Diversion tunnel structure for water conservancy project

By designing buffer components in the water diversion tunnel, including step-type baffles and drainage tanks, combined with buffer springs and reinforcement ribs, the problems of long construction cycles and inability to reuse in traditional water diversion tunnels are solved, and effective reduction and buffering of water flow is achieved, avoiding the use of buffering and evacuation of water flow. Tunnel collapses and improves resource utilization.

CN222435204UActive Publication Date: 2025-02-07YUNNAN WATER RESOURCES & HYDRO POWER RECONNAISSANCE & DESIGN RES INST
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421250852.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2025-02-07
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

Traditional water diversion tunnels have a long construction period and cannot be reused after being discarded, resulting in waste of resources and is inconvenient to eliminate and buffer the water flow, which may lead to tunnel collapse or damage to internal components.

Method used

A water diversion tunnel structure for water conservancy engineering was designed, using buffer components, including step-type baffles and drainage tanks, combined with buffer springs and reinforcement ribs, to slow down the water flow velocity and disperse the water flow pressure.

Benefits of technology

By slowing down the water flow velocity and dispersing the water flow pressure, the impact of flooding on the downstream areas is reduced, tunnel collapse or internal components are avoided, and the device's usage effect and resource utilization rate are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222435204U_ABST
    Figure CN222435204U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of hydraulic engineering, and particularly relates to a diversion tunnel structure for hydraulic engineering, which comprises a bottom plate, side plates symmetrically arranged on the upper surface of the bottom plate and a cover plate arranged on the two groups of side plates, a fence is fixed on the upper surface of the bottom plate, a buffer component is arranged on the bottom plate, and the buffer component is fixedly arranged on the bottom plate. The buffering assembly comprises a first baffle, a second baffle, a third baffle and a fourth baffle which are sequentially fixed to the upper surface of the bottom plate, the heights of the first baffle, the second baffle, the third baffle and the fourth baffle are sequentially increased, the whole buffering assembly is of a stepped structural design, and drainage grooves are formed in the surfaces of the second baffle, the third baffle and the fourth baffle correspondingly. By arranging the buffer assembly, the water flow speed can be reduced, and the water flow pressure can be dispersed, so that the influence of flood on a downstream area is relieved to a certain extent, the situation that the tunnel collapses or internal components of the tunnel are destroyed due to overlarge water flow storage potential is avoided, the using effect of the device is improved, and the actual using requirement is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water conservancy projects, and in particular relates to a water diversion tunnel structure for water conservancy projects. Background Art

[0002] In order to ensure the safety of the protected objects, the excess flood water exceeding a certain water level or flow rate is systematically discharged into lakes, depressions, or other rivers, or discharged directly into the sea, or bypassing the protected area and returning to the original river channel downstream, which is called a flood diversion project. "Flood diversion channel" (or "flood diversion river channel, flood diversion channel") can be a type of flood diversion project or a component of a flood diversion project. "Flood diversion channel" is generally composed of flood diversion gates, channels, water transfer tunnels, etc.;

[0003] After checking the public (announcement) number; CN215888151U discloses a water diversion tunnel structure for water conservancy projects. This technology discloses "including a bottom plate, a slot is provided on the bottom plate, a side support plate is provided inside the slot, the side support plate is connected to the bottom plate through the slot, the top of the side support plate is fixedly connected to an inner connecting plate, and the top of the inner connecting plate is provided with a left top plate and a right top plate, etc. The whole process is simple to operate and convenient to construct, and effectively solves the problem that in the traditional method, the water diversion tunnel is generally made by pouring concrete, the construction period is long, and after the construction, when the tunnel is abandoned, it cannot be reused, resulting in waste of resources, etc.";

[0004] When used, the above design effectively solves the problem that in the traditional method, the water diversion tunnel is generally made by pouring concrete, the construction period is long, and after the construction, when the tunnel is abandoned, it cannot be reused, resulting in a waste of resources. However, it is not convenient to reduce and buffer the water flow, which may cause the water flow to accumulate too much and cause the tunnel to collapse or destroy the internal components of the tunnel, reducing the use effect of the device;

[0005] In order to solve the above problems, the present application proposes a water diversion tunnel structure for water conservancy projects. Utility Model Content

[0006] To solve the problems raised in the above background technology. The utility model provides a water diversion tunnel structure for water conservancy projects, which can slow down the water flow speed and disperse the water flow pressure, thereby reducing the impact of floods on downstream areas to a certain extent, avoiding excessive water flow that causes tunnel collapse or destroys the internal components of the tunnel, improving the use effect of the device, and meeting the actual use needs.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a water diversion tunnel structure for a water conservancy project, comprising a bottom plate and side plates symmetrically arranged and installed on the upper surface of the bottom plate, and a cover plate installed on two groups of the side plates, a fence is fixed on the upper surface of the bottom plate, a buffer assembly is installed on the bottom plate, the buffer assembly comprises a first baffle, a second baffle, a third baffle and a fourth baffle fixed in sequence on the upper surface of the bottom plate, the heights of the first baffle to the fourth baffle increase in sequence, and the overall structure is designed in a stepped manner, and the surfaces of the second baffle, the third baffle and the fourth baffle are all provided with drainage grooves.

[0008] As a preferred embodiment of the water diversion tunnel structure for a water conservancy project of the utility model, a rectangular plate is slidably connected inside the first baffle plate, and symmetrically arranged buffer springs are fixed between the rectangular plate and the first baffle plate.

[0009] As a preferred embodiment of the water diversion tunnel structure for a water conservancy project of the utility model, a movable groove matching the rectangular plate is provided on the surface of the first baffle plate, and the rectangular plate and the first baffle plate are slidably connected via the movable groove.

[0010] As a preferred embodiment of the water diversion tunnel structure for a water conservancy project of the utility model, a plurality of groups of slow flow holes arranged at equal distances are provided on the surface of the first baffle.

[0011] As a preferred water diversion tunnel structure for a water conservancy project of the utility model, symmetrically arranged reinforcing ribs are fixed between the bottom plate and the first baffle plate, a connecting rod is fixed on the surface of the reinforcing ribs, one end of the connecting rod passes through the second baffle plate, the third baffle plate and the fourth baffle plate in sequence, and is fixedly connected to the bottom plate.

[0012] As a preferred water diversion tunnel structure for a water conservancy project of the utility model, a limiting reinforcement rod 1 is fixed to a side of the upper surface of the bottom plate close to the side plate, a limiting reinforcement rod 2 is fixed inside the limiting reinforcement rod 1 by bolts, the bottom end of the limiting reinforcement rod 2 is fixedly connected to the bottom plate, a slot 1 is provided on the surface of the side plate, a slot 2 is provided on the inner side wall of the cover plate, one end of the limiting reinforcement rod 1 is inserted into the slot 1, and the top end of the limiting reinforcement rod 2 is inserted into the slot 2.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] By setting up a buffer component, the water flow speed can be slowed down and the water flow pressure can be dispersed, thereby reducing the impact of floods on downstream areas to a certain extent, avoiding excessive water flow that may cause tunnel collapse or destroy internal tunnel components, improving the use effect of the device and meeting actual use needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 It is a partial diagram of the overall structure of the utility model;

[0018] Figure 3 This is a structural cross-sectional view of the first baffle in the utility model;

[0019] Figure 4 It is a structural sectional view of the side plate in the utility model.

[0020] In the figure: 1. bottom plate; 2. side plate; 3. cover plate; 4. fence; 5. buffer assembly; 501. first baffle plate; 502. second baffle plate; 503. third baffle plate; 504. fourth baffle plate; 505. rectangular plate; 506. buffer spring; 507. slow flow hole; 508. reinforcing rib; 509. connecting rod; 510. drainage groove; 511. limiting reinforcing rod one; 512. limiting reinforcing rod two; 513. slot one; 514. slot two. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] Example 1

[0023] like Figure 1 As shown:

[0024] A water diversion tunnel structure for water conservancy projects comprises a bottom plate 1, side plates 2 symmetrically arranged on the upper surface of the bottom plate 1, and a cover plate 3 installed on the two groups of side plates 2. A fence 4 is fixed on the upper surface of the bottom plate 1.

[0025] In this embodiment: the existing device {publication (announcement) number}: CN215888151U discloses a water diversion tunnel structure for water conservancy projects. This application makes further improvements on this existing main body. For details, please refer to the disclosed technology below; to solve the technical problems existing in this prior art, as disclosed in the background technology above, "the above-mentioned design, when used, effectively solves the problem that in the traditional way, the water diversion tunnel is generally made by pouring concrete, the construction period is long, and after construction, when the tunnel is abandoned, it cannot be reused, resulting in waste of resources, but it is not convenient to reduce and buffer the water flow, which may cause the water flow to accumulate too much and cause the tunnel to collapse or destroy the internal components of the tunnel, reducing the use effect of the device." In terms of use, this problem is obviously a real problem that exists and is relatively difficult to solve. In view of this, in order to solve this technical problem, a buffer component 5 is added to the application document.

[0026] More specifically:

[0027] like Figure 1-Figure 4 As shown:

[0028] A buffer assembly 5 is installed on the base plate 1, and the buffer assembly 5 includes a first baffle 501, a second baffle 502, a third baffle 503 and a fourth baffle 504 which are fixed sequentially on the upper surface of the base plate 1. The heights of the first baffle 501 to the fourth baffle 504 increase sequentially, and the overall structure is designed in a stepped manner. The surfaces of the second baffle 502, the third baffle 503 and the fourth baffle 504 are all provided with drainage grooves 510.

[0029] In this embodiment: when the water diversion tunnel structure for the water conservancy project is in use, when the water flow is too large and enters the tunnel, it is initially blocked by the first baffle 501, and the water flows through the second baffle 502, the third baffle 503 and the fourth baffle 504 in sequence. At the same time, part of the water flow is discharged step by step through the drainage trough 510, and the first baffle 501, the second baffle 502, the third baffle 503 and the fourth baffle 504 are overall stepped structures, so that the height gradually increases, which can slow down the water flow speed and disperse the water flow pressure, thereby reducing the impact of floods on downstream areas to a certain extent, avoiding excessive water flow that causes tunnel collapse or destroys internal components of the tunnel, improving the use effect of the device, and meeting actual use needs.

[0030] Going further;

[0031] In an optional embodiment, a rectangular plate 505 is slidably connected inside the first baffle 501, and symmetrically arranged buffer springs 506 are fixed between the rectangular plate 505 and the first baffle 501;

[0032] A moving groove adapted to the rectangular plate 505 is provided on the surface of the first baffle plate 501, and the rectangular plate 505 and the first baffle plate 501 are slidably connected through the moving groove;

[0033] The surface of the first baffle 501 is provided with a plurality of groups of slow flow holes 507 which are arranged at equal intervals.

[0034] In this embodiment: when the flood impacts the first baffle 501, part of the water flow is discharged through the slow flow hole 507, reducing the impact of the main water flow on the first baffle 501, and at the same time also impacts the rectangular plate 505, and compresses the buffer spring 506, thereby achieving a certain buffering effect, avoiding the first baffle 501 from being damaged due to a large impact force.

[0035] Going further;

[0036] In an optional embodiment, symmetrically arranged reinforcing ribs 508 are fixed between the bottom plate 1 and the first baffle plate 501 , a connecting rod 509 is fixed on the surface of the reinforcing ribs 508 , one end of the connecting rod 509 passes through the second baffle plate 502 , the third baffle plate 503 and the fourth baffle plate 504 in sequence, and is fixedly connected to the bottom plate 1 .

[0037] In this embodiment: the first baffle plate 501 is supported by the reinforcing ribs 508, which can significantly improve the bearing capacity of the first baffle plate 501, so that it can better withstand the pressure of the flood and prevent deformation or damage under the impact of the flood. The connecting rod 509 is fixedly connected to the reinforcing ribs 508, and the connecting rod 509 is respectively fixed to the second baffle plate 502, the third baffle plate 503, the fourth baffle plate 504 and the bottom plate 1, thereby forming an integral connection to increase the stability of the overall component and improve the buffering effect against floods.

[0038] Going further;

[0039] In an optional embodiment, a limiting reinforcement rod 511 is fixed to one side of the upper surface of the base plate 1 close to the side plate 2, and a limiting reinforcement rod 512 is fixed to the inside of the limiting reinforcement rod 511 by bolts. The bottom end of the limiting reinforcement rod 512 is fixedly connected to the base plate 1, a slot 513 is provided on the surface of the side plate 2, and a slot 514 is provided on the inner side wall of the cover plate 3. One end of the limiting reinforcement rod 511 is inserted into the slot 513, and the top end of the limiting reinforcement rod 512 is inserted into the slot 514.

[0040] In this embodiment: by setting the limiting reinforcing rod 1 511 and the limiting reinforcing rod 2 512, the side plate 2 and the cover plate 3 can be supported horizontally, avoiding the dislocation of the connection between the bottom plate 1, the side plate 2 and the cover plate 3 and causing collapse, improving the overall stability of the tunnel, and further improving the use requirements of the device, and the limiting reinforcing rod 2 512 and the limiting reinforcing rod 1 511 are connected to form a triangular structure, which can effectively disperse and withstand pressure. This makes the triangular structure perform well when bearing heavy loads or wind pressure and earthquake forces, and enhances its stability.

[0041] Working principle and use process of the utility model: When the water diversion tunnel structure for water conservancy projects is in use, when the water flow is too large and enters the tunnel, it is initially blocked by the first baffle 501, and the water flows through the second baffle 502, the third baffle 503 and the fourth baffle 504 in sequence, and part of the water flows through the drainage groove 510 for step-by-step discharge, and the first baffle 501, the second baffle 502, the third baffle 503 and the fourth baffle 504 are overall in a stepped structure, so that the height gradually increases, It can slow down the water flow speed and disperse the water flow pressure, thereby reducing the impact of the flood on the downstream area to a certain extent, avoiding the collapse of the tunnel or the destruction of the internal components of the tunnel due to excessive water flow, improving the use effect of the device, and meeting the actual use needs. When the flood impacts the first baffle 501, part of the water flow is discharged through the slow flow hole 507, reducing the impact of the main water flow on the first baffle 501, and also impacts the rectangular plate 505, and compresses the buffer spring 506, thereby playing a certain buffering effect, avoiding the first baffle 501 from being damaged due to a large impact force. The first baffle 501 is supported by the reinforcing rib 508, which can significantly improve the bearing capacity of the first baffle 501, so that it can better withstand the pressure of the flood and prevent deformation or damage under the impact of the flood. The connecting rod 509 is fixedly connected to the reinforcing rib 508, and the connecting rod 509 is respectively fixed to the second baffle 502, the third baffle 503, the fourth baffle 504 and the bottom plate 1, thereby forming a The structure is connected as a whole to increase the stability of the overall component and improve the buffering effect on floods. By setting the limiting reinforcing rod 1 511 and the limiting reinforcing rod 2 512, the side plate 2 and the cover plate 3 can be supported horizontally, avoiding the dislocation of the connection between the bottom plate 1, the side plate 2 and the cover plate 3 and causing collapse, improving the overall stability of the tunnel, and further improving the use requirements of the device. The limiting reinforcing rod 2 512 and the limiting reinforcing rod 1 511 are connected to form a triangular structure, which can effectively disperse and withstand pressure. This makes the triangular structure perform well when bearing heavy loads or wind pressure and seismic force, and enhances its stability.

[0042] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A water diversion tunnel structure for a water conservancy project, comprising a bottom plate (1), side plates (2) symmetrically arranged on the upper surface of the bottom plate (1), and cover plates (3) mounted on two groups of the side plates (2), wherein a fence (4) is fixed on the upper surface of the bottom plate (1), characterized in that: A buffer assembly (5) is installed on the bottom plate (1), and the buffer assembly (5) comprises a first baffle (501), a second baffle (502), a third baffle (503) and a fourth baffle (504) which are fixed in sequence on the upper surface of the bottom plate (1), the first baffle (501) to the fourth baffle (504) have increasing heights in sequence, and the overall structure is designed in a stepped manner, and the surfaces of the second baffle (502), the third baffle (503) and the fourth baffle (504) are all provided with drainage grooves (510).

2. The water diversion tunnel structure for water conservancy projects according to claim 1 is characterized in that: A rectangular plate (505) is slidably connected inside the first baffle (501), and symmetrically arranged buffer springs (506) are fixed between the rectangular plate (505) and the first baffle (501).

3. The water diversion tunnel structure for water conservancy projects according to claim 2 is characterized in that: A movable groove matching the rectangular plate (505) is provided on the surface of the first baffle plate (501), and the rectangular plate (505) and the first baffle plate (501) are slidably connected via the movable groove.

4. The water diversion tunnel structure for water conservancy projects according to claim 3 is characterized in that: The surface of the first baffle (501) is provided with a plurality of groups of slow flow holes (507) arranged at equal intervals.

5. The water diversion tunnel structure for water conservancy project according to claim 4, characterized in that: Symmetrically arranged reinforcing ribs (508) are fixed between the bottom plate (1) and the first baffle plate (501), a connecting rod (509) is fixed on the surface of the reinforcing ribs (508), one end of the connecting rod (509) passes through the second baffle plate (502), the third baffle plate (503) and the fourth baffle plate (504) in sequence, and is fixedly connected to the bottom plate (1).

6. The water diversion tunnel structure for water conservancy project according to claim 5, characterized in that: A limiting reinforcing rod 1 (511) is fixed on the upper surface of the bottom plate (1) near the side plate (2), a limiting reinforcing rod 2 (512) is fixed inside the limiting reinforcing rod 1 (511) by means of bolts, the bottom end of the limiting reinforcing rod 2 (512) is fixedly connected to the bottom plate (1), a clamping groove 1 (513) is provided on the surface of the side plate (2), a clamping groove 2 (514) is provided on the inner side wall of the cover plate (3), one end of the limiting reinforcing rod 1 (511) is clamped into the clamping groove 1 (513), and the top end of the limiting reinforcing rod 2 (512) is clamped into the clamping groove 2 (514).

Citation Information

Patent Citations

  • Diversion tunnel structure for water conservancy project

    CN215888151U