Through a fault monitoring system based on dry transformer vibration, vibration and humidity sensors are used to analyze fault risks, solving the problem of post-dry transformer failure problems, achieving better fault response and circuit safety and stability.

CN118364399BActive Publication Date: 2024-11-26WUXI ENOW ELECTRIC POWER EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410454435.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-16
Publication Date
2024-11-26
Estimated Expiration
2044-04-16

AI Technical Summary

Technical Problem

Faults in dry transformers are often delayed during operation, resulting in untimely maintenance and affecting the normal operation of the circuit.

Method used

A fault monitoring system based on dry transformer vibration is designed, and the vibration is converted into Krani graphics through the imaging module, combined with a humidity sensor to monitor the environmental humidity, analyze the operating status visual parameters, determine the fault risk in real time and issue early warnings.

Benefits of technology

Realize instant detection and early warning of dry transformer faults, improve the fault response speed, and ensure the safe and stable circuit operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118364399B_ABST
    Figure CN118364399B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of dry-type transformers, and in particular to a fault monitoring system based on the vibration of dry-type transformers, comprising: a control terminal, which is a main control terminal of a system and is used to issue an execution command; a collection module, which is used to collect visual parameters of the operating state of the dry-type transformer; a monitoring module, which is used to monitor the relative humidity of the environment in which the dry-type transformer is located in real time; an analysis module, which is used to receive the visual parameters of the operating state of the dry-type transformer collected in the collection module, and analyze the operating fault risk of the dry-type transformer based on the visual parameters of the operating state of the dry-type transformer; the present invention converts the vibration generated in the operating state of the dry-type transformer into a Chladni figure, and analyzes the operating state of the dry-type transformer based on the change analysis of the Chladni figure, thereby realizing the operating fault detection of the dry-type transformer, and compared with the existing dry-type transformer fault monitoring means, the present invention has better immediacy and predictability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of dry-type transformers, and in particular to a fault monitoring system based on vibration of dry-type transformers. Background Art

[0002] Dry-type transformer is an important power equipment, mainly used for voltage conversion, power transmission and distribution in power systems.

[0003] The main difference between dry-type transformers and oil-immersed transformers is the different cooling methods. Dry-type transformers rely on air convection for cooling, while oil-immersed transformers rely on transformer oil for cooling. In addition, the insulation media of the two are also different. Dry-type transformers use insulating materials such as epoxy resin for winding insulation, while oil-immersed transformers use transformer oil for winding insulation.

[0004] Compared with oil-immersed transformers, dry-type transformers have the advantages of small size, light weight and simple maintenance.

[0005] However, the current dry-type transformers often produce faults during daily operation. In the initial stage of the fault, the staff often cannot detect it in time, which leads to untimely maintenance measures to deal with the fault problem, so that the fault problem is further aggravated and affects the normal operation of the circuit where the transformer is located. Summary of the invention

[0006] In view of the above-mentioned shortcomings of the prior art, the present invention provides a fault monitoring system based on dry-type transformer vibration, which solves the technical problems raised in the above-mentioned background technology.

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0008] A fault monitoring system based on vibration of dry-type transformer, comprising:

[0009] The control terminal is the main control end of the system and is used to issue execution commands; the acquisition module is used to collect the visual parameters of the dry-type transformer operating status; the monitoring module is used to monitor the relative humidity of the environment in which the dry-type transformer is located in real time; the analysis module is used to receive the visual parameters of the dry-type transformer operating status collected in the acquisition module, and analyze the dry-type transformer operating failure risk based on the visual parameters of the dry-type transformer operating status; the judgment module is used to receive the dry-type transformer operating failure risk analysis results in the analysis module, set the safety judgment threshold and compare it with the dry-type transformer operating failure risk analysis results, and judge whether the dry-type transformer has a failure risk; the interaction module is used to identify the judgment result of the judgment module, and when the judgment result is yes, feedback the judgment result and the judgment result-related data content to the control terminal;

[0010] The dry-type transformer operation failure risk analysis logic is expressed as:

[0011]

[0012] Where: DIFF(a,b) is the difference between the dry-type transformer operating state visualization parameter a and the dry-type transformer operating state visualization parameter b; s is the gray value; is the intensity mean of the visualization parameters of the dry-type transformer operation status; p s is the probability of gray level s in the dry-type transformer operating status visualization parameters; m is the set of regions in the dry-type transformer operating status visualization parameters; a n is the pixel mean value of the nth area in the dry-type transformer operating status visualization parameter a; b n is the pixel mean value of the nth region in the dry-type transformer operating status visualization parameter b;

[0013] in, The variance weighted information entropy of the dry-type transformer operating status visualization parameter a is represented by: The variance weighted information entropy of the dry-type transformer operating status visualization parameter b is represented. a and b used in the dry-type transformer operating failure risk analysis logic are from the imaging module of the lower submodule of the same acquisition module, and a and b are two sets of dry-type transformer operating status visualization parameters collected. The larger the DIFF(a, b), the greater the risk of dry-type transformer operating failure. Conversely, the smaller the DIFF(a, b), the smaller the risk of dry-type transformer operating failure.

[0014] Furthermore, the acquisition module is provided with submodules at the lower level, including:

[0015] An imaging module is used to sense the operating vibration of the dry-type transformer and convert the operating vibration of the dry-type transformer into a Chladni figure;

[0016] A storage unit, used for receiving the visualization parameters of the operating status of the dry-type transformer collected by the collection module, and storing the visualization parameters of the operating status of the dry-type transformer;

[0017] Among them, the imaging module is composed of a metal box and sand, the metal box is fixedly connected to the surface of the dry-type transformer, the sand is placed inside the metal box, the imaging module is provided with no less than three groups, and no less than three groups of the imaging modules are equidistantly deployed on the surface of the dry-type transformer, the acquisition module is integrated with a high-definition camera, and the acquisition module operates to collect the visualization parameters of the operating status of the dry-type transformer, that is, the Chladni figures generated by the sand in the metal box of the imaging module based on the vibration conduction of the dry-type transformer during operation. When the storage module stores the visualization parameters of the operating status of the dry-type transformer, the parameter acquisition timestamp is synchronously applied to mark the parameters.

[0018] Furthermore, the monitoring module is integrated by a plurality of groups of humidity sensors, which are distributed around the dry-type transformer in a surrounding shape, and the straight-line distance between each group of humidity sensors and the dry-type transformer is no more than three meters;

[0019] The relative humidity of the environment in which the dry-type transformer is located monitored by the monitoring module is synchronously configured with a monitoring timestamp. The relative humidity of the environment in which the dry-type transformer is located monitored by the monitoring module with a timestamp is synchronously transmitted to the storage unit. After the storage unit receives the relative humidity of the environment in which the dry-type transformer is located with a timestamp, the timestamp marked based on the dry-type transformer operating status visualization parameter is synchronized, and the relative humidity of the environment in which the dry-type transformer is located with the same timestamp is performed, so that the relative humidity of the environment in which the dry-type transformer is located and marked with the same timestamp is bound to the dry-type transformer operating status visualization parameter;

[0020] Among them, when the relative humidity of the environment in which the dry-type transformer is located is bound to the visualization parameters of the dry-type transformer operating status, the relative humidity of the environment in which the dry-type transformer is located corresponds to the source humidity sensor, and the visualization parameters of the dry-type transformer operating status correspond to the source high-definition camera. The humidity sensor and the high-definition camera are the closest to each other. Among the relative humidity of the environment in which the dry-type transformer is located with a timestamp received by the storage unit, if it is not bound to the visualization parameters of the dry-type transformer operating status, the deletion process is executed.

[0021] Furthermore, when analyzing the dry-type transformer operation failure risk, the dry-type transformer operation failure risk analysis logic is applied to calculate each group of two consecutive dry-type transformer operation status visualization parameters from the same imaging module, and further sum and average the DIFF (a, b) corresponding to the same parameter marking timestamp in each group of calculation results, and the above setting is recorded as logic 1;

[0022] The analysis module is provided with submodules at the lower level, including:

[0023] A calling module is used to call the visual parameters of the dry-type transformer operating status stored in the storage unit and feed them back to the segmentation unit;

[0024] A segmentation unit is used to receive the dry-type transformer operating status visualization parameters fed back by the calling unit, and perform segmentation processing on each group of dry-type transformer operating status visualization parameters;

[0025] Among them, when the segmentation unit segments the visualization parameters of the operating status of the dry-type transformer, the segmentation size is 2×2~99×99 groups. The more precise the requirement for the monitoring of the operating fault risk of the dry-type transformer is, the smaller the segmentation size is. Conversely, the larger the segmentation size is, the segmentation unit segments the visualization parameters of the operating status of the dry-type transformer. The initial default segmentation is 3×3 groups. The visualization parameters of the operating status of each sub-dry-type transformer obtained by segmentation are summed and averaged after logical processing based on the dry-type transformer operating fault risk analysis, and then further processed based on logic 1.

[0026] Furthermore, the analysis module is internally provided with submodules, including:

[0027] A calibration unit, used for receiving the summing and averaging results of each group obtained based on logic 1 in the analysis module, and calibrating each group of results;

[0028] The sum and average results of each group obtained based on logic 1 in the analysis module are recorded as DIFF(a,b)′.

[0029] Furthermore, the calibration logic of the calibration unit on the result is expressed as:

[0030]

[0031] Where: DIFF stat is the calibration result; DIFF(a,b)′ is the result of summing and averaging; RH corr DIFF(a,b)′ v The humidity value detected by the monitoring module at the corresponding timestamp; RH 0 is the standard humidity value;

[0032] Among them, the standard humidity value RH 0 , set manually by the system user, standard humidity value RH 0 The initial setting is 40% RH, RH corr Select the humidity value with the highest humidity among all the humidity sensors, RH corr >RH 0 When the “±” in the formula is changed to “+”, RH corr ≤RH 0 When “±” is changed to “-”.

[0033] Furthermore, during the operation phase of the determination module, the dry-type transformer operation fault risk analysis result is continuously received, and the dry-type transformer operation fault risk analysis result is continuously compared based on the safety determination threshold. When the dry-type transformer operation fault risk analysis result is within the safety determination threshold, the operation state of the dry-type transformer is determined to be safe. Otherwise, it is determined that there is a fault risk in the operation of the dry-type transformer.

[0034] The determination module is provided with submodules at the lower level, including:

[0035] An early warning unit is used to obtain the dry-type transformer operation failure risk analysis results continuously received in the determination module, and predict whether the dry-type transformer has a failure risk based on the change trend of the dry-type transformer operation failure risk analysis results;

[0036] Among them, after the early warning unit obtains the dry-type transformer operation fault analysis results, it identifies the corresponding timestamps of each group of results, and sorts the results based on the corresponding timestamps of each group of results. When the sorted dry-type transformer operation fault analysis results show an upward trend, the early warning unit predicts that the dry-type transformer has a fault risk, otherwise, there is no fault risk.

[0037] Furthermore, the early warning unit operates in real time to monitor the determination result of the determination module, and when the determination result of the determination module is that the operation state of the dry-type transformer is safe, the early warning unit is triggered to operate.

[0038] Furthermore, when the determination result of the determination module is negative, the interactive module refreshes the system operation. During the operation phase of the interactive module, the prediction result of the early warning unit is synchronously identified. When the prediction result is positive, the prediction result and the data content associated with the prediction result are fed back to the control terminal. When the prediction result of the early warning unit is negative, the system operation is refreshed.

[0039] Among them, the judgment result associated data content and the prediction result associated data content in the interactive module are DIFF output during the operation of the calibration unit. stat , the system end user reads the associated data content in the control terminal.

[0040] Furthermore, the control terminal is interactively connected to a collection module via a wireless network, the collection module is interactively connected to a storage unit via a wireless network, the collection module is interactively connected to a monitoring module and an analysis module via a wireless network, the analysis module is interactively connected to a retrieval unit and a segmentation unit via a wireless network, the monitoring module and the analysis module are interactively connected to the storage unit via a wireless network, the analysis module is interactively connected to a calibration unit via a wireless network, the analysis module is interactively connected to a determination module and an interaction module via a wireless network, and the determination module and the interaction module are interactively connected to an early warning unit via a wireless network.

[0041] Compared with the known public technology, the technical solution provided by the present invention has the following beneficial effects:

[0042] The present invention provides a fault monitoring system based on the vibration of a dry-type transformer. During operation, the system converts the vibration generated in the operation state of the dry-type transformer into a Chladni figure, and analyzes the operation state of the dry-type transformer based on the change analysis of the Chladni figure, thereby realizing operation fault detection of the dry-type transformer. Compared with the existing dry-type transformer fault monitoring means, the system has better immediacy and predictability, brings reliable safety fault monitoring for the dry-type transformer, effectively maintains the safe and stable operation of the circuit where the dry-type transformer is located, and ensures that when a fault occurs in the dry-type transformer, the staff can detect the fault based on the system, thereby reducing the severity of the fault of the dry-type transformer. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0044] Figure 1 It is a structural schematic diagram of a fault monitoring system based on dry-type transformer vibration;

[0045] Figure 2 This is an example diagram showing the appearance of a dry-type transformer in the present invention;

[0046] Figure 3 A schematic diagram showing the connection status of the imaging module and the dry-type transformer in the present invention;

[0047] Figure 4 It is a schematic cross-sectional view of the metal box in the present invention;

[0048] The numbers in the figure represent: 1. Dry-type transformer; 2. Metal box. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] The present invention will be further described below in conjunction with the embodiments.

[0051] Embodiment 1:

[0052] A fault monitoring system based on dry-type transformer vibration in this embodiment, such as Figure 1 As shown, including:

[0053] Control terminal 1 is the main control terminal of the system and is used to issue execution commands;

[0054] Collection module 2, used to collect visual parameters of dry-type transformer operation status;

[0055] An imaging module 21 is used to sense the operating vibration of the dry-type transformer and convert the operating vibration of the dry-type transformer into a Chladni figure;

[0056] The storage unit 22 is used to receive the visualization parameters of the operating status of the dry-type transformer collected by the collection module 2, and store the visualization parameters of the operating status of the dry-type transformer;

[0057] Monitoring module 3, used for real-time monitoring of the relative humidity of the environment in which the dry-type transformer is located;

[0058] The analysis module 4 is used to receive the visualization parameters of the operation status of the dry-type transformer collected in the collection module 2, and analyze the operation failure risk of the dry-type transformer based on the visualization parameters of the operation status of the dry-type transformer;

[0059] The retrieval module 41 is used to retrieve the dry-type transformer operating status visualization parameters stored in the storage unit 21 and feed back to the segmentation unit 42;

[0060] The segmentation unit 42 is used to receive the dry-type transformer operating state visualization parameters fed back by the retrieval unit 41, and perform segmentation processing on each group of dry-type transformer operating state visualization parameters;

[0061] The calibration unit 43 is used to receive the summing and averaging results of each group obtained by the analysis module 4 based on logic 1, and calibrate each group of results;

[0062] The sum and average results of each group obtained in the analysis module 4 based on logic 1 are recorded as DIFF(a,b)′;

[0063] The logic of dry-type transformer operation failure risk analysis is expressed as:

[0064]

[0065] Where: DIFF(a,b) is the difference between the dry-type transformer operating state visualization parameter a and the dry-type transformer operating state visualization parameter b; s is the gray value; is the intensity mean of the visualization parameters of the dry-type transformer operation status; p s is the probability of gray level s in the dry-type transformer operating status visualization parameters; m is the set of regions in the dry-type transformer operating status visualization parameters; a nis the pixel mean value of the nth area in the dry-type transformer operating status visualization parameter a; b n is the pixel mean value of the nth region in the dry-type transformer operating status visualization parameter b;

[0066] in, The variance weighted information entropy of the dry-type transformer operating status visualization parameter a is represented by: The variance weighted information entropy of the dry-type transformer operating state visualization parameter b is represented. The a and b used in the dry-type transformer operating fault risk analysis logic are from the imaging module 21, a lower submodule of the same acquisition module 2, and a and b are two sets of dry-type transformer operating state visualization parameters collected. The larger the DIFF (a, b), the greater the dry-type transformer operating fault risk. Conversely, the smaller the DIFF (a, b), the smaller the dry-type transformer operating fault risk.

[0067] The determination module 5 is used to receive the dry-type transformer operation failure risk analysis result in the analysis module 4, set a safety determination threshold value and compare it with the dry-type transformer operation failure risk analysis result to determine whether the dry-type transformer has a failure risk;

[0068] The early warning unit 51 is used to obtain the dry-type transformer operation failure risk analysis results continuously received in the determination module 5, and predict whether the dry-type transformer has a failure risk based on the change trend of the dry-type transformer operation failure risk analysis results;

[0069] The interaction module 6 is used to identify the determination result of the determination module 5, and when the determination result is yes, feed back the determination result and the data content associated with the determination result to the control terminal 1;

[0070] The control terminal 1 is interactively connected to the acquisition module 2 through a wireless network, the acquisition module 2 is interactively connected to the storage unit 22 through a wireless network, the acquisition module 2 is interactively connected to the monitoring module 3 and the analysis module 4 through a wireless network, the analysis module 4 is interactively connected to the retrieval unit 41 and the segmentation unit 42 through a wireless network, the monitoring module 3 and the analysis module 4 are interactively connected to the storage unit 22 through a wireless network, the analysis module 4 is interactively connected to the calibration unit 43 through a wireless network, the analysis module 4 is interactively connected to the determination module 5 and the interaction module 6 through a wireless network, and the determination module 5 and the interaction module 6 are interactively connected to the early warning unit 51 through a wireless network.

[0071] In this embodiment, the control terminal 1 controls the acquisition module 2 to run and collect the visualization parameters of the operating status of the dry-type transformer, the imaging module 21 senses the operating vibration of the dry-type transformer in real time, and converts the operating vibration of the dry-type transformer into a Chladni figure, the storage unit 22 synchronously receives the visualization parameters of the operating status of the dry-type transformer collected by the acquisition module 2, and stores the visualization parameters of the operating status of the dry-type transformer, the monitoring module 3 is post-operated to monitor the relative humidity of the environment in which the dry-type transformer is located in real time, the analysis module 4 further receives the visualization parameters of the operating status of the dry-type transformer collected in the acquisition module 2, and analyzes the risk of operating failure of the dry-type transformer based on the visualization parameters of the operating status of the dry-type transformer, the retrieval module 41 retrieves the visualization parameters of the operating status of the dry-type transformer stored in the storage unit 21 in real time, and feeds back to the segmentation unit 42, and the segmentation unit 42 synchronously receives the dry state feedback from the retrieval unit 41. The visualization parameters of the operating status of the dry-type transformer are segmented and processed for each group of visualization parameters of the operating status of the dry-type transformer, and the calibration unit 43 receives the sum and average results of each group obtained based on logic 1 in the analysis module 4, and calibrates each group of results. Finally, the judgment module 5 runs to receive the dry-type transformer operation fault risk analysis result in the analysis module 4, sets the safety judgment threshold and compares it with the dry-type transformer operation fault risk analysis result, and determines whether the dry-type transformer has a fault risk. The early warning unit 51 obtains the dry-type transformer operation fault risk analysis results continuously received in the judgment module 5 in real time, and predicts whether the dry-type transformer has a fault risk based on the change trend of the dry-type transformer operation fault risk analysis result. The interactive module 6 runs to identify the judgment result of the judgment module 5. When the judgment result is yes, the judgment result and the data content associated with the judgment result are fed back to the control terminal 1;

[0072] Through the operation of the above system, a condition of operating vibration visualization is brought to the dry-type transformer, and then the operating faults of the dry-type transformer are monitored with the vibration visualization results, providing safety guarantee for the operation of the dry-type transformer;

[0073] See also Figures 2-3 As shown, based on Figure 2 The content shown further shows the connection status between the dry-type transformer and the metal box 2 in the induction module 21. Figure 3 The content shown further shows the sand prevented inside the metal box 2 (not marked in the figure), and based on the arrow indication, it further shows the direction in which the acquisition module collects the visual parameters of the operating status of the dry-type transformer (that is, the operating vibration of the dry-type transformer is transmitted to the metal box 2, causing the Chladni figure generated by the running of the sand in the metal box 2).

[0074] Embodiment 2:

[0075] In terms of specific implementation, based on Example 1, this example refers to Figure 1A fault monitoring system based on dry-type transformer vibration in Example 1 is further described in detail:

[0076] The imaging module 21 is composed of a metal box and sand. The metal box is fixedly connected to the surface of the dry-type transformer, and the sand is placed inside the metal box. There are no less than three groups of imaging modules 21, and no less than three groups of imaging modules 21 are equidistantly deployed on the surface of the dry-type transformer. The acquisition module 2 is integrated with a high-definition camera. The acquisition module 2 operates to collect visualization parameters of the operating status of the dry-type transformer, that is, the Chladni figures generated by the sand in the metal box of the imaging module 21 based on the vibration conduction of the dry-type transformer during operation. When the storage module 22 stores the visualization parameters of the operating status of the dry-type transformer, it synchronously applies the parameter acquisition timestamp to mark the parameters.

[0077] Through the above settings, the composition of the imaging module 21 is further limited, ensuring that the acquisition module 2 in the system operates stably to collect the visual parameters of the operating status of the dry-type transformer.

[0078] like Figure 1 As shown, the monitoring module 3 is integrated by a plurality of groups of humidity sensors, and the plurality of groups of humidity sensors are distributed around the dry-type transformer in a surrounding shape, and the straight-line distance between each group of humidity sensors and the dry-type transformer is no more than three meters;

[0079] The relative humidity of the environment in which the dry-type transformer is located monitored by the monitoring module 3 is synchronously configured with a monitoring timestamp. The relative humidity of the environment in which the dry-type transformer is located with a timestamp monitored by the monitoring module 3 is synchronously transmitted to the storage unit 22. After the storage unit 22 receives the relative humidity of the environment in which the dry-type transformer is located with a timestamp, it synchronizes the timestamp based on the dry-type transformer operating status visualization parameter mark, and performs the relative humidity of the environment in which the dry-type transformer is located with the same timestamp, so that the relative humidity of the environment in which the dry-type transformer is located and marked with the same timestamp is bound to the dry-type transformer operating status visualization parameter;

[0080] Among them, when the relative humidity of the environment in which the dry-type transformer is located is bound to the visualization parameters of the operating status of the dry-type transformer, the relative humidity of the environment in which the dry-type transformer is located corresponds to the source humidity sensor, and the visualization parameters of the operating status of the dry-type transformer correspond to the source high-definition camera. The humidity sensor and the high-definition camera are the closest to each other. The relative humidity of the environment in which the dry-type transformer is located with a timestamp received by the storage unit 22 is not bound to the visualization parameters of the operating status of the dry-type transformer, and a deletion process is performed.

[0081] Through the above settings, the operation logic of the monitoring module 3 is further limited, and based on the operation data of the monitoring module 3, necessary operation data support is provided for the further operation of the system.

[0082] like Figure 1As shown, when analyzing the dry-type transformer operation failure risk, the dry-type transformer operation failure risk analysis logic is applied to calculate each group of two consecutive dry-type transformer operation status visualization parameters from the same imaging module 21, and further sum the DIFF (a, b) corresponding to the same parameter marking timestamp in each group of calculation results, and then calculate the average, and the above setting is recorded as logic 1;

[0083] When the segmentation unit 42 segments the visualization parameters of the operating status of the dry-type transformer, the segmentation size is 2×2~99×99 groups. The more precise the requirement for monitoring the operating fault risk of the dry-type transformer is, the smaller the segmentation size is. Conversely, the larger the segmentation size is, the segmentation unit 42 segments the visualization parameters of the operating status of the dry-type transformer. The initial default segmentation is 3×3 groups. The visualization parameters of the operating status of each sub-dry-type transformer obtained by segmentation are summed and averaged after logical processing based on the dry-type transformer operating fault risk analysis, and then further processed based on logic 1.

[0084] In this embodiment, the operation logic of the analysis module 4 and the segmentation unit 42 is further limited to ensure that the analysis module 4 operates stably and accurately analyzes the operational failure risks of the dry-type transformer.

[0085] Embodiment three:

[0086] In terms of specific implementation, based on Example 1, this example refers to Figure 1 A fault monitoring system based on dry-type transformer vibration in Example 1 is further described in detail:

[0087] The calibration logic of the calibration unit 43 for the result is expressed as:

[0088]

[0089] Where: DIFF stat is the calibration result; DIFF(a,b)′ is the result of summing and averaging; RH corr DIFF(a,b)′ v The humidity value detected by monitoring module 3 at the corresponding timestamp; RH 0 is the standard humidity value;

[0090] Among them, the standard humidity value RH 0 , set manually by the system user, standard humidity value RH 0 The initial setting is 40% RH, RH corr Select the humidity value with the highest humidity among all the humidity sensors, RH corr >RH 0 When the “±” in the formula is changed to “+”, RH corr ≤RH 0When “±” is changed to “-”.

[0091] Through the above settings, the sum and average results of the dry-type transformer operation fault risk analysis results are further corrected, making the system operation output results more accurate and reliable, and making accurate decisions on dry-type transformer fault monitoring.

[0092] like Figure 1 As shown, during the operation phase of the determination module 5, the dry-type transformer operation fault risk analysis result is continuously received, and the dry-type transformer operation fault risk analysis result is continuously compared based on the safety determination threshold. When the dry-type transformer operation fault risk analysis result is within the safety determination threshold, the dry-type transformer operation state is determined to be safe, otherwise, it is determined that there is a fault risk in the operation of the dry-type transformer;

[0093] After the early warning unit 51 obtains the dry-type transformer operation fault analysis results, it identifies the timestamps corresponding to each group of results, and sorts the results based on the timestamps corresponding to each group of results. When the sorted dry-type transformer operation fault analysis results show an upward trend, the early warning unit 51 predicts that the dry-type transformer has a fault risk, otherwise, there is no fault risk;

[0094] The early warning unit 51 runs in real time to monitor the determination result of the determination module 5. When the determination result of the determination module 5 is that the operation state of the dry-type transformer is safe, the early warning unit 51 is triggered to run.

[0095] Through the above settings, the operation logic between the determination module 5, the early warning unit 51 and the interaction module 6 is further limited to ensure that the interaction module 6 stably operates to identify the determination result of the determination module 5 and completes the feedback of the determination result and the feedback of the determination result related data.

[0096] like Figure 1 As shown, when the determination result of the determination module 5 is negative, the interactive module 6 refreshes the system operation. During the operation phase of the interactive module 6, the prediction result of the early warning unit 51 is synchronously identified. When the prediction result is positive, the prediction result and the data content associated with the prediction result are fed back to the control terminal 1. When the prediction result of the early warning unit 51 is negative, the system operation is refreshed.

[0097] The data content associated with the determination result and the data content associated with the prediction result in the interactive module 6 are both DIFF output during the operation of the calibration unit 43. stat , the system end user reads the associated data content in the control terminal 1.

[0098] Through the above settings, the key data content fed back by the interactive module 6 is further limited, and the system operation logic is further provided to make the system operation form a closed loop, and finally realize the real-time monitoring of the dry-type transformer.

[0099] In summary, during the operation of the system in the above embodiment, the vibration generated by the dry-type transformer in the operating state is converted into a Chladni pattern, and the operating state of the dry-type transformer is analyzed based on the change analysis of the Chladni pattern, thereby realizing the operation fault detection of the dry-type transformer. Compared with the existing dry-type transformer fault monitoring means, it has better immediacy and predictability, brings reliable safety fault monitoring for the dry-type transformer, effectively maintains the safe and stable operation of the circuit where the dry-type transformer is located, and ensures that when a dry-type transformer fails, the staff can detect the fault problem based on the system, thereby reducing the severity of the dry-type transformer fault problem.

[0100] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A fault monitoring system based on dry-type transformer vibration, It is characterized in that include: The control terminal (1) is the main control terminal of the system and is used to issue execution commands; A collection module (2), used for collecting visual parameters of the dry-type transformer operating status; A monitoring module (3), used for real-time monitoring of the relative humidity of the environment in which the dry-type transformer is located; An analysis module (4) is used to receive the visualization parameters of the dry-type transformer operating status collected by the collection module (2), and analyze the risk of dry-type transformer operating failure based on the visualization parameters of the dry-type transformer operating status; The dry-type transformer operation failure risk analysis logic is expressed as: Where: DIFF(a,b) is the difference between the dry-type transformer operating state visualization parameter a and the dry-type transformer operating state visualization parameter b; s is the gray value; is the intensity mean of the dry-type transformer operating status visualization parameter; ps is the probability of gray level s in the dry-type transformer operating status visualization parameter; m is the set of regions in the dry-type transformer operating status visualization parameter; an is the pixel mean of the nth region in the dry-type transformer operating status visualization parameter a; bn is the pixel mean of the nth region in the dry-type transformer operating status visualization parameter b; in, The variance weighted information entropy of the dry-type transformer operating status visualization parameter a is represented by: The variance weighted information entropy of the dry-type transformer operating state visualization parameter b is represented, and a and b used in the dry-type transformer operating fault risk analysis logic are from the imaging module (21) of the lower submodule of the same acquisition module (2), and a and b are two sets of dry-type transformer operating state visualization parameters collected. The larger the DIFF (a, b), the greater the dry-type transformer operating fault risk. Conversely, the smaller the DIFF (a, b), the smaller the dry-type transformer operating fault risk. A determination module (5) is used to receive the dry-type transformer operation failure risk analysis result in the analysis module (4), set a safety determination threshold value and compare it with the dry-type transformer operation failure risk analysis result to determine whether the dry-type transformer has a failure risk; The interaction module (6) is used to identify the determination result of the determination module (5), and when the determination result is yes, feed back the determination result and the data content associated with the determination result to the control terminal (1); The acquisition module (2) is provided with submodules at the lower level, including: An imaging module (21) is used to sense the operating vibration of the dry-type transformer and convert the operating vibration of the dry-type transformer into a Chladni figure; A storage unit (22) is used to receive the dry-type transformer operating status visualization parameters collected by the collection module (2) and store the dry-type transformer operating status visualization parameters; The imaging module (21) is composed of a metal box and sand particles, the metal box is fixedly connected to the surface of the dry-type transformer, the sand particles are placed inside the metal box, the imaging module (21) is provided with at least three groups, and at least three groups of the imaging modules (21) are equidistantly deployed on the surface of the dry-type transformer, the acquisition module (2) is integrated with a high-definition camera, the acquisition module (2) operates to collect visual parameters of the operating state of the dry-type transformer, that is, the Chladni figure generated by the sand particles in the metal box of the imaging module (21) based on the vibration transmission of the dry-type transformer during operation, and the storage module (22) synchronously applies the parameter acquisition timestamp to mark the parameters when storing the visual parameters of the operating state of the dry-type transformer; The monitoring module (3) is integrated by a plurality of groups of humidity sensors, which are distributed around the dry-type transformer in a surrounding shape, and the straight-line distance between each group of humidity sensors and the dry-type transformer is no more than three meters; The relative humidity of the environment in which the dry-type transformer is located monitored by the monitoring module (3) is synchronously configured with a monitoring timestamp. The relative humidity of the environment in which the dry-type transformer is located monitored by the monitoring module (3) with the timestamp is synchronously transmitted to the storage unit (22). After receiving the relative humidity of the environment in which the dry-type transformer is located with the timestamp, the storage unit (22) synchronizes the timestamp based on the dry-type transformer operating state visualization parameter mark, and performs the relative humidity of the environment in which the dry-type transformer is located with the same timestamp, so that the relative humidity of the environment in which the dry-type transformer is located and marked with the same timestamp is bound to the dry-type transformer operating state visualization parameter; When the relative humidity of the environment in which the dry-type transformer is located is bound to the visualization parameters of the operating status of the dry-type transformer, the relative humidity of the environment in which the dry-type transformer is located corresponds to the humidity sensor, and the visualization parameters of the operating status of the dry-type transformer are bound to the high-definition camera. The humidity sensor and the high-definition camera are the closest to each other. The relative humidity of the environment in which the dry-type transformer is located with a timestamp received by the storage unit (22) is not bound to the visualization parameters of the operating status of the dry-type transformer, and a deletion process is performed.

2. A fault monitoring system based on dry-type transformer vibration according to claim 1, It is characterized in that When analyzing the dry-type transformer operation failure risk, the dry-type transformer operation failure risk analysis logic is applied to calculate each group of two consecutive dry-type transformer operation status visualization parameters from the same imaging module (21), and further summing the DIFF (a, b) corresponding to the same parameter marking timestamp in each group of calculation results, and then averaging, and the above setting is recorded as logic 1; The analysis module (4) is provided with submodules at the lower level, including: A retrieval module (41) is used to retrieve the visual parameters of the dry-type transformer operating status stored in the storage unit (21) and feed back to the segmentation unit (42); A segmentation unit (42) is used to receive the dry-type transformer operating status visualization parameters fed back by the retrieval unit (41) and perform segmentation processing on each group of dry-type transformer operating status visualization parameters; When the segmentation unit (42) segments the visualization parameters of the operating status of the dry-type transformer, the segmentation size is 2×2 to 99×99 groups. The more precise the monitoring requirements for the operating fault risk of the dry-type transformer are, the smaller the segmentation size is. Conversely, the larger the segmentation size is, the segmentation unit (42) segments the visualization parameters of the operating status of the dry-type transformer. The initial default segmentation is 3×3 groups. The visualization parameters of the operating status of each sub-dry-type transformer obtained by segmentation are summed and averaged after being processed based on the logic of the dry-type transformer operating fault risk analysis, and then further processed based on logic 1.

3. A fault monitoring system based on dry-type transformer vibration according to claim 2, It is characterized in that The analysis module (4) is internally provided with submodules, including: A calibration unit (43) is used to receive the summation and averaging results of each group obtained based on logic 1 in the analysis module (4) and calibrate each group of results; The sum and average results of each group obtained based on logic 1 in the analysis module (4) are recorded as DIFF(a,b)′.

4. A fault monitoring system based on dry-type transformer vibration according to claim 3, It is characterized in that The calibration logic of the calibration unit (43) for the result is expressed as: Where: DIFFstat is the calibration result; DIFF(a,b)′ is the result of summing and averaging; RH corr DIFF(a,b)′ v The humidity value detected by the monitoring module (3) at the corresponding timestamp; RH 0 is the standard humidity value; Among them, the standard humidity value RH 0 , set manually by the system user, standard humidity value RH 0 The initial setting is 40% RH, RH corr Select the humidity value with the highest humidity among all the humidity sensors, RH corr >RH 0 When "±" is changed to "+", RH corr ≤RH 0 When the "±" in the formula is changed to "-".

5. A fault monitoring system based on dry-type transformer vibration according to claim 4, It is characterized in that During the operation phase of the determination module (5), the dry-type transformer operation fault risk analysis result is continuously received, and the dry-type transformer operation fault risk analysis result is continuously compared with the dry-type transformer operation fault risk analysis result based on the safety determination threshold value. When the dry-type transformer operation fault risk analysis result is within the safety determination threshold value, it is determined that the dry-type transformer operation state is safe; otherwise, it is determined that there is a fault risk in the operation of the dry-type transformer; The determination module (5) is provided with submodules at a lower level, including: An early warning unit (51) is used to obtain the dry-type transformer operation failure risk analysis results continuously received in the determination module (5), and predict whether the dry-type transformer has a failure risk based on a change trend of the dry-type transformer operation failure risk analysis results; After the early warning unit (51) obtains the dry-type transformer operation fault analysis results, it identifies the timestamps corresponding to each group of results, and sorts the results based on the timestamps corresponding to each group of results. When the sorted dry-type transformer operation fault analysis results show an upward trend, the early warning unit (51) predicts that the dry-type transformer has a fault risk, otherwise, there is no fault risk.

6. A fault monitoring system based on dry-type transformer vibration according to claim 5, It is characterized in that The early warning unit (51) operates in real time to monitor the determination result of the determination module (5), and when the determination result of the determination module (5) is that the operation state of the dry-type transformer is safe, the early warning unit (51) is triggered to operate.

7. A fault monitoring system based on dry-type transformer vibration according to claim 6, It is characterized in that When the determination result of the determination module (5) is negative, the interaction module (6) refreshes the system operation. During the operation phase of the interaction module (6), the prediction result of the early warning unit (51) is synchronously identified. When the prediction result is positive, the prediction result and the data content associated with the prediction result are fed back to the control terminal (1). When the prediction result of the early warning unit (51) is negative, the system operation is refreshed. The determination result associated data content and the prediction result associated data content in the interactive module (6) are both DIFFstat output during the operation of the calibration unit (43), and the system end user reads the associated data content in the control terminal (1).

8. A fault monitoring system based on dry-type transformer vibration according to claim 7, It is characterized in that The control terminal (1) is interactively connected to a collection module (2) via a wireless network; the collection module (2) is interactively connected to a storage unit (22) via a wireless network; the collection module (2) is interactively connected to a monitoring module (3) and an analysis module (4) via a wireless network; the analysis module (4) is interactively connected to a retrieval unit (41) and a segmentation unit (42) via a wireless network; the monitoring module (3) and the analysis module (4) are interactively connected to the storage unit (22) via a wireless network; the analysis module (4) is interactively connected to a calibration unit (43) via a wireless network; the analysis module (4) is interactively connected to a determination module (5) and an interaction module (6) via a wireless network; the determination module (5) and the interaction module (6) are interactively connected to an early warning unit (51) via a wireless network.