Pipe jacking control system and control method based on hydrological digital twin

Through the hoisting control system and method based on hydrological digital twins, hydrological data is monitored in real time, risk factors and construction plans are selected, and the stability and accuracy of hoisting hoisting under hydrological abnormal conditions is solved, achieving higher construction safety Sex and success rate.

CN118363308BActive Publication Date: 2024-11-05赵正明
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410786981.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2024-11-05
Estimated Expiration
2044-06-18

AI Technical Summary

Technical Problem

The existing methods of hoisting pipe lifting control lack effective risk control and refined control when facing abnormal hydrological conditions, resulting in low stability and poor accuracy of hoisting pipe lifting, and inability to deal with risks in a timely manner, affecting construction safety and efficiency.

Method used

Using the hoisting control system and method based on hydrological digital twins, the risk factors are screened through multiple linear regression analysis, a risk plan database is built, hydrological data is monitored in real time, environmental abnormality and deviation degree are judged, early warning and alarm instructions are issued, and the lifting plan is adjusted. , ensure the safety and reliability of the hoisting pipe.

Benefits of technology

Effectively reduce the impact of hydrological factors on the hoisting of the pipe, improve construction safety and success rate, ensure the stability and accuracy of the lifting process, reduce the risks of human operations, and improve construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118363308B_ABST
    Figure CN118363308B_ABST
Patent Text Reader

Abstract

The present invention discloses a pipe jacking hoisting control system and control method based on hydrological digital twin, which relates to the technical field of pipe jacking hoisting control. Multiple linear regression analysis is used to screen out risk factors from a number of environmental conditions. According to the correspondence between risk factors and risk plans, a risk plan library outputs corresponding risk plans. The monitoring network collects hoisting process data, and constructs a deviation degree from the hoisting data. If the deviation degree exceeds the deviation threshold, an early warning signal is issued. A correction scheme is given for the pipe jacking hoisting process by a pipe jacking hoisting correction knowledge graph, and the correction scheme is tested by a pipe jacking hoisting digital twin model. Whether the correction scheme is feasible is determined based on the test data. A variation coefficient is constructed by hydrological data during the pipe jacking process. If the variation coefficient exceeds expectations, an alarm instruction is issued. The completion of the pipe jacking hoisting process is assisted, and the impact of hydrological factors is reduced when there is a certain degree of abnormality in the current hydrological environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pipe jacking hoisting control, and in particular to a pipe jacking hoisting control system and a control method based on hydrological digital twin. Background Art

[0002] The water intake head pipe jacking machine is a mechanical device specially used for water intake projects, especially for laying pipes when crossing complex terrain or water areas. It uses pipe jacking technology to push prefabricated pipes into the ground or underwater without large-scale excavation, thereby achieving pipe connection of water intake heads and other water conservancy facilities. The equipment is usually composed of a propulsion system, a pipeline system, a mud circulation system, and a control system.

[0003] The working principle of the water intake head pipe jacking machine is mainly based on the pipe jacking technology. According to the different construction environments and pipeline specifications, the water intake head pipe jacking machine can be divided into many types, such as long-distance transportation pipe jacking machine, large-diameter pipe jacking machine, etc. The water intake head pipe jacking machine is widely used in pipeline construction in the fields of water conservancy, municipal administration, transportation, etc., especially in the following scenarios: Water intake head construction: When constructing water intake heads in rivers, lakes and other waters, it is necessary to cross the riverbed or embankment. The pipe jacking machine can realize the rapid laying of pipelines and reduce the difficulty and cost of construction.

[0004] The digital twin model is an innovative technology application. It simulates the behavioral characteristics of physical objects in the real environment by creating digital representations of physical objects in virtual space. The digital twin model refers to the digital presentation of physical objects in virtual space, that is, creating virtual models for physical objects in a digital way to simulate their behavioral characteristics in the real environment. It is an integrated system of data, models and analysis tools applied to the entire product life cycle.

[0005] In the Chinese invention patent with application publication number CN112794208A, a hoisting method is provided, the method comprising: obtaining multiple on-site construction images and hoisting operation information of the hoisting operation equipment, the hoisting operation information comprising hoisting position information and hook drop position information; in the process of the hoisting operation equipment performing the hoisting operation according to the execution instruction, the execution of the hoisting operation is monitored at the ground control end according to the on-site construction images and the hoisting operation information. The technical solution provided by the present invention enables the operator to perform normal operations on the hoisting operation equipment under the tower, thereby reducing safety hazards and improving construction efficiency.

[0006] Combined with the above application and the contents of the prior art:

[0007] After determining the installation area of ​​the jacking pipe, it is necessary to hoist the jacking pipe. However, when hoisting the jacking pipe, there may be certain abnormalities in the hydrological conditions in the hoisting area. For example, the flow rate of the water body is faster than usual, and the wave height, frequency and sediment content of the waves are also larger than usual. When disturbed by these abnormal external factors, the accuracy of the jacking pipe hoisting will be affected to a certain extent. In view of this situation, the existing jacking pipe hoisting control method usually adjusts the hoisting process through manual operation when the hoisting data changes, so that the hoisting process can be completed smoothly. However, in this case, there is a lack of risk management and refined control of the jacking pipe hoisting, and it cannot be handled in time when the hoisting risk is about to occur, which easily leads to low stability and poor accuracy of the jacking pipe hoisting.

[0008] To this end, the present invention provides a pipe jacking lifting control system and control method based on hydrological digital twin. Summary of the invention

[0009] 1. Technical issues to be resolved

[0010] In view of the deficiencies of the prior art, the present invention provides a pipe jacking hoisting control system and control method based on hydrological digital twins. Risk factors are screened out from a number of environmental conditions by using multiple linear regression analysis. According to the correspondence between risk factors and risk plans, the risk plan library outputs corresponding risk plans. The monitoring network collects the hoisting process data, and the deviation degree is constructed from the hoisting data. If the obtained deviation degree exceeds the deviation threshold, an early warning signal is sent to the outside. The pipe jacking hoisting correction knowledge map provides a correction plan for the pipe jacking hoisting process, determines whether the correction plan is feasible, and constructs a coefficient of variation from the hydrological data during the pipe jacking process. If the coefficient of variation exceeds expectations, an alarm command is issued. The completion of the pipe jacking hoisting process is assisted, and when there is a certain degree of abnormality in the current hydrological environment, the impact of hydrological factors is reduced, thereby solving the technical problems raised in the background technology.

[0011] (II) Technical solution

[0012] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0013] The pipe jacking control method based on hydrological digital twin includes monitoring the hydrological status data in the lifting area and constructing a hydrological environment data set, and constructing an environmental anomaly degree from the hydrological environment data set. If the environment is abnormal Exceeding expectations, issuing data collection instructions to external parties;

[0014] Obtain environmental condition data, pipe jacking and its lifting data in the lifting area, train and obtain the pipe jacking lifting digital twin model after formulating the lifting plan, use the pipe jacking lifting digital twin model to test the lifting plan, and construct the feasibility of pipe jacking lifting based on the test data , based on the feasibility of obtaining Verify whether the lifting plan is feasible; the lifting process is divided into several lifting stages according to the lifting progress, and the corresponding lifting speed is obtained at the end of each lifting stage and balance , perform linear normalization on both and map the corresponding data values ​​to the interval The feasibility is constructed as follows :

[0015] Weight coefficient: , ,and , , is the number of hoisting stages; For the i The balance of each lifting stage, is the mean value of the balance, is the qualified standard value of balance; For the i The lifting speed of each lifting stage, is the mean lifting speed, is the qualified standard value of lifting speed;

[0016] Use multiple linear regression analysis to screen out risk factors from several environmental conditions, and calculate the risk level of environmental conditions based on the risk level of risk factors. If the risk If the preset risk threshold is exceeded, the risk plan library will output the corresponding risk plan based on the correspondence between risk factors and risk plans;

[0017] A monitoring network is installed in the lifting area to collect lifting process data and construct a deviation degree based on the lifting data. , if the obtained deviation If the deviation threshold is exceeded, an early warning signal will be sent to the outside world;

[0018] After receiving the warning signal, the knowledge graph of pipe jacking correction provides a correction plan for the pipe jacking process. The correction plan is tested using the pipe jacking digital twin model. The feasibility of the correction plan is determined based on the test data, and the variation coefficient is constructed using the hydrological data during the pipe jacking process. , if the coefficient of variation obtained is If it exceeds expectations, an alarm command will be issued to the outside.

[0019] Furthermore, hydrological monitoring equipment is installed in the lifting area to monitor the hydrological status data in the lifting area, and the hydrological environment data set is constructed after being summarized; the environmental anomaly degree is constructed from the hydrological environment data set , where the water flow rate and sediment content Perform linear normalization and map the corresponding data values ​​to the interval According to the following method:

[0020] Weight coefficient: , ,and ; , is the total number of monitoring nodes, For the i The water flow velocity at each monitoring node is is the mean water velocity; For the i The sediment content at each monitoring node is is the mean value of sediment content.

[0021] Furthermore, after receiving the data collection instruction, the hydrological state data and soil state data in the lifting area are collected, and after completing the real-time data collection, the corresponding historical data are obtained. After the obtained data are summarized, part of the data is extracted as sample data; according to the specification data of the jacking pipe, the hydrological data and soil data in the lifting area, a lifting plan is formulated for the jacking pipe lifting, and the lifting plan includes: lifting path, lifting point, fixing method and lifting steps, and corresponding lifting equipment;

[0022] The pipe jacking specification data, hydrological and soil data in the lifting area, etc. are aggregated and constructed to construct a pipe jacking lifting data set; part of the data in the pipe jacking lifting data set is used as sample data, and the initial model is trained with the sample data to obtain a pipe jacking lifting digital twin model;

[0023] Use the pipe jacking lifting digital twin model to test the lifting scheme, obtain the corresponding test data, and construct the feasibility of pipe jacking lifting based on the test data , if the feasibility of obtaining If the value is lower than the feasibility threshold, the optimized lifting plan is obtained and used as the target lifting plan.

[0024] Furthermore, under different environmental conditions, the pipe jacking digital twin model is used to test the target lifting scheme and obtain the corresponding feasibility. , based on the feasibility of lifting As dependent variables, environmental condition parameters were used as independent variables to conduct multiple linear regression analysis and construct the corresponding linear regression equation;

[0025] Obtain the regression coefficient corresponding to the environmental condition parameter from the linear regression equation. If the value of the regression coefficient exceeds the expected value, the corresponding environmental condition coefficient is used as a risk factor; calculate the risk degree of the environmental condition , if the risk level is When the preset risk threshold is exceeded, several risk plans are collected and formulated for the pipe jacking process, and a corresponding risk plan library is compiled and constructed.

[0026] Furthermore, a correlation analysis is performed between two different risk factors and the corresponding correlation coefficient is obtained. The centrality of each risk factor is calculated using the correlation coefficient. , as follows:

[0027] in, For the i The risk factors and j The correlation coefficients among the risk factors is the mean of the correlation coefficient, is the number of risk factors; in obtaining the regression coefficient of each risk factor and centrality Then, the risk of environmental conditions is calculated under dimensionless conditions. , as follows:

[0028] Weight coefficient: , ,and , For the i The centrality of the risk factor, is the mean of the centrality, For the i The regression coefficients of the risk factors are is the mean of the regression coefficients.

[0029] Furthermore, a hoisting monitoring network is built in the hoisting area, and the hoisting monitoring network collects the data of the pipe jacking hoisting process, and the collected process data are summarized to construct a hoisting process data set; the deviation degree is constructed from the hoisting process data set Among them, the lifting angle on each lifting node And lifting height Perform linear normalization and map the corresponding data values ​​to the interval According to the following method:

[0030] Weight coefficient: , ,and ; , is the total number of lifting nodes, For the i The lifting angle on the lifting node, is the corresponding standard reference value; For the i The lifting height on each lifting node, are the corresponding standard reference values.

[0031] Furthermore, various data in the hoisting process are collected, and several correction features are obtained after feature extraction. With pipe jacking hoisting as the target word, a positive knowledge graph for pipe jacking hoisting is pre-built. Based on the correspondence between the correction features and the correct scheme for pipe jacking hoisting, a correction scheme is given for the pipe jacking hoisting process from the positive knowledge graph for pipe jacking hoisting. The correction scheme includes: adjusting the speed, height and angle during the hoisting process.

[0032] Furthermore, the correction scheme was tested using the pipe jacking installation digital twin model, and several deviations during installation were constructed based on the test data. , by the degree of deviation Construct the corresponding correction factor , if the correction factor Without exceeding the correction threshold, the various parameters of the correction scheme are optimized, and the optimized correction scheme is executed to correct the lifting process; the correction coefficient The construction is as follows:

[0033] in, , is the number of tests, For the i The deviation during the test, is the mean of the deviations.

[0034] Furthermore, when the hoisting process is corrected and the hoisting process is continued, the hydrological data in the hoisting area is collected and the environmental anomaly degree is constructed. , sort the sub-stages before and after the execution of the lifting plan according to the timeline and correspond one to one, and The change in the coefficient of variation ;

[0035] If the coefficient of variation If the preset change threshold is exceeded, an alarm command will be issued to the outside; after receiving the alarm command, emergency measures will be taken, or the risk plan library will output the corresponding risk plan based on the current risk factors; the change coefficient The construction is as follows:

[0036] in, For the i The median value of the change in each sub-stage, is its mean value, , is the number of sub-stages, and They are respectively before and after the execution of the lifting plan i The degree of environmental abnormality in each sub-stage, and is the corresponding mean.

[0037] The pipe jacking control system based on hydrological digital twin includes: a hydrological status monitoring unit, which monitors the hydrological status data in the lifting area and constructs a hydrological environment data set, and constructs an environmental anomaly degree from the hydrological environment data set. If the environment is abnormal Exceeding expectations, issuing data collection instructions;

[0038] The model building unit obtains the environmental condition data, pipe jacking and its lifting data in the lifting area, trains and obtains the pipe jacking lifting digital twin model after formulating the lifting plan, uses the pipe jacking lifting digital twin model to test the lifting plan, and constructs the feasibility of pipe jacking based on the test data. , based on the feasibility of obtaining Verify whether the lifting plan is feasible;

[0039] The plan construction unit uses multiple linear regression analysis to screen out risk factors from several environmental conditions and calculates the risk level of environmental conditions based on the risk level of risk factors. If the risk If the preset risk threshold is exceeded, the risk plan library will output the corresponding risk plan based on the correspondence between risk factors and risk plans;

[0040] The test unit installs a monitoring network in the lifting area, collects lifting process data through the monitoring network, and constructs the deviation degree based on the lifting data , if the obtained deviation If the deviation threshold is exceeded, an early warning signal will be sent to the outside world;

[0041] The correction unit, after receiving the early warning signal, uses the knowledge graph of pipe jacking lifting correction to provide a correction plan for the pipe jacking lifting process, uses the pipe jacking lifting digital twin model to test the correction plan, judges whether the correction plan is feasible based on the test data, and constructs the variation coefficient based on the hydrological data during the pipe jacking lifting process. , if the coefficient of variation If it exceeds expectations, an alarm command will be issued to the outside.

[0042] (III) Beneficial effects

[0043] The present invention provides a pipe jacking hoisting control system and control method based on hydrological digital twin, which has the following beneficial effects:

[0044] 1. Based on the degree of environmental abnormality Determine whether there are any abnormalities in the current hydrological environment. If there are any abnormalities and the degree of abnormality is high, take the impact of the current abnormal hydrological state into consideration to ensure the safety of the pipe jacking construction.

[0045] 2. The collected data is used as sample data and trained to obtain a digital twin model for pipe jacking lifting. The lifting plan and lifting process can be tested based on the digital twin model. After several tests, the feasibility of the current lifting plan can be determined to reduce the risk of lifting during actual lifting.

[0046] 3. Construct the corresponding feasibility from the acquired test data , according to feasibility Can screen the lifting scheme based on feasibility As a criterion, the feasibility of the lifting plan is judged. If the plan is not feasible, the lifting plan is revised or re-formulated to ensure that the lifting plan has a certain degree of feasibility before the lifting of the pipe.

[0047] 4. Evaluate the magnitude of the risk brought by the risk factors and determine the degree of impact on the lifting construction. If the degree of impact is large, a corresponding risk plan can be formulated in advance. When the risk level of the risk factor increases further, the risk plan library will output the corresponding risk plan for the risk factor, so that it can be dealt with urgently when the risk actually occurs, ensuring the safety and reliability of the pipe jacking lifting process.

[0048] 5. Compare the acquired monitoring data with the preset reference data and construct the corresponding deviation degree , according to the deviation Evaluate and judge the degree of deviation of the hoisting status. If the current degree of deviation is large, correct the current hoisting process or restart the hoisting to ensure that the hoisting process can be completed smoothly and improve the success rate of the pipe jacking construction.

[0049] 6. The knowledge graph of pipe jacking hoisting adjustment can provide correction plans in time. If the pipe jacking is still in the hoisting state, it can save time in formulating the correction plan and improve efficiency. It can evaluate whether the correction plan is feasible, and optimize the correction plan once or multiple times when it is not feasible, until the adjustment of the lifting process is completed. It can assist in the completion of the jacking pipe lifting process and reduce the impact of hydrological factors when there is a certain degree of abnormality in the current hydrological environment.

[0050] 7. Monitor the changes of hydrological data in the lifting area in real time, and construct the corresponding coefficient of variation based on the acquired monitoring data. , based on the coefficient of variation The value of can be used to judge the environmental risk in the lifting area. If the environmental risk is large, it can be used as the starting point to terminate the lifting process or select the corresponding risk plan for emergency treatment to ensure the smooth completion of the lifting process and improve the stability of the jacking pipe lifting. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a schematic diagram of the control process of pipe jacking installation based on hydrological digital twin of the present invention;

[0052] Figure 2 It is a schematic diagram of the pipe jacking lifting control system based on hydrological digital twin of the present invention. DETAILED DESCRIPTION

[0053] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0054] See also Figure 1 The present invention provides a pipe jacking control method based on hydrological digital twin, comprising:

[0055] Step 1: Monitor the hydrological status data in the lifting area and construct a hydrological environment data set, and construct an environmental anomaly degree from the hydrological environment data set If the environment is abnormal Exceeding expectations, issuing data collection instructions to external parties;

[0056] The step 1 includes the following contents:

[0057] Step 101: after determining the pipe jacking area, construct an electronic map covering the hoisting area; install hydrological monitoring equipment in the hoisting area, such as a water level meter, a current meter, etc., to monitor the hydrological status data in the hoisting area in real time, including the flow velocity of the water body at each monitoring node, the wave height, frequency and sediment content of the water body, etc., and construct a hydrological environment data set after summarizing;

[0058] Step 102: Constructing environmental anomaly degree from hydrological environment data set , where the water flow rate and sediment content Perform linear normalization and map the corresponding data values ​​to the interval According to the following method:

[0059] Weight coefficient: , ,and ; , To monitor the total number of nodes, the weight coefficient can be obtained by referring to the analytic hierarchy process; For the i The water flow velocity at each monitoring node is is the mean water velocity; For the i The sediment content at each monitoring node is is the mean value of sediment content;

[0060] Based on historical data and safety management expectations for pipe jacking, abnormal thresholds are set in advance; if the acquired environment is abnormal If the value exceeds the preset abnormal threshold, it means that the current environment is abnormal, which may have a certain degree of impact on the pipe jacking process, and a data collection instruction is issued to the outside;

[0061] Flow rate: The water flow rate directly affects the stability of the top pipe in the water. Too high a flow rate will increase the swing and displacement of the top pipe, affecting the accuracy and safety of the lifting. Flow rate changes: Instantaneous changes in flow rate (such as during floods or flood discharges) will have a significant impact on the stability of the lifting process.

[0062] Water flow direction: The relationship between the direction of water flow and the lifting path of the jacking pipe determines the impact force of water flow on the jacking pipe. If the direction of water flow is perpendicular to the lifting path, the impact force is the greatest, affecting the stability of the lifting.

[0063] Water quality: suspended matter and pollutants in the water will affect the operation of monitoring equipment and lifting equipment. Sediment content: excessive sediment content in the water will affect the impact of the water flow on the jacking pipe, and may also make it difficult to position the jacking pipe in the water. Waves: waves caused by wind and waves and passing ships will have an impact on the lifting equipment and jacking pipes. Especially when constructing at sea, special attention should be paid to the height and frequency of the waves. Swells: large fluctuations over a long period of time, usually caused by long-distance storms or other meteorological phenomena, will have a significant impact on the stability of the lifting process.

[0064] When using, combine the contents in steps 101 and 102:

[0065] When the pipe jacking needs to be hoisted, after the construction area of ​​the pipe jacking is determined, hydrological data are collected in the hoisting construction area and its adjacent areas, and the corresponding environmental anomaly degree is constructed after selecting representative parameters. , according to the degree of environmental abnormality Determine whether there are any abnormalities in the current hydrological environment. If there are any abnormalities and the degree of abnormality is high, it means that the current lifting construction may be affected to a certain extent. In this case, if the lifting construction is to continue, it is necessary to take the impact of the current abnormal hydrological state into account, so as to ensure the safety of the pipe jacking construction.

[0066] After determining the installation area of ​​the jacking pipe, it is necessary to hoist the jacking pipe. However, when hoisting the jacking pipe, the hydrological conditions in the hoisting area may be abnormal. For example, the flow rate of the water body is faster than usual, and the wave height, frequency and sediment content of the waves are also larger than usual. When disturbed by these abnormal external factors, the accuracy of the jacking pipe hoisting will be affected to a certain extent. In view of this situation, the existing jacking pipe hoisting control method usually adjusts the hoisting process through manual operation when the hoisting data changes, so that the hoisting process can be completed smoothly. However, in this case, there is a lack of risk management and refined control of the jacking pipe hoisting, and it cannot be handled in time when the hoisting risk is about to occur, which easily leads to low stability and poor accuracy of the jacking pipe hoisting.

[0067] Step 2: Obtain environmental condition data, pipe jacking and its lifting data in the lifting area, train and obtain the pipe jacking lifting digital twin model after formulating the lifting plan, use the pipe jacking lifting digital twin model to test the lifting plan, and construct the feasibility of pipe jacking based on the test data. , based on the feasibility of obtaining Verify whether the lifting plan is feasible;

[0068] The step 2 includes the following contents:

[0069] Step 201: after receiving the data collection instruction, collect various data in the hoisting area, including hydrological status data, water velocity, flow, water level, rainfall and tide, etc., select exploration points in the hoisting area, conduct geological exploration of the hoisting area, obtain soil layer structure, groundwater level, geological strength and other soil layer status data, and obtain corresponding historical data after completing real-time data collection. After summarizing the acquired data, extract part of the data as sample data;

[0070] Step 202: according to the specification data of the jacking pipe, including length, diameter, material and weight, etc., the hydrological data and soil layer data in the hoisting area, a hoisting plan is formulated for the jacking pipe hoisting, and the hoisting plan includes: hoisting path, lifting point, fixing method and hoisting steps, etc., and corresponding hoisting equipment, such as crane, hoisting device, guide device, etc.;

[0071] The pipe jacking specification data, hydrological and soil data in the lifting area, etc. are aggregated and constructed to construct a pipe jacking lifting data set; some data in the pipe jacking lifting data set are used as sample data, and after the initial model is built using the machine learning algorithm, the sample data is used to train the initial model to obtain the pipe jacking lifting digital twin model;

[0072] During use, after collecting various data of pipe jacking lifting, the collected data is used as sample data and trained to obtain the digital twin model of pipe jacking lifting; based on the digital twin model of pipe jacking lifting, the lifting plan and the lifting process can be tested, so as to determine the feasibility of the current lifting plan after several tests, and reduce the risk of lifting during actual lifting.

[0073] Step 203: Use the pipe jacking digital twin model to test the lifting scheme to verify the lifting scheme and obtain corresponding test data, including lifting progress, pipe jacking balance state, lifting speed, and lifting point stress conditions, etc. The feasibility of pipe jacking is constructed from the test data. ,in,

[0074] The lifting process is divided into several lifting stages according to the lifting progress. At the end of each lifting stage, the corresponding lifting speed is obtained. And the force difference at each hanging point, using the force difference as the balance , perform linear normalization on both and map the corresponding data values ​​to the interval According to the following method:

[0075] Weight coefficient: , ,and , the weight coefficient can be obtained by referring to the hierarchical analysis method; , is the number of hoisting stages; For the i The balance of each lifting stage, is the mean value of the balance, is the qualified standard value of balance; For the i The lifting speed of each lifting stage, is the mean lifting speed, is the qualified standard value of lifting speed;

[0076] Based on historical data and management expectations for pipe jacking, a feasibility threshold is set in advance; if the feasibility obtained is If it is lower than the feasibility threshold, it means that the current lifting plan is not feasible. At this time, the lifting plan is optimized using an optimization algorithm, or the lifting plan is re-formulated to obtain the optimized lifting plan and use it as the target lifting plan;

[0077] When using, combine the contents in steps 201 to 203:

[0078] When the digital twin model of pipe jacking is used to test the lifting scheme, the corresponding feasibility is constructed based on the obtained test data. , so that when several lifting schemes are obtained, according to the feasibility It can screen the lifting schemes based on feasibility. As a judgment criterion, the feasibility of the lifting plan is judged. If the plan is not feasible, the lifting plan can be revised or re-formulated. In this way, with the cooperation of the digital twin model of pipe jacking lifting, the feasibility of the pipe jacking lifting plan can be ensured before the pipe jacking is lifted.

[0079] Step 3: Use multiple linear regression analysis to screen out risk factors from several environmental conditions, and calculate the risk level of environmental conditions based on the risk level of risk factors. If the risk If the preset risk threshold is exceeded, the risk plan library will output the corresponding risk plan based on the correspondence between risk factors and risk plans;

[0080] The step three includes the following contents:

[0081] Step 301: Under different environmental conditions, use the pipe jacking digital twin model to test the target lifting scheme and obtain the corresponding feasibility. , based on the feasibility of lifting As the dependent variable, the environmental condition parameters are used as independent variables, multiple linear regression analysis is performed and the corresponding linear regression equation is constructed; the regression coefficient corresponding to the environmental condition parameters is obtained from the linear regression equation, and if the value of the regression coefficient exceeds the expectation, the corresponding environmental condition coefficient is used as a risk factor;

[0082] When in use, after obtaining the risk factors, it is possible to determine which factors have a greater impact on the safety of lifting construction, and focus on them when necessary.

[0083] Step 302: Perform a correlation analysis between two different risk factors and obtain the corresponding correlation coefficient, and calculate the centrality of each risk factor using the correlation coefficient. , as follows:

[0084] in, For the i The risk factors and j The correlation coefficients among the risk factors is the mean of the correlation coefficient, is the number of risk factors; in obtaining the regression coefficient of each risk factor and centrality Then, the risk of environmental conditions is calculated under dimensionless conditions. , as follows:

[0085] Weight coefficient: , ,and , the value of the weight coefficient is the same as the previous value; For the i The centrality of the risk factor, is the mean of the centrality, For the i The regression coefficients of the risk factors are is the mean of the regression coefficient;

[0086] Step 303: If the risk If the preset risk threshold is exceeded, it means that the current environmental conditions may interfere with and affect the pipe jacking to a certain extent, and there may be certain safety risks. At this time, an early warning instruction is issued to the outside;

[0087] After receiving the plan warning instruction, several risk plans are collected and formulated for the pipe jacking process, and the corresponding risk plan library is compiled and constructed. According to the correspondence between risk factors and risk plans, the risk plan library outputs the corresponding risk plan, which includes personnel evacuation, equipment protection, emergency measures, etc.

[0088] When using, combine the contents in steps 301 to 303:

[0089] After screening out several risk factors, a risk score is constructed based on the risk level of the risk factors. , according to the risk Assess the magnitude of the risk brought by the risk factors and determine the degree of impact on the lifting construction. If the impact is large, a corresponding risk plan can be formulated in advance. When the risk level of the risk factor increases further, the risk plan library will output the corresponding risk plan for the risk factor, so that it can be dealt with urgently when the risk actually occurs, ensuring the safety and reliability of the pipe jacking lifting process.

[0090] Step 4: Install a monitoring network in the lifting area, collect lifting process data through the monitoring network, and construct a deviation degree based on the lifting data. , if the obtained deviation If the deviation threshold is exceeded, an early warning signal will be sent to the outside world;

[0091] The step 4 includes the following contents:

[0092] Step 401: After entering the pipe jacking stage, monitoring equipment is arranged at various locations in the hoisting area, such as height detection equipment, balance detection equipment and imaging devices, etc., to build a complete hoisting monitoring network, and the hoisting monitoring network collects pipe jacking process data, including the speed, angle and height of the pipe jacking, etc., and the collected process data is aggregated to form a hoisting process data set;

[0093] Step 402: After setting corresponding standard reference values ​​for various parameters according to the preset hoisting process, the deviation degree is constructed from the hoisting process data set. , according to the deviation Determine the degree of deviation between the current lifting process and the preset scenario, including the lifting angle at each lifting node And lifting height Perform linear normalization and map the corresponding data values ​​to the interval According to the following method:

[0094] Weight coefficient: , ,and ; , is the total number of lifting nodes, and the weight coefficient can be obtained by referring to the hierarchical analysis method; For the i The lifting angle on the lifting node, is the corresponding standard reference value; For the i The lifting height on each lifting node, is the corresponding standard reference value;

[0095] Based on historical data and safety management expectations for the lifting process, the deviation threshold is set in advance; if the deviation degree If the deviation threshold is exceeded, it means that there is an abnormality or safety risk in the current lifting process. At this time, an early warning signal is sent to the outside.

[0096] When using, combine the contents in steps 401 and 402:

[0097] When executing the pipe jacking process, the pipe jacking process, especially the status of the pipe jacking, is monitored in different ways. After obtaining the monitoring data, the obtained monitoring data is compared with the preset reference data, and the corresponding deviation degree is constructed. , according to the deviation Evaluate and judge the degree of deviation of the lifting status. If the current degree of deviation is large, it means that the current lifting process is not successful enough and it is difficult to achieve the expected effect at the end of the lifting. It is necessary to correct the current lifting process or restart the lifting to ensure that the lifting process can be completed smoothly, improve the success rate of the jacking pipe lifting construction, and reduce the risk of failure.

[0098] Step 5: After receiving the warning signal, the knowledge graph of pipe jacking correction is used to provide a correction plan for the pipe jacking process. The correction plan is tested using the pipe jacking digital twin model. The feasibility of the correction plan is determined based on the test data, and the variation coefficient is constructed using the hydrological data during the pipe jacking process. , if the coefficient of variation If it exceeds expectations, an alarm command will be issued to the outside;

[0099] The step five includes the following contents:

[0100] Step 501: after receiving the warning signal, various data in the hoisting process are collected, and several correction features are obtained after feature extraction. Pipe jacking hoisting is taken as the target word. After deep retrieval and building the corresponding entity relationship, a knowledge graph of pipe jacking hoisting correction is pre-built; using the trained matching model, according to the correspondence between the correction features and the correction scheme of pipe jacking hoisting correction, a correction scheme is given for the pipe jacking hoisting process from the knowledge graph of pipe jacking hoisting correction, and the correction scheme includes: adjusting the speed, height and angle during the hoisting process;

[0101] During use, when it is necessary to correct the current lifting plan and lifting process, after collecting the current lifting status data, the jacking pipe lifting adjustment knowledge graph can promptly give a correction plan. If the jacking pipe is still in the lifting state, it can save the time of formulating the correction plan and improve efficiency.

[0102] Step 502: Use the digital twin model of pipe jacking to test the correction scheme, and construct several deviations during lifting from the test data. , by the degree of deviation Construct the corresponding correction factor , as follows:

[0103] in, , is the number of tests, For the i The deviation during the test, is the mean of the deviation;

[0104] Based on the historical data of the deviation management expectations of the lifting process, the correction threshold is set in advance; if the correction coefficient If the correction threshold is exceeded, it means that the correction plan is feasible. If the correction plan is not feasible, the various parameters of the correction plan can be optimized until a feasible correction plan is obtained, and the optimized correction plan is executed to correct the lifting process;

[0105] When using, after obtaining the correction plan, test the correction plan and obtain the test data, and then use the correction coefficient constructed It is able to evaluate whether the correction plan is feasible, and optimize the correction plan once or multiple times if it is not feasible, until the adjustment of the lifting process is completed, thereby assisting the completion of the jacking pipe lifting process and reducing the impact of hydrological factors when there is a certain degree of abnormality in the current hydrological environment.

[0106] Step 503: When the hoisting process is corrected and the hoisting process is continued, the hydrological data in the hoisting area is collected and the environmental anomaly degree is constructed. , sort the sub-stages before and after the execution of the lifting plan according to the timeline and correspond one to one, and The change in the coefficient of variation , as follows:

[0107] in, For the i The median value of the change in each sub-stage, is its mean value, , is the number of sub-stages, and They are respectively before and after the execution of the lifting plan i The degree of environmental abnormality in each sub-stage, and is the corresponding mean.

[0108] If the coefficient of variation If the preset change threshold is exceeded, it means that the current hoisting process will be significantly affected by environmental conditions and needs to be adjusted in time. At this time, an alarm command is issued to the outside. After receiving the alarm command, emergency measures are taken, such as suspending hoisting, adjusting the position of the jacking pipe, etc., or the risk plan library outputs the corresponding risk plan based on the current risk factors;

[0109] When using, combine the contents in steps 501 to 503:

[0110] When the pipe jacking is in progress, the changes of hydrological data in the lifting area are monitored in real time, and the corresponding coefficient of variation is constructed based on the acquired monitoring data. , based on the coefficient of variation The value of can be used to judge the environmental risk in the lifting area. If the environmental risk is large, it can be used as the starting point to terminate the lifting process or select the corresponding risk plan for emergency treatment to ensure the smooth completion of the lifting process and improve the stability of the jacking pipe lifting.

[0111] The knowledge graph method for constructing pipe jacking and installation correction can refer to the following:

[0112] Determine the scope and objectives: key links in the process of pipe jacking, such as balance correction, center of gravity calculation, and adjustment of the lifting point position. Provide real-time data support for balance correction during pipe jacking through knowledge graphs to improve the safety and accuracy of lifting.

[0113] Data collection: Sensor data: real-time data from inclination sensors, pressure sensors, laser measuring instruments, total stations, etc. Design drawings and technical documents: design drawings, structural parameters and construction technical documents of the jacking pipe. Historical data: data from previous jacking pipe lifting projects, including successful cases and failed cases. Expert knowledge: experience and advice from construction experts and engineers.

[0114] Data preprocessing: Data cleaning: Remove noise and erroneous data from sensor data. Data conversion: Convert data in different formats into a unified format for subsequent processing. Data standardization: Standardize the data so that it has consistent measurement units and scales.

[0115] Construct ontology: Define concepts: determine core concepts such as jacking pipes, lifting equipment, sensors, and measurement data. Define relationships: clarify the relationship between concepts, such as the installation relationship between jacking pipes and sensors, the force relationship between jacking pipes and lifting points, etc. Attribute description: add attribute descriptions to each concept, such as the length and weight of jacking pipes, the type of sensor, and measurement accuracy. Ontology tools: ontology editing tools such as Protégé can be used to build and manage ontologies.

[0116] Knowledge graph construction: Data mapping: Map the preprocessed data into the ontology structure to generate a knowledge graph. Storage: Use a graph database (such as Neo4j, GraphDB) to store the knowledge graph. Instantiation: Instantiate specific pipe jacking project data into the knowledge graph to form a specific knowledge instance.

[0117] Knowledge reasoning: Rule definition: Define the reasoning rules for pipe jacking correction, for example: when the inclination data exceeds a certain range, trigger the inclination correction. When the forces on each hanging point are uneven, trigger the force correction. Reasoning engine: Use the reasoning engine (such as RDF4J, Apache Jena) to perform real-time reasoning based on the defined rules and provide correction suggestions.

[0118] Knowledge graph visualization: Graph display: Use graph visualization tools (such as Neo4j Bloom, GraphDB visualization plug-in) to display the knowledge graph of pipe jacking and correction. Real-time monitoring: Use the visualization interface to monitor the sensor data and correction status during the pipe jacking process in real time.

[0119] System integration: Integrate the knowledge graph into the monitoring system of pipe jacking to provide real-time data support and correction suggestions. API interface: Build an API interface so that the monitoring system can call the knowledge graph data and reasoning results. User interface: Design a friendly user interface to facilitate operators to use the correction suggestions provided by the knowledge graph.

[0120] See also Figure 2 The present invention provides a pipe jacking control system based on hydrological digital twin, comprising:

[0121] The hydrological status monitoring unit monitors the hydrological status data in the lifting area and constructs a hydrological environment data set, and constructs an environmental anomaly degree from the hydrological environment data set If the environment is abnormal Exceeding expectations, issuing data collection instructions;

[0122] The model building unit obtains the environmental condition data, pipe jacking and its lifting data in the lifting area, trains and obtains the pipe jacking lifting digital twin model after formulating the lifting plan, uses the pipe jacking lifting digital twin model to test the lifting plan, and constructs the feasibility of pipe jacking based on the test data. , based on the feasibility of obtaining Verify whether the lifting plan is feasible;

[0123] The plan construction unit uses multiple linear regression analysis to screen out risk factors from several environmental conditions and calculates the risk level of environmental conditions based on the risk level of risk factors. If the risk If the preset risk threshold is exceeded, the risk plan library will output the corresponding risk plan based on the correspondence between risk factors and risk plans;

[0124] The test unit installs a monitoring network in the lifting area, collects lifting process data through the monitoring network, and constructs the deviation degree based on the lifting data , if the obtained deviation If the deviation threshold is exceeded, an early warning signal will be sent to the outside world;

[0125] The correction unit, after receiving the early warning signal, uses the knowledge graph of pipe jacking lifting correction to provide a correction plan for the pipe jacking lifting process, uses the pipe jacking lifting digital twin model to test the correction plan, judges whether the correction plan is feasible based on the test data, and constructs the variation coefficient based on the hydrological data during the pipe jacking lifting process. , if the coefficient of variation If it exceeds expectations, an alarm command will be issued to the outside.

[0126] The Analytic Hierarchy Process (AHP) is a decision-making method that decomposes decision-related elements into levels such as goals, criteria, and plans, and conducts qualitative and quantitative analysis on this basis. It is particularly suitable for dealing with target systems with hierarchical and staggered evaluation indicators, and when the target value is difficult to describe quantitatively, the AHP is an effective decision-making tool.

[0127] The core of the hierarchical analysis method is to decompose the decision problem into multiple levels to form a hierarchical structure, which usually includes the target level, the criterion level, the sub-criterion level and the solution level. By solving the eigenvector of the judgment matrix, the priority weight of each element of each level to an element of the previous level is obtained, and the final weight of each alternative solution to the total goal is recursively merged by the weighted sum method, so as to find the optimal solution.

[0128] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0129] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0130] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0131] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only some logical function divisions. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0132] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0133] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0134] If the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, and other media that can store program codes.

[0135] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A pipe jacking control method based on hydrological digital twin, characterized by: include, Monitor the hydrological status data in the lifting area and construct a hydrological environment data set, and construct an environmental anomaly degree from the hydrological environment data set If the environment is abnormal Exceeding expectations, issuing data collection instructions to external parties; Obtain environmental condition data, pipe jacking and its lifting data in the lifting area, train and obtain the pipe jacking lifting digital twin model after formulating the lifting plan, use the pipe jacking lifting digital twin model to test the lifting plan, and construct the feasibility test data , based on the feasibility of obtaining Verify whether the lifting plan is feasible; the lifting process is divided into several lifting stages according to the lifting progress, and the corresponding lifting speed is obtained at the end of each lifting stage and balance , perform linear normalization on both and map the corresponding data values ​​to the interval The feasibility is constructed as follows : Weight coefficient: , ,and , , is the number of hoisting stages; For the i The balance of each lifting stage, is the mean value of the balance, is the qualified standard value of balance; For the i The lifting speed of each lifting stage, is the mean lifting speed, is the qualified standard value of lifting speed; Use multiple linear regression analysis to screen out risk factors from several environmental conditions, and calculate the risk level of environmental conditions based on the risk level of risk factors. If the risk If the preset risk threshold is exceeded, the risk plan library will output the corresponding risk plan based on the correspondence between risk factors and risk plans; A monitoring network is installed in the lifting area to collect lifting process data and construct a deviation degree based on the lifting data. , if the obtained deviation If the deviation threshold is exceeded, an early warning signal will be sent to the outside world; After receiving the warning signal, the knowledge graph of pipe jacking correction provides a correction plan for the pipe jacking process. The correction plan is tested using the pipe jacking digital twin model. The feasibility of the correction plan is determined based on the test data. The coefficient of variation is constructed using hydrological data during the pipe jacking process. , if the coefficient of variation obtained is If it exceeds expectations, an alarm command will be issued to the outside.

2. The pipe jacking control method based on hydrological digital twin according to claim 1 is characterized in that: Install hydrological monitoring equipment in the lifting area to monitor the hydrological status data in the lifting area, and then construct a hydrological environment data set after summarizing it; construct an environmental anomaly degree from the hydrological environment data set , where the water flow rate and sediment content Perform linear normalization and map the corresponding data values ​​to the interval According to the following method: Weight coefficient: , ,and ; , is the total number of monitoring nodes, For the i The water flow velocity at each monitoring node is is the mean water velocity; For the i The sediment content at each monitoring node is is the mean value of sediment content.

3. The pipe jacking control method based on hydrological digital twin according to claim 1 is characterized in that: After receiving the data collection instruction, collect the hydrological status data and soil layer status data in the lifting area, and obtain the corresponding historical data. After summarizing the acquired data, extract part of the data as sample data; According to the specification data of the jacking pipe, the hydrological data and soil layer data in the lifting area, a lifting plan is formulated for the jacking pipe lifting. The lifting plan includes: lifting path, lifting point, fixing method and lifting steps, and corresponding lifting equipment; The pipe jacking specification data, hydrological and soil layer data in the lifting area are aggregated and constructed to construct a pipe jacking lifting data set; part of the data in the pipe jacking lifting data set is used as sample data, and the sample data is used to train the initial model to obtain a pipe jacking lifting digital twin model; Use the pipe jacking digital twin model to test the lifting scheme, obtain the corresponding test data, and construct the feasibility , if the feasibility of obtaining If the value is lower than the feasibility threshold, the optimized lifting plan is obtained and used as the target lifting plan.

4. The pipe jacking control method based on hydrological digital twin according to claim 3 is characterized in that: Under different environmental conditions, the pipe jacking digital twin model is used to test the target lifting scheme and obtain the corresponding feasibility. , based on feasibility As dependent variables, environmental condition parameters were used as independent variables to conduct multiple linear regression analysis and construct the corresponding linear regression equation; Obtain the regression coefficient corresponding to the environmental condition parameter from the linear regression equation. If the value of the regression coefficient exceeds the expectation, the corresponding environmental condition coefficient is used as a risk factor. Calculate the risk of environmental conditions If the risk When the preset risk threshold is exceeded, several risk plans are collected and formulated for the pipe jacking process, and a corresponding risk plan library is compiled and constructed.

5. The pipe jacking control method based on hydrological digital twin according to claim 4 is characterized in that: Perform correlation analysis between two risk factors and obtain the corresponding correlation coefficient, and use the correlation coefficient to calculate the centrality of each risk factor , as follows: in, For the i The risk factors and j The correlation coefficients among the risk factors is the mean of the correlation coefficient, is the number of risk factors; In obtaining the regression coefficients of each risk factor and centrality Then, the risk of environmental conditions is calculated under dimensionless conditions. , as follows: Weight coefficient: , ,and , For the i The centrality of the risk factor, is the mean of the centrality, For the i The regression coefficients of the risk factors are is the mean of the regression coefficients.

6. The pipe jacking control method based on hydrological digital twin according to claim 1 is characterized in that: A hoisting monitoring network is built in the hoisting area. The hoisting monitoring network collects the data of the pipe jacking process, and the collected process data are summarized to construct a hoisting process data set. The deviation degree is constructed from the hoisting process data set. , where the lifting angle at each lifting node is And lifting height Perform linear normalization and map the corresponding data values ​​to the interval The deviation degree is constructed as follows : Weight coefficient: , ,and ; , is the total number of lifting nodes, For the i The lifting angle on the lifting node, is the corresponding standard reference value; For the i The lifting height on each lifting node, are the corresponding standard reference values.

7. The pipe jacking control method based on hydrological digital twin according to claim 6 is characterized in that: Collect various data during the hoisting process, extract features and obtain several correction features. Take pipe jacking as the target word and build a knowledge graph of pipe jacking decoration in advance. According to the correspondence between the correction features and the correction scheme for pipe jacking lifting, a correction scheme is given for the pipe jacking lifting process by the correction knowledge graph. The correction scheme includes: adjusting the speed, height and angle during the lifting process.

8. The method for controlling pipe jacking installation based on hydrological digital twin according to claim 7 is characterized in that: The correction scheme was tested using the pipe jacking installation digital twin model, and several deviations during installation were constructed based on the test data. , by the degree of deviation Construct the corresponding correction factor , if the correction factor Without exceeding the correction threshold, various parameters of the correction scheme are optimized, and the optimized correction scheme is executed to correct the lifting process; Correction factor The construction is as follows: in, , is the number of tests, For the i The deviation during the test, is the mean of the deviations.

9. The pipe jacking control method based on hydrological digital twin according to claim 1 is characterized in that: When the hoisting process is corrected and the hoisting process is continued, the hydrological data in the hoisting area is collected and the environmental anomaly degree is constructed. , sort the sub-stages before and after the execution of the lifting plan according to the timeline and correspond one to one, and The change in the coefficient of variation ; If the coefficient of variation When the preset change threshold is exceeded, an alarm instruction is issued to the outside; after receiving the alarm instruction, emergency measures are taken, or the risk plan library outputs the corresponding risk plan based on the current risk factors; Coefficient of variation The construction is as follows: in, For the i The median value of the change in each sub-stage, is its mean value, , is the number of sub-stages, and They are respectively before and after the execution of the lifting plan i The degree of environmental abnormality in each sub-stage, and is the corresponding mean.

10. The pipe jacking control system based on hydrological digital twin is characterized by: include: The hydrological status monitoring unit monitors the hydrological status data in the lifting area and constructs a hydrological environment data set, and constructs an environmental anomaly degree from the hydrological environment data set If the environment is abnormal Exceeding expectations, issuing data collection instructions; The model building unit obtains the environmental condition data, pipe jacking and its lifting data in the lifting area, trains and obtains the pipe jacking lifting digital twin model after formulating the lifting plan, uses the pipe jacking lifting digital twin model to test the lifting plan, and constructs the feasibility test data based on the test data. , based on the feasibility of obtaining Verify whether the lifting plan is feasible; The plan construction unit uses multiple linear regression analysis to screen out risk factors from several environmental conditions and calculates the risk level of environmental conditions based on the risk level of risk factors. If the risk If the preset risk threshold is exceeded, the risk plan library will output the corresponding risk plan based on the correspondence between risk factors and risk plans; The test unit installs a monitoring network in the lifting area, collects lifting process data through the monitoring network, and constructs the deviation degree based on the lifting data , if the obtained deviation If the deviation threshold is exceeded, an early warning signal will be sent to the outside world; The correction unit, after receiving the early warning signal, uses the knowledge graph of pipe jacking lifting correction to provide a correction plan for the pipe jacking lifting process, uses the pipe jacking lifting digital twin model to test the correction plan, judges whether the correction plan is feasible based on the test data, and constructs the variation coefficient based on the hydrological data during the pipe jacking lifting process. , if the coefficient of variation If it exceeds expectations, an alarm command will be issued to the outside.