Permanent and temporary combined green construction method for underground structure
Through three-dimensional visual digital modeling technology and simulation erecting sequence optimization, the problems of misalignment of the connection between the ring frame beam and the side wall main ribs, large material usage and high labor intensity in underground structure construction are solved, and accurate connection and efficient construction are achieved.
Patent Information
- Application Number
- CN202411145875.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-26
AI Technical Summary
During the construction process, the underground structure is often associated with misalignment of the frame beam and the side wall main ribs, the large amount of construction materials, large waste emissions, and high labor intensity.
Using three-dimensional visual digital modeling technology to establish the frame beam and main structure model, plan the steel bar installation steps and embedded sleeve position in advance, ensure the accuracy of steel bar connections through real-time monitoring and adjustment of the model, and optimize the support frame through simulated erecting sequence. and temporary platform design to reduce material usage and labor intensity.
It improves the accuracy of steel bar connections, reduces labor intensity, maximizes material consumption, reduces waste emissions, and improves construction efficiency and project quality.
Smart Images

Figure CN119021270A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of underground structure construction, and in particular to a permanent and temporary combined green construction method for underground structures. Background Art
[0002] As an important pillar industry of the national economy, the construction industry has made important contributions to promoting my country's economic development, benefiting society, improving the human living environment, and improving the living standards of the general public. However, while the construction industry is developing rapidly, it also consumes a large amount of natural resources and emits a large amount of waste. It is necessary to vigorously promote green construction, integrate low-carbon and carbon reduction research throughout the entire process of green construction, and actively promote and apply it to accelerate the realization of low-carbon and carbon reduction goals in the construction industry.
[0003] At present, the green construction of underground structures combined with permanent and temporary construction is mainly reflected in the direction of construction drawing design. Through green and low-carbon design, the allocation of material resources is optimized to save resources to the maximum extent. However, compared with the construction units, which carry out construction more according to the permanent and temporary design drawings, they have not explored the maximum saving of materials, reduced waste emissions, and reduced labor intensity during the construction stage to realize the permanent and temporary green construction technology system. Summary of the invention
[0004] The main purpose of the present invention is to provide a green construction method for the permanent and temporary combination of underground structures, so as to solve the problems in the related technology that the ring frame beam and the main reinforcement of the side wall are easily connected and misaligned, the amount of construction materials is large, the amount of waste discharged is large, and the labor intensity is high during the permanent and temporary combination construction of underground structures.
[0005] In order to achieve the above-mentioned purpose, the present invention provides a green construction method combining permanent and temporary construction of underground structures.
[0006] A ring frame beam model and a main structure model are established by using three-dimensional visualization digital modeling technology, and the steel bar installation steps of the ring frame beam and the installation position of the embedded sleeve on the ring frame beam are planned in advance, and the embedded sleeve model is added to the ring frame beam model according to the position of the embedded sleeve;
[0007] Projecting the embedded sleeve model on the ring frame beam model onto the bottom plate surface of the main structure model, and adjusting the position of the ring frame beam model so that the positional relationship between the embedded sleeve and the edge line of the side wall in the main structure meets the requirements;
[0008] Ring frame beam construction: constructing the ring frame beam and the embedded sleeve based on the ring frame beam model;
[0009] Waist beam construction: construct a concrete waist beam below the ring frame beam;
[0010] Construction of the bottom plate and the first layer of side walls of the main structure: after the reinforcement of the ring frame beam is tied, the position of the embedded sleeve is measured first, and the position of the embedded sleeve is imported into the model. When constructing the bottom plate of the main structure, the position of the embedded sleeve is set out to the horizontal positioning reinforcement of the side wall, and the position of the vertical main reinforcement of the side wall is marked with a vertical line with a red bar, so that the vertical main reinforcement of the side wall corresponds to the embedded sleeve, and then the bottom plate and the first layer of side walls are cast. The first layer of side walls is located below the waist beam;
[0011] Modifying the position of the vertical main reinforcement of the side wall in the main structure model based on the position of the embedded sleeve, and then constructing the bottom plate surface of the main structure and the first layer of side wall according to the main structure model;
[0012] Setting up the support frame and temporary platform: using three-dimensional visual digital modeling technology to establish the support frame model, temporary platform model, steel replacement support model and steel formwork tripod model in the main structure model, and simulate the setting sequence, the support frame is set on the bottom plate surface, the temporary platform is supported by the support frame, the temporary platform is used for cutting and moving the waist beam, after the waist beam is cut and moved, the temporary platform is used to support the steel formwork tripod, and the steel replacement support is used to support the first layer side wall; during the waist beam cutting, movement and steel formwork tripod construction, an automatic monitoring device is arranged between the support frame and the temporary platform to monitor the stress and deformation of the temporary platform and the support frame in real time.
[0013] Verify the temporary platform model and the support frame model, and adjust the temporary platform model and the support frame model so that the temporary platform meets the working load conditions of carrying and transporting waist beam concrete and placing at least one waist beam concrete, and at the same time, the elevation of the temporary platform meets the elevation of the steel formwork tripod, so that the front end of the steel formwork tripod arranged on the temporary platform can be connected to the first layer side wall, and the rear end can be connected to the temporary platform;
[0014] Construction of the second layer side wall of the main structure: cutting and moving the waist beam on the temporary platform, then setting up the steel formwork tripod on the temporary platform based on the model, and using the steel formwork tripod as a template to construct the second layer side wall on the first layer side wall, the second layer side wall is located below the ring frame beam;
[0015] Construction of the third layer side wall of the main structure: dismantle the temporary platform and the steel formwork tripod, set up an operating frame on the support frame along the side wall, connect the vertical main reinforcement of the side wall and the main reinforcement of the ring frame beam through the embedded sleeve, set up the formwork of the third layer side wall, and carry out the construction of the third layer side wall.
[0016] Furthermore, a ring frame beam model and a main structure model are established by using a three-dimensional visualization digital modeling technology, and the steel bar installation steps of the ring frame beam and the installation position of the embedded sleeve on the ring frame beam are planned in advance, and the embedded sleeve model is added to the ring frame beam model according to the position of the embedded sleeve, including:
[0017] The three-dimensional visual digital modeling technology is used to establish the ring frame beam reinforcement model, which is then disassembled to hide the upper and lower horizontal reinforcements and stirrups, retaining the main reinforcement and positioning reinforcement skeleton on both sides of the ring frame beam. The embedded sleeve model is arranged on the inner side of the main reinforcement according to the designed spacing and welded firmly to the positioning reinforcement. The bottom and top horizontal distribution bars, inner and outer stirrups are then tied, so that the ring frame beam reinforcement model and the embedded sleeve model are accurately installed according to the design drawings.
[0018] Furthermore, the ring frame beam and the embedded sleeve are constructed based on the ring frame beam model, including:
[0019] Arrange the ring frame beam reinforcement based on the ring frame beam reinforcement model, arrange the embedded sleeve inside the main reinforcement according to the designed spacing, and weld it firmly with the positioning reinforcement;
[0020] Set up the ring frame beam formwork and cast the ring frame beam.
[0021] Further, after the reinforcement of the ring frame beam is tied, the position of the embedded sleeve is first measured, and the position of the embedded sleeve is imported into the model. When the bottom plate of the main structure is constructed, the position of the embedded sleeve is lofted to the horizontal positioning reinforcement of the side wall, and the position of the vertical main reinforcement of the side wall is marked with a vertical line with a red bar, so that the vertical main reinforcement of the side wall corresponds to the embedded sleeve, and then the bottom plate and the first layer of side wall are cast. The first layer of side wall is located below the waist beam, including:
[0022] Use a total station to measure 3-5 coordinates of each row of embedded sleeves in each section of the ring frame beam. The coordinates of the remaining sleeves are calculated according to the set spacing and arranged on the model. If there is a deviation in the model arrangement, the coordinates of the embedded sleeves in the deviation section are checked.
[0023] During the construction of the base plate of the main structure, 3-4 main reinforcement control points corresponding to the measured embedded sleeve positions are selected on the side wall positioning horizontal reinforcement. The main reinforcement control points are distributed at the two corners and the middle section.
[0024] The remaining main reinforcement control points are arranged according to the set spacing;
[0025] Spot check the position deviation between several main reinforcement control points and embedded sleeves. If there is a deviation, recheck it. If there is no deviation, proceed with the construction of the base plate and the first layer of side walls.
[0026] Furthermore, the temporary platform model and the support frame model are verified, including:
[0027] Perform strength calculation on the temporary platform model: Use the Lizheng structural software to simulate the bending and shearing performance of a single I-beam under the live and dead loads of the construction conditions under the most unfavorable working conditions of the three-span continuous beam of the steel platform. The calculation will be used only after it meets the requirements;
[0028] The support frame model is used for stability verification: PKPM software and floor slab concrete calculation model are used to add the floor slab thickness to the construction load on the platform, and then the stability of a single vertical pole in the support frame and the overall stability of the support frame are calculated. The calculation will be used only after it meets the requirements.
[0029] Furthermore, during the cutting and transportation of the waist beam and the construction of the steel formwork tripod, an automatic monitoring device is arranged between the support frame and the temporary platform to monitor the stress and deformation of the temporary platform and the support frame in real time, including:
[0030] During the cutting, transportation and construction of the waist beam tripod, an automatic monitoring device is installed at the most unfavorable position on the top surface of the support frame, with two rows arranged perpendicular to the side wall and three monitoring points in each row in the horizontal direction of the side wall. The automatic monitoring device is used to collect the axial force, displacement and inclination angle of the support frame and the temporary platform, and monitor them in real time during construction.
[0031] Furthermore, verifying the temporary platform model and the support frame model, and adjusting the temporary platform model and the support frame model further includes:
[0032] The adjusted support frame model is merged with the steel replacement support model, and the steel replacement support model is adjusted to reduce the collision between the steel replacement support and the buckle bracket. After the adjustment, the model is established to recheck the matching of the support frame and the steel replacement support.
[0033] Further, the temporary platform model and the support frame model are adjusted so that the elevation of the temporary platform meets the elevation of the steel formwork tripod, including:
[0034] Use 3D visualization digital modeling technology to simulate the installation height of the steel formwork tripod so that the installation height of the steel formwork tripod matches the installation angle of the embedded sleeve bolts on the side wall of the first floor;
[0035] Based on the installation height of the steel formwork tripod, by adjusting the jacking height on the support frame and / or the height of the support on the temporary platform, the front end of the steel formwork tripod can be connected to the embedded bolt sleeve and the rear end can be fixed on the support of the temporary platform.
[0036] Further, the temporary platform and the steel formwork tripod are removed, an operating frame is set up on the support frame along the side wall, the vertical main reinforcement of the side wall and the main reinforcement of the ring frame beam are connected through the embedded sleeve, the formwork of the third layer side wall is set up, and the third layer side wall construction is carried out, specifically:
[0037] Remove the temporary platform and steel formwork tripod, and set up an operating frame on the support frame along the side wall;
[0038] Waterproof construction of the connection node between the ring frame beam and the side wall: before installing the dowels between the ground connection wall and the ring frame beam, apply cement-based penetrating crystallization coating, bend the bottom surface of the dowels of the ring frame beam to embed the PVC waterproof membrane connected to the side wall, with a lap length of 500mm, and attach an external waterstop to the waterproof membrane;
[0039] Construction of steel bars at the connection node between the ring frame beam and the side wall: clean the mud and sand around the bottom surface of the ring frame beam and the embedded sleeve, and roughen the bottom surface of the ring frame beam with an air gun;
[0040] The main reinforcement joints of the side wall vertical main reinforcement extending to the connection node of the ring frame beam are staggered by 35d;
[0041] Measure the main reinforcement length of the node connecting the ring frame beam and the side wall on site to determine the main reinforcement length of the node segment and cut the material;
[0042] The node segment main reinforcement is first connected to the embedded sleeve on the ring frame beam, and then connected to the side wall main reinforcement sleeve. The sleeve is reversed to make the node segment main reinforcement and the side wall vertical main reinforcement firmly connected;
[0043] After the vertical main reinforcement facing the soil surface is connected, one end of the horizontal reinforcement is welded to the end of the side wall main reinforcement, and the horizontal reinforcement is then welded to the tension bolts. Then the wooden formwork, secondary ribs, main ribs and double steel pipes are installed to form a side wall formwork support tension system. The poured concrete is introduced from the pre-embedded pouring holes of the ring frame beam, and poured and vibrated in layers.
[0044] Furthermore, the supporting member is a disc-shaped bracket, and the steel support is a horizontally arranged steel straight support. The steel straight support is provided in plurality, at least three of the plurality of steel straight supports are perpendicular to the side wall, and at least four of the plurality of steel straight supports are at an angle of 45°-60° to the side wall, and are symmetrically divided into two groups.
[0045] First, in the present invention, a three-dimensional visualization digital modeling technology is used to establish a ring frame beam model and a main structure model, and the positioning of the embedded sleeve on the ring frame beam cover and the vertical main reinforcement of the side wall is inverted, thereby improving the mechanical connection accuracy of the steel bars. Through the ring frame beam model, the installation sequence and reinforcement positioning of the embedded sleeve under the dense reinforcement frame can be simulated, and the coordinates of each row of embedded sleeves are measured and imported into the three-dimensional visualization digital model. When the vertical main reinforcement of the side wall is installed on the bottom plate, the measured embedded sleeve coordinates are lofted to the horizontal reinforcement of the side wall positioning, thereby accurately positioning the vertical main reinforcement, thereby avoiding the problem of misalignment of the ring frame beam construction first and the side wall main reinforcement connection later.
[0046] Secondly, the present invention uses three-dimensional visualization digital modeling technology to simulate the joint design and construction of the support frame and the temporary platform. When the support frame plan is formulated, the three-dimensional visualization digital modeling technology is used to simulate the erection method and sequence, and the support frame is used as the supporting structure of the temporary platform, and the temporary platform is used as the cutting platform for the concrete waist beam, and the load requirements of forklift transportation and placement of concrete blocks are met. The support frame is adjusted to ensure the overall stability of the support frame after bearing, and real-time automatic monitoring is carried out during construction; finally, the three-dimensional visualization digital modeling technology is used to simulate the temporary platform as the supporting structure of the steel formwork tripod, and the installation and positioning problems between the steel formwork tripod and the side wall and the temporary platform are simulated, so that the steel formwork tripod can be smoothly implemented on the temporary platform.
[0047] The present invention establishes a model through three-dimensional visual digital modeling technology for construction simulation, and adjusts the model according to actual conditions during the construction process, so that the connection between the main reinforcement is more accurate, the project quality is guaranteed, and the labor intensity is reduced. During the implementation of the project, the temporary platform, the support frame and the steel formwork tripod platform are designed and constructed together, and verification and intelligent automatic monitoring are carried out, which not only ensures the construction safety, but also avoids repeated erection, maximizes the saving of materials, and improves the construction efficiency. It finally solves the problems in the related technology that the ring frame beam and the side wall main reinforcement are easily connected and misaligned during the permanent and temporary construction of the underground structure, the construction material consumption is large, the waste discharge is large, and the labor intensity is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention, so that other features, purposes and advantages of the present invention become more obvious. The accompanying drawings of the exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0049] Figure 1 is a schematic diagram of the construction of the bottom plate and the first-layer side wall according to an embodiment of the present invention;
[0050] Figure 2 is a schematic diagram of the alignment of the embedded sleeve and the vertical main reinforcement according to an embodiment of the present invention;
[0051] Figure 3 is a schematic diagram of waist beam cutting and transporting according to an embodiment of the present invention;
[0052] Figure 4 is a schematic diagram of a steel replacement support and a support frame combined according to an embodiment of the present invention;
[0053] Figure 5 is a schematic diagram of another steel replacement support and a support frame combined according to an embodiment of the present invention;
[0054] Figure 6is a schematic diagram of the construction of a steel formwork tripod according to an embodiment of the present invention;
[0055] Figure 7 is a schematic diagram of the construction of the third-layer side wall according to an embodiment of the present invention;
[0056] Figure 8 is a schematic diagram of the connection between the embedded sleeve and the vertical main reinforcement of the side wall according to this embodiment;
[0057] Fig. 9 is a schematic diagram of the arrangement of the side wall formwork support tensioning system according to this embodiment;
[0058] Among them, 1 bottom plate, 2 first floor side wall, 3 waist beam, 4 ring frame beam, 5 side wall positioning horizontal reinforcement, 6 side wall vertical main reinforcement, 7 embedded sleeves, 8 temporary platform, 9 support frame, 10 steel replacement support, 11 second floor side wall, 12 steel formwork tripod, 13 side wall formwork support tensioning system, 14 side wall main reinforcement sleeves, 15 automatic monitoring equipment. DETAILED DESCRIPTION
[0059] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0060] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged under appropriate circumstances to facilitate the embodiments of the present invention described herein.
[0061] In the present invention, the directions or positional relationships indicated by the terms "upper", "lower", "inner", etc. are based on the directions or positional relationships shown in the drawings. These terms are mainly used to better describe the present invention and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific direction, or to be constructed and operated in a specific direction.
[0062] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in the present invention can be understood according to specific circumstances.
[0063] In addition, the terms "disposed", "provided with", "connected", "fixed" and the like should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements or components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0064] In addition, the term "plurality" shall mean two or more.
[0065] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0066] To solve relevant technical problems, such as Figures 1 to 7 As shown, the embodiment of the present invention provides a green construction method combining permanent and temporary construction of underground structures.
[0067] The ring frame beam model and the main structure model are established by using three-dimensional visual digital modeling technology, and the steel bar installation steps of the ring frame beam 4 and the installation position of the embedded sleeve 7 on the ring frame beam 4 are planned in advance, and the embedded sleeve model is added to the ring frame beam model according to the position of the embedded sleeve 7;
[0068] Project the embedded sleeve model on the ring frame beam model onto the bottom plate 1 surface of the main structure model, and adjust the position of the ring frame beam model so that the position relationship between the embedded sleeve 7 and the edge line of the side wall in the main structure meets the requirements;
[0069] Construction of the ring frame beam 4: The ring frame beam 4 and the embedded sleeve 7 are constructed based on the ring frame beam model, including: arranging the steel bars of the ring frame beam 4 based on the steel bar model of the ring frame beam 4, arranging the embedded sleeve 7 on the inner side of the main bars according to the designed spacing, and welding it firmly with the positioning steel bars; setting up the template of the ring frame beam 4, and casting to form the ring frame beam 4;
[0070] Construction of waist beam 3: Concrete waist beam is constructed below the ring frame beam 4;
[0071] Construction of the bottom plate 1 and the first layer of side wall 2 of the main structure: After the reinforcement of the ring frame beam is tied, first measure the position of the embedded sleeve 7, import the position of the embedded sleeve 7 into the model, and when constructing the bottom plate 1 of the main structure, loft the position of the embedded sleeve 7 to the side wall positioning horizontal reinforcement 5 to locate the side wall vertical main reinforcement 6, so that the side wall vertical main reinforcement 6 corresponds to the embedded sleeve 7, and then cast the bottom plate 1 and the first layer of side wall 2, and the first layer of side wall 2 is located below the waist beam 3;
[0072] Modify the position of the vertical main reinforcement 6 of the side wall in the main structure model based on the position of the embedded sleeve 7, and then construct the bottom plate 1 surface and the first layer side wall 2 of the main structure according to the main structure model;
[0073] Setting up the support frame 9 and temporary platform 8: using three-dimensional visual digital modeling technology to establish the support frame model, temporary platform model, steel replacement support model and steel formwork tripod model in the main structure model, and simulate the setting sequence, the support frame 9 is set on the bottom plate 1, the temporary platform 8 is supported by the support frame 9, the temporary platform 8 is used for cutting and moving the waist beam 3, after the waist beam 3 is cut and moved, the temporary platform 8 is used to support the steel formwork tripod 12, and the steel replacement support 10 is used to support the first-layer side wall 2; during the cutting and movement of the waist beam 3 and the construction of the steel formwork tripod 12, the steel platform support frame 9 is equipped with an intelligent automatic monitoring device 15 to monitor the stress and deformation of the steel platform 8 and the support frame 9 in real time.
[0074] Verify the temporary platform model and the support frame model, and adjust the temporary platform model and the support frame model so that the temporary platform 8 meets the working load conditions of carrying and transporting the waist beam 3 concrete and placing at least one waist beam 3 concrete, and at the same time, the elevation of the temporary platform 8 meets the elevation of the steel formwork tripod 12, so that the front end of the steel formwork tripod 12 arranged on the temporary platform 8 can be connected to the first-layer side wall 2, and the rear end can be connected to the temporary platform 8;
[0075] Construction of the second-layer side wall 11 of the main structure: the waist beam 3 is cut and moved on the temporary platform 8, and then a steel formwork tripod 12 is set up on the temporary platform 8 based on the model. The second-layer side wall 11 is constructed on the first-layer side wall 2 using the steel formwork tripod 12 as a template. The second-layer side wall 11 is located below the ring frame beam 4;
[0076] Construction of the third-layer side wall of the main structure: dismantle the temporary platform 8 and the steel formwork tripod 12, set up an operating frame on the support frame 9 along the side wall, connect the vertical main reinforcement 6 of the side wall and the main reinforcement of the ring frame beam 4 through the embedded sleeve 7, set up the formwork of the third-layer side wall, and carry out the construction of the third-layer side wall.
[0077] In this embodiment, the construction process of the permanent and temporary underground structure is roughly as follows:
[0078] Construction of ring frame beam 4;
[0079] Waist beam 3 construction;
[0080] Construction of the base plate 1 of the main structure;
[0081] Construction of the first-story side wall 2 of the main structure;
[0082] The support frame 9, steel replacement support 10 and temporary platform 8 are set up;
[0083] Cutting and moving waist beam 3;
[0084] Steel formwork tripod 12 is erected;
[0085] Construction of the second layer side wall 11 of the main structure;
[0086] The steel formwork tripod 12 and the temporary platform 8 are removed, and an operating frame is set up on the support frame 9;
[0087] The vertical main reinforcement 6 of the side wall and the embedded sleeve 7 on the ring frame beam 4 are connected on the operating frame, and then the third layer of side wall construction is carried out.
[0088] In this embodiment, based on the above-mentioned construction process, a corresponding construction model is established by using three-dimensional visualization digital modeling technology. First, before the construction of the ring frame beam 4, a ring frame beam model and a main structure model are established by using three-dimensional visualization digital modeling technology. In the ring frame beam model, the dense steel bar model of the ring frame beam 4 can be disassembled. Specifically, the upper and lower horizontal steel bars and stirrups can be hidden, and the main bars and positioning steel bar skeletons on both sides of the ring frame beam 4 are retained, so that the layout position of the embedded sleeve 7 is more intuitive. The embedded sleeve model is arranged on the inner side of the main bar according to the designed spacing, and is firmly welded with the positioning steel bar, and then the bottom and top horizontal distribution bars, inner and outer stirrups are tied, so that the ring frame beam 4 steel bar model and the embedded sleeve model are accurately installed according to the design drawings. So far, the steel bar installation steps of the ring frame beam 4 and the installation steps and positions of the embedded sleeve 7 are determined based on the three-dimensional visualization digital modeling technology. In the subsequent construction of the ring frame beam 4, the steel bars and the embedded sleeve 7 can be arranged according to the determined installation steps and installation positions.
[0089] To further improve the construction quality, the position of the embedded sleeve 7 can be further checked before the construction of the ring frame beam 4. Specifically, the embedded sleeve model on the ring frame beam model can be projected onto the bottom plate 1 surface of the main structure model, and the position of the ring frame beam model can be adjusted so that the positional relationship between the embedded sleeve 7 and the edge line of the side wall in the main structure meets the requirements.
[0090] After the ring frame beam 4 is constructed, the waist beam 3 is constructed. The waist beam 3 is mainly formed by pouring concrete. The waist beam 3 is located below the ring frame beam 4. The distance between the two is determined according to the design requirements, and there is no restriction on it in this embodiment.
[0091] like Figure 1 As shown, after the waist beam 3 is constructed, the bottom plate 1 and the first layer of side wall 2 of the main structure can be constructed. Specifically, in this embodiment, the bottom plate 1 and the first layer of side wall 2 of the main structure can be constructed according to conventional construction techniques, including arranging bottom plate steel bars, bottom plate formwork, side wall steel bars, and side wall formwork, and then pouring the bottom plate 1 and the first layer of side wall 2 in sequence. In this construction process, as shown in FIG. Figure 2As shown, the side wall vertical main reinforcement 6 is positioned synchronously when the bottom plate reinforcement is arranged. Since the side wall vertical main reinforcement 6 needs to be connected with the embedded sleeve 7 on the ring frame beam 4, and since the ring frame beam 4 is constructed before the side wall vertical main reinforcement 6, it is necessary to locate the position of the side wall vertical main reinforcement 6 based on the actual position of the embedded sleeve 7, so as to avoid the problem of misalignment of the ring frame beam 4 constructed first and the side wall main reinforcement connected later.
[0092] In this embodiment, the positioning of the vertical main reinforcement 6 of the side wall is achieved by first measuring the position of the embedded sleeve 7, importing the position of the embedded sleeve 7 into the model, and when the base plate 1 of the main structure is constructed, the position of the embedded sleeve 7 is laid out to the side wall positioning horizontal reinforcement 5, and the position of the vertical main reinforcement 6 of the side wall is marked with a vertical red line to make the vertical main reinforcement 6 of the side wall correspond to the embedded sleeve 7.
[0093] Specifically, in this embodiment, in order to improve the construction efficiency, a total station is used to measure 3-5 coordinates of each row of embedded sleeves 7 of each section of the ring frame beam 4, and the coordinates of the remaining sleeves are calculated according to the set spacing and arranged on the model. When the model arrangement has deviations, the coordinates of the embedded sleeves 7 of the deviation section are checked;
[0094] When constructing the bottom plate 1 of the main structure, select 3-4 main reinforcement control points corresponding to the measured positions of the embedded sleeves 7 on the side wall positioning horizontal reinforcement 5, and the main reinforcement control points are distributed at the two corners and the middle section;
[0095] The remaining main reinforcement control points are arranged according to the set spacing;
[0096] Spot check the position deviation between several main reinforcement control points and the embedded sleeve 7. If there is a deviation, recheck it. If there is no deviation, proceed with the construction of the base plate 1 and the first layer side wall 2.
[0097] In addition, when constructing the first layer of side wall 2, a steel mold can be arranged on the bottom plate 1 as a casting template for the first layer of side wall 2. The specific arrangement method is not limited in this embodiment, and a conventional arrangement method can be used.
[0098] In one embodiment, for the construction of the first layer of side wall 2, it is necessary to control the verticality and pouring quality of the side wall steel grid: the verticality of the high and thick side wall is controlled, the soil-facing steel grid and the ground-connected wall are tied with expansion bolts and wires, and the soil-facing steel grid and the soil-facing steel bars are fixed with hook bars to keep the side wall steel bars vertical as a whole. The steel formwork tripod is used to pour the side wall concrete, and the pouring pipe is extended to the pouring bottom surface by extending the pump pipe. The personnel go down to the construction surface to vibrate in layers and sections to ensure the compactness of the side wall concrete.
[0099] like Figures 3 to 5As shown, after the construction of the bottom plate 1 and the first layer side wall 2 of the main structure is completed, the support frame 9, the steel replacement support 10 and the temporary platform 8 can be erected. The main reason for setting the temporary platform 8 in this embodiment is that due to the limitation of the permanent and temporary combination of the large-section ring frame beam 4 under the cutting of the concrete waist beam 3, the ground crane needs to bend the wire rope about 160° to lift the concrete block of the waist beam 3, which poses a major safety risk. Therefore, the temporary platform 8 is designed, and the forklift can move on the temporary platform 8 to move the concrete of the waist beam 3 to the outside of the ring frame beam 4, so that the crane wire rope can vertically lift the concrete block to the ground.
[0100] like Figure 6 As shown, since a temporary platform 8 needs to be set up, considering that the corresponding formwork needs to be arranged when pouring the second-layer side wall 11, on this basis. In order to improve construction efficiency and reduce material consumption, this embodiment considers using the support frame 9 as the support structure of the temporary platform 8, and also considers using the temporary platform 8 as the installation foundation of the steel formwork tripod 12 required for pouring the second-layer side wall 11. In other words, in this embodiment, the support frame 9 serves as the support structure of both the temporary platform 8 and the steel formwork tripod 12, and the temporary platform 8 needs to serve as the installation foundation of the steel formwork tripod 12.
[0101] Based on this, in this embodiment, the three-dimensional visualization digital modeling technology is first used to establish the support frame model, temporary platform model, steel replacement support model and steel formwork tripod model. Since the temporary platform 8 is not only the installation basis of the seat steel formwork tripod 12, but also needs to be used as a platform for cutting and moving the concrete of the waist beam 3, and the support frame 9 needs to meet the support performance of a larger load, it is necessary to verify and adjust the structure. Since the steel replacement support 10 is used to support the side wall, it will inevitably interfere with the support frame 9 according to the layout position, so the layout of the steel replacement support 10 also needs to be considered during the verification.
[0102] In this embodiment, after the corresponding model is established by three-dimensional visual digital modeling technology, the corresponding verification software is used to verify the strength and stability of the structure, and the structure of the support frame 9, the structure of the temporary platform 8 and the structure of the steel replacement support 10 are adjusted based on the verification results. At the same time, it is also necessary to consider whether the elevation of the temporary platform 8 matches the elevation of the steel formwork tripod. According to the construction requirements, the front end of the steel formwork tripod needs to be connected to the embedded structure (such as the embedded threaded sleeve) on the first-layer side wall 2, and the rear end needs to be installed on the temporary platform 8. Since the embedded structure on the first-layer side wall 2 has a certain inclination angle, the elevation of the steel formwork tripod needs to be determined by the position and angle of the embedded structure on the first-layer side wall 2, and the corresponding elevation of the temporary platform 8 needs to be determined according to the elevation of the steel formwork tripod.
[0103] This embodiment can further simulate the erection sequence of the corresponding components after adjusting the model through the three-dimensional visualization digital modeling technology. When the erection sequence is established, the support frame 9, the steel replacement support 10 and the temporary platform 8 can be erected according to the simulation results. Since the three-dimensional visualization digital modeling technology has been used in advance for adjustment and verification before erection, the structure after construction can meet the requirements, improve the construction quality and reduce the amount of materials.
[0104] like Figure 3 As shown, after the temporary platform 8 is completed, the waist beam 3 can be cut and moved on the temporary platform 8. After all the waist beams 3 are cut and moved, the steel formwork tripod 12 can be set up on the temporary platform 8. The setting process can be carried out according to the structure and sequence in the three-dimensional visualized digital model, and the second layer side wall 11 is constructed on the first layer side wall 2 using the steel formwork tripod 12 as a template.
[0105] like Figure 7 and Figure 8 As shown, after the pouring construction of the second-layer side wall 11 is completed, the steel formwork tripod and the temporary platform 8 can be removed, and the pouring construction of the third-layer side wall needs to be carried out at this time. Before the pouring construction of the third-layer side wall, the corresponding reinforcement arrangement needs to be carried out. The reinforcement arrangement process includes connecting the vertical main reinforcement 6 of the side wall and the embedded sleeve 7 on the ring frame beam 4. Therefore, in this embodiment, an operating frame is first set up on the support frame 9 along the side wall. Since the structural strength and stability of the support frame 9 are relatively high, the operating frame only needs to be set up along the side wall, and does not need to be fully laid, thereby greatly reducing the amount of support materials and construction time. After the operating frame is set up, the corresponding reinforcement arrangement and formwork arrangement can be carried out, and then the concrete pouring of the third-layer side wall can be carried out.
[0106] First, in the present invention, a three-dimensional visualization digital modeling technology is used to establish a ring frame beam model and a main structure model, and the positioning of the embedded sleeve 7 on the cover of the ring frame beam 4 and the vertical main reinforcement 6 of the side wall is inverted, thereby improving the mechanical connection accuracy of the steel bars. Through the ring frame beam model, the installation sequence and steel bar positioning of the embedded sleeve 7 under the dense steel bar frame can be simulated, and the coordinates of each row of embedded sleeves 7 are measured and imported into the three-dimensional visualization digital model. When the vertical main reinforcement 6 of the side wall is installed on the bottom plate 1, the measured coordinates of the embedded sleeve 7 are lofted to the side wall positioning horizontal reinforcement 5, thereby accurately positioning the vertical main reinforcement, thereby avoiding the problem of misalignment of the ring frame beam 4 constructed first and the side wall main reinforcement connection later.
[0107] Secondly, the present invention uses three-dimensional visual digital modeling technology to simulate the joint design and construction of the support frame 9 and the temporary platform 8. When the support frame 9 plan is formulated, the three-dimensional visual digital modeling technology is used to simulate the erection method and sequence, and the support frame 9 is used as the supporting structure of the temporary platform 8, and the temporary platform 8 is used as the cutting platform of the concrete waist beam 3. It also meets the load requirements of forklift transportation and placement of concrete blocks. The support frame 9 is adjusted to ensure the overall stability of the support frame 9 after bearing. Real-time automatic monitoring is carried out during construction. Beidou monitoring and fiber optic monitoring technology can be integrated to realize real-time, accurate and comprehensive data collection of on-site construction on the platform. Management personnel can check the influence of forklift transportation of concrete and concrete blocks placed on the platform on the deformation of various parts of the support frame on their mobile phones at any time, adjust the construction rhythm in time, match the construction with the bearing capacity of the support frame, and monitor and warn the support frame in real time;
[0108] The three-dimensional visual digital modeling technology is used to simulate the use of the temporary platform 8 as the supporting structure of the steel formwork tripod, and to simulate the installation and positioning problems between the steel formwork tripod, the side wall and the temporary platform 8, so that the steel formwork tripod can be smoothly implemented on the temporary platform 8.
[0109] The present invention establishes a model through three-dimensional visual digital modeling technology for construction simulation, and adjusts the model according to actual conditions during the construction process, so that the connection between the main reinforcements is more accurate, the project quality is guaranteed, and the labor intensity is reduced. During the implementation of the project, the temporary platform 8, the support frame 9 and the steel formwork tripod platform are designed and constructed together, and verification and intelligent automatic monitoring are performed, which not only ensures construction safety, but also avoids repeated erection, maximizes material savings, and improves construction efficiency. It finally solves the problems of easy connection dislocation between the ring frame beam 4 and the side wall main reinforcement 6, large amount of construction materials, large amount of waste emissions, and high labor intensity during the permanent and temporary construction of underground structures in the related technology.
[0110] In summary, the present invention adopts three-dimensional visual digital modeling technology to pre-invert the positioning connection between the embedded sleeve of the ring frame beam and the main reinforcement of the side wall, and simulates the joint design and construction of the disc buckle support frame and the temporary steel platform, which transforms the one-time construction into modular and standardized construction, simplifies the complex, greatly reduces the construction difficulty and construction period risk, and adopts a variety of green construction technologies to reduce material consumption and save labor and other construction costs.
[0111] Furthermore, the temporary platform model and the support frame model are verified, including:
[0112] Perform strength calculation on the temporary platform model: Use Lizheng Structure Software to simulate the bending and shear performance of a single I-beam under the live and dead loads of the construction conditions under the most unfavorable working conditions of the three-span continuous beam of the steel platform. Use it after the calculation meets the requirements.
[0113] Specifically, by verifying the I-beam continuous beam of the steel platform, the tensile, bending, compressive and shear strengths of the steel platform after bearing are compared with the design strength of the I-beam material. When the load applied to the platform is less than the design strength of the I-beam, the use requirements are met.
[0114] 1) Bearing strength stress calculation formula:
[0115]
[0116] Where: σ—bearing strength stress;
[0117] M χ —Design value of the maximum bending moment acting around the strong axis (N·mm);
[0118] y χ — Plastic development coefficient of the section about the principal axes x and y;
[0119] W nχ —net section modulus about the x-axis;
[0120] f—Design value of steel bending strength (N / mm 2 ).
[0121] 2) Shear stress calculation formula:
[0122]
[0123] Where: τ—shear strength stress;
[0124] V—design value of shear force acting along the web plane of the calculation section (N);
[0125] S—Area moment of the gross section above (or below) the shear stress to the neutral axis (mm 3 );
[0126] I—gross section moment of inertia of the component (mm 4 );
[0127] t w —web thickness of the component (mm);
[0128] f v —Design value of shear strength of steel (N / mm 2 ).
[0129] Table 1 Calculation table of effective section modulus stress of 25a I-beam
[0130]
[0131] Table 2 25a I-beam material strength design index table
[0132] Cross-number <![CDATA[Flexural strength (N / mm 2 )]]> <![CDATA[Shearing strength (N / mm 2 )]]> 1 215.000 125.000 2 215.000 125.000 3 215.000 125.000
[0133] The support frame model is used for stability verification: PKPM software and floor slab concrete calculation model are used to add the floor slab thickness to the construction load on the platform, and then the stability of a single vertical pole in the support frame 9 and the overall stability of the support frame 9 are calculated. The calculation is used only after it meets the requirements.
[0134] Specifically, 1) Stability verification of a single pole:
[0135]
[0136] Where: σ—Calculated value of compressive strength of steel pipe upright (N / mm 2 );
[0137] [f]—Design value of compressive strength of steel pipe uprights, [f] = 300.00 N / mm 2 ;
[0138] N—design value of the axial pressure of the vertical pole, N=57.39kN;
[0139] φ—Stability coefficient of axially compressed column, obtained by looking up the slenderness ratio l0 / i;
[0140] i—calculate the cross-sectional radius of gyration of the vertical pole (cm); i=2.01;
[0141] A—Net cross-sectional area of the pole (cm 2 ); A = 5.71;
[0142] W—net section resistance moment of vertical pole (cm 3 ); W = 7.70;
[0143] l 0 —Calculate the length (m).
[0144] 2) Verification of overall stability of the support frame:
[0145] β=γ 0 γ u γ m ·γ' m
[0146] Verification strength: β≥1.5;
[0147] Verification stability: β ≥ 2.2 (support frame);
[0148] Where: β——comprehensive safety factor of scaffolding structure and components;
[0149] γ 0 ——Structural importance coefficient, value is 1.100;
[0150] γ u——The weighted average of the permanent load and variable load partial factors is 1.363;
[0151] γ m ——The comprehensive safety factor of scaffolding structure and components is 1.165;
[0152] γ' m ——Material strength additional coefficient, the value is 1.050 when checking strength, and the value is 1.500 when checking stability.
[0153] like Figure 6 As shown, during the cutting and transportation of the waist beam 3 and the construction of the steel formwork tripod 12, an automatic monitoring device 15 is arranged between the support frame 9 and the temporary platform 8 to monitor the stress deformation of the temporary platform 8 and the support frame 9 in real time, including:
[0154] During the cutting, transportation of the waist beam 3 and the construction of the steel formwork tripod 12, an automatic monitoring device 15 is set at the most unfavorable position on the top surface of the support frame 9, and two rows are arranged in a direction perpendicular to the side wall, with three monitoring points in each row in the horizontal direction of the side wall. The automatic monitoring device 15 is used to collect the axial force, displacement and inclination angle of the support frame 9 and the temporary platform 8, and monitor them in real time during construction.
[0155] Specifically, in this embodiment, an I-beam is set on the top support of the support frame 9, and a steel platform is set on the I-beam to form a temporary platform 8. The automatic monitoring device 15 can be arranged between the top support of the support frame 9 and the I-beam. The automatic monitoring device 15 can include Beidou monitoring, optical fiber monitoring, etc. The automatic monitoring device 15 can ensure the safety and stability of the entire support frame 9.
[0156] like Figure 4 and Figure 5 As shown, the temporary platform model and the support frame model are verified and adjusted, and the following also includes:
[0157] The adjusted support frame model is merged with the steel replacement support model, and the steel replacement support model is adjusted to reduce the collision between the steel replacement support 10 and the buckle bracket. After the adjustment, the model is established to recheck the matching of the support frame 9 and the steel replacement support 10.
[0158] In one embodiment, if Figure 4 As shown in the figure, the steel replacement brace model of the steel diagonal brace is first established. After merging the steel replacement brace model with the support frame model, it is found that there are a lot of continuous collisions. Therefore, in order to reduce the continuous collisions and meet the corresponding support performance, as shown in the figure, Figure 5As shown, in this embodiment, the steel diagonal brace is adjusted to a steel straight brace, that is, a horizontally arranged steel column is used to support the side wall. After the steel straight brace model is established, the matching of the support frame 9 and the steel replacement brace 10 is rechecked through the three-dimensional visual digital modeling technology to avoid the safety risk of the support frame 9 becoming unstable.
[0159] Further, the temporary platform model and the support frame model are adjusted so that the elevation of the temporary platform 8 meets the elevation of the steel formwork tripod 12, including:
[0160] Use three-dimensional visualization digital modeling technology to simulate the installation height of the steel formwork tripod, so that the installation height of the steel formwork tripod matches the installation angle of the embedded sleeve 7 bolts on the first layer side wall 2;
[0161] Based on the installation height of the steel formwork tripod, by adjusting the jacking height on the support frame 9 and / or the height of the support on the temporary platform 8, the front end of the steel formwork tripod can be connected to the embedded bolt sleeve and the rear end can be fixed on the support of the temporary platform 8.
[0162] like Figures 7 to 9 As shown, the temporary platform 8 and the steel formwork tripod 12 are removed, and an operating frame is set up on the support frame 9 along the side wall. The vertical main reinforcement 6 of the side wall and the main reinforcement of the ring frame beam 4 are connected through the embedded sleeve 7, and the template of the third layer side wall is set up to carry out the construction of the third layer side wall. Specifically,
[0163] Remove the temporary platform 8 and the steel formwork tripod 12, and set up an operating frame on the support frame 9 along the side wall;
[0164] Waterproof construction of the connection node between the ring frame beam 4 and the side wall: before installing the dowels between the ground-connected wall and the ring frame beam 4, apply cement-based penetrating crystallization coating, bend the bottom surface of the dowels of the ring frame beam 4 around to embed the PVC waterproofing membrane connected to the side wall, with an overlap length of 500mm, and attach an external water stop to the waterproofing membrane. When constructing to the connection node between the ring frame beam 4 and the side wall, clean the mud and sand around the base surface of the ground-connected wall and the waterproofing membrane, overlap the cut PVC waterproofing membrane with the upper and lower interfaces by 100mm each, and heat-melt weld with a hot air gun;
[0165] Construction of steel bars at the connection node between the ring frame beam 4 and the side wall: clean the mud and sand around the bottom surface of the ring frame beam 4 and the embedded sleeve 7, and roughen the bottom surface of the ring frame beam 4 with an air gun;
[0166] The main reinforcement joints of the side wall vertical main reinforcement 6 extending to the connection node of the ring frame beam 4 are staggered by 35d;
[0167] Measure the main reinforcement length of the node connecting the ring frame beam 4 and the side wall on site to determine the main reinforcement length of the node segment and cut the material;
[0168] The node segment main reinforcement is first connected to the embedded sleeve 7 on the ring frame beam 4, and then connected to the side wall main reinforcement sleeve 14, and the sleeve is reversed to make the node segment main reinforcement and the side wall vertical main reinforcement 6 firmly connected;
[0169] After the vertical main reinforcement facing the soil surface is connected, one end of the horizontal reinforcement is welded to the end of the side wall main reinforcement, and the horizontal reinforcement is welded to the tension bolts. Then the wooden formwork, secondary ribs, main ribs and double steel pipes are installed to form a side wall formwork support tension system 13. The poured concrete is introduced from the pre-buried pouring holes of the ring frame beam 4, and poured and vibrated in layers.
[0170] Furthermore, the supporting member is a disc-shaped bracket, and the steel support 10 is a horizontally arranged steel straight support. There are multiple steel straight supports, at least three of the multiple steel straight supports are perpendicular to the side wall, and at least four of the multiple steel straight supports are 45°-60° between the side wall and are symmetrically divided into two groups.
[0171] In one embodiment, the dense steel bar model of the ring frame beam 4 is three rows of 14φ32 steel bars on both sides, 2 rows of 16φ25 steel bars on the top and bottom, the ring frame beam 4 has 6 stirrups in the horizontal and vertical directions with a spacing of 100mm, and the φ32 embedded sleeves 7 are arranged with a spacing of 100mm.
[0172] The total station measures the coordinates of the 7 embedded sleeves in each row of the ring frame beam 4, which means extracting 3 to 4 coordinate points from each row of embedded sleeves in each section of the ring frame beam 4, and arranging the remaining points at a spacing of 100 mm on the model. When there is a deviation in the model arrangement, the 7 points of the embedded sleeves in the deviation section are rechecked.
[0173] The first-floor side wall 2 is 5.8m high and 1.4m wide. The vertical reinforcement is φ32 steel bar @100, the horizontal reinforcement is φ25 steel bar @100, and the tie reinforcement is φ14 @400×400.
[0174] The parameters for erecting the steel platform from top to bottom are: the platform width is 6m, and the panel is fully paved with 20mm thick steel plates; the top supporting beam is made of 25 I-beam and arranged perpendicular to the side wall; the support frame 9 is arranged 6m outward along the edge of the side wall with a spacing of 0.6×0.6m, and the spacing of the support frame 9 in the remaining range is 1.2×1.2m, the step distance of the support frame 9 is 1.5m, the vertical diagonal bars are arranged at intervals of 1 span, and φ48 horizontal scissors braces are continuously arranged on the top, middle and bottom of the support frame 9.
[0175] The steel diagonal brace model is set evenly around the permanent and temporary side walls. The steel diagonal brace has a diameter of 800, a width and height of 4.9×4.9m, and a collision cross-sectional area of 336.14m with the buckle support frame 9. 2 , so that the support frame 9 cannot be effectively connected from the bottom to the top plate. The steel straight support model has a diameter of 800, with a total of 5 paths, flush with the top of the support frame 9, and the cross-sectional area of the collision with the support frame 9 is 62.56m 2φ48 steel pipe horizontal scissor brace is used, with continuous tie reinforcement. The width of the scissor brace shall not be less than 4 spans and shall not be less than 6m. The inclination angle between the diagonal rod and the ground shall be between 45 and 60°.
[0176] Before installing the steel platform, move the top surface of the steel platform down to 400mm from the top surface of the cast side wall, move the embedded φ28 sleeve down to 300mm from the top surface of the side wall, arrange them at a longitudinal spacing of 300mm, and embed the sleeve at an installation angle of 45°, so that the tripod steel formwork can be tied to the embedded sleeve 7 steel bars on the steel platform.
[0177] The support point position and height of the simulated steel formwork tripod on the steel platform refers to the positioning steel bars of the steel formwork set 150mm down from the top surface of the side wall when the steel formwork is hoisted and lowered to the side wall reference plane. The positioning steel bars have a diameter of φ14 and a spacing of 300mm. The front end of the steel formwork tripod is supported on the adjustable top support and channel steel of the first row of disc-shaped uprights on the side wall, and the rear end column and pad are supported on the double-jointed 25 I-steel.
[0178] Polysulfide sealant is applied on the top interface of the embedded waterproof membrane of the ring frame beam 4 and the connection surface between the ground and the wall, and an external waterstop is attached to the waterproof membrane.
[0179] The operating frame is equipped with three rows of vertical poles, with a spacing of 1200×1200mm and a step distance of 1500mm. Vertical diagonal bars are tightened at each step on the outer circumference of the operating frame. A guy wire is set on the outside of the operating frame, with two vertical legs at a longitudinal interval of 2400mm. A step ladder is set inside the operating frame, and a guardrail is set on the top of the operating frame.
[0180] The side wall formwork support tension system 13 refers to that after connecting the main reinforcement facing the soil surface, one end of the φ14 horizontal steel bar is welded to the end of the side wall main reinforcement for 10d, and the protruding horizontal steel bar is welded to the φ14 tension bolt. The spacing between the tension bolts is 450×450mm. The tension bolts are inserted into the wooden formwork. The secondary ribs are 40×90 square timbers, placed horizontally with a spacing of 150mm. The main ribs are φ48 double steel pipes, placed vertically with a spacing of 450mm. Nuts are inserted to tighten and fix the formwork.
[0181] The diameter of the pre-buried casting hole of the ring frame beam 4 is 150mm. The pump pipe is extended into the casting hole to pour concrete, and then moved to the other side for casting.
[0182] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Within the spirit and principle of the present invention, any modification, equivalent replacement, improvement, etc. made shall be included in the protection scope of the present invention.
Claims
1. A green construction method combining permanent and temporary construction of underground structures, characterized in that: A ring frame beam model and a main structure model are established by using three-dimensional visualization digital modeling technology, and the steel bar installation steps of the ring frame beam and the installation position of the embedded sleeve on the ring frame beam are planned in advance, and the embedded sleeve model is added to the ring frame beam model according to the position of the embedded sleeve; Projecting the embedded sleeve model on the ring frame beam model onto the bottom plate surface of the main structure model, and adjusting the position of the ring frame beam model so that the positional relationship between the embedded sleeve and the edge line of the side wall in the main structure meets the requirements; Ring frame beam construction: constructing the ring frame beam and the embedded sleeve based on the ring frame beam model; Waist beam construction: construct a concrete waist beam below the ring frame beam; Construction of the bottom plate and the first layer of side walls of the main structure: After the reinforcement of the ring frame beam is tied, first measure the position of the embedded sleeve, import the position of the embedded sleeve into the model, and when constructing the bottom plate of the main structure, loft the position of the embedded sleeve to the horizontal positioning reinforcement of the side wall, and mark the position of the vertical main reinforcement of the side wall with a vertical line with a red bar, so that the vertical main reinforcement of the side wall corresponds to the embedded sleeve, and then cast the bottom plate and the first layer of side walls, the first layer of side walls is located below the waist beam; Modifying the position of the vertical main reinforcement of the side wall in the main structure model based on the position of the embedded sleeve, and then constructing the bottom plate surface of the main structure and the first layer of side wall according to the main structure model; Setting up the support frame and temporary platform: using three-dimensional visual digital modeling technology to establish a support frame model, a temporary platform model, a steel replacement support model and a steel formwork tripod model in the main structure model, and simulating the order of setting up, the support frame is set on the bottom plate surface, the temporary platform is supported by the support frame, the temporary platform is used for cutting and moving the waist beam, after the waist beam is cut and moved, the temporary platform is used to support the steel formwork tripod, and the steel replacement support is used to support the first layer side wall; During the cutting and transportation of the waist beam and the construction of the steel formwork tripod, an automatic monitoring device is installed between the support frame and the temporary platform to monitor the stress and deformation of the temporary platform and the support frame in real time; Verify the temporary platform model and the support frame model, and adjust the temporary platform model and the support frame model so that the temporary platform meets the working load conditions of carrying and transporting waist beam concrete and placing at least one waist beam concrete, and at the same time, the elevation of the temporary platform meets the elevation of the steel formwork tripod, so that the front end of the steel formwork tripod arranged on the temporary platform can be connected to the first layer side wall, and the rear end can be connected to the temporary platform; Construction of the second layer side wall of the main structure: cutting and moving the waist beam on the temporary platform, then setting up the steel formwork tripod on the temporary platform based on the model, and using the steel formwork tripod as a template to construct the second layer side wall on the first layer side wall, the second layer side wall is located below the ring frame beam; Construction of the third layer side wall of the main structure: dismantle the temporary platform and the steel formwork tripod, set up an operating frame on the support frame along the side wall, connect the vertical main reinforcement of the side wall and the main reinforcement of the ring frame beam through the embedded sleeve, set up the formwork of the third layer side wall, and carry out the construction of the third layer side wall.
2. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: The ring frame beam model and the main structure model are established by using three-dimensional visualization digital modeling technology, and the steel bar installation steps of the ring frame beam and the installation position of the embedded sleeve on the ring frame beam are planned in advance. The embedded sleeve model is added to the ring frame beam model according to the position of the embedded sleeve, including: The three-dimensional visual digital modeling technology is used to establish the ring frame beam reinforcement model, which is then disassembled to hide the upper and lower horizontal reinforcements and stirrups, retaining the main reinforcement and positioning reinforcement skeleton on both sides of the ring frame beam. The embedded sleeve model is arranged on the inner side of the main reinforcement according to the designed spacing and welded firmly to the positioning reinforcement. The bottom and top horizontal distribution bars, inner and outer stirrups are then tied, so that the ring frame beam reinforcement model and the embedded sleeve model are accurately installed according to the design drawings.
3. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: The ring frame beam and the embedded sleeve are constructed based on the ring frame beam model, including: Arrange the ring frame beam reinforcement based on the ring frame beam reinforcement model, arrange the embedded sleeve inside the main reinforcement according to the designed spacing, and weld it firmly with the positioning reinforcement; Set up the ring frame beam formwork and cast the ring frame beam.
4. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: After the ring frame beam reinforcement is tied, first measure the position of the embedded sleeve, import the position of the embedded sleeve into the model, and when constructing the bottom plate of the main structure, loft the position of the embedded sleeve to the horizontal positioning reinforcement of the side wall, and mark the position of the vertical main reinforcement of the side wall with a vertical line with a red bar, so that the vertical main reinforcement of the side wall corresponds to the embedded sleeve, and then cast the bottom plate and the first layer of side wall. The first layer of side wall is located below the waist beam, including: Use a total station to measure 3-5 coordinates of each row of embedded sleeves in each section of the ring frame beam. The coordinates of the remaining sleeves are calculated according to the set spacing and arranged on the model. If there is a deviation in the model arrangement, the coordinates of the embedded sleeves in the deviation section are checked. During the construction of the base plate of the main structure, 3-4 main reinforcement control points corresponding to the measured embedded sleeve positions are selected on the side wall positioning horizontal reinforcement. The main reinforcement control points are distributed at the two corners and the middle section. The remaining main reinforcement control points are arranged according to the set spacing; Spot check the position deviation between several main reinforcement control points and embedded sleeves. If there is a deviation, recheck it. If there is no deviation, proceed with the construction of the base plate and the first layer of side walls.
5. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: Verifying the temporary platform model and the support frame model includes: Perform strength calculation on the temporary platform model: Use the Lizheng structural software to simulate the bending and shearing performance of a single I-beam under the live and dead loads of the construction conditions under the most unfavorable working conditions of the three-span continuous beam of the steel platform. The calculation will be used only after it meets the requirements; The support frame model is used for stability verification: PKPM software and floor slab concrete calculation model are used to add the floor slab thickness to the construction load on the platform, and then the stability of a single vertical pole in the support frame and the overall stability of the support frame are calculated. The calculation will be used only after it meets the requirements.
6. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: During the cutting and transportation of the waist beam and the construction of the steel formwork tripod, an automatic monitoring device is arranged between the support frame and the temporary platform to monitor the stress and deformation of the temporary platform and the support frame in real time, including: During the cutting, transportation and construction of the waist beam tripod, an automatic monitoring device is installed at the most unfavorable position on the top surface of the support frame, with two rows arranged perpendicular to the side wall and three monitoring points in each row in the horizontal direction of the side wall. The automatic monitoring device is used to collect the axial force, displacement and inclination angle of the support frame and the temporary platform, and monitor them in real time during construction.
7. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: Verifying the temporary platform model and the support frame model, and adjusting the temporary platform model and the support frame model, further comprising: The adjusted support frame model is merged with the steel replacement support model, and the steel replacement support model is adjusted to reduce the collision between the steel replacement support and the buckle bracket. After the adjustment, the model is established to recheck the matching of the support frame and the steel replacement support.
8. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: Adjusting the temporary platform model and the support frame model so that the elevation of the temporary platform meets the elevation of the steel formwork tripod includes: Use 3D visualization digital modeling technology to simulate the installation height of the steel formwork tripod so that the installation height of the steel formwork tripod matches the installation angle of the embedded sleeve bolts on the side wall of the first floor; Based on the installation height of the steel formwork tripod, by adjusting the jacking height on the support frame and / or the height of the support on the temporary platform, the front end of the steel formwork tripod can be connected to the embedded bolt sleeve and the rear end can be fixed on the support of the temporary platform.
9. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: The temporary platform and the steel formwork tripod are removed, an operating frame is set up on the support frame along the side wall, the vertical main reinforcement of the side wall and the main reinforcement of the ring frame beam are connected through the embedded sleeve, the formwork of the third layer side wall is set up, and the third layer side wall construction is carried out, specifically: Remove the temporary platform and steel formwork tripod, and set up an operating frame on the support frame along the side wall; Waterproof construction of the connection node between the ring frame beam and the side wall: before installing the dowels between the ground connection wall and the ring frame beam, apply cement-based penetrating crystallization coating, bend the bottom surface of the dowels of the ring frame beam to embed the PVC waterproof membrane connected to the side wall, with a lap length of 500mm, and attach an external waterstop to the waterproof membrane; Construction of steel bars at the connection node between the ring frame beam and the side wall: clean the mud and sand around the bottom surface of the ring frame beam and the embedded sleeve, and roughen the bottom surface of the ring frame beam with an air gun; The main reinforcement joints of the side wall vertical main reinforcement extending to the connection node of the ring frame beam are staggered by 35d; Measure the main reinforcement length of the node connecting the ring frame beam and the side wall on site to determine the main reinforcement length of the node segment and cut the material; The node segment main reinforcement is first connected to the embedded sleeve on the ring frame beam, and then connected to the side wall main reinforcement sleeve. The sleeve is reversed to make the node segment main reinforcement and the side wall vertical main reinforcement firmly connected; After the vertical main reinforcement facing the soil surface is connected, one end of the horizontal reinforcement is welded to the end of the side wall main reinforcement, and the horizontal reinforcement is then welded to the tension bolts. Then the wooden formwork, secondary ribs, main ribs and double steel pipes are installed to form a side wall formwork support tension system. The poured concrete is introduced from the pre-embedded pouring holes of the ring frame beam, and poured and vibrated in layers.
10. The green construction method for underground structure combined with permanent and temporary construction according to claim 1 is characterized in that: The supporting member is a disc-shaped bracket, and the steel support is a horizontally arranged steel straight support. The steel straight support is provided in plurality, at least three of the plurality of steel straight supports are perpendicular to the side wall, and at least four of the plurality of steel straight supports are at an angle of 45°-60° to the side wall, and are symmetrically divided into two groups.