A material management method, electronic device and computer readable storage medium
By obtaining customer order demand information and adjusting production work orders, the problems of inventory backlog and production interruption in material management are solved, the timely arrival and effective utilization of materials are achieved, and storage costs are reduced.
Patent Information
- Application Number
- CN202410759537.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-13
AI Technical Summary
Existing material management methods drive material flow by predicting customer demand, resulting in materials that may not arrive in time, causing production interruptions or inventory backlogs, wasting warehouse space and increasing storage costs.
By obtaining current customer order demand information, we determine production work orders, detect bottleneck materials based on the available quantities of each required material, and adjust production work orders and material pull plans to ensure that materials arrive on time and avoid inventory backlogs and production interruptions.
It effectively avoids the backlog of material inventory, saves warehouse space and storage costs, improves material utilization, and ensures production on demand.
Smart Images

Figure CN118333530B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of production management, and in particular to a material management method, an electronic device, and a computer-readable storage medium. Background Art
[0002] The timely delivery of products and the effective management of materials are not only crucial to the normal operation of enterprises, but also help enterprises to effectively manage costs and improve market competitiveness. Among them, the existing enterprise resource planning (ERP) system can convert customer needs into purchase requests and orders. However, passing orders to suppliers is only part of the cumbersome and complex material ordering plan, not all of it, and the current ERP system promotes the flow of materials by predicting customer needs, rather than pulling materials according to actual customer needs. At the same time, after adjusting the procurement plan based on the shortage of materials determined by the time point of customer demand for the product, it may be that the materials cannot arrive before the production date because it takes a certain amount of time to pull the materials, resulting in production interruptions due to material shortages. Therefore, the existing material management methods may cause inventory backlogs of materials, resulting in problems such as waste of warehouse storage space and increased storage costs. Summary of the invention
[0003] The purpose of this application is to provide a material management method, an electronic device and a computer-readable storage medium, which can effectively avoid inventory backlogs of materials, save warehouse storage space, and save storage costs.
[0004] To achieve the above objectives:
[0005] In a first aspect, an embodiment of the present application provides a material management method, the method comprising:
[0006] Get the current version of customer order demand information;
[0007] Determine a production work order for the target product according to the customer order demand information, wherein the production work order includes a production date and a production quantity;
[0008] Obtaining the available quantity of each required material for producing the target product; the available quantity includes the current inventory quantity and the quantity that can be delivered before the production date;
[0009] Based on the available quantity of each of the required materials, detecting whether there is at least one bottleneck material; the bottleneck material is the required material whose quantity of the target product that can be produced is less than the production quantity;
[0010] When it is determined that the at least one bottleneck material exists, adjusting the production work order for the target product according to the available quantity of the at least one bottleneck material;
[0011] A material pulling plan for each of the required materials is generated based on the adjusted production work order.
[0012] In one embodiment, obtaining the available quantity of each required material for producing the target product includes:
[0013] Get the material pulling order generated based on the previous version of customer order demand information and sent to the supplier;
[0014] According to the pulling quantity of each of the required materials in the pulling order, the quantity of each of the required materials that can arrive before the production date is determined.
[0015] In one embodiment, adjusting the production work order for the target product according to the available quantity of the at least one bottleneck material includes:
[0016] Determining the production quantity of each bottleneck material for the target product according to the available quantity of each bottleneck material;
[0017] The production quantity in the production work order is adjusted according to the minimum producible quantity.
[0018] In one embodiment, adjusting the production work order for the target product according to the available quantity of the at least one bottleneck material includes:
[0019] According to the production quantity in the production work order, obtaining a first required quantity for each of the required materials; the first required quantity is the quantity of each of the required materials required to produce the target product required on the production work order;
[0020] Determine the arrival time of each bottleneck material with a target pulling quantity according to the historical pulling order data of each bottleneck material; the target pulling quantity is determined based on the first required quantity and the available quantity corresponding to the bottleneck material;
[0021] The production date in the production work order is adjusted according to the latest arrival time.
[0022] In one embodiment, generating a material pulling plan for each of the required materials based on the adjusted production work order includes:
[0023] According to the production quantity in the adjusted production work order, obtain the second required quantity for each of the required materials; the second required quantity is the quantity of each of the required materials required to produce the target product required on the adjusted production work order; according to the current inventory quantity of each of the required materials, the quantity in transit and the second required quantity, determine the required pulling quantity of each of the required materials;
[0024] Determine the arrival time of each required material according to the production date in the adjusted production work order;
[0025] A material pulling plan for each of the required materials is generated according to the pulling quantity and the arrival time.
[0026] In one embodiment, the method further comprises:
[0027] The remaining inventory quantity of each material in the warehouse is monitored, and when it is detected that the remaining inventory quantity of at least one of the materials is less than a preset threshold, a purchase reminder message for the material is issued.
[0028] In one embodiment, the method further comprises:
[0029] Obtaining the actual scrap rate corresponding to each of the required materials when producing the target product;
[0030] When the actual scrap rate corresponding to the required material is greater than the preset theoretical scrap rate, the increase quantity of the required material is predicted, and the material pulling plan of the required material is adjusted based on the increase quantity.
[0031] In one embodiment, the method further comprises at least one of the following:
[0032] Analyze customer demand changes based on the current version of customer order demand information and the previous version of customer order demand information, and output a customer demand change analysis report;
[0033] Analyze material consumption deviations based on the required quantity and actual usage quantity of each of the required materials, and output the obtained material consumption report.
[0034] In a second aspect, an embodiment of the present application discloses an electronic device, specifically comprising:
[0035] processor;
[0036] a memory for storing instructions executable by the processor;
[0037] Wherein, the processor is configured to execute the instructions to execute the material management method as described in the first aspect.
[0038] In a third aspect, an embodiment of the present application provides a computer-readable storage medium, in which a computer program is stored. When the instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device can implement the material management method described in the first aspect.
[0039] In the material management method, electronic device and computer-readable storage medium provided in the embodiments of the present application, the method includes: obtaining the current version of customer order demand information; determining the production work order for the target product based on the customer order demand information, the production work order including the production date and production quantity; obtaining the available quantity of each required material for producing the target product, the available quantity including the current inventory quantity and the quantity that can be delivered before the production date; based on the available quantity of each required material, detecting whether there is at least one bottleneck material; the bottleneck material is a required material that can produce the target product in a quantity less than the required quantity; when it is determined that there is at least one bottleneck material, adjusting the production work order for the target product according to the available quantity of at least one bottleneck material; and generating a material pulling plan for each required material based on the adjusted production work order. In this way, after determining the production work order for the target product based on the customer order demand information, the bottleneck material that limits the production of the target product is determined in combination with the available quantity of each required material for producing the target product before the production date in the production work order, and then the production work order of the target product is adjusted in combination with the available quantity of the bottleneck material, so as to generate a material pulling plan for pulling each required material based on the adjusted production work order, thereby reducing the quantity of idle materials and the idle time of the materials, effectively avoiding the phenomenon of inventory backlog of materials, saving storage space in the warehouse, and saving storage costs. At the same time, in this application, after adjusting the production date and / or production quantity in the production work order of the target product in combination with the available quantity of the bottleneck material, a material pulling plan for pulling each required material is generated based on the adjusted production work order, which can ensure that all materials can be fully utilized, and at the same time can avoid production interruptions due to material shortages, improve material utilization, and can realize the adjustment of the production work order based on customer demand, so that the production work order matches customer demand. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 A schematic diagram of a flow chart of a material management method provided in an embodiment of the present invention.
[0041] Figure 2 A schematic diagram of the structure of an intelligent material ordering system provided in an embodiment of the present invention.
[0042] Figure 3 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0043] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.
[0044] It should be noted that, in this article, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element. In addition, components, features, and elements with the same name in different embodiments of the present application may have the same meaning or different meanings, and their specific meanings need to be determined by their explanation in the specific embodiment or further combined with the context of the specific embodiment.
[0045] It should be understood that, although the terms first, second, third, etc. may be used to describe various information in this article, these information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this article, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein can be interpreted as "at the time of..." or "when..." or "in response to determination". Furthermore, as used in this article, the singular forms "one", "one" and "the" are intended to also include plural forms, unless there is an opposite indication in the context. It should be further understood that the terms "comprising", "including" indicate that there are described features, steps, operations, elements, components, projects, kinds, and / or groups, but do not exclude the existence, occurrence or addition of one or more other features, steps, operations, elements, components, projects, kinds, and / or groups. The terms "or" and "and / or" used herein are interpreted as inclusive, or mean any one or any combination. Thus, “A, B, or C” or “A, B and / or C” means “any of the following: A; B; C; A and B; A and C; B and C; A, B, and C.” An exception to this definition will occur only when a combination of elements, functions, steps, or operations are inherently mutually exclusive in some manner.
[0046] It should be understood that, although the various steps in the flowchart in the embodiment of the present application are displayed in sequence according to the indication of the arrows, these steps are not necessarily performed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and it can be performed in other orders. Moreover, at least a portion of the steps in the figure may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and their execution order is not necessarily performed in sequence, but can be performed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
[0047] It should be noted that, in this article, step codes such as S101, S102, etc. are used for the purpose of expressing the corresponding content more clearly and concisely, and do not constitute a substantial limitation on the sequence. When implementing the step, those skilled in the art may execute S102 first and then S101, etc., but these should all be within the scope of protection of this application.
[0048] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0049] In the subsequent description, the suffixes such as "module", "component" or "unit" used to represent elements are only used to facilitate the description of the present application and have no specific meaning. Therefore, "module", "component" or "unit" can be used in a mixed manner.
[0050] See also Figure 1 , is a material management method provided in an embodiment of the present application. The detection method can be executed by a material ordering system provided in an embodiment of the present application. The material ordering system can be implemented in software and / or hardware, for example, it can be a computer, server or other electronic device. The material management method provided in this embodiment includes:
[0051] Step S101: Obtain the current version of customer order demand information.
[0052] It can be understood that after obtaining a purchase order with a long and uncertain delivery cycle issued by a customer, it is necessary to send a purchase order corresponding to the required materials for producing the target product to the supplier, but the purchase order does not clearly specify the delivery time and quantity of the required materials. At the same time, as the customer's needs become more certain, the customer can update the customer order demand information irregularly or periodically in a rolling manner. Based on the generation time sequence of the customer order demand information, in this embodiment, they are respectively referred to as the previous version of the customer order demand information, the current version of the customer order demand information, etc.
[0053] Here, in each version of the customer order demand information, the delivery time and required quantity corresponding to the target product may be included, wherein the target product refers to the product required by the customer, which may include one or more products; the delivery time refers to the time when the target product is required to be delivered to the customer or sent to the customer; the required quantity refers to the quantity of the target product that needs to be delivered at the delivery time. In addition, the customer order demand information may also include parameters such as the size of the target product, which are not specifically limited here.
[0054] In addition, after obtaining the current version of the customer demand order information, it can be compared with the previous version of the customer demand order information to determine the changed information. It can be understood that the previous version of the customer demand order information may be formulated too early. Although it reflects the accurate demand information at the time when it was formulated, the current real-time demand information may have changed. The current version of the customer demand order information is the demand plan formulated now, which is formulated according to the actual production needs of the customer and meets the predicted needs of the customer at this moment. Therefore, the production work order shall be determined based on the latest version of the customer demand order information. In this embodiment, the delivery time in the current version of the customer demand order information is the same as that in the previous version of the customer demand order information. However, in the case where the supplier has been notified to prepare materials based on the previous version of the customer demand order information, since the current version of the customer demand order information may be inconsistent with the previous version of the customer demand order information, the quantity required for each demand material of the production target product will change. At this time, it is necessary to combine the difference between the current version of the customer demand order information and the previous version of the customer demand order information and other information for corresponding processing.
[0055] Exemplarily, after obtaining the current version of the customer demand order information, if it is detected that the current version of the customer demand order information shows an increase in the demand quantity for the target product or an earlier delivery time compared to the previous version of the customer demand order information, a corresponding prompt message may be issued to prompt the staff to check whether the available quantity of each required material for producing the target product, production capacity and other information can meet the requirements of the increased demand quantity or earlier delivery time. If so, production can be directly promoted based on the current version of the customer demand order information, that is, step S102 is executed; if not, feedback to the customer is required, and step S102 is executed after the customer confirms that the demand quantity and / or delivery time can be adjusted.
[0056] For example, if it is detected that the current version of the customer demand order information shows a decrease in the demand quantity for the target product or a postponement in the delivery time compared to the previous version of the customer demand order information, a corresponding prompt message may also be issued to prompt the staff to check whether the required materials for the production of the target product are already in stock or in transit, that is, it is necessary to confirm whether the required materials for the production of the target product have irreversibly become a storage burden. If so, the staff may contact the customer to request that the order requirements continue to be executed in accordance with the previous version of the customer demand order information.
[0057] Step S102: Determine a production work order for the target product according to the customer order requirement information, where the production work order includes a production date and a production quantity.
[0058] Specifically, first, the current version of the customer order demand information is identified to obtain the delivery time and required quantity corresponding to the target product; then, according to the delivery time and required quantity corresponding to the target product, the production work order for the target product is determined.
[0059] Here, the production quantity of the target product can be determined according to the demand quantity in the customer order demand information, wherein the production quantity of the target product can be slightly larger than the demand quantity, so as to meet the customer's needs while taking into account possible losses or quality problems, so as to arrange an additional amount of production to prepare for emergencies. At the same time, a reasonable production date can also be determined based on the delivery time corresponding to the target product and the time required to produce the target product, logistics time, packaging and inspection time, etc., to ensure that the target product can be delivered within the delivery time required by the customer, and leave enough time for subsequent processes such as quality inspection and packaging. In addition, when setting the production date, it should also be ensured that the production date is postponed as much as possible under the premise of meeting customer needs, so as to avoid the problem of product accumulation in the warehouse due to premature production. It should be noted that due to the quantity limit of each required material for producing the target product, the production work order for the target product determined according to the customer order demand information may be an initial production work order.
[0060] Step S103: Obtain the available quantity of each required material for producing the target product; the available quantity includes the current inventory quantity and the quantity that can be delivered before the production date.
[0061] Specifically, first determine the material types of each required material required for producing a single target product, and then obtain the available quantity of each required material for producing the target product before the production date in the production work order according to the current inventory quantity of each required material and the quantity that can be delivered before the production date. Here, the required material is the material that must be used to produce the target product. Among them, the current inventory quantity of each required material can be determined by conducting an inventory audit on each required material, which can be obtained based on the material records in the warehouse management system. It should be noted that the current inventory quantity of the required material can be the value of the quantity of the required material stored in the warehouse minus the preset spare safety quantity, and the preset spare safety quantity is used to represent the minimum number of materials that must be retained in the warehouse. It can be understood that when the material arrives, the warehouse manager will enter the type of the material arriving and the actual quantity arriving, and subtract the quantity of the material being picked from the production picking to obtain the storage quantity in the warehouse. In addition, the quantity that can be delivered before the production date may include the quantity that is already in transit and can be delivered before the production date, and the quantity that is not in transit but can be delivered before the production date by pulling materials, etc.
[0062] In one embodiment, obtaining the available quantity of each required material for producing the target product includes:
[0063] Get the material pulling order generated based on the previous version of customer order demand information and sent to the supplier;
[0064] Determine the quantity of each required material that can be delivered before the production date based on the material quantity of each required material in the material order.
[0065] It can be understood that based on the previous version of the customer order demand information, a material pulling order including the delivery time and the corresponding material pulling quantity of each required material will be generated, and the material pulling order will be sent to the supplier. Since the supplier will prepare the materials for each required material after obtaining the purchase order, and will deliver the required materials based on the material pulling order after receiving the material pulling order, when the current version of the customer order demand information is obtained, some required materials may have been in transit. Therefore, the material pulling quantity for each required material in the material pulling order belongs to the quantity that can be delivered before the production date of each required material. In addition, the total time required from issuing the material pulling order to the supplier and then delivering the corresponding required materials from the supplier can be analyzed in combination with the number of historical material pulling orders. If, based on this time, it is determined that the material pulling order can be issued to the supplier before the production date and it is guaranteed that it can be delivered before the production date, the material pulling quantity for each required material in the material pulling order issued at this time also belongs to the quantity that can be delivered before the production date of each required material. In this way, by determining the quantity of each required material that can arrive before the production date through the material pulling order, the accuracy of the available quantity of each required material can be ensured, while meeting customer needs and further effectively avoiding inventory backlogs of materials.
[0066] Step S104: Based on the available quantity of each demand material, detect whether there is at least one bottleneck material; a bottleneck material is a demand material whose quantity of target products that can be produced is less than the production quantity.
[0067] It can be understood that the required quantity of each demand material for the production of a single target product and the production quantity of the target product can be known, and then it can be detected whether there is a demand material whose quantity of target products can be produced is less than the production quantity or the available quantity is less than the required quantity for production, that is, whether there is a bottleneck material. Here, if the test result shows that the available quantity of a certain demand material is less than the required quantity for production or the quantity of target products that can be produced is less than the production quantity, it means that the demand material is insufficient, and the demand material is determined as a bottleneck material, which can also be called a bottleneck material.
[0068] For example, assuming that based on the production order, it is determined that 10,000 target products will be produced on May 15, and the production of the target products requires 100 kinds of required materials, if the usage quantity of each required material for the production of a single target product is set to 1, and there is no scrap rate, if at least 10,000 of these 100 required materials can be obtained before May 15, that is, it is determined that the available quantity of these 100 required materials is greater than or equal to 10,000, then it is determined that there is no bottleneck material; if it is determined that before May 15, there are 3 kinds of required materials with available quantities of 9,000, 8,000, and 7,000 respectively, then these 3 kinds of required materials are determined to be bottleneck materials.
[0069] Step S105: When it is determined that there is at least one bottleneck material, the production work order for the target product is adjusted according to the available quantity of the at least one bottleneck material.
[0070] It can be understood that the existence of bottleneck materials will affect the timely completion of the production work order of the target product, and further affect the inventory and pulling plan of the required materials. Therefore, when it is determined that there is at least one bottleneck material, the production work order for the target product can be adjusted according to the available quantity of at least one bottleneck material.
[0071] Here, when it is determined that there is at least one bottleneck material, the production order for the target product can be adjusted by postponing the production date of the target product, reducing the production quantity of the target product, etc. Here, according to the available quantity of each required material, it may also be necessary to rearrange the workflow of the production line to maximize efficiency and reduce waste, including but not limited to changing the order of operations, optimizing equipment use, or reallocating human resources, etc.
[0072] In one embodiment, adjusting a production order for a target product according to an available quantity of at least one bottleneck material includes:
[0073] According to the available quantity of each bottleneck material, determine the production quantity of each bottleneck material for the target product;
[0074] Adjust the production quantity in the production order according to the minimum producible quantity.
[0075] Specifically, based on the quantity of each bottleneck material required to produce a single target product and the available quantity of each bottleneck material, the producible quantity of each bottleneck material for the target product can be determined, and the production quantity in the production order can be adjusted based on the minimum producible quantity.
[0076] It can be understood that, without adjusting the production date in the production work order, the minimum producible quantity of each bottleneck material for the target product is the maximum production quantity in the production work order, which limits the production work order because it determines the maximum number of target products that can be produced without purchasing any additional required materials. Therefore, the production quantity of the target product in the production work order can be adjusted according to the minimum producible quantity, that is, the production quantity in the adjusted production work order cannot exceed the minimum producible quantity, and then each required material can be pulled based on the adjusted production work order to ensure that all materials can be fully utilized and avoid production interruptions due to material shortages. Here, after adjusting the production quantity in the production work order, it is also necessary to notify the relevant production department, procurement department, sales department, etc. of the adjusted production work order so that corresponding production adjustments and preparations can be made according to the adjusted production work order. In this way, the production quantity in the production order is adjusted by using the minimum producible quantity of each bottleneck material for the target product, ensuring that all materials can be fully utilized. At the same time, production interruptions due to material shortages are avoided, material utilization is improved, and inventory backlogs of materials are further effectively avoided.
[0077] For example, suppose the original production order produces 10,000 target products on May 15, but due to the constraint on the available quantity of bottleneck materials, the minimum producible quantity of the bottleneck material for the target product is 7,000. In this case, the production quantity in the production order needs to be changed to 7,000. Accordingly, based on the adjusted production order, other required materials that are not bottleneck materials should also be changed to 7,000 to ensure that only 7,000 other required materials arrive instead of 10,000. Otherwise, out of 10,000 other required materials that arrive, 3,000 will be idle.
[0078] In one embodiment, adjusting a production order for a target product according to an available quantity of at least one bottleneck material includes:
[0079] According to the production quantity in the production work order, the first required quantity of each required material is obtained; the first required quantity is the quantity of each required material required to produce the target product required in the production work order;
[0080] According to the historical material pulling order data of each bottleneck material, determine the arrival time of each bottleneck material with the target material pulling quantity; the target material pulling quantity is determined based on the first required quantity and available quantity corresponding to the bottleneck material;
[0081] Adjust the production date in the production order according to the latest arrival time.
[0082] It can be understood that without adjusting the production quantity in the production work order, the types of required materials and the quantity of each required material required to produce a single target product can be determined first. Then, according to the production quantity of the target product in the production work order, the first required quantity of each required material is calculated, that is, the required quantity of each required material for producing the target product with the production quantity. Then, according to the historical material preparation order data of each bottleneck material, the total time required for each bottleneck material from issuing the material pulling order to the supplier and then delivering the corresponding bottleneck material from the supplier can be analyzed, and based on this time and the current time of issuing the material pulling order, the corresponding arrival time of each bottleneck material with the target material pulling quantity can be determined. Then, according to the arrival time corresponding to each bottleneck material, the latest arrival time can be determined, and the production date in the production work order can be adjusted according to the latest arrival time.
[0083] Here, the first required quantity corresponding to each required material can be further determined in combination with the scrap rate of each required material during production to improve the accuracy of the first required quantity of each required material. For example, assuming that the production quantity of the target product is 10,000, the number of each required material used to produce a single target product is 1, and the production process of the target product is 3 steps, and the yield rate of each step (i.e., the difference between 1 and the scrap rate) is 95%, 98%, and 82%, respectively, then the first required quantity of the required material invested in the first step is determined to be 10,000 / 0.95 / 0.98 / 0.82=13,099, the first required quantity of the required material invested in the second step is determined to be 10,000 / 0.98 / 0.82=12,444, and the first required quantity of the required material invested in the third step is determined to be 10,000 / 0.82=12,195.
[0084] Secondly, the historical material pulling order data of each bottleneck material may include the material quantity, frequency, supplier's delivery evaluation, supplier's material preparation time in historical orders, material transportation time, etc., in order to estimate the arrival time corresponding to the future material pulling order. Among them, the target material pulling quantity of the bottleneck material can be the difference between the first required quantity corresponding to the bottleneck material and the available quantity of the bottleneck material, and of course it can also be greater than the difference. It can be understood that after determining the target material pulling quantity of the bottleneck material, the minimum shipping quantity (MSQ) agreed by the supplier can also be considered. If the MSQ is 15,000, although the difference between the first required quantity corresponding to the bottleneck material and the available quantity of the bottleneck material is 13,099, the target material pulling quantity of the bottleneck material can only be set to 15,000. In this way, the excess 1,901 bottleneck materials are the necessary redundancy in the supply chain, and these 1,901 bottleneck materials will be stranded in the inventory to wait for the consumption of the next work order.
[0085] In addition, by adjusting the production date in the production work order according to the latest arrival time, it is possible to ensure that all necessary demand materials arrive before production begins, thereby avoiding production delays. For example, assuming that the production date in the original production work order is May 15, if the available quantity of three demand materials is insufficient on May 15, but the available quantity of these three demand materials must wait until May 25 to meet the production quantity in the production work order, the production date in the production work order can be adjusted to May 25. At the same time, the material pulling plan for other demand materials is also adjusted accordingly to arrive as close to May 25 as possible. In this way, calculation of production work orders and material pulling planning based on the latest arrival time of demand materials is conducive to reducing idle materials to a minimum and reducing idle time to a minimum.
[0086] In this way, the arrival time of the bottleneck material is determined through the historical material pulling order data of the bottleneck material, and then the production date in the production order is adjusted based on the latest arrival time of the bottleneck material. This can avoid production interruptions due to material shortages, improve material utilization, and further effectively avoid inventory backlogs of materials.
[0087] Step S106: Generate a material pulling plan for each required material based on the adjusted production work order.
[0088] Specifically, based on the production quantity in the adjusted production work order, the second required quantity for each required material is obtained; the second required quantity is the quantity of each required material needed to produce the target product required on the adjusted production work order; based on the current inventory quantity of each required material, the quantity in transit, and the second required quantity, the required pulling quantity of each required material is determined; based on the production date in the adjusted production work order, the corresponding arrival time of each required material is determined; based on the pulling quantity and arrival time, a material pulling plan for each required material is generated.
[0089] First, the second required quantity for each required material can be determined based on the production quantity in the adjusted production work order and the quantity of each required material required for producing a single target product. Then, based on the current inventory quantity of each required material, the quantity that has been ordered but is still in transit (i.e., the quantity in transit), and the second required quantity, the quantity that needs to be pulled for each required material is calculated, i.e., the pull quantity, where the pull quantity is obtained by subtracting the sum of the inventory quantity and the in-transit quantity from the second required quantity. It should be noted that the pull quantity required for the required material refers to the quantity of the required material that needs to be pulled from the supplier to meet the production quantity requirements in the adjusted production work order. Furthermore, in order to ensure that each required material can arrive before the start of production, while avoiding inventory accumulation and minimizing inventory occupancy, an expected arrival time can be determined for each required material based on the production date in the adjusted production work order. The arrival time can be determined in combination with the supplier's delivery cycle, transportation time, and possible preparation time. Finally, a detailed material pulling plan is developed in accordance with the pulling quantity and arrival time of each required material to guide the purchasing department on when to place an order, specify the quantity of materials in the order, and coordinate logistics to ensure that the materials arrive on time. In this way, material supply can be kept consistent with production demand, thereby avoiding production interruptions and inventory backlogs, while improving the efficiency of the entire supply chain.
[0090] For example, assuming that the adjusted production order is to produce 10,000 target products on May 15, the material pulling plan for the required materials aims to arrive 10,000 before May 15, and the specific lead time can be set according to the different operating capabilities of each factory. For example, some factories can arrive one day in advance, that is, on May 14, while others need to arrive 5 days in advance. But no matter what, through the above material management method, the materials can arrive as late as possible and as little as possible within the factory's operating capacity, so as to minimize the idleness of materials.
[0091] It should be noted that it is also possible to determine the difference in changes between the current version of customer demand and the previous version of customer demand, and based on the difference between at least one version, determine the changing pattern of customer demand, such as the proportion of increasing or decreasing customer demand within a period of one month, one year, etc. In this way, by determining the changing pattern of customer demand and adjusting the production work order for scarce materials, and adjusting the future order quantity of scarce materials to the next version of the customer order, it can be ensured that the output within a fixed period meets the rolling customer demand.
[0092] In summary, in the material management method provided in the above embodiment, after determining the production work order for the target product based on the customer order demand information, the bottleneck material that limits the production of the target product is determined in combination with the available quantity of each required material for producing the target product before the production date in the production work order, and then the production work order of the target product is adjusted in combination with the available quantity of the bottleneck material, so as to generate a material pulling plan for pulling each required material based on the adjusted production work order, thereby reducing the number of idle materials and the idle time of the materials, effectively avoiding the phenomenon of inventory backlog of materials, saving storage space in the warehouse, and saving storage costs, and improving the efficiency of material management. At the same time, in this application, after adjusting the production date and / or production quantity in the production work order of the target product in combination with the available quantity of the bottleneck material, a material pulling plan for pulling each required material is generated based on the adjusted production work order, which can ensure that all materials can be fully utilized, and at the same time, it can avoid production interruptions due to material shortages, improve material utilization, and can realize the adjustment of the production work order based on customer demand, so that the production work order matches customer demand.
[0093] In one embodiment, the method further comprises:
[0094] Monitor the remaining inventory quantity of each material in the warehouse, and when it is detected that the remaining inventory quantity of at least one material is less than the preset threshold, issue a purchase reminder message for the material.
[0095] Here, a preset threshold can be set for the materials in the warehouse based on comprehensive considerations of historical consumption data, supplier delivery cycles, production volatility, and safety stock levels, so that the preset threshold can trigger a purchase request reminder signal, indicating that the current inventory of the material needs to be replenished. Of course, the remaining inventory quantity of each material can also be monitored in real time through a warehouse management system (WMS) or other inventory management tools, which usually involves automatically scanning inventory records or using sensor technology to track the use and flow of materials. Among them, the corresponding preset thresholds may be different for different materials. By regularly checking the remaining inventory quantity of each material and comparing it with the preset threshold, if the remaining inventory quantity of any material is monitored to be lower than its preset threshold, a corresponding purchase request reminder message can be issued based on the material information. Among them, this purchase request reminder message is usually sent to the purchasing department, inventory management personnel, or relevant personnel directly responsible for ordering, and the purchase request reminder message may include information such as the material name, current inventory level, preset threshold, and possible order quantity. It should be noted that if the preset threshold setting is found to be inaccurate or unreasonable during implementation, it can be adjusted according to actual conditions. At the same time, if the remaining inventory quantity is often lower than the preset threshold, it may be necessary to re-evaluate the entire supply chain strategy, including inventory management policies, supplier selection and procurement processes. In this way, by monitoring and reminding the remaining inventory quantity of materials, it is helpful to replenish inventory in time, avoid production delays caused by material shortages, and maintain the economy and rationality of inventory levels.
[0096] In one embodiment, the method further comprises:
[0097] Obtain the actual scrap rate of each required material when producing the target product;
[0098] When the actual scrap rate corresponding to the required material is greater than the preset theoretical scrap rate, the increase in the required material quantity is predicted, and the material pulling plan of the required material is adjusted based on the increase in quantity.
[0099] Specifically, when producing the target product, the corresponding production data is monitored in real time, and the actual scrap rate of each required material in the production process is recorded accordingly, and the actual scrap rate of each required material is compared with the preset theoretical scrap rate. Among them, the theoretical scrap rate corresponding to each required material may be different. If it is detected that the actual scrap rate is greater than the preset theoretical scrap rate, it means that the demand for the required material will increase during this production process, and the required quantity of the required material determined according to the previous production work order may be in short supply. Then, the increase in the number of the material can be predicted according to the actual scrap rate, and the material pulling plan for the required material can be adjusted based on the increase in the number of required materials, so as to make up for the material gap caused by the increase in the actual scrap rate by investing or pulling more required materials. If it is detected that the actual scrap rate is less than the preset theoretical scrap rate, it means that the required materials prepared during this production process may be redundant, then the redundant quantity of the material can be predicted and the redundant quantity can be included in the inventory, so that the redundant quantity can be deducted when the required material is pulled next time. In this way, by analyzing the actual scrap rate corresponding to the material and the preset theoretical scrap rate, the material pulling plan of the required material can be adjusted accordingly when the actual scrap rate corresponding to the material is greater than the preset theoretical scrap rate to ensure that the material meets the production work order. This can effectively avoid production delays caused by material shortages and improve material management efficiency.
[0100] In one embodiment, the method further comprises at least one of the following:
[0101] Analyze customer demand changes based on the current version of customer order demand information and the previous version of customer order demand information, and output the obtained customer demand change analysis report;
[0102] Analyze the material consumption deviation based on the required quantity and actual usage quantity of each required material, and output the obtained material consumption report.
[0103] Here, by comparing the current version of the customer order demand information with the previous version of the customer order demand information, we can analyze the changes in customer demand quantity, product type, delivery date and other information, and output a customer demand change analysis report, which may include the specific circumstances of the increase or decrease in demand, the percentage of change, the types of products affected, the estimated degree of impact, etc., so as to facilitate the adjustment of material preparation based on changes in customer demand.
[0104] Here, a comparison is made between the required quantity (planned usage) and the actual usage quantity (actual consumption) of each required material to calculate the consumption deviation of each material and output a material consumption report, which can show the comparison between the planned and actual consumption of each material, the size of the deviation, the percentage of the deviation, possible cause analysis, etc., so as to facilitate the adjustment of the production and price of the target product based on the material consumption situation.
[0105] Optionally, based on the data of the production work orders and actual output of the target product, compare the planned output and actual output of the target product, analyze the deviation of the output, and output a work order output deviation report. The report should include a comparison of the planned and actual output of each work order, the size of the deviation, the percentage of the deviation, the changing trend of production efficiency, possible influencing factors, etc.
[0106] In addition, the age of each material in the inventory can be analyzed, that is, the length of time the material has been stored in the inventory. By comparing the age data with the age target set in the inventory management strategy, materials with too long or too short ages can be identified, and an age deviation report can be output. The report can show the comparison between the actual age of various materials and the target age, the degree of age deviation, possible reasons (such as over-purchase, inaccurate demand forecast, market changes, etc.), and recommended improvement measures. In this way, by monitoring and analyzing the production process of the target product, it helps to better understand the dynamic changes in market demand, material consumption in the production process, the efficiency of production execution, and the effectiveness of inventory management. At the same time, it can also help to adjust production orders in a timely manner, optimize inventory levels, and improve procurement strategies, thereby improving overall operational efficiency and customer satisfaction.
[0107] Based on the same inventive concept as the above embodiments, the material management method provided by the present application is specifically described below through a specific example. In this embodiment, the execution subject of the material management method is an intelligent materials ordering system (iMOS) as an example. Figure 2 The intelligent material ordering system can drive, monitor and process materials. The intelligent material ordering system includes: customer demand management module, purchase ordering module, material pulling module, warehouse module, production module, analysis module and report module, which are described in detail below:
[0108] 1. Customer Demand Management Module
[0109] The customer demand management module is used to receive customer demand in real time. Here, customer demand is input into the iMOS system in the form of orders or forecasts to serve as the driving force for the entire iMOS system operation. In supply chain management, it usually starts with the customer placing a demand order. These orders reflect the customer's long-term needs and guide the company to generate "purchase requests" and "orders" for materials, including purchase orders for materials that require a long time to prepare or deliver, such as demand orders previously received from customers (i.e., N version of customer order demand information, hereinafter referred to as N version). These orders usually reflect customer demand on a larger time scale, such as weeks, months or even longer cycles. Based on these general customer needs, purchase orders for corresponding demand materials can be issued to suppliers, especially for materials that require a long time to prepare (i.e., long-delivery materials). It should be noted that since customer demand may not be very specific at this stage, these purchase orders will not specify the exact delivery time and quantity in detail. Correspondingly, after receiving the purchase order, the supplier begins to prepare the required long-delivery materials. At the same time, at this stage, the supplier will produce or prepare inventory based on the generated purchase order, but the specific delivery details have not yet been determined. As time goes by, based on the more detailed demand information received from customers (i.e., N+1 version of customer order demand information, hereinafter referred to as N+1 version), the originally rough customer demand information becomes clearer. Once the delivery time and quantity of customer demand are clear, the material pull process is triggered accordingly. This process involves issuing specific instructions to suppliers, informing them when (specified time) and how many (specified quantity) of materials need to be delivered to the enterprise. Correspondingly, the supplier delivers the specified quantity of materials within the specified time according to the instruction. In this way, the transition from forecast-driven push supply chain management (push-based) to demand-driven pull supply chain management (pull-based) is achieved. In other words, material preparation is initially based on forecasts and rough demand, and then adjusted to precise material flow control based on exact demand. This combination of push and pull strategies can effectively cope with the fluctuations and uncertainties of customer demand and improve the efficiency and responsiveness of the supply chain.
[0110] Here, when the demand for a product in version N+1 increases or advances compared to version N, the system prompts the operator to check whether the raw materials, production capacity, etc. can meet the increase or advance situation. At the same time, the customer must communicate with the supplier to confirm whether the supplier can advance or increase the quantity. If not, the corresponding reason will be fed back to the customer; if yes, confirm that the customer's N+1 version advance or increase requirements are agreed. These operations of communication, confirmation and acceptance of the customer's N+1 version requirements can be completed on the iMOS online collaboration platform. When the demand for a product in version N+1 decreases or is postponed compared to version N, the system prompts the operator to check whether the materials corresponding to the product are already in stock or on the way, that is, whether these materials have become the company's inventory burden irreversibly. If so, the sales staff will contact the customer to request that the irreversible part still be executed according to the N version requirements. However, if the contact is unsuccessful, the irreversible material part formed will be reflected in the report module.
[0111] Understandably, the materials prepared by the supplier based on the purchase order determined in version N cannot be changed (or it is very difficult), that is, the materials already in stock or in transit are irreversible. Even if the customer's N+1 version demand forecast shows that these in-stock and in-transit stocks are needed in version N but no longer needed in version N+1, they cannot be "reversed" and disappear. In this case, iMOS will output a warning message, requiring the salesperson to coordinate with the customer to continue to complete the production and shipment of the irreversible in-stock and in-transit stocks (according to version N). For materials that are not yet in stock or in transit, the supplier's delivery can be canceled, delayed, or adjusted to reduce the quantity accordingly.
[0112] 2. Purchase ordering module
[0113] The purchase ordering module is used to generate a material purchase list based on the N+1 version determined by the customer demand management module. Here, iMOS is an integrated IT system that has its own calculation algorithm and integrates other systems including ERP, MES, QR codescanning, etc. Among them, the ERP system has a good solution to the function of converting customer demand (orders or forecasts) into "purchase requests" and "purchase orders". The characteristic of iMOS is that it organically combines the external material purchase list with the process of pulling materials (see the material pulling module below) for two-way communication. Through the material purchase list, the supplier is instructed to prepare in advance, prepare and produce the long-delivery materials, and be ready for delivery at any time. The pulling order instructs the supplier to deliver the prepared finished products in batches according to the time and quantity of the order.
[0114] Here, the purchase request and ordering module is also used to monitor the storage quantity of materials in the warehouse. When it is detected that the storage quantity of materials in the warehouse has dropped to the warning value (that is, the storage quantity of the material has dropped to insufficient compared with the customer's future demand), the purchase request and ordering process of the material is triggered in time.
[0115] 3. Pulling Module
[0116] The material pulling module is used to determine the quantity of required materials to be pulled according to the customer order requirements of the current version (i.e., version N+1). Here, the purchase ordering module and the material pulling module are both interrelated and different processes that are crucial to the efficiency of supply chain operations. Since the ERP system has a good solution to the purchase ordering process, but the process of pulling materials is almost missing, the importance of the iMOS material pulling module is particularly prominent. And for the inventory problem that every company attaches great importance to, the importance of pulling materials is much higher than the material purchase ordering process. The driving force of the material pulling module is: pull the production work order with clear customer shipment requirements, pull the work order with the production work order, and pull the material shortage calculation with the work order to obtain the time and quantity of the shortage. In this process, it is necessary to consider the customer's shipment requirements and detect the bottleneck materials in the demand materials (i.e., materials that affect the production time and production quantity due to the material quantity and the pulling time). Here, the bottleneck material quantity or time is used as an important parameter for calculation. If the bottleneck material is not a constraint factor, the customer's shipment requirements can be met. If the bottleneck material is a constraint factor, the customer needs to be notified to reduce the delivery quantity or delay the delivery time. Here, the core idea of the material pulling module is to target the production date so that the materials required by the production work order (quantity, time) arrive at the factory as late as possible or as little as possible.
[0117] For example, assuming that the production quantity of the target product is 10,000, the number of each required material used to produce a single target product is 1, and the production process of the target product is 3 steps, and the yield rate (i.e. the difference between 1 and the scrap rate) of each step is 95%, 98%, and 82% respectively, then the required quantity of the required material invested in the first step is determined to be 10,000 / 0.95 / 0.98 / 0.82=13,099, the required quantity of the required material invested in the second step is determined to be 10,000 / 0.98 / 0.82=12,444, and the required quantity of the required material invested in the third step is determined to be 10,000 / 0.82=12,195. Here, the minimum shipping quantity (MSQ) agreed by the supplier must also be determined. If MSQ=15,000, then although the required quantity of the required material that our company actually needs is 13,099, due to the limitation of MSQ, we can only pull 15,000 pieces. Among them, 15000-13099 = 1901 are the unavoidable redundancy in the supply chain, which are retained in the inventory to wait for the next work order. Here, it is assumed that the work order production time is 8:00 am on May 16, and the arrival time of 15,000 materials is 17:00 on May 15. After implementing the incoming quality control (IQC, Incoming Quality Control) of the materials and scanning the quick response code into the warehouse, it is determined that the inventory age of 13099 raw materials is only a few hours before they can be put into production, which effectively reduces the raw material inventory and improves the inventory turnover rate. The redundant 1901 materials in the supply chain have to wait for the next work order.
[0118] 4. Warehouse Module
[0119] The warehouse module is used to automatically record the quantity of incoming goods, the quantity of outgoing goods, and the production status of each material based on the Quick Response Code scan. This can avoid human errors and complete accounting quickly and efficiently. At the same time, the inventory age management can be strengthened (see the following analysis module and report module), and the inventory age can be set according to the company's operating capacity, as shown in Table 1:
[0120] Table 1
[0121]
[0122] Optionally, the warehouse module can be linked to the reconciliation function, that is, to achieve a 3-way matching reconciliation operation, including: comparing the order data contained in the material pull instruction (including the pull quantity and pull time of the pulled material), the arrival record (automatically obtained from the quick response code scan) and the invoice. When the data information of the three is determined to be consistent, the payment process is triggered accordingly. If it is inconsistent, find the cause of the difference and deal with it accordingly (for example, return the invoice to the supplier and ask him to check and modify it).
[0123] 5. Production Module
[0124] The production module is used to produce the target products based on the required materials obtained by pulling, and record the number of target products actually completed each working day and each shift. Here, iMOS is an integrated IT system that has its own calculation algorithm and integrates other systems including ERP, MES, quick response code scanning, etc. The production module integrates the MES system, or offline statistical data that has not yet been covered by MES, and compares the actual output quantity with the pre-set production work order or the output quantity specified on the work order through iMOS to help identify whether the production is proceeding according to plan or whether there are any deviations. Here, the production module records the actual output quantity per day and each shift, compares it with the quantity required by the production work order or work order, and automatically calculates and generates a production log, so that the production log can be merged and considered when calculating the new version (N+1 version) of the production work order.
[0125] Specifically, when producing the target product, the corresponding production data is monitored in real time, and the actual scrap rate of each required material in the production process is recorded accordingly, and the actual scrap rate of each required material is compared with the preset theoretical scrap rate. Among them, the theoretical scrap rate corresponding to each required material may be different. If it is detected that the actual scrap rate is greater than the preset theoretical scrap rate, it means that the demand for the required material will increase during this production process, and the required quantity of the required material determined according to the previous production work order may be in short supply. Then, the increase in the number of the material can be predicted according to the actual scrap rate, and the material pulling plan for the required material can be adjusted based on the increase in the number of required materials, so as to make up for the material gap caused by the increase in the actual scrap rate by investing or pulling more required materials. If it is detected that the actual scrap rate is less than the preset theoretical scrap rate, it means that the required materials prepared during this production process may be redundant, then the redundant quantity of the material can be predicted and the redundant quantity can be included in the inventory, so that the redundant quantity can be deducted when the required material is pulled next time.
[0126] 6. Analysis Module
[0127] The analysis module is used to capture data from the above five modules, analyze and compare them, and output the analysis results to provide a basis for decision making (decision making support), especially deviation analysis, including customer demand change deviation analysis, raw material consumption deviation analysis, work order output deviation analysis, inventory age deviation analysis, etc.
[0128] VII. Report Module
[0129] The reporting module is used to provide a data dashboard based on the business intelligence (BI) model to present data reports of various time dimensions required by various management levels. The management levels include: Chairman / CEO, VP, supply chain, production operations, factory director, department heads: production, planning, procurement, etc. The time dimensions include: real-time, per shift, per day, weekly report, monthly report, quarterly report, YTD report, and annual report.
[0130] In summary, the intelligent material ordering system provided in the above embodiment can effectively make up for the lack of the call off (pulling materials) process (i.e., the process of extracting materials from inventory according to actual production needs during the production process) in the current popular ERP, and the ERP system promotes the flow of materials based on predictions, rather than pulling materials according to actual needs. However, the system can respond to actual production needs more effectively, make up for the lack of bottleneck constraint material planning, and fill the gap in integrating ERP (responsible for enterprise resource planning), MES (responsible for factory-level production management), quick response code scanning (used to track materials and products) and other systems, and then organically integrate customer demand management, shipping plans, production work orders, material planning, inventory management, production yield, machine capacity and utilization, etc., to give full play to the integration benefits, and achieve the minimum inventory while meeting customer needs on time and in quantity.
[0131] Based on the same inventive concept as the above embodiments, an embodiment of the present invention provides an electronic device, such as Figure 3 As shown, the electronic device includes: a processor 210 and a memory 211 storing a computer program; wherein, Figure 3 The processor 210 shown in the figure is not used to indicate that the number of the processor 210 is one, but is only used to indicate the positional relationship of the processor 210 relative to other devices. In actual applications, the number of the processor 210 may be one or more; similarly, Figure 3 The memory 211 shown in the figure has the same meaning, that is, it is only used to refer to the position relationship of the memory 211 relative to other devices. In practical applications, the number of memories 211 can be one or more. When the processor 210 runs the computer program, the material management method described above is implemented.
[0132] The electronic device may also include: at least one network interface 212. The various components in the electronic device are coupled together via a bus system 213. It is understood that the bus system 213 is used to achieve connection and communication between these components. In addition to the data bus, the bus system 213 also includes a power bus, a control bus, and a status signal bus. However, for the sake of clarity, the bus system 213 is not used in the following examples. Figure 3 Various buses are labeled as bus system 213.
[0133] The memory 211 may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. The non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a magnetic random access memory (FRAM), a flash memory, a magnetic surface memory, an optical disc, or a compact disc read-only memory (CD-ROM); the magnetic surface memory may be a disk memory or a tape memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static random access memory (SRAM), synchronous static random access memory (SSRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDRSDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM, SyncLink Dynamic Random Access Memory), and direct RAMbus random access memory (DRRAM, Direct Rambus Random Access Memory).The memory 211 described in the embodiments of the present invention is intended to include but is not limited to these and any other suitable types of memories.
[0134] The memory 211 in the embodiment of the present invention is used to store various types of data to support the operation of the electronic device. Examples of these data include: any computer program used to operate on the electronic device, such as an operating system and an application; contact data; phone book data; messages; pictures; videos, etc. Among them, the operating system includes various system programs, such as a framework layer, a core library layer, a driver layer, etc., which are used to implement various basic services and process hardware-based tasks. The application program may include various applications, such as a media player (Media Player), a browser (Browser), etc., which are used to implement various application services. Here, the program that implements the method of the embodiment of the present invention may be included in the application program.
[0135] Based on the same inventive concept as the above-mentioned embodiment, this embodiment further provides a computer-readable storage medium, in which a computer program is stored. The computer-readable storage medium may be a ferromagnetic random access memory (FRAM), a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a flash memory, a magnetic surface memory, an optical disc, or a compact disc read-only memory (CD-ROM); it may also be various devices including one or any combination of the above-mentioned memories, such as a mobile phone, a computer, a tablet device, a personal digital assistant, etc. When the computer program stored in the computer-readable storage medium is executed by the processor, it is applied to the above-mentioned material management method. For the specific steps implemented when the computer program is executed by the processor, please refer to Figure 1 The description of the illustrated embodiment will not be repeated here.
[0136] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0137] In this document, the terms "comprises," "comprising," or any other variations thereof, are intended to cover a non-exclusive inclusion of elements other than those listed and may also include additional elements not expressly listed.
[0138] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A material management method, characterized in that: The method comprises: Get the current version of customer order demand information; Determine a production work order for the target product according to the customer order demand information, wherein the production work order includes a production date and a production quantity; Obtaining the available quantity of each required material for producing the target product; the available quantity includes the current inventory quantity and the quantity that can be delivered before the production date; Based on the available quantity of each of the required materials, detecting whether there is at least one bottleneck material; the bottleneck material is the required material whose quantity of the target product that can be produced is less than the production quantity; When it is determined that the at least one bottleneck material exists, adjusting the production work order for the target product according to the available quantity of the at least one bottleneck material; the adjusting the production work order for the target product includes: adjusting the production date and / or production quantity in the production work order; Generating a material pulling plan for each of the required materials based on the adjusted production work order; The step of adjusting the production work order for the target product according to the available quantity of the at least one bottleneck material comprises: According to the production quantity in the production work order, obtaining a first required quantity for each of the required materials; the first required quantity is the quantity of each of the required materials required to produce the target product required on the production work order; Determine the arrival time of each bottleneck material corresponding to a target pulling quantity according to the historical pulling order data of each bottleneck material; the target pulling quantity is greater than or equal to the difference between the first required quantity and the available quantity corresponding to the bottleneck material; The production date in the production work order is adjusted according to the latest arrival time.
2. The method according to claim 1, characterized in that The obtaining of the available quantity of each required material for producing the target product includes: Get the material pulling order generated based on the previous version of customer order demand information and sent to the supplier; According to the pulling quantity of each of the required materials in the pulling order, the quantity of each of the required materials that can arrive before the production date is determined.
3. The method according to claim 1, characterized in that The step of adjusting the production work order for the target product according to the available quantity of the at least one bottleneck material comprises: Determining the production quantity of each bottleneck material for the target product according to the available quantity of each bottleneck material; The production quantity in the production work order is adjusted according to the minimum producible quantity.
4. The method according to claim 1 or 3, characterized in that: Generating a material pulling plan for each of the required materials based on the adjusted production work order includes: According to the production quantity in the adjusted production work order, obtain the second required quantity for each of the required materials; the second required quantity is the quantity of each of the required materials required to produce the target product required on the adjusted production work order; according to the current inventory quantity of each of the required materials, the quantity in transit and the second required quantity, determine the required pulling quantity of each of the required materials; Determine the arrival time of each required material according to the production date in the adjusted production work order; A material pulling plan for each of the required materials is generated according to the pulling quantity and the arrival time.
5. The method according to claim 1, characterized in that The method further comprises: The remaining inventory quantity of each material in the warehouse is monitored, and when it is detected that the remaining inventory quantity of at least one of the materials is less than a preset threshold, a purchase reminder message for the material is issued.
6. The method according to any one of claims 1 to 3, characterized in that The method further comprises: Obtaining the actual scrap rate corresponding to each of the required materials when producing the target product; When the actual scrap rate corresponding to the required material is greater than the preset theoretical scrap rate, the increase quantity of the required material is predicted, and the material pulling plan of the required material is adjusted based on the increase quantity.
7. The method according to any one of claims 1 to 3, characterized in that The method further comprises at least one of the following: Analyze customer demand changes based on the current version of customer order demand information and the previous version of customer order demand information, and output a customer demand change analysis report; Analyze material consumption deviations based on the required quantity and actual usage quantity of each of the required materials, and output the obtained material consumption report.
8. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; Wherein, the processor is configured to execute the instructions to implement the material management method as described in any one of claims 1-7.
9. A computer-readable storage medium, characterized in that: When the instructions in the computer-readable storage medium are executed by a processor, the material management method according to any one of claims 1 to 7 is implemented.