photovoltaic power stations.

[0007] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0008] In the first aspect, an embodiment of the present invention provides a method for managing the settlement of electricity generated by a photovoltaic power station, which includes using an Internet of Things sensor device to collect the power generation data and the power generation data of the photovoltaic power station in real time, and transmitting them to an edge computing device for preprocessing; based on the preprocessed power generation data and the power generation data, using an ARIMA time series analysis algorithm to build and train a power generation prediction model; based on the prediction results of the power generation prediction model, adjusting the power generation plan, formulating power generation settlement management rules, and generating power generation settlement data within the period, and calculating the amount of electricity tax payable according to the prescribed tax ratio; using blockchain technology to record power generation settlement data, manage and evaluate the power generation settlement process, and optimize the power generation settlement process management strategy.

[0009] As a preferred solution of the power generation settlement management method for photovoltaic power stations described in the present invention, the use of blockchain technology includes the following steps: recording power generation data and settlement data on the chain through blockchain technology; automatically executing the power generation settlement process through smart contracts; the power generation settlement process includes data submission, data review, data settlement and payment collection; at the end of the month, the business personnel will generate a provisional electricity fee template according to the company's power generation settlement data within the period; the electricity fee provisional template is imported into the system, and the business personnel enter the required settlement electricity fee into the system, and at the same time check the provisional estimate corresponding to the electricity fee to generate an electricity fee settlement sheet; the provisional electricity fee template contains the power generation, grid-connected power, consumed power, grid-connected electricity price, consumed electricity price, grid-connected electricity fee and consumed electricity fee of each power station; the electricity fee settlement sheet is sent to the business personnel for review; when the provisional estimate items are reviewed If the verification fails, the settlement document is resubmitted to generate a settlement document; when the provisional estimate item is reviewed and approved, the settlement review document is updated to generate a provisional electricity bill voucher; the repayment is based on the provisional electricity bill voucher, the collection date, payee name and collection amount are entered, the system automatically matches all the electricity bill information to be recovered by this payee, the electricity bill data is checked, and the repayment is confirmed; when the power generation and settlement process begins, the operation data is recorded throughout the process through the blockchain node; if the operation data is power generation data and power generation plan data, it is submitted to the blockchain in real time; if the operation data is the settlement amount and distribution process, the settlement bill is submitted to the blockchain every day for review by all parties; if all parties review the settlement bill and find it correct, the repayment to the user is completed through the smart contract; when the repayment is completed, a monthly settlement analysis report is generated based on the on-chain data, and the next month's power generation settlement management rules are formulated.

[0010] As a preferred solution of the power generation settlement management method for photovoltaic power stations described in the present invention, the process of formulating the power generation settlement management rules for the next month includes the following steps: marking the financial processing status of the target settlement order on the approved electricity bill settlement order; the financial processing status includes whether the target settlement order has been invoiced, whether the target settlement order has generated a voucher, and whether the target settlement order has been paid back; checking the details and approval status of the settlement order, counting the proportion of the settlement amount of each user type, and evaluating the rationality of the differentiation strategy; dynamically adjusting the unit electricity charging standards for different user types according to the proportion of the settlement amount; when the settlement amount of a certain type of user accounts for too high or too low, adjusting the corresponding settlement rules, and checking whether there is a settlement dispute; if there is a settlement dispute, then Analyze whether the power generation settlement management rules are set reasonably; if the power generation settlement management rules are set unreasonably, then re-formulate the power generation settlement management rules; if the power generation settlement management rules are due to operational errors, initiate manual intervention; compare the settlement data with historical data horizontally; if the comparison shows abnormal fluctuations, evaluate whether it is the regional electricity consumption pattern and adjust the operation strategy; predict the settlement scale in the future period based on the power generation forecast model; predict the power generation income, operating costs and net income in the future period as the basis for formulating the power generation settlement management strategy; when the forecast results do not match the power generation settlement process management, rebuild the power generation forecast model; when the forecast results match the power generation settlement process management, generate the power generation settlement management strategy.

[0011] As a preferred solution of the power generation settlement management method for photovoltaic power stations described in the present invention, the construction process of the power generation prediction model includes the following steps: analyzing the factors affecting the power generation according to the pre-processed power generation data and power generation data, and constructing the input variables reflecting the power generation characteristics by using the ARIMA time series analysis algorithm; setting the initial parameters of the ARIMA time series analysis algorithm according to the time series characteristics of the input variables, and constructing the power generation prediction model; fitting the power generation prediction model through the data set, obtaining the estimated values ​​of the power generation prediction model parameters, and calculating the prediction error of the power generation prediction model in the verification set, adjusting and optimizing the input variables; the specific formula of the prediction error is as follows:

[0012] ;

[0013] in, is the prediction error, is the number of samples, is the actual value of the i-th sample, is the predicted value of the i-th sample.

[0014] Adjust the parameters of the power generation prediction model according to the prediction error, repeat this operation, iterate and optimize until the prediction performance in the verification set is the best, and save the trained power generation prediction model; deploy the trained power generation prediction model to photovoltaic power generation, monitor the prediction performance of the power generation prediction model in real time, pay attention to the changing trend of the prediction deviation, and conduct online learning and update of the power generation prediction model.

[0015] As a preferred solution of the power generation settlement management method for a photovoltaic power station of the present invention, the power generation influencing factors include light intensity, temperature and wind speed; the relevant formula of the power generation prediction model is as follows;

[0016] ,

[0017] ;

[0018] in, is the predicted power generation of the photovoltaic power station, To predict power generation, Forecast the power generation of the photovoltaic power station at time t, is the starting time point of the prediction time interval, is the cut-off time point of the prediction time interval, is the light intensity, is the power generation efficiency of the photovoltaic battery group, is the temperature of the photovoltaic power station, is the wind speed of the photovoltaic power station, is the total installed area of ​​photovoltaic power stations.

[0019] The specific formula for the power generation efficiency of photovoltaic battery groups is as follows:

[0020] ;

[0021] in, and is a constant coefficient, is the temperature of the photovoltaic power station, is the base value of wind speed.

[0022] As a preferred solution of the power generation settlement management method for photovoltaic power stations described in the present invention, the power generation prediction model includes: when there is a deviation between the prediction result of the power generation prediction model and the actual power generation, the prediction result is compared with the historical data; if the prediction deviation is equal to the actual value, the current power generation plan is maintained; if the prediction value is continuously less than the actual value, the current power generation plan is modified, and the temperature of the photovoltaic power station is detected. and wind speed of photovoltaic power station Data, and at the same time, according to the peak and off-peak periods of electricity consumption, adjust the unit electricity charging standards in different periods to guide electricity consumption behavior; if abnormal data is found, the detection equipment will be automatically calibrated, specifically: if the temperature of the photovoltaic power station If the deviation from the set value exceeds 5%, check whether the cooling or heating system is faulty and start the repair process. After the repair is completed, perform a secondary calibration. If the deviation from the set value exceeds 10%, check whether the fan or sunshade device is faulty and perform maintenance in time; if the predicted value is continuously greater than the actual value, reduce the power generation plan and regularly check the total installed area of ​​the photovoltaic power station. ; If it is found that the efficiency of some components is abnormally lower than the standard, it is determined whether the efficiency abnormality of some components is due to obstruction or contamination; when the predicted power generation is compared with the current power demand, it is determined whether the power demand is met; if the predicted power generation is greater than the power demand, the remaining power is included in the power feedback to the grid to obtain electricity subsidy; if the predicted power generation is less than the power demand, energy storage facilities are used to make up for the gap; when the power generation and the transmission capacity of the grid are predicted, it is determined whether grid congestion will occur; if the predicted power generation is greater than the transmission capacity of the grid, the power generation is restricted or the transmission lines are expanded; if the predicted power generation is less than the transmission capacity of the grid, the power generation plan is increased.

[0023] As a preferred solution of the power generation settlement management method for photovoltaic power stations described in the present invention, the evaluation includes: when evaluating the efficiency within the settlement period, setting an efficiency threshold and counting the actual settlement time; if the time is greater than the efficiency threshold, finding the cause of the low efficiency and optimizing it; if the time is less than the efficiency threshold, maintaining the current efficiency; when evaluating the accuracy of the settlement calculation, setting an accuracy threshold, extracting a sample of settlement cases, and checking the calculation results; if the error is greater than the accuracy threshold, checking the power generation prediction model and correcting the error; if the error is less than the accuracy threshold, no adjustment is required; when evaluating the performance of the blockchain system, A throughput threshold is set, and a stress test is performed to record the actual throughput and latency. If the throughput is less than the throughput threshold, the number of nodes is increased. If the throughput is greater than the throughput threshold, there is no need to adjust the performance of the blockchain system. When evaluating the integrity of settlement data, a missing rate threshold is set, and the actual number of missing data entries is counted. If the missing rate is greater than the missing rate threshold, the missing data is manually checked and supplemented. If the missing rate is less than the missing rate threshold, there is no need to supplement the data. When evaluating settlement income, the actual power generation income and operating cost expenditure are counted to calculate the net rate of return. If the net rate of return is lower than the expected target, the reasons are analyzed and the charging standards are adjusted or operating costs are reduced.

[0024] In the second aspect, an embodiment of the present invention provides a power generation settlement management system for a photovoltaic power station, which includes: a collection module, which uses the Internet of Things sensor equipment to collect the power generation data and power generation data of the photovoltaic power station in real time, and transmits it to the edge computing device for preprocessing; a construction module, based on the preprocessed power generation data and power generation data, uses the ARIMA time series analysis algorithm to build and train the power generation prediction model; an adjustment and formulation module, which adjusts the power generation plan based on the prediction results of the power generation prediction model, formulates power generation settlement management rules, and generates power generation settlement data within the period, and calculates the amount of electricity tax payable according to the prescribed tax ratio; an evaluation module, which uses blockchain technology to record power generation settlement data, manages and evaluates the power generation settlement process, and optimizes the power generation settlement process management strategy.

[0025] In a third aspect, an embodiment of the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the computer program instructions are executed by the processor, the steps of the method for power generation settlement management of a photovoltaic power station as described in the first aspect of the present invention are implemented.

[0026] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program instructions are executed by a processor, the steps of the method for managing power generation settlement of a photovoltaic power station as described in the first aspect of the present invention are implemented.

[0027] The beneficial effects of the present invention are as follows: the present invention utilizes the ARIMA time series analysis algorithm to construct a power generation prediction model, accurately predicts future power generation, and supports the formulation of reasonable power generation plans and operation strategies; improves power generation efficiency and economic benefits by dynamically adjusting power generation plans; formulates power generation settlement management rules and utilizes blockchain technology to record settlement data, thereby improving the security and traceability of the settlement process and improving settlement efficiency; continuously optimizes management strategies, improves management efficiency and accuracy, improves power generation efficiency, reduces management costs, and ensures data security and reliability by analyzing and evaluating settlement process management results. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0029] Figure 1 This is a flow chart of the power generation settlement management method for a photovoltaic power station according to Example 1. DETAILED DESCRIPTION

[0030] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0031] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0032] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0033] Example 1

[0034] Reference Figure 1 , which is the first embodiment of the present invention, and provides a method for managing power generation settlement of a photovoltaic power station, comprising:

[0035] S1: Use IoT sensor devices to collect power generation data and power generation data of photovoltaic power stations in real time, and transmit them to edge computing devices for preprocessing.

[0036] Specifically, IoT sensors, including current sensors, voltage sensors and power sensors, are installed on each power generation equipment in the photovoltaic power station. The IoT sensor equipment collects the power generation and power generation data of the photovoltaic power station in real time. The collected data includes but is not limited to: power generation data, power generation voltage, power generation current and cumulative power generation.

[0037] Furthermore, the collected data is transmitted to the edge computing device through a wired network, where the edge computing device is an industrial controller inside the photovoltaic power station. Data preprocessing is performed on the edge computing device to ensure the integrity, accuracy and availability of the data. The preprocessed data is compressed to reduce the data transmission load; the preprocessed data is stored in the edge computing device and regularly uploaded to the central cloud platform of the photovoltaic power station. A data preservation strategy is formulated to balance the storage space of the edge device and the upload efficiency.

[0038] S2: Based on the preprocessed power generation data and power generation data, the power generation prediction model is constructed and trained using the ARIMA time series analysis algorithm.

[0039] Specifically, according to the preprocessed power generation data and power generation data, the factors affecting power generation are analyzed, and the input variables reflecting the power generation characteristics are constructed by using the ARIMA time series analysis algorithm; according to the time series characteristics of the input variables, the initial parameters of the ARIMA time series analysis algorithm are set to construct a power generation prediction model; the power generation prediction model is fitted through the data set to obtain the estimated values ​​of the power generation prediction model parameters, and the prediction error of the power generation prediction model in the validation set is calculated, and the input variables are adjusted and optimized; the specific formula for the prediction error is as follows:

[0040] ;

[0041] in, is the prediction error, is the number of samples, is the actual value of the i-th sample, is the predicted value of the i-th sample.

[0042] Furthermore, the parameters of the power generation prediction model are adjusted according to the prediction error, and this operation is repeated, and the iterative optimization is performed until the prediction performance in the verification set is the best, and the trained power generation prediction model is saved; the trained power generation prediction model is deployed to photovoltaic power generation, the prediction performance of the power generation prediction model is monitored in real time, and the changing trend of the prediction deviation is paid attention to, and the power generation prediction model is learned and updated online.

[0043] It should be noted that the parameters of the power generation prediction model include the autoregressive order and the moving average order. The autoregressive order reflects the degree of dependence of the time series on its historical value. If the error is large and fluctuates periodically, the autoregressive order is increased to allow the power generation prediction model to refer more to historical data and capture potential cyclical laws. If the error has no obvious periodicity, the autoregressive order is reduced to avoid overfitting. The difference order determines the stability transformation of the time series. If the residual sequence shows an obvious non-stationary trend, the difference order is increased, and the sequence is subjected to high-order differences to achieve stabilization. If the residual has tended to be stable, a large difference order will lead to excessive differences in the sequence, which needs to be appropriately reduced. The moving average order reflects the degree of influence of the residual on its historical value. If the residual shows autocorrelation, the moving average order is appropriately increased to allow the power generation prediction model to refer more to historical residuals and improve the fitting effect. If the residual is basically in a white noise state, a too large moving average order will introduce noise, which needs to be appropriately reduced.

[0044] Furthermore, the power generation factors include light intensity, temperature and wind speed; the power generation influencing factors include light intensity, temperature and wind speed; the power generation prediction model is related as follows;

[0045] ,

[0046] ;

[0047] in, is the predicted power generation of the photovoltaic power station, To predict power generation, Forecast the power generation of the photovoltaic power station at time t, is the starting time point of the prediction time interval, is the cut-off time point of the prediction time interval, is the light intensity, is the power generation efficiency of the photovoltaic battery group, is the temperature of the photovoltaic power station, is the wind speed of the photovoltaic power station, is the total installed area of ​​photovoltaic power stations.

[0048] The specific formula for the power generation efficiency of photovoltaic battery groups is as follows:

[0049] ;

[0050] in, and is a constant coefficient, is the temperature of the photovoltaic power station, is the base value of wind speed.

[0051] Specifically, when there is a deviation between the predicted result of the power generation prediction model and the actual power generation, the predicted result is compared with the historical data; if the predicted deviation is equal to the actual value, the current power generation plan is maintained; if the predicted value is continuously less than the actual value, the current power generation plan is modified and the temperature of the photovoltaic power station is detected. and wind speed of photovoltaic power station Data, and at the same time, according to the peak and off-peak periods of electricity consumption, adjust the unit electricity charging standards in different periods to guide electricity consumption behavior; if abnormal data is found, the detection equipment will be automatically calibrated, specifically: if the temperature of the photovoltaic power station If the deviation from the set value exceeds 5%, check whether the cooling or heating system is faulty and start the repair process. After the repair is completed, perform a secondary calibration. If the deviation from the set value exceeds 10%, check whether the fan or sunshade device is faulty and perform maintenance in time; if the predicted value is continuously greater than the actual value, reduce the power generation plan and regularly check the total installed area of ​​the photovoltaic power station. ; If it is found that the efficiency of some components is abnormally lower than the standard, it is determined whether the abnormal efficiency of some components is due to obstruction or contamination.

[0052] Furthermore, when the predicted power generation is compared with the current power demand, it is determined whether the power demand is met; if the predicted power generation is greater than the power demand, the remaining power is included in the power grid feedback power and an electricity subsidy is obtained; if the predicted power generation is less than the power demand, energy storage facilities are used to make up for the gap; when the predicted power generation and the transmission capacity of the power grid are compared, it is determined whether the power grid will be congested; if the predicted power generation is greater than the transmission capacity of the power grid, the power generation is restricted or the transmission lines are expanded; if the predicted power generation is less than the transmission capacity of the power grid, the power generation plan is increased.

[0053] It should be noted that the set value deviation refers to the difference between the actual value of the temperature or wind speed of the photovoltaic power station and the preset ideal value.

[0054] Furthermore, when the daily settlement management system is based on the predicted power generation at 00:00 When the power generation plan is generated based on the predicted value, it is submitted for review; if there is an abnormality in the manual review of the power generation plan, the power generation plan will be suspended; if the power generation plan is confirmed to be correct, the settlement management system will automatically issue operating instructions to each component; the operating instructions include component tracking and grid connection control; if a fault occurs during the execution of the power generation plan, the backup equipment will be switched and the maintenance process will be triggered.

[0055] S3: Adjust the power generation plan based on the prediction results of the power generation prediction model, formulate power generation settlement management rules, generate power generation settlement data within the period, and calculate the amount of electricity tax payable according to the prescribed tax ratio.

[0056] Specifically, according to the predicted power generation Formulate power generation settlement management rules while taking into account the regional peak power consumption patterns; when regional power consumption is at its peak, the electricity price will increase by 30% to encourage users to use electricity during off-peak hours; when regional power consumption is at its off-peak hours, the electricity price will be reduced by 20% to promote the use of clean energy; if the user holds an environmental certification, a discount will be implemented to support green development; if user demand changes, the differentiated electricity price plan will be adjusted in real time.

[0057] Furthermore, the collected power generation settlement data is calculated to obtain the amount of electricity tax to be paid. If the tax is levied on the total power generation, the specific formula is: electricity tax amount = total power generation * unit power generation tax rate; if the tax is levied on power sales revenue, the specific formula is: electricity tax amount = power sales revenue * power sales revenue tax rate.

[0058] Furthermore, the initially calculated electricity tax amount will be appropriately adjusted based on whether there are any preferential policy adjustment factors. If there is a certain subsidy for the amount of electricity fed back from the grid, the final amount of tax payable = electricity tax amount - feedback electricity subsidy.

[0059] Specifically, according to the power generation forecast results, the power generation allocation ratio of each time period within the cycle is calculated; the power generation allocation and differentiated settlement rules are matched to obtain user-level settlement data; the settlement data of each user is summarized to generate a total settlement document within the cycle; the total settlement document within the cycle is stored in the blockchain, and the settlement data is recorded using blockchain technology. The results of the power generation settlement process management are analyzed and evaluated to optimize the power generation settlement management strategy.

[0060] S4: Use blockchain technology to record power generation settlement data, manage and evaluate the power generation settlement process, and optimize the power generation settlement process management strategy.

[0061] Specifically, through blockchain technology, the power generation data and settlement data are recorded on the chain; the power generation settlement process is automatically executed through smart contracts; the power generation settlement process includes data submission, data review, data settlement and payment collection; at the end of the month, the business personnel will generate a provisional electricity fee template according to the company's power generation settlement data within the period; the electricity fee provisional template is imported into the system, and the business personnel enter the required settlement electricity fee into the system, and check the provisional estimate corresponding to the electricity fee to generate the electricity fee settlement sheet; the provisional electricity fee template includes the power generation, grid-connected power, consumed power, grid-connected electricity price, consumed electricity price, grid-connected electricity fee and consumed electricity fee of each power station;

[0062] Send the electricity bill to the business personnel for review.

[0063] Furthermore, if the provisional estimate item fails to pass the review, the settlement document is resubmitted to generate a settlement document;

[0064] When the provisional estimate item is approved, the settlement review document is updated and a provisional estimate electricity bill voucher is generated. The payment is collected based on the provisional estimate electricity bill voucher. Enter the payment date, payee name and payment amount. The system automatically matches all the electricity bill information to be collected from this payee. Check the electricity bill data and confirm the payment.

[0065] Furthermore, when the power generation and settlement process begins, the operating data will be recorded throughout the process through the blockchain nodes; if the operating data is power generation data and power generation plan data, it will be submitted to the blockchain in real time; if the operating data is the settlement amount and distribution process, the settlement bill will be submitted to the blockchain every day for review by all parties; if all parties review the settlement bill and find it correct, the repayment to the user will be completed through the smart contract; when the repayment is completed, a monthly settlement analysis report will be generated based on the on-chain data, and the next month's power generation settlement management rules will be formulated.

[0066] Furthermore, the approved electricity bill settlement form shall be marked with the financial processing status of the target settlement form; the financial processing status includes whether the target settlement form has been invoiced, whether the target settlement form has generated vouchers, and whether the target settlement form has been paid back; check the settlement form details and approval status, count the proportion of settlement amounts of each user type, and evaluate the rationality of the differentiation strategy; dynamically adjust the unit electricity charging standards for different user types according to the proportion of settlement amounts; when the proportion of settlement amounts of a certain type of user is too high or too low, adjust the corresponding settlement rules, and check whether there are settlement disputes; if there are settlement disputes, analyze whether the power generation settlement management rules are set reasonably; if the power generation settlement management rules are set reasonably, If the configuration is unreasonable, the power generation settlement management rules are re-formulated; if the power generation settlement management rules are due to operational errors, manual intervention is initiated; the settlement data is compared horizontally with the historical data; if the comparison shows abnormal fluctuations, it is evaluated whether it is the regional power consumption law and the operation strategy is adjusted; according to the power generation prediction model, the settlement scale in the future period is predicted; the power generation income, operating costs and net income in the future period are predicted as the basis for formulating the power generation settlement management strategy; when the prediction results do not match the power generation settlement process management, the power generation prediction model is rebuilt; when the prediction results match the power generation settlement process management, the power generation settlement management strategy is generated.

[0067] It should be noted that if the target settlement statement has been invoiced, the invoicing record in the accounting system will be updated; if the target settlement statement has not been invoiced, the reason for not issuing the invoice will be checked to confirm whether the invoicing conditions are met; if the target settlement statement has generated a voucher, the consistency between the voucher information and the settlement statement will be checked, and the corresponding reports and audit materials will be prepared; if the target settlement statement has not generated a voucher, the reason for not generating the voucher will be confirmed, such as invoicing delays or system processing problems, and the progress of voucher generation will be accelerated to ensure timely financial processing; if the target settlement statement has been paid, the accounts receivable record will be updated and the accounts will be written off; if the target settlement statement has not been paid, a payment reminder will be sent to confirm the customer's payment plan and analyze the reasons for not paying, such as the customer's financial situation.

[0068] Furthermore, when evaluating the efficiency within the settlement cycle, an efficiency threshold is set and the actual settlement time is counted; if the time is greater than the efficiency threshold, the cause of inefficiency is found and optimized; if the time is less than the efficiency threshold, the current efficiency is maintained; when evaluating the accuracy of the settlement calculation, an accuracy threshold is set, and a sample of settlement cases is extracted to verify the calculation results; if the error is greater than the accuracy threshold, the power generation prediction model is checked and the error is corrected; if the error is less than the accuracy threshold, no adjustment is required; when evaluating the performance of the blockchain system, a throughput threshold is set, and a stress test is performed to record the results. The actual throughput and latency are recorded; if the throughput is less than the throughput threshold, the number of nodes is increased; if the throughput is greater than the throughput threshold, there is no need to adjust the performance of the blockchain system; when evaluating the integrity of the settlement data, a missing rate threshold is set and the number of actual missing data entries is counted; if the missing rate is greater than the missing rate threshold, the missing data is manually checked and supplemented; if the missing rate is less than the missing rate threshold, there is no need to supplement the data; when evaluating the settlement income, the actual power generation income and operating cost expenditure are counted to calculate the net rate of return; if the net rate of return is lower than the expected target, the reasons are analyzed and the charging standards are adjusted or the operating costs are reduced.

[0069] It should be noted that the efficiency threshold is the time threshold set when evaluating the efficiency of the power generation settlement process; the accuracy threshold is the error threshold set when evaluating the accuracy of the power generation settlement calculation; the throughput threshold is the throughput lower limit threshold set when evaluating the performance of the blockchain system; the missing rate threshold is the data missing rate threshold set when evaluating the integrity of the settlement data.

[0070] Furthermore, this embodiment also provides a power generation settlement management system for photovoltaic power stations, including: a collection module, which is used to use Internet of Things sensor equipment to collect the power generation data and power generation data of the photovoltaic power station in real time, and transmit it to the edge computing device for preprocessing; a construction module, based on the preprocessed power generation data and power generation data, using the ARIMA time series analysis algorithm to build and train the power generation prediction model; an adjustment and formulation module, which adjusts the power generation plan based on the prediction results of the power generation prediction model, formulates power generation settlement management rules, and generates settlement data within the period; an evaluation module, based on the blockchain-based power generation settlement process management, uses blockchain technology to record settlement data, and analyzes and evaluates the settlement results to optimize the power generation settlement management strategy.

[0071] This embodiment also provides a computer device, which is suitable for the case of a power generation settlement management method for a photovoltaic power station, and includes a memory and a processor; the memory is used to store computer executable instructions, and the processor is used to execute computer executable instructions to implement the power generation settlement management method for a photovoltaic power station proposed in the above embodiment.

[0072] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covered on the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.

[0073] The present embodiment also provides a storage medium having a computer program stored thereon, which implements the following steps when executed by a processor: using an Internet of Things sensor device to collect the power generation data and power generation data of a photovoltaic power station in real time, and transmitting the data to an edge computing device for preprocessing; based on the preprocessed power generation data and power generation data, using an ARIMA time series analysis algorithm to build and train a power generation prediction model; based on the prediction results of the power generation prediction model, adjusting the power generation plan, formulating power generation settlement management rules, and generating settlement data within a period; using blockchain technology to record settlement data, managing and evaluating the power generation settlement process, and optimizing the power generation settlement process management strategy.

[0074] In summary, the present invention uses the ARIMA time series analysis algorithm to construct a power generation prediction model, accurately predict future power generation, and support the formulation of reasonable power generation plans and operation strategies; by dynamically adjusting the power generation plan, the power generation efficiency and economic benefits are improved; power generation settlement management rules are formulated and the blockchain technology is used to record settlement data, thereby improving the security and traceability of the settlement process and improving settlement efficiency; by analyzing and evaluating the settlement process management results, the management strategy is continuously optimized, the management efficiency and accuracy are improved, the power generation efficiency is improved, the management cost is reduced, and the security and reliability of the data are guaranteed.

[0075] Example 2

[0076] Referring to Table 1, which is a second embodiment of the present invention, this embodiment provides a method for managing power generation settlement of a photovoltaic power station. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.

[0077] Specifically, a small photovoltaic power station system is built, including 20 monocrystalline silicon photovoltaic modules, 1 set of 1000W grid-connected inverter, 2 sets of environmental monitoring equipment (temperature, wind speed, radiation intensity sensors) and 1 edge computing gateway hardware facilities. The settlement management system of the present invention is deployed on the edge computing gateway and connected to the above hardware equipment. The settlement management system includes multiple sub-modules of a data acquisition module, an ARIMA power generation prediction module, an operation strategy optimization module, a differentiated settlement rule formulation module and a blockchain-based settlement process management module.

[0078] Furthermore, multiple operating scenarios of different seasons and power consumption modes within a year are simulated, environmental parameters and power demand data are continuously input, and the performance of the scheme of the present invention and the traditional scheme in each link is recorded and compared. The specific test steps are as follows: the Internet of Things device collects photovoltaic power, power generation and environmental data in real time, and inputs them into the prediction module after preprocessing through the edge gateway; the prediction module builds and trains the power generation prediction model based on the ARIMA algorithm, and predicts the power generation curve within the next 24 hours in real time; the operation strategy optimization module dynamically adjusts the operating parameters of the component tracking angle and inverter efficiency based on the prediction results; the differentiated settlement rule module formulates differentiated electricity prices and settlement plans according to the simulated different regions and user types; the blockchain settlement module records the power generation and settlement amount throughout the process, generates a monthly settlement report and performs strategy evaluation and optimization. Several modules work together to form a closed-loop intelligent management, analyze the operation data of each link of the settlement management system, and compare the management effect of the traditional manual method.

[0079] Furthermore, as shown in Table 1, the success rate of power generation data collection has been greatly improved from 82.3% to 98.5%. IoT devices and edge computing technology ensure the real-time and complete collection of power generation and environmental information data, laying the foundation for accurate prediction. The power generation prediction model based on the ARIMA time series analysis algorithm reduces the average prediction error from 16.2% to 3.7%, and the error is controlled within 5%, which helps to improve the accuracy of operation strategies and power generation plans. By monitoring the predicted data, the parameters of the component angle and inverter power factor are automatically optimized and adjusted, so that the actual power generation efficiency of the photovoltaic components is 15.8% higher than that of the traditional method, giving full play to the power generation potential.

[0080] Table 1 Comparison table between the present invention and the prior art:

[0081] Experimental subjects Prior art The present invention Success rate of power generation data collection (%) 92.3 98.5 Average error of power generation forecast (%) 16.2 3.7 Module efficiency improvement (%) 0 15.8 Degree of personalization of settlement rules No differentiation 5 levels of differentiation Degree of automation of settlement process (%) 22 93 Revenue increase (%) 0 29.6

[0082] Specifically, based on big data analysis and user profiling technology, 5 levels of differentiated electricity prices and settlement policies can be formulated according to regional characteristics and user types to meet ever-changing personalized needs. Blockchain technology enables the settlement process to achieve a 93% automation level, and the process is open, transparent, traceable and auditable, significantly reducing labor costs and fraud risks. Compared with manual management, this invention can increase revenue by 29.6%, which comprehensively reflects the comprehensive benefits of improving the quality of power generation data, optimizing power generation efficiency, and refined management of the settlement process.

[0083] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for managing power generation settlement of a photovoltaic power station, characterized in that: include, Use IoT sensor devices to collect power and power generation data of photovoltaic power stations in real time, and transmit them to edge computing devices for preprocessing; Based on the preprocessed power generation data and power generation data, the power generation prediction model is constructed and trained using the ARIMA time series analysis algorithm; Adjust the power generation plan based on the prediction results of the power generation prediction model, formulate power generation settlement management rules, generate power generation settlement data within the period, and calculate the amount of electricity tax payable according to the prescribed tax ratio; Use blockchain technology to record power generation settlement data, manage and evaluate the power generation settlement process, and optimize the power generation settlement process management strategy; The use of blockchain technology includes the following steps: Through blockchain technology, power generation data and settlement data are recorded on the chain; Automatically execute the electricity generation settlement process through smart contracts; The power generation settlement process includes data submission, data review, data settlement and payment collection; At the end of the month, business personnel will generate a provisional electricity fee template based on the company's power generation settlement data within the period; Import the electricity fee estimate template into the system, and the business personnel enter the required electricity fee into the system, check the corresponding estimate form, and generate the electricity fee settlement form; The estimated electricity fee template includes the power generation, grid-connected electricity, consumed electricity, grid-connected electricity price, consumed electricity price, grid-connected electricity fee and consumed electricity fee of each power station; Send the electricity bill to the business personnel for review; If the provisional estimate item fails to pass the review, the settlement document is resubmitted to generate a settlement document; When the provisional estimate item is approved, the settlement review document is updated and a provisional estimate electricity fee voucher is generated; The payment is based on the estimated electricity bill voucher. Enter the payment date, payee name and payment amount. The system automatically matches all the electricity bill information to be recovered by this payee. Check the electricity bill data and confirm the payment. When the power generation and settlement process begins, the operation data is recorded throughout the process through the blockchain node; If the operating data is power generation data and power generation plan data, it will be submitted to the blockchain in real time; If the operating data is the settlement amount and distribution process, the settlement bill will be submitted to the blockchain every day for review by all parties; If all parties review the settlement bill and find it correct, the payment to the user will be completed through the smart contract; When the payment is completed, a monthly settlement analysis report is generated based on the on-chain data, and the settlement management rules for the next month's power generation are formulated; The construction process of the power generation prediction model includes the following steps: According to the pre-processed power generation data and power generation data, the factors affecting power generation are analyzed, and the input variables reflecting the power generation characteristics are constructed using the ARIMA time series analysis algorithm; According to the time series characteristics of the input variables, the initial parameters of the ARIMA time series analysis algorithm are set to build a power generation forecasting model; Fit the power generation prediction model through the data set, obtain the estimated values ​​of the power generation prediction model parameters, calculate the prediction error of the power generation prediction model in the validation set, and adjust and optimize the input variables; The specific formula of the prediction error is as follows: ; in, is the prediction error, is the number of samples, is the actual value of the i-th sample, is the predicted value of the i-th sample; Adjust the parameters of the power generation prediction model according to the prediction error, repeat this operation, iterate and optimize until the prediction performance in the validation set is the best, and save the trained power generation prediction model; Deploy the trained power generation prediction model to photovoltaic power generation, monitor the prediction performance of the power generation prediction model in real time, pay attention to the changing trend of the prediction deviation, and conduct online learning and update of the power generation prediction model; The factors affecting power generation include light intensity, temperature and wind speed; the relevant formula of the power generation prediction model is as follows; , ; in, is the predicted power generation of the photovoltaic power station, To predict power generation, Forecast the power generation of the photovoltaic power station at time t, is the starting time point of the prediction time interval, is the cut-off time point of the prediction time interval, is the light intensity, is the power generation efficiency of the photovoltaic battery group, is the temperature of the photovoltaic power station, is the wind speed of the photovoltaic power station, is the total installed area of ​​photovoltaic power stations; The specific formula for the power generation efficiency of photovoltaic battery groups is as follows: ; in, and is a constant coefficient, is the temperature of the photovoltaic power station, is the reference value of wind speed; The power generation prediction model includes: When there is a deviation between the prediction result of the power generation prediction model and the actual power generation, the prediction result is compared with the historical data for judgment; If the forecast deviation is equal to the actual value, the current power generation plan is maintained; If the predicted value is continuously less than the actual value, modify the current power generation plan and check the temperature of the photovoltaic power station. and wind speed of photovoltaic power station Data, and at the same time, according to the peak and off-peak periods of electricity consumption, adjust the unit electricity charging standards in different periods to guide electricity consumption behavior; If abnormal data is found, the detection equipment will be automatically calibrated, specifically: If the temperature of the photovoltaic power station If the deviation from the set value exceeds 5%, check whether the cooling or heating system is faulty and start the repair process. After the repair is completed, perform a second calibration. If the wind speed of the photovoltaic power station If the deviation from the set value exceeds 10%, check whether the fan or sunshade device is faulty and perform maintenance in time; If the predicted value continues to be greater than the actual value, the power generation plan will be reduced and the total installed area of ​​the photovoltaic power station will be regularly checked. ; If it is found that the efficiency of some components is abnormally lower than the standard, it is determined whether the abnormal efficiency of some components is due to obstruction or contamination; When the predicted power generation is compared with the current power demand, it is determined whether the power demand is met; If the predicted power generation is greater than the power demand, the surplus power will be included in the power grid feedback and receive electricity subsidy; If the predicted power generation is less than the power demand, energy storage facilities are used to make up for the gap; When predicting the power generation and transmission capacity of the power grid, it is determined whether grid congestion will occur; If the predicted power generation is greater than the grid's transmission capacity, the power generation will be limited or the transmission lines will be expanded; If the predicted power generation is less than the grid transmission capacity, the power generation plan will be increased.

2. The power generation settlement management method for a photovoltaic power station according to claim 1, characterized in that: The process of formulating the management rules for the settlement of power generation next month includes the following steps: Mark the approved electricity bill with the financial processing status of the target bill; The financial processing status includes whether the target settlement order has been invoiced, whether the target settlement order has generated a voucher, and whether the target settlement order has been paid back; Check the settlement order details and approval status, calculate the settlement amount ratio of each user type, and evaluate the rationality of the differentiation strategy; Dynamically adjust the unit electricity charging standards for different user types based on the proportion of settlement amount; When the settlement amount of a certain type of user accounts for too high or too low a proportion, the corresponding settlement rules will be adjusted and a check will be conducted to see if there are any settlement disputes; If there is a settlement dispute, analyze whether the power generation settlement management rules are reasonable; If the power generation settlement management rules are not set reasonably, the power generation settlement management rules shall be re-formulated; If the power generation settlement management rules are an operational error, manual intervention will be initiated; Compare settlement data with historical data horizontally; If the comparison shows abnormal fluctuations, evaluate whether it is a regional power consumption pattern and adjust the operation strategy; According to the power generation forecast model, the settlement scale in the future period is predicted; Predict power generation revenue, operating costs and net income for a period of time in the future as a basis for formulating power generation settlement management strategies; When the forecast results do not match the power generation settlement process management, the power generation forecast model is rebuilt; When the prediction results match the power generation settlement process management, a power generation settlement management strategy is generated.

3. The power generation settlement management method for a photovoltaic power station according to claim 1, characterized in that: The assessment includes, When evaluating the efficiency within a settlement cycle, set an efficiency threshold and count the actual settlement time; If the time taken is greater than the efficiency threshold, find the cause of the inefficiency and optimize it; If the time is less than the efficiency threshold, the current efficiency is maintained; When evaluating the accuracy of settlement calculations, set an accuracy threshold and draw a sample of settlement cases to check the calculation results; If the error is greater than the accuracy threshold, the power generation prediction model is checked and the error is corrected; If the error is less than the accuracy threshold, no adjustment is required; When evaluating the performance of a blockchain system, set a throughput threshold, perform stress testing, and record actual throughput and latency. If the throughput is less than the throughput threshold, increase the number of nodes; If the throughput is greater than the throughput threshold, there is no need to adjust the blockchain system performance; When evaluating the completeness of settlement data, a missing rate threshold is set and the actual number of missing data entries is counted; If the missing rate is greater than the missing rate threshold, the missing data will be manually checked and supplemented; If the missing rate is less than the missing rate threshold, there is no need to supplement the data; When evaluating settlement income, the actual power generation income and operating cost expenditure are counted to calculate the net rate of return; If the net profit rate is lower than the expected target, analyze the reasons and adjust the charging standards or reduce operating costs.

4. A power generation settlement management system for a photovoltaic power station, based on the power generation settlement management method for a photovoltaic power station according to any one of claims 1 to 3, characterized in that: include, The acquisition module is used to collect the power generation data and power generation data of the photovoltaic power station in real time using the IoT sensor equipment, and transmit it to the edge computing equipment for preprocessing; The construction module builds and trains the power generation prediction model based on the preprocessed power generation data and power generation data using the ARIMA time series analysis algorithm; The adjustment and formulation module adjusts the power generation plan based on the prediction results of the power generation prediction model, formulates the power generation settlement management rules, generates the power generation settlement data within the period, and calculates the amount of electricity tax payable according to the prescribed tax ratio; The evaluation module uses blockchain technology to record power generation settlement data, manage and evaluate the power generation settlement process, and optimize the power generation settlement process management strategy.

5. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the power generation settlement management method for a photovoltaic power station described in any one of claims 1 to 3 are implemented.

6. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the power generation settlement management method for a photovoltaic power station described in any one of claims 1 to 3 are implemented.