Sealing nail assembly equipment, sealing nail assembly method and battery production line
By designing the conveying and nailing mechanism of the sealing nail assembly equipment, combined with the position switching and variable distance adjustment of the loading and unloading mechanism, the problem of low sealing nail assembly efficiency in battery production is solved, an efficient battery production line is realized, and the production capacity and assembly reliability are improved. sex.
Patent Information
- Application Number
- CN202410815655.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-06-24
AI Technical Summary
In the battery manufacturing process, the sealing nail assembly step is inefficient, affecting the production rhythm and making it difficult to meet the increasing production capacity needs.
A sealing nail assembly equipment is designed, including a conveying mechanism, a nailing mechanism and a loading and unloading mechanism. Through the position switching and distance adjustment of the pick-and-place mechanism, efficient loading of unnailed batteries and efficient unloading of nailed batteries are achieved. materials, simplify the binding process and speed up the production cycle.
It improves the efficiency of the battery production line, simplifies the manufacturing steps, maximizes production capacity, and achieves automation and reliability of sealing nail assembly.
Smart Images

Figure CN118380629B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of battery technology, and in particular to sealing nail assembly equipment, a sealing nail assembly method and a battery production line. Background Art
[0002] New energy batteries are being used more and more widely in life and industry. For example, new energy vehicles equipped with batteries have been widely used. In addition, batteries are also being increasingly used in areas such as energy storage.
[0003] In the production and manufacturing process of batteries, especially in the manufacturing process of assembling sealing nails to the liquid injection holes of batteries, the relevant technology usually requires multiple steps such as loading un-nailed batteries, nailing, and unloading nailed batteries, which affects the production rhythm, has low production efficiency, and is difficult to meet the ever-increasing production capacity needs. Summary of the invention
[0004] In order to solve the above technical problems, the present application provides a sealing nail assembly device, a sealing nail assembly method and a battery production line with high production efficiency.
[0005] This application is implemented through the following technical solutions.
[0006] The first aspect of the present application provides a sealing nail assembly device, comprising: a conveying mechanism for conveying batteries, the conveying mechanism comprising a first conveying mechanism and a second conveying mechanism located on one side of the first conveying mechanism; a stapling mechanism for assembling sealing nails on unstapled batteries on the second conveying mechanism to become stapled batteries; a loading and unloading mechanism, comprising a pick-and-place mechanism, the pick-and-place mechanism comprising a first pick-and-place assembly and a second pick-and-place assembly, the pick-and-place mechanism being configured to be rotatable so that the first pick-and-place assembly and the second pick-and-place assembly can switch positions between a first pick-and-place position and a second pick-and-place position, wherein the first pick-and-place assembly at the first pick-and-place position can move toward the first conveying mechanism, and the first pick-and-place assembly at the first pick-and-place position can move toward the first conveying mechanism, and the first pick-and-place assembly at the second ... first pick-and-place position can move toward the first conveying mechanism, and the first pick-and-place assembly at the second pick-and-place position can move toward the first conveying mechanism, and the first pick-and A pick-and-place component can pick up multiple unstapled batteries on the first conveying mechanism, the second pick-and-place component in the second pick-and-place position can move toward the second conveying mechanism, and the second pick-and-place component can pick up multiple stapled batteries on the second conveying mechanism, the first pick-and-place component in the second pick-and-place position can move toward the second conveying mechanism, and the first pick-and-place component can release the picked-up multiple unstapled batteries to the second conveying mechanism, the second pick-and-place component in the first pick-and-place position can move toward the first conveying mechanism, and the second pick-and-place component can release the picked-up multiple stapled batteries to the first conveying mechanism.
[0007] By rotating the pick-and-place mechanism, the first pick-and-place assembly and the second pick-and-place assembly are switched between the first pick-and-place position and the second pick-and-place position, and the multiple unstapled batteries conveyed by the first conveying mechanism are released to the second conveying mechanism to realize the loading operation, and the multiple stapled batteries conveyed by the second conveying mechanism are released to the first conveying mechanism to realize the unloading operation. Thus, the loading operation of the multiple unstapled batteries and the unloading operation of the multiple stapled batteries are combined together, which simplifies the stapling process, helps to speed up the production rhythm, improve production efficiency, and thus helps to maximize production capacity.
[0008] In some embodiments, the loading and unloading mechanism also includes a rotating mechanism, and the pick-and-place mechanism also includes a mobile frame, the mobile frame is connected to the rotating mechanism, the first pick-and-place assembly and the second pick-and-place assembly are respectively arranged on the mobile frame, and the rotating mechanism is used to drive the mobile frame to drive the first pick-and-place assembly and the second pick-and-place assembly to rotate.
[0009] The rotating mechanism drives the mobile frame to rotate the first pick-and-place assembly and the second pick-and-place assembly, so that the first pick-and-place assembly and the second pick-and-place assembly can synchronously and quickly switch positions between the first pick-and-place position and the second pick-and-place position, further accelerating the production rhythm and improving production efficiency.
[0010] In some embodiments, the mobile frame can drive the first pick-and-place assembly and the second pick-and-place assembly to rotate around the same rotation axis under the drive of the rotating mechanism. Along a first direction, the pick-and-place mechanism is located between the first conveying mechanism and the second conveying mechanism, and the first direction is perpendicular to the direction of the rotation axis.
[0011] Along the first direction, the pick-and-place mechanism is located between the first conveying mechanism and the second conveying mechanism. Such a layout can shorten the distance between the first pick-and-place component and the second pick-and-place component to the first conveying mechanism and the second conveying mechanism, facilitate the quick pick-and-place of unstapled batteries and stapled batteries, improve production efficiency, and make the loading and unloading mechanism more compact as a whole, reducing space occupancy.
[0012] In some embodiments, a plurality of the first pick-and-place assemblies are provided, and the plurality of the first pick-and-place assemblies are arranged along a second direction and can approach or move away from each other along the second direction; a plurality of the second pick-and-place assemblies are provided, and the plurality of the second pick-and-place assemblies are arranged along a second direction and can approach or move away from each other along the second direction, and the second direction is perpendicular to the direction of the rotation axis and the first direction.
[0013] By having multiple first pick-and-place components and multiple second pick-and-place components approach or move away from each other along the second direction, the spacing between the multiple first pick-and-place components and the multiple second pick-and-place components is adjusted respectively, thereby changing the spacing between the multiple stapled batteries released to the first conveying mechanism and the multiple unstapled batteries released to the second conveying mechanism. As a result, the stapling operation can be efficiently completed when stapling different battery types, making production more flexible.
[0014] In some embodiments, the picking and placing mechanism also includes a first distance changing mechanism and a second distance changing mechanism, the first distance changing mechanism is connected to at least two of the plurality of the first picking and placing components, and the first picking and placing components connected to the first distance changing mechanism approach or move away from each other under the drive of the first distance changing mechanism, and the second distance changing mechanism is connected to at least two of the plurality of the second picking and placing components, and the second picking and placing components connected to the second distance changing mechanism approach or move away from each other under the drive of the second distance changing mechanism.
[0015] Thus, the variable distance operation of the plurality of first pick-and-place components and the plurality of second pick-and-place components can be automatically realized, thereby improving production efficiency.
[0016] In some embodiments, the first distance changing mechanism includes: a first slide rail, which is arranged on the movable frame and extends along the second direction; a plurality of first sliders, which are respectively slidably connected to the first slide rail, each of the first sliders is provided with a first distance changing groove, and each of the first picking and placing assemblies is connected to its respective first slider; a plurality of first pull rods, each adjacent two of the first sliders are connected by the first pull rods, and both ends of the first pull rods are respectively arranged in the first distance changing grooves of two adjacent first sliders, and both ends of the first pull rods can move in their respective first distance changing grooves along the second direction.
[0017] By moving one first slider and pulling the remaining first sliders to slide along the first slide rail through the first pull rod, the first sliders can be moved closer to or farther from each other more smoothly and reliably, so that the spacing adjustment between the first pick-and-place assemblies is more reliable.
[0018] In some embodiments, the second pitch change mechanism includes: a second slide rail, which is arranged on the movable frame and extends along the second direction; a plurality of second sliders, which are respectively slidably connected to the second slide rails, each second slider is provided with a second pitch change groove, and each second pick-and-place assembly is connected to its respective second slider; a plurality of second pull rods, each adjacent two second sliders are connected by a second pull rod, and both ends of the second pull rods are respectively arranged in the second pitch change grooves of two adjacent second sliders, and both ends of the second pull rods can move in their respective second pitch change grooves along the second direction.
[0019] By moving one second slider and pulling the remaining second sliders to slide along the second slide rail through the second pull rod, the second sliders can be moved closer to or farther from each other more smoothly and reliably, so that the spacing adjustment between the second pick-and-place assemblies is more reliable.
[0020] In some embodiments, the first distance changing mechanism further includes a first distance changing driving member, a driving end of which is connected to the first first slider among the plurality of first sliders along the second direction; and / or, the second distance changing mechanism further includes a second distance changing driving member, a driving end of which is connected to the first second slider among the plurality of second sliders along the second direction.
[0021] By driving the first slider to move and pulling each slider to slide in sequence through a pull rod, step-by-step pitch change can be achieved, and the pitch change operation of picking and placing components can be achieved with fewer pitch change driving parts, which simplifies the structure and helps to improve the reliability of pitch change.
[0022] In some embodiments, the first pick-and-place assembly includes a pair of first pick-and-place jaws, the pair of first pick-and-place jaws can approach or move away from each other, and the first pick-and-place jaws include an arc-shaped first clamping surface; the second pick-and-place assembly includes a pair of second pick-and-place jaws, the pair of second pick-and-place jaws can approach or move away from each other, and the second pick-and-place jaws include an arc-shaped second clamping surface.
[0023] The first pick-and-place clamping jaw and the second pick-and-place clamping jaw respectively include arc-shaped clamping surfaces, which can more appropriately and reliably clamp cylindrical batteries.
[0024] In some embodiments, the loading and unloading mechanism also includes a frame, a lifting assembly and a lifting drive member. The lifting assembly is connected to the pick-and-place mechanism and can be lifted and lowered on the frame. The driving end of the lifting drive member is connected to the lifting assembly for driving the lifting assembly to lift and lower the first pick-and-place assembly and the second pick-and-place assembly.
[0025] By driving the lifting assembly through the lifting drive member to drive the first pick-and-place assembly and the second pick-and-place assembly to lift and lower, the first pick-and-place assembly and the second pick-and-place assembly can be more smoothly and accurately made to reach or leave the first conveying mechanism and the second conveying mechanism respectively, providing convenience for picking up and releasing unstapled batteries and stapled batteries and switching positions.
[0026] In some embodiments, the lifting assembly includes a lifting frame slidably disposed on the frame, a driving end of the lifting drive member is connected to the lifting frame, and the lifting frame is connected to the moving frame.
[0027] The lifting drive member drives the lifting frame to lift and lower the moving frame, so that the first pick-and-place assembly and the second pick-and-place assembly arranged on the moving frame can be lifted and lowered together, thereby synchronously reaching the first conveying mechanism and the second conveying mechanism, thereby speeding up the production rhythm and improving efficiency.
[0028] In some embodiments, the first conveying mechanism and the second conveying mechanism are respectively provided with a plurality of brackets arranged along the second direction, and each of the brackets is used for placing a battery.
[0029] By placing the batteries on the bracket, each battery can be kept in the desired posture, thereby reducing the risk of thermal runaway caused by the batteries tipping over and colliding with each other, and improving the reliability of battery transportation. In addition, cylindrical batteries with smaller support surfaces can also be transported reliably.
[0030] In some embodiments, a spacing between the plurality of brackets disposed on the first conveying mechanism is different from a spacing between the plurality of brackets disposed on the second conveying mechanism.
[0031] By setting a larger spacing between the multiple brackets of the second conveying mechanism, the stapling operation can be completed more smoothly.
[0032] In some embodiments, each of the brackets has a battery receiving slot, and the inner circumference of the battery receiving slot has a shape that matches the outer contour of the battery.
[0033] As a result, the battery can be more stably accommodated in the battery receiving slot and the transportation is more reliable.
[0034] In some embodiments, the second conveying mechanism is configured to have a ring-shaped conveying path.
[0035] The annular conveying path can convey the batteries in a circular manner, providing convenience for transferring the stapled batteries to the first conveying mechanism, thereby improving the conveying efficiency and reducing the occupied space.
[0036] In some embodiments, the stapling mechanism includes a pre-stapling mechanism and a stapling mechanism. Along the conveying path direction of the second conveying mechanism, the pre-stapling mechanism is located upstream of the stapling mechanism. The sealing nail assembly device also includes a nail supply mechanism.
[0037] The nail supply mechanism is used to provide sealing nails to the pre-installing nail mechanism, and the pre-installing nail mechanism is configured to pick up the sealing nails and pre-install the sealing nails on the un-stapled batteries. The nailing mechanism is used to nail the batteries pre-installed with sealing nails into nailed batteries.
[0038] The nail supply mechanism provides sealing nails to the pre-loading nail mechanism, and the pre-loading nail mechanism picks up the sealing nails and pre-assembles the sealing nails on multiple un-loaded batteries, so that the process from providing the sealing nails to assembling the sealing nails can be completed automatically, thereby improving the stapling efficiency. In addition, pre-loading before stapling can reduce the probability of sealing nail assembly failure and improve the stapling reliability.
[0039] In some embodiments, the pre-stapling mechanism includes multiple suction cup assemblies, a transfer mechanism and a transfer drive mechanism, the suction cup assembly is used to absorb the sealing nails, the transfer mechanism is connected to the suction cup assembly, and the transfer drive mechanism is used to drive the transfer mechanism to drive the suction cup assembly to move and pre-assemble the absorbed sealing nails to the multiple un-stapled batteries.
[0040] The transfer mechanism is driven by the transfer drive mechanism to move the suction cup components, so that the sealing nails can be sucked and pre-assembled automatically, thereby improving the nailing efficiency.
[0041] In some embodiments, the nail supply mechanism includes: a screening mechanism for screening out the sealing nails in a specified posture; a sealing nail transfer mechanism for picking up and transferring the sealing nails in the specified posture; and a cache mechanism for receiving the sealing nails transferred by the sealing nail transfer mechanism and keeping the sealing nails in the specified posture.
[0042] The sealing nails with a specified posture are screened out by a screening mechanism, picked up by a sealing nail transfer mechanism and transferred to a cache mechanism, and the sealing nails are kept in a specified posture by the cache mechanism, thereby improving the nail supply efficiency and facilitating the pre-loading nail mechanism to absorb the sealing nails and pre-assemble them on multiple un-loaded batteries without adjusting the posture of the sealing nails again, thereby improving the loading efficiency.
[0043] In some embodiments, the cache mechanism includes a first cache table, a second cache table and a cache table driver, the first cache table and the second cache table are respectively used to place the sealing nails, the cache table driver is connected to the first cache table and the second cache table, and is used to drive the first cache table and the second cache table to move and alternately reach a sealing nail receiving position and a sealing nail providing position, at the sealing nail receiving position and the sealing nail providing position, one of the first cache table and the second cache table is used to receive the sealing nails transferred from the sealing nail transfer mechanism, and the other is used to provide the sealing nails to the pre-loading nail mechanism.
[0044] The first cache station and the second cache station alternately reach the sealing nail receiving position and the sealing nail providing position, and can continuously provide sealing nails for the pre-loading nail mechanism, which is conducive to speeding up the production rhythm and improving production efficiency.
[0045] In some embodiments, the cache table driving member includes a transmission assembly and a transmission driving member, the transmission assembly includes two pulleys arranged at intervals and a transmission belt wound around the two pulleys, the first cache table and the second cache table are respectively connected to the transmission belts, and the transmission driving member is connected to at least one of the pulleys for driving the pulleys to rotate clockwise and counterclockwise, so that the transmission belt drives the first cache table and the second cache table to move in opposite directions respectively.
[0046] The first cache table and the second cache table are driven by the belt transmission assembly to switch positions alternately between the sealing nail receiving position and the sealing nail providing position in opposite directions, thereby reducing the number of driving parts and simplifying the structure.
[0047] In some embodiments, the cache mechanism also includes a switching component, the switching component includes a track and a sliding rod, the track includes a concave-convex surface, one end of the sliding rod is slidably disposed on the concave-convex surface, and the other end of the sliding rod is connected to the second cache table, and the second cache table is raised and lowered by the sliding rod along the concave-convex surface, so that when the first cache table and the second cache table move in opposite directions, the first cache table and the second cache table are misaligned in the lifting direction.
[0048] By allowing the first cache table and the second cache table to be misaligned in the lifting direction while they move in opposite directions, the first cache table and the second cache table can be alternately switched between the sealing nail receiving position and the sealing nail providing position, making the cache mechanism more compact as a whole, reducing space occupancy, and at the same time reducing switching paths, thereby improving nail supply efficiency.
[0049] In some embodiments, the concave-convex surface includes a first convex surface, a concave surface, and a second convex surface connected in sequence. When the sliding rod slides to the concave surface, the second cache table is misaligned with the first cache table in the lifting direction. When the sliding rod slides to the first convex surface or the second convex surface, one of the second cache table and the first cache table is located at the sealing pin receiving position, and the other is located at the sealing pin providing position.
[0050] By sequentially connecting the first convex surface, the concave surface and the second convex surface, the sliding rod can drive the second cache table to rise and fall, and the structure is compact.
[0051] In some embodiments, the cache mechanism also includes a first sliding assembly and a second sliding assembly, the first sliding assembly includes a first guide rail and a first slider slidably connected to the first guide rail, and the first cache table is connected to the first slider; the second sliding assembly includes a second guide rail, a second slider and a movable plate, the second guide rail is parallel to the first guide rail, the second slider is slidably connected to the second guide rail and to the movable plate, the movable plate is provided with a through hole, and the sliding rod can be raised and lowered through the through hole.
[0052] The first cache table and the second cache table respectively move back and forth between the sealing nail receiving position and the sealing nail providing position along their own guide rails through their own sliders, which can improve the stability during operation, reduce the risk of tilting or falling of the sealing nails on the first cache table and the second cache table, and improve the reliability of nail supply.
[0053] In some embodiments, the first cache table and the second cache table are respectively provided with sealing pin retaining portions for maintaining the sealing pins in a specified posture.
[0054] This helps the pre-loading nail mechanism to quickly pick up and complete the pre-loading operation without having to adjust the sealing nail posture again, thereby speeding up the production cycle.
[0055] In some embodiments, the cache mechanism also includes a sealing nail collecting device, which includes a collection box and a ventilation pipe. One end of the ventilation pipe is connected to the inner cavity of the collection box, and the other end is used to connect to the air pressure system. The ventilation pipe is provided with a receiving hole for receiving abnormal sealing nails transferred by the pre-loading nail mechanism.
[0056] The sealing nail collecting device can collect abnormal sealing nails in time for reuse.
[0057] In some embodiments, the screening mechanism includes a vibrating screen and a sealing pin identification mechanism, the vibrating screen can vibrate to change the posture of the sealing pins, and the sealing pin identification mechanism is used to identify the sealing pins that meet the specified posture.
[0058] In some embodiments, the sealing nail transfer mechanism includes a sealing nail picking assembly, a movable arm and a movable arm driving mechanism. The sealing nail picking assembly is connected to the movable arm and is used to pick up the sealing nail in the specified posture. The movable arm driving mechanism is used to drive the movable arm to drive the sealing nail picking assembly to transfer the picked up sealing nail to the cache mechanism.
[0059] The sealing nail transfer mechanism can automatically complete the sealing nail transfer operation, thereby improving production efficiency.
[0060] In some embodiments, the nailing mechanism includes multiple cam mechanisms and multiple punch assemblies, and the cam contour surface of each cam mechanism abuts against the punch of the respective punch assembly to drive the respective punches to move back and forth to nail the pre-nailed batteries into nailed batteries.
[0061] The cam in the cam mechanism rotates so that the outer contour of the cam moves against the punch assembly toward the sealing nail on the pre-stapled battery at the stapling station, compacting the pre-staple nail and improving the stapling reliability.
[0062] A second aspect of the present application provides a sealing nail assembly method, which is applied to a sealing nail assembly device, wherein the sealing nail assembly device includes a first conveying mechanism, a second conveying mechanism, a stapling mechanism and a loading and unloading mechanism, wherein the loading and unloading mechanism includes a pick-up and placement mechanism, and the pick-up and placement mechanism includes a first pick-up and placement component and a second pick-up and placement component. The sealing nail assembly method includes: a battery conveying step, wherein the first conveying mechanism provides a plurality of unstapled batteries to the second conveying mechanism, and receives a plurality of stapled batteries from the second conveying mechanism; a stapling step, wherein the stapling mechanism assembles sealing nails on the unstapled batteries on the second conveying mechanism into the stapled batteries; and a battery position switching step, wherein the pick-up and placement mechanism is rotated so that the first pick-up and placement component and the second pick-up and placement component are positioned between a first pick-up and placement position and a second pick-up and placement position. Switching, the first pick-and-place component at the first pick-and-place position can move toward the first conveying mechanism, and the first pick-and-place component picks up the multiple unstapled batteries on the first conveying mechanism, the second pick-and-place component at the second pick-and-place position can move toward the second conveying mechanism, and the second pick-and-place component can pick up the multiple stapled batteries on the second conveying mechanism, the first pick-and-place component at the second pick-and-place position can move toward the second conveying mechanism, and the first pick-and-place component can release the picked-up multiple unstapled batteries to the second conveying mechanism, the second pick-and-place component at the first pick-and-place position can move toward the first conveying mechanism, and the second pick-and-place component can release the picked-up multiple stapled batteries to the first conveying mechanism.
[0063] By rotating the pick-and-place mechanism, the first pick-and-place assembly and the second pick-and-place assembly are switched between the first pick-and-place position and the second pick-and-place position, and the multiple unstapled batteries conveyed by the first conveying mechanism are released to the second conveying mechanism to realize the loading operation, and the multiple stapled batteries conveyed by the second conveying mechanism are released to the first conveying mechanism to realize the unloading operation. Thus, the loading operation of multiple unstapled batteries and the unloading operation of multiple stapled batteries are combined together, which simplifies the stapling process, is conducive to speeding up the production rhythm, improving production efficiency, and maximizing production capacity.
[0064] In some embodiments, the battery position switching step further includes: a lifting step: lifting the pick-and-place mechanism so that the first pick-and-place component and the second pick-and-place component reach the first conveying mechanism and the second conveying mechanism respectively.
[0065] By lifting and lowering the pick-and-place mechanism, the first pick-and-place assembly and the second pick-and-place assembly can be lifted and lowered, so that the first pick-and-place assembly and the second pick-and-place assembly can reach the first conveying mechanism and the second conveying mechanism respectively more smoothly and accurately, providing convenience for picking up and releasing unstapled batteries and stapled batteries as well as position switching.
[0066] In some embodiments, a plurality of the first pick-and-place assemblies are provided, a plurality of the second pick-and-place assemblies are provided, and the sealing nail assembly method further includes: a battery distance changing step: changing the distance between each of the first pick-and-place assemblies by bringing the plurality of the first pick-and-place assemblies closer to or farther away from each other; changing the distance between each of the second pick-and-place assemblies by bringing the plurality of the second pick-and-place assemblies closer to or farther away from each other.
[0067] The stapling operation can also be completed efficiently when stapling different battery types, which is conducive to flexible production.
[0068] In some embodiments, the stapling mechanism includes a pre-stapling mechanism and a stapling mechanism, and the stapling step includes: a pre-stapling step: pre-assembling the sealing nail to the un-stapled battery by the pre-stapling mechanism; a stapling step: stapling the pre-stapled battery into the stapled battery by the stapling mechanism.
[0069] Pre-nailing before nailing can reduce the probability of sealing nail assembly failure and improve nailing reliability.
[0070] In some embodiments, the sealing nail assembly device further includes a nail supply mechanism, and the sealing nail assembly method further includes: a sealing nail providing step: providing sealing nails to the pre-installing nail mechanism through the nail supply mechanism.
[0071] The sealing nails are provided to the pre-stacking mechanism by the nail supply mechanism, and the pre-stacking mechanism picks up the sealing nails and pre-assembles the sealing nails to a plurality of un-stapled batteries, so that the process from providing the sealing nails to assembling the sealing nails can be completed automatically, thereby improving the stapling efficiency.
[0072] In some embodiments, the nail supply mechanism includes a screening mechanism, a sealing nail transfer mechanism and a cache mechanism, and the sealing nail providing step includes: a screening step: screening out the sealing nails in a specified posture through the screening mechanism; a sealing nail transfer step: using the sealing nail transfer mechanism to pick up and transfer the sealing nails in the specified posture; a cache step: receiving the sealing nails transferred by the sealing nail transfer mechanism through the cache mechanism and keeping the sealing nails in the specified posture, and providing the sealing nails in the specified posture to the pre-loading nail mechanism.
[0073] The sealing pins with a specified posture are screened out by a screening mechanism, picked up by a sealing pin transfer mechanism and transferred to a cache mechanism, and the sealing pins are kept in a specified posture by the cache mechanism, so that the pre-stapling mechanism can absorb the sealing pins and pre-assemble them on multiple un-stapled batteries without adjusting the posture of the sealing pins again, thereby improving the stapling efficiency.
[0074] In some embodiments, the cache mechanism includes a first cache table, a second cache table and a cache table driver, and the cache step includes: driving the first cache table and the second cache table to move and alternately reach a sealing nail receiving position and a sealing nail providing position by the cache table driver, and at the sealing nail receiving position and the sealing nail providing position, one of the first cache table and the second cache table receives the sealing nail transferred from the sealing nail transfer mechanism, and the other provides the sealing nail in a specified posture to the pre-loading nail mechanism.
[0075] The first cache station and the second cache station alternately reach the sealing nail receiving position and the sealing nail providing position, and can continuously provide sealing nails for the pre-loading nail mechanism, which is conducive to speeding up the production rhythm and improving production efficiency.
[0076] In some embodiments, the sealing nail assembly device further includes a sealing nail detection mechanism. After the nailing step, the sealing nail assembly method further includes: a sealing nail detection step, in which the sealing nail detection mechanism detects the nailed battery and issues a detection result.
[0077] Sealing nail detection can promptly detect abnormal conditions of installed batteries, facilitate timely processing and improve product quality.
[0078] A third aspect of the present application provides a battery production line, comprising: a battery conveyor line; and at least one sealing nail assembly device as described in the first aspect, wherein the first conveying mechanism is a part of the battery conveyor line.
[0079] Effect of the invention:
[0080] Through the embodiments of the present application, the manufacturing steps can be simplified, the production cycle can be accelerated, the production efficiency can be improved, and the production capacity can be maximized. BRIEF DESCRIPTION OF THE DRAWINGS
[0081] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Moreover, the same reference numerals are used throughout the drawings to represent the same components. In the drawings:
[0082] Figure 1 A simplified schematic diagram of the structure of a sealing nail assembly device provided in some embodiments of the present application;
[0083] Figure 2 A schematic top view of a sealing nail assembly device provided in some embodiments of the present application;
[0084] Figure 3 A schematic diagram of the structure of a loading and unloading mechanism provided in some embodiments of the present application;
[0085] Figure 4 A schematic diagram of the connection structure between the first pick-and-place assembly and the distance-changing mechanism provided in some embodiments of the present application;
[0086] Figure 5 A schematic diagram of the structure of a bracket provided in some embodiments of the present application;
[0087] Figure 6 A schematic diagram of the structure of a pre-stapling mechanism provided in some embodiments of the present application;
[0088] Figure 7 A schematic diagram of the structure of a cache mechanism provided in some embodiments of the present application;
[0089] Figure 8 A schematic structural diagram of a cache mechanism from another perspective provided in some embodiments of the present application;
[0090] Fig. 9 A schematic diagram of the structure of a staple feeding mechanism, a staple preloading mechanism and a part of a second conveying mechanism in which a buffer mechanism is omitted, provided in some embodiments of the present application;
[0091] Fig.10 A schematic diagram of the structure of a nailing mechanism provided in some embodiments of the present application;
[0092] Fig.11 A schematic diagram of the structure of a sealing nail detection mechanism provided in some embodiments of the present application;
[0093] Fig.12 A simplified schematic diagram of the structure of two sealing nail assembly devices provided in some embodiments of the present application;
[0094] Fig.13Sealing nail assembly method process provided in some embodiments of the present application Figure 1 ;
[0095] Fig.14 Sealing nail assembly method process provided in some embodiments of the present application Figure 2 ;
[0096] Fig.15 Sealing nail assembly method process provided in some embodiments of the present application Figure 3 ;
[0097] Fig.16 Sealing nail assembly method process provided in some embodiments of the present application Figure 4 ;
[0098] Fig.17 Sealing nail assembly method process provided in some embodiments of the present application Figure 5 ;
[0099] Fig.18 Sealing nail assembly method process provided in some embodiments of the present application Figure 6 ;
[0100] Fig.19 Sealing nail assembly method process provided in some embodiments of the present application Figure 7 ;
[0101] Fig. 20 Sealing nail assembly method process provided in some embodiments of the present application Figure 8 .
[0102] Description of reference numerals:
[0103] 100-Sealing nail assembly equipment;
[0104] 1- first conveying mechanism;
[0105] 2- second conveying mechanism;
[0106] 3-loading and unloading mechanism; 31-pick-and-place mechanism; 32-rotating mechanism; 33-frame; 34-lifting assembly; 35-lifting drive; 311-first pick-and-place assembly; 312-second pick-and-place assembly; 313-moving frame; 314-first pitch-changing mechanism; 315-second pitch-changing mechanism; 341-lifting frame; 342-screw nut assembly; 3111-first pick-and-place clamp; 3112-first clamp cylinder; 3111a-first Clamping surface; 3121-second pick-and-place clamping claw; 3121a-second clamping surface; 3122-second clamping claw cylinder; 3141-first slide rail; 3142-first slider; 3142a-first variable pitch groove; 3143-first pull rod; 3144-first variable pitch driving member; 3151-second slide rail; 3152-second slider; 3152a-second variable pitch groove; 3153-second pull rod; 3154-second variable pitch driving member;
[0107] 4- bracket; 41- battery receiving slot;
[0108] 5-pre-stapling mechanism; 51-suction cup assembly; 52-transfer mechanism; 53-transfer drive mechanism;
[0109] 6-nail feeding mechanism; 61-screening mechanism; 62-sealing nail transfer mechanism; 63-caching mechanism; 611-vibrating screen; 612-sealing nail identification mechanism; 621-sealing nail picking assembly; 622-moving arm; 623-moving arm driving mechanism; 631-first cache station; 632-second cache station; 633-caching station driving member; 634-switching assembly; 635-first sliding assembly; 636-second sliding assembly; 637-sealing nail collecting device; 63 31-transmission assembly; 6331a-pulley; 6331b-transmission belt; 6332-transmission drive member; 6341-track; 6341a-first convex surface; 6341b-concave surface; 6341c-second convex surface; 6342-slide bar; 6351-first guide rail; 6352-first sliding member; 6361-second guide rail; 6362-second sliding member; 6363-moving plate; 6363a-through hole; 6371-collection box; 6372-ventilation pipe;
[0110] 7- nailing mechanism; 71- punch assembly;
[0111] 8- Sealing nail detection mechanism;
[0112] L-rotation axis; P-stapling station; P1-pre-stapling station; P2-inspection station; S1-first pick-and-place position; S2-second pick-and-place position; W1-sealing nail receiving position; W2-sealing nail providing position;
[0113] X-first direction; Y-second direction; Z-up and down direction. DETAILED DESCRIPTION
[0114] The following embodiments of the technical solution of the present application are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.
[0115] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification of this application and the above-mentioned drawings and any variations thereof are intended to cover non-exclusive inclusions.
[0116] In the description of the embodiments of the present application, the technical terms "first", "second", "third", etc. are only used to distinguish different objects, and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined.
[0117] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0118] In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0119] In the description of the embodiments of the present application, the orientation or position relationship indicated by technical terms such as "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", and "circumferential" are based on the orientation or position relationship shown in the accompanying drawings. They are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed, operated or used in a specific orientation. Therefore, they should not be understood as limitations on the embodiments of the present application.
[0120] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0121] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, the technical term "contact" should be understood in a broad sense, and may be direct contact or contact through an intermediate medium layer. It may be contact with essentially no interaction force between the two contacting parties, or it may be contact with interaction force between the two contacting parties.
[0122] Below, this application is described in detail.
[0123] At present, new energy batteries are increasingly used in life and industry. New energy batteries are not only used in energy storage power systems such as hydropower, thermal power, wind power and solar power stations, but are also widely used in electric vehicles such as electric bicycles, electric motorcycles, electric cars, as well as aerospace and other fields. With the continuous expansion of the application field of power batteries, the market demand is also constantly expanding.
[0124] In the manufacturing process of batteries, especially in the manufacturing process of assembling sealing nails to the liquid injection holes of batteries, it is usually necessary to go through multiple steps such as loading un-nailed batteries, nailing, and unloading nailed batteries. The production efficiency is low, which affects the production rhythm and makes it difficult to meet the ever-increasing production capacity needs.
[0125] After research, it was found that combining the loading operation of multiple unstapled batteries with the unloading operation of multiple stapled batteries can simplify the manufacturing process, help maximize production capacity and improve production efficiency.
[0126] Based on such a design concept, the present application provides a sealing nail assembly device, comprising: a first conveying mechanism and a second conveying mechanism located on one side of the first conveying mechanism; a stapling mechanism, used to assemble sealing nails on unstapled batteries on the second conveying mechanism so that the unstapled batteries become stapled batteries; a loading and unloading mechanism, comprising a pick-and-place mechanism, the pick-and-place mechanism comprising a first pick-and-place assembly and a second pick-and-place assembly, the pick-and-place mechanism being configured to be rotatable so that the first pick-and-place assembly and the second pick-and-place assembly are switched between a first pick-and-place position and a second pick-and-place position, wherein the first pick-and-place assembly at the first pick-and-place position can move toward the first conveying mechanism, and the first pick-and-place assembly can pick up a plurality of unstapled batteries on the first conveying mechanism, the second pick-and-place assembly at the second pick-and-place position can move toward the second conveying mechanism, and the second pick-and-place assembly can pick up a plurality of stapled batteries of the second conveying mechanism, the first pick-and-place assembly at the second pick-and-place position can move toward the second conveying mechanism, and the first pick-and-place assembly can release a plurality of unstapled batteries to the second conveying mechanism, the second pick-and-place assembly at the first pick-and-place position can move toward the first conveying mechanism, and the second pick-and-place assembly can release a plurality of stapled batteries to the first conveying mechanism.
[0127] The first pick-and-place assembly and the second pick-and-place assembly are switched between the first pick-and-place position and the second pick-and-place position by rotating the pick-and-place mechanism, and the multiple unstapled batteries conveyed by the first conveying mechanism are provided to the second conveying mechanism by the first pick-and-place assembly, thereby completing the loading operation of the unstapled batteries. At the same time, the multiple stapled batteries conveyed by the second conveying mechanism are provided to the first conveying mechanism by the second pick-and-place assembly, thereby completing the unloading operation of the stapled batteries. In this way, the loading operation of the multiple unstapled batteries and the unloading operation of the multiple stapled batteries are combined together, which simplifies the manufacturing process, speeds up the production rhythm, improves the production efficiency, and is conducive to maximizing production capacity.
[0128] The sealing nail assembly equipment provided in the embodiment of the present application can be used in, but not limited to, battery production and manufacturing, and can also be used in the loading and unloading processes of other workpieces.
[0129] The battery provided in the embodiment of the present application may be a secondary battery, which refers to a battery that can be continuously used by activating the active material by charging after the battery is discharged.
[0130] The battery can be a lithium ion battery, a sodium ion battery, a sodium lithium ion battery, a lithium metal battery, a sodium metal battery, a lithium sulfur battery, a magnesium ion battery, a nickel hydrogen battery, a nickel cadmium battery, a lead storage battery, etc., which is not limited in the embodiments of the present application.
[0131] In some embodiments, the battery may include a housing. The housing is used to encapsulate components such as electrode assemblies and electrolytes. The housing may be a steel housing, an aluminum housing, a plastic housing (such as polypropylene), a composite metal housing (such as a copper-aluminum composite housing), or an aluminum-plastic film.
[0132] As an example, the battery can be a cylindrical battery, a prismatic battery, a soft-pack battery or a battery of other shapes. Prismatic batteries include square shell batteries, blade-shaped batteries, and polygonal prismatic batteries. Polygonal prismatic batteries are, for example, hexagonal prismatic batteries, etc. There is no particular limitation in the present application.
[0133] In some embodiments, the housing includes an end cap and a shell, the shell is provided with an opening, and the end cap closes the opening to form a closed space for accommodating substances such as the electrode assembly and the electrolyte. The shell may be provided with one or more openings. One or more end caps may also be provided. The housing is provided with a liquid injection hole, for example, the liquid injection hole may be provided on the end cap.
[0134] Below, refer to Figures 1 to 12 Some embodiments of the present application are described in detail.
[0135] The embodiment of the present application provides a sealing nail assembly device 100, comprising: a first conveying mechanism 1 and a second conveying mechanism 2 located on one side of the first conveying mechanism 1; a stapling mechanism for assembling sealing nails on un-stapled batteries on the second conveying mechanism 2 so that the un-stapled batteries become stapled batteries; a loading and unloading mechanism 3, comprising a pick-and-place mechanism 31, the pick-and-place mechanism 31 comprising a first pick-and-place component 311 and a second pick-and-place component 312, the pick-and-place mechanism 31 being configured to be rotatable so that the first pick-and-place component 311 and the second pick-and-place component 312 are switched between a first pick-and-place position S1 and a second pick-and-place position S2, and the first pick-and-place component 311 at the first pick-and-place position S1 can be oriented toward the first conveying mechanism 1 The first pick-and-place component 311 can move, and the first pick-and-place component 311 can pick up multiple unstapled batteries on the first conveying mechanism 1, the second pick-and-place component 312 at the second pick-and-place position S2 can move toward the second conveying mechanism 2, and the second pick-and-place component 312 can pick up multiple stapled batteries on the second conveying mechanism 2, the first pick-and-place component 311 at the second pick-and-place position S2 can move toward the second conveying mechanism 2, and the first pick-and-place component 311 can release multiple unstapled batteries to the second conveying mechanism 2, the second pick-and-place component 312 at the first pick-and-place position S1 can move toward the first conveying mechanism 1, and the second pick-and-place component 312 can release multiple stapled batteries to the first conveying mechanism 1.
[0136] An un-stapled battery refers to a battery whose liquid injection hole is not equipped with a sealing nail. A nailed battery refers to a battery whose liquid injection hole is equipped with a sealing nail. The sealing nail can be a component that can seal the liquid injection hole to maintain the airtightness requirement of the liquid injection hole, such as a rubber nail, a plastic nail, a metal nail, etc.
[0137] The first conveying mechanism 1 is used to provide a plurality of unstapled batteries to the second conveying mechanism 2 and receive a plurality of stapled batteries from the second conveying mechanism 2. The first conveying mechanism 1 can provide unstapled batteries to the second conveying mechanism 2, and the second conveying mechanism 2 can provide stapled batteries to the first conveying mechanism 1, so that the first conveying mechanism 1 can both provide unstapled batteries to the second conveying mechanism 2 and receive stapled batteries from the second conveying mechanism 2.
[0138] The stapling mechanism is used to assemble sealing nails on the un-stapled batteries on the second conveying mechanism 2 so that the un-stapled batteries become stapled batteries. The second conveying mechanism 2 passes through the stapling station P, where the un-stapled batteries are assembled with sealing nails by the stapling mechanism to become stapled batteries. The second conveying mechanism 2 receives a plurality of un-stapled batteries provided by the first conveying mechanism 1, and transports the received plurality of un-stapled batteries to the stapling station P to complete the assembly of sealing nails, thereby becoming stapled batteries.
[0139] The first conveying mechanism 1 and the second conveying mechanism 2 are respectively used to convey the batteries along their respective conveying paths. For example, the first conveying mechanism 1 and the second conveying mechanism 2 can be belt conveying mechanisms, chain conveying mechanisms, roller conveying mechanisms, etc.
[0140] The pick-and-place mechanism 31 includes a first pick-and-place component 311 and a second pick-and-place component 312 . The first pick-and-place component 311 and the second pick-and-place component 312 can pick up and release batteries respectively.
[0141] The pick-and-place mechanism 31 is configured to be rotatable so that the first pick-and-place component 311 and the second pick-and-place component 312 can be switched between the first pick-and-place position S1 and the second pick-and-place position S2. It can be understood that the pick-and-place mechanism 31 is rotated so that one of the first pick-and-place component 311 and the second pick-and-place component 312 is located at the first pick-and-place position S1, and the other is located at the second pick-and-place position S2. That is, when the first pick-and-place component 311 is located at the first pick-and-place position S1, the second pick-and-place component 312 is located at the second pick-and-place position S2; when the first pick-and-place component 311 is located at the second pick-and-place position S2, the second pick-and-place component 312 is located at the first pick-and-place position S1.
[0142] The first pick-and-place component 311 located at the first pick-and-place position S1 can reach the first conveying mechanism 1 and pick up multiple unstapled batteries on the first conveying mechanism 1, and the second pick-and-place component 312 located at the second pick-and-place position S2 can reach the second conveying mechanism 2 and pick up multiple stapled batteries; the second pick-and-place component 312 located at the first pick-and-place position S1 can reach the first conveying mechanism 1 and release multiple stapled batteries to the first conveying mechanism 1, and the first pick-and-place component 311 located at the second pick-and-place position S2 can reach the second conveying mechanism 2 and release multiple unstapled batteries to the second conveying mechanism 2.
[0143] The first pick-and-place component 311 and the second pick-and-place component 312 can arrive at the first conveying mechanism 1 and the second conveying mechanism 2 at the same time, and pick up multiple un-stapled batteries and multiple stapled batteries at the same time, and release multiple un-stapled batteries and multiple stapled batteries at the same time. Of course, the first pick-and-place component 311 and the second pick-and-place component 312 can also arrive at the first conveying mechanism 1 and the second conveying mechanism 2 at different times, pick up multiple un-stapled batteries and multiple stapled batteries at different times, and release multiple un-stapled batteries and multiple stapled batteries at different times.
[0144] When the first pick-and-place assembly 311 is located at the first pick-and-place position S1 and the second pick-and-place assembly 312 is located at the second pick-and-place position S2, the first pick-and-place assembly 311 can reach the first conveying mechanism 1 and pick up a plurality of unstapled batteries on the first conveying mechanism 1, and the second pick-and-place assembly 312 can reach the second conveying mechanism 2 and pick up a plurality of stapled batteries. The pick-and-place mechanism 31 rotates so that the first pick-and-place assembly 311 is located at the second pick-and-place position S2 and the second pick-and-place assembly 312 is located at the first pick-and-place position S1, thereby realizing that the first pick-and-place assembly 311 and the second pick-and-place assembly 312 are located at the first pick-and-place position S1. The first pick-and-place component 311 located at the second pick-and-place position S2 can reach the second conveying mechanism 2 and release a plurality of unstapled batteries, thereby providing a plurality of unstapled batteries of the first conveying mechanism 1 to the second conveying mechanism 2, thereby realizing the loading operation of a plurality of unstapled batteries, and the second pick-and-place component 312 located at the first pick-and-place position S1 can reach the first conveying mechanism 1 and release a plurality of stapled batteries, thereby transferring a plurality of stapled batteries on the second conveying mechanism 2 to the first conveying mechanism 1, thereby realizing the unloading operation of a plurality of stapled batteries.
[0145] As an example, in the initial state, see Figures 1 to 3, the first pick-and-place component 311 is located at the first pick-and-place position S1, the second pick-and-place component 312 is located at the second pick-and-place position S2, the first conveying mechanism 1 conveys a plurality of un-stapled batteries to the first loading and unloading position corresponding to the first pick-and-place position S1, the second conveying mechanism 2 conveys a plurality of stapled batteries to the second loading and unloading position corresponding to the second pick-and-place position S2, then, the first pick-and-place component 311 picks up a plurality of un-stapled batteries located at the first loading and unloading position, the second pick-and-place component 312 picks up a plurality of stapled batteries located at the second loading and unloading position, then, the pick-and-place The mechanism 31 rotates so that the first pick-and-place component 311 carries the picked-up multiple unstapled batteries to the second pick-and-place position S2, and the second pick-and-place component 312 carries the picked-up multiple stapled batteries to the first pick-and-place position S1, completing the position switching operation. Then, the first pick-and-place component 311 releases the picked-up multiple unstapled batteries to the second loading and unloading position of the second conveying mechanism 2, completing the loading operation of the unstapled batteries, and the second pick-and-place component 312 releases the multiple stapled batteries to the first loading and unloading position of the first conveying mechanism 1, completing the unloading operation of the stapled batteries.
[0146] By rotating the pick-and-place mechanism 31, the first pick-and-place component 311 and the second pick-and-place component 312 are switched between the first pick-and-place position S1 and the second pick-and-place position S2, and the multiple unstapled batteries conveyed by the first conveying mechanism 1 are released to the second conveying mechanism 2 to realize the loading operation, and the multiple stapled batteries conveyed by the second conveying mechanism 2 are released to the first conveying mechanism 1 to realize the unloading operation. Thus, the loading operation of multiple unstapled batteries and the unloading operation of multiple stapled batteries are combined together, which simplifies the stapling process, helps to speed up the production rhythm, improve production efficiency, and thus helps to maximize production capacity.
[0147] In some embodiments, reference Figure 3 The loading and unloading mechanism 3 also includes a rotating mechanism 32, and the pick-and-place mechanism 31 also includes a moving frame 313, the moving frame 313 is connected to the rotating mechanism 32, the first pick-and-place component 311 and the second pick-and-place component 312 are respectively arranged on the moving frame 313, and the rotating mechanism 32 is used to drive the moving frame 313 to drive the first pick-and-place component 311 and the second pick-and-place component 312 to rotate.
[0148] The moving frame 313 is used to support and fix the first pick-and-place assembly 311 and the second pick-and-place assembly 312. The rotating mechanism 32 drives the moving frame 313 to rotate, thereby driving the first pick-and-place assembly 311 and the second pick-and-place assembly 312 to rotate synchronously.
[0149] As an example, the rotating mechanism 32 may include a rotating motor and a reducer, the output shaft of the rotating motor is connected to the input end of the reducer, and the output end of the reducer is connected to the moving frame 313. Of course, the rotating mechanism 32 may also be a mechanism such as a rotating cylinder that can drive the moving frame 313 to rotate around the rotation axis.
[0150] The rotating mechanism 32 drives the moving frame 313 to rotate the first pick-and-place assembly 311 and the second pick-and-place assembly 312, so that the first pick-and-place assembly 311 and the second pick-and-place assembly 312 can synchronously and quickly switch positions between the first pick-and-place position S1 and the second pick-and-place position S2, further improving production efficiency.
[0151] In some embodiments, reference Figure 3 The movable frame 313 can rotate the first pick-and-place assembly 311 and the second pick-and-place assembly 312 around the same rotation axis L under the drive of the rotating mechanism 32. The pick-and-place mechanism 31 is located between the first conveying mechanism 1 and the second conveying mechanism 2 along the first direction X, and the first direction X is perpendicular to the direction of the rotation axis L.
[0152] As an example, the direction of the rotation axis L can be Figure 3 The direction indicated by the arrow Z in the middle may also be referred to as the up-down direction or the lifting direction Z (described later). Along the first direction X perpendicular to the rotation axis L, the first conveying mechanism 1 and the second conveying mechanism 2 are spaced apart, the pick-and-place mechanism 31 is located between the first conveying mechanism 1 and the second conveying mechanism 2, and the mobile frame 313 can horizontally rotate the first pick-and-place assembly 311 and the second pick-and-place assembly 312 around the same rotation axis L under the drive of the rotating mechanism 32.
[0153] Typically, the opening direction of the battery's injection hole faces upward, and the first pick-and-place assembly 311 and the second pick-and-place assembly 312 rotate horizontally around the same rotation axis L, so that the injection holes of the picked-up unstapled batteries and stapled batteries can remain in an upward posture respectively, thereby reducing the risk of leakage of unstapled batteries and stapled batteries and improving the reliability of the stapling process.
[0154] By locating the pick-and-place mechanism 31 between the first conveying mechanism 1 and the second conveying mechanism 2 along the first direction X, such a layout can shorten the distance between the first pick-and-place component 311 and the second pick-and-place component 312 and the first conveying mechanism 1 and the second conveying mechanism 2 during the position switching process between the first pick-and-place position S1 and the second pick-and-place position S2, thereby facilitating the quick pick-and-place of unstapled batteries and stapled batteries, improving production efficiency, and making the loading and unloading mechanism 3 more compact as a whole, reducing space occupancy.
[0155] In some embodiments, a plurality of first pick-and-place components 311 are provided, and the plurality of first pick-and-place components 311 are arranged along the second direction Y and can approach or move away from each other along the second direction Y; a plurality of second pick-and-place components 312 are provided, and the plurality of second pick-and-place components 312 are arranged along the second direction Y and can approach or move away from each other along the second direction Y, and the second direction Y is perpendicular to the direction of the rotation axis L and the first direction X.
[0156] The multiple first pick-and-place components 311 can approach or move away from each other along the second direction Y. It can be understood that any two adjacent ones of the multiple first pick-and-place components 311 approach or move away from the other, or the two approach or move away from each other, thereby adjusting the spacing between the multiple first pick-and-place components 311.
[0157] The multiple second pick-and-place components 312 can approach or move away from each other along the second direction Y. It can be understood that any two adjacent ones of the multiple second pick-and-place components 312 approach or move away from the other, or the two approach or move away from each other, thereby adjusting the spacing between the multiple second pick-and-place components 312.
[0158] The spacing adjustment of the plurality of first pick-and-place components 311 and the spacing adjustment of the plurality of second pick-and-place components 312 can be performed before the first pick-and-place components 311 and the plurality of second pick-and-place components 312 switch positions between the first pick-and-place position S1 and the second pick-and-place position S2, or can be performed after the position switching.
[0159] The spacing between the multiple unstapled batteries provided by the first conveying mechanism 1 to the second conveying mechanism 2 may be different from the spacing between the multiple unstapled batteries required on the second conveying mechanism 2. For example, in order to facilitate the stapling operation of multiple unstapled batteries at the stapling station, it is expected that the spacing between each unstapled battery is as large as possible to reduce the risk of unreliable stapling or stapling failure caused by mutual interference during the stapling process. In the process of stapling multiple cylindrical batteries, due to the structural characteristics of cylindrical batteries, the distance between each cylindrical battery requires a larger spacing, so that the spacing between the injection holes between adjacent cylindrical batteries meets the stapling requirements. In addition, in order to improve the conveying efficiency, the spacing between multiple batteries on the first conveying mechanism 1 is usually small.
[0160] To this end, the multiple first pick-and-place components 311 and the multiple second pick-and-place components 312 are respectively moved closer to or farther away from each other along the second direction Y, thereby adjusting the spacing between the multiple first pick-and-place components 311 and the multiple second pick-and-place components 312, thereby changing the spacing between the multiple stapled batteries released to the first conveying mechanism 1 and the multiple unstapled batteries released to the second conveying mechanism 2. As a result, the stapling operation can be efficiently completed when stapling different battery types, making production more flexible.
[0161] In some embodiments, the picking and placing mechanism 31 also includes a first distance changing mechanism 314 and a second distance changing mechanism 315. The first distance changing mechanism 314 is connected to at least two of the multiple first picking and placing components 311, and the first picking and placing components 311 connected to the first distance changing mechanism 314 approach or move away from each other under the drive of the first distance changing mechanism 314. The second distance changing mechanism 315 is connected to at least two of the multiple second picking and placing components 312, and the second picking and placing components 312 connected to the second distance changing mechanism 315 approach or move away from each other under the drive of the second distance changing mechanism 315.
[0162] At least two of the multiple first pick-and-place components 311 are connected to the first distance-changing mechanism 314, so that the spacing between at least two of the first pick-and-place components 311 is changed under the drive of the first distance-changing mechanism 314, and at least two of the multiple second pick-and-place components 312 are connected to the second distance-changing mechanism 315, so that the spacing between at least two of the second pick-and-place components 312 is changed under the drive of the second distance-changing mechanism 315.
[0163] The multiple first pick-and-place components 311 and the multiple second pick-and-place components 312 are respectively driven by the first distance changing mechanism 314 and the second distance changing mechanism 315 to approach or move away from each other along the second direction Y, thereby adjusting the distance between at least two first pick-and-place components 311 and at least two second pick-and-place components 312, thereby changing the distance between at least two unstapled batteries provided by the first conveying mechanism 1 to the second conveying mechanism 2, and changing the distance between at least two stapled batteries received by the first conveying mechanism 1 from the second conveying mechanism 2. In this way, the distance changing operation of the multiple first pick-and-place components and the multiple second pick-and-place components can be automatically realized, thereby improving production efficiency.
[0164] In some embodiments, reference Figure 3 and Figure 4 The first pitch changing mechanism 314 includes a first slide rail 3141, a plurality of first sliders 3142 and a plurality of first pull rods 3143. The first slide rail 3141 is arranged on the movable frame 313 and extends along the second direction Y; the plurality of first sliders 3142 are respectively slidably connected with the first slide rail 3141, each of the first sliders 3142 is provided with a first pitch changing groove 3142a, and each first pick-and-place assembly 311 is connected with its respective first slider 3142; each adjacent two first sliders 3142 are connected by a first pull rod 3143, and the two ends of the first pull rod 3143 are respectively arranged in the first pitch changing grooves 3142a of the two adjacent first sliders 3142, and the two ends of the first pull rod 3143 can move in their respective first pitch changing grooves 3142a along the second direction Y.
[0165] When it is necessary to increase the spacing between the first pick-and-place components 311, one of the two adjacent first sliders 3142 can be moved away from the other along the second direction Y, and the first pull rod 3143 between the two adjacent first sliders 3142 can be used to pull the first sliders 3142 away from each other along the second direction Y and present an unfolded posture to each other, thereby increasing the spacing between the first pick-and-place components 311; when it is necessary to reduce the spacing between the first pick-and-place components 311, one of the two adjacent first sliders 3142 can be moved closer to the other along the second direction Y, and the first pull rod 3143 between the two adjacent first sliders 3142 can be used to push the first sliders 3142 closer to each other along the second direction Y and present a close posture to each other, thereby reducing the spacing between the first pick-and-place components 311.
[0166] By moving one first slider 3142 and pulling the remaining first sliders 3142 to slide along the first slide rail 3141 through the first pull rod 3143, the first sliders 3142 can move closer to or farther away from each other more smoothly and reliably, so that the spacing adjustment between the first pick-and-place assemblies 311 is more reliable.
[0167] In some embodiments, the second distance changing mechanism 315 includes a second slide rail 3151, a plurality of second sliders 3152, and a plurality of second pull rods 3153. The second slide rail 3151 is arranged on the movable frame 313 and extends along the second direction Y; the plurality of second sliders 3152 are respectively slidably connected to the second slide rail 3151, and each second slider 3152 is provided with a second distance changing groove 3152a, and each second pick-and-place assembly 312 is connected to its respective second slider 3152; each adjacent second slider 3152 is connected by a second pull rod 3153, and the two ends of the second pull rod 3153 are respectively arranged in the second distance changing groove 3152a of the two adjacent second sliders 3152, and the two ends of the second pull rod 3153 can move in their respective second distance changing grooves 3152a along the second direction Y.
[0168] When it is necessary to increase the spacing between the second pick-and-place components 312, one of the two adjacent second sliders 3152 can be moved away from the other along the second direction Y, and the second pull rod 3153 between the two adjacent second sliders 3152 can be used to pull the second sliders 3152 away from each other along the second direction Y and present an expanded posture to each other, thereby increasing the spacing between the second pick-and-place components 312; when it is necessary to reduce the spacing between the second pick-and-place components 312, one of the two adjacent second sliders 3152 can be moved closer to the other along the second direction Y, and the second pull rod 3153 between the two adjacent second sliders 3152 can be used to push the second sliders 3152 closer to each other along the second direction Y and present a close posture to each other, thereby reducing the spacing between the second pick-and-place components 312.
[0169] By moving one second slider 3152 and pulling the remaining second sliders 3152 to slide along the second slide rail 3151 through the second pull rod 3153, the second sliders 3152 can be moved closer to or farther away from each other more smoothly and reliably, so that the spacing adjustment between the second pick-and-place components 312 is more reliable.
[0170] In some embodiments, the first variable distance mechanism 314 also includes a first variable distance driving member 3144, the driving end of which is connected to the first first slider 3142 along the second direction Y among the multiple first sliders 3142; and / or, the second variable distance mechanism 315 also includes a second variable distance driving member 3154, the driving end of which is connected to the first second slider 3152 along the second direction Y among the multiple second sliders 3152.
[0171] The driving end of the first variable pitch driving member 3144 drives the first first slider 3142 to move, and pulls each first slider 3142 to slide along the first slide rail 3141 in sequence through each first pull rod 3143, so that each first slider 3142 moves closer or farther away in sequence along the second direction Y, thereby changing the spacing between each first pick-and-place assembly 311. The first variable pitch driving member 3144 can be a telescopic cylinder.
[0172] The driving end of the second variable-pitch driving member 3154 drives the first second slider 3152 to move, and pulls each second slider 3152 to slide along the second slide rail 3151 in sequence through each second pull rod 3153, so that each second slider 3152 moves closer or farther away in sequence along the second direction Y, thereby changing the spacing between each second pick-and-place assembly 312. The second variable-pitch driving member 3154 can be a telescopic cylinder.
[0173] By driving the first slider to move and pulling each slider to slide in sequence through a pull rod, the variable pitch operation of picking and placing the component can be achieved with less variable pitch driving parts, which simplifies the structure and helps to improve the reliability of variable pitch.
[0174] In some embodiments, reference Figure 4 Each first pick-and-place assembly 311 includes a pair of first pick-and-place jaws 3111, which can move closer to or farther away from each other, and the first pick-and-place jaws 3111 include an arc-shaped first clamping surface 3111a; the second pick-and-place assembly 312 includes a pair of second pick-and-place jaws 3121, which can move closer to or farther away from each other, and the second pick-and-place jaws 3121 include an arc-shaped second clamping surface 3121a.
[0175] As an example, the paired first pick-and-place clamps 3111 are moved closer to each other to clamp unstapled batteries, and the paired first pick-and-place clamps 3111 are moved away from each other to release unstapled batteries; the paired second pick-and-place clamps 3121 are moved closer to each other to clamp stapled batteries, and the paired second pick-and-place clamps 3121 are moved away from each other to release stapled batteries. The paired first pick-and-place clamps 3111 can be driven closer to or farther from each other by the first clamp cylinder 3112. The paired second pick-and-place clamps 3121 can be driven closer to or farther from each other by the second clamp cylinder 3122.
[0176] The first pick-and-place clamping jaw 3111 and the second pick-and-place clamping jaw 3121 respectively include arc-shaped clamping surfaces, which can more appropriately and reliably clamp cylindrical batteries.
[0177] In some embodiments, reference Figure 3 The loading and unloading mechanism 3 also includes a frame 33, a lifting assembly 34 and a lifting drive 35. The lifting assembly 34 is connected to the pick-and-place mechanism 31 and can be lifted and lowered on the frame 33. The driving end of the lifting drive 35 is connected to the lifting assembly 34, and is used to drive the lifting assembly 34 to drive the first pick-and-place assembly 311 and the second pick-and-place assembly 312 to lift and lower.
[0178] As an example, the pick-and-place mechanism 31 can be located above the first conveying mechanism 1 and the second conveying mechanism 2, and the lifting drive 35 drives the lifting assembly 34 to drive the first pick-and-place assembly 311 and the second pick-and-place assembly 312 to descend, so that the first pick-and-place assembly 311 and the second pick-and-place assembly 312 respectively reach or leave the first conveying mechanism 1 and the second conveying mechanism 2, so as to pick up or release unstapled batteries and stapled batteries respectively; the lifting drive 35 drives the lifting assembly 34 to drive the first pick-and-place assembly 311 and the second pick-and-place assembly 312 to rise, so that the first pick-and-place assembly 311 and the second pick-and-place assembly 312 can perform position switching operations between the first pick-and-place position S1 and the second pick-and-place position S2.
[0179] By driving the lifting component 34 through the lifting drive 35 to drive the first pick-and-place component 311 and the second pick-and-place component 312 to rise and fall, the first pick-and-place component 311 and the second pick-and-place component 312 can be more smoothly and accurately made to reach or leave the first conveying mechanism 1 and the second conveying mechanism 2 respectively, providing convenience for picking up and releasing unstapled batteries and stapled batteries and switching positions.
[0180] In some embodiments, the lifting assembly 34 includes a lifting frame 341 slidably disposed on the frame 33 , a driving end of the lifting driving member 35 is connected to the lifting frame 341 , and the lifting frame 341 is connected to the moving frame 313 .
[0181] As an example, the lifting assembly 34 may further include a lead screw nut assembly 342 for connecting with the lifting frame 341. In some embodiments, the lifting drive 35 may further include a motor or a cylinder or a hydraulic cylinder or other components for providing power.
[0182] The lifting drive 35 drives the lifting frame 341 to lift and lower the moving frame 313, so that the first pick-and-place assembly 311 and the second pick-and-place assembly 312 arranged on the moving frame 313 can be lifted and lowered together, thereby reaching the first conveying mechanism and the second conveying mechanism synchronously, thereby speeding up the production rhythm and improving efficiency.
[0183] In some embodiments, the first conveying mechanism 1 and the second conveying mechanism 2 are respectively provided with a plurality of brackets 4 arranged along the second direction Y ( Figure 5 As shown), each bracket 4 is used to place batteries.
[0184] By placing the batteries on the bracket 4, each battery can be kept in a desired posture, thereby reducing the risk of thermal runaway caused by the batteries tipping over and colliding with each other, and improving the reliability of the batteries during transportation. In addition, cylindrical batteries with a smaller support surface can also be transported reliably.
[0185] In some embodiments, the spacing between the plurality of brackets 4 disposed on the first conveying mechanism 1 is different from the spacing between the plurality of brackets 4 disposed on the second conveying mechanism 2 .
[0186] During the stapling process of cylindrical batteries, due to the structural characteristics of cylindrical batteries, in order to facilitate the stapling operation of multiple unstapled batteries at the stapling station P, it is expected that the spacing between each unstapled battery is as large as possible. By setting the spacing between the multiple brackets 4 of the second conveying mechanism 2 to be larger, the stapling operation can be completed more smoothly.
[0187] Therefore, by making the spacing between the multiple brackets 4 of the first conveying mechanism 1 different from the spacing between the multiple brackets 4 arranged on the second conveying mechanism 2, it can be applied to various application scenarios, which is conducive to flexible production.
[0188] In some embodiments, each bracket 4 has a battery receiving slot 41 , and the inner circumference of the battery receiving slot 41 has a shape that matches the outer contour of the battery.
[0189] The battery receiving groove 41 is used to receive the battery. The inner circumference of the battery receiving groove 41 has a shape that matches the outer contour of the battery, so that the battery can be more stably received in the battery receiving groove 41 and can be transported more reliably.
[0190] As an example, when the battery is a cylindrical battery, the inner circumferential surface of the battery receiving groove 41 is an arc surface that matches the circular outer contour.
[0191] In some embodiments, the second conveying mechanism 2 is configured to have an annular conveying path, which may be in the shape of a circular ring, a racetrack, or the like.
[0192] The annular conveying path can cyclically convey the batteries, providing convenience for transferring the stapled batteries to the first conveying mechanism 1, thereby improving the conveying efficiency.
[0193] In some embodiments, reference Figure 1 and Figure 2 The stapling mechanism includes a pre-stapling mechanism 5 and a stapling mechanism 7. Along the conveying path direction of the second conveying mechanism 2, the pre-stapling mechanism 5 is located upstream of the stapling mechanism 7. The sealing nail assembly device 100 also includes a nail supply mechanism 6, which is used to provide sealing nails to the pre-stapling mechanism 5. The pre-stapling mechanism 5 is configured to be able to pick up the sealing nails and pre-assemble the sealing nails to the un-stapled batteries. The stapling mechanism 7 is used to nail the batteries pre-installed with sealing nails into nailed batteries.
[0194] Along the conveying path of the second conveying mechanism 2, the second conveying mechanism 2 passes through the pre-stapling station P1 located on the upstream side of the stapling station P. The nail supply mechanism 6 is used to provide sealing nails to the pre-stapling mechanism 5. The pre-stapling mechanism 5 is configured to be able to pick up the sealing nails and pre-assemble the sealing nails to multiple unstapled batteries at the pre-stapling station P1.
[0195] Sealing nails are provided to the pre-stapling mechanism 5 through the nail supply mechanism 6, and the pre-stapling mechanism 5 picks up the sealing nails and pre-assembles the sealing nails on multiple un-stapled batteries, so that the process from providing the sealing nails to assembling the sealing nails can be completed automatically, thereby improving the stapling efficiency. In addition, pre-stapling before stapling can reduce the probability of sealing nail assembly failure and improve the stapling reliability.
[0196] In some embodiments, reference Figure 6 The pre-stapling mechanism 5 includes a plurality of suction cup assemblies 51, a transfer mechanism 52 and a transfer drive mechanism 53. The suction cup assembly 51 is used to absorb the sealing nails. The transfer mechanism 52 is connected to the suction cup assembly 51. The transfer drive mechanism 53 is used to drive the transfer mechanism 52 to drive the suction cup assembly 51 to move and pre-assemble the absorbed sealing nails to a plurality of un-stapled batteries.
[0197] As an example, each suction cup assembly 51 is connected to a negative pressure system for sucking and releasing sealing nails. The transfer mechanism 52 can reciprocate along the second direction Y between the position where the nail supply mechanism 6 provides the sealing nails and the pre-stacking station, and can be lifted and lowered along the lifting direction Z to suck and release the sealing nails, thereby pre-assembling the sealing nails to a plurality of unstapled batteries.
[0198] By driving the transfer mechanism 52 with each suction cup assembly 51 through the transfer drive mechanism 53, the sealing nails can be sucked and pre-assembled automatically, thereby improving the nailing efficiency.
[0199] In some embodiments, reference Figure 2 and Fig. 9 The nail supply mechanism 6 includes a screening mechanism 61, a sealing nail transfer mechanism 62 and a buffer mechanism 63. The screening mechanism 61 is used to screen out sealing nails with a specified posture; the sealing nail transfer mechanism 62 is used to pick up and transfer the sealing nails with a specified posture; the buffer mechanism 63 is used to receive the sealing nails transferred by the sealing nail transfer mechanism 62 and keep the sealing nails in the specified posture.
[0200] The prescribed posture may be a posture consistent with the posture when the sealing pin is inserted into the liquid injection hole of the battery. For example, the prescribed posture may be a posture in which the large end of the sealing pin is at the top and the small end is at the bottom.
[0201] The sealing pins with a specified posture are screened out by the screening mechanism 61, and the sealing pin transfer mechanism 62 picks up the sealing pins with a specified posture and transfers them to the cache mechanism 63. The cache mechanism 63 keeps the sealing pins in a specified posture, so that the pre-stapling mechanism 5 can absorb the sealing pins and pre-assemble them on multiple un-stapled batteries without adjusting the posture of the sealing pins again, thereby improving the stapling efficiency.
[0202] In some embodiments, reference Figure 7 and Figure 8 The cache mechanism 63 includes a first cache table 631, a second cache table 632 and a cache table driving member 633. The first cache table 631 and the second cache table 632 are respectively used to place sealing nails. The cache table driving member 633 is connected to the first cache table 631 and the second cache table 632, and is used to drive the first cache table 631 and the second cache table 632 to move and alternately reach the sealing nail receiving position W1 and the sealing nail providing position W2. At the sealing nail receiving position W1 and the sealing nail providing position W2, one of the first cache table 631 and the second cache table 632 is used to receive the sealing nails transferred from the sealing nail transfer mechanism 62, and the other is used to provide the sealing nails to the pre-loading nail mechanism 5.
[0203] The first buffer station 631 and the second buffer station 632 are respectively used to place the sealing pins and keep the sealing pins in a specified posture. In some embodiments, the first buffer station 631 and the second buffer station 632 are respectively provided with a sealing pin holding portion. The sealing pin holding portion can be, for example, a through hole or a groove provided on the first buffer station 631 and the second buffer station 632, or other structures that can keep the sealing pin in a specified posture.
[0204] The first cache station 631 and the second cache station 632 alternately reach the sealing nail receiving position W1 and the sealing nail providing position W2. It can be understood that when one of the first cache station 631 and the second cache station 632 reaches the sealing nail receiving position W1, the other is located at the sealing nail providing position W2.
[0205] The first cache station 631 or the second cache station 632 arriving at the sealing nail receiving position W1 can receive the sealing nails transferred by the sealing nail transfer mechanism 62, and the first cache station 631 or the second cache station 632 arriving at the sealing nail providing position W2 can provide sealing nails to the pre-loading nail mechanism 5.
[0206] The first buffer station 631 and the second buffer station 632 alternately reach the sealing nail receiving position W1 and the sealing nail providing position W2, and can continuously provide sealing nails for the pre-loading nail mechanism 5, which is beneficial to speed up the production rhythm and improve the production efficiency.
[0207] In some embodiments, the cache table drive 633 includes a transmission assembly 6331 and a transmission drive 6332. The transmission assembly 6331 includes two pulleys 6331a and a transmission belt 6331b wound around the two pulleys 6331a. The transmission drive 6332 is connected to at least one pulley 6331a, and is used to drive the pulley 6331a to rotate clockwise and counterclockwise, and drive the transmission belt 6331b to transmit around the pulley 6331a. The first cache table 631 and the second cache table 632 are respectively connected to two sections of the transmission belt 6331b with opposite transmission directions, so that the first cache table 631 and the second cache table 632 move in opposite directions.
[0208] As an example, when the sealing nails on the second cache table 632 located at the sealing nail providing position W2 are used up and the sealing nails on the first cache table 631 located at the sealing nail receiving position W1 are ready, the transmission drive 6332 drives the pulley 6331a to rotate clockwise or counterclockwise to make the transmission belt 6331b drive the first cache table 631 to move from the sealing nail receiving position W1 to the sealing nail providing position W2, and at the same time, the transmission belt 6331b drives the second cache table 632 to move from the sealing nail providing position W2 to the sealing nail receiving position W1; when the first cache table 631 at the sealing nail providing position W2 provides sealing nails for the pre-loading nail mechanism 5, the second cache table 632 at the sealing nail receiving position W1 can receive the sealing nails transferred by the sealing nail transfer mechanism 62.
[0209] The transmission driving member 6332 can be a mechanism such as a rotating motor or a rotating cylinder that can drive the pulley 6331a to rotate.
[0210] The first cache table 631 and the second cache table 632 are driven by the belt drive assembly to switch positions alternately between the sealing nail receiving position W1 and the sealing nail providing position W2 in opposite directions. The belt drive process is smoother, so that the sealing nail can maintain a specified posture more stably, and the number of driving parts can be reduced, simplifying the structure.
[0211] In some embodiments, the cache mechanism 63 also includes a switching component 634, the switching component 634 includes a track 6341 and a slide bar 6342, the track 6341 includes a concave-convex surface, one end of the slide bar 6342 is slidably disposed on the concave-convex surface, the other end of the slide bar 6342 is connected to the second cache table 632, and the second cache table 632 slides and rises and falls along the concave-convex surface through the slide bar 6342, wherein during the movement of the first cache table 631 and the second cache table 632 in opposite directions, the first cache table 631 and the second cache table 632 can be misaligned in the lifting direction Z.
[0212] The first cache table 631 and the second cache table 632 can be misaligned in the lifting direction Z. This means that when the first cache table 631 and the second cache table 632 move in opposite directions, the second cache table 632 slides and rises and falls along the concave and convex surface through the sliding rod 6342, so that the second cache table 632 passes over the first cache table 631, or the first cache table 631 passes over the second cache table 632.
[0213] By allowing the first cache table 631 and the second cache table 632 to be misaligned in the lifting direction Z while the first cache table 631 and the second cache table 632 move in opposite directions, the first cache table 631 and the second cache table 632 can alternately switch positions between the sealing nail receiving position W1 and the sealing nail providing position W2, thereby making the cache mechanism 63 more compact as a whole and reducing space occupancy.
[0214] In some embodiments, the concave and convex surfaces include a first convex surface 6341a, a concave surface 6341b, and a second convex surface 6341c connected in sequence, the first convex surface 6341a and the second convex surface 6341c are at the same height in the lifting direction Z, when the sliding rod 6342 slides to the concave surface 6341b, the second cache table 632 is misaligned with the first cache table 631 in the lifting direction Z, when the sliding rod 6342 slides to the first convex surface 6341a or the second convex surface 6341c, one of the second cache table 632 and the first cache table 631 is located at the sealing nail receiving position W1, and the other is located at the sealing nail providing position W2.
[0215] When the slide bar 6342 slides to the concave surface 6341b, the second cache table 632 is misaligned with the first cache table 631 in the lifting direction Z. It can be understood that when the slide bar 6342 is located at least one section of the concave surface 6341b, the second cache table 632 is misaligned with the first cache table 631 in the lifting direction Z.
[0216] When the sliding rod 6342 slides to the first convex surface 6341a or the second convex surface 6341c, one of the second cache table 632 and the first cache table 631 is located at the sealing nail receiving position W1, and the other is located at the sealing nail providing position W2. It can be understood that when the sliding rod 6342 is located at at least one section of the convex surface of the first convex surface 6341a or at least one section of the convex surface of the second convex surface 6341c, one of the second cache table 632 and the first cache table 631 is located at the sealing nail receiving position W1, and the other is located at the sealing nail providing position W2. For example, when the slide bar 6342 is located at the stop point position closest to the sealing nail receiving position W1 of the first convex surface 6341a, the second cache table 632 is located at the sealing nail receiving position W1, and the first cache table 631 is located at the sealing nail providing position W2; when the slide bar 6342 is located at the stop point position closest to the sealing nail providing position W2 of the second convex surface 6341c, the second cache table 632 is located at the sealing nail providing position W2, and the first cache table 631 is located at the sealing nail receiving position W1.
[0217] The first cache station 631 and the second cache station 632 are alternately switched between the sealing nail receiving position W1 and the sealing nail providing position W2 by cooperating with the slide bar 6342 and the concave-convex surface, so that the cache mechanism 63 is more compact as a whole and reduces space occupancy.
[0218] In some embodiments, the cache mechanism 63 also includes a first sliding component 635 and a second sliding component 636. The first sliding component 635 includes a first guide rail 6351 and a first sliding member 6352. The first cache table 631 is connected to the first sliding member 6352. The second sliding component 636 includes a second guide rail 6361, a second sliding member 6362 and a movable plate 6363. The second guide rail 6361 is parallel to the first guide rail 6351. The second sliding member 6362 is slidably connected to the second guide rail 6361 and is connected to the movable plate 6363. The movable plate 6363 is provided with a through hole 6363a. The sliding rod 6342 can be raised and lowered through the through hole 6363a.
[0219] The first buffer station 631 reciprocates between the sealing nail receiving position W1 and the sealing nail providing position W2 along the first guide rail 6351 through the first sliding member 6352.
[0220] The second cache table 632 reciprocates between the sealing nail receiving position W1 and the sealing nail providing position W2 along the second guide rail 6361 through the second sliding member 6362. During the movement, the sliding rod 6342 slides and rises and falls along the concave and convex surface. The sliding rod 6342 drives the movable plate 6363 to slide along the second guide rail 6361 and slide and rise and fall along the through hole 6363a, thereby driving the second cache table 632 to move and rise and fall along the second guide rail 6361.
[0221] The first cache table 631 and the second cache table 632 respectively move back and forth between the sealing nail receiving position W1 and the sealing nail providing position W2 along their respective guide rails through their respective sliding members, which can improve the stability during operation, reduce the risk of tilting or falling of the sealing nails on the first cache table 631 and the second cache table 632, and improve the reliability of nail supply.
[0222] In some embodiments, reference Figure 7 The cache mechanism 63 also includes a sealing nail collecting device 637, which includes a collection box 6371 and a ventilation pipe 6372. One end of the ventilation pipe 6372 is connected to the inner cavity of the collection box 6371, and the other end is used to communicate with the air pressure system. The ventilation pipe 6372 is provided with a receiving hole (not shown in the figure) for receiving abnormal sealing nails transferred by the pre-loading nail mechanism 5.
[0223] If the sealing nail sucked by the pre-stapling mechanism 5 is found to be abnormal, the abnormal sealing nail is transferred to the receiving hole and placed in the vent pipe 6372, and the air pressure system blows into the vent pipe 6372 to blow the sealing nail in the vent pipe 6372 into the collection box 6371. For example, the negative pressure when the pre-stapling mechanism 5 sucks the sealing nail can be used to determine whether the sealing nail is sucked in place, such as whether the sealing nail is in a specified posture, or the posture of the sealing nail can be detected by a visual mechanism.
[0224] The sealing nail collecting device 637 can collect abnormal sealing nails in time for reuse.
[0225] In some embodiments, reference Figure 2 and Fig. 9 The screening mechanism 61 includes a vibrating screen 611 and a sealing pin identifying mechanism 612. The vibrating screen 611 can vibrate to change the posture of the sealing pins. The sealing pin identifying mechanism 612 is used to identify the sealing pins that meet the specified posture.
[0226] The vibration screen 611 uses the reciprocating vibration generated by the vibrator excitation to change the posture of the sealing pin. The sealing pin identification mechanism 612 identifies the sealing pins that meet the specified posture from the vibration screen 611. The sealing pin identification mechanism 612 can be a visual camera.
[0227] Through the cooperation of the vibrating screen 611 and the sealing nail identification mechanism 612, sealing nails that meet the specified posture can be continuously screened out, so as to continuously provide sealing nails to the pre-installing nail mechanism 5, thereby improving the nail supply efficiency.
[0228] In some embodiments, reference Figure 2 and Fig. 9The sealing nail transfer mechanism 62 includes a sealing nail picking assembly 621, a movable arm 622 and a movable arm driving mechanism 623. The sealing nail picking assembly 621 is connected to the movable arm 622 and is used to pick up sealing nails in a specified posture. The movable arm driving mechanism 623 is used to drive the movable arm 622 to drive the sealing nail picking assembly 621 to transfer the picked up sealing nails to the cache mechanism 63.
[0229] The movable arm 622 may be a multi-axis movable arm that can move or rotate in different directions. The sealing nail picking assembly 621 may include a clamping claw that is driven by a clamping claw cylinder to clamp and release the sealing nail. The movable arm driving mechanism 623 may be a motor, a cylinder, etc.
[0230] The sealing nail transfer mechanism 62 can automatically complete the sealing nail transfer operation, thereby improving production efficiency.
[0231] In some embodiments, the nailing mechanism 7 includes a plurality of cam mechanisms and a plurality of punch assemblies 71, and the outer contour surface of the cam of each cam mechanism abuts against one end of the punch of the punch assembly 71, and is used to drive the punch of each punch assembly 71 to move back and forth and nail the sealing nails on the pre-stapled batteries at the stapling station P into nailed batteries. For example, the punch assembly 71 may include a mounting plate and a punch slidably disposed on the mounting plate, and an elastic member is disposed between the punch and the mounting plate, so that one end of the punch always abuts against the outer contour surface of the cam, and the cam is driven to rotate by the cam driving member, so that the outer contour surface of the cam abuts against the punch to hit the sealing nail.
[0232] The cam in the cam mechanism rotates so that the outer contour of the cam moves against the punch assembly 71 toward the sealing nail on the pre-stapled battery at the stapling station P, compacting the pre-staple nail and improving the stapling reliability.
[0233] In some embodiments, the sealing nail assembly device 100 further includes a sealing nail detection mechanism 8 for detecting the assembled batteries and issuing a detection result. The sealing nail detection mechanism 8 may be a visual mechanism such as a camera.
[0234] If the sealing nail detection mechanism 8 detects that the nailed battery is abnormal, it will send an abnormal signal to the upper computer, and the upper computer will issue a prompt according to the received abnormal signal. The abnormality of the nailed battery may be that the sealing nail is not assembled in place, the battery is tilted, etc.
[0235] Below, specific examples of embodiments of the present application are described.
[0236] Reference Fig.12The sealing nail assembly device 100 of the embodiment of the present application includes two sealing nail assembly devices 100 distributed along the second direction Y and symmetrically arranged with each other. The first conveying mechanisms 1 of the two sealing nail assembly devices 100 are arranged side by side and parallel to each other along the first direction X. The following takes one of the sealing nail assembly devices 100 as an example to describe the specific structure and working process of the other sealing nail assembly device 100, and the sealing nail assembly device 100 to be described can be referred to.
[0237] Reference Figure 1 The sealing nail assembly equipment 100 includes a first conveying mechanism 1, a second conveying mechanism 2, a loading and unloading mechanism 3 spanning between the first conveying mechanism 1 and the second conveying mechanism 2 along a first direction X, a pre-stapling mechanism 5, a stapling mechanism 7, a sealing nail detection mechanism 8, and a nail supply mechanism 6 located on one side of the pre-stapling mechanism 5 along a second direction Y.
[0238] The first conveying mechanism 1 has a linear conveying path, on which a bracket 4 for placing batteries is placed, and the batteries move along the linear conveying path through the bracket 4. The second conveying mechanism 2 has an annular conveying path, on which a bracket 4 for placing batteries is placed, and the batteries move along the annular conveying path through the bracket 4. The spacing between the multiple brackets 4 on the second conveying mechanism 2 is greater than the spacing between the multiple brackets 4 on the first conveying mechanism 1, so as to provide operating space for the pre-stapling mechanism 5 and the nailing mechanism 7 around the second conveying mechanism 2. The second conveying mechanism 2 can convey the unstapled batteries to the pre-stapling station P1, the stapling station P (which can also be called the nailing station) and the inspection station P2 in sequence. The pre-stapling mechanism 5 is located at the pre-stapling station P1, the nailing mechanism 7 is located at the stapling station P, and the sealing nail detection mechanism 8 is located at the inspection station P2.
[0239] Refer to the following Figures 1 to 5 The battery loading and unloading process of the embodiment of the present application is described.
[0240] Incoming process of unstapled batteries: When the multiple unstapled batteries carried by the bracket 4 are about to arrive at the first loading and unloading position of the first conveying mechanism 1 from the assembly line station, the blocking cylinder on the downstream side of the first loading and unloading position extends to block the multiple unstapled batteries at the first loading and unloading position. Specifically, when the batteries are about to arrive at the first loading and unloading position of the first conveying mechanism 1 from the assembly line station, the number of unstapled batteries can be counted by a photoelectric sensor. For example, after counting 12 unstapled batteries, the blocking cylinder on the upstream side of the first loading and unloading position extends to block the 13th unstapled battery outside the first loading and unloading position. At this time, the multiple unstapled batteries to be loaded are in a static state to be grasped.
[0241] The incoming process of stapled batteries: When the multiple unstapled batteries (for example, 12) carried by the bracket 4 of the second conveying mechanism 2 are pre-stapled at the pre-staple station P1 along the annular conveying path, stapled at the staple station P, and inspected at the inspection station P2, they arrive at the second loading and unloading position of the second conveying mechanism 2. The multiple stapled batteries to be unloaded can be restricted at the second loading and unloading position by a clamping mechanism or a blocking cylinder. At this time, the multiple stapled batteries to be unloaded are also in a static state to be grasped.
[0242] Loading and unloading process: In the initial state, the first pick-and-place component 311 of the loading and unloading mechanism 3 is located at the first pick-and-place position S1 corresponding to above the first loading and unloading position, and the second pick-and-place component 312 is located at the second pick-and-place position S2 corresponding to above the second loading and unloading position. The loading and unloading mechanism 3 is started, and the lifting drive member 35 drives the lifting assembly 34 to drive the first pick-and-place assembly 311 and the second pick-and-place assembly 312 to descend synchronously, so that the first pick-and-place assembly 311 and the second pick-and-place assembly 312 reach the first loading and unloading position and the second loading and unloading position respectively; then, the multiple first pick-and-place clamps 3111 of the first pick-and-place assembly 311 respectively clamp the multiple unstapled batteries located at the first loading and unloading position, and the multiple second pick-and-place clamps 3121 of the second pick-and-place assembly 312 respectively clamp the multiple stapled batteries located at the second loading and unloading position; then, the lifting drive member 35 drives the lifting assembly 34 to drive the first pick-and-place assembly 311 and the second pick-and-place assembly 312 to rise synchronously; then, the rotating mechanism 32 drives the first pick-and-place assembly 311 and the second pick-and-place assembly 312 to rotate 180 degrees around the same rotation axis L to switch positions, so that the first pick-and-place assembly 311 is located at the second pick-and-place position S2, and the second pick-and-place assembly 312 is located at the second pick-and-place position S3. Located at the first pick-and-place position S1; then, the spacing between the multiple first pick-and-place components 311 is changed by the first distance-changing mechanism 314, thereby changing the spacing between the multiple unstapled batteries, and the spacing between the multiple second pick-and-place components 312 is changed by the second distance-changing mechanism 315, thereby changing the spacing between the multiple stapled batteries; then, the lifting drive 35 drives the lifting component 34 to drive the first pick-and-place component 311 and the second pick-and-place component 312 to descend synchronously again, so that the first pick-and-place component 311 and the second pick-and-place component 312 reach the second loading and unloading position and the first loading and unloading position respectively; then, the first pick-and-place component 311 releases the multiple unstapled batteries after the distance change to their respective brackets 4 located at the second loading and unloading position, and the second pick-and-place component 312 releases the multiple stapled batteries after the distance change to their respective brackets 4 located at the first loading and unloading position, thereby completing the loading and unloading operations of the unstapled batteries and the stapled batteries.
[0243] Refer to the following Figure 1 , Figure 2 , Figure 6 , Fig.10 and Fig.11 The battery stapling process of the embodiment of the present application is described.
[0244] Battery stapling process: the un-stapled batteries on the respective brackets 4 located at the second loading and unloading position are transported to the pre-stapling station P1 through the second conveying mechanism 2, and the sealing nails of the prescribed posture provided by the nail supply mechanism 6 are pre-assembled in the injection holes of the un-stapled batteries through the pre-stapling mechanism 5 at the pre-stapling station P1, thereby a plurality of un-stapled batteries become a plurality of pre-stapled batteries; then, the plurality of pre-stapled batteries continue to be transported downstream to the stapling station P through the second conveying mechanism 2, and the sealing nails on the pre-stapled batteries are further compacted into For nailed batteries; then, multiple nailed batteries continue to be conveyed downstream to the inspection station P2 through the second conveying mechanism 2, and the sealing nails of the nailed batteries are detected by the sealing nail detection mechanism 8 of the inspection station P2 to see whether the sealing nails assembled are qualified (whether they are abnormal). If unqualified, the number of the unqualified battery is recorded, and the unqualified battery is removed when it is transferred to the NG station; then, the nailed batteries that have been inspected are continued to be conveyed to the second loading and unloading position through the second conveying mechanism 2, waiting for unloading, thereby completing the pre-loading, nailing and inspection operations of the battery.
[0245] Refer to the following Figure 1 , Figure 2 , Figure 7 , Figure 8 and Fig. 9 The nail supply process of the embodiment of the present application is described.
[0246] Sealing pin screening and transfer process: The sealing pins are vibrated by the vibrating screen 611 to change their postures, and the sealing pin identification mechanism 612 identifies the sealing pins that meet the specified posture. The sealing pin transfer mechanism 62 picks up the sealing pins that meet the specified posture and transfers them to the cache mechanism 63 according to the identification results of the sealing pin identification mechanism 612. The cache mechanism 63 maintains the specified posture of the sealing pins and provides them to the pre-loading nail mechanism 5.
[0247] Sealing nail cache switching process: the transmission driving member 6332 rotates to rotate the pulley 6331a, so that the transmission belt 6331b is transmitted around the pulley 6331a, so that the first cache station 631 reciprocates between the sealing nail receiving position W1 and the sealing nail providing position W2 along the first guide rail 6351, and the second cache station 632 reciprocates between the sealing nail receiving position W1 and the sealing nail providing position W2 along the second guide rail 6361 through the moving plate, wherein the first cache station 631 and the second cache station 632 move in opposite directions respectively, and during the movement, the second cache station 632 is connected to the sealing nail receiving position W1 and the sealing nail providing position W2 through the sliding rod 6342. The concave and convex surfaces cooperate to achieve the misalignment of the first cache table 631 and the second cache table 632 in the lifting direction Z, so that there is no interference when the movement processes of the two in opposite directions intersect, and when the first cache table 631 is located at the sealing nail receiving position W1, the second cache table 632 is located at the sealing nail providing position W2, and when the first cache table 631 is located at the sealing nail providing position W2, the second cache table 632 is located at the sealing nail receiving position W1. Therefore, the first cache table 631 and the second cache table 632 are alternately switched between the sealing nail receiving position W1 and the sealing nail providing position W2, thereby realizing continuous and uninterrupted supply of nails to the pre-loading nail mechanism 5.
[0248] Refer to the following Figures 13 to 20 The sealing nail assembly method of the embodiment of the present application is described in detail.
[0249] The present application also provides a sealing nail assembly method, which is applied to a sealing nail assembly device 100. The sealing nail assembly device 100 includes a first conveying mechanism 1, a second conveying mechanism 2, a stapling mechanism, and a loading and unloading mechanism 3. The loading and unloading mechanism 3 includes a pick-and-place mechanism 31. The pick-and-place mechanism 31 includes a first pick-and-place component 311 and a second pick-and-place component 312. Fig.13 , the sealing nail assembly method includes:
[0250] S01 battery conveying step: providing a plurality of unstapled batteries to the second conveying mechanism 2 through the first conveying mechanism 1, and receiving a plurality of stapled batteries from the second conveying mechanism 2;
[0251] S02 stapling step: assembling sealing nails on the unstapled batteries on the second conveying mechanism 2 to form stapled batteries by the stapling mechanism;
[0252] S03 Battery position switching step: The first pick-and-place component 311 and the second pick-and-place component 312 are switched between the first pick-and-place position S1 and the second pick-and-place position S2 by rotating the pick-and-place mechanism 31, wherein the first pick-and-place component 311 at the first pick-and-place position S1 moves toward the first conveying mechanism 1, and the first pick-and-place component 311 picks up multiple unstapled batteries on the first conveying mechanism 1, and the second pick-and-place component 312 at the second pick-and-place position S2 moves toward the second conveying mechanism 2, and the second pick-and-place component 312 picks up multiple stapled batteries on the second conveying mechanism 2, the first pick-and-place component 311 at the second pick-and-place position S2 moves toward the second conveying mechanism 2, and the first pick-and-place component 311 releases the picked up multiple unstapled batteries to the second conveying mechanism 2, and the second pick-and-place component 312 at the first pick-and-place position S1 moves toward the first conveying mechanism 1, and the second pick-and-place component 312 releases the picked up multiple stapled batteries to the first conveying mechanism 1.
[0253] By rotating the pick-and-place mechanism 31, the first pick-and-place component 311 and the second pick-and-place component 312 are switched between the first pick-and-place position S1 and the second pick-and-place position S2, and the multiple unstapled batteries conveyed by the first conveying mechanism 1 are released to the second conveying mechanism 2 to realize the loading operation, and the multiple stapled batteries conveyed by the second conveying mechanism 2 are released to the first conveying mechanism 1 to realize the unloading operation. Thus, the loading operation of multiple unstapled batteries and the unloading operation of multiple stapled batteries are combined together, which simplifies the stapling process, is conducive to speeding up the production rhythm, improving production efficiency, and maximizing production capacity.
[0254] In some embodiments, reference Fig.14 , S03 battery position switching step also includes:
[0255] S031 lifting step: lifting the pick-and-place mechanism 31 so that the first pick-and-place component 311 and the second pick-and-place component 312 reach the first conveying mechanism 1 and the second conveying mechanism 2 respectively.
[0256] By lifting and lowering the pick-and-place mechanism 31, the first pick-and-place component 311 and the second pick-and-place component 312 can be lifted and lowered, so that the first pick-and-place component 311 and the second pick-and-place component 312 can reach the first conveying mechanism 1 and the second conveying mechanism 2 respectively more smoothly and accurately, providing convenience for picking up and releasing unstapled batteries and stapled batteries as well as position switching.
[0257] In some embodiments, the first pick-and-place assembly 311 is provided in plurality, and the second pick-and-place assembly 312 is provided in plurality. Fig.15The sealing nail assembly method also includes a distance changing step S012: by moving multiple first pick-and-place components 311 closer to or farther away from each other, thereby changing the distance between each first pick-and-place component 311; by moving multiple second pick-and-place components 312 closer to or farther away from each other, thereby changing the distance between each second pick-and-place component 312.
[0258] Therefore, the stapling operation can be completed efficiently when stapling different battery types, which is conducive to flexible production.
[0259] In some embodiments, reference Fig.16 , the stapling steps include:
[0260] S021 pre-staple step: pre-installing the sealing nail on the unstapled battery by the pre-staple mechanism 5;
[0261] S022 Nailing step: The pre-installed batteries are nailed into nailed batteries by the nailing mechanism 7.
[0262] Pre-nailing before nailing can reduce the probability of sealing nail assembly failure and improve nailing reliability.
[0263] In some embodiments, the sealing nail assembly device 100 further includes a nail supply mechanism 6, referring to Fig.17 The sealing nail assembly method also includes: S04 sealing nail providing step: providing sealing nails to the pre-installing nail mechanism 5 through the nail supply mechanism 6.
[0264] The sealing nails are provided to the pre-stacking mechanism 5 by the nail supply mechanism 6, and the pre-stacking mechanism 5 picks up the sealing nails and pre-assembles the sealing nails to a plurality of un-stapled batteries, so that the process from providing the sealing nails to assembling the sealing nails can be completed automatically, thereby improving the stapling efficiency.
[0265] In some embodiments, the nail supply mechanism 6 includes a screening mechanism 61, a sealing nail transfer mechanism 62 and a buffer mechanism 63. Fig.18 , S04 sealing nail providing steps include:
[0266] S041 screening step: screening out sealing pins of a specified posture through the screening mechanism 61;
[0267] S042 sealing pin transfer step, the sealing pins in a specified posture are picked up and transferred by the sealing pin transfer mechanism 62;
[0268] S043 is a buffering step, in which the buffering mechanism 63 receives the sealing nails transferred from the sealing nail transfer mechanism 62 and keeps the sealing nails in a specified posture, and provides the sealing nails in the specified posture to the pre-loading mechanism 5.
[0269] The sealing pins with a specified posture are screened out by the screening mechanism 61, and the sealing pin transfer mechanism 62 picks up the sealing pins with a specified posture and transfers them to the cache mechanism 63. The cache mechanism 63 keeps the sealing pins in a specified posture, so that the pre-stapling mechanism 5 can absorb the sealing pins and pre-assemble them on multiple un-stapled batteries without adjusting the posture of the sealing pins again, thereby improving the stapling efficiency.
[0270] In some embodiments, the cache mechanism 63 includes a first cache station 631, a second cache station 632 and a cache station driving member 633. Fig.19 , S043 caching step includes: S0431 drives the first cache table 631 and the second cache table 632 to move and alternately reach the sealing nail receiving position W1 and the sealing nail providing position W2 through the cache table driving member 633, at the sealing nail receiving position W1 and the sealing nail providing position W2, one of the first cache table 631 and the second cache table 632 receives the sealing nail transferred by the sealing nail transfer mechanism 62, and the other provides the sealing nail in a specified posture to the pre-loading nail mechanism 5.
[0271] The first buffer station 631 and the second buffer station 632 alternately reach the sealing nail receiving position W1 and the sealing nail providing position W2, and can continuously provide sealing nails for the pre-loading nail mechanism 5, which is beneficial to speed up the production rhythm and improve the production efficiency.
[0272] In some embodiments, the sealing nail assembly device 100 further includes a sealing nail detection mechanism 8, referring to Fig. 20 After the nailing step S022, the sealing nail assembly method further includes:
[0273] S05 is a sealing nail detection step, in which the nailed batteries are detected by the sealing nail detection mechanism 8 and the detection result is issued.
[0274] Sealing nail detection can promptly detect abnormal conditions of installed batteries, facilitate timely processing and improve product quality.
[0275] An embodiment of the present application further provides a battery production line, comprising: a battery conveyor line; and at least one sealing nail assembly device 100 as mentioned above, wherein the first conveying mechanism 1 is a part of the battery conveyor line.
[0276] Reference Fig.12 As an example, two sealing nail assembly devices 100 can be provided to form a double sealing nail assembly device 100. The double sealing nail assembly device 100 can perform stapling operations at the same time to improve the stapling efficiency.
[0277] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them; although the present application is described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments can still be modified, or some or all of the technical features therein can be replaced by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application, and they should all be included in the scope of the present application. In particular, as long as there is no structural conflict, the various technical features mentioned in each embodiment can be combined in any way. The present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the present application.
Claims
1. A sealing nail assembly device, characterized in that: include: A conveying mechanism for conveying batteries, the conveying mechanism comprising a first conveying mechanism and a second conveying mechanism located on one side of the first conveying mechanism, the first conveying mechanism passing through a first loading and unloading position, the second conveying mechanism being configured to have an annular conveying path, the second conveying mechanism being capable of conveying unstapled batteries to a stapling station, and being capable of conveying a plurality of stapled batteries to a second loading and unloading position; A stapling mechanism, used for assembling sealing nails on the un-stapled batteries on the second conveying mechanism at the stapling station so that the un-stapled batteries become the stapled batteries; The loading and unloading mechanism comprises a pick-and-place mechanism, wherein the pick-and-place mechanism comprises a first pick-and-place assembly and a second pick-and-place assembly, wherein the pick-and-place mechanism is configured to be rotatable so that the first pick-and-place assembly and the second pick-and-place assembly can be switched between a first pick-and-place position corresponding to the first loading and unloading position and a second pick-and-place position corresponding to the second loading and unloading position. The first pick-and-place assembly at the first pick-and-place position can move toward the first conveying mechanism, and the first pick-and-place assembly can pick up the plurality of unstapled batteries on the first conveying mechanism, and the second pick-and-place assembly at the second pick-and-place position can move toward the second conveying mechanism, and the second pick-and-place assembly can pick up the plurality of stapled batteries on the second conveying mechanism. The first pick-and-place component at the second pick-and-place position can move toward the second conveying mechanism, and the first pick-and-place component can release the picked-up multiple unstapled batteries to the second conveying mechanism. The second pick-and-place component at the first pick-and-place position can move toward the first conveying mechanism, and the second pick-and-place component can release the picked-up multiple stapled batteries to the first conveying mechanism.
2. The sealing nail assembly device according to claim 1, characterized in that: The loading and unloading mechanism also includes a rotating mechanism. The pick-and-place mechanism further includes a moving frame, the moving frame is connected to the rotating mechanism, the first pick-and-place assembly and the second pick-and-place assembly are respectively arranged on the moving frame, The rotating mechanism is used to drive the moving frame to drive the first pick-and-place assembly and the second pick-and-place assembly to rotate.
3. The sealing nail assembly device according to claim 2, characterized in that: The mobile frame can make the first pick-and-place assembly and the second pick-and-place assembly rotate around the same rotation axis under the drive of the rotating mechanism. The pick-and-place mechanism is located between the first conveying mechanism and the second conveying mechanism along a first direction, and the first direction is perpendicular to an extending direction of the rotating shaft.
4. The sealing nail assembly device according to claim 3, characterized in that: The first pick-and-place components are provided in plurality, and the plurality of first pick-and-place components are arranged along the second direction and can approach or move away from each other along the second direction; A plurality of the second pick-and-place assemblies are provided, and the plurality of the second pick-and-place assemblies are arranged along a second direction and can approach or move away from each other along the second direction, and the second direction, the first direction, and the extension direction of the rotation axis are perpendicular to each other.
5. The sealing nail assembly device according to claim 4, characterized in that: The pick-and-place mechanism also includes a first distance-changing mechanism and a second distance-changing mechanism. The first distance-changing mechanism is connected to at least two of the first pick-and-place assemblies, and the first pick-and-place assemblies connected to the first distance-changing mechanism move closer to or farther from each other under the drive of the first distance-changing mechanism. The second distance-changing mechanism is connected to at least two of the plurality of second pick-and-place assemblies, and the second pick-and-place assemblies connected to the second distance-changing mechanism move closer to or farther from each other under the driving of the second distance-changing mechanism.
6. The sealing nail assembly device according to claim 5, characterized in that: The first pitch-changing mechanism comprises: A first slide rail, disposed on the moving frame and extending along the second direction; A plurality of first sliders are respectively slidably connected to the first slide rails, each of the first sliders is provided with a first variable pitch groove, and each of the first pick-and-place assemblies is connected to the respective first sliders; Multiple first pull rods, each adjacent two first sliding blocks are connected by the first pull rod, and the two ends of the first pull rod are respectively arranged in the first variable pitch grooves of the two adjacent first sliding blocks, and the two ends of the first pull rod can move in their respective first variable pitch grooves along the second direction.
7. The sealing nail assembly device according to claim 6, characterized in that: The second pitch-changing mechanism comprises: A second slide rail, disposed on the moving frame and extending along the second direction; A plurality of second sliders are respectively slidably connected to the second slide rails, each of the second sliders is provided with a second variable pitch groove, and each of the second pick-and-place assemblies is connected to the respective second sliders; Multiple second pull rods, each adjacent two second sliding blocks are connected by a second pull rod, and the two ends of the second pull rod are respectively arranged in the second variable pitch grooves of the two adjacent second sliding blocks, and the two ends of the second pull rod can move in their respective second variable pitch grooves along the second direction.
8. The sealing nail assembly device according to claim 7, characterized in that: The first variable pitch mechanism further includes a first variable pitch driving member, a driving end of the first variable pitch driving member being connected to a first first sliding block along the second direction among the plurality of first sliding blocks; and / or, The second variable pitch mechanism further includes a second variable pitch driving member, wherein a driving end of the second variable pitch driving member is connected to a first second sliding block along the second direction among the plurality of second sliding blocks.
9. The sealing nail assembly device according to any one of claims 4 to 8, characterized in that: The first pick-and-place assembly comprises a pair of first pick-and-place clamping jaws, the pair of first pick-and-place clamping jaws can move closer to or farther from each other, and the first pick-and-place clamping jaws comprise an arc-shaped first clamping surface; The second pick-and-place assembly includes a pair of second pick-and-place clamping jaws, the pair of second pick-and-place clamping jaws can move closer to or farther away from each other, and the second pick-and-place clamping jaws include an arc-shaped second clamping surface.
10. The sealing nail assembly device according to any one of claims 2 to 8, characterized in that: The loading and unloading mechanism also includes a frame, a lifting assembly and a lifting drive member. The lifting assembly is connected to the pick-and-place mechanism and can be lifted and lowered to the frame. The driving end of the lifting drive member is connected to the lifting assembly, and is used to drive the lifting assembly to drive the first pick-and-place assembly and the second pick-and-place assembly to lift and lower.
11. The sealing nail assembly device according to claim 10, characterized in that: The lifting assembly comprises a lifting frame slidably arranged on the frame, a driving end of the lifting driving member is connected to the lifting frame, and the lifting frame is connected to the moving frame.
12. The sealing nail assembly device according to any one of claims 4 to 8, characterized in that: The first conveying mechanism and the second conveying mechanism are respectively provided with a plurality of brackets arranged along the second direction, and each of the brackets is used for placing batteries.
13. The sealing nail assembly device according to claim 12, characterized in that: The interval between the plurality of brackets provided in the first conveying mechanism is different from the interval between the plurality of brackets provided in the second conveying mechanism.
14. The sealing nail assembly device according to claim 12, characterized in that: Each of the brackets has a battery receiving slot, and the inner circumference of the battery receiving slot has a shape that matches the outer contour of the battery.
15. The sealing nail assembly device according to any one of claims 1 to 8, characterized in that: The stapling mechanism includes a pre-stapling mechanism and a stapling mechanism. Along the conveying path direction of the second conveying mechanism, the pre-stapling mechanism is located upstream of the stapling mechanism. The sealing nail assembly device also includes a nail supply mechanism. The nail supply mechanism is used to provide sealing nails to the pre-installing nail mechanism, and the pre-installing nail mechanism is configured to pick up the sealing nails and pre-install the sealing nails on the un-stapled batteries. The nailing mechanism is used to nail the batteries pre-installed with sealing nails into nailed batteries.
16. The sealing nail assembly device according to claim 15, characterized in that: The pre-stapling mechanism includes a plurality of suction cup assemblies, a transfer mechanism and a transfer drive mechanism. The suction cup assembly is used to suck up the sealing nail, the transfer mechanism is connected to the suction cup assembly, and the transfer drive mechanism is used to drive the transfer mechanism to drive the suction cup assembly to move and pre-assemble the sucked sealing nail to the un-stapled battery.
17. The sealing nail assembly device according to claim 15, characterized in that: The nail supply mechanism comprises: A screening mechanism, used for screening out the sealing pins in a specified posture; A sealing pin transfer mechanism, used for picking up and transferring the sealing pin in the specified posture; The buffer mechanism is used to receive the sealing pin transferred by the sealing pin transfer mechanism and keep the sealing pin in the specified posture.
18. The sealing nail assembly device according to claim 17, characterized in that: The cache mechanism includes a first cache table, a second cache table and a cache table driving member. The first buffering platform and the second buffering platform are used to place the sealing pins respectively. The cache table driving component is connected to the first cache table and the second cache table, and is used to drive the first cache table and the second cache table to move and alternately reach a sealing nail receiving position and a sealing nail providing position. At the sealing nail receiving position and the sealing nail providing position, one of the first cache table and the second cache table is used to receive the sealing nail transferred by the sealing nail transfer mechanism, and the other is used to provide the sealing nail to the pre-loading nail mechanism.
19. The sealing nail assembly device according to claim 18, characterized in that: The buffer station driving member includes a transmission assembly and a transmission driving member, the transmission assembly includes two belt pulleys arranged at intervals and a transmission belt wound around the two belt pulleys, the first buffer station and the second buffer station are respectively connected to the transmission belt, The transmission drive is connected to at least one of the pulleys and is used to drive the pulley to rotate clockwise and counterclockwise, so that the transmission belt drives the first cache table and the second cache table to move in opposite directions respectively.
20. The sealing nail assembly device according to claim 19, characterized in that: The cache mechanism also includes a switching component, which includes a track and a sliding rod. The track includes a concave-convex surface. One end of the sliding rod is slidably arranged on the concave-convex surface. The other end of the sliding rod is connected to the second cache table. The second cache table is raised and lowered by the sliding rod along the concave-convex surface. Therefore, when the first cache table and the second cache table move in opposite directions, the first cache table and the second cache table are misaligned in the lifting direction.
21. The sealing nail assembly device according to claim 20, characterized in that: The concave-convex surface includes a first convex surface, a concave surface and a second convex surface connected in sequence, When the sliding rod slides to the concave surface, the second cache table is misaligned with the first cache table in the lifting direction, and when the sliding rod slides to the first convex surface or the second convex surface, one of the second cache table and the first cache table is located at the sealing pin receiving position, and the other is located at the sealing pin providing position.
22. The sealing nail assembly device according to claim 20, characterized in that: The cache mechanism also includes a first sliding assembly and a second sliding assembly. The first sliding assembly includes a first guide rail and a first slider slidably connected to the first guide rail, and the first buffer table is connected to the first slider; The second sliding assembly includes a second guide rail, a second slider and a movable plate. The second guide rail is parallel to the first guide rail. The second slider is slidably connected to the second guide rail and to the movable plate. The movable plate is provided with a through hole. The sliding rod is liftably disposed through the through hole.
23. The sealing nail assembly device according to claim 18, characterized in that: The first buffer stage and the second buffer stage are respectively provided with sealing pin retaining parts for maintaining the sealing pins in a specified posture.
24. The sealing nail assembly device according to claim 18, characterized in that: The cache mechanism also includes a sealing nail collecting device, which includes a collection box and a ventilation pipe. One end of the ventilation pipe is connected to the inner cavity of the collection box, and the other end is used to connect to the air pressure system. The ventilation pipe is provided with a receiving hole for receiving abnormal sealing nails transferred by the pre-loading nail mechanism.
25. The sealing nail assembly device according to claim 18, characterized in that The screening mechanism includes a vibrating screen and a sealing pin identification mechanism. The vibrating screen can vibrate to change the posture of the sealing pins. The sealing pin identification mechanism is used to identify the sealing pins that meet the specified posture.
26. The sealing nail assembly device according to claim 18, characterized in that The sealing nail transfer mechanism includes a sealing nail picking assembly, a moving arm and a moving arm driving mechanism. The sealing pin picking assembly is connected to the moving arm and is used to pick up the sealing pin in the specified posture. The movable arm driving mechanism is used to drive the movable arm to drive the sealing pin picking assembly to transfer the picked-up sealing pin to the buffer mechanism.
27. The sealing nail assembly device according to claim 15, characterized in that: The nailing mechanism includes a plurality of cam mechanisms and a plurality of punch assemblies. The cam profile surface of each cam mechanism abuts against the punch of the respective punch assembly to drive the respective punch to move back and forth to nail the pre-nailed batteries into nailed batteries.
28. A sealing nail assembly method, characterized in that: Applicable to sealing nail assembly equipment, the sealing nail assembly equipment includes a first conveying mechanism, a second conveying mechanism, a stapling mechanism and a loading and unloading mechanism, the loading and unloading mechanism includes a pick-and-place mechanism, the pick-and-place mechanism includes a first pick-and-place component and a second pick-and-place component, The sealing nail assembly method comprises: A battery conveying step, providing a plurality of unstapled batteries to the second conveying mechanism through the first conveying mechanism, and receiving a plurality of stapled batteries from the second conveying mechanism, wherein the first conveying mechanism passes through a first loading and unloading position, and the second conveying mechanism is configured to have an annular conveying path, and the second conveying mechanism can convey the unstapled batteries to the stapling station, and can convey the plurality of stapled batteries to the second loading and unloading position; A stapling step, in which a stapling mechanism is used to assemble sealing nails on the unstapled batteries on the second conveying mechanism at the stapling station to form the stapled batteries; a battery position switching step, wherein the pick-and-place mechanism is rotated so that the first pick-and-place assembly and the second pick-and-place assembly are switched between a first pick-and-place position corresponding to the first loading and unloading position and a second pick-and-place position corresponding to the second loading and unloading position; The first pick-and-place assembly at the first pick-and-place position moves toward the first conveying mechanism, and the first pick-and-place assembly picks up the plurality of unstapled batteries on the first conveying mechanism, and the second pick-and-place assembly at the second pick-and-place position moves toward the second conveying mechanism, and the second pick-and-place assembly picks up the plurality of stapled batteries on the second conveying mechanism, The first pick-and-place component at the second pick-and-place position moves toward the second conveying mechanism, and the first pick-and-place component releases the multiple unstapled batteries picked up to the second conveying mechanism, and the second pick-and-place component at the first pick-and-place position moves toward the first conveying mechanism, and the second pick-and-place component releases the multiple stapled batteries picked up to the first conveying mechanism.
29. The sealing nail assembly method according to claim 28, characterized in that: The battery position switching step also includes: Lifting step: lifting the pick-and-place mechanism so that the first pick-and-place assembly and the second pick-and-place assembly reach the first conveying mechanism and the second conveying mechanism respectively.
30. The sealing nail assembly method according to claim 28, characterized in that: There are a plurality of first pick-and-place components, and a plurality of second pick-and-place components. The sealing nail assembly method also includes: Distance changing step: changing the distance between the first pick-and-place components by moving the plurality of the first pick-and-place components closer to or farther away from each other; The plurality of second pick-and-place components are moved closer to or farther from each other, thereby changing the spacing between the second pick-and-place components.
31. The sealing nail assembly method according to claim 30, characterized in that: The stapling mechanism includes a pre-stapling mechanism and a stapling mechanism, and the stapling step includes: Pre-stacking step: pre-assembling the sealing nails on the unstacking batteries by the pre-stacking mechanism; Nailing step: nailing the pre-installed batteries into the nailed batteries through the nailing mechanism.
32. The sealing nail assembly method according to claim 31, characterized in that: The sealing nail assembly device also includes a nail supply mechanism, The sealing nail assembly method also includes: Sealing nail providing step: providing sealing nails to the pre-stacking mechanism through the nail supply mechanism.
33. The sealing nail assembly method according to claim 32, characterized in that: The nail supply mechanism includes a screening mechanism, a sealing nail transfer mechanism and a buffer mechanism. The sealing nail providing step comprises: Screening step: screening out the sealing pins with a specified posture by the screening mechanism; Sealing pin transfer step: picking up and transferring the sealing pin in the specified posture by the sealing pin transfer mechanism; Buffering step: receiving the sealing pins transferred from the sealing pin transfer mechanism through the buffering mechanism and keeping the sealing pins in the specified posture, and providing the sealing pins in the specified posture to the pre-loading mechanism.
34. The sealing nail assembly method according to claim 33, characterized in that: The cache mechanism includes a first cache table, a second cache table and a cache table driving member. The caching step includes: driving the first cache table and the second cache table to move and alternately reach a sealing nail receiving position and a sealing nail providing position through the cache table driving member, at which the first cache table and the second cache table receive the sealing nail transferred by the sealing nail transfer mechanism, and the other provides the sealing nail in a specified posture to the pre-loading nail mechanism.
35. The sealing nail assembly method according to claim 31, characterized in that: The sealing nail assembly equipment also includes a sealing nail detection mechanism, After the nailing step, the sealing nail assembly method further comprises: A sealing nail detection step is to detect the stapled batteries through the sealing nail detection mechanism and issue a detection result.
36. A battery production line, characterized in that: include: Battery conveyor line; At least one sealing nail assembly device according to any one of claims 1 to 27, wherein the first conveying mechanism is part of the battery conveying line.
Citation Information
Patent Citations
Machining device and machining method
CN116352295A
Battery sealing nail welding system, using method thereof and battery sealing nail welding method
CN117655579A
Pick-and-place device capable of changing spacing
CN214217428U
Transverse moving device for driving container to move in two directions
CN217775084U