Beam-slab pile foundation structure and its construction method

Through modular structural design and concrete pouring methods, the problems of long construction period and poor quality of cast-in-place beam-slab pile foundation structures were solved, and an efficient and stable construction process and structural strength improvement were achieved.

CN118390563BActive Publication Date: 2024-10-11ZHEJIANG HUADONG XINNENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410854315.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-11
Estimated Expiration
2044-06-28

AI Technical Summary

Technical Problem

The construction period of the cast-in-place beam-slab pile foundation structure is long, the quality of the foundation structure is poor, the construction is difficult, and it is greatly affected by the environment.

Method used

Adopting a modular structural design, the prefabricated parts include prefabricated piles, prefabricated floors, prefabricated columns and prefabricated beams, which are spliced ​​to form an overall structure, and concrete is poured in the reserved post-pouring part to improve structural strength and construction efficiency.

Benefits of technology

The construction process is simplified, construction time and environmental impact are reduced, and the quality of the infrastructure and construction efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118390563B_ABST
    Figure CN118390563B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of wind power foundation structure, and discloses a beam-slab pile foundation structure and a construction method thereof, which have the advantages of high construction efficiency and good structural quality. The beam-slab pile foundation structure comprises: a precast pile; a precast base plate connected to the top of the precast pile; the precast base plate is formed by splicing a plurality of precast base plate modules, and a first post-casting part is formed between the plurality of precast base plate modules; a precast column is connected to the top of the precast base plate and is located in the middle of the precast base plate; the precast column comprises a plurality of precast column modules, and the plurality of precast column modules are arranged at intervals around a circle, and a second post-casting part is formed between two adjacent precast column modules; a precast beam is arranged around the outer peripheral side of the precast column, and the precast beam is connected between the precast base plate and the precast column; the precast beam is formed by splicing a plurality of precast beam modules, and a third post-casting part is formed between the plurality of precast beam modules; the cast-in-place concrete part is cast and formed in the first post-casting part, the second post-casting part and the third post-casting part.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of onshore wind power foundation structure design and construction, and in particular to a beam-slab type pile foundation structure and a construction method thereof. Background Art

[0002] With the continuous improvement of wind power generation technology, wind turbines are becoming larger and larger, and wind turbine towers are getting taller and taller, which makes the size of wind power foundation structures larger and larger. Onshore wind power foundation structures usually adopt cast-in-place beam-slab pile foundation structures. Due to their large overall size, they have defects such as long construction period, poor foundation quality, greater construction difficulty, and greater environmental impact. Summary of the invention

[0003] In view of this, the present invention provides a beam-slab pile foundation structure and a construction method thereof to solve the problems of long construction period of cast-in-place beam-slab pile foundation structure, poor quality of foundation structure, great construction difficulty, and great environmental influence.

[0004] In a first aspect, the present invention provides a beam-slab pile foundation structure, comprising a prefabricated part and a cast-in-place concrete part; the prefabricated part comprises: a prefabricated pile; a prefabricated base plate connected to the top of the prefabricated pile; the prefabricated base plate is formed by splicing a plurality of prefabricated base plate modules, and a first post-casting part is formed between the plurality of prefabricated base plate modules; a prefabricated column is connected to the top of the prefabricated base plate and is located in the middle of the prefabricated base plate; the prefabricated column comprises a plurality of prefabricated column modules, the plurality of prefabricated column modules are arranged at intervals around a circle, and a second post-casting part is formed between two adjacent prefabricated column modules; a prefabricated beam is arranged around the outer peripheral side of the prefabricated column, and the prefabricated beam is connected between the prefabricated base plate and the prefabricated column; the prefabricated beam is formed by splicing a plurality of prefabricated beam modules, and a third post-casting part is formed between the plurality of prefabricated beam modules; the cast-in-place concrete part is cast and formed in the first post-casting part, the second post-casting part and the third post-casting part.

[0005] In some embodiments, in the direction from the middle to the edge of the prefabricated floor, the prefabricated floor module includes a core area module, an inner circle module, a middle circle module and an outer circle module that are sequentially arranged and interconnected.

[0006] In some embodiments, multiple inner circle modules, middle circle modules and outer circle modules are arranged at circumferential intervals around the core area module, and two adjacent inner circle modules, two adjacent middle circle modules and two adjacent outer circle modules are interconnected; the connections between the core area module, multiple inner circle modules, multiple middle circle modules and multiple outer circle modules jointly form a first post-casting part.

[0007] In some embodiments, the number of prefabricated column modules is the same as the number of inner circle modules, and the plurality of prefabricated column modules are respectively connected to the plurality of inner circle modules.

[0008] In some embodiments, the prefabricated beam module includes a main beam module and a secondary beam module. The multiple main beam modules of the multiple prefabricated beam modules are arranged at circumferential intervals along the prefabricated column. The multiple secondary beam modules of the multiple prefabricated beam modules are respectively connected between two adjacent main beam modules. The connection between the main beam module and the secondary beam module forms a third post-casting part.

[0009] In some embodiments, main beam modules are correspondingly arranged on the outer side of the prefabricated column module and the outer side of the second post-cast part.

[0010] In some embodiments, a fourth post-cast part is provided at the connection between the main beam module and the prefabricated column module, and at least part of the structure of the cast-in-place concrete part is cast and formed in the fourth post-cast part; the fourth post-cast part is vertically arranged, and / or the fourth post-cast part is inclined.

[0011] In some embodiments, a plurality of precast piles are provided, the plurality of precast piles are arranged at intervals and are respectively provided corresponding to the first post-casting parts.

[0012] In some embodiments, a steel bar structure is provided inside the first post-cast part, the second post-cast part and the third post-cast part, and the steel bar structure is connected between the prefabricated part and the concrete cast-in-place part.

[0013] In the second aspect, the present invention also provides a construction method for a beam-slab pile foundation structure, which is used to obtain the beam-slab pile foundation structure as described above, and the construction method includes the steps of: driving precast piles into the foundation; arranging a plurality of precast base plate modules on the precast piles, and connecting adjacent precast base plate modules to form a precast base plate; arranging and connecting a plurality of precast column modules and a plurality of precast beam modules in sequence on the precast base plate to form precast columns and precast beams, respectively; pouring concrete in the first post-casting part, the second post-casting part, and the third post-casting part to form a concrete cast-in-place part.

[0014] By using the technical solution of the present invention, the beam-slab pile foundation structure adopts modular structure splicing to form prefabricated parts. The overall weight and volume of each prefabricated module (referring to prefabricated piles, prefabricated bottom plate modules, prefabricated column modules, and prefabricated beam modules) are relatively small, which is convenient for transportation, hoisting and construction. The construction is convenient and fast, and the construction efficiency is improved. In addition, the prefabricated part is reserved with a post-casting part (a first post-casting part, a second post-casting part, a third post-casting part, etc.), and the entire prefabricated part is connected into an integral structure by pouring concrete on site to improve the overall structural strength and ensure the quality of the beam-slab pile foundation structure. Among them, the concrete cast-in-place part is relatively small, the pouring time is short, and the pouring amount is small. It is less affected by the environment and the constructors, and the stability of the structural quality is relatively high. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 and Figure 2 A structural schematic diagram of a beam-slab pile foundation structure according to an embodiment of the present invention;

[0017] Figure 3 for Figure 2 A is a partial enlarged schematic diagram;

[0018] Figure 4 A schematic diagram of the structure of a prefabricated part according to an embodiment of the present invention;

[0019] Figure 5 This is a schematic structural diagram of a concrete cast-in-place part according to an embodiment of the present invention;

[0020] Figure 6 This is a schematic diagram of the structure of a core area module according to an embodiment of the present invention;

[0021] Figure 7 This is a schematic structural diagram of an inner ring module according to an embodiment of the present invention;

[0022] Figure 8 This is a schematic structural diagram of a middle ring module according to an embodiment of the present invention;

[0023] Fig. 9 This is a schematic structural diagram of an outer ring module according to an embodiment of the present invention;

[0024] Fig.10 This is a schematic structural diagram of a prefabricated column module according to an embodiment of the present invention;

[0025] Fig.11 This is a schematic structural diagram of the bottom of a prefabricated column module according to an embodiment of the present invention;

[0026] Fig.12 This is a structural schematic diagram of a main beam module according to an embodiment of the present invention;

[0027] Fig.13 This is a schematic structural diagram of the bottom of a main beam module according to an embodiment of the present invention;

[0028] Fig.14 It is a structural schematic diagram of a secondary beam module according to an embodiment of the present invention;

[0029] Fig.15A schematic diagram of the structure of a prefabricated pile according to an embodiment of the present invention;

[0030] Figure 16-Figure 19 This is a schematic diagram of the structure of the connection nodes of each module in an embodiment of the present invention;

[0031] Fig. 20 This is a schematic diagram of the structure of the connection between a main beam module and a middle circle module according to an embodiment of the present invention;

[0032] Fig.21 This is a schematic structural diagram of a prefabricated column module connected to an inner circle module according to an embodiment of the present invention;

[0033] Fig. 22 This is a schematic structural diagram of a prefabricated column module connected to a main beam module according to an embodiment of the present invention;

[0034] Fig.23 It is a structural schematic diagram of another prefabricated column module and main beam module according to an embodiment of the present invention;

[0035] Fig.24 This is a structural schematic diagram of another embodiment of the present invention, in which a prefabricated column module is connected to a main beam module;

[0036] Figure 25-28 The present invention is a schematic diagram of the process structure of a construction method of a beam-slab pile foundation structure according to an embodiment of the present invention.

[0037] Description of reference numerals:

[0038] 100. Prefabricated parts;

[0039] 1. Prefabricated piles; 11. Pre-embedded steel bars in piles;

[0040] 2. Prefabricated bottom plate; 20. First post-casting part; 21. Core area module; 211. Pre-buried steel bars in the core area; 22. Inner circle module; 221. First inner circle pre-buried steel bars; 222. Second inner circle pre-buried steel bars; 23. Middle circle module; 231. First middle circle pre-buried steel bars; 232. Second middle circle pre-buried steel bars; 24. Outer circle module; 241. Outer circle pre-buried steel bars;

[0041] 3. Precast column; 30. Second post-casting part; 31. Precast column module; 311. Column embedded steel bars; 312. Column reinforcement hole; 313. Prestressed steel bar anchor groove; 314. Prestressed steel bar channel;

[0042] 4. Precast beam; 40. Third post-casting part; 41. Main beam module; 411. Main beam embedded steel bars; 412. Main beam reinforcement holes; 42. Secondary beam module; 421. Secondary beam embedded steel bars; 43. Fourth post-casting part;

[0043] 5. Steel bar structure; 51. Stirrups; 52. Circumferential reinforcement; 53. Radial reinforcement; 54. Longitudinal reinforcement;

[0044] 200. Cast-in-place concrete part;

[0045] 6. The first cast-in-place part; 7. The second cast-in-place part; 8. The third cast-in-place part; 9. The fourth cast-in-place part. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0047] In the onshore wind power foundation structure of the related art, a cast-in-place integral concrete foundation structure is usually used. Due to the large overall size of the foundation structure, the following defects exist in the actual construction process:

[0048] 1. The amount of on-site pouring is large, which not only makes the construction difficult, but also takes a long time, affecting the construction efficiency of the entire project.

[0049] 2. Due to the long pouring time, the bonding between the early poured parts and the later poured parts is poor, resulting in poor quality of the entire foundation structure.

[0050] 3. The quality of concrete is greatly affected by the ambient temperature, weather, and manual operation, which makes the quality stability of the foundation structure poor.

[0051] Based on this, the present invention provides a beam-slab pile foundation structure and a construction method thereof to solve the problems of long construction period of cast-in-place beam-slab pile foundation structure, poor quality of foundation structure, great construction difficulty, and great environmental influence.

[0052] Combine the following Figures 1 to 28 , describing an embodiment of the present invention.

[0053] According to an embodiment of the present invention, on the one hand, a beam-slab pile foundation structure is provided, such as Figure 1-5 As shown, the beam-slab type pile foundation structure includes a prefabricated part 100 and a cast-in-place concrete part 200 .

[0054] Specifically, the prefabricated part 100 includes a prefabricated pile 1, a prefabricated base plate 2, a prefabricated column 3 and a prefabricated beam 4. Among them, a plurality of prefabricated piles 1 can be provided, and the prefabricated piles 1 are fixed to the foundation. The prefabricated base plate 2 is connected to the top of the prefabricated pile 1, and the prefabricated base plate 2 is formed by splicing a plurality of prefabricated base plate modules, and a first post-casting part 20 is formed between the plurality of prefabricated base plate modules. The prefabricated column 3 is connected to the top of the prefabricated base plate 2 and is located in the middle of the prefabricated base plate 2. The prefabricated column 3 includes a plurality of prefabricated column modules 31, and the plurality of prefabricated column modules 31 are arranged at intervals around a circle, and a second post-casting part 30 is formed between two adjacent prefabricated column modules 31. The prefabricated beam 4 is arranged around the outer peripheral side of the prefabricated column 3, and the prefabricated beam 4 is connected between the prefabricated base plate 2 and the prefabricated column 3. The prefabricated beam 4 is formed by splicing a plurality of prefabricated beam modules, and a third post-casting part 40 is formed between the plurality of prefabricated beam modules.

[0055] Furthermore, the cast-in-place concrete part 200 is cast and formed in the first post-casting part 20 of the precast base plate 2 , in the second post-casting part 30 on the precast column 3 , and in the third post-casting part 40 of the precast beam 4 .

[0056] By using the technical solution of the present invention, the beam-slab pile foundation structure adopts a modular structure to form a prefabricated part 100. The overall weight and volume of each prefabricated module (referring to the prefabricated pile 1, the prefabricated bottom plate module, the prefabricated column module 31, and the prefabricated beam module) are relatively small, which is convenient for transportation, hoisting and construction. The construction is convenient and fast, and the construction efficiency is improved. In addition, the prefabricated part 100 is reserved with a post-casting part (the first post-casting part 20, the second post-casting part 30, the third post-casting part 40, etc.), and the entire prefabricated part 100 is connected into an integral structure by pouring concrete on site to improve the overall structural strength and ensure the quality of the beam-slab pile foundation structure. Among them, the concrete cast-in-place part 200 is relatively small, the pouring time is short, and the pouring amount is small. It is less affected by the environment and the constructors, and the quality stability of the structure is relatively high.

[0057] Furthermore, in some embodiments, Figure 3 and 4 As shown, in the direction from the middle to the edge of the prefabricated floor 2, the prefabricated floor module includes a core area module 21, an inner circle module 22, a middle circle module 23 and an outer circle module 24 which are sequentially arranged and connected to each other. The prefabricated floor 2 is formed by sequentially splicing the core area module 21, the inner circle module 22, the middle circle module 23 and the outer circle module 24 from the inside to the outside, which is convenient for construction and has a high construction effect.

[0058] Specifically, in some embodiments, Figure 4As shown, multiple inner circle modules 22, middle circle modules 23 and outer circle modules 24 are arranged at intervals around the circumference of the core area module 21, and two adjacent inner circle modules 22, two adjacent middle circle modules 23, and two adjacent outer circle modules 24 are connected to each other. The connection between the core area module 21, multiple inner circle modules 22, multiple middle circle modules 23 and multiple outer circle modules 24 together forms the above-mentioned first post-casting part 20. Concrete is poured in the first post-casting part 20 to form the first cast-in-place part 6 of the above-mentioned concrete cast-in-place part 200.

[0059] In some embodiments, a plurality of precast piles 1 are provided, and the plurality of precast piles 1 are arranged at intervals and are respectively provided corresponding to the first post-casting part 20. In this way, the first cast-in-place part 6 can connect the plurality of precast piles 1 and the modules of the precast base plate 2 into an integral structure with high structural strength. Fig.15 As shown, the top of the precast pile 1 is provided with a pile pre-embedded steel bar 11, and a plurality of pile pre-embedded steel bars 11 are arranged at intervals along the circumference of the top of the precast pile 1 to facilitate connection with the precast bottom plate 2. For example, the pile pre-embedded steel bar 11 can be a hook-shaped steel bar. Fig.25 As shown, the precast piles 1 can be arranged in a circular array. Exemplarily, the pile structure of the beam-slab pile foundation structure includes inner circle piles, middle circle piles and outer circle piles, and each circle is provided with a plurality of precast piles 1. Among them, the plurality of precast piles 1 of the inner circle piles are arranged and connected to the connection between the core area module 21 and the inner circle module 22, the middle circle piles are arranged and connected to the connection between the inner circle module 22 and the middle circle module 23, and the outer circle piles are arranged and connected to the connection between the middle circle module 23 and the outer circle module 24.

[0060] It can be understood that the prefabricated bottom plate 2 and the first cast-in-place part 6 together constitute the bottom plate structure of the beam-slab pile foundation structure, and the shape and structure of the bottom plate structure depends on the shape and structure of the prefabricated bottom plate 2. The present invention does not specifically limit the shape and structure of the prefabricated bottom plate 2, as long as it has sufficient bearing capacity. For example, the cross section of the prefabricated bottom plate 2 can be configured as a circle, a rectangle, or the like.

[0061] In some embodiments, the cross-section of the prefabricated base plate 2 is circular. Figure 6 As shown, the cross-section of the core module 21 is circular, and a plurality of core pre-embedded steel bars 211 are arranged at intervals on the outer periphery of the core module 21. Exemplarily, the core pre-embedded steel bars 211 may be U-shaped closed steel bars.

[0062] like Figure 7 and 8As shown, the cross sections of the inner circle module 22 and the middle circle module 23, which are located on the outside of the core area module 21, are both trapezoidal. In this way, the outer peripheries of the inner circle module 22 and the middle circle module 23 are both straight lines, so that the side length accuracy of the inner circle module 22 and the middle circle module 23 is easy to control, the size of the obtained preform is more standard, and the corresponding mold is simple to manufacture and low in cost.

[0063] like Figure 7 As shown, the outer peripheral side of the inner circle module 22 is provided with a first inner circle pre-embedded steel bar 221, so as to facilitate connection with the core area module 21, the middle circle module 23 and the adjacent inner circle module 22. Exemplarily, the first inner circle pre-embedded steel bar 221 can also be a U-shaped closed steel bar. The top of the inner circle module 22 is also provided with a second inner circle pre-embedded steel bar 222, so as to facilitate connection with the prefabricated column module 31. Exemplarily, the second inner circle pre-embedded steel bar 222 is a straight dowel.

[0064] like Figure 8 As shown, the outer peripheral side of the middle circle module 23 is provided with a first middle circle pre-embedded steel bar 231, so as to facilitate connection with the inner circle module 22, the outer circle module 24 and the adjacent middle circle module 23. Exemplarily, the first middle circle pre-embedded steel bar 231 can also be a U-shaped closed steel bar. The top of the middle circle module 23 is also provided with a second middle circle pre-embedded steel bar 232, so as to facilitate connection with the prefabricated beam module. Exemplarily, the second middle circle pre-embedded steel bar 232 is a straight-line dowel bar.

[0065] like Fig. 9 As shown, the cross-section of the outer ring module 24 located outside the middle ring module 23 is configured as an arc, and the side of the outer ring module 24 facing the middle ring module 23 is provided with an outer ring embedded steel bar 241 to facilitate connection with the middle ring module 23.

[0066] Understandably, if Figure 4 As shown, gaps are provided between the core area module 21 and the inner circle module 22, between the inner circle module 22 and the middle circle module 23, between the middle circle module 23 and the outer circle module 24, between adjacent inner circle modules 22, and between adjacent middle circle modules 23, and the above-mentioned first post-casting part 20 is jointly formed in the above-mentioned gaps.

[0067] In some embodiments not shown in the figures, the cross-sections of the inner circle module 22 and the middle circle module 23 may also be configured as arcs or rectangles.

[0068] In some embodiments not shown in the figures, the core area module 21 can be configured as a plate structure, such as a circular plate or a rectangular plate, etc. The inner ring module 22, the middle ring module 23 and the outer ring module 24 can all be configured as a closed ring structure, such as a circular ring or a rectangular ring, etc.

[0069] Furthermore, in some embodiments, the number of prefabricated column modules 31 is the same as the number of inner circle modules 22, and a plurality of prefabricated column modules 31 are respectively connected to a plurality of inner circle modules 22. Fig.10 and 11 As shown, the prefabricated column module 31 is generally constructed as a cubic structure, and column pre-embedded steel bars 311 are provided on both sides and the back of the prefabricated column module 31. The prefabricated column module 31 is connected to the adjacent prefabricated column modules 31 through the column pre-embedded steel bars 311 on both sides, and the prefabricated column module 31 is connected to the prefabricated beam module through the column pre-embedded steel bars 311 on the back. Exemplarily, the column pre-embedded steel bars 311 can be U-shaped closed steel bars, and the bottom of the prefabricated column module 31 is provided with a plurality of column insertion holes 312, such as Fig.21 As shown, the second inner ring embedded steel bar 222 on the inner ring module 22 is correspondingly inserted into the column reinforcement hole 312 to limit the prefabricated column module 31. The prefabricated column module 31 is also provided with a prestressed tendon anchor groove 313 and a prestressed tendon channel 314. The prestressed tendon anchor groove 313 is provided at the bottom of the prefabricated column module 31, and the prestressed tendon channel 314 is provided at the top of the prefabricated column module 31, and is connected and arranged above the prestressed tendon anchor groove 313. The prestressed tendon anchor groove 313 and the prestressed tendon channel 314 facilitate the installation of the prestressed anchor structure.

[0070] It can be understood that the plurality of precast column modules 31 are arranged at intervals, and the second post-casting part 30 is formed between two adjacent precast column modules 31. Concrete is poured in the second post-casting part 30 to form the second cast-in-place part 7 of the concrete cast-in-place part 200. The second cast-in-place part 7 connects the plurality of precast column modules 31, and the precast column modules 31 and the precast base plate 2 into an integral structure. The plurality of precast column modules 31 and the second cast-in-place part 7 together form the central column structure of the beam-slab pile foundation structure.

[0071] Further, in some embodiments, the precast beam module includes a main beam module 41 and a secondary beam module 42, the main beam modules 41 of the plurality of precast beam modules are arranged at intervals along the circumference of the precast column 3, the secondary beam modules 42 of the plurality of precast beam modules are respectively connected between two adjacent main beam modules 41, and the connection between the main beam module 41 and the secondary beam module 42 forms a third post-casting portion 40. Among them, each secondary beam module 42 is connected to one end of the main beam module 41 away from the precast column 3.

[0072] like Fig.12 and 13As shown, the side of the main beam module 41 opposite to the precast column 3, the side of the main beam module 41 opposite to the secondary beam module 42, and the bottom surface of the main beam module 41 can be provided with main beam embedded steel bars 411, so as to facilitate connection with the precast column 3, the secondary beam module 42 and the precast bottom plate 2. Exemplarily, the main beam embedded steel bars 411 can be U-shaped closed steel bars. The bottom surface of the main beam module 41 can also be provided with a plurality of main beam reinforcing bar insertion holes 412.

[0073] Exemplarily, the number of main beam modules 41 is the same as the number of middle circle modules 23, and the plurality of main beam modules 41 are respectively connected to the plurality of middle circle modules 23. Fig. 20 As shown, the second middle circle embedded steel bars 232 of the middle circle module 23 are correspondingly inserted into a plurality of main beam reinforcing bar insertion holes 412 to limit the main beam module 41.

[0074] like Fig.14 As shown, both sides of the secondary beam module 42 opposite to the main beam module 41 are provided with secondary beam embedded steel bars 421 to facilitate connection with the main beam module 41. Exemplarily, the secondary beam embedded steel bars 421 can be U-shaped closed steel bars.

[0075] It can be understood that the number of main beam modules 41 is the same as the number of secondary beam modules 42, and gaps are formed between the main beam modules 41 and the adjacent secondary beam modules 42, and the multiple gaps between the main beam modules 41 and the secondary beam modules 42 form the third cast-in-place part 8. After pouring concrete in the third cast-in-place part 8, the third cast-in-place part 8 of the above-mentioned concrete cast-in-place part 200 is formed. The third cast-in-place part 8 connects the main beam module 41 with the secondary beam module 42, and the prefabricated main beam with the prefabricated bottom plate 2 into an integral structure. Multiple main beam modules 41, multiple secondary beam modules 42 and the third cast-in-place part 8 together form the beam structure of the beam-slab pile foundation structure.

[0076] In some embodiments, main beam modules 41 are correspondingly arranged on the outer side of the prefabricated column module 31 and the outer side of the second post-casting part 30, so that the main beam modules 41 support each prefabricated column module 31 and the second cast-in-place part 7 to ensure the reliability of the central column structure. It can be understood that the number of prefabricated column modules 31 is half of the number of main beam modules 41.

[0077] Furthermore, in some embodiments, a fourth post-casting portion 43 is provided at the connection between the main beam module 41 and the precast column module 31, and at least part of the structure of the cast-in-place concrete part 200 is cast and formed in the fourth post-casting portion 43, so that the main beam module 41 and the precast column module 31 form an integral structure. Fig. 22As shown, the prefabricated column module 31 is constructed as a cubic structure, and the fourth post-cast part 43 between it and the main beam module 41 is vertically arranged, and concrete is poured in the fourth post-cast part 43 to form the fourth cast-in-place part 9 of the above-mentioned concrete cast-in-place part 200.

[0078] Or, in some embodiments, illustratively, Fig.23 and 24 As shown, the prefabricated column module 31 includes a cubic column part and a rib plate part integrally formed with the back of the column part. The fourth post-casting part 43 between the rib plate part and the main beam module 41 is tilted, and concrete is poured in the fourth post-casting part 43 to form the fourth cast-in-place part 9 of the above-mentioned concrete cast-in-place part 200. The connection node between the beam and the column is a key stress point. With such a setting, the column part and the rib plate part of the prefabricated column module 31 are integrally formed, and the connection is more reliable. In addition, the nodes of the beam and the column mainly transmit bending moments. Compared with the straight section, the fourth cast-in-place part 9 is tilted, which has a better force transmission effect and a higher bearing capacity.

[0079] Furthermore, in some embodiments, a steel bar structure 5 is provided in the first post-cast part 20, the second post-cast part 30, the third post-cast part 40 and the fourth post-cast part 43, and the steel bar structure 5 connects the prefabricated modules into an integral structure. After pouring concrete, the steel bar structure 5 is connected between the prefabricated part 100 and the cast-in-place concrete part 200, thereby further improving the overall structural strength.

[0080] Specifically, Figure 4 As shown, the first post-casting part 20 includes radial connection nodes B1 between the core area module 21 and the inner circle module 22, radial connection nodes B2 between the inner circle module 22 and the middle circle module 23, radial connection nodes B3 between the middle circle module 23 and the outer circle module 24, annular connection nodes B4 between adjacent inner circle modules 22, and annular connection nodes B5 between adjacent middle circle modules 23. Among them, each connection node is tied, overlapped and / or welded by the above-mentioned steel bar structure 5.

[0081] The steel structure 5 at the radial connection nodes B1, B2 and B3 includes stirrups 51 and annular steel bars 52. Taking B2 as an example, Fig.16As shown, a plurality of stirrups 51 are respectively connected between a plurality of first inner circle embedded steel bars 221 of the inner circle module 22 and a plurality of first middle circle embedded steel bars 231 of the middle circle module 23. A plurality of circumferential steel bars 52 are respectively arranged and connected between the first inner circle embedded steel bars 221 and the stirrups 51, and between the first middle circle embedded steel bars 231 and the stirrups 51. Among them, the pile embedded steel bars 11 of the above-mentioned prefabricated pile 1 can be tied and overlapped or welded with the stirrups 51 or the circumferential steel bars 52 at the corresponding position. And the bottom of the above-mentioned secondary beam module 42 is provided with secondary beam embedded steel bars 421, and the secondary beam embedded steel bars 421 are tied and overlapped or welded with the circumferential steel bars 52 at the B3 node at the corresponding position.

[0082] The steel bar structure 5 at the annular connection nodes B4 and B5 includes radial steel bars 53. Taking B5 as an example, Fig.17 As shown, a plurality of radial steel bars 53 are inserted and connected in the corresponding first middle circle pre-embedded steel bars 231 of the adjacent middle circle modules 23, and the radial steel bars 53 are tied, overlapped or welded with the first middle circle pre-embedded steel bars 231. Among them, the main beam pre-embedded steel bars 411 are provided at the bottom of the main beam module 41, and the main beam pre-embedded steel bars 411 can be tied, overlapped or welded with the radial steel bars 53 at the corresponding positions.

[0083] In some embodiments not shown in the figures, the steel reinforcement structure 5 at the annular connection nodes B4 and B5 may also include stirrups 51.

[0084] Specifically, Figure 4 As shown, the second post-casting part 30 includes a connection node C between the prefabricated column modules 31, as shown in FIG. Fig.19 As shown, the steel structure 5 at the connection node C includes stirrups 51 and longitudinal bars 54. Among them, a plurality of stirrups 51 are respectively connected between a plurality of column embedded steel bars 311 on opposite sides of adjacent prefabricated column modules 31 and a plurality of main beam embedded steel bars 411 on the back of the main beam module 41, and a plurality of longitudinal bars 54 are respectively connected between the stirrups 51 and the column embedded steel bars 311, and between the stirrups 51 and the main beam embedded steel bars 411.

[0085] Specifically, Figure 4 As shown, the third post-casting part 40 includes a connection node D between the main beam module 41 and the secondary beam module 42, as shown in FIG. Fig.18 As shown, the steel structure 5 at the connection node D includes stirrups 51 and longitudinal bars 54. The stirrups 51 are respectively connected between the main beam embedded steel bars 411 of the main beam modules 41 and the secondary beam embedded steel bars 421 of the secondary beam modules 42, and the longitudinal bars 54 are respectively connected between the stirrups 51 and the main beam embedded steel bars 411 and between the stirrups 51 and the secondary beam embedded steel bars 421.

[0086] Specifically, Figure 4As shown, the fourth post-cast part 43 includes a connection node E between the main beam module 41 and the prefabricated column module 31. The steel structure 5 at the connection node E includes stirrups 51 and longitudinal bars 54. Its connection form is similar to that of the connection node D and will not be repeated here.

[0087] According to an embodiment of the present invention, on the other hand, a construction method of a beam-slab pile foundation structure is provided, for obtaining the beam-slab pile foundation structure as described above. Figure 25-28 As shown, the construction method comprises the steps of:

[0088] S1: driving precast piles 1 into the foundation; wherein the precast piles 1 are driven into the foundation to be fixed to the foundation. The number and distribution of the precast piles 1 can be flexibly arranged to meet the bearing capacity. Fig.25 As shown, the pile structure includes an inner circle pile, a middle circle pile and an outer circle pile, each circle is provided with a plurality of precast piles 1, and the plurality of precast piles 1 in each circle are evenly spaced.

[0089] S2: Arrange a plurality of prefabricated floor modules on the prefabricated pile 1, and connect adjacent prefabricated floor modules to form a prefabricated floor 2; Fig.26 As shown, the core area module 21, the inner circle module 22, the middle circle module 23 and the outer circle module 24 are arranged above the prefabricated pile 1 in sequence, and connected to form an integral structure of the pile and the base plate through the above-mentioned steel bar structure 5.

[0090] S3: sequentially arranging and connecting a plurality of prefabricated column modules 31 and a plurality of prefabricated beam modules on the prefabricated base plate 2 to form prefabricated columns 3 and prefabricated beams 4, respectively; Fig. 27 As shown, a plurality of prefabricated column modules 31, main beam modules 41 and secondary beam modules 42 are sequentially arranged above the prefabricated base plate 2, and connected through the above-mentioned steel bar structure 5 to form an integral structure of piles, base plates, central columns and beams.

[0091] S4: pouring concrete in the first post-casting part 20, the second post-casting part 30, the third post-casting part 40, and the fourth post-casting part 43 to form the concrete cast-in-place part 200. The pouring operations of the first post-casting part 20, the second post-casting part 30, the third post-casting part 40, and the fourth post-casting part 43 can be performed one by one. Fig.28 A schematic structural diagram of the first cast-in-place part 6 formed after the first post-cast part 20 is cast inside is shown, wherein the top surface of the first cast-in-place part 6 is roughly located in the same plane as the top surfaces of the core area module 21, the inner circle module 22, the middle circle module 23 and the outer circle module 24.

[0092] By using the construction method of the present invention, the prefabricated part 100 is composed of modules, and a post-casting part is reserved in the prefabricated part 100, and concrete is poured in the post-casting part to form the concrete cast-in-place part 200. The concrete cast-in-place part 200 and the prefabricated part 100 form an integral structure, and its structural strength is used for the cast-in-place structure. Thus, the construction process of factory prefabrication and on-site assembly is realized, overcoming the disadvantages of long construction period, large amount of on-site wet work, difficult piling, and great environmental impact of construction.

[0093] Furthermore, before step S1, the following steps may be included: excavating a pile pit on the foundation; leveling the foundation site; placing a measurement line, etc.

[0094] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A beam-slab pile foundation structure, characterized in that: It comprises a prefabricated part (100) and a cast-in-place concrete part (200); the prefabricated part (100) comprises: Precast piles (1); A prefabricated base plate (2) connected to the top of the prefabricated pile (1); the prefabricated base plate (2) is formed by splicing a plurality of prefabricated base plate modules, and a first post-casting portion (20) is formed between the plurality of prefabricated base plate modules; A prefabricated column (3) connected to the top of the prefabricated base plate (2) and located in the middle of the prefabricated base plate (2); the prefabricated column (3) comprises a plurality of prefabricated column modules (31), the plurality of prefabricated column modules (31) are arranged at intervals around a circle, and a second post-casting portion (30) is formed between two adjacent prefabricated column modules (31); A precast beam (4) is arranged around the outer periphery of the precast column (3), and the precast beam (4) is connected between the precast base plate (2) and the precast column (3); the precast beam (4) is formed by splicing a plurality of precast beam modules, and a third post-casting portion (40) is formed between the plurality of precast beam modules; The cast-in-place concrete part (200) is cast and formed in the first post-cast part (20), the second post-cast part (30) and the third post-cast part (40).

2. The beam-slab pile foundation structure according to claim 1, characterized in that: In the direction from the middle to the edge of the prefabricated base plate (2), the prefabricated base plate module comprises a core area module (21), an inner circle module (22), a middle circle module (23) and an outer circle module (24) which are arranged in sequence and connected to each other.

3. The beam-slab pile foundation structure according to claim 2, characterized in that: The inner ring modules (22), the middle ring modules (23) and the outer ring modules (24) are each arranged at intervals in the circumferential direction of the core area module (21), and two adjacent inner ring modules (22), two adjacent middle ring modules (23) and two adjacent outer ring modules (24) are connected to each other; The connections between the core area module (21), the plurality of inner circle modules (22), the plurality of middle circle modules (23), and the plurality of outer circle modules (24) jointly form the first post-casting portion (20).

4. The beam-slab pile foundation structure according to claim 3, characterized in that: The number of the prefabricated column modules (31) is the same as the number of the inner circle modules (22), and a plurality of the prefabricated column modules (31) are respectively connected to a plurality of the inner circle modules (22).

5. The beam-slab pile foundation structure according to claim 1, characterized in that: The precast beam module comprises a main beam module (41) and a secondary beam module (42); the main beam modules (41) of the precast beam modules are arranged at intervals along the circumference of the precast column (3); the secondary beam modules (42) of the precast beam modules are respectively connected between two adjacent main beam modules (41); and the connection between the main beam module (41) and the secondary beam module (42) forms the third post-casting portion (40).

6. The beam-slab pile foundation structure according to claim 5, characterized in that: The main beam module (41) is correspondingly arranged on the outer side of the prefabricated column module (31) and the outer side of the second post-cast portion (30).

7. The beam-slab pile foundation structure according to claim 6, characterized in that: A fourth post-cast portion (43) is provided at the connection between the main beam module (41) and the prefabricated column module (31), and at least part of the structure of the concrete cast-in-place portion (200) is cast and formed in the fourth post-cast portion (43); The fourth post-casting portion (43) is arranged vertically, and / or the fourth post-casting portion (43) is arranged inclined.

8. The beam-slab pile foundation structure according to claim 1, characterized in that: A plurality of the precast piles (1) are provided, and the plurality of precast piles (1) are arranged at intervals and are respectively provided corresponding to the first post-casting parts (20).

9. The beam-slab pile foundation structure according to any one of claims 1 to 8, characterized in that: A steel bar structure (5) is provided in the first post-cast part (20), the second post-cast part (30) and the third post-cast part (40), and the steel bar structure (5) is connected between the prefabricated part (100) and the concrete cast-in-place part (200).

10. A construction method for a beam-slab pile foundation structure, for obtaining the beam-slab pile foundation structure according to any one of claims 1 to 9, characterized in that: Includes steps: Driving the prefabricated piles (1) into the foundation; Arranging the plurality of prefabricated floor modules on the prefabricated piles (1), and connecting adjacent prefabricated floor modules to form the prefabricated floor (2); The plurality of prefabricated column modules (31) and the plurality of prefabricated beam modules are sequentially arranged and connected on the prefabricated base plate (2) to form the prefabricated columns (3) and the prefabricated beams (4), respectively; Concrete is poured into the first post-casting part (20), the second post-casting part (30), and the third post-casting part (40) to form the concrete cast-in-place part (200).