A method for settlement review and financial accounting management of power engineering

By analyzing the characteristic data of power engineering projects, selecting appropriate review methods, and using neural networks to evaluate the importance of the project and optimize the review process, the problems of insufficient review and high cost in the existing technology are solved, and a more efficient and accurate review is achieved. Power project settlement review and financial accounting management.

CN118379028BActive Publication Date: 2024-10-01ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410810603.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-10-01
Estimated Expiration
2044-06-21

AI Technical Summary

Technical Problem

The existing power project settlement review methods lack comprehensiveness, which may result in missing key information or insufficient review. Moreover, the structure or characteristics of different review contents are greatly different, resulting in unreasonable review methods, high costs, and time-consuming and labor-intensive review.

Method used

By obtaining the project data to be reviewed for power engineering projects, the best review method is selected based on the project characteristics data (cost coefficient, risk impact coefficient, project scale coefficient, project complexity coefficient), and the neural network is used to establish project importance assessment data and generate Importance coefficient, establish review priority ranking list, prioritize project review and financial accounting.

Benefits of technology

It improves the efficiency and accuracy of the review, reduces the review cost, ensures the smooth progress and successful implementation of the engineering project, and reduces the cumbersomeness and cost of the review task through scientific and accurate selection of review methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118379028B_ABST
    Figure CN118379028B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for settlement review and financial accounting management of electric power engineering, which relates to the technical field of electric power engineering, and comprises the following steps: obtaining project characteristic data of a project to be reviewed, selecting the best review method for each project to be reviewed according to the project characteristic data in combination with preset review method selection rules, wherein the review method comprises comprehensive review, comparative review, screening review, and key review; establishing project importance assessment data based on a neural network according to the project characteristic data, and generating an importance coefficient for each project to be reviewed; establishing a review priority ranking table for the project to be reviewed according to the importance coefficient of the project to be reviewed, the review method, and preset review priority rules; conducting project review and financial accounting for the project to be reviewed according to the review priority ranking table and the review method. The present application solves the problems of unreasonable and inappropriate review methods or low review effects and heavy review tasks, high costs, and time-consuming and labor-intensive review.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power engineering, and more specifically, to a method for settlement review and financial accounting management of electric power engineering. Background Art

[0002] The settlement review of power engineering refers to the process of checking and auditing the various costs, engineering quantities, quality, etc. involved in the construction process of power engineering projects. The specific contents include but are not limited to: review of the implementation of the construction contract, including the progress of the project, the implementation of the technical specifications and standards agreed in the contract, etc.; verification of the engineering quantity during the construction process, confirming whether the actual amount of work completed in the construction is consistent with the engineering quantity agreed in the contract; review of the use of construction materials and equipment, ensuring that the purchased materials and equipment meet the technical specifications and quality standards; inspection of engineering quality, including quality control and acceptance during the construction process; accounting of various costs, including the rationality and accuracy of various costs incurred during the construction process; handling of changes and claims during the construction process, reviewing and verifying contract changes and claims. Through the settlement review, it can be ensured that the construction process of the power engineering project is compliant, the cost is reasonable, and the quality is controllable, providing guarantee for the smooth completion of the project.

[0003] Financial accounting management after power audit is an important link to ensure that the audit results are correctly reflected and effectively handled. On the one hand, it is necessary to accurately record the various expenses, engineering quantities, quality and other information involved in the audit, and classify and summarize them in accordance with relevant regulations. On the other hand, financial accounting operations should be carried out according to the audit results, including timely accounting of engineering funds, material costs, equipment costs and other expenditures that meet the contract agreement. At the same time, reasonable processing and recording of expenses that do not meet the agreement or are controversial need to be carried out. Financial accounting management also needs to work closely with relevant departments such as project management and contract management to promptly feedback the audit results and ensure that the problems found in the audit are solved and adjusted in a timely manner. In addition, financial accounting management should also strengthen the supervision and control of relevant financial processes to ensure that the use of funds is compliant and transparent, and provide good financial support and guarantee for the smooth progress of power engineering projects.

[0004] For example, the power transmission and transformation project settlement auxiliary review system announced by the invention patent with announcement number: CN117522318A, by integrating various deviation rate factors, provides a comprehensive evaluation index, reflecting the deviation of power transmission and transformation projects in different aspects, and not only reviews the cost deviation of the project, but also includes multiple aspects such as project quantity, materials supplied by Party A, and completion drawings, ensuring that all aspects of the power transmission and transformation project are comprehensively evaluated. By using weight factors, the system can adjust the relative importance of various deviation factors according to specific needs, increase the accuracy of the review, and ensure that reviewers can evaluate the rationality of the project more objectively. The use of automatic matching and parsing components to process settlement review materials reduces the need for manual work and improves the efficiency of the review. Settlement data can be obtained more quickly, and compliance and rationality reviews can be conducted, thereby saving time and energy.

[0005] For example, the invention patent announcement with announcement number: CN110309499B discloses a device for generating a review report and a method for generating a review report online, including: a review template configuration module for constructing a review report template; a first integration module for integrating a first external system and obtaining a first review material in response to a user's online search instruction; and a review report generation module for automatically generating a review report based on the review report template and the first review material. The present invention also discloses a method for generating a review report online. According to the device and method disclosed in the present invention, a review report can be automatically generated, freeing up manpower and improving efficiency. And by integrating the online review report generation device with the review system, the review report can be automatically generated online, solving the problem that when preparing a review report offline, some key review materials cannot be effectively cited in the review report due to difficulties in data collation.

[0006] The above disclosed technical solutions have at least the following technical problems:

[0007] The existing review methods may lack a comprehensive review of the project pre-settlement, which may result in the omission of some key information or incomplete review. In addition, the structures or characteristics of different review contents vary greatly. The same review method cannot review all of them with high quality, which may lead to unreasonable, inappropriate or low review effects. In addition, the review tasks are heavy, and problems are often discovered only after all projects have been reviewed and settled, which is costly, time-consuming and labor-intensive.

[0008] In view of the above problems, the present invention proposes a solution. Summary of the invention

[0009] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a settlement review and financial accounting management method for power engineering, which solves the problems raised in the above-mentioned background technology through power engineering.

[0010] To achieve the above object, the present invention provides the following technical solutions:

[0011] A method for settlement review and financial accounting management of electric power engineering projects, characterized in that it includes the following steps: obtaining data on projects to be reviewed of the electric power engineering projects, numbering the projects to be reviewed respectively and establishing a set of projects to be reviewed; obtaining project characteristic data of the projects to be reviewed, and selecting the best review method for each project to be reviewed based on the project characteristic data in combination with preset review method selection rules, wherein the review methods include comprehensive review, comparative review, screening review, and key review; establishing project importance assessment data based on a neural network according to the project characteristic data, and generating an importance coefficient for each project to be reviewed; establishing a review priority ranking table for the projects to be reviewed according to the importance coefficients of the projects to be reviewed, the review methods, and preset review priority rules; and conducting project review and financial accounting on the projects to be reviewed according to the review priority ranking table and the review methods.

[0012] In a preferred embodiment, the project characteristic data includes a cost coefficient, a risk impact coefficient, a project scale coefficient, and a project complexity coefficient.

[0013] In a preferred embodiment, the preset review method selection rules are as follows: when the risk impact coefficient is greater than the preset risk threshold, the review method of the project to be reviewed is marked as key review; when the engineering complexity coefficient is greater than the preset complexity threshold and the cost coefficient is less than the preset cost threshold, the review method of the project to be reviewed is marked as comprehensive review; when the engineering scale coefficient is greater than the preset scale coefficient and the cost coefficient is greater than the preset cost threshold, the review method of the project to be reviewed is marked as screening review; when the engineering complexity coefficient is less than the preset complexity threshold and the cost coefficient is greater than the preset cost threshold, the review method of the project to be reviewed is marked as comparative review; when the project to be reviewed meets the rules of multiple methods, the method selection priority is key review>comprehensive review>screening review>comparative review; when the rules of all methods are not met, the review method of the project to be reviewed is marked as comprehensive review.

[0014] In a preferred embodiment, a review priority ranking table is established for the items to be reviewed based on their importance coefficients, review methods, and preset review priority rules. Specifically, items to be reviewed of key review types are placed before all other items, items to be reviewed of key review types are internally sorted from large to small according to their importance coefficients, and items to be reviewed of other review methods are then sorted from large to small according to their importance coefficients to obtain a review priority ranking table.

[0015] In a preferred embodiment, the project to be reviewed is subject to project review and financial accounting according to the review priority ranking table and the review method. Specifically, the settlement review of important review methods is given priority, and when there are no abnormalities, each project to be reviewed is reviewed according to its own review method according to the review priority ranking table. If an abnormality occurs, an alarm is issued, and the settlement review is completed and financial accounting is performed.

[0016] In a preferred embodiment, the specific method for obtaining the engineering complexity coefficient is as follows: define the first standard threshold, the second standard threshold and the complexity coefficient of the project to be reviewed; the first preset coefficient, the second preset coefficient and the third preset coefficient; when the complexity coefficient of the project to be reviewed exceeds the first standard threshold, subtract the first preset coefficient; when the complexity coefficient of the project to be reviewed is between the first standard threshold and the second standard threshold, add the second preset coefficient; when the complexity coefficient of the project to be reviewed is lower than the second standard threshold, subtract the third preset coefficient; when the complexity coefficient of the project to be reviewed exceeds the preset value of the first standard threshold, the second preset coefficient and the third preset coefficient are set to 0; when the complexity coefficient of the project to be reviewed is between the first standard threshold and the second standard threshold, the first preset coefficient and the third preset coefficient are both set to 0; when the complexity coefficient of the project to be reviewed is lower than the second standard threshold, the first preset coefficient and the second preset coefficient are set to 0; according to the first preset coefficient, the second preset coefficient and the third preset coefficient, the engineering complexity coefficient is calculated.

[0017] In a preferred embodiment, the specific method for obtaining the project scale coefficient is as follows: according to the length, area, and volume parameters provided in the bill of quantities, multiply by the corresponding coefficient or perform corresponding calculations to obtain the actual project quantity; according to the bill of quantities of the project, the actual project quantity of each line is calculated in combination with a preset line length scale calculation formula; the actual project quantity of the tower project is calculated in combination with a preset tower quantity calculation formula; the actual project quantity of the equipment installation is calculated in combination with a preset installation equipment quantity calculation formula; according to historical data, the standard project quantity of each work content is determined; the actual project quantity is compared with the standard project quantity and added to obtain the project scale coefficient.

[0018] In a preferred embodiment, the specific method for obtaining the cost coefficient is as follows: collect cost data of the power engineering project, including labor cost, material cost, equipment cost, construction time, remaining project time and historical error rate; organize and prepare the collected data to ensure the accuracy and completeness of the data; calculate the cost coefficient based on the cost data based on principal component analysis.

[0019] In a preferred embodiment, the specific method for obtaining the risk impact coefficient is as follows: collect historical data of historical related projects, the historical data includes various types of errors, classify the collected error records by type, assign error weights to different types of errors to reflect the impact of the errors on the engineering project, and calculate the historical reference coefficient according to the type and weight of the error records; obtain the population density and population size affected by the project errors and the regional distance, and calculate the affected population coefficient; obtain the type of project radiation area, the type of project radiation area includes city, rural area, factory, natural environment, and set the regional score for the type of area according to the population density; calculate the risk impact coefficient in combination with the affected population coefficient, the historical reference coefficient and the regional score.

[0020] The technical effects and advantages of the settlement review and financial accounting management method of an electric power project of the present invention are as follows:

[0021] 1. The present invention selects the best review method by analyzing the project characteristic data and combining it with the preset review method selection rules. Among them, the project characteristic data includes cost coefficient, risk impact coefficient, project scale coefficient and project complexity coefficient. The article also introduces in detail the calculation method of the risk impact coefficient, and how to select a suitable review method based on the risk impact coefficient, so as to improve the review efficiency and accuracy. Through the analysis of the cost coefficient, project scale coefficient and project complexity coefficient, the article also explains how to comprehensively consider the economic benefits, scale and complexity of the project to select a suitable review method. Finally, the article also designs preset review method selection rules to automatically select the best review method according to the characteristics of the project. Overall, the method proposed in this article can select the review method more scientifically and accurately, thereby improving the review efficiency, reducing the review cost, and ensuring the smooth progress and successful implementation of the engineering project.

[0022] 2. The present invention establishes project importance assessment data by using a neural network, and generates a process of importance coefficients for each project to be reviewed. Among them, the calculation formula of the importance coefficient is calculated according to the preset proportional coefficients of the risk impact coefficient, the cost coefficient, the engineering scale coefficient and the engineering complexity coefficient. According to the importance coefficients of the projects to be reviewed, the review methods and the preset review priority rules, a review priority ranking table is established. Specifically, the projects to be reviewed of the key review types are ranked before all projects, and are internally sorted from large to small according to the importance coefficients, and then the projects to be reviewed of the remaining review methods are sorted from large to small according to the importance coefficients to obtain a review priority ranking table. According to the review priority ranking table and the review method, the projects to be reviewed are reviewed and financially accounted. Specifically, the settlement review of the important review method is first carried out. If there is no abnormality, each project to be reviewed is reviewed according to its review method according to the review priority ranking table; if an abnormality occurs, an alarm is issued, and financial accounting is carried out after the settlement review is completed. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 The present invention is a schematic diagram of the structure of a method for settlement review and financial accounting management of electric power engineering. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Embodiment 1, Figure 1 The present invention provides a method for settlement review and financial accounting management of electric power engineering, comprising the following steps:

[0026] S1, obtaining data of pending projects of power engineering, labeling the pending projects respectively and establishing a set of pending projects;

[0027] S2, obtaining project characteristic data of the project to be reviewed, and selecting the best review method for each project to be reviewed based on the project characteristic data and the preset review method selection rules, wherein the review methods include comprehensive review, comparative review, screening review, and key review;

[0028] S3, establishing project importance assessment data based on a neural network according to the project characteristic data, and generating an importance coefficient for each project to be reviewed;

[0029] S4, establishing a review priority ranking table for the projects to be reviewed based on the importance coefficients of the projects to be reviewed, the review methods and the preset review priority rules;

[0030] S5. Conduct project review and financial accounting for the projects to be reviewed based on the review priority list and review methodology.

[0031] The existing review methods may lack a comprehensive review of the project pre-settlement, which may result in the omission of some key information or incomplete review. In addition, the structures or characteristics of different review contents vary greatly. The same review method cannot review all of them with high quality, resulting in unreasonable, inappropriate or low review effects. In addition, the review tasks are arduous, and problems are often discovered only after all projects have been reviewed and settled, which is costly, time-consuming and labor-intensive.

[0032] In this embodiment, the project characteristic data of the project to be reviewed is obtained, and the best review method is selected for each project to be reviewed according to the project characteristic data and the preset review method selection rules. The review methods include comprehensive review, comparative review, screening review, and key review.

[0033] As mentioned above, the project characteristic data include cost coefficient, risk impact coefficient, project scale coefficient, and project complexity coefficient;

[0034] Specifically, the risk impact coefficient is an indicator that comprehensively considers historical reference data, the affected population, and regional scores, and is used to assess the risk level and impact range when problems occur in a project. Through a comprehensive analysis of these factors, a numerical indicator can be obtained, reflecting the risks that the project may face. When selecting a review method, the review method can be determined based on the size of the risk impact coefficient. If the risk impact coefficient is low, it means that the project risk is relatively small, and a simpler review method can be used. If the risk impact coefficient is high, a more rigorous and comprehensive review method is required to ensure that problems are discovered and resolved in a timely manner and that project risks are reduced. Therefore, the risk impact coefficient plays a guiding role in selecting a review method, helps improve review efficiency and accuracy, and ensures the smooth progress and successful implementation of engineering projects.

[0035] In this embodiment, the review method of analyzing the risk impact coefficient to determine the items to be reviewed has the following effects and advantages:

[0036] Quantitative risk assessment: The risk impact coefficient quantifies the project risk in a numerical way, making the assessment of project risk more objective and accurate;

[0037] Personalized review method selection: According to the size of the risk impact coefficient, you can choose the appropriate review method for different projects; for projects with lower risks, you can use a simplified review method to improve review efficiency; for projects with higher risks, you need to use a more rigorous and comprehensive review method to deal with potential risks;

[0038] Improved review precision: By taking into account historical reference data, affected population conditions and regional scores, the risk impact factor can more comprehensively assess the risk situation of the project, thereby improving the precision and accuracy of the review;

[0039] Reduce review costs: Selecting appropriate review methods based on project risk can avoid unnecessary review processes, thereby reducing review costs and time investment;

[0040] In summary, analyzing the risk impact coefficient helps to select the appropriate review method based on project characteristics and risk levels, improves the efficiency and accuracy of the review, and also reduces the cost of the review.

[0041] The specific method for obtaining the risk impact coefficient is as follows:

[0042] Collect historical data of historical related projects. The historical data includes various types of errors. The collected error records are classified by type, and error weights are assigned to different types of errors to reflect the impact of errors on the project. According to the type and weight of the error records, the historical reference coefficient is calculated;

[0043] Obtain the population density, population size and regional distance affected by the project error, and calculate the affected population coefficient;

[0044] Get the type of project radiation area, which includes city, rural area, factory, and natural environment. Set the regional score according to the population density.

[0045] The risk impact coefficient is calculated by combining the affected population coefficient, historical reference coefficient and regional score.

[0046] The specific calculation formula of the historical reference coefficient is as follows:

[0047] ;

[0048] The specific calculation formula for the affected population coefficient is as follows:

[0049] ;

[0050] The specific calculation formula of the risk impact coefficient is as follows:

[0051] ;

[0052] In the formula, is the historical reference coefficient, is the weight of the i-th type of error, is the number of times the i-th error occurs, is the number of times the error type occurs, V is the total number of errors, is the affected population coefficient, is the number of areas affected, is the population density, is the distance from the region to the project center, P is the regional score, is the risk impact coefficient.

[0053] It is necessary to explain the types of errors such as quality problems, delays, cost overruns, etc.;

[0054] From the calculation formula of the risk impact coefficient, it can be seen that when the performance value of the risk impact coefficient is larger, it indicates that the risk impact degree of the project to be reviewed is relatively high. Conversely, when the performance value of the risk impact coefficient is smaller, it indicates that the risk impact degree of the project to be reviewed is relatively low.

[0055] The cost coefficient is an indicator that comprehensively considers factors such as project review costs, time investment, and possible economic losses, and is used to evaluate the selection of review methods for projects to be reviewed. By analyzing the cost coefficient, we can better weigh the relationship between the selection of review methods and project risks. If the cost coefficient is low, it means that a simplified review method may be more appropriate to save costs and time. If the cost coefficient is high, it is necessary to consider adopting a more rigorous and comprehensive review method to reduce possible economic losses and risks. Therefore, the cost coefficient plays an important role in the selection of review methods and helps to strike a balance between economic benefits and review needs.

[0056] In this embodiment, the cost coefficient has the following effects and advantages on the review method for determining the items to be reviewed:

[0057] Economic benefit assessment: The cost coefficient can comprehensively consider the cost, time and possible economic losses required for the review method, thereby evaluating the economic benefits of the review method; this helps to ensure that the selection of the review method is in line with the economic reality of the project and avoid unnecessary waste of resources;

[0058] Optimize resource allocation: By analyzing the cost coefficient, you can optimize the allocation of resources, use more resources for projects with higher risks, adopt a more rigorous and comprehensive review method, and use resources for projects with lower risks, and use a simplified review method, so as to achieve the best resource utilization efficiency;

[0059] Improve examination efficiency: The analysis of cost coefficients helps determine the balance between the cost and benefits of the examination method, and avoids excessive investment of resources that leads to low examination efficiency. Therefore, the efficiency and quality of the examination can be improved through the guidance of cost coefficients.

[0060] Reduce economic risks: By comprehensively considering possible economic losses, the cost coefficient can help project parties better understand the economic risks that may be brought about by adopting different review methods, so as to select review methods in a targeted manner and reduce potential economic losses;

[0061] In summary, the cost coefficient plays a positive role in optimizing resource utilization, improving review efficiency and reducing economic risks in determining the review method for the project to be reviewed.

[0062] The specific method for obtaining the cost coefficient is as follows:

[0063] Collect cost data for power engineering projects, including labor costs, material costs, equipment costs, construction time, remaining time on the project, and historical error rates;

[0064] Organize and prepare the collected data to ensure its accuracy and completeness;

[0065] The cost coefficient is calculated based on the cost data based on the principal component analysis method.

[0066] The specific calculation formula of the cost coefficient is as follows:

[0067]

[0068] In the formula, is the cost coefficient, For labor costs, is the equipment cost, For construction time, The remaining time of the project, is the historical error rate;

[0069] From the calculation formula of the cost coefficient, it can be seen that when the performance value of the cost coefficient is larger, it indicates that the cost of the project to be reviewed is relatively high. Conversely, when the performance value of the cost coefficient is smaller, it indicates that the cost of the project to be reviewed is relatively low.

[0070] The project scale coefficient is an indicator used to quantify the scale of the project to be reviewed. Its main purpose is to assist in determining the applicable review method. The coefficient comprehensively considers factors such as the scale, capacity, and quantity of the project and converts them into a numerical value to facilitate comparison with the requirements of the review method. Through the project scale coefficient, the review method suitable for a specific project can be selected more accurately, thereby improving the efficiency and accuracy of the review.

[0071] In this embodiment, the method of analyzing the project scale coefficient to determine the review project has the following effects and advantages:

[0072] First, the project scale coefficient can objectively quantify the scale of the project to be reviewed, making the selection of review methods more scientific and accurate; by analyzing the project scale, the applicable review method can be better determined, avoiding the situation of insufficient or excessive review caused by blind selection; secondly, the project scale coefficient can improve the efficiency of the review; by quantifying the project scale, the applicable review method can be quickly screened out, saving the time and energy of the reviewers; this helps to speed up the review process, improve the review efficiency, and ensure that the project can be advanced on time. In addition, the project scale coefficient can reduce unnecessary complexity in the review process; different review methods and indicators may be required for projects of different sizes. The introduction of the project scale coefficient can be flexibly adjusted according to the actual situation of the project, avoiding overly complex review processes and making the review work more concise and clear.

[0073] To sum up, the project scale coefficient has obvious effects and advantages in determining the review method of the project to be reviewed. It can improve the scientificity, efficiency and simplicity of the review and provide strong support for the smooth implementation of the project.

[0074] The specific method for obtaining the project scale coefficient is as follows:

[0075] According to the length, area and volume parameters provided in the bill of quantities, multiply by the corresponding coefficient or perform corresponding calculations to obtain the actual project quantity;

[0076] According to the project's bill of quantities, the actual engineering quantity of each line is calculated in combination with the preset line length scale calculation formula; the actual engineering quantity of the tower position is calculated in combination with the preset tower position quantity calculation formula; the actual engineering quantity of the equipment installation is calculated in combination with the preset installation equipment quantity calculation formula;

[0077] Determine the standard engineering quantity for each work content based on historical data; compare and add the actual engineering quantity with the standard engineering quantity to obtain the engineering scale coefficient;

[0078] The specific calculation formula for the actual engineering quantity of each line is as follows:

[0079] ;

[0080] The specific calculation formula for the actual engineering quantity of the tower project is as follows:

[0081] ;

[0082] The specific calculation formula for the actual engineering quantity of the equipment installation is as follows:

[0083] ;

[0084] The specific calculation formula of the project scale coefficient is as follows:

[0085] ;

[0086] In the formula, is the actual engineering quantity of each line, m is the number of sections of the line, is the straight-line distance of the line, is the line curvature, is the terrain height difference, is the number of turns of the line, is the actual engineering quantity of the tower project, is the total number of tower positions, is the tower height, is the tower angle, is the number of tower floors, is the tower location terrain number; The actual engineering quantity for equipment installation. is the total number of devices, is the number of equipment types, is the required material quantity for the equipment, For installation labor costs, is the number of installations, is the project scale factor, is the standard engineering quantity of each line, is the standard engineering quantity of the tower project. Standard engineering quantities for equipment installation.

[0087] From the calculation formula of the project scale coefficient, it can be seen that when the performance value of the project scale coefficient is larger, it indicates that the scale of the project to be reviewed is relatively high. Conversely, when the performance value of the project scale coefficient is smaller, it indicates that the scale of the project to be reviewed is relatively low.

[0088] The engineering complexity coefficient is an indicator used to evaluate the technical difficulty and complexity of the project to be reviewed. It comprehensively considers factors such as the type of project involved, the construction stage, the review focus, and the technical difficulty, and reflects the complexity of the project in a quantitative way. By analyzing the engineering complexity coefficient, the selection of review methods for the project to be reviewed can be more accurately judged. For example, for projects with higher complexity, more detailed review methods such as comprehensive review or focused review may be required, while for projects with lower complexity, simplified review methods such as screening review can be used; therefore, the engineering complexity coefficient has important guiding significance in guiding the review work, and can effectively improve the accuracy and efficiency of the review work;

[0089] The specific method for obtaining the engineering complexity coefficient is as follows:

[0090] Define the first standard threshold value and the second standard threshold value of the item to be reviewed; the first preset coefficient, the second preset coefficient and the third preset coefficient;

[0091] When the complexity coefficient of the project to be reviewed exceeds the first standard threshold, the first preset coefficient is subtracted; when the complexity coefficient of the project to be reviewed is between the first standard threshold and the second standard threshold, the second preset coefficient is increased; when the complexity coefficient of the project to be reviewed is lower than the second standard threshold, the third preset coefficient is subtracted;

[0092] When the complexity coefficient of the item to be reviewed exceeds the first standard threshold of the preset value, the second preset coefficient and the third preset coefficient are set to 0;

[0093] When the complexity coefficient of the item to be reviewed is between the first standard threshold and the second standard threshold, the first preset coefficient and the third preset coefficient are both set to 0; when the complexity coefficient of the item to be reviewed is lower than the second standard threshold, the first preset coefficient and the second preset coefficient are set to 0;

[0094] The engineering complexity coefficient is calculated according to the first preset coefficient, the second preset coefficient and the third preset coefficient.

[0095] The review methods include comprehensive review, comparative review, screening review, and focused review;

[0096] Specifically, comprehensive review is a review method, the core of which is to conduct a comprehensive review of the project's quotas, costs and project quantities by starting from the construction drawings, combining the cost documents and calculation regulations of various project budgets, as well as the project organization and design, contract content and quota values. This method is suitable for staff who are not proficient in the review business. The advantage of comprehensive review is that its review process is comprehensive and meticulous, and it can effectively review all aspects of the project, thereby improving the accuracy and comprehensiveness of the review. However, the disadvantage of comprehensive review is that its review time is relatively long, and it is easy to have repeated work, which increases the workload. Therefore, for relatively simple projects, comprehensive review is an applicable method, but it requires reviewers to have high work literacy, sufficient work experience and work patience to ensure the smooth progress of the review work.

[0097] In this embodiment, the comprehensive review applies to the following projects:

[0098] Complex projects: For projects with complex structures, diverse cost structures, and multiple stakeholders, a comprehensive review can ensure that all key review items are covered, thereby fully understanding the project situation;

[0099] Projects with large cost budgets: For projects with large cost budgets and involving multiple cost items, a comprehensive review can systematically review and check all cost items to ensure the accuracy and rationality of the costs;

[0100] Projects with high risks: For projects with high risks and prone to problems, a comprehensive review can fully understand the risk situation of the project, identify and solve problems in a timely manner, and ensure the smooth progress of the project;

[0101] Projects that require multiple aspects of review: For projects that require multiple aspects of review, such as cost, schedule, quality, compliance, etc., a comprehensive review can ensure that all key review items are covered, thereby comprehensively evaluating the status of the project;

[0102] Highly critical engineering projects: For engineering projects that are of great significance to the company's business development and are highly critical, a comprehensive review can ensure a comprehensive understanding and evaluation of all key links, thereby reducing project risks and ensuring successful implementation of the project;

[0103] In general, comprehensive review is suitable for engineering projects with high complexity, huge cost budgets, high risks, and the need to review multiple aspects. It can help to fully understand and evaluate the situation of the engineering project, discover and solve problems in a timely manner, and ensure the smooth progress of the engineering project.

[0104] Comparative review is a review method, the core of which is to ensure the consistency of project costs by comparing the preliminary settlement of different projects in the same area; for example, when reviewing the structure and building standards of a construction project, it is necessary to compare the project costs of different projects to find out the discrepancies with expectations. Through comparative review, the differences between different projects can be analyzed, and the differential projects can be reviewed in detail to further analyze the root causes and causes of the problems; the advantage of this method is that it can discover the differences between different projects, which helps to find and solve problems in a timely manner; however, comparative review also needs to be analyzed based on the same project cost rules to ensure the accuracy and fairness of the evaluation.

[0105] In this embodiment, the comparative review is applicable to the following projects:

[0106] Projects with high similarity: When there are multiple projects with high similarity, you can compare their cost structures, schedules, etc. through comparative review to find and analyze the differences;

[0107] Projects in the same region or of the same type: Projects in the same region or of the same type often have similar market conditions and resource conditions. Comparative review can be used to compare the cost levels, project progress, etc. between them, so as to discover anomalies or problems;

[0108] Projects with highly comparable historical data: If there is highly comparable historical data available for reference, the current project situation can be compared with the historical data through comparative review to identify potential problems or trend changes;

[0109] Projects with the same contractor or supplier: For projects undertaken or supplied by the same contractor or supplier, comparative review can be used to compare the cost, quality, etc. between them, so as to evaluate the performance and reputation of the contractor or supplier;

[0110] In general, comparative review is suitable for engineering projects with high similarity and strong comparability. By comparing the costs, progress, quality, etc. between different projects, it can help identify problems, improve efficiency, and gain lessons.

[0111] Screening review is a method of engineering settlement review, and its main purpose is to screen and review the expenses in the engineering budget to ensure that they are reasonable, accurate, and in compliance with relevant regulations and standards; first, screen the expenses in the budget, and exclude expense items that do not meet the requirements in accordance with the budget preparation principles and requirements; then, review the screened expense items, including a detailed review of the cost calculation method, calculation basis, and calculation process, to ensure the accuracy and rationality of the cost calculation; finally, analyze the differences between the budget standard and the quota standard found in the review. If there are large differences, targeted adjustments are required to ensure the rationality and accuracy of the budget; the advantage of the screening review method is that it can effectively exclude non-compliant expense items and ensure the quality and reliability of the budget.

[0112] In this embodiment, the screening review is applicable to the following projects:

[0113] Large-scale engineering projects: Large-scale engineering projects often involve multiple sub-projects and complex cost structures, which require screening and review of costs to ensure the accuracy and rationality of the budget;

[0114] Projects with complex cost structures: For projects with complex cost structures and involving multiple types of costs, screening and review can help identify and exclude unreasonable cost items to ensure the accuracy of the budget;

[0115] Long-term projects: For projects with a long period and relatively slow progress, it is necessary to review and adjust the costs regularly to adapt to changes in the progress of the project; screening and review can help to timely discover and solve cost problems and ensure the smooth progress of the project;

[0116] Engineering projects involving multi-party cooperation: For engineering projects involving multi-party cooperation, there may be cost sharing and management issues among different stakeholders. Costs need to be screened and reviewed to ensure the balance and rationality of the interests of all parties;

[0117] Projects with Frequently Changing Requirements: For projects with frequently changing requirements and constantly adjusted project contents, it may be necessary to flexibly adjust and screen costs to adapt to changes in project requirements. Screening and review can help timely identify and resolve cost adjustment issues and ensure the smooth implementation of the project.

[0118] In general, screening reviews are suitable for engineering projects with complex cost structures, long cycles, involving multi-party cooperation or frequent changes in demand. They can help identify and resolve cost issues and ensure the smooth progress of engineering projects.

[0119] Key review is an important method in the review of project pre-settlement. Its main purpose is to conduct in-depth review on key contents that have a greater impact on the project cost to ensure the accuracy and comprehensiveness of the review work. During the review process, key review is usually carried out on those contents that are prone to errors. For example, when reviewing the brick-concrete structure with high-end decoration in the design of a project, it is necessary to focus on important items such as the amount of bricks and stones, aluminum alloy windows and doors, and granite veneer costs. When conducting a key review, it is also necessary to review aspects such as material usage, budget prices, machinery costs, and labor costs to ensure the accuracy and rationality of various data. The advantage of key review is that it can specifically discover and solve important problems in project costs, avoid potential risks and errors, and ensure the accuracy and rationality of project budgets.

[0120] In this embodiment, the focus is on reviewing projects applicable to the following situations:

[0121] Projects with clear key nodes: For projects with clear key nodes, we can focus on these nodes through key review to ensure their smooth completion, so as to ensure the smooth progress of the entire project;

[0122] Project sub-projects with large costs or large impacts: For project sub-projects with large costs or large impacts, these projects can be reviewed and analyzed in depth through focused review to ensure the accuracy and rationality of their budgets;

[0123] Engineering projects with high technical difficulty: For engineering projects with high technical difficulty and high risk, we can focus on key technical links and risk points through key review, timely discover and solve problems, and ensure the smooth implementation of the engineering projects;

[0124] Highly important engineering sub-projects: For high-importance sub-projects or key equipment in the engineering project, their quality and safety can be ensured through focused review to ensure the successful implementation of the entire engineering project;

[0125] Engineering sub-projects that are prone to problems as shown in historical experience: For engineering sub-projects that are prone to problems as shown in historical experience, we can focus on possible problem points through key reviews and take timely measures to solve them to avoid recurring problems;

[0126] In general, key review is suitable for engineering projects with clear key nodes, high costs or impacts, high technical difficulty, high importance, or which historical experience shows are prone to problems. It can help focus on key links, discover and solve problems in a timely manner, and ensure the smooth progress of the engineering project.

[0127] Based on the differences and applicability of the above four methods, the preset examination method selection rules are designed. The preset examination method selection rules are as follows:

[0128] When the risk impact coefficient is greater than the preset risk threshold, the review method of the project to be reviewed will be marked as key review;

[0129] When the engineering complexity coefficient is greater than the preset complexity threshold and the cost coefficient is less than the preset cost threshold, the review method of the project to be reviewed is marked as comprehensive review;

[0130] When the project scale factor is greater than the preset scale factor and the cost factor is greater than the preset cost threshold, the review method of the project to be reviewed is marked as screening review;

[0131] When the engineering complexity coefficient is less than the preset complexity threshold and the cost coefficient is greater than the preset cost threshold, the review method of the project to be reviewed is marked as comparative review;

[0132] When the project to be reviewed meets the rules of multiple methods, the method selection priority is focused review > comprehensive review > screening review > comparative review;

[0133] When the rules of all methods are not satisfied, the review method of the item to be reviewed is marked as a comprehensive review.

[0134] This embodiment selects the best review method by analyzing the project characteristic data and combining it with the preset review method selection rules. Among them, the project characteristic data includes cost coefficient, risk impact coefficient, project scale coefficient and project complexity coefficient. The article also introduces in detail the calculation method of the risk impact coefficient, and how to select the appropriate review method according to the risk impact coefficient, so as to improve the review efficiency and accuracy. Through the analysis of the cost coefficient, project scale coefficient and project complexity coefficient, the article also explains how to comprehensively consider the economic benefits, scale and complexity of the project to select the appropriate review method. Finally, the article also designs preset review method selection rules to automatically select the best review method according to the characteristics of the project. Overall, the method proposed in this article can select the review method more scientifically and accurately, thereby improving the review efficiency, reducing the review cost, and ensuring the smooth progress and successful implementation of the engineering project.

[0135] Embodiment 2: Establish project importance assessment data based on a neural network according to project characteristic data, and generate an importance coefficient for each project to be reviewed.

[0136] The specific calculation formula of the importance coefficient is as follows:

[0137] ;

[0138] In the formula, is the preset proportional coefficient of the risk impact coefficient, is the preset proportionality factor of the cost factor, is the preset proportional coefficient of the project scale factor, It is the preset proportional coefficient of the engineering complexity coefficient. is the risk impact coefficient, is the cost coefficient, is the project scale factor, is the importance coefficient, is the engineering complexity coefficient.

[0139] According to the importance coefficients, review methods and preset review priority rules of the projects to be reviewed, a review priority ranking table is established for the projects to be reviewed;

[0140] Specifically, the key review type pending review items are placed before all other items, and the key review type pending review items are sorted internally from large to small according to the importance coefficient, and then the remaining review methods pending review items are sorted from large to small according to the importance coefficient, to obtain a review priority ranking table;

[0141] Conduct project review and financial accounting for the projects to be reviewed based on the review priority list and review methodology.

[0142] Specifically, priority is given to the settlement review of important review methods. When there are no abnormalities, each item to be reviewed is reviewed according to its own review method based on the review priority ranking table. If an abnormality is found, an alarm is issued. After the settlement review is completed, financial accounting is carried out.

[0143] This embodiment uses a neural network to establish project importance assessment data and generates a process of importance coefficients for each project to be reviewed. Among them, the calculation formula of the importance coefficient is calculated according to the preset proportional coefficients of the risk impact coefficient, the cost coefficient, the project scale coefficient and the project complexity coefficient. According to the importance coefficients of the projects to be reviewed, the review methods and the preset review priority rules, a review priority ranking table is established. Specifically, the projects to be reviewed of the key review types are ranked before all projects, and are internally sorted from large to small according to the importance coefficients, and then the projects to be reviewed of the remaining review methods are sorted from large to small according to the importance coefficients to obtain a review priority ranking table. According to the review priority ranking table and the review method, the projects to be reviewed are reviewed and financially accounted. Specifically, the settlement review of the important review method is first carried out. If there is no abnormality, each project to be reviewed is reviewed according to its review method according to the review priority ranking table; if an abnormality occurs, an alarm is issued, and the financial account is recorded after the settlement review is completed.

[0144] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0145] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments may be implemented in whole or in part in the form of a computer program product.

[0146] Those of ordinary skill in the art will appreciate that the modules and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0147] In addition, each functional module in each embodiment of the present application may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module.

[0148] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0149] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for settlement review and financial accounting management of power engineering projects. It is characterized in that The steps include: Obtain data on pending projects of power engineering and label the pending projects; Obtaining project characteristic data of the project to be reviewed, and selecting the best review method for each project to be reviewed based on the project characteristic data and the preset review method selection rules, wherein the review methods include comprehensive review, comparative review, screening review, and key review; The project characteristic data include cost coefficient, risk impact coefficient, project scale coefficient and preset project complexity coefficient; The specific calculation formula of the cost coefficient is as follows: In the formula, is the cost coefficient, For labor costs, is the equipment cost, For construction time, The remaining time of the project, is the historical error rate; The specific calculation formula of the risk impact coefficient is as follows: In the formula, is the risk impact coefficient, is the weight of the i-th type of error, is the number of times the i-th error occurs, is the number of times the error type occurs, V is the total number of errors, is the number of areas affected, is the population density, is the distance from the region to the project center, and P is the regional score; The specific calculation formula of the project scale coefficient is as follows: ; In the formula, is the actual engineering quantity of each line, is the actual engineering quantity of the tower project, The actual engineering quantity for equipment installation. is the standard engineering quantity of each line, is the standard engineering quantity of the tower project. Provide standard engineering quantities for equipment installation; Establish project importance assessment data based on neural network according to project characteristic data, and generate importance coefficient of each project to be reviewed; The specific calculation formula of the importance coefficient is as follows In the formula, is the preset proportional coefficient of the risk impact coefficient, is the preset proportionality factor of the cost factor, is the preset proportional coefficient of the project scale factor, It is the preset proportional coefficient of the engineering complexity coefficient. is the risk impact coefficient, is the cost coefficient, is the project scale factor, is the importance coefficient, is the engineering complexity coefficient; Establish a review priority ranking table for the projects to be reviewed based on their importance coefficients, review methods, and preset review priority rules; Conduct project review and financial accounting for the projects to be reviewed based on the review priority list and review methodology.

2. The method for settlement review and financial accounting management of electric power engineering according to claim 1, It is characterized in that The preset review method selection rules are as follows: Setting standard thresholds based on the requirements of the project to be reviewed, including risk thresholds, complexity thresholds, cost thresholds and scale factors; Compare and analyze project characteristic data with standard thresholds; When the risk impact coefficient is greater than the preset risk threshold, the review method of the project to be reviewed will be marked as key review; When the engineering complexity coefficient is greater than the preset complexity threshold and the cost coefficient is less than the preset cost threshold, the review method of the project to be reviewed is marked as a comprehensive review; When the project scale factor is greater than the preset scale factor and the cost factor is greater than the preset cost threshold, the review method of the project to be reviewed is marked as screening review; When the engineering complexity coefficient is less than the preset complexity threshold and the cost coefficient is greater than the preset cost threshold, the review method of the project to be reviewed is marked as comparative review; When the project to be reviewed meets the rules of multiple methods, the review methods are prioritized in order of priority, namely, focused review, comprehensive review, screening review, and comparative review; When the rules of all methods are not satisfied, the review method of the item to be reviewed is marked as a comprehensive review.

3. The method for settlement review and financial accounting management of electric power engineering according to claim 2, It is characterized in that According to the importance coefficient of the project to be reviewed, the review method and the preset review priority rules, a review priority ranking table is established for the project to be reviewed, specifically: According to the content of the project to be reviewed, the review type priority is defined, and the projects to be reviewed are sorted from large to small according to their importance coefficients to obtain a review priority ranking table.

4. The method for settlement review and financial accounting management of electric power engineering according to claim 3, It is characterized in that The specific method for obtaining the engineering complexity coefficient is as follows: Define the first standard threshold, the second standard threshold and the complexity coefficient of the item to be reviewed; the first preset coefficient, the second preset coefficient and the third preset coefficient; When the complexity coefficient of the project to be reviewed exceeds the first standard threshold, the first preset coefficient is subtracted; when the complexity coefficient of the project to be reviewed is between the first standard threshold and the second standard threshold, the second preset coefficient is increased; when the complexity coefficient of the project to be reviewed is lower than the second standard threshold, the third preset coefficient is subtracted; When the complexity coefficient of the item to be reviewed exceeds the first standard threshold of the preset value, the second preset coefficient and the third preset coefficient are set to 0; When the complexity coefficient of the item to be reviewed is between the first standard threshold and the second standard threshold, the first preset coefficient and the third preset coefficient are both set to 0; when the complexity coefficient of the item to be reviewed is lower than the second standard threshold, the first preset coefficient and the second preset coefficient are set to 0; The engineering complexity coefficient is calculated according to the first preset coefficient, the second preset coefficient and the third preset coefficient.

5. The method for settlement review and financial accounting management of electric power engineering according to claim 4, It is characterized in that The specific method for obtaining the cost coefficient is as follows: Collect cost data of power engineering projects, process the collected data, and calculate cost coefficients based on the cost data based on principal component analysis.

6. The method for settlement review and financial accounting management of electric power engineering according to claim 5, It is characterized in that The data processing of the collected data specifically includes: Obtain cost data for power engineering projects and use Lagrange interpolation method to process missing and abnormal data; Performing data normalization on the processed data to obtain standard data; Perform keyword analysis on standard data to obtain several keywords; Compare several keywords with standard audit data and eliminate non-standard data.

7. The method for settlement review and financial accounting management of electric power engineering according to claim 6, It is characterized in that The specific method for obtaining the risk impact coefficient is as follows: Collect historical data of historical related projects, classify the collected error records by type, and record the classification type; Assign error weights to different types of error data and calculate historical reference coefficients; Obtain the population density, population size and regional distance affected by the project error, and calculate the affected population coefficient; Get the type of project radiation area, which includes urban, rural, factory and natural environment. Set the regional score according to the population density. The risk impact coefficient is calculated by combining the affected population coefficient, historical reference coefficient and regional score.

Citation Information

Patent Citations

  • Apparatus for generating review reports and method for generating review reports online

    CN110309499B

  • Auxiliary checking system for settlement of power transmission and transformation project

    CN117522318A

  • Power transaction settlement method based on power transformation system

    CN110866842A

  • Electricity selling company-oriented settlement system for electric power spot market

    CN116245528A

  • Pre-settlement auditing equipment and method for electrical engineering

    CN117934179A