A vehicle range extender power generation control method and controller

By intelligently controlling the range extender, predicting power consumption based on the vehicle's initial power and historical driving information, and intelligently planning the charging time and location, the problem of unnecessary power generation by the range extender in the existing technology is solved, and the vehicle is economical and environmentally friendly. operation, improving battery life and charging efficiency.

CN118386879BActive Publication Date: 2024-10-29SUZHOU AOYIKESI AUTOMOBILE CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410478016.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-10-29
Estimated Expiration
2044-04-19

AI Technical Summary

Technical Problem

Existing range-extended electric vehicle energy management systems fail to fully consider driving routes and real-time changes in road conditions, causing the range extender to generate electricity when unnecessary, causing economic and environmental problems.

Method used

By obtaining the vehicle's initial power, current driving route, current road condition information and historical driving information, the vehicle's power consumption is predicted, and the startup and shutdown of the range extender are intelligently controlled to ensure that the vehicle's power is replenished when needed, reducing unnecessary Generate electricity.

Benefits of technology

It realizes the economical and safe operation of the vehicle, improves the endurance and charging efficiency, avoids driving failures caused by insufficient power, optimizes the power consumption strategy, and provides guarantee for long-distance driving.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118386879B_ABST
    Figure CN118386879B_ABST
Patent Text Reader

Abstract

A vehicle range extender power generation control method and controller, applied to the field of vehicle technology, the method includes obtaining the vehicle's initial power, current driving route, current road condition information, and historical driving information; when determining that the current driving route is any of the historical driving routes, predicting the vehicle's first power consumption; if the initial power is lower than the first power consumption, determining the vehicle's first charging time and first charging location in the current driving route based on historical charging records; determining the vehicle's first power generation and controlling the range extender to start; determining the power generation of the range extender; when the range extender charges the vehicle to the first power generation, controlling the range extender to shut down. By implementing this method, when the vehicle's power is insufficient, the range extender is started to replenish the vehicle's power to support the vehicle's travel to the charging station, reducing the range extender's power generation, solving the vehicle's endurance problem, and intelligently controlling the range extender to start and shut down, achieving economical and safe operation of the vehicle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of vehicle technology, and in particular to a vehicle range extender power generation control method and controller. Background Art

[0002] In the context of global energy conservation and emission reduction, electric vehicles have become an important development direction of the automotive industry. However, the range problem faced by electric vehicles limits their popularity. In order to solve this problem, extended-range electric vehicles came into being. They extend the driving distance of electric vehicles by integrating internal combustion engines or other types of range extenders as battery charging devices. Therefore, effective management of range extenders is crucial, which not only involves monitoring the battery status, but also includes starting, stopping, and regulating energy output of the range extender to achieve the optimal configuration of the vehicle's energy.

[0003] At present, the extended-range electric vehicles on the market are usually equipped with an energy management system. When the energy management system detects that the battery power of the vehicle is lower than the minimum value, it turns on the range extender to generate electricity for the vehicle. In this way, the range extender can provide auxiliary power when the battery power is low, or maintain the battery power during long-distance driving.

[0004] Although the energy management system of extended-range electric vehicles provides a solution to the range problem of electric vehicles, the relevant technology still has shortcomings. For example, the impact of driving routes and real-time road conditions on energy consumption is not fully considered, and the vehicle is always powered by the range extender, which is neither economical nor environmentally friendly. Summary of the invention

[0005] The present application provides a vehicle range extender power generation control method and controller, which are used to start the range extender to replenish the vehicle's power when the vehicle's power is insufficient to support the vehicle's travel to a charging station, thereby reducing the range extender's power generation and solving the vehicle's endurance problem. At the same time, the range extender is intelligently controlled to be turned on and off, thereby achieving economical and safe operation of the vehicle.

[0006] In a first aspect, the present application provides a method for controlling power generation of a vehicle range extender, the method comprising: obtaining an initial power level of the vehicle, a current driving route, current road condition information corresponding to the current driving route, and historical driving information, the historical driving information comprising historical driving routes and historical charging records, the historical driving routes comprising multiple driving routes within a preset period of time in the past, and the historical charging records comprising multiple charging times and multiple charging locations; when determining that the current driving route is any one of the historical driving routes, predicting a first power consumption of the vehicle based on the current driving route and the current road condition information; if the initial power level is lower than the first power consumption, determining a first charging time and a first charging location of the vehicle in the current driving route based on the historical charging records; when the vehicle does not arrive at the first charging location at the first charging time, determining a first power generation amount of the vehicle and controlling the range extender to start, the first power generation amount being the power required for the vehicle to arrive at the first charging location; determining the power generation power of the range extender based on the first power generation amount and the remaining mileage of the vehicle to arrive at the first charging location; and controlling the range extender to shut down when the range extender charges the vehicle to the first power generation amount.

[0007] In the above embodiment, the method obtains the initial power of the vehicle, the current driving route, and the current road condition information, and combines the historical driving route and the historical charging record in the historical driving information to accurately predict the power consumption of the vehicle's current driving route. When it is predicted that the power is insufficient, the controller can intelligently determine the charging time and charging location in the current driving route according to the historical charging record, so as to charge in time. During driving, the controller can monitor the power status in real time. Once the power is insufficient, the range extender is immediately started to generate power, and the power generation of the range extender is adjusted according to the first power generation required for the vehicle to reach the first charging location and the remaining mileage of the vehicle to reach the first charging location. When the vehicle has the first power generation, it means that the vehicle can drive to the first charging location for charging with the charging pile. The controller controls the range extender to turn off, but does not use the range extender too much, which reduces the power generation of the range extender, solves the problem of vehicle endurance, and achieves economy and environmental protection. Compared with the existing electric vehicle range extension technology, which mainly relies on fixed charging plans and preset driving modes, it is difficult to flexibly respond to real-time changing road conditions and power requirements. In contrast, this method makes full use of the vehicle's historical driving information, can accurately predict the vehicle's power consumption, reasonably plan the charging time and location, and intelligently control the start and shut down of the range extender, so as to achieve economical and safe operation of the vehicle, avoid driving failures caused by insufficient power, and improve the reliability of the vehicle. This method can effectively solve the endurance problem during vehicle operation, optimize the vehicle's power consumption strategy, and provide protection for the vehicle's long-distance driving.

[0008] In combination with some embodiments of the first aspect, in some embodiments, when the current driving route is determined to be any of the historical driving routes, the first power consumption of the vehicle is predicted based on the current driving route and the current road condition information, specifically including: extracting a target driving route from the historical driving routes whose matching degree with the current driving route exceeds a preset matching degree threshold; extracting the historical power consumption in the target driving route from the historical charging records; extracting traffic information and weather information from the current road condition information; and inputting the historical power consumption, traffic information and weather information into a preset power consumption prediction model to obtain the first power consumption of the vehicle on the current driving route.

[0009] In the above embodiment, the controller determines the historical power consumption in the target driving route by matching the target driving route in the historical driving route, and uses the preset power consumption prediction model to calculate the first power consumption in combination with traffic information and weather information, thereby realizing an accurate prediction of the power consumption of the current driving route, and thus being able to more accurately plan the vehicle's charging strategy and avoid the risk of failure caused by power consumption prediction deviation. This improves the intelligence and accuracy of power consumption prediction and provides effective support for vehicle endurance charging control.

[0010] In combination with some embodiments of the first aspect, in some embodiments, if the initial power consumption is lower than the first power consumption, the first charging time and the first charging location of the vehicle in the current driving route are determined based on the historical charging records, specifically including: extracting the target charging record that best matches the current driving route from the historical charging records, the target charging record including the target charging time and the target charging location; determining the target charging time and the target charging location as the first charging time and the first charging location of the vehicle in the current driving route.

[0011] In the above embodiment, the target charging record with the highest matching degree with the current driving route is determined in the historical charging records to determine the charging time and charging location of the current driving route, thereby obtaining the best matching charging plan, so as to reasonably arrange the charging strategy of the current driving route. In this way, the past successful charging experience of the vehicle can be used as much as possible to plan the charging time and charging location more accurately and reliably, thereby reducing the uncertainty caused by charging planning and improving the charging efficiency and safety of the vehicle.

[0012] In combination with some embodiments of the first aspect, in some embodiments, before the step of inputting historical power consumption, traffic information and weather information into a preset power consumption prediction model to obtain the first power consumption of the vehicle on the current driving route, the method also includes: determining a recurrent neural network as a model to be trained; taking historical power consumption, traffic information and weather information as input and actual power consumption as output, and combining them into multiple training data; inputting the multiple training data into the model for training; and obtaining a power consumption prediction model when the loss function of the model is lower than a preset function threshold.

[0013] In the above embodiment, the method uses a recurrent neural network to train a power consumption prediction model, with historical power consumption, traffic information and weather information as input, and actual power consumption as output, which are combined into multiple training data and trained repeatedly to continuously optimize the parameters of the model and reduce the model loss to below the preset function threshold, thereby obtaining an accurate power consumption prediction model. Compared with traditional statistical methods, this method can achieve better approximation and modeling of vehicle power consumption under complex driving conditions, and improve the intelligence level of power consumption prediction. Therefore, using the power consumption prediction model to predict power consumption can significantly improve the accuracy of the prediction results.

[0014] In combination with some embodiments of the first aspect, in some embodiments, the power generation power of the range extender is determined based on the first power generation and the remaining mileage of the vehicle to reach the first charging location, specifically including: dividing the remaining mileage into multiple sub-sections according to the road type; determining the section distance and basic energy consumption coefficient of each sub-section; calculating the energy demand of each sub-section based on the basic energy consumption coefficient and section distance of each sub-section; allocating the energy demand of each sub-section based on the first power generation to obtain the section power generation allocated to each sub-section; and calculating the power generation power of each sub-section based on the section power generation and section distance.

[0015] In the above embodiment, the method fully considers the basic energy consumption coefficient and the sum of the section distance of each sub-section in the remaining mileage, accurately calculates the energy demand of each sub-section, and then reasonably allocates the section power generation of each sub-section according to the allocation ratio of the first power generation in each sub-section, thereby obtaining the optimal power generation setting of each sub-section as the power generation power of the range extender. In this way, the power generation parameters of the range extender can be adaptively optimized and controlled according to the actual road conditions, so as to maximize the effectiveness of the range extender, ensure power supply, and improve power utilization efficiency.

[0016] In combination with some embodiments of the first aspect, in some embodiments, after obtaining the initial power of the vehicle, the current driving route, the current road condition information corresponding to the current driving route, and the historical driving information, the historical driving information includes the historical driving route and the historical charging record, the historical driving route includes multiple driving routes within a preset period of time in the past, and the historical charging record includes multiple charging times and multiple charging locations, the method also includes: when it is determined that the current driving route does not meet any of the driving routes in the historical driving routes, predicting the second power consumption of the vehicle according to the current driving route and the current road condition information; if the initial power is lower than the second power consumption, determining an alternative charging location within the preset range of the current driving route; obtaining the real-time number of vehicles in queue at each alternative charging location; taking the alternative charging location with a real-time number of vehicles in queue less than the preset vehicle number threshold as the second charging location of the vehicle on the current driving route; predicting the second charging time when the vehicle arrives at the second charging location according to the driving distance between the current position of the vehicle and the second charging location; when the vehicle does not arrive at the second charging location at the second charging time, determining the second power generation of the vehicle and controlling the range extender to start, the second power generation being the power required for the vehicle to arrive at the second charging location.

[0017] In the above embodiment, if the controller determines that the current driving route does not meet any of the driving routes in the historical driving routes, an alternative charging planning method is provided. This method intelligently determines the optimal charging plan by comprehensively analyzing the charging station information within the preset range of the current driving route. It can handle problems when historical experience cannot be used, expands the scope of application of the method, and fully considers the impact of the real-time number of vehicles queuing at the alternative charging location on the charging efficiency, avoids the selection of congested charging stations, and improves the convenience of charging. At the same time, when the vehicle cannot reach the charging location at the charging time, the range extender is controlled to generate electricity to ensure power supply.

[0018] In combination with some embodiments of the first aspect, in some embodiments, after the step of determining the power generation power of the range extender based on the first power generation and the remaining mileage of the vehicle to reach the first charging location, the method also includes: real-time detection of the actual power generation power of the range extender; when the actual power generation power exceeds the safe range of the power generation power, controlling the alarm device to issue a warning and controlling the range extender to adjust the power generation power.

[0019] In the above embodiment, a closed-loop control safety monitoring mechanism is provided. The controller detects the actual power generation of the range extender in real time and compares it with the safe range of the power generation of the range extender. When the actual power generation exceeds the safe range of the power generation, the controller can quickly make adjustments and issue an early warning. This effectively prevents the range extender from malfunctioning or unexpected problems and ensures the safe and reliable operation of the range extender. The use of this monitoring and feedback mechanism can improve the robustness and fault tolerance of the method, reduce safety hazards, and achieve accurate management of vehicle power control.

[0020] In a second aspect, an embodiment of the present application provides a controller, comprising: one or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code includes computer instructions, and the one or more processors call the computer instructions to enable the controller to execute the method described in the first aspect and any possible implementation method of the first aspect.

[0021] In a third aspect, an embodiment of the present application provides a computer program product comprising instructions, which, when the computer program product runs on a controller, enables the controller to execute the method described in the first aspect and any possible implementation of the first aspect.

[0022] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, comprising instructions, which, when executed on a controller, cause the controller to execute the method described in the first aspect and any possible implementation of the first aspect.

[0023] It is understandable that the controller provided in the second aspect, the computer program product provided in the third aspect, and the computer storage medium provided in the fourth aspect are all used to execute the method provided in the embodiment of the present application. Therefore, the beneficial effects that can be achieved can refer to the beneficial effects in the corresponding method, which will not be repeated here.

[0024] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:

[0025] 1. Due to the use of an intelligent planning method that combines the vehicle's historical driving routes and historical charging records to determine the charging time and charging location during driving, it is possible to accurately predict the vehicle's cruising range, scientifically and rationally plan the vehicle's charging time and charging location, and turn on the range extender when the vehicle cannot reach the charging location due to insufficient power, effectively solving the problem of inappropriate charging planning caused by the difficulty in accurately predicting vehicle cruising range in related technologies, thereby achieving safe operation of the vehicle. This method makes full use of the vehicle's own historical data and conducts personalized intelligent analysis, rather than simply relying on experience values, which can greatly improve the accuracy of predictions, enhance the pertinence of charging planning, and ensure power supply.

[0026] 2. Since the recurrent neural network model is used to predict vehicle power consumption, it can achieve high-precision learning of vehicle power consumption characteristics under complex road conditions, effectively solving the problem that traditional statistical methods used in related technologies cannot adapt to complex conditions, thereby realizing intelligent and accurate power consumption prediction. It breaks through the limitations of simple linear models, allowing the power consumption prediction model to quickly adapt to changes in the traffic environment, greatly improving the accuracy of power consumption prediction.

[0027] 3. Due to the use of a control strategy that dynamically optimizes the range extender's power generation according to the road section requirements, it is possible to achieve autonomous adjustment of the range extender's power generation parameters on different road sections, effectively solving the problem of power waste caused by the use of a fixed power generation mode in related technologies, and thus achieving efficient use of on-board power. This power generation control strategy achieves closed-loop control of power supply and demand, which not only ensures power supply, but also improves utilization efficiency, maximizes the effectiveness of limited power, and achieves the purpose of energy conservation and environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a flow chart of a method for controlling power generation of a vehicle range extender in an embodiment of the present application;

[0029] Figure 2 is another flow chart of the vehicle range extender power generation control method in the embodiment of the present application;

[0030] Figure 3 It is a schematic diagram of a physical device structure of a controller in an embodiment of the present application. DETAILED DESCRIPTION

[0031] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification of the present application, the singular expressions "one", "a kind of", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more of the listed items.

[0032] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.

[0033] The following is a description of the process of the method provided by this implementation. Figure 1 , is a flow chart of a method for controlling power generation of a vehicle range extender in an embodiment of the present application.

[0034] S101, obtaining the initial power of the vehicle, the current driving route, the current road condition information corresponding to the current driving route, and the historical driving information, wherein the historical driving information includes the historical driving route and the historical charging record, the historical driving route includes multiple driving routes within a preset period of time in the past, and the historical charging record includes multiple charging times and multiple charging locations;

[0035] The initial power of the vehicle can be obtained by the controller collecting data from the battery management system in the vehicle in real time. The current driving route can be obtained by the controller through the vehicle navigation system or positioning device. The current road condition information corresponding to the current driving route may include traffic conditions, weather conditions, the degree of congestion of the current driving route, and road obstacles on the current driving route, etc., which can be obtained by the controller from the vehicle sensing device or the network. The acquisition of these data is not limited here. The historical driving information is a database accumulated by the controller for a long time, including multiple historical driving routes within a preset period of time in the past and historical charging records on the historical driving routes. The historical charging records include charging time and charging location. For example, the controller can statistically store all historical driving routes of the vehicle in the past year, as well as the time, location, power consumption and other data of charging on these historical driving routes, so as to realize the intelligent planning and control of the current trip later.

[0036] S102, when it is determined that the current driving route is any of the historical driving routes, predicting a first power consumption of the vehicle according to the current driving route and current road condition information;

[0037] The controller determines whether the current driving route can be matched in the historical driving routes. If the controller can match a driving route in the historical driving routes that has a higher similarity to the current driving route than the preset similarity threshold, the controller can predict the power consumption of the vehicle on the current driving route through the relevant data of the driving route. For example, if the similarity between the current driving route and the historical driving route A is 90%, and the preset similarity threshold is 85%, and the similarity between the current driving route and the historical driving route A exceeds the preset similarity threshold, the controller can predict the first power consumption of the vehicle based on the historical driving route A, combined with the current driving route and the current road condition information. The historical driving route A shows that under similar road condition information and weather conditions, the average power consumption of the vehicle is 20 kilowatt hours (kWh), so the controller can predict that the vehicle will have similar power consumption on the current driving route.

[0038] S103, if the initial power consumption is lower than the first power consumption, determining a first charging time and a first charging location of the vehicle in the current driving route according to the historical charging record;

[0039] If the vehicle's initial power is lower than the power required to complete the current driving route, that is, the first power consumption, the controller needs to plan charging. The controller searches for a driving route whose similarity with the current driving route exceeds a preset similarity threshold from the historical driving information, and retrieves the charging record in the driving route, including the charging time and charging location, and uses the charging time and charging location as the first charging time and first charging location of the vehicle in the current driving route. Historical charging records can be used as a reference to determine the charging time and charging location of the current driving route, but in specific planning, the current actual road conditions must also be considered, and the charging time and charging location in the historical charging records may need to be appropriately adjusted to adapt to the current situation.

[0040] Optionally, under normal circumstances, if the initial power consumption is lower than the first power consumption, determining the first charging time and the first charging location of the vehicle in the current driving route based on the historical charging records can be achieved in the following way: extracting the target charging record that best matches the current driving route from the historical charging records, the target charging record including the target charging time and the target charging location; determining the target charging time and the target charging location as the first charging time and the first charging location of the vehicle in the current driving route.

[0041] The controller selects the route with the highest matching degree with the current route from the historical routes as the target route. That is, assuming the current route is o, there are m, n, p and q in the historical routes, and the matching degree between o and m is calculated to be 56%, the matching degree between o and n is 78%, the matching degree between o and p is 90%, and the matching degree between o and q is 87%. Then it is determined that o and p have the highest matching degree, and p is used as the target route. The controller finds the historical charging record p` from the historical route p as the target charging record, and the historical charging time and the historical charging location in the historical charging record p` are determined as the target charging time and the target charging location. Since the current route has the highest matching degree with the target route, it means that the current route is highly similar to the target route, so the first charging time and the first charging location of the current route can be determined according to the target charging time and the target charging location in the target route.

[0042] S104, when the vehicle has not arrived at the first charging location at the first charging time, determining a first power generation amount of the vehicle and controlling the range extender to start, the first power generation amount being the amount of power required for the vehicle to arrive at the first charging location;

[0043] If the vehicle has not arrived at the first charging location at the first planned charging time, it means that the vehicle's power cannot support the vehicle to reach the first charging location for charging. At this time, the controller needs to start the range extender to generate electricity to ensure that the vehicle can continue to travel to the charging location. For example, if the controller determines that the vehicle's initial power is 40 degrees, and the first power consumption of the planned current driving route is expected to be 60 degrees, then the vehicle needs to replenish power at the first charging location to complete the current driving route. When the vehicle does not arrive at the first charging location at the first charging time, it means that the vehicle's power is difficult to support the vehicle to reach the first charging location for charging. At this time, the controller needs to control the range extender to start to reach the first charging location. Assuming that the vehicle still needs 10 degrees to reach the first charging time, that is, the first power generation is 10 degrees, the controller controls the range extender to enable power generation according to the required power to ensure the vehicle's endurance.

[0044] S105, determining the power generation power of the range extender according to the first power generation amount and the remaining mileage of the vehicle to reach the first charging location;

[0045] The controller needs to calculate the remaining mileage of the vehicle from the current location to the first charging location, and determine the power generation energy required by the range extender based on the remaining mileage. The controller determines the driving time of the vehicle from the current location to the first charging location as the power generation time of the range extender, and calculates the power generation power of the range extender based on the calculation formula: Power generation = Power generation energy / Power generation time.

[0046] Optionally, in general, determining the power generation power of the range extender based on the first power generation and the remaining mileage of the vehicle to reach the first charging location can be achieved in the following manner: dividing the remaining mileage into multiple sub-sections according to the road type; determining the section distance and basic energy consumption coefficient of each sub-section; calculating the energy demand of each sub-section based on the basic energy consumption coefficient and section distance of each sub-section; allocating the energy demand of each sub-section based on the first power generation to obtain the section power generation allocated to each sub-section; and calculating the power generation power of each sub-section based on the section power generation and section distance.

[0047] The route is divided into multiple sections. For each section, the controller can calculate the power consumption demand of the section based on the location characteristics, road type, altitude, and driving speed of the section. Then, based on the total power generation, it is reasonably allocated to each section in proportion, that is, the amount of power that the generator of each section needs to generate is determined. Finally, based on the length of the section and the allocated power, the controller can determine the optimal power generation power of the range extender in each section and control it in stages, which can ensure power supply and improve efficiency.

[0048] First, the controller divides the remaining mileage of the vehicle to the first charging location into multiple sub-segments according to road type (such as highways, urban roads, mountain roads, etc.), and each sub-segment has representative road characteristics and driving conditions.

[0049] The controller then determines the basic energy consumption coefficient for each sub-segment. The basic energy consumption coefficient is usually calculated based on the average energy consumption of the vehicle under specific road characteristics and driving conditions (unit: kWh / km), which can be obtained by referring to data provided by the vehicle manufacturer or by analyzing historical driving information.

[0050] The controller uses the basic energy consumption coefficient and the section distance of each sub-section to calculate the energy demand of each sub-section. The calculation formula is: energy demand of each sub-section = basic energy consumption coefficient * section distance of each sub-section.

[0051] According to the first power generation, the controller allocates the energy demand of each sub-segment. The allocation method can be implemented by simple proportional allocation or other more complex optimization algorithms to ensure that each sub-segment has enough power to support driving. The calculation method of the segment power generation allocated to each sub-segment is: the segment power generation allocated to each sub-segment = the energy demand of each sub-segment / the expected driving time of each sub-segment.

[0052] Finally, the controller calculates the power generation of each sub-section based on the power generation and distance of the section. The calculation formula is: power generation = power generation of the section / distance of the section, which is the average power generation per kilowatt-hour that the range extender needs to provide on each sub-section.

[0053] S106 . When the range extender charges the vehicle to a first power generation amount, control the range extender to be turned off.

[0054] When the range extender charges the vehicle to the first power generation amount, it means that the vehicle is sufficient to reach the charging location. At this time, the controller automatically controls to turn off the range extender, and the charging station takes over to charge the vehicle.

[0055] In the above embodiment, the current driving route of the vehicle is accurately predicted by obtaining the initial power of the vehicle, the current driving route, and the current road condition information, and combining the historical driving route and the historical charging record in the historical driving information. When it is predicted that the power is insufficient, the controller can intelligently determine the charging time and charging location in the current driving route according to the historical charging record, so as to charge in time. During driving, the controller can monitor the power status in real time. Once the power is insufficient, the range extender is immediately started to generate power, and the power generation power of the range extender is adjusted according to the first power generation required for the vehicle to reach the first charging location and the remaining mileage of the vehicle to reach the first charging location. When the vehicle has the first power generation, it means that the vehicle can drive to the first charging location for charging with the charging pile. The controller controls the range extender to turn off, but does not use the range extender too much, which reduces the power generation of the range extender, solves the problem of vehicle endurance, and achieves economy and environmental protection. The existing electric vehicle range extension technology mainly relies on fixed charging plans and preset driving modes, which makes it difficult to flexibly respond to real-time changing road conditions and power requirements. In contrast, this method makes full use of the vehicle's historical driving information, can accurately predict the vehicle's power consumption, reasonably plan the charging time and location, and intelligently control the start and shut down of the range extender, so as to achieve economical and safe operation of the vehicle, avoid driving failures caused by insufficient power, and improve the reliability of the vehicle. This method can effectively solve the endurance problem during vehicle operation, optimize the vehicle's power consumption strategy, and provide protection for the vehicle's long-distance driving.

[0056] The following is a more detailed description of the process of the method provided by this implementation. Figure 2 , is another flow chart of the vehicle range extender power generation control method in an embodiment of the present application.

[0057] S201, obtaining the initial power of the vehicle, the current driving route, the current road condition information corresponding to the current driving route, and the historical driving information, wherein the historical driving information includes the historical driving route and the historical charging record, the historical driving route includes multiple driving routes within a preset time period in the past, and the historical charging record includes multiple charging times and multiple charging locations;

[0058] For details, please refer to step S101, which will not be described in detail here.

[0059] S202, when it is determined that the current driving route does not satisfy any of the historical driving routes, predicting a second power consumption of the vehicle according to the current driving route and current road condition information;

[0060] When the controller determines that the current driving route cannot be matched in the historical driving route, that is, the similarity between the current driving route and any of the historical driving routes does not exceed the preset similarity threshold, the controller cannot directly predict the second power consumption of the vehicle based on the relevant data in the historical driving information. At this time, the controller will comprehensively analyze the current driving route and the current road condition information, call the power consumption prediction model, and calculate the second power consumption of the vehicle on the current driving route.

[0061] S203, if the initial power consumption is lower than the second power consumption, determining an alternative charging location within a preset range of the current driving route;

[0062] If the predicted second power consumption is greater than the initial power consumption of the vehicle, the controller will plan charging within the preset range of the current driving route. The controller searches the navigation system for all available charging station locations within the preset range of the current driving route and uses them as alternative charging locations. For example, if the navigation system shows that there are three charging stations A, B, and C within a 20-kilometer range of the current driving route, all three charging stations will be included in the alternative charging locations.

[0063] S204, obtaining the real-time number of vehicles queuing at each alternative charging location;

[0064] The controller needs to obtain the charging station information of each alternative charging location, which includes the number of charging piles, the idle status of the charging piles, and the number of vehicles currently waiting for charging, that is, the real-time number of vehicles in the queue. The controller can obtain the real-time number of vehicles in the queue at each charging station through the traffic network and the charging station main system. For example, in the alternative charging location A, charging station a is charging 10 vehicles, b is charging 5 vehicles, and c has only 1 vehicle waiting in the queue.

[0065] S205, selecting an alternative charging location where the number of vehicles in the real-time queue is less than a preset vehicle number threshold as a second charging location for the vehicle on the current driving route;

[0066] The controller comprehensively compares the real-time number of vehicles in queue at each alternative charging location, and preferentially selects the alternative charging location with a real-time number of vehicles in queue less than the preset vehicle number threshold as the second charging location for the vehicle on the current driving route. In the example of step S204, assuming that the preset vehicle number threshold is 3, the controller will select station C as the second charging location for the current driving route to reduce the charging waiting time. If the real-time number of vehicles in queue at multiple alternative charging locations is similar, the controller also needs to compare more factors such as the distance of the alternative charging locations and the charging efficiency.

[0067] S206, predicting a second charging time when the vehicle arrives at the second charging location based on the travel distance between the current location of the vehicle and the second charging location;

[0068] After determining the second charging location, the controller needs to predict when the vehicle will be able to reach the second charging location. The controller obtains the current location of the vehicle, calculates the distance the vehicle travels from the current location to the second charging location, and then estimates the time it takes to travel from the current location to the second charging location through the navigation system, and obtains the estimated time to arrive at the second charging location as the second charging time. For example, the current location of the vehicle is 50 kilometers away from charging station C, and the current time is 12:00. The navigation system predicts that it will take 1 hour to arrive based on the real-time traffic status and the current average speed of the vehicle, so the second charging time is expected to be 13:00.

[0069] S207, when the vehicle has not arrived at the second charging location at the second charging time, determining a second power generation amount of the vehicle and controlling the range extender to start, the second power generation amount being the amount of power required for the vehicle to arrive at the second charging location;

[0070] If the vehicle still fails to reach the second charging location at the predicted second charging time, the vehicle cannot continue to drive to the second charging location due to insufficient power, and the controller needs to start the range extender to generate power to ensure endurance. The controller will calculate the current location of the vehicle, the amount of power required for the vehicle to reach the second charging location from the current location, that is, the second power generation, determine the power generation that the range extender needs to start, and then control the range extender to generate power according to the second power generation to ensure that the vehicle can continue to drive to the charging location.

[0071] S208, determining a recurrent neural network as a model to be trained;

[0072] The controller needs to train an accurate power consumption prediction model, so the controller determines to build a recurrent neural network as the framework of the power consumption prediction model. Compared with simple models such as linear regression, recurrent neural networks can approximate complex nonlinear relationships and have a certain degree of adaptability to new driving routes.

[0073] S209, taking historical power consumption, traffic information and weather information as input and actual power consumption as output, and combining them into a plurality of training data;

[0074] The controller extracts the historical power consumption corresponding to the historical driving route according to the historical driving information obtained in step S101, and uses the historical power consumption, different traffic information, and different weather information as sample inputs and the actual power consumption as sample outputs to combine into multiple training data required for training. A large amount of training data can improve the training accuracy of the neural network.

[0075] S210, inputting a plurality of training data into the model for training;

[0076] The controller repeatedly inputs multiple training data into the model for training and continuously adjusts the parameters of the model.

[0077] S211, when the loss function of the model is lower than a preset function threshold, a power consumption prediction model is obtained;

[0078] When the loss function of the model is lower than the preset function threshold, it means that the controller has obtained a power consumption prediction model that meets the accuracy requirements through neural network training, and the controller can use the power consumption prediction model to predict the power consumption of the new route. When a new driving route is obtained, the controller will first determine whether the driving route can find a matching driving route in the historical driving routes. If not, the controller can directly use the power consumption prediction model to predict the power consumption of the new route.

[0079] S212, extracting a target driving route from the historical driving routes, the target driving route whose matching degree with the current driving route exceeds a preset matching degree threshold;

[0080] The controller selects the driving routes from the historical driving routes that have a matching degree exceeding the preset matching degree threshold as the target driving routes, such as similar passing areas, similar road types, etc. If the preset matching degree threshold is 80, and there are multiple historical driving routes that have a matching degree of more than 90% with the current driving route, then these historical driving routes can be used as similar routes.

[0081] S213, extracting historical power consumption in the target driving route from historical charging records;

[0082] After similar target driving routes are determined, the controller extracts the historical power consumption of these target driving routes from the stored historical driving information. Assume that the driver of the vehicle plans to travel from home (starting point X) to the office (end point Y). In the past month, the driver has traveled along this route every day, and the time, speed, and power consumption of each trip are recorded. When the target driving route is this route, the historical power consumption can also be determined from this.

[0083] S214, extracting traffic information and weather information from current road condition information;

[0084] In addition to historical power consumption, the controller also needs to obtain the current road condition information of the current driving route and extract traffic information and weather conditions from the current road condition information. These traffic information and weather information will also affect the final power consumption and need to be provided to the power consumption prediction model. The controller can obtain traffic information and weather information around the current driving route through traffic networks, meteorological stations, etc.

[0085] S215, inputting historical power consumption, traffic information and weather information into a preset power consumption prediction model to obtain a first power consumption of the vehicle on the current driving route;

[0086] After the controller obtains the historical power consumption data, traffic information, and weather information of the current driving route, it needs to integrate these data to predict power consumption. The controller will call the previously trained power consumption prediction model, use the collected historical power consumption, traffic information, and weather information as inputs to the power consumption prediction model, perform prediction calculations, and finally output the first power consumption of the vehicle on the current driving route.

[0087] S216: If the initial power consumption is lower than the first power consumption, determining a first charging time and a first charging location of the vehicle in the current driving route according to the historical charging record;

[0088] For details, please refer to step S103, which will not be described in detail here.

[0089] S217, when the vehicle has not arrived at the first charging location at the first charging time, determining a first power generation amount of the vehicle and controlling the range extender to start, the first power generation amount being the amount of power required for the vehicle to arrive at the first charging location;

[0090] For details, please refer to step S104, which will not be described in detail here.

[0091] S218, determining the power generation power of the range extender according to the first power generation amount and the remaining mileage of the vehicle to reach the first charging location;

[0092] For details, please refer to step S105, which will not be described in detail here.

[0093] S219, detecting the actual power generation of the range extender in real time;

[0094] After the controller calculates and determines the optimal power generation of each sub-section and controls the range extender to generate power as planned, the controller also needs to monitor the actual power generation of the range extender in real time. The controller can obtain the actual power generation of the range extender by collecting the sensors of the range extender.

[0095] S220, when the actual power generation exceeds the safe range of the power generation, the control alarm device issues a warning and controls the range extender to adjust the power generation;

[0096] The controller compares the measured actual power generation with the safety range of power generation to monitor whether the actual power generation is within the specified normal range. For example, the safety range of power generation is set to ±10% of the power generation.

[0097] Once the controller detects that the actual power generation of the range extender exceeds the safe range of power generation, the controller will determine that it is an abnormal situation, indicating that the range extender has failed or may be damaged. At this time, the controller needs to immediately activate the alarm device and issue a visual or sound alarm to prompt the driver or maintenance personnel to deal with it in time. At the same time, the controller also needs to directly adjust the power of the range extender to quickly reduce or increase the output power of the range extender to a safe range. This can be achieved by adjusting the generator current and other means. In this way, when an abnormality occurs, the controller can respond and compensate quickly to reduce the impact of the problem, which is an important guarantee for the safe and reliable operation of the vehicle system.

[0098] S221. When the range extender charges the vehicle to a first power generation amount, control the range extender to be turned off.

[0099] For details, please refer to step S106, which will not be described in detail here.

[0100] In the above embodiment, since an intelligent planning method is adopted to determine the charging time and charging location of the vehicle during driving by combining the historical driving route and historical charging record of the vehicle, it is possible to accurately predict the vehicle's cruising range, scientifically and rationally plan the charging time and charging location of the vehicle, and turn on the range extender when the vehicle cannot reach the charging location due to insufficient power, which effectively solves the problem of inappropriate charging planning caused by the difficulty in accurately predicting the vehicle's cruising range in related technologies, thereby achieving safe operation of the vehicle. This method makes full use of the vehicle's own historical data and conducts personalized intelligent analysis, rather than simply relying on experience values, which can greatly improve the prediction accuracy, enhance the pertinence of charging planning, and ensure power supply.

[0101] At the same time, a recurrent neural network model is used to predict vehicle power consumption, so high-precision learning of vehicle power consumption characteristics under complex road conditions can be achieved, effectively solving the problem that traditional statistical methods used in related technologies cannot adapt to complex conditions, thereby realizing the intelligent and accurate prediction of power consumption. Breaking through the limitations of simple linear models, the power consumption prediction model can quickly adapt to changes in the traffic environment, greatly improving the accuracy of power consumption prediction. The control strategy of dynamically optimizing the power generation power of the range extender according to the needs of the road section, so the power generation parameters of the range extender can be autonomously adjusted under different road sections, effectively solving the problem of power waste caused by the use of fixed power generation modes in related technologies, thereby realizing efficient use of on-board power. This power generation control strategy realizes closed-loop control of power supply and demand, which not only ensures power supply, but also improves utilization efficiency, maximizes the effectiveness of limited power, and achieves the purpose of energy saving and environmental protection.

[0102] The controller in the embodiment of the present invention is described below from the perspective of hardware processing. Figure 3, is a schematic diagram of a physical device structure of a controller in an embodiment of the present application.

[0103] It should be noted that Figure 3 The structure of the controller shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0104] like Figure 3 As shown, the controller includes a central processing unit (CPU) 301, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 302 or the program loaded from the storage part 308 to the random access memory (RAM) 303, such as executing the method described in the above embodiment. In the RAM 303, various programs and data required for system operation are also stored. The CPU 301, the ROM 302 and the RAM 303 are connected to each other through the bus 304. The input / output (I / O) interface 305 is also connected to the bus 304.

[0105] The following components are connected to the I / O interface 305: an input section 306 including an audio input device, a button switch, etc.; an output section 307 including a liquid crystal display (LCD) and an audio output device, an indicator light, etc.; a storage section 308 including a hard disk, etc.; and a communication section 309 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 309 performs communication processing via a network such as the Internet. A drive 310 is also connected to the I / O interface 305 as needed. A removable medium 311, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 310 as needed so that a computer program read therefrom is installed into the storage section 308 as needed.

[0106] In particular, according to an embodiment of the present invention, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present invention includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through the communication part 309, and / or installed from a removable medium 311. When the computer program is executed by the central processing unit (CPU) 301, various functions defined in the present invention are performed.

[0107] It should be noted that specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, apparatus, or device.

[0108] The flowcharts and block diagrams in the accompanying drawings illustrate the possible architecture, functions and operations of the systems, methods and computer program products according to various embodiments of the present invention. Each box in the flowchart or block diagram may represent a module, a program segment, or a part of a code, and the above-mentioned module, program segment, or a part of a code contains one or more executable instructions for implementing the specified logical functions. It should also be noted that in some alternative implementations, the functions marked in the box may also occur in an order different from that marked in the accompanying drawings.

[0109] Specifically, the controller of this embodiment includes a processor and a memory. The memory stores a computer program. When the computer program is executed by the processor, the vehicle range extender power generation control method provided in the above embodiment is implemented.

[0110] As another aspect, the present invention further provides a computer-readable storage medium, which may be included in the controller described in the above embodiment; or may exist independently without being assembled into the controller. The above storage medium carries one or more computer programs, and when the above one or more computer programs are executed by a processor of the controller, the controller implements the vehicle range extender power generation control method provided in the above embodiment.

[0111] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

[0112] As used in the above embodiments, the term "when..." may be interpreted to mean "if..." or "after..." or "in response to determining..." or "in response to detecting...", depending on the context. Similarly, the phrases "upon determining..." or "if (the stated condition or event) is detected" may be interpreted to mean "if determining..." or "in response to determining..." or "upon detecting (the stated condition or event)" or "in response to detecting (the stated condition or event)", depending on the context.

[0113] Those skilled in the art can understand that to implement all or part of the processes in the above-mentioned embodiments, the processes can be completed by computer programs to instruct related hardware, and the programs can be stored in computer-readable storage media. When the programs are executed, they can include the processes of the above-mentioned method embodiments. The aforementioned storage media include: ROM or random access memory RAM, magnetic disk or optical disk and other media that can store program codes.

Claims

1. A vehicle range extender power generation control method, characterized in that: The method comprises: Obtaining the initial power of the vehicle, the current driving route, the current road condition information corresponding to the current driving route, and historical driving information, wherein the historical driving information includes historical driving routes and historical charging records, wherein the historical driving routes include multiple driving routes within a preset period of time in the past, and the historical charging records include multiple charging times and multiple charging locations; When it is determined that the current driving route does not satisfy any of the historical driving routes, predicting a second power consumption of the vehicle according to the current driving route and the current road condition information; If the initial power consumption is lower than the second power consumption, determining an alternative charging location within a preset range of the current driving route; Obtaining the real-time number of vehicles queuing at each of the alternative charging locations; The alternative charging location where the number of vehicles in the real-time queue is less than a preset vehicle number threshold is used as the second charging location for the vehicle on the current driving route; predicting a second charging time when the vehicle arrives at the second charging location based on a travel distance between the current location of the vehicle and the second charging location; When the vehicle does not arrive at the second charging location at the second charging time, determining a second power generation amount of the vehicle and controlling the range extender to start, the second power generation amount being the amount of power required for the vehicle to arrive at the second charging location; When determining that the current driving route is any one of the historical driving routes, predicting a first power consumption of the vehicle according to the current driving route and the current road condition information; If the initial power consumption is lower than the first power consumption, determining a first charging time and a first charging location of the vehicle in the current driving route according to historical charging records; When the vehicle does not arrive at the first charging location at the first charging time, determining a first power generation amount of the vehicle and controlling the range extender to start, the first power generation amount being the amount of power required for the vehicle to arrive at the first charging location; determining the power generation power of the range extender according to the first power generation amount and the remaining mileage of the vehicle to reach the first charging location; When the range extender charges the vehicle to the first power generation amount, the range extender is controlled to be turned off.

2. The method according to claim 1, characterized in that When determining that the current driving route is any one of the historical driving routes, predicting the first power consumption of the vehicle according to the current driving route and the current road condition information specifically includes: Extracting a target driving route from the historical driving routes, the target driving route having a matching degree exceeding a preset matching degree threshold value with the current driving route; Extracting historical power consumption in the target driving route from the historical charging records; Extracting traffic information and weather information from the current road condition information; The historical power consumption, the traffic information and the weather information are input into a preset power consumption prediction model to obtain a first power consumption of the vehicle on the current driving route.

3. The method according to claim 1, characterized in that If the initial power consumption is lower than the first power consumption, determining a first charging time and a first charging location of the vehicle in the current driving route according to historical charging records, specifically includes: Extracting a target charging record with the highest matching degree with the current driving route from the historical charging records, the target charging record including a target charging time and a target charging location; The target charging time and the target charging location are determined as a first charging time and a first charging location of the vehicle in the current driving route.

4. The method according to claim 2, characterized in that: Before the step of inputting the historical power consumption, the traffic information, and the weather information into a preset power consumption prediction model to obtain a first power consumption of the vehicle on the current driving route, the method further includes: Determine a recurrent neural network as the model to be trained; The historical power consumption, the traffic information and the weather information are used as inputs and the actual power consumption is used as output, and are combined into a plurality of training data; Inputting a plurality of training data into the model for training; When the loss function of the model is lower than a preset function threshold, the power consumption prediction model is obtained.

5. The method according to claim 1, characterized in that The determining the power generation power of the range extender according to the first power generation and the remaining mileage of the vehicle to reach the first charging location specifically includes: Dividing the remaining mileage into a plurality of sub-segments according to road types; Determining the section distance and basic energy consumption coefficient of each of the sub-sections; Calculating the energy demand of each sub-section according to the basic energy consumption coefficient and the section distance of each sub-section; Allocating the energy demand of each of the sub-sections according to the first power generation to obtain the section power generation allocated to each of the sub-sections; The power generation power of each of the sub-sections is calculated according to the power generation amount of the section and the distance of the section.

6. The method according to claim 1, characterized in that After the step of determining the power generation power of the range extender according to the first power generation amount and the remaining mileage of the vehicle to reach the first charging location, the method further includes: Real-time detection of the actual power generation of the range extender; When the actual generated power exceeds the safe range of the generated power, the control alarm device issues an early warning and controls the range extender to adjust the generated power.

7. A controller, characterized in that: The controller comprises: one or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code comprises computer instructions, and the one or more processors call the computer instructions so that the controller executes the method as described in any one of claims 1 to 6.

8. A computer-readable storage medium comprising instructions, characterized in that: When the instructions are executed on a controller, the controller is caused to execute the method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Range extender control method and device, driving system and range extending type hybrid power vehicle

    CN112406564A

  • Control method, device and equipment for reducing fuel consumption of range extending type automobile and storage medium

    CN115923763A

  • Charging control method and system of extended-range electric vehicle and computer readable medium

    CN116278834A

  • Vehicle range extender control method and device, electronic equipment and storage medium

    CN116587892A

  • Method and apparatus for selecting optimal driving route for electric vehicle

    CN116858272A