A method for coordinated planning of thermal energy storage to cope with uncertainty of renewable energy sources

By constructing an operating scenario set and entropy weight method to optimize thermal power units and energy storage parameters, the fuzzy scene description and calculation difficulties under the uncertainty of renewable energy are solved, effective response to extreme scenarios and efficient use of resources are achieved, and the system is improved. economy and stability.

CN118381086BActive Publication Date: 2024-10-29NORTHEAST DIANLI UNIVERSITY
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410523834.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2024-10-29
Estimated Expiration
2044-04-29

AI Technical Summary

Technical Problem

When existing technologies deal with the uncertainty of renewable energy, scene description is vague, calculation is difficult, and economic benefits are difficult to guarantee. It is difficult to accurately depict extreme scenarios and low resource utilization.

Method used

The operating scenario set is constructed through historical data, the entropy weight method is used to determine the startup capacity and energy storage parameters of thermal power units, and flexibility indicators are used for evaluation and optimization to ensure the comprehensive performance of the solution in multiple scenarios.

Benefits of technology

It achieves accurate depiction of extreme scenarios of renewable energy and meets flexibility requirements, improves resource utilization and economy, and ensures stable operation of the system in a variety of uncertain scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118381086B_ABST
    Figure CN118381086B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for coordinated planning of thermal energy storage to cope with the uncertainty of renewable energy. First, a method for selecting the capacity of thermal power units based on entropy weight is proposed. The startup plan of thermal power units is evaluated in multiple dimensions by using flexibility evaluation indicators of different properties. The corresponding weight is assigned to each indicator by the entropy weight method to obtain a comprehensive startup plan that can adapt to a variety of different scenarios to the greatest extent, and then the new capacity of thermal power units is determined; secondly, a variety of extreme scenarios and conventional scenarios are set to construct a scenario set for renewable energy power generation, and the optimal energy storage configuration is determined with the goal of minimizing the expected cost of the entire planning cycle; finally, a calculation example is designed to analyze and verify the effectiveness of the present invention. The present invention can comprehensively deal with the impact caused by different scenarios and comprehensively deal with the challenges brought by the uncertainty of renewable energy power generation to system operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy storage configuration technology, and more specifically, to a thermal energy storage coordination planning method for coping with uncertainty of renewable energy. Background Art

[0002] Since the fluctuations of renewable energy are often large in amplitude, diverse in form and difficult to predict in advance, it is difficult to cope with the impact of extreme scenarios of renewable energy output by adjusting the scheduling strategy and operation mode alone. Therefore, extreme scenarios of renewable energy output should be considered in the system planning stage, and appropriate flexibility resources should be allocated to cope with the impact of extreme scenarios. At present, the more mature method is to use energy storage devices such as electrochemical energy storage to shift the electric energy in time to hedge against the fluctuations of renewable energy. As a reliable regulating power source, thermal power units can also provide adjustment space for system flexibility, but they are limited by their own forced output, and the startup capacity of thermal power units will affect the flexibility they can provide. The startup capacity of thermal power units specified for the supply guarantee target traditionally provides insufficient downward flexibility, which is difficult to adapt to the flexibility requirements in both directions in the extremely high proportion system, and cannot cope with the source-side fluctuations caused by the uncertainty of renewable energy. In the planning process, the capacity of thermal power units and energy storage devices are considered at the same time, and a joint configuration of thermal-storage is carried out.

[0003] At present, extensive research has been carried out on power planning and energy storage devices for renewable energy uncertainty, which are mainly divided into stochastic planning, robust planning and multi-scenario methods. Stochastic planning mainly describes the volatility of renewable energy in the form of probability distribution. The literature [Liu Shuai, Wang Mingqiang, Ding Tianchi, et al. Active distribution network power planning considering the optimal acceptable domain of net load [J]. Power System Technology, 2023, 47 (06): 2239-2254.] describes the uncertainty of net load in the form of probability distribution, and incorporates the uncertainty of node net load into the optimization range according to the concept of acceptable domain. The literature [Zhe Li, Student Member, IEEE, et al. Probability-Interval-Based Optimal Planning of Integrated Energy System With Uncertain Wind Power [Z]: 1-10.] considers the impact of wind power uncertainty in the form of probability intervals, and introduces CVaR cost for evaluation. Reference [Huang Miao, Chen Xin, Wen Xu, et al. Stochastic planning and dispatching model of wind-solar hybrid microgrid with electric vehicles considering market risks [J]. Power System Technology, 2020, 44(08): 2883-2890.] In the context of the power market, three uncertainties, namely source, load and market factors, are considered, and a heuristic algorithm with embedded Monte Carlo random simulation is used to solve the probability constraints. The accuracy of the stochastic planning method dominated by the distribution function of random variables is largely affected by the distribution model, and the fluctuation form of uncertain power sources such as wind and light has not yet been accurately modeled. In addition, the distribution function extracted from the scenario generated by historical data or Monte Carlo method destroys the randomness of renewable energy output in the time series characteristics.

[0004] The robust optimization method is to model the uncertainty of wind and light as an uncertainty set and consider the optimal result under the worst case. Reference [Dundun Liu, Shenxi Zhang, Haozhong Cheng, et al. Accommodating uncertain wind power investment and coal-fired unit retirement by robust energy storage system planning [J]. Csee Journal of Power and Energy Systems, 2020: 1-10.] Energy storage devices are used to compensate for the uncertainty of future wind power investment and the pressure on system rotation reserve caused by the retirement of thermal power units, and a three-layer energy storage robust planning model is established. Reference [Fu Yang, Liu Zhibin, Liu Lujie, et al. Robust planning of offshore wind power access system based on master-slave game [J]. Automation of Electric Power Systems, 2023, 47 (16): 54-65.] The idea of ​​master-slave game is introduced in robust optimization, and the ellipsoid uncertainty set is used to deal with the power generation uncertainty of offshore wind power systems. Reference [Liu Siyi, Zhao Bo, Wang Xiangjin, et al. Robust Optimization Capacity Configuration Model for Independent Microgrids Based on Benders Decomposition [J]. Automation of Electric Power Systems, 2017.] The predicted value is limited to fluctuate within a certain range based on historical information, and the range is limited by the intensity of system uncertainty. Reference [Ge Yuyou, Shang Ce. Energy Storage Planning with Life Constraints [J]. Proceedings of the CSEE, 2020, 40(19): 6150-6161.] Considering the life constraints of electrochemical energy storage devices in planning avoids the problem of overly optimistic energy storage planning results in planning work, but the consideration of uncertainty is limited to the load side. The robust planning method ensures the safety of system power supply to a large extent, but its optimization idea based on the worst scenario also makes the planning results conservative, making a great sacrifice in economy.

[0005] In addition, scenario analysis has traditionally been widely used in uncertain planning of power systems. Reference [Xu Yanping, Bai Jie, Shi Haobo, et al. Extreme operation mode extraction method based on convex hull algorithm [J]. China Electric Power: 1-9.] The convex hull algorithm is used to extract extreme scenarios in simulated operation, and the impact of renewable energy output uncertainty on system production and operation is characterized from multiple dimensions. Reference [Shi Zhaodi, Huang Yuehui, Li Pai, et al. Wind / solar / storage collaborative optimization planning method considering deep belief network scenario generation [J]. Power System Technology, 2023, 47(04): 1331-1342.] A deep belief network is used to generate new energy output scenarios with time series characteristics. The constructed wind / solar / storage system collaborative planning model can better take into account the time series characteristics of renewable energy over a long period of time. Reference [Wang Ruiqi, Xue Xizhen, Huang Ruanming, et al. Energy storage multi-parameter equivalent conversion configuration method for new energy fluctuation smoothing [J]. Power Grid Technology: 1-12.] Analyzes the conversion methods of various energy storage performance and cost parameters from the perspective of smoothing renewable energy fluctuations, and provides guidance for energy storage configuration and selection for smoothing wind and light fluctuations. Reference [Yang Xiuyu, Liu Peiye, Sun Yong, et al. Dynamic planning method for flexibility resources considering the evolution law of flexibility demand [J]. Electric Power Construction, 2023.] Analyzes the relationship between flexibility demand and renewable energy penetration rate from the daily and annual time scales, and constructs a multi-stage flexibility resource optimization configuration model using a dynamic programming method. The model takes into account the flexibility transformation of thermal power units and the improvement of system flexibility by electrochemical energy storage devices. Reference [Jiang Haiyang, Du Ershun, Jin Chen, et al. Multi-time scale energy storage capacity optimization planning for transnational interconnected power systems with high proportion of clean energy grid connection [J]. Proceedings of the CSEE, 2021, 41(06): 2101-2115.] The impact of renewable energy on system operation is dealt with by using energy storage resources of various time scales, which provides ideas for realizing a 100% clean energy system in the future. Most of the above methods match a single load with a single renewable energy. As the penetration rate of renewable energy gradually increases, the power system will face the problem of stable load corresponding to uncertain power sources. The "one-to-one" relationship between load and renewable energy is difficult to cope with the multiple uncertainties of renewable energy.

[0006] After research, it was found that most current research focuses on two aspects: stochastic programming and robust programming. Among them, stochastic programming requires obtaining the PDF or CDF function of the random variable to characterize the uncertainty of the random variable. However, there is currently no distribution model that can accurately characterize the fluctuations of renewable energy, and the prediction results obtained in the form of functions are difficult to integrate into the currently widely used planning methods. Robust planning usually considers the optimal results under the worst conditions, which leads to the results of robust planning tending to be conservative, and the redundant configuration of too many flexible resources results in low resource utilization. In robust planning, the uncertainty of renewable energy is described in the form of uncertain sets, which only limits a certain fluctuation range and does not specifically characterize the extreme scenarios of system operation.

[0007] After the above analysis, the problems existing in the prior art are as follows:

[0008] (1) The scenario description is vague. In stochastic planning, probability distribution is used to describe the fluctuation of renewable energy. However, there are currently multiple distribution models, and no model can accurately characterize the fluctuation of renewable energy. In robust planning, an uncertainty set is established based on the fluctuation range of renewable energy, and extreme scenarios are not directly described.

[0009] (2) Computational difficulties. The function form used by the stochastic programming method is difficult to integrate into the conventional power system planning method. The large number of integer variables in robust planning will greatly slow down the solution speed.

[0010] (3) Economic benefits are difficult to guarantee. Robust planning seeks the optimal solution under the worst conditions, which results in the planning schemes obtained by this method often being conservative and easily causing redundant configuration of resources and waste of resources. Summary of the invention

[0011] The present invention is provided to solve the above problems existing in the prior art. Therefore, a method for coordinated planning of thermal storage to cope with the uncertainty of renewable energy is needed to achieve at least one of the following purposes:

[0012] (1) Solve the problem of fuzzy scene description. The present invention uses historical measured data to characterize and screen scenes, and classifies them into conventional operation scenes with a high probability of occurrence and extreme scenes with a low probability of occurrence. The extreme scenes are specifically described, and each type of extreme scene corresponds to the flexibility requirements in the actual operation of the system, such as extreme output scenes of renewable energy, extreme ramping scenes of the system, etc.

[0013] (2) Solve the problem of computational difficulties. The scenario-based planning method adopted by the present invention can be well integrated with the current system planning method using typical scenarios. The startup capacity of the thermal power unit determined by the entropy weight method has a faster calculation speed.

[0014] (3) Solve the problem of difficulty in ensuring economic benefits. The present invention selects the capacity of thermal power units through the entropy weight method, aiming to objectively evaluate the comprehensive performance of a startup plan in various scenarios. The plan obtained by the present invention can comprehensively cope with a variety of uncertain scenarios, ensuring that the planning plan will not be biased towards a specific scenario, resulting in poor economic performance during system operation.

[0015] The present invention provides a thermal storage coordination planning method for coping with uncertainty of renewable energy, the method comprising:

[0016] Based on historical data, a system operation scenario set is constructed, wherein the operation scenario set includes conventional operation scenarios and extreme scenarios, wherein the extreme scenarios include extreme ramp-up scenarios, extremely high output scenarios of renewable energy, and extremely low output scenarios of renewable energy;

[0017] Determine the initial startup plan for each scenario based on the maximum net load in each scenario;

[0018] A production simulation is performed based on the initial startup plan to obtain the system flexibility imbalance corresponding to each initial startup plan, and the system flexibility imbalance is evaluated by a flexibility index, and the flexibility index includes an expectation of insufficient upward flexibility capacity, an expectation of insufficient downward flexibility capacity, an expectation of insufficient upward flexibility climbing, an expectation of insufficient downward flexibility climbing, an expectation of insufficient hours for insufficient upward flexibility capacity, an expectation of insufficient hours for insufficient downward flexibility capacity, an expectation of insufficient hours for insufficient upward flexibility climbing, and an expectation of insufficient hours for insufficient downward flexibility climbing;

[0019] The information entropy and weight of each flexibility index are calculated based on the entropy weight method to obtain the scores of each initial startup plan, and the comprehensive startup plan is determined according to the scores of each initial startup plan;

[0020] Determine the capacity of the thermal power unit and configure corresponding energy storage parameters according to the comprehensive startup plan, wherein the energy storage parameters include initial values ​​of energy storage capacity and power;

[0021] Calculating the construction cost according to the determined comprehensive startup plan and energy storage parameters, performing production simulation in response to the determined comprehensive startup plan and energy storage parameters, calculating the expected operating cost of the system, and taking the sum of the construction cost and the expected operating cost of the system as the total operating cost of the system;

[0022] Determine the optimal cost and judge whether the total cost of the system operation is lower than the optimal cost:

[0023] When the total system operation cost is not less than the target cost, updating the energy storage parameters to obtain a new comprehensive startup plan, and updating the total system operation cost according to the updated energy storage parameters and the new comprehensive startup plan;

[0024] When the total system operating cost is lower than the target cost, the comprehensive startup plan and energy storage parameters corresponding to the current total system operating cost are used as the optimal planning plan.

[0025] The present invention has at least the following beneficial effects:

[0026] 1) The present invention aims to deal with the uncertainty of renewable energy generation and the problem of low-probability extreme scenarios faced in system operation at the system planning level. The operation scenario set is constructed through historical data to ensure the effectiveness of the obtained scenarios, that is, the scenario set is all possible real scenarios. The extreme scenarios constructed according to the actual needs faced by the system operation can ensure that each type of extreme scenario can correspond to the requirements of the system operation in terms of regulating capacity or regulating rate, and can accurately depict the impact of extreme scenarios that may be encountered in the system operation.

[0027] 2) The present invention adopts the entropy weight theory to determine the comprehensive startup plan of the thermal power unit and conducts thermal storage coordination planning to cope with the uncertainty of renewable energy. As a completely objective weighting method, the entropy weight method can adapt to input data with strong fluctuations. In addition, since the flexibility demand indicators of different natures are comprehensively considered, the startup plan obtained by the method of the present invention can comprehensively cope with the impact caused by different scenarios and comprehensively cope with the challenges brought by the uncertainty of renewable energy power generation to the system operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A flow chart of a thermal storage coordination planning method for coping with uncertainty of renewable energy sources according to an embodiment of the present invention is shown.

[0029] Figure 2 A schematic diagram of a load curve and a renewable energy curve for a certain scheduling day according to an embodiment of the present invention is shown.

[0030] Figure 3 A schematic diagram comparing two startup schemes according to an embodiment of the present invention is shown.

[0031] Figure 4 A schematic diagram of original predicted load and renewable energy output data according to an embodiment of the present invention is shown.

[0032] Figure 5 A schematic diagram of raw data of 5 typical days in scheme III according to an embodiment of the present invention is shown.

[0033] Figure 6 A schematic diagram of the startup capacity of Scheme I and Scheme II and the net load of each scenario in a typical day 2 according to an embodiment of the present invention is shown.

[0034] Figure 7A schematic diagram of the startup capacity of Scheme I and Scheme II and the net load of each scenario in a typical day 2 according to an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0035] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings and specific embodiments, but are not intended to limit the present invention. For the various steps described herein, if there is no necessity for a causal relationship between each other, the order in which they are described as examples herein should not be regarded as a limitation, and those skilled in the art should know that they can be adjusted in order, as long as the logic between them is not destroyed, resulting in the inability to implement the entire process.

[0036] With the current large-scale access of renewable energy to the power grid, large-scale renewable energy generation has squeezed the power generation space of thermal power units. At the same time, its strong uncertainty has also caused strong fluctuations on the power supply side of the power system, resulting in frequent extreme scenarios in the power system. In order to rationally configure regulating resources (thermal power and energy storage) under the background of strong uncertainty to comprehensively respond to a variety of possible extreme scenarios to ensure the safety and economy of system operation, an embodiment of the present invention provides a thermal power and energy storage coordination planning method that copes with the uncertainty of renewable energy. The thermal power and energy storage coordination planning method that copes with the uncertainty of renewable energy represents a planning method that simultaneously considers the capacity of thermal power units and the capacity and power of energy storage devices during the power system planning process. As Figure 1 As shown, it is a flow chart of the method, which includes the following steps S1 to S9, which are described in detail as follows:

[0037] Step S1, based on historical data, construct a system operation scenario set, the operation scenario set includes conventional operation scenarios and extreme scenarios, the extreme scenarios include extreme climbing scenarios, extremely high output scenarios of renewable energy, and extremely low output scenarios of renewable energy.

[0038] It should be noted that the system described in this article refers to the power system, and the normal operation scenario refers to the current or previous scenario of normal operation of the power system.

[0039] This embodiment considers extreme scenarios, specifically to deal with the uncertainty of renewable energy. In traditional power systems with low penetration rates of renewable energy, the power supply side is approximately fully controllable, and the main source of system uncertainty is load uncertainty. In future systems with a high proportion of renewable energy, the uncertainty of renewable energy will be the dominant factor in system operation uncertainty. Currently, in the work of system operation and planning, the accuracy of system load forecasting has reached an extremely high level. Therefore, the main problem faced in the operation of high-proportion renewable energy systems will be the problem of matching deterministic loads with uncertain wind power.

[0040] like Figure 2 As shown, there are three renewable energy scenarios on this dispatch day, of which scenario 2 is a conventional scenario with a high probability of occurrence, and scenarios 1 and 3 represent scenarios with extremely high or extremely low renewable energy generation, respectively. Obviously, the system operation faces different problems in different scenarios. In scenario 1, renewable energy is highly generated, and its output curve is very close to the system load curve. At this time, the power generation resources in the system are abundant, but there is a risk of renewable energy abandonment. In scenario 3, the output of renewable energy is extremely low, close to 0 output in some periods. At this time, the power supply pressure in the system is large and there is a risk of load shedding. How to formulate a reasonable startup plan to comprehensively respond to different flexibility requirements in multiple scenarios will have a significant impact on the safety and economy of system operation.

[0041] Figure 3 The diagram shows the net load curves under three scenarios and two startup schemes. Among them, startup scheme 1 selects the maximum net load value in all possible scenarios as the startup capacity, and scheme 2 selects the maximum net load value of the scenario with the highest probability of occurrence. Although scheme 1 ensures the power supply security when the renewable energy generation is extremely low, it almost completely exceeds its net load curve in conventional scenarios, and the energy storage device fails to obtain sufficient action space, resulting in a large amount of net load that cannot be absorbed. However, scheme 2 cannot guarantee the power supply security of the system in extreme scenario 1. Most of the net load exceeds the output upper limit of the thermal power unit, and energy storage alone cannot guarantee the power supply security. It is obviously unreasonable to refer to the startup scheme of extreme scenario 1, so it will not be discussed.

[0042] Step S2, determining the initial startup plan corresponding to each scenario according to the maximum value of the net load in each scenario.

[0043] It should be noted that the method of determining the initial startup plan according to the maximum value of the net load is a prior art and will not be described in detail in this embodiment.

[0044] Step S3, perform production simulation based on the initial startup plan, and obtain the system flexibility imbalance corresponding to each initial startup plan. The system flexibility imbalance is evaluated by flexibility indicators, and the flexibility indicators include the expected increase in flexibility capacity shortage, the expected decrease in flexibility capacity shortage, the expected increase in flexibility climbing shortage, the expected decrease in flexibility climbing shortage, the expected increase in flexibility capacity shortage hours, the expected decrease in flexibility capacity shortage hours, the expected increase in flexibility climbing shortage hours and the expected decrease in flexibility climbing shortage hours.

[0045] The flexibility index is used to comprehensively judge the flexibility of a startup solution in different scenarios. This embodiment adopts two directions of upward adjustment and downward adjustment, two dimensions of capacity and ramp rate, and two attributes of power and hours, totaling 8 flexibility evaluation indicators, as follows.

[0046] The upward adjustment of the flexible capacity shortfall expectation and the downward adjustment of the flexible capacity shortfall expectation are calculated by the following formula:

[0047]

[0048]

[0049]

[0050]

[0051] In the formula, They are the system upward and downward flexibility capacity shortfall expectations; represents the upper and lower limits of the unit output under the i-th startup scheme; Pr j is the probability of the jth scenario occurring, Indicates that the flexibility of increasing power at time t in scenario j is insufficient. represents the net load at time t in scenario j, t represents the current time, T represents the total duration of a typical day, Indicates that the flexibility to reduce power is insufficient at time t in scenario j.

[0052] The upward adjustment flexibility climbing shortfall expectation and the downward adjustment flexibility climbing shortfall expectation are calculated by the following formula:

[0053]

[0054]

[0055]

[0056]

[0057] In the formula, The upward and downward flexibility of the system are insufficient to meet expectations; RU i , RD i Indicates the maximum upward / downward climbing capacity of the unit corresponding to startup scheme i, Indicates insufficient power for climbing at time t in scenario j, Indicates insufficient power for climbing at time t in scenario j.

[0058] The expected upward and downward flexible capacity shortage hours are calculated using the following formula:

[0059]

[0060]

[0061] In the formula, are the expected number of hours of insufficient flexibility capacity for upward and downward adjustments of the system respectively; Pr{} represents the probability that scenario j satisfies the expression in {}.

[0062] Step S4, calculating the information entropy and weight of each flexibility index based on the entropy weight method, obtaining the score of each initial startup plan, and determining the comprehensive startup plan according to the score of each initial startup plan.

[0063] It should be noted that entropy is a physical concept that is used to measure the degree of disorder of a system. In information theory, information is a measure of the degree of order of a system, and entropy is a measure of the degree of disorder of a system. Entropy weight theory is a method of calculating the weight of each indicator through information entropy, a tool for judging the degree of discreteness of indicators.

[0064] The entropy weight method is an objective weighting method that determines weights based on data fluctuations. This method measures the degree of disorder of data in a certain indicator through entropy value, so as to judge the influence of different indicators on the comprehensive evaluation. The characteristic of this method is that it completely eliminates the subjective factors in the weighted evaluation process, assigns corresponding weights to indicators based entirely on the original data, and can quickly and objectively process changing data sets in different scenarios.

[0065] Specifically, according to the flexibility index, an initial matrix X as shown below is obtained:

[0066]

[0067] In the formula, x ij Indicates the value of the jth evaluation index corresponding to the i-th startup plan;

[0068] After the initial matrix is ​​formed, the initial matrix is ​​normalized by the following formula:

[0069]

[0070]

[0071] Where Y is the standardized matrix, y ij represents the value of the flexibility index after standardization; X j is a column vector consisting of the values ​​of the flexibility index j under all startup schemes, min() represents the minimum function, and max() represents the maximum function;

[0072] After performing the standardization operation, the proportion of data in each flexibility indicator and the information entropy of the indicator are calculated using the following formula:

[0073]

[0074]

[0075] In the formula, p ij is the proportion of the corresponding value of the comprehensive startup plan i in the flexibility index j; e j represents the information entropy contained in the flexibility index j, and n represents the number of data in each flexibility index;

[0076] Determine the corresponding weight according to the information entropy of each flexibility indicator:

[0077]

[0078] In the formula, w j represents the corresponding weight of the j-th flexibility index;

[0079] Based on the information entropy and weight of the activity indicators, the score of the comprehensive startup solution is calculated by the following formula:

[0080] S i =∑w j *y ij (19)

[0081] In the formula, S i is the comprehensive score of the i-th comprehensive startup plan.

[0082] The finalized comprehensive startup plan U max That is to make S i The minimum corresponding

[0083] This embodiment adopts the entropy weight method in combination with indicators that characterize the different flexibility requirements of the system to determine a startup plan that adapts to multiple scenarios. With the cooperation of the energy storage device, it will not cause a large amount of load shedding in the scenario of extremely low renewable energy, and can also provide space for renewable energy consumption as much as possible in other scenarios, ensuring that the system has the flexibility to adapt to various net load forms.

[0084] Step S5, determining the capacity of the thermal power unit, and configuring corresponding energy storage parameters according to the comprehensive startup plan, wherein the energy storage parameters include initial values ​​of energy storage capacity and power.

[0085] Step S6, calculating the construction cost according to the determined comprehensive startup plan and energy storage parameters, performing production simulation in response to the determined comprehensive startup plan and energy storage parameters, calculating the expected operating cost of the system, and taking the sum of the construction cost and the expected operating cost of the system as the total operating cost of the system.

[0086] In some embodiments, the economic efficiency is taken as the planning goal, and after comprehensively considering each typical day and various possible scenarios, the economic efficiency of the planning result is measured by the construction cost of the energy storage device and the expected operating cost within the planning period. The calculation formula for the total system operating cost is as follows:

[0087] C=C ESS +C TH +C OP (20)

[0088] In the formula, C ESS represents the construction cost of energy storage device; C TH represents the new construction cost of thermal power units; C OP Indicates the running cost.

[0089] C TH =c th P th (twenty one)

[0090] In the formula, cth represents the unit construction cost of thermal power units, and Pth represents the newly built capacity of thermal power units.

[0091] The construction cost of the energy storage device consists of two parts: the energy storage construction cost and the energy storage power cost, namely:

[0092] C ESS =c e E ess +c p P ess (twenty two)

[0093] In the formula, c e 、c p They represent the unit capacity and unit power construction cost of the energy storage device respectively; E ess , P ess Indicates the capacity and power of the energy storage device to be constructed in the planned scheme.

[0094] The operating cost of the system should take into account the coal burning cost, power abandonment cost, and load shedding cost in different scenarios, and be expressed in the expected form in combination with the probability of occurrence of each scenario as follows:

[0095] C OP =E[c coal ∑P g ]+E[c w ∑W c ]+E[c L ∑L c ] (twenty three)

[0096] In the formula, E[] is the symbol of mathematical expectation; c coal is the unit power generation cost of thermal power units, P g is the power generation of thermal power units; c w The penalty for abandoning power is W. c is the abandoned power; c L is the unit load shedding penalty, L c is the load shedding power.

[0097] Step S7, determining the optimal cost, and judging whether the total cost of the system operation is lower than the optimal cost.

[0098] Step S8, when the total system operating cost is not lower than the target cost, update the energy storage parameters to obtain a new comprehensive startup plan, and update the total system operating cost according to the updated energy storage parameters and the new comprehensive startup plan.

[0099] Step S9, when the total system operating cost is lower than the target cost, the comprehensive startup plan and energy storage parameters corresponding to the current total system operating cost are used as the optimal planning plan.

[0100] In some embodiments, operating constraints are set to perform production simulation in response to a determined comprehensive startup plan or an updated comprehensive startup plan and energy storage parameters, and the operating constraints include one of thermal power unit constraints, renewable energy unit operating constraints, energy storage device operating constraints, and power conservation constraints, and a combination thereof.

[0101] The thermal power unit constraint is expressed as:

[0102] U min ≤P g,t ≤U max (twenty four)

[0103] RD≤P g,t -P g,t-1 ≤RU (25)

[0104] Where U max , U min P is the upper and lower limits of the thermal power unit output under the selected comprehensive startup plan; g,t It represents the output of the thermal power unit at time t; RU and RD are the upward and downward climbing power limits of the thermal power unit;

[0105] The operation constraints of the renewable energy units are expressed as:

[0106] 0≤W t ≤W t max (26)

[0107] 0≤W c,t ≤W t max (27)

[0108] Where W t is the actual output of renewable energy at time t, Wmax t is the upper limit of renewable energy output; W c,t is the amount of renewable energy curtailment at time t.

[0109] The energy storage device operation constraints are expressed as:

[0110] 0≤P ch,t ≤P ess n ch,t (28)

[0111] 0≤P dis,t ≤P ess n dis,t (29)

[0112] n ch,t +n dis,t =1 (30)

[0113] Where P ch,t , P dis,t are the charging and discharging power of the energy storage device at time t; n ch,t 、n dis,t represents the charge and discharge state of the energy storage device at time t. Formula (30) limits the energy storage device to be in only one state, either charging or discharging, at the same time;

[0114] SoC t =SoC t-1 +(P ch,t η ch -P dis,t / η dis )Δt (31)

[0115] SoC min ≤SoC t ≤SoC max (32)

[0116] SoC 24 =SoC ini (33)

[0117] Where, SoC t is the state of charge of the energy storage device at time t, η ch , η dis are the charging and discharging efficiency of the energy storage device, respectively, Δt is the unit time; SoC max 、SoC min Limit the maximum and minimum range of energy storage charge state; SoC ini is the initial charge state of the energy storage device. Formula (33) ensures that the energy storage device returns to its initial charge state after the scheduling cycle ends.

[0118] The power conservation constraint is expressed as:

[0119] P g,t +W t +P dis,t +L c,t =Lt +P ch ,t (34)

[0120] W c,t +W t =W max (35)

[0121] L c,t ≤L t (36)

[0122] Where, L c,t is the load shedding power at time t, formula (34) is used to ensure the real-time balance of power in the system, formula (35) is used to limit the renewable energy generation and power abandonment to not exceed the total amount of renewable energy in the system at the current moment, and formula (36) is used to limit the load shedding power of the system.

[0123] The following embodiments of the present invention will be combined with specific examples to demonstrate the feasibility and advancement of the present application.

[0124] According to the historical operation data of a certain power grid (the current installed capacity of thermal power units in the region is 8.1 million kW), typical days are extracted (the target annual renewable energy penetration rate is about 41%). Since the load curves in the system are very similar in fluctuation form and only differ significantly in numerical values, this paper extracts 5 types of load curves corresponding to 5 typical days. Taking into account the strong uncertainty of renewable energy, each typical day corresponds to 5 RE scenarios, including 2 conventional prediction scenarios with a high probability of occurrence and 3 extreme scenarios with a low probability (set to 1% in this paper), including three situations where renewable energy generation is extremely high, extremely low, and the peak-to-valley difference of renewable energy generation is extremely large. The original prediction data is as follows Figure 4 The occurrence frequency and scenario probability of each typical day are shown in Table 1.

[0125] Table 1 Number of days and probability of occurrence of each typical day

[0126] RE1 RE2 RE3 RE4 RE5 Days Typical day 1 1% 1% 1% 37.51% 59.49% 75 Typical day 2 1% 1% 1% 41.31% 55.69% 54 Typical day 3 1% 1% 1% 25.73% 71.27% 49 Typical day 4 1% 1% 1% 24.53% 72.47% 87 Typical day 5 1% 1% 1% 50.44% 46.56% 100

[0127] like Figure 4 As shown, Figure 4 In (b)-(f), RE1 represents the scenario of extremely high renewable energy generation, RE2 represents the scenario of extremely low renewable energy generation, and RE3 represents the scenario of extremely high peak-to-valley difference in renewable energy generation. The probability of occurrence of these extreme scenarios is set to 1%. RE4 and RE5 are conventional renewable energy generation scenarios with a high probability of occurring on this typical day. Based on this original data, the following three planning schemes are divided according to whether the uncertainty of renewable energy is considered and whether the entropy weight theory is adopted:

[0128] Solution I: Considering the uncertainty of renewable energy, the entropy weight theory is used to determine the typical daily operating capacity and the capacity of new units, and then energy storage configuration is carried out;

[0129] Option II: Considering the uncertainty of renewable energy, the capacity of new thermal power units and energy storage configuration are determined based on the maximum net load that may occur on each typical day;

[0130] Scheme III: Without considering the uncertainty, the maximum value of the net load on each typical day is used as the startup capacity.

[0131] Option I:

[0132] This example takes into account the uncertainty of renewable energy during the actual operation of the system and the extreme scenarios that may be faced, and determines the capacity of the thermal power unit by using the entropy weight method.

[0133] Depend on Figure 4 As shown in the figure, considering five net load scenarios in each typical day, the single capacity of the thermal power unit is set to 300,000 kW, and the startup plan set is formed from the lowest single unit to the maximum load value (rounded up) that may be obtained in each scenario on the typical day. The preliminary startup plan is determined, and each startup plan is evaluated by the eight flexibility evaluation indicators proposed above. The entropy weight method is used to dynamically determine the weight of each indicator in different typical days, and the comprehensive score of each plan is calculated based on this weight. Finally, all preliminary startup plans are combined to finally obtain a startup plan that can cope with different load and RE fluctuations.

[0134] Table 2 Maximum net load of each scenario on each typical day (unit: 10,000 kW)

[0135] Scenario 1 Scenario 2 Scene 3 Scene 4 Scene 5 Typical day 1 -197.19 1649.89 981.27 596.84 1402.85 Typical day 2 581.97 1892.95 1584.16 1017.94 1709.25 Typical day 3 -66.10 1209.40 945.72 168.68 915.63 Typical day 4 -115.11 1338.23 873.84 311.20 1089.04 Typical day 5 -154.43 1432.94 1321.90 1108.65 565.81

[0136] As can be seen in Table 2, due to the fluctuation of renewable energy, the maximum value of net load in different typical days and even in different scenarios on the same typical day varies significantly. This makes it difficult for the startup capacity determined based on the maximum value of net load in a certain scenario to cope with fluctuations in other scenarios. For example, on Typical Day 1, the startup capacity based on Scenario 5 with the highest probability of occurrence cannot meet the power supply demand of Scenario 2, and in Scenario 1 it completely exceeds the power supply demand of net load, resulting in a large amount of power abandonment of renewable energy.

[0137] The entropy weight theory is used to determine the weight of each indicator and comprehensively evaluate the adaptability of each initial plan to multiple scenarios. The information entropy, weight and comprehensive startup plan are shown in Tables 3 and 4.

[0138] Table 3 Information entropy and weight of each indicator

[0139]

[0140] Based on the comprehensive startup plan obtained in Table 3, the capacity of the newly built thermal power unit is determined, and a production simulation is carried out to obtain the capacity and power of the energy storage device to be planned, as well as the corresponding simulation operation results.

[0141] Table 4 Planning results (planning period 10 years)

[0142]

[0143]

[0144] Option II:

[0145] The entropy weight theory is not used in this example. Only the maximum value of the net load obtained from all predicted scenarios in each typical day is taken as the startup capacity for production simulation and energy storage configuration. The startup plans for each typical day are shown in Table 5.

[0146] Table 5 Summary of startup plans for each typical day

[0147]

[0148] Table 6 Planning results

[0149] Capacity (10,000 kW / 10,000 kWh) Cost (100 million yuan) New thermal power units 1110 555.00 Energy storage device 150 / 600 97.50 Thermal power generation 7141570.71 164.26 Abandoned power 2463136.88 204.44 Load shedding power 0 0 Total Cost 4339.50

[0150] As shown in Table 6, although the maximum net load startup ensures sufficient power supply and completely solves the load shedding problem, in order to achieve the purpose of supply guarantee, 11.1 million kW of new thermal power units are built, which is 3.9 million kW more than Scheme I, and the investment in thermal power construction increases by 19 billion yuan. However, in some scenarios with low net load, the higher thermal power startup leads to insufficient downward adjustment space of the system, and a large amount of renewable energy cannot be absorbed. At the same time, due to the high forced output of thermal power units, the lack of discharge space of energy storage devices also makes it difficult for energy storage devices to play their role. The capacity configuration of energy storage devices has decreased by 6 million kWh, and the downward adjustment flexibility of the system is seriously insufficient. Compared with Scheme I, which adopts the entropy weight method to determine the startup capacity, the amount of abandoned electricity in this example has increased by 53.53%, resulting in an increase of 7.128 billion yuan / year in the cost of abandoned electricity. Since renewable energy cannot be absorbed, in order to meet the power supply demand, the thermal power generation in this example has increased by 8.644 billion MWh, and the coal cost has increased by 1.889 billion yuan / year. Ultimately, the total cost of the planning period has increased by 97.44 billion yuan.

[0151] Option III:

[0152] This example does not consider the uncertainty in the operation process, and uses a fixed load and renewable energy output curve for each typical day. Figure 5 and Table 7.

[0153] Table 7 Summary of startup plans for each typical day

[0154]

[0155] Table 8 Planning results

[0156] Capacity (10,000 kW / 10,000 kWh) Cost (100 million yuan) New thermal power units 900 450.00 Energy storage device 100 / 500 80.00 Thermal power generation 6477618.55 148.99 Abandoned power 1802627.23 149.62 Load shedding power 3442.51 3.44 Total Cost 3550.50

[0157] As shown in Table 7, without considering the uncertainty in the actual operation process, the startup capacity selected by Scheme III on most typical days is between Schemes II and I. However, on Typical Day 3, because the extremely low renewable energy generation is not taken into account, the startup capacity obtained by Scheme III is smaller than that of the other two schemes.

[0158] The planning results are shown in Table 8. Under Scheme III, the construction cost of the new equipment is the lowest, but its simulated operating cost is higher than that of Scheme I. Since deterministic scenarios are used for planning, when faced with uncertain scenarios in actual operation, Scheme III neither fully guarantees the load supply like Scheme II, nor comprehensively considers the characteristics of different scenarios like Scheme I to achieve a balance between power abandonment and load shedding. In addition, due to the small amount of energy storage configuration, the regulation resources in the system are relatively scarce and it is difficult to cope with the uncertainty of renewable energy in both directions.

[0159] In terms of economy, compared with Plan I, the load shedding cost in this plan is slightly reduced, but the cost of power abandonment and thermal power generation increases significantly, and the final total operating cost increases by 1.884 billion yuan per year.

[0160] This example also selects the scenarios of typical day 2 (maximum load) and typical day 3 (minimum load) for comparison, and analyzes in detail the equipment operation conditions in each extreme scenario and conventional scenario in Scheme I and Scheme II. First, on typical day 2, the net load conditions of each scenario are as follows Figure 6 and as shown in Table 9.

[0161] Table 9 Comparison of power generation, abandoned and short supply of thermal power units in Scheme I (15.3 million kW) and Scheme II (19.2 million kW)

[0162]

[0163] Typical day 2 is the typical day with the largest load, with a total load of 387.8105 million kWh and an average load of 16.1588 million kW. Scenario 1 in Table 9 is the scenario with the largest RE power generation, in which the total net load is -15.349 million kWh, the average net load is -639,500 kW, and the renewable energy penetration rate is 103.96%; Scenario 2 is the scenario with the smallest RE power generation, with a total net load of 366.2557 million kWh, an average net load of 15.2607 million kWh, and a renewable energy penetration rate of only 5.56%; Scenario 3 is the scenario with the largest RE peak-to-valley difference, with a RE peak-to-valley difference of 15.8961 million kW; Scenarios 4 and 5 are conventional scenarios, with total net loads of 117.5431 million kWh and 286.7515 million kWh, respectively, and renewable energy penetration rates of 30.31% and 73.94%, respectively.

[0164] Compared with Scheme II, Scheme I reduces the operating capacity of thermal power units by 3.9 million kW. The reduction in the operating capacity of thermal power units provides the system with greater downward adjustment space, which is conducive to the consumption of renewable energy. As can be seen in Table 9, the power generation of thermal power units has decreased in all scenarios. In the extreme scenario 1 with extremely high RE power generation, the total power generation of thermal power units in Scheme I has decreased by 46.8 million kWh, a decrease of 20.31%. In terms of power abandonment, the power abandonment of Scheme I in each scenario is lower than or equal to that of Scheme II. In scenarios 1 and 4 with high penetration rates of renewable energy, the power abandonment has decreased by 46.8 million kWh, a decrease of 19.04% and 41.47%. At the same time, with the cooperation of energy storage devices and thermal power units, Scheme I only has a small amount of load shedding in scenario 2 with extremely low renewable energy power generation, and the proportion of load shedding is only 3.05%.

[0165] In summary, in typical day 2, Scheme I, which adopts the entropy weight method to coordinate the planning of thermal storage to cope with the uncertainty of renewable energy, has obvious advantages in all scenarios. It reduces the power generation of thermal power units and improves the utilization rate of renewable energy. Finally, in typical day 2, compared with Scheme II, Scheme I can reduce the power generation of thermal power units by 21.952 million kWh, reduce the abandoned power by 21.8337 million kWh, increase the load shedding power by 118,200 kWh, and save operating costs by 21.9889 million yuan.

[0166] Typical day 5 is the scenario with the smallest total load among all typical days. The net loads of each scenario are as follows: Figure 7 , the production simulation results are shown in Table 10.

[0167] Table 10 Comparison of power generation, abandoned and shorted power generation in Scheme I (10.2 million KW) and Scheme II (12.3 million KW)

[0168]

[0169] Typical day 5 is the typical day with the lowest load, with a total load of 262.7869 million KWh and an average load of 10.9485 million KW. In Table 10, the total net load in scenario 1 is -99.8199 million KWh, the average net load is -4.1592 million KW, and the renewable energy penetration rate is 137.99%; the total net load in scenario 2 is 216.7259 million KWh, the average net load is 9.0302 million KW, and the renewable energy penetration rate is 17.53%; the peak-to-valley difference of RE in scenario 3 is 16.6828 million KW; scenarios 4 and 5 are conventional scenarios, with total net loads of -36.7699 million KWh and 1134.1704 million KWh respectively, and renewable energy penetration rates of 113.99% and 48.94% respectively.

[0170] As shown in Table 10, in Typical Day 5, since Scheme I also selected a smaller startup scheme, the power generation and power abandonment of the thermal power units in each scenario were reduced, and due to the effect of the energy storage device, no load shedding occurred in Scenario 2.

[0171] Scheme I using the entropy weight method has achieved good results in all scenarios, achieving the goal of energy conservation and emission reduction, and has not caused load shedding losses. Based on the expectations of each scenario, Scheme I reduces thermal power generation by 20.7803 million KWh, reduces abandoned power by 20.7803 million KWh, and ultimately reduces the total operating cost by 22.0271 million yuan. The expected operating costs of Scheme I and Scheme II for each scenario are summarized as follows.

[0172] Table 11 Summary of typical daily operating costs (unit: 10,000 yuan)

[0173]

[0174] As shown in Table 11, Scheme I can reduce the power generation of thermal power units, promote the consumption of renewable energy, and reduce the operating cost of the system on all typical days.

[0175] This paper proposes a method for selecting startup capacity and coordinating the configuration of energy storage devices based on the entropy weight theory. First, based on historical data, the renewable energy output curve and load curve on different typical days are predicted, and the uncertainty of renewable energy and possible extreme scenarios are comprehensively considered to set different probability-based scenarios on each typical day; then, combined with 8 flexibility evaluation indicators, the entropy weight theory is used to determine the comprehensive startup plan that can simultaneously cope with fluctuations in different forms of renewable energy; finally, the capacity of the newly built thermal power unit is determined in combination with the startup plan, and the capacity and power of the energy storage device are configured to cope with the uncertainty of renewable energy in the actual operation process. And an example analysis is carried out using the operation data of a power grid in Northeast China to prove the effectiveness of the method proposed in this paper, and the following conclusions are drawn:

[0176] (1) In a system with an extremely high proportion of renewable energy, the system has dual uncertainties in source and load, and the output of renewable energy fluctuates over a large range. Extreme scenarios with low probability may differ significantly from conventional operating scenarios, which will have a significant impact on the safe and stable operation of the system.

[0177] (2) If the uncertainty of renewable energy is not considered during the planning process, the final planning results will be difficult to cope with the impact caused by extreme scenarios. At this time, the system will have hidden dangers in both supply and consumption. Therefore, the uncertainty of renewable energy should be taken into account at the level of system planning.

[0178] (3) The net loads in extremely high-proportion renewable energy systems under different scenarios vary significantly, and the startup plan derived from a single scenario is difficult to adapt to the impact of multiple uncertain scenarios. This paper uses the entropy weight theory to comprehensively consider the flexibility of the system in terms of both upward and downward adjustments, and derives the corresponding indicator weights and startup plans under different probability scenarios. The startup plan derived by this method can comprehensively respond to different renewable energy and load scenarios, taking into account both supply and consumption requirements.

[0179] In addition, although exemplary embodiments have been described herein, the scope includes any and all embodiments based on the present invention with equivalent elements, modifications, omissions, combinations (e.g., various embodiments intersecting schemes), adaptations or changes. The elements in the claims will be interpreted broadly based on the language adopted in the claims, and are not limited to the examples described in this specification or during the implementation of this application, and the examples will be interpreted as non-exclusive. Therefore, this specification and examples are intended to be considered as examples only, and the true scope and spirit are indicated by the following claims and the full scope of their equivalents.

[0180] The above description is intended to be illustrative rather than restrictive. For example, the above examples (or one or more of them) can be used in combination with each other. For example, those of ordinary skill in the art can use other embodiments when reading the above description. In addition, in the above-mentioned specific embodiments, various features can be grouped together to simplify the present invention. This should not be interpreted as a feature of an invention that is not claimed for protection being necessary for any claim. On the contrary, the subject matter of the present invention may be less than all the features of the embodiments of a specific invention. Thus, the following claims are incorporated into the specific embodiments as examples or embodiments, wherein each claim is independently used as a separate embodiment, and it is considered that these embodiments can be combined with each other in various combinations or arrangements. The scope of the present invention should be determined with reference to the full scope of the equivalent forms of the attached claims and these claims.

Claims

1. A method for coordinated planning of thermal storage to cope with uncertainty of renewable energy, characterized in that: The method comprises: Based on historical data, a system operation scenario set is constructed, wherein the operation scenario set includes conventional operation scenarios and extreme scenarios, wherein the extreme scenarios include extreme ramp-up scenarios, extremely high output scenarios of renewable energy, and extremely low output scenarios of renewable energy; Determine the initial startup plan for each scenario based on the maximum net load in each scenario; A production simulation is performed based on the initial startup plan to obtain the system flexibility imbalance corresponding to each initial startup plan, and the system flexibility imbalance is evaluated by a flexibility index, and the flexibility index includes an expectation of insufficient upward flexibility capacity, an expectation of insufficient downward flexibility capacity, an expectation of insufficient upward flexibility climbing, an expectation of insufficient downward flexibility climbing, an expectation of insufficient hours for insufficient upward flexibility capacity, an expectation of insufficient hours for insufficient downward flexibility capacity, an expectation of insufficient hours for insufficient upward flexibility climbing, and an expectation of insufficient hours for insufficient downward flexibility climbing; The information entropy and weight of each flexibility index are calculated based on the entropy weight method to obtain the scores of each initial startup plan, and the comprehensive startup plan is determined according to the scores of each initial startup plan; Determine the capacity of the thermal power unit and configure corresponding energy storage parameters according to the comprehensive startup plan, wherein the energy storage parameters include initial values ​​of energy storage capacity and power; Calculating the construction cost according to the determined comprehensive startup plan and energy storage parameters, performing production simulation in response to the determined comprehensive startup plan and energy storage parameters, calculating the expected operating cost of the system, and taking the sum of the construction cost and the expected operating cost of the system as the total operating cost of the system; Determine the optimal cost and judge whether the total cost of the system operation is lower than the optimal cost: When the total system operation cost is not less than the target cost, updating the energy storage parameters to obtain a new comprehensive startup plan, and updating the total system operation cost according to the updated energy storage parameters and the new comprehensive startup plan; When the total system operating cost is lower than the target cost, the comprehensive startup plan and energy storage parameters corresponding to the current total system operating cost are used as the optimal planning plan; The upward adjustment of the flexible capacity shortfall expectation and the downward adjustment of the flexible capacity shortfall expectation are calculated by the following formula: In the formula, They are the system upward and downward flexibility capacity shortfall expectations; represents the upper and lower limits of the unit output under the i-th startup scheme; Pr j is the probability of the jth scenario occurring, Indicates that the flexibility of increasing power at time t in scenario j is insufficient. represents the net load at time t in scenario j, t represents the current time, and T represents the total duration of a typical day. It indicates that the flexibility of reducing the power is insufficient at time t in scenario j; The upward adjustment flexibility climbing shortfall expectation and the downward adjustment flexibility climbing shortfall expectation are calculated by the following formula: In the formula, The upward and downward flexibility of the system are insufficient to meet expectations; RU i , RD i Indicates the maximum upward / downward climbing capacity of the unit corresponding to startup scheme i, Indicates insufficient power for climbing at time t in scenario j, Indicates insufficient power for climbing at time t in scenario j; The expected upward and downward flexible capacity shortage hours are calculated using the following formula: In the formula, are the expected number of hours of insufficient flexibility capacity for upward and downward adjustments of the system, respectively; Pr{} represents the probability that scenario j satisfies the expression in {}; The expected upward flexibility ramp-down hours and the expected downward flexibility ramp-down hours are calculated using the following formula: In the formula, They are respectively the expected number of hours of insufficient upward and downward flexibility ramping of the system.

2. The method according to claim 1, characterized in that Based on the entropy weight method, the information entropy and weight of each flexibility indicator are calculated to obtain the scores of each initial startup plan, including: According to the flexibility index, the initial matrix X is obtained as shown below: In the formula, x ij Indicates the value of the jth evaluation index corresponding to the i-th startup plan; After the initial matrix is ​​formed, the initial matrix is ​​normalized by the following formula: Where Y is the standardized matrix, y ij represents the value of the flexibility index after standardization; X j is a column vector consisting of the values ​​of the flexibility index j under all startup schemes, min() represents the minimum function, and max() represents the maximum function; After performing the standardization operation, the proportion of data in each flexibility indicator and the information entropy of the indicator are calculated using the following formula: In the formula, p ij is the proportion of the corresponding value of the comprehensive startup plan i in the flexibility index j; e j represents the information entropy contained in the flexibility index j, and n represents the number of data in each flexibility index; Determine the corresponding weight according to the information entropy of each flexibility indicator: In the formula, w j represents the corresponding weight of the j-th flexibility index; Based on the information entropy and weight of the activity indicators, the score of the comprehensive startup solution is calculated by the following formula: S i =∑w j *and ij (19) In the formula, S i is the comprehensive score of the i-th comprehensive startup plan.

3. The method according to claim 1, characterized in that The total system operating cost is calculated using the following formula: C=C ESS +C TH +C OP (20) C TH =c th P th (21) C ESS =c e E ess +c p P ess (22) In the formula, C ESS represents the construction cost of energy storage device; C TH represents the new construction cost of thermal power units, c th represents the unit construction cost of thermal power units, P th Indicates the newly built capacity of thermal power units; C OP represents the operating cost, c e 、c p They represent the unit capacity and unit power construction cost of the energy storage device respectively; E ess , P ess Indicates the capacity and power of the energy storage device to be constructed in the planned scheme, is the mathematical expectation symbol; c coal is the unit power generation cost of thermal power units, P g is the power generation of thermal power units; c w The penalty for abandoning power is W. c is the abandoned power; c L is the unit load shedding penalty, L c is the load shedding power.

4. The method according to claim 1, characterized in that: Operation constraints are set to perform production simulation in response to the determined comprehensive startup plan or the updated comprehensive startup plan and energy storage parameters, wherein the operation constraints include one of thermal power unit constraints, renewable energy unit operation constraints, energy storage device operation constraints, and power conservation constraints, and a combination thereof.

5. The method according to claim 4, characterized in that The thermal power unit constraint is expressed as: IN min ≤P g,t ≤U max (24) RD≤P g,t -P g,t-1 ≤RU (25) Where U max , U min P is the upper and lower limits of the thermal power unit output under the selected comprehensive startup plan; g,t It represents the output of the thermal power unit at time t; RU and RD are the upward and downward climbing power limits of the thermal power unit; The operation constraints of the renewable energy units are expressed as: 0≤W t ≤W t max (26) 0≤W c,t ≤W t max (27) Where W t is the actual output of renewable energy at time t, capping the output of renewable energy; Wc,t is the amount of renewable energy abandoned at time t.

6. The method according to claim 5, characterized in that The energy storage device operation constraints are expressed as: 0≤P ch,t ≤P ess n ch,t (28) 0≤P dis,t ≤P ess n dis,t (29) n ch,t +n dis,t =1 (30) Where P ch,t , P dis,t are the charging and discharging power of the energy storage device at time t; n ch,t 、n dis,t represents the charge and discharge state of the energy storage device at time t. Formula (29) limits the energy storage device to be in only one state, either charging or discharging, at the same time; SoC t =SoC t-1 +(P ch,t the ch -P dis,t / η dis )Δt (31) SoC min ≤SoC t ≤SoC max (32) SoC 24 =SoC ini (33) Where, SoC t is the state of charge of the energy storage device at time t, η ch , η dis are the charging and discharging efficiency of the energy storage device, respectively, Δt is the unit time; SoC max 、SoC min Limit the maximum and minimum range of energy storage charge state; SoC ini is the initial charge state of the energy storage device. Formula (31) ensures that the energy storage device returns to its initial charge state after the scheduling cycle ends.

7. The method according to claim 6, characterized in that The power conservation constraint is expressed as: P g,t +W t +P dis,t +L c,t =L t +P ch,t (34) IN c,t +W t =In max (35) L c,t ≤L t (36) Where, L c,t is the load shedding power at time t, formula (34) is used to ensure the real-time balance of power in the system, formula (35) is used to limit the renewable energy generation and power abandonment to not exceed the total amount of renewable energy in the system at the current moment, and formula (36) is used to limit the load shedding power of the system.

Citation Information

Patent Citations

  • Multi-attribute multi-target energy storage working condition adaptability contrastive analysis method

    CN107959302A

  • Thermal power generating unit flexibility transformation planning method considering source load uncertainty

    CN114548757A

  • Power grid energy storage double-layer optimization method and system considering flexibility and new energy consumption

    CN115036914A

  • Power system flexibility evaluation model construction method, evaluation method and related device

    CN115471037A

  • Thermal power generating unit deep peak regulation and composite energy storage collaborative planning method and device

    CN116191493A