A mountain railway structure and construction method in debris flow areas

By designing the diversion trough structure and waterproofing system in the Bangshan Railway section, the threat of debris flow to the railway was solved, and the safe operation of the railway was achieved and the strength of the structure was improved.

CN113047233BActive Publication Date: 2024-10-29CHINA RAILWAY ERYUAN CHENGDU SURVEY DESIGN & RES INST CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202110352544.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-31
Publication Date
2024-10-29
Estimated Expiration
2041-03-31

Smart Images

  • Figure CN113047233B_ABST
    Figure CN113047233B_ABST
Patent Text Reader

Abstract

The present application relates to a mountainside railway structure in a debris flow area, comprising a drainage structure for diverting debris flows, the drainage structure comprising a near-mountain side diversion trough structure gradually lowering from the near-mountain side toward the far-mountain side, a debris flow aqueduct structure, and a far-mountain side rapids trough structure, the near-mountain side diversion trough structure, the debris flow aqueduct structure, and the far-mountain side rapids trough structure being interconnected, the debris flow aqueduct structure comprising an open hole structure for allowing a railway to pass through; the present application has the advantage of preventing debris flows from damaging the mountainside railway.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of railway engineering construction, and in particular to a mountainside railway structure and construction method in a debris flow area. Background Art

[0002] Mountain railways are usually built in the form of roadbeds or bridges along mountainous areas. However, with the frequent occurrence of extreme weather in recent years, especially sudden debris flows, they pose a great threat to mountainous railways. Due to the influence of extremely heavy rainfall in a short period of time, large-scale debris flows will break out in the mountainous areas where existing railways are located. High-kinetic energy and large-volume debris flows will cut through valleys and collapse bank slopes along the way, and carry debris flows to destroy railway bridges, causing train suspension and traffic interruption, resulting in serious losses. Summary of the invention

[0003] On the first hand, in order to prevent debris flows from causing serious impacts on railways along mountainous areas, the present application provides a railway structure along mountainous areas in debris flow areas.

[0004] The present application provides a mountainside railway structure in a debris flow area that adopts the following technical solution.

[0005] A mountainside railway structure in a debris flow area includes a drainage structure for diverting debris flows, the drainage structure includes a near-mountain side diversion trough structure gradually lowering from the near-mountain side to the far-mountain side, a debris flow aqueduct structure, and a far-mountain side rapids trough structure, the near-mountain side diversion trough structure, the debris flow aqueduct structure, and the far-mountain side rapids trough structure are interconnected, and the debris flow aqueduct structure includes an open hole structure for allowing a railway to pass through.

[0006] By adopting the above technical scheme, the debris flow can be diverted and channeled through the diversion trough structure on the near mountain side, the debris flow aqueduct structure and the rapids trough structure on the far mountain side to prevent the debris flow from destroying the mountain railway, thereby realizing the safe operation of the mountain railway in the debris flow area.

[0007] Optionally, the guide trough structure on the near-mountain side, the debris flow trough structure and the rapids trough structure on the far-mountain side all include a trough body, wherein the trough body includes relatively arranged trough bodies and a trough bottom fixedly arranged between the trough bodies on both sides, the inner surface of the trough bottom is provided with a wear-resistant layer, and the wear-resistant layer is provided with a reinforcement for reinforcing the wear-resistant layer, a first waterproof layer is provided between the trough bottom and the wear-resistant layer of the debris flow trough structure, and a second waterproof layer is provided between the trough bottom and the wear-resistant layer of the rapids trough structure on the far-mountain side.

[0008] By adopting the above technical scheme, when a debris flow occurs, the debris flow will flow into the trough body, so that the trough body can play a role in channeling the debris flow; the provision of the wear-resistant layer and the reinforcement piece can achieve the protection effect on the trough bottom, prevent the stones in the debris flow from colliding with the trough bottom and causing the trough bottom to be damaged, thereby improving the strength of the trough body; the provision of the first waterproof layer and the second waterproof layer can prevent the debris flow from penetrating through the wear-resistant layer and the trough bottom to the location of the open hole structure, thereby preventing the infiltrated water from damaging the open hole structure, thereby improving the strength of the open hole structure.

[0009] Optionally, the reinforcement member includes a plurality of reinforcement rods arranged at intervals in the wear-resistant layer, and the surfaces of the reinforcement rods facing away from the groove bottom are flush with the wear-resistant surface of the wear-resistant layer or are exposed from the wear-resistant surface of the wear-resistant layer.

[0010] By adopting the above technical solution, the reinforcing rod can strengthen the structure of the wear-resistant layer. When the reinforcing rod is partially exposed outside the wear-resistant layer and the debris flow moves on the wear-resistant layer, the reinforcing rod can isolate large stones in the debris flow from the wear-resistant layer, thereby preventing the large stones in the debris flow from damaging the wear-resistant layer, further improving the wear-resistant effect of the wear-resistant layer.

[0011] Optionally, a cushion layer is provided under the bottom of the groove of the guide groove structure on the near-mountain side, and bottom plates are provided on the bottom walls of the groove bodies on both sides of the guide groove structure on the near-mountain side and are integrated with the groove bodies, and multiple piles are provided on the surfaces of the bottom plates on both sides facing away from the groove bodies, and the ends of the multiple piles away from the bottom plates are embedded in the ground surface. The guide groove structure on the near-mountain side also includes a rammed filling part and a reinforcement part, the rammed filling part is used to fill on both sides of the groove body of the guide groove structure on the near-mountain side, and the reinforcement part is used to fill between the bottom of the groove body of the guide groove structure on the near-mountain side and the ground surface, and the piles are located in the reinforcement part.

[0012] By adopting the above technical scheme, since the height of the guide trough structure on the mountain side is relatively high, the arrangement of piles and cushion layers can realize the structural support of the trough body of the guide trough structure on the mountain side, making the trough body of the guide trough structure on the mountain side more stable, and the reinforcement part can support the pile body, thereby indirectly improving the supporting effect of the pile body on the trough body; the compaction part can support the trough body, thereby indirectly improving the strength of the trough body.

[0013] Optionally, the debris flow aqueduct structure includes a wall filled between the bottom of the debris flow aqueduct structure and the ground surface and an open hole foundation located below the wall, the wall includes a lower wall arranged on the open hole foundation and an upper wall arranged on the lower wall, the trough bottom and the trough body are both arranged on the upper wall, the open hole structure includes a hole body opened on the wall and the open hole foundation and used for the railway to pass through, bases are arranged on the inner wall of the hole body and on both sides of the hole body, an arch ring located on the top wall of the hole body is arranged across between the bases on both sides, the base includes a lower base arranged in the lower wall and an upper base arranged in the upper wall, the arch ring includes a plurality of prefabricated splicing rings, adjacent splicing rings are arranged to abut each other, and stiffeners for fixing the splicing ring and the wall together are arranged on both sides of each splicing ring.

[0014] By adopting the above technical scheme, the upper wall and the lower wall can support the upper base and the lower base, thereby improving the strength and stability of the upper base and the lower base, and the upper base and the lower base can support the arch ring, thereby improving the strength and stability of the arch ring; the arch ring includes multiple splicing rings, and there is no need for construction workers to set up large-scale formwork for construction and pouring within the railway range to interrupt railway operations; the stiffeners can drive the splicing rings and the wall to be fixed together, so that the splicing rings and the wall form a whole, thereby further improving the strength and stability of the splicing rings.

[0015] Optionally, a splicing groove is provided on one of the surfaces of each splicing ring adjacent to the debris flow aqueduct structure along the length direction of the splicing ring, and a splicing strip located in the splicing groove is provided on the other surface of each splicing ring adjacent to the debris flow aqueduct structure along the length direction of the splicing ring, the thickness of the splicing strip is less than the depth of the splicing strip, the splicing strip is located at a position where the splicing groove is away from the debris flow aqueduct structure, a gap is left between the splicing strip and the splicing groove on adjacent splicing rings, a first sealing structure for sealing the splicing groove between adjacent splicing rings is provided between adjacent splicing rings and located in the splicing groove, a second sealing structure is provided between the surface of the splicing strip facing away from the splicing ring and the splicing groove of the adjacent splicing ring, the second sealing structure is used to seal the gap between adjacent splicing rings, and a waterproof coating is coated on the surface of each splicing ring facing the debris flow aqueduct structure.

[0016] By adopting the above technical scheme, the splicing grooves and splicing strips improve the splicing and fixing effect of adjacent splicing rings, and prevent the position deviation between adjacent splicing rings; the first sealing structure can seal and fix the adjacent splicing rings, and prevent part of the infiltrated water from entering into the open tunnel and affecting the railway operation; the second sealing structure can further seal the gaps between the adjacent splicing rings, thereby further preventing the infiltrated water from entering into the tunnel along the adjacent splicing rings and affecting the railway operation; the waterproof coating can waterproof, anti-seepage and protect the water-facing surface of the splicing ring, prevent the infiltrated water from penetrating into the splicing ring, thereby further preventing the infiltrated water from affecting the railway operation in the tunnel.

[0017] Optionally, a plurality of anti-slip grooves are reserved on the surface of the wall facing the debris flow aqueduct structure, and a plurality of anti-slip slide blocks for being inserted into the anti-slip grooves are arranged on the bottom of the debris flow aqueduct structure.

[0018] By adopting the above technical solution, the anti-slip groove and anti-sliding block can drive the wall and the groove body of the debris flow aqueduct structure to become a whole, thereby preventing the groove body of the debris flow aqueduct structure from moving on the wall, thereby further improving the strength and stability of the entire debris flow aqueduct structure.

[0019] Optionally, the rapid flow trough structure on the far mountain side further includes a trough foundation for being embedded in the ground surface, and the trough bottom and trough body of the rapid flow trough structure on the far mountain side are both arranged on the trough foundation.

[0020] By adopting the above technical solution, the entire trough foundation is embedded in the ground surface, which improves the trough body of the rapids trough structure on the far mountain side driven by the trough foundation and has better strength and stability. At the same time, it can drive the trough foundation to support the wall and reinforcement, thereby improving the supporting effect of the rapids trough structure on the far mountain side on the debris flow aqueduct structure and the diversion trough structure on the near mountain side.

[0021] Optionally, a drainage blind ditch is arranged in the reinforced part of the guide trough structure on the near mountain side, and the drainage includes a main blind ditch and auxiliary blind ditches located on both sides of the main blind ditch and connected to the main blind ditch. Drainage blind pipes are arranged on the surface below the debris flow aqueduct structure and on the surface below the rapids trough structure on the far mountain side. The drainage blind pipes are used to connect with the main blind ditch of the drainage blind ditch.

[0022] By adopting the above technical scheme, there is a lot of groundwater under the diversion trough structure near the mountain. The drainage blind ditch and drainage blind pipe can be used to discharge the groundwater, preventing the groundwater from softening the diversion trough structure and open hole structure near the mountain, thereby preventing uneven settlement.

[0023] On the second aspect, in order to prevent debris flows from causing serious impacts on railways along mountainous areas, the present application provides a method for constructing railways along mountainous areas in debris flow areas.

[0024] The present application provides a method for constructing a mountainside railway in a debris flow area, which adopts the following technical solution.

[0025] A method for constructing a mountainside railway in a debris flow area, comprising the mountainside structure in the debris flow area, comprising:

[0026] S1: First, bury the drainage blind pipe in the ground at the bottom of the debris flow aqueduct structure and the rapids trough structure on the far mountain side;

[0027] S2: A groove for accommodating the open hole foundation is excavated on the surface below the debris flow aqueduct structure, and the open hole foundation made of plain concrete is poured in the pre-excavated groove. The lower base made of reinforced concrete on both sides is poured on the open hole foundation. The splicing ring made of reinforced concrete is prefabricated and cured to reach the design strength. When the splicing ring is prefabricated, stress-bearing steel bars are reserved at both ends of the splicing ring. When the splicing ring is prefabricated, stiffening members made of reinforcing steel bars are reserved on both sides of the splicing ring. The stiffening members are partially exposed from the splicing ring. Each splicing ring is hoisted to the specified position of the lower base by a crane through the stiffening members, and the adjacent splicing rings are spliced ​​together through the splicing strips and splicing grooves. First, the two-component polymer The second sealing structure made of sulfur sealing paste is filled between the sealing strip and the sealing groove of the adjacent splicing ring, and then the first sealing structure made of micro-expansive concrete of grade C50 or above is poured in the splicing groove, and a waterproof coating made of cement-based penetrating crystallization type is applied on the surface of each splicing ring away from the ground surface, and the lower base made of reinforced concrete is poured to the designated position. During the pouring, the stress-bearing steel bars reserved on the splicing ring are poured into the lower base, and the steel bars between the lower base and the upper base are poured together. The lower wall made of plain concrete and the upper wall made of plain concrete of the wall are cast and formed separately. During the pouring, an anti-slip groove is reserved on the upper wall, and connecting steel bars are reserved on the upper wall;

[0028] S3: Cast the trough body made of reinforced concrete of the debris flow aqueduct structure on the wall, cast the trough bottom made of plain concrete of the debris flow aqueduct structure on the wall and between the trough bodies on both sides, so that the anti-sliding block integrally formed at the trough bottom is cast into the anti-sliding trough, and at the same time, the connecting steel bars of the upper wall are driven to be cast into the trough bottom, cast the first waterproof layer made of airtight reinforced concrete of the debris flow aqueduct structure into the trough bottom, cast the wear-resistant layer made of high-strength steel fiber concrete material of grade C40 or above with pre-embedded reinforcement made of steel rails on the first waterproof layer, cast and connect the steel bars between the trough bottom, the wear-resistant layer and the first waterproof layer together, and complete the casting and construction of the debris flow aqueduct structure;

[0029] S4: reserve a deformation joint between the debris flow aqueduct structure and the rapids trough structure on the far mountain side, fill the deformation joint with polyethylene rigid foam plastic board, steel-edge rubber waterstop and polysulfide sealant to achieve waterproof treatment, dig a trough for accommodating the trough foundation on the surface below the rapids trough structure on the far mountain side, cast the trough foundation made of plain concrete in the pre-dug trough, cast the trough body made of reinforced concrete of the rapids trough structure on the far mountain side on the trough foundation, cast the trough bottom made of plain concrete of the rapids trough structure on the far mountain side on the trough foundation and between the trough bodies on both sides, cast the second waterproof layer made of airtight reinforced concrete of the rapids trough structure on the far mountain side in the trough bottom, tie and cast the steel bars with pre-embedded reinforcement made of steel rails and wear-resistant layer made of high-strength steel fiber concrete material of grade C40 or above on the second waterproof layer, cast and connect the steel bars between the trough bottom, the wear-resistant layer and the second waterproof layer together, and complete the casting and construction of the rapids trough structure on the far mountain side;

[0030] S5: reserve a deformation joint between the debris flow aqueduct structure and the diversion channel structure near the mountain, fill the deformation joint with polyethylene rigid foam plastic board, steel-edge rubber water stop and polysulfide sealant to achieve waterproof treatment, dig a trench on the surface below the diversion channel structure near the mountain, cast a pile body made of reinforced concrete, and embed one end of the pile body in the ground of the trench bottom plate, lay a drainage blind ditch in the trench, connect the drainage blind ditch with the drainage blind pipe, tamp the reinforcement part made of dry block stone dam in the trench, and tamp the tamped part made of soil and stone near the mountain. On both sides of the trough body of the side diversion trough structure, the cushion layer made of medium-coarse sand is rammed on the reinforced part, and the plain concrete bottom plate, reinforced concrete trough body and plain concrete trough bottom of the diversion trough structure on the mountain side are cast between the reinforced part and the rammed part. The steel bars with pre-embedded reinforcement parts made of steel rails and wear-resistant layers made of high-strength steel fiber concrete materials of grade C40 or above are tied and cast on the trough bottom, and the steel bars between the trough bottom and the wear-resistant layer are cast and connected together to complete the casting and construction of the diversion trough structure on the mountain side.

[0031] By adopting the above technical scheme, since the arch ring is constructed with multiple prefabricated splicing rings, the construction of the diversion trough structure on the near-mountain side, the debris flow trough structure and the rapids trough structure on the far-mountain side can be realized without interrupting the operation of the mountainside railway in the debris flow area, thereby improving the construction effect of the diversion trough structure on the near-mountain side, the debris flow trough structure and the rapids trough structure on the far-mountain side.

[0032] In summary, the present application includes at least one of the following beneficial technical effects:

[0033] Through the diversion channel structure near the mountain side, the debris flow aqueduct structure and the rapid flow channel structure on the far mountain side, the debris flow can be diverted and channeled to prevent the debris flow from destroying the mountain railway, thus realizing the safe operation of the mountain railway in the debris flow area;

[0034] When a debris flow occurs, the debris flow will flow into the trough body, so that the trough body can guide the debris flow; the setting of the wear-resistant layer and the reinforcement piece can achieve the protection effect on the trough bottom, preventing the stones in the debris flow from colliding with the trough bottom and causing the trough bottom to be damaged, thereby improving the strength of the trough body; the setting of the first waterproof layer and the second waterproof layer can prevent the debris flow from penetrating through the wear-resistant layer and the trough bottom to the location of the open hole structure, thereby preventing the infiltrated water from damaging the open hole structure, thereby improving the strength of the open hole structure;

[0035] The splicing grooves and splicing strips improve the splicing and fixing effect of adjacent splicing rings, and prevent position deviations between adjacent splicing rings; the first sealing structure can seal and fix adjacent splicing rings, and prevent some infiltrated water from entering the open tunnel and affecting the operation of the railway; the second sealing structure can further seal the gaps between adjacent splicing rings, thereby further preventing the infiltrated water from entering the tunnel along the adjacent splicing rings and affecting the operation of the railway; the waterproof coating can waterproof, anti-seepage and protect the water-facing surface of the splicing ring, and prevent the infiltrated water from penetrating into the splicing ring, thereby further preventing the infiltrated water from affecting the operation of the railway in the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;

[0037] Figure 2 It is a schematic diagram of the overall structure of an embodiment of the present application;

[0038] Figure 3 This is a structural schematic diagram of an embodiment of the present application for illustrating the structure of the guide trough near the mountain side;

[0039] Figure 4 This is a schematic structural diagram for illustrating a debris flow aqueduct structure according to an embodiment of the present application;

[0040] Figure 5 This is a schematic diagram of the structure of the embodiment of the present application for showing the rapids trough on the far mountain side;

[0041] Figure 6 This is a schematic structural diagram for illustrating an open hole structure in an embodiment of the present application;

[0042] Figure 7 is a schematic structural diagram of adjacent splicing circles in an embodiment of the present application;

[0043] Figure 8 is a schematic structural diagram for showing a stiffener in an embodiment of the present application;

[0044] Fig. 9 is a structural schematic diagram for illustrating a first sealing structure and a second sealing structure in an embodiment of the present application;

[0045] Fig.10 It is a structural schematic diagram for showing a drainage blind ditch according to an embodiment of the present application.

[0046] Explanation of reference numerals: 1. diversion channel structure on the near mountain side; 11. cushion layer; 12. bottom plate; 13. pile body; 14. tamping part; 15. reinforcement part; 2. debris flow channel structure; 21. first waterproof layer; 22. open hole foundation; 23. lower wall; 24. upper wall; 25. anti-slip groove; 26. anti-sliding block; 3. rapid flow channel structure on the far mountain side; 31. second waterproof layer; 32. channel foundation; 4. open hole structure; 41. hole body ; 42. Upper base; 43. Lower base; 44. Arch ring; 441. Splicing ring; 442. Stiffener; 443. Splicing groove; 444. Splicing strip; 445. First sealing structure; 446. Second sealing structure; 45. Sidewall; 5. Trough body; 51. Trough body; 52. Trough bottom; 53. Wear-resistant layer; 531. Reinforcement rod; 6. Drainage blind ditch; 61. Main blind ditch; 62. Auxiliary blind ditch; 63. Drainage blind pipe. DETAILED DESCRIPTION

[0047] The following is combined with Figure 1-10 This application is described in further detail.

[0048] The present application embodiment discloses a mountain railway structure in a debris flow area. Figure 1 and Figure 2 A mountainside railway structure in a debris flow area includes a drainage structure for diverting debris flows, the drainage structure includes a near-mountain side diversion trough structure 1 that gradually descends from the near-mountain side toward the far-mountain side, a debris flow trough structure 2, and a far-mountain side rapids trough structure 3, the near-mountain side diversion trough structure 1, the debris flow trough structure 2, and the far-mountain side rapids trough structure 3 are interconnected, and the debris flow trough structure 2 includes an open hole structure 4 for allowing a railway to pass through.

[0049] Combination Figure 1 and Figure 3 The guide channel structure 1 on the near mountain side, the debris flow aqueduct structure 2 and the rapids channel structure 3 on the far mountain side all include a trough body 5, which includes a trough body 51 arranged opposite to each other and a trough bottom 52 fixedly arranged between the trough bodies 51 on both sides, and the spacing between the trough bodies 51 on both sides gradually decreases toward the direction approaching the trough bottom 52. The trough body 51 is cast by reinforced concrete, and the trough bottom 52 is cast by plain concrete. When casting the trough body 51 and the trough bottom 52, the steel bars reserved on the trough body 51 are cast in the trough bottom 52, thereby improving the connection and fixing effect between the trough body 51 and the trough bottom 52.

[0050] Combination Figure 1 and Figure 3In order to prevent the mud-rock flow from damaging the trough bottom 52, a wear-resistant layer 53 is arranged on the inner surface of the trough bottom 52. The wear-resistant layer 53 is cast with high-strength steel fiber concrete material of grade C40 or above. When casting the wear-resistant layer 53, the trough bottom 52 and the wear-resistant layer 53 are connected by steel bars to form a whole, which is beneficial to the stress of the structure; in order to further enhance the strength of the wear-resistant layer 53, a reinforcing member for reinforcing the wear-resistant layer 53 is arranged in the wear-resistant layer 53, and the reinforcing member includes a plurality of reinforcing rods 531 arranged at intervals in the wear-resistant layer 53, each reinforcing rod is set as a rail, and in order to improve the casting effect of the rail in the wear-resistant layer 53, the cross section of the rail is set to an "I" shape, and the surface of the reinforcing rod 531 away from the trough bottom 52 is flush with the wear-resistant surface of the wear-resistant layer 53 or exposed to the wear-resistant surface of the wear-resistant layer 53; in this embodiment, the reinforcing rod 531 made of the rail is slightly exposed to the wear-resistant surface of the wear-resistant layer 53.

[0051] Combination Figure 4 and Figure 5 In order to prevent the infiltration water from infiltrating along the trough bottom 52 of the debris flow aqueduct structure 2 to below the trough bottom 52, a first waterproof layer 21 is arranged between the trough bottom 52 of the debris flow aqueduct structure 2 and the wear-resistant layer 53. The first waterproof layer 21 is cast by airtight reinforced concrete, and the first waterproof layer 21 is connected to the wear-resistant layer 53 by steel bars during casting; in order to prevent the infiltration water from infiltrating along the trough bottom 52 of the rapids trough structure 3 on the far mountain side to below the trough bottom 52, a second waterproof layer 31 is arranged between the trough bottom 52 of the rapids trough structure 3 on the far mountain side and the wear-resistant layer 53. The second waterproof layer 31 is cast by airtight reinforced concrete, and the second waterproof layer 31 is connected to the wear-resistant layer 53 during casting.

[0052] Combination Figure 2 and Figure 3 A cushion layer 11 is arranged under the groove bottom 52 of the guide groove structure 1 on the mountain side, and the cushion stone is compacted with medium-coarse sand. A bottom plate 12 is arranged on the bottom wall of the groove body 51 on both sides of the guide groove structure 1 on the mountain side, and a plurality of piles 13 are arranged on the surface of the bottom plate 12 on both sides away from the groove body 51. The bottom plate 12 and the pile body 13 are cast by reinforced concrete. When the groove body 51, the bottom plate 12 and the pile body 13 are cast, a steel bar is used between the bottom plate 12 and the pile body 13. The ends of the piles 13 away from the bottom plate 12 are embedded in the ground. The guide channel structure 1 on the mountain side also includes a rammed filling part 14 and a reinforcement part 15. The rammed filling part 14 is used to fill the two sides of the channel body 5 of the guide channel structure 1 on the mountain side. The rammed part is set to soil and stone. The reinforcement part 15 is used to fill the bottom of the channel body 5 of the guide channel structure 1 on the mountain side and the ground. The reinforcement part 15 is set to be stacked as a dry-laid stone dam, and the pile body 13 is located in the reinforcement part 15.

[0053] Combination Figure 2 and Figure 6The debris flow aqueduct structure 2 includes a wall filled between the bottom of the debris flow aqueduct structure 2 and the ground surface and an open hole foundation 22 located below the wall. The wall is cast with plain concrete, and the open hole foundation 22 is cast with plain concrete. The wall includes a lower wall 23 arranged on the open hole foundation 22 and an upper wall 24 arranged on the lower wall 23. The trough bottom 52 and the trough body 51 are both arranged on the upper wall 24; when the lower wall 23 and the upper wall 24 are cast, the lower wall 23 and the upper wall 24 are connected by steel bars; in order to improve the connection and fixing effect between the trough bottom 52 of the debris flow aqueduct structure 2 and the wall, a plurality of anti-slip grooves 25 are reserved on the surface of the wall facing the debris flow aqueduct structure 2, and a plurality of anti-sliding blocks 26 for being inserted into the anti-sliding grooves 25 are arranged on the trough bottom 52 of the debris flow aqueduct structure 2, and the anti-sliding blocks 26 are integrally cast with the trough bottom 52 of the debris flow aqueduct structure 2.

[0054] Combination Figure 4 and Figure 6 The open hole structure 4 includes a hole body 41 opened on the wall and the open hole foundation 22 and used for the railway to pass through. Bases are arranged on the inner wall of the hole body 41 and on both sides of the hole body 41. An arch ring 44 located on the top wall of the hole body 41 is arranged across between the bases on both sides. The base includes a lower base 43 arranged in the lower wall 23 and an upper base 42 arranged in the upper wall 24. The upper base 42 and the lower base 43 are both cast by reinforced concrete. The arch ring 44 includes a plurality of prefabricated splicing rings 441. Each splicing ring 441 is prefabricated by reinforced concrete, and adjacent splicing rings 441 are arranged to abut each other.

[0055] Combination Figure 6 and Figure 7 Each of the two sides of the splicing ring 441 is provided with reinforcing members 442 for fixing the splicing ring 441 and the wall together (see Figure 8 ), the stiffening member 442 is configured to be formed by bending the stiffening steel bar. When the splicing ring 441 is cast, the two ends of the stiffening steel bar are pre-buried in the splicing ring 441, and the bent section of the stiffening steel bar is exposed outside the splicing ring 441, which is convenient for the crane to lift. At the same time, the bent section of the stiffening steel bar is cast in the wall, which improves the connection and fixing effect between the splicing ring 441 and the wall. In this embodiment, in order to prevent the splicing ring 441 from moving on the lower base 43 during lifting, a retaining edge 45 is provided on the edge of the lower base 43 on one side. The retaining edge 45 is used to prevent the splicing ring 441 from moving on the lower base 43 when it is placed on the lower base 43, thereby realizing the positioning of the splicing ring 441. In other embodiments, retaining edges 45 can be provided on the lower bases 43 on both sides to realize the positioning of the two ends of the splicing ring 441.

[0056] Combination Figure 4 and Figure 7In order to improve the splicing effect between adjacent splicing circles 441, a splicing groove 443 is opened on one of the surfaces of each splicing circle 441 adjacent to the debris flow aqueduct structure 2 along the length direction of the splicing circle 441, and a splicing strip 444 located in the splicing groove 443 is provided on the other surface of each splicing circle 441 adjacent to the debris flow aqueduct structure 2 along the length direction of the splicing circle 441. The thickness of the splicing strip 444 is less than the depth of the splicing groove 443. When adjacent splicing circles 441 abut against each other, the splicing strip 444 can be driven to be located at a position of the splicing groove 443 away from the debris flow aqueduct structure 2.

[0057] Combination Figure 7 and Fig. 9 In order to seal the splicing groove 443, a first sealing structure 445 for sealing the splicing groove 443 between adjacent splicing circles 441 is provided between adjacent splicing circles 441 and in the splicing groove 443; in this embodiment, the first sealing structure 445 is provided with a micro-expansive concrete of a grade of C50 or above filled in the splicing groove 443; a gap is left between the splicing strip 444 and the splicing groove 443 on the adjacent splicing circle 441, and the gap is usually set to 3-10 cm. In order to seal the gap, a first sealing structure 445 is provided between the splicing strip 444 and the splicing groove 443 on the adjacent splicing circle 441; A second sealing structure 446 is provided between the surface away from the splicing ring 441 and the splicing groove 443 of the adjacent splicing ring 441. The second sealing structure 446 is used to seal the gap between the adjacent splicing rings 441. In this embodiment, the second sealing structure 446 is set as a two-component polysulfide sealing paste. In order to prevent the penetration water from penetrating the splicing ring 441, a waterproof coating is coated on the surface of each splicing ring 441 facing the debris flow aqueduct structure 2. In this embodiment, the waterproof coating is set as a cement-based permeable crystalline waterproof coating.

[0058] like Figure 5 As shown, in order to improve the strength and stability of the rapids trough structure 3 on the distant mountain side, the rapids trough structure 3 on the distant mountain side also includes a trough foundation 32 for being embedded in the ground surface. The trough foundation 32 is cast by casting plain concrete. The trough bottom 52 and the trough body 51 of the rapids trough structure 3 on the distant mountain side are both arranged on the trough foundation 32. When casting the trough foundation 32, the trough foundation 32 and the trough bottom 52 of the rapids trough structure 3 on the distant mountain side are connected by steel bars.

[0059] Combination Figure 2 and Fig.10In order to discharge the groundwater under the near-mountain side diversion channel structure 1, a drainage blind ditch 6 is laid in the reinforcement part 15 of the near-mountain side diversion channel structure 1. The drainage blind ditch 6 is set as a tubular blind ditch filled with coarse-grained materials such as crushed stones and gravel and paved with a back filter layer. In this embodiment, the drainage blind ditch 6 is arranged in a tree-like shape as a whole. The drainage includes a main blind ditch 61 and auxiliary blind ditches 62 located on both sides of the main blind ditch 61 and connected to the main blind ditch 61. The distance between the auxiliary blind ditch 62 and the main blind ditch 61 gradually decreases from the near-mountain side to the far-mountain side; drainage blind pipes 63 are arranged in the ground surface below the debris flow aqueduct structure 2 and the ground surface below the far-mountain side rapids channel structure 3. The drainage blind pipes 63 are used to communicate with the main blind ditch 61 of the drainage blind ditch 6. The drainage blind pipes 63 are also called drainage blind ditch 6, which are mainly made of synthetic fibers, plastics, and synthetic rubbers, etc., and are made into various types of multifunctional geotechnical products through different process methods. The material is hydrophobic and has low resistance. It has extremely high surface water permeability and internal water permeability, which can prevent the water inside the drainage blind pipe 63 from reversely permeating into the ground surface, thereby improving the drainage effect of debris flow infiltration water.

[0060] A method for constructing a mountainside railway in a debris flow area, comprising the mountainside structure in the debris flow area, comprising:

[0061] S1: First, bury the drainage blind pipe 63 in the ground at the bottom of the debris flow aqueduct structure 2 and the far mountain side rapids trough structure 3;

[0062] S2: A groove for accommodating the open hole foundation 22 is excavated on the ground surface below the debris flow aqueduct structure 2, and the open hole foundation 22 made of plain concrete is poured into the pre-excavated groove. The lower base 43 made of reinforced concrete on both sides is poured on the open hole foundation 22, and the splicing ring 441 made of reinforced concrete is prefabricated and cured to reach the design strength. When the splicing ring 441 is prefabricated, stress-bearing steel bars are reserved at both ends of the splicing ring 441. When the splicing ring 441 is prefabricated, stiffening members 442 made of stiffening steel bars are reserved on both sides of the splicing ring 441, and the stiffening members 442 are partially exposed from the splicing ring 441. Each splicing ring 441 is hoisted to a specified position of the lower base 43 by a crane through the stiffening members 442, and the adjacent splicing rings 441 are driven to be spliced ​​together through the splicing strips 444 and the splicing grooves 443. First, fill the second sealing structure 446 made of two-component polysulfide sealing paste between the sealing strip and the sealing groove of the adjacent splicing ring 441, and then cast the first sealing structure 445 made of micro-expansive concrete of grade C50 or above in the splicing groove 443, apply a waterproof coating made of cement-based penetrating crystallization type on the surface of each splicing ring 441 away from the ground, cast the lower base 43 made of reinforced concrete to the designated position, and cast the stress-bearing steel bars reserved on the splicing ring 441 into the lower base 43 during casting, cast the steel bars between the lower base 43 and the upper base 42 together, and cast and form the lower wall 23 made of plain concrete and the upper wall 24 made of plain concrete respectively. When casting, reserve an anti-slip groove 25 on the upper wall 24, and reserve connecting steel bars on the upper wall 24;

[0063] S3: Cast the trough body 51 made of reinforced concrete of the debris flow aqueduct structure 2 on the wall, cast the trough bottom 52 made of plain concrete of the debris flow aqueduct structure 2 on the wall and between the trough bodies 51 on both sides, so that the anti-sliding block 26 integrally formed at the trough bottom 52 is cast into the anti-sliding trough 25, and at the same time, the connecting steel bars of the upper wall 24 are driven to be cast into the trough bottom 52, cast the first waterproof layer 21 made of airtight reinforced concrete of the debris flow aqueduct structure 2 into the trough bottom 52, cast the wear-resistant layer 53 made of high-strength steel fiber concrete material of grade C40 or above with a reinforcement made of steel rails pre-embedded on the first waterproof layer 21, and cast and connect the steel bars between the trough bottom 52, the wear-resistant layer 53 and the first waterproof layer 21 together, and complete the casting and construction of the debris flow aqueduct structure 2;

[0064] S4: a deformation joint is reserved between the debris flow aqueduct structure 2 and the mountain-side rapids trough structure 3, and a polyethylene rigid foam plastic board, a steel-edge rubber water stop and a polysulfide sealant are filled in the deformation joint to achieve waterproof treatment, a groove for accommodating the groove foundation 32 is excavated on the ground below the mountain-side rapids trough structure 3, and the groove foundation 32 made of plain concrete is poured into the pre-excavated groove, and the groove body 51 made of reinforced concrete of the mountain-side rapids trough structure 3 is poured on the groove foundation 32, and the plain concrete of the mountain-side rapids trough structure 3 is poured on the groove body 51. The trough bottom 52 is cast on the trough foundation 32 and located between the trough bodies 51 on both sides. The second waterproof layer 31 made of airtight reinforced concrete of the rapid trough structure 3 on the far mountain side is cast in the trough bottom 52. The steel bars with the pre-embedded reinforcement made of rails and the wear-resistant layer 53 made of high-strength steel fiber concrete material of grade C40 or above are tied and cast on the second waterproof layer 31. The steel bars between the trough bottom 52, the wear-resistant layer 53 and the second waterproof layer 31 are cast and connected together to complete the casting and construction of the rapid trough structure 3 on the far mountain side.

[0065] S5: A deformation joint is reserved between the debris flow aqueduct structure 2 and the diversion channel structure 1 on the mountain side, and a polyethylene rigid foam plastic board, a steel-edge rubber water stop and a polysulfide sealant are filled in the deformation joint to achieve waterproof treatment. A groove is excavated on the surface below the diversion channel structure 1 on the mountain side, and a pile body 13 made of reinforced concrete is cast and formed, and one end of the pile body 13 is embedded in the ground of the groove bottom 52 plate 12, and a drainage blind ditch 6 is laid in the groove, and the drainage blind ditch 6 is connected with the drainage blind pipe 63, and the reinforcement part 15 made of dry block stone dam is compacted in the groove, and the compacted part composed of soil and stone is compacted in the diversion channel on the mountain side. On both sides of the trough body 51 of the structure 1, a cushion layer 11 made of medium-coarse sand is rammed on the reinforcement part 15, and the base plate 12 made of plain concrete, the trough body 51 made of reinforced concrete and the trough bottom 52 made of plain concrete of the guide trough structure 1 on the near-mountain side are cast between the reinforcement part 15 and the rammed part. The steel bars with pre-embedded reinforcement parts made of steel rails and wear-resistant layers 53 made of high-strength steel fiber concrete materials of grade C40 or above are tied and cast on the trough bottom 52, and the steel bars between the trough bottom 52 and the wear-resistant layer 53 are cast and connected together to complete the casting and construction of the guide trough structure 1 on the near-mountain side.

[0066] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for constructing a mountainside railway in a debris flow area, comprising a drainage structure for diverting debris flows, the drainage structure comprising a near-mountain side diversion trough structure (1) gradually descending from a near-mountain side toward a far-mountain side, a debris flow aqueduct structure (2) and a far-mountain side rapid flow trough structure (3), the near-mountain side diversion trough structure (1), the debris flow aqueduct structure (2) and the far-mountain side rapid flow trough structure (3) being arranged in communication with each other, the debris flow aqueduct structure (2) comprising an open hole structure (4) for allowing a railway to pass through, the near-mountain side diversion trough structure (1), the debris flow aqueduct structure (2) and the far-mountain side rapid flow trough structure (3) all comprising a trough body (5), the trough body (5) comprising a trough body (51) arranged opposite to each other and fixedly arranged on both sides of the trough body (51), the inner surface of the trough bottom (52) is provided with a wear-resistant layer (53), a reinforcing member for reinforcing the wear-resistant layer (53) is provided in the wear-resistant layer (53), a first waterproof layer (21) is provided between the trough bottom (52) and the wear-resistant layer (53) of the debris flow aqueduct structure (2), a second waterproof layer (31) is provided between the trough bottom (52) and the wear-resistant layer (53) of the far mountain side rapids trough structure (3), the reinforcing member comprises a plurality of reinforcing rods (531) arranged at intervals in the wear-resistant layer (53), the surface of the reinforcing rods (531) facing away from the trough bottom (52) is flush with the wear-resistant surface of the wear-resistant layer (53) or exposed from the wear-resistant surface of the wear-resistant layer (53), the near mountain side A cushion layer (11) is arranged under the groove bottom (52) of the guide groove structure (1); bottom plates (12) are arranged on the bottom walls of the groove bodies (51) on both sides of the guide groove structure (1) on the near-mountain side and are integrally provided with the groove bodies (51); a plurality of pile bodies (13) are arranged on the surfaces of the bottom plates (12) on both sides away from the groove bodies (51); ends of the plurality of pile bodies (13) away from the bottom plates (12) are embedded in the ground surface; the guide groove structure (1) on the near-mountain side further comprises a tamping part (14) and a reinforcement part (15); the tamping part (14) is used to fill the two sides of the groove body (5) of the guide groove structure (1) on the near-mountain side; the reinforcement part (15) is used to fill the space between the bottom of the groove body (5) of the guide groove structure (1) on the near-mountain side and the ground surface; the pile bodies (13) are provided on the surfaces of the bottom plates (12) on both sides away from the groove body (51); and the ends of the plurality of pile bodies (13) away from the bottom plates (12) are embedded in the ground surface. 13) is located in the reinforcement part (15), the debris flow aqueduct structure (2) includes a wall body filled between the bottom of the debris flow aqueduct structure (2) and the ground surface and an open hole foundation (22) located below the wall body, the wall body includes a lower wall (23) arranged on the open hole foundation (22) and an upper wall (24) arranged on the lower wall (23), the trough bottom (52) and the trough body (51) are both arranged on the upper wall (24), the open hole structure (4) includes a hole body (41) opened on the wall body and the open hole foundation (22) and used for railways to pass through, bases are arranged on the inner wall of the hole body (41) and on both sides of the hole body (41), and an arch ring (44) located on the top wall of the hole body (41) is arranged across the bases on both sides,The base comprises a lower base (43) arranged in the lower wall (23) and an upper base (42) arranged in the upper wall (24); the arch ring (44) comprises a plurality of prefabricated splicing rings (441); adjacent splicing rings (441) are arranged to abut against each other; stiffeners (442) for fixing the splicing ring (441) and the wall body are arranged on both sides of each splicing ring (441); a splicing groove (443) is provided on one of the surfaces of each splicing ring (441) adjacent to the debris flow aqueduct structure (2) along the length direction of the splicing ring (441); each splicing ring (441) adjacent to the debris flow aqueduct structure (2) A splicing strip (444) located in the splicing groove (443) is provided on the other surface along the length direction of the splicing ring (441); the thickness of the splicing strip (444) is less than the depth of the splicing groove (443); the splicing strip (444) is located at a position of the splicing groove (443) away from the debris flow aqueduct structure (2); a gap is left between the splicing strip (444) and the splicing groove (443) on the adjacent splicing ring (441); a first sealing structure (445) for sealing the splicing groove (443) between adjacent splicing rings (441) is provided between adjacent splicing rings (441) and located in the splicing groove (443); the splicing strip (444) is provided at a position of the splicing groove (443) away from the debris flow aqueduct structure (2); A second sealing structure (446) is provided between the surface of the splicing ring (444) facing away from the splicing ring (441) and the splicing groove (443) of the adjacent splicing ring (441), and the second sealing structure (446) is used to seal the gap between the adjacent splicing rings (441). The surface of each splicing ring (441) facing the debris flow aqueduct structure (2) is coated with a waterproof coating. A plurality of anti-slip grooves (25) are reserved on the surface of the wall facing the debris flow aqueduct structure (2). A plurality of anti-sliding blocks (26) for plugging into the anti-slip grooves (25) are provided on the groove bottom (52) of the debris flow aqueduct structure (2). The remote mountain side rapids trough structure (3) also includes a A trough foundation (32) is arranged on the ground surface, the trough bottom (52) and the trough body (51) of the far mountain side rapid flow trough structure (3) are both arranged on the trough foundation (32), a drainage blind ditch (6) is arranged in the reinforcement part (15) of the near mountain side guide trough structure (1), the drainage includes a main blind ditch (61) and auxiliary blind ditches (62) located on both sides of the main blind ditch (61) and connected to the main blind ditch (61), drainage blind pipes (63) are arranged in the ground surface below the debris flow aqueduct structure (2) and the ground surface below the far mountain side rapid flow trough structure (3), and the drainage blind pipes (63) are used to communicate with the main blind ditch (61) of the drainage blind ditch (6), characterized in that: include: S1: First, bury the drainage blind pipe (63) in the ground at the bottom of the debris flow aqueduct structure (2) and the rapid flow trough structure (3) on the far mountain side; S2: A groove for accommodating an open hole foundation (22) is excavated on the ground surface below the debris flow aqueduct structure (2), the open hole foundation (22) made of plain concrete is poured into the pre-excavated groove, a lower base (43) made of reinforced concrete on both sides is poured on the open hole foundation (22), a splicing ring (441) made of reinforced concrete is prefabricated and cured to reach the design strength, and when the splicing ring (441) is prefabricated, the splicing ring (441) is Stress-bearing steel bars are reserved at both ends, and when the splicing ring (441) is prefabricated, stiffening pieces (442) made of stiffening steel bars are reserved on both sides of the splicing ring (441), and the stiffening pieces (442) are partially exposed from the splicing ring (441). A crane is used to hoist each splicing ring (441) to a designated position of the lower base (43) through the stiffening pieces (442), so that adjacent splicing rings (441) are spliced ​​to each other through the splicing strips (444) and the splicing grooves (443). First, a second sealing structure (446) made of a two-component polysulfide sealing paste is filled between the sealing strip and the sealing groove of the adjacent splicing ring (441), and then a first sealing structure (445) made of micro-expansive concrete of a grade of C50 or above is poured into the splicing groove (443), and a waterproof coating made of a cement-based penetrating crystal type is applied on the surface of each splicing ring (441) away from the ground surface, and a lower base (43) made of reinforced concrete is poured to a specified position. During the pouring, the stress-bearing steel bars reserved on the splicing ring (441) are poured into the lower base (43), and the steel bars between the lower base (43) and the upper base (42) are poured together, and the lower wall (23) made of plain concrete and the upper wall (24) made of plain concrete of the wall are cast and formed separately, and an anti-slip groove (25) is reserved on the upper wall (24) during the pouring, and a connecting steel bar is reserved on the upper wall (24); S3: Casting the trough body (51) made of reinforced concrete of the debris flow trough structure (2) on the wall, casting the trough bottom (52) made of plain concrete of the debris flow trough structure (2) on the wall and between the trough bodies (51) on both sides, so that the anti-sliding block (26) integrally formed on the trough bottom (52) is cast into the anti-sliding trough (25), and at the same time drives the connecting steel bars of the upper wall (24) to be cast into the trough bottom (52), casting the first waterproof layer (21) made of airtight reinforced concrete of the debris flow trough structure (2) into the trough bottom (52), casting the wear-resistant layer (53) made of high-strength steel fiber concrete material of grade C40 or above with a reinforcement piece made of steel rail pre-embedded on the first waterproof layer (21), and casting and connecting the steel bars between the trough bottom (52), the wear-resistant layer (53) and the first waterproof layer (21) together, thereby completing the casting and construction of the debris flow trough structure (2); S4: a deformation joint is reserved between the debris flow aqueduct structure (2) and the mountain-side rapids trough structure (3), and a polyethylene rigid foam plastic board, a steel-edge rubber water stop and a polysulfide sealant are filled in the deformation joint to achieve waterproofing. A groove for accommodating the groove foundation (32) is excavated on the ground surface below the mountain-side rapids trough structure (3), and the groove foundation (32) made of plain concrete is poured into the pre-excavated groove. A groove body (51) made of reinforced concrete of the mountain-side rapids trough structure (3) is poured on the groove foundation (32), and a groove bottom (52) made of plain concrete of the mountain-side rapids trough structure (3) is poured on the groove foundation (32). 52) is cast on the trough foundation (32) and located between the trough bodies (51) on both sides, the second waterproof layer (31) made of airtight reinforced concrete of the mountain-side rapid trough structure (3) is cast in the trough bottom (52), the steel bars with pre-buried reinforcement parts made of rails and wear-resistant layer (53) made of high-strength steel fiber concrete material of C40 or above are tied and cast on the second waterproof layer (31), the steel bars between the trough bottom (52), the wear-resistant layer (53) and the second waterproof layer (31) are cast and connected together, and the casting and construction of the mountain-side rapid trough structure (3) is completed; S5: A deformation joint is reserved between the debris flow aqueduct structure (2) and the diversion channel structure (1) on the mountain side, and a polyethylene rigid foam plastic board, a steel-edge rubber water stop and a polysulfide sealant are filled in the deformation joint to achieve waterproof treatment. A trench is excavated on the ground below the diversion channel structure (1) on the mountain side, and a pile body (13) made of reinforced concrete is cast and formed, and one end of the pile body (13) is embedded in the ground of the trench bottom (52) plate (12), and a drainage blind ditch (6) is laid in the trench, and the drainage blind ditch (6) is connected with the drainage blind pipe (63), and a reinforcement part (15) made of dry block stone dam is compacted in the trench, and a compacted part composed of soil and stone is compacted on the diversion channel structure (1) on the mountain side. 1), a cushion layer (11) made of medium-coarse sand is compacted on the reinforcement part (15), a base plate (12) made of plain concrete, a trough body (51) made of reinforced concrete and a trough bottom (52) made of plain concrete of the near-mountain side diversion trough structure (1) are cast and formed between the reinforcement part (15) and the compacted part, a reinforcement member made of a steel rail and a wear-resistant layer (53) made of a high-strength steel fiber concrete material of a grade of C40 or above are pre-buried, and then cast on the trough bottom (52), and the reinforcement between the trough bottom (52) and the wear-resistant layer (53) is cast and connected together, thereby completing the casting and construction of the near-mountain side diversion trough structure (1).