A method and system for optimizing resource allocation of intelligent enterprises
By establishing a resource demand prediction model in the enterprise, using historical production data to analyze the correlation between environmental parameters, and automatically compute the materials required for production, it solves the cumbersome problem of manual accounting under traditional methods, improves resource utilization efficiency and reduces production costs.
Patent Information
- Application Number
- CN202410617655.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-05-17
AI Technical Summary
Traditional resource optimization methods are difficult to adapt to large-scale and complex production environments, resulting in enterprises needing to manually calculate the materials required for production in a dynamically changing production environment, which is cumbersome and consumes a lot of manpower, increasing production costs.
By obtaining the company's historical production data and environmental parameters for correlation analysis, a resource demand prediction model is established, and the model is used to generate a production plan based on the current environmental parameters and material names, and the quantity of materials required for production is automatically calculated to reduce manual intervention.
It realizes the estimated demand required for automatic acquisition of materials in the production process every day, saves staff's operating procedures, reduces operating costs, and improves resource utilization efficiency and response speed.
Smart Images

Figure CN118396323B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of enterprise resource optimization, and in particular to an intelligent enterprise resource configuration optimization method and system. Background Art
[0002] At present, in order to improve the core competitiveness of enterprises, especially in the production process, enterprises need to continuously optimize the allocation of material resources to improve resource utilization efficiency. However, traditional resource optimization methods are mostly based on historical data and manual experience, which is difficult to adapt to large-scale and complex production environments. In a dynamically changing production environment, staff need to manually calculate the materials required for production every day, which is cumbersome and consumes a lot of manpower, increasing the production cost of the enterprise, so improvements are needed. Summary of the invention
[0003] In order to facilitate the accounting of materials required for production, improve the rational allocation of resources, and reduce the production costs of enterprises; this application provides an intelligent enterprise resource allocation optimization method and system.
[0004] The above-mentioned invention objective of the present application is achieved through the following technical solutions:
[0005] A method for optimizing resource allocation of an intelligent enterprise comprises the following steps:
[0006] Obtain the company's historical production data and the corresponding environmental parameters at that time; the historical production data includes output, failure rate and raw material consumption;
[0007] Perform correlation analysis on historical production data and environmental parameters, identify and train environmental parameters that affect historical production data, and obtain a resource demand prediction model, wherein the environmental parameters include temperature, humidity, and ventilation volume;
[0008] When receiving the environmental parameter instruction, obtaining the current environmental parameters and the required material names, and sending the obtained environmental parameters and the required material names to the resource demand prediction model;
[0009] When the resource demand forecasting model receives the environmental parameters and the names of the required materials, it extracts the estimated amount of materials that match the environmental parameters and generates a production plan;
[0010] The production plan is sent to the production staff terminal for operation by the production staff.
[0011] By adopting the above technical solution, when the enterprise needs to optimize the allocation of resources in the production link, the historical production data and the corresponding environmental parameters at that time are obtained. Since the production data in the environmental parameters that change every day are different, the historical production data and the environmental parameters are analyzed for correlation, and the environmental parameters that affect the output, failure rate and raw material consumption are identified. The resource demand prediction model can be obtained by training based on the affected environmental parameters and historical production data; since the daily environmental parameters are dynamically changing, when the environmental parameter instructions are received, the current environmental parameters and the required material names are obtained, and the obtained environmental parameters and the required material names are sent to the resource demand prediction model, which can match the corresponding material estimates with the environmental parameters, and generate a production plan, and send the production plan to the production staff terminal for operation by the production staff. Therefore, the production staff terminal can obtain the quantity of materials required for production without daily calculations, and automatically obtain the estimated demand for materials in the production link every day, saving the staff's cumbersome operating procedures, reducing operating costs, and improving resource utilization efficiency and response speed.
[0012] In a preferred example of the present application, the steps of performing correlation analysis between historical production data and environmental parameters, identifying environmental parameters that affect historical production data and training them, and obtaining a resource demand prediction model include the following steps:
[0013] Conduct correlation analysis between historical production data and environmental parameters, and identify and extract all production processes affected by environmental parameters in historical production data;
[0014] Compare all production processes under different environmental parameters;
[0015] The production processes that change with environmental parameters are screened out and marked as key processes. The environmental parameters that affect the changes in the key processes are associated and trained to obtain a resource demand prediction model.
[0016] By adopting the above technical scheme, the production data obtained in the environmental parameters that change every day are different. Therefore, by performing correlation analysis on the historical production data and the production link data, all the production processes affected by the environmental parameters in the historical production data can be identified and extracted; all the production processes under different environmental parameters are compared, and the specific impact of each environmental parameter on the production process is analyzed. For example, whether the output is increased under certain temperature or humidity conditions, the change trend between the production process and the environmental parameters can be obtained, the production process that changes with the environmental parameters can be screened out, marked as a key process, and the environmental parameters that affect the changes in the key process can be associated, so as to obtain a resource demand forecasting model, so as to accurately predict the consumption of raw materials and manage inventory, reduce waste, and reduce costs.
[0017] In a preferred example of the present application, the step of screening out production processes that vary with environmental parameters and marking them as key processes includes the following steps:
[0018] Calculate the rate of change of each production process based on environmental parameters;
[0019] Based on the rate of change, the slope of the correlation coefficient between each environmental parameter and the production process is calculated;
[0020] comparing the slope to a preset slope value;
[0021] If the slope is greater than the preset slope value, the production process is marked as a critical process.
[0022] By adopting the above technical scheme, since the production processes under different environmental parameters are different, the environmental parameters related to each production process can be determined by calculating the change rate of each production process under different environmental parameters, and then the slope of the correlation coefficient in the production process corresponding to each environmental parameter is obtained by calculating the correlation coefficient between each environmental parameter and the production process. The slope is compared with the preset slope value. If the slope is greater than the preset slope value, the production process is marked as a critical process. When the impact of the environmental parameter change on the production process is greater than the preset slope value, it means that the production process is a critical process.
[0023] In a preferred example of the present application, when the resource demand prediction model receives the environmental parameters and the required material names, the step of extracting the material estimation corresponding to the environmental parameters includes the following steps:
[0024] When the resource demand prediction model receives the environmental parameters and the name of the required material, the resource demand prediction model finds the raw material consumption within the same environmental parameter range from the database;
[0025] Based on the required material name, filter out the raw material consumption associated with the required material name and mark it as material estimated quantity.
[0026] By adopting the above technical solution, since the required material quantity changes with the daily environmental parameters, when the current environmental parameters and the required material name are received, the environmental parameters will be used as query conditions to retrieve the matching raw material consumption data from the database, so that the resource demand prediction model can find the raw material consumption within the same environmental parameter range from the database. Since there are raw material consumptions of various product materials within the same environmental parameter range, the raw material consumption associated with the material name can be screened out according to the required material name, and the screened raw material consumption is used as the material estimate for that day, thereby realizing automated acquisition of material estimates, reducing personnel intervention and processing time, saving manpower and costs, and ensuring maximum production efficiency and cost-effectiveness.
[0027] In a preferred example of the present application: after the step of screening out the raw material consumption associated with the required material name based on the required material name and marking it as the material estimated amount, the following steps are performed:
[0028] Acquire new historical production data and send the new historical production data to the resource demand forecasting model;
[0029] When a manual abandonment of entry instruction is received, the new historical production data will not be included in the database for calculation with the output, failure rate and raw material consumption; otherwise, the new historical production data will be calculated with the output, failure rate and raw material consumption in the database to update the latest environmental parameters and the corresponding material estimates.
[0030] By adopting the above technical solution, since the equipment will suffer from wear and aging problems due to long-term operation, the new historical production data of the previous day is obtained before the equipment is operated, and the new historical production data is sent to the resource demand prediction model. Since human factors may cause unreasonable historical production data, when a manual abandonment of entry instruction is received, the new historical production data is not included in the database for calculation with the output, failure rate and raw material consumption; otherwise, the new historical production data is calculated with the output, failure rate and raw material consumption in the database to update the latest environmental parameters and the corresponding material estimates, which can solve the problem of data accuracy affected by the current equipment wear and aging problems, so as to ensure that the resource demand prediction model can reflect the latest production situation.
[0031] In a preferred example of the present application: when the resource demand prediction model receives the environmental parameters and the required material names, the step of extracting the material estimation corresponding to the environmental parameters also includes the following steps:
[0032] When the resource demand prediction model cannot find the same environmental parameter range from the database, the resource demand prediction model finds the raw material consumption closest to the environmental parameter from the database;
[0033] Based on the required material names and raw material consumption, the estimated material quantity is screened;
[0034] Based on the material change rate, the material estimate is adjusted to obtain an adjusted material estimate.
[0035] By adopting the above technical solution, due to the different environmental parameters every day, when the resource demand prediction model cannot find data with the same environmental parameter range in the database, the resource demand prediction model will find the raw material consumption closest to the environmental parameters from the database to determine the most relevant raw material consumption close to the environmental parameters, and screen out the material estimate based on the required material name and raw material consumption. According to the rate of change of the environmental parameters to the production process, the material estimate is adjusted to obtain the adjusted material estimate, thereby improving the prediction accuracy of the resource demand prediction model, promoting the optimization of resource utilization, thereby improving production efficiency and reducing costs.
[0036] The second object of the invention is achieved by the following technical solutions:
[0037] An intelligent enterprise resource configuration optimization system, comprising:
[0038] A data collection module is used to obtain the company's historical production data and the corresponding environmental parameters at that time; the historical production data includes output, failure rate and raw material consumption;
[0039] A model training module is used to analyze the correlation between historical production data and environmental parameters, identify and train environmental parameters that affect historical production data, and obtain a resource demand prediction model. The environmental parameters include temperature, humidity, and ventilation volume.
[0040] An instruction acquisition module, for acquiring current environmental parameters and required material names when receiving an environmental parameter instruction, and sending the acquired environmental parameters and required material names to a resource demand prediction model;
[0041] The demand forecasting module is used to extract the estimated amount of materials corresponding to the environmental parameters when the resource demand forecasting model receives the environmental parameters and the names of the required materials, and generate a production plan;
[0042] The plan sending module is used to send the production plan to the production staff terminal for operation by the production staff.
[0043] By adopting the above technical solution, when the enterprise needs to optimize the allocation of resources in the production link, the historical production data and the corresponding environmental parameters at that time are obtained. Since the production data in the environmental parameters that change every day are different, the historical production data and the environmental parameters are analyzed for correlation, and the environmental parameters that affect the output, failure rate and raw material consumption are identified. The resource demand prediction model can be obtained by training based on the affected environmental parameters and historical production data; since the daily environmental parameters are dynamically changing, when the environmental parameter instructions are received, the current environmental parameters and the required material names are obtained, and the obtained environmental parameters and the required material names are sent to the resource demand prediction model, which can match the corresponding material estimates with the environmental parameters, and generate a production plan, and send the production plan to the production staff terminal for operation by the production staff. Therefore, the production staff terminal can obtain the quantity of materials required for production without daily calculations, and automatically obtain the estimated demand for materials in the production link every day, saving the staff's cumbersome operating procedures, reducing operating costs, and improving resource utilization efficiency and response speed.
[0044] Optionally, also include:
[0045] The production process extraction module is used to analyze the correlation between historical production data and environmental parameters, and identify and extract all production processes affected by environmental parameters in the historical production data;
[0046] The production process comparison module is used to compare all production processes under different environmental parameters;
[0047] The environmental parameter association module is used to screen out production processes that change with environmental parameters, mark them as key processes, and associate the environmental parameters that affect the changes in the key processes to train a resource demand prediction model.
[0048] By adopting the above technical scheme, the production data obtained in the environmental parameters that change every day are different. Therefore, by performing correlation analysis on the historical production data and the production link data, all the production processes affected by the environmental parameters in the historical production data can be identified and extracted; all the production processes under different environmental parameters are compared, and the specific impact of each environmental parameter on the production process is analyzed. For example, whether the output is increased under certain temperature or humidity conditions, the change trend between the production process and the environmental parameters can be obtained, the production process affected by the environmental parameters can be screened out, marked as a key process, and the environmental parameters that affect the changes in the key process can be associated, so as to obtain a resource demand forecasting model, so as to accurately predict the consumption of raw materials and manage inventory, reduce waste, and reduce costs.
[0049] The third objective of the present application is achieved through the following technical solutions:
[0050] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned intelligent enterprise resource configuration optimization method when executing the computer program.
[0051] The fourth objective of the present application is achieved through the following technical solutions:
[0052] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned intelligent enterprise resource configuration optimization method are implemented.
[0053] In summary, the present application includes at least one of the following beneficial technical effects:
[0054] 1. Since the production data in the environmental parameters that change every day are different, the historical production data and environmental parameters are analyzed for correlation, and the environmental parameters that affect the output, failure rate and raw material consumption are identified. The resource demand prediction model can be obtained by training based on the affected environmental parameters and historical production data; since the daily environmental parameters are dynamically changing, when the environmental parameter instruction is received, the current environmental parameters and the required material names are obtained, and the obtained environmental parameters and the required material names are sent to the resource demand prediction model, which can match the corresponding material estimates with the environmental parameters, and generate a production plan, and send the production plan to the production staff terminal for operation by the production staff. Therefore, the production staff terminal can obtain the quantity of materials required for production without daily calculations, and realize automatic acquisition of the estimated demand for materials in the production link every day, saving the cumbersome operation process of the staff, reducing operating costs, and improving resource utilization efficiency and response speed;
[0055] 2. The production data obtained under the environmental parameters that change every day are different. Therefore, by performing correlation analysis on the historical production data and the production link data, all the production processes affected by the environmental parameters in the historical production data can be identified and extracted; then all the production processes under different environmental parameters are compared to analyze the specific impact of each environmental parameter on the production process, such as whether the output is increased under certain temperature or humidity conditions, and the change trend between the production process and the environmental parameters can be obtained. The production processes affected by the environmental parameters are screened out and marked as key processes, and the environmental parameters that affect the changes in the key processes are associated, so that a resource demand forecasting model can be obtained to accurately forecast raw material consumption and manage inventory, reduce waste, and reduce costs;
[0056] 3. Since the production process conditions under different environmental parameters are different, the environmental parameters related to each production process can be determined by calculating the change rate of each production process under different environmental parameters. Then, by calculating the correlation coefficient between each environmental parameter and the production process, the slope of the correlation coefficient in the production process corresponding to each environmental parameter is obtained. The slope is compared with the preset slope value. If the slope is greater than the preset slope value, the production process is marked as a key process. When the impact of the environmental parameter change on the production process is greater than the preset slope value, it means that the production process is a key process.
[0057] 4. Since the required material quantity changes with the daily environmental parameters, when the current environmental parameters and the required material name are received, the environmental parameters will be used as query conditions to retrieve the matching raw material consumption data from the database, so that the resource demand forecasting model can find the raw material consumption within the same environmental parameter range from the database. Since there are raw material consumptions of various product materials within the same environmental parameter range, the raw material consumption associated with the material name can be screened out according to the required material name, and the screened raw material consumption can be used as the material estimate for the day, thereby realizing automated acquisition of material estimates, reducing personnel intervention and processing time, saving manpower and costs, and ensuring maximum production efficiency and cost-effectiveness. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 This is a flow chart of an embodiment of an intelligent enterprise resource allocation optimization method of the present application;
[0059] Figure 2 This is a flowchart of an implementation of step S20 in an embodiment of a smart enterprise resource configuration optimization method of the present application;
[0060] Figure 3 This is a flowchart for implementing step S230 in an embodiment of a smart enterprise resource configuration optimization method of the present application;
[0061] Figure 4 This is a flowchart for implementing step S30 in an embodiment of a smart enterprise resource configuration optimization method of the present application;
[0062] Figure 5 This is an implementation flow chart after step S320 in an embodiment of an intelligent enterprise resource configuration optimization method of the present application;
[0063] Figure 6 This is another implementation flow chart of step S30 in an embodiment of a smart enterprise resource configuration optimization method of the present application;
[0064] Figure 7 This is a principle block diagram of a computer device of the present application. DETAILED DESCRIPTION
[0065] The following is combined with Figure 1-7 This application is described in further detail.
[0066] In one embodiment, if Figure 1 As shown, the present application discloses a method for optimizing resource allocation of an intelligent enterprise, which specifically includes the following steps:
[0067] S10: Obtaining the historical production data of the enterprise and the corresponding environmental parameters at that time; the historical production data includes output, failure rate and raw material consumption;
[0068] In this embodiment, historical production data refers to the production material usage data of the enterprise over the past period of time, including output, failure rate and raw material consumption; environmental parameters refer to various variables, conditions or indicators that affect the production process, such as temperature, humidity, and ventilation volume.
[0069] Specifically, before an enterprise optimizes resources, it obtains the enterprise's historical production data and the corresponding environmental parameters at that time; the historical production data includes output, failure rate and raw material consumption.
[0070] S20: performing correlation analysis on historical production data and environmental parameters, identifying and training environmental parameters that affect historical production data, and obtaining a resource demand prediction model, wherein the environmental parameters include temperature, humidity, and ventilation volume;
[0071] In this embodiment, correlation analysis refers to a quantitative evaluation of the relationship between historical production data such as output, failure rate, raw material consumption and environmental parameters such as temperature, humidity, and ventilation volume.
[0072] Specifically, after the equipment terminal obtains the historical production data and the current corresponding environmental parameters, it performs a correlation analysis on the historical production data and the environmental parameters, analyzes the variable relationship between the two, and thus identifies the environmental parameters that affect the changes in historical production data and conducts training to obtain a resource demand prediction model, so as to adjust the required material quantity according to the model's prediction results to optimize resource allocation and improve production efficiency.
[0073] S30: when receiving the environmental parameter instruction, obtaining the current environmental parameters and the required material names, and sending the obtained environmental parameters and the required material names to the resource demand prediction model;
[0074] In this embodiment, the environmental parameter instruction refers to a work instruction triggered by a user through a user terminal to start the device terminal to obtain the current environmental parameters. The required material name refers to the production material required in the production link.
[0075] Specifically, when obtaining the estimated amount of materials, an environmental parameter instruction is issued through the PC in the production workshop to obtain the environmental parameter range and required material names in the production workshop for one day, and the obtained environmental parameters and required material names are sent to the resource demand prediction model.
[0076] S40: When the resource demand prediction model receives the environmental parameters and the required material names, it extracts the estimated material quantity corresponding to the environmental parameters and generates a production plan;
[0077] In this embodiment, material estimation refers to analyzing the usage of various materials based on environmental parameters from historical production data, and generation plan refers to plans in production links such as material estimation and personnel allocation.
[0078] Specifically, when the resource demand forecasting model receives the environmental parameters and the names of the required materials, it extracts the estimated amount of materials that match the environmental parameters according to the material consumption in the corresponding environmental parameters, and generates a production plan.
[0079] S50: Send the production plan to the production staff terminal for operation by the production staff.
[0080] In this embodiment, the production plan is sent to a production operator terminal for operation by the production operator and is displayed in the form of a list or a perspective chart, and the data of the required material quantity of each material name is displayed through the list or the perspective chart.
[0081] In one embodiment, referring to Figure 2 , step S20 comprises the steps of:
[0082] S210: performing correlation analysis on the historical production data and the environmental parameters, identifying and extracting all production processes affected by the environmental parameters in the historical production data;
[0083] S220: Compare all production processes under different environmental parameters;
[0084] S230: Filter out the production processes that change with the environmental parameters, mark them as key processes, associate the environmental parameters that affect the changes in the key processes, and train to obtain a resource demand prediction model.
[0085] In this embodiment, the production process refers to each production step in the production process that is affected by environmental parameters to affect the output, failure rate and raw material consumption.
[0086] Specifically, a correlation analysis is performed on historical production data and environmental parameters, and the influence relationship between the two is analyzed through the correlation analysis, so as to identify and extract all production processes affected by environmental parameters in historical production data, check the degree of change of all production processes affected by environmental parameters, and then compare all production processes under different environmental parameters to find out which production processes are most affected by environmental parameters. The production processes that change with environmental parameters are screened out and marked as key processes. Then the environmental parameters that affect the changes of the key processes are associated, and model training is performed to obtain a resource demand prediction model, so that the environmental parameters as input features can match the known material usage data under the corresponding environmental parameters, thereby achieving a reasonable allocation of the required material quantity in the production link and increasing production.
[0087] In one embodiment, referring to Figure 3 , step S230 comprises the steps of:
[0088] S231: Calculate the change rate of each production process based on the environmental parameters;
[0089] S232: Calculate the slope of the correlation coefficient between each environmental parameter and the production process based on the change rate;
[0090] S233: Compare the slope with a preset slope value;
[0091] S234: If the slope is greater than a preset slope value, the production process is marked as a critical process.
[0092] In this embodiment, the rate of change refers to the percentage change of each production process relative to its initial value within the range of environmental parameters, which is used to evaluate the sensitivity and volatility of changes in indicator environmental parameters; the slope refers to the rate at which the dependent variable changes with the independent variable, that is, each environmental parameter is used as an independent variable and each production process is used as a dependent variable; the preset slope value is used to determine whether a production process should be marked as a critical process, and is set by the enterprise based on its specific production needs and experience, in order to distinguish the production processes that are most sensitive to changes in environmental parameters.
[0093] Specifically, based on historical production data, including output, failure rate and raw material consumption, each production process under different environmental parameters is analyzed. For each production process, the change rate of the production process is calculated for different environmental parameters, so that the Pearson correlation coefficient is used to determine the correlation between each environmental parameter and the production process. Based on the correlation coefficient, the slope of the correlation coefficient between each environmental parameter and the production process is calculated to analyze the sensitivity of environmental parameter changes to production process changes. According to the size of the slope, the degree of influence of different environmental parameters on the production process can be evaluated; the slope is compared with the preset slope value; if the slope is greater than the preset slope value, the production process is marked as a critical process.
[0094] In one embodiment, referring to Figure 4 , step S30 comprises the steps of:
[0095] S310: When the resource demand prediction model receives the environmental parameters and the required material names, the resource demand prediction model finds the raw material consumption within the same environmental parameter range from the database;
[0096] S320: Based on the required material name, filter out the raw material consumption associated with the required material name and mark it as the material estimated quantity.
[0097] In this embodiment, the required material name refers to the specific raw materials or components required to be used in the production process; the environmental parameter range refers to a small interval within which the link parameters vary.
[0098] Specifically, environmental parameters and the names of required materials are two input features received by the resource demand prediction model. When the resource demand prediction model receives the environmental parameters and the names of required materials, the resource demand prediction model searches the historical data in the database for records that match the same range as the input environmental parameters. The records contain the consumption of raw materials under the same environmental conditions in the past. According to the name of the required material, the associated raw material consumption is screened out and marked as the estimated material amount. By considering the impact of environmental parameters on raw material consumption, the accuracy and reliability of resource demand prediction are improved, and production efficiency is improved.
[0099] In one embodiment, referring to Figure 5 After step S320, perform the following steps:
[0100] S321: Acquire new historical production data, and send the new historical production data to the resource demand prediction model;
[0101] S322: When a manual abandonment input instruction is received, the new historical production data is not included in the database for calculation with the output, failure rate and raw material consumption; otherwise, the new historical production data is calculated with the output, failure rate and raw material consumption in the database to update the latest environmental parameters and the corresponding material estimates.
[0102] In this embodiment, since equipment may wear out and age, new historical production data is periodically acquired and sent to the resource demand prediction model; after the resource demand prediction model receives the new historical production data, when a manual instruction to abandon entry is received, the resource demand prediction model will not use the new historical production data to update the output, failure rate, and raw material consumption in the database, indicating that the data will not affect the current state of the model; otherwise, the new historical production data is compared and calculated with the existing data stored in the database to use the new data to update and optimize the environmental parameters and material estimates of the resource demand prediction model.
[0103] In one embodiment, referring to Figure 6 , step 30 further comprises the steps of:
[0104] S31: When the resource demand prediction model cannot find the same environmental parameter range from the database, the resource demand prediction model finds the raw material consumption closest to the environmental parameter from the database;
[0105] S32: based on the required material names and the raw material consumption, the material estimated quantity is obtained by screening;
[0106] S33: Based on the material change rate, adjust the material estimate to obtain an adjusted material estimate.
[0107] In this embodiment, when the resource demand prediction model cannot find matching data with the same environmental parameter range as the input in the database, the resource demand prediction model will retrieve the raw material consumption closest to the same environmental parameter range, the name of the required material and the raw material consumption under the similar environmental parameters found, filter out the material estimate, and then use the previously calculated rate of change to adjust the material estimate to obtain a more accurate prediction value.
[0108] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0109] In one embodiment, a smart enterprise resource configuration optimization system is provided, and the smart enterprise resource configuration optimization system corresponds to the smart enterprise resource configuration optimization method in the above embodiment. The smart enterprise resource configuration optimization system includes:
[0110] A data collection module is used to obtain the company's historical production data and the corresponding environmental parameters at that time; the historical production data includes output, failure rate and raw material consumption;
[0111] A model training module is used to analyze the correlation between historical production data and environmental parameters, identify and train environmental parameters that affect historical production data, and obtain a resource demand prediction model. The environmental parameters include temperature, humidity, and ventilation volume.
[0112] An instruction acquisition module, for acquiring current environmental parameters and required material names when receiving an environmental parameter instruction, and sending the acquired environmental parameters and required material names to a resource demand prediction model;
[0113] The demand forecasting module is used to extract the estimated quantity of the material corresponding to the environmental parameters when the resource demand forecasting model receives the environmental parameters and the name of the required material, and generate a production plan;
[0114] The plan sending module is used to send the production plan to the production staff terminal for operation by the production staff.
[0115] Optionally, also include:
[0116] The production process extraction module is used to analyze the correlation between historical production data and environmental parameters, and identify and extract all production processes affected by environmental parameters in the historical production data;
[0117] The production process comparison module is used to compare all production processes under different environmental parameters;
[0118] The environmental parameter association module is used to screen out production processes that change with environmental parameters, mark them as key processes, and associate the environmental parameters that affect the changes in the key processes to train a resource demand prediction model.
[0119] Optionally, the environmental parameter association module includes:
[0120] The change rate calculation submodule calculates the change rate of each production process based on environmental parameters;
[0121] The slope calculation submodule is used to calculate the slope of the correlation coefficient between each environmental parameter and the production process based on the rate of change;
[0122] A slope comparison submodule, for comparing the slope with a preset slope value;
[0123] The key process marking submodule is used to mark the production process as a key process if the slope is greater than a preset slope value.
[0124] Optionally, the model training module includes:
[0125] A retrieval submodule, for when the resource demand prediction model receives the environmental parameters and the name of the required material, the resource demand prediction model finds the raw material consumption within the same environmental parameter range from the database;
[0126] The screening submodule is used to screen out the raw material consumption associated with the required material name based on the required material name and mark it as the material estimated amount.
[0127] Optionally, also include:
[0128] A data acquisition module, used for acquiring new historical production data and sending the new historical production data to a resource demand prediction model;
[0129] The instruction receiving module is used to, when a manual abandonment input instruction is received, the new historical production data will not be included in the database for calculation with the output, failure rate and raw material consumption; otherwise, the new historical production data will be calculated with the output, failure rate and raw material consumption in the database to update the latest environmental parameters and the corresponding material estimates.
[0130] Optionally, the model training module also includes:
[0131] The data matching submodule is used to find the raw material consumption closest to the environmental parameters from the database when the resource demand prediction model cannot find the same environmental parameter range from the database;
[0132] The estimated quantity screening submodule is used to screen the material estimated quantity based on the required material name and raw material consumption;
[0133] The estimated quantity adjustment submodule is used to adjust the material estimated quantity based on the material change rate to obtain an adjusted material estimated quantity.
[0134] For the specific definition of an intelligent enterprise resource configuration optimization system, please refer to the definition of an intelligent enterprise resource configuration optimization method above, which will not be repeated here. Each module in the above-mentioned intelligent enterprise resource configuration optimization system can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0135] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 7As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store historical production data, environmental parameters, material names, production processes and production plans. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for optimizing resource allocation of an intelligent enterprise is implemented.
[0136] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements an intelligent enterprise resource configuration optimization method when executing the computer program;
[0137] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, an intelligent enterprise resource configuration optimization method is implemented.
[0138] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0139] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0140] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for optimizing resource allocation of an intelligent enterprise, characterized in that: Includes steps: Obtain the company's historical production data and the corresponding environmental parameters at that time; the historical production data includes output, failure rate and raw material consumption; Perform correlation analysis on historical production data and environmental parameters, identify and train environmental parameters that affect historical production data, and obtain a resource demand prediction model, wherein the environmental parameters include temperature, humidity, and ventilation volume; When receiving the environmental parameter instruction, obtaining the current environmental parameters and the required material names, and sending the obtained environmental parameters and the required material names to the resource demand prediction model; When the resource demand forecasting model receives the environmental parameters and the names of the required materials, it extracts the estimated amount of materials that match the environmental parameters and generates a production plan; Send the production plan to the production terminal for production staff to operate; The step of performing correlation analysis between historical production data and environmental parameters, identifying environmental parameters that affect historical production data and training them, and obtaining a resource demand prediction model comprises the following steps: Conduct correlation analysis between historical production data and environmental parameters, and identify and extract all production processes affected by environmental parameters in historical production data; Compare all production processes under different environmental parameters; Filter out the production processes that change with environmental parameters, mark them as key processes, associate the environmental parameters that affect the changes in the key processes, and train to obtain a resource demand prediction model; The step of screening out the production processes that vary with environmental parameters and marking them as key processes comprises the following steps: Calculate the rate of change of each production process based on environmental parameters; Based on the rate of change, the slope of the correlation coefficient between each environmental parameter and the production process is calculated; comparing the slope to a preset slope value; If the slope is greater than the preset slope value, the production process is marked as a critical process; The step of extracting the estimated amount of materials corresponding to the environmental parameters when the resource demand prediction model receives the environmental parameters and the required material names comprises the following steps: When the resource demand prediction model receives the environmental parameters and the name of the required material, the resource demand prediction model finds the raw material consumption within the same environmental parameter range from the database; Based on the required material name, filter out the raw material consumption associated with the required material name and mark it as material estimated quantity; Based on the required material name, filter out the raw material consumption associated with the required material name, and after marking it as the material estimate, perform the following steps: Acquire new historical production data and send the new historical production data to the resource demand forecasting model; When a manual abandonment input instruction is received, the new historical production data is not included in the database for calculation with the output, failure rate and raw material consumption; otherwise, the new historical production data is calculated with the output, failure rate and raw material consumption in the database to update the latest environmental parameters and the corresponding material estimation; The step of extracting the estimated amount of materials corresponding to the environmental parameters when the resource demand prediction model receives the environmental parameters and the required material names also includes the following steps: When the resource demand prediction model cannot find the same environmental parameter range from the database, the resource demand prediction model finds the raw material consumption closest to the environmental parameter from the database; Based on the required material names and raw material consumption, the estimated material quantity is screened; Based on the material change rate, the material estimate is adjusted to obtain an adjusted material estimate.
2. An intelligent enterprise resource allocation optimization system, characterized in that: include: A data collection module is used to obtain the company's historical production data and the corresponding environmental parameters at that time; the historical production data includes output, failure rate and raw material consumption; A model training module is used to analyze the correlation between historical production data and environmental parameters, identify and train environmental parameters that affect historical production data, and obtain a resource demand prediction model. The environmental parameters include temperature, humidity, and ventilation volume. An instruction acquisition module, for acquiring current environmental parameters and required material names when receiving an environmental parameter instruction, and sending the acquired environmental parameters and required material names to a resource demand prediction model; The demand forecasting module is used to extract the estimated amount of materials corresponding to the environmental parameters when the resource demand forecasting model receives the environmental parameters and the names of the required materials, and generate a production plan; The plan sending module is used to send the production plan to the production terminal for production staff to operate; The production process extraction module is used to analyze the correlation between historical production data and environmental parameters, and identify and extract all production processes affected by environmental parameters in the historical production data; The production process comparison module is used to compare all production processes under different environmental parameters; The environmental parameter association module is used to screen out production processes that change with environmental parameters, mark them as key processes, and associate the environmental parameters that affect the changes in the key processes to train and obtain a resource demand prediction model; The change rate calculation submodule calculates the change rate of each production process based on environmental parameters; The slope calculation submodule is used to calculate the slope of the correlation coefficient between each environmental parameter and the production process based on the rate of change; A slope comparison submodule, for comparing the slope with a preset slope value; A key process marking submodule is used to mark the production process as a key process if the slope is greater than a preset slope value; A retrieval submodule, for when the resource demand prediction model receives the environmental parameters and the name of the required material, the resource demand prediction model finds the raw material consumption within the same environmental parameter range from the database; A screening submodule, for screening out the raw material consumption associated with the required material name based on the required material name, and marking it as the material estimated amount; A data acquisition module, used for acquiring new historical production data and sending the new historical production data to a resource demand prediction model; The instruction receiving module is used for not counting the new historical production data into the database for calculation with the output, failure rate and raw material consumption when receiving the manual abandonment input instruction; otherwise, the new historical production data is calculated with the output, failure rate and raw material consumption in the database to update the latest environmental parameters and the corresponding material estimation; The data matching submodule is used to find the raw material consumption closest to the environmental parameters from the database when the resource demand prediction model cannot find the same environmental parameter range from the database; The estimated quantity screening submodule is used to screen the material estimated quantity based on the required material name and raw material consumption; The estimated quantity adjustment submodule is used to adjust the material estimated quantity based on the material change rate to obtain the adjusted material estimated quantity.
3. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the intelligent enterprise resource configuration optimization method as claimed in claim 1 are implemented.
4. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the intelligent enterprise resource configuration optimization method as claimed in claim 1 are implemented.
Citation Information
Patent Citations
Online prediction method and system for yield and consumption of metallurgical byproduct gas
CN114580712A
Production intelligent feedback regulation and control system based on data mining
CN115630839A
Intelligent garden monitoring platform based on big data and method thereof
CN117063820A
Mine exploration raise boring machine with high guide hole deviation rate
CN117365289A
Full-process production method and system for intelligent integrated precast beam factory
CN117944173A
