Urban electricity consumption image display method, device, electronic device and readable medium
By constructing a three-dimensional urban electricity consumption model and combining power color information and abnormal detection results, the problem of information overload and long network transmission time in urban electricity consumption portrait display is solved, and intuitive and timely feedback on urban electricity consumption is achieved.
Patent Information
- Application Number
- CN202410814773.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-06-24
AI Technical Summary
Existing methods for displaying urban electricity consumption portraits suffer from information overload, making it difficult to provide intuitive feedback on urban electricity consumption. When the amount of data is large, network transmission and rendering take a long time, making it difficult to provide timely feedback.
By obtaining detailed building electricity consumption information and urban building outline vector data, a three-dimensional urban electricity consumption model is constructed. Combined with electricity color information and abnormal detection results, an intuitive urban electricity consumption portrait is generated, and is sent to the monitoring terminal when network transmission conditions are met.
It reduces the number and structural complexity of two-dimensional charts, improves the intuitiveness and timely feedback of urban electricity consumption, and reduces data transmission and rendering time.
Smart Images

Figure CN118397193B_ABST
Abstract
Description
Technical Field
[0001] Embodiments of the present disclosure relate to the field of computer technology, and in particular to a method, device, electronic device, and readable medium for displaying a city electricity consumption portrait. Background Art
[0002] The method for displaying a city electricity consumption portrait is a technology used to provide feedback on the city's electricity consumption situation. At present, when displaying a city electricity consumption portrait, the usual method is: first, statistically analyze the city's electricity consumption details and analyze the data anomaly through the year-on-year and year-on-year values of the electricity consumption data. Then, the city electricity consumption details data and electricity consumption statistical analysis data are sent to the data display terminal as the source data of the two-dimensional chart for display, thereby realizing the display of the city electricity consumption portrait.
[0003] However, in practice, it is found that when the above method is used to display the city's electricity consumption portrait, the following technical problems often occur:
[0004] First, due to the space and dimension limitations of two-dimensional charts, when the amount of data included in the urban electricity consumption portrait is large or the data dimensions are many, if two-dimensional charts are still used for display, the number of two-dimensional charts will increase or the structure will become complicated, which will easily lead to information overload and make it difficult to intuitively feedback the urban electricity consumption situation;
[0005] Second, since the year-on-year and month-on-month data are used to reflect the changing trend of the current power data, it is usually difficult to set a fixed year-on-year and month-on-month threshold for identifying abnormal power data, which makes the accuracy of abnormal analysis results low. As a result, the generated urban power consumption portrait is difficult to accurately reflect the urban power consumption situation;
[0006] Third, since the urban electricity consumption portrait usually has a large amount of data, when the network environment is poor, it usually takes a long time to transmit data and render the model, which makes it difficult to provide timely feedback on the urban electricity consumption situation.
[0007] The above information disclosed in this Background section is only for enhancement of understanding of the background of the present disclosure concept and therefore it may contain information that does not form the prior art that is already known in this country to a person of ordinary skill in the art. Summary of the invention
[0008] The content of this disclosure is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this disclosure is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.
[0009] Some embodiments of the present disclosure propose a method, device, electronic device and readable medium for displaying a portrait of urban electricity consumption to solve one or more of the technical problems mentioned in the above background technology section.
[0010] In a first aspect, some embodiments of the present disclosure provide a method for displaying a city electricity consumption portrait, the method comprising: obtaining a building electricity consumption detail information set and city building outline vector data corresponding to a target city, wherein the city building outline vector data comprises a building attribute information set; based on the building electricity consumption detail information set, updating the building attribute information set to obtain an updated building attribute information set corresponding to the city building outline vector data; determining a power color information group corresponding to the updated building attribute information set; constructing a three-dimensional city electricity consumption portrait based on the city building outline vector data and the power color information group. power model; generate a regional power consumption index information set based on a preset power index algorithm information set, urban zoning structure data and the above-mentioned building power consumption detail information set; perform abnormal detection processing on each building power consumption detail information in the above-mentioned building power consumption detail information set to obtain an abnormal power consumption information group; in response to determining that the network transmission index data meets the preset transmission conditions, determine the above-mentioned three-dimensional urban power consumption model, the above-mentioned regional power consumption index information set and the above-mentioned abnormal power consumption information group as a city power consumption portrait, and send the above-mentioned city power consumption portrait to a monitoring terminal for displaying the above-mentioned city power consumption portrait in a preset city power consumption monitoring interface.
[0011] In a second aspect, some embodiments of the present disclosure provide a device for displaying a portrait of urban electricity consumption, the device comprising: an acquisition unit, configured to acquire a building electricity consumption detail information set and a city building outline vector data corresponding to a target city, wherein the city building outline vector data comprises a building attribute information set; an update processing unit, configured to update the building attribute information set based on the building electricity consumption detail information set, and obtain an updated building attribute information set corresponding to the city building outline vector data; a first determination unit, configured to determine a power color information group corresponding to the updated building attribute information set; a construction unit, configured to construct a three-dimensional city based on the city building outline vector data and the power color information group. An electricity consumption model; a generating unit configured to generate a regional electricity consumption index information set based on a preset electricity index algorithm information set, urban zoning structure data and the above-mentioned building electricity consumption detail information set; an abnormality detection processing unit configured to perform abnormality detection processing on each building electricity consumption detail information in the above-mentioned building electricity consumption detail information set to obtain an abnormal electricity consumption information group; a second determining and sending unit configured to determine the above-mentioned three-dimensional urban electricity consumption model, the above-mentioned regional electricity consumption index information set and the above-mentioned abnormal electricity consumption information group as a city electricity consumption portrait in response to determining that the network transmission index data meets the preset transmission conditions, and send the above-mentioned city electricity consumption portrait to the monitoring terminal for displaying the above-mentioned city electricity consumption portrait in a preset city electricity consumption monitoring interface.
[0012] In a third aspect, some embodiments of the present disclosure provide an electronic device comprising: one or more processors; a storage device on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation manner of the above-mentioned first aspect.
[0013] In a fourth aspect, some embodiments of the present disclosure provide a computer-readable medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the method described in any implementation manner of the above-mentioned first aspect is implemented.
[0014] The above-mentioned embodiments of the present disclosure have the following beneficial effects: through the urban power consumption image display method of some embodiments of the present disclosure, information overload can be reduced and the urban power consumption situation can be intuitively fed back. Specifically, the reason for information overload and difficulty in intuitively feeding back the urban power consumption situation is that due to the space limitation and dimension limitation of the two-dimensional chart, when the amount of data included in the urban power consumption image is large or the data dimension is large, if the two-dimensional chart is still used for display, the number of two-dimensional charts will increase or the structure will become complicated. Based on this, the urban power consumption image display method of some embodiments of the present disclosure first obtains the building power consumption detail information set and the urban building outline vector data corresponding to the target city. Among them, the above-mentioned urban building outline vector data includes a building attribute information set. Thus, the detailed power consumption data and urban geographic information data of the city can be obtained, which is convenient for the subsequent multi-dimensional display of the power consumption data. Secondly, based on the above-mentioned building power consumption detail information set, the above-mentioned building attribute information set is updated to obtain the updated building attribute information set corresponding to the above-mentioned urban building outline vector data. Thus, the detailed power consumption data can be embedded in the urban geographic information data for subsequent display in the urban area map. Then, determine the power color information group corresponding to the above-mentioned updated building attribute information set. This makes it convenient to highlight and distinguish power-consuming buildings with different power consumption in the urban area map from the color texture dimension. Afterwards, a three-dimensional urban power consumption model is constructed based on the above-mentioned urban building outline vector data and the above-mentioned power color information group. Thus, a three-dimensional model that integrates urban power consumption data with less space occupation can be obtained, which is convenient for intuitive display of the power consumption data of each building. Then, based on the preset power index algorithm information set, urban zoning structure data and the above-mentioned building power consumption details information set, a regional power consumption index information set is generated. Thus, the statistical analysis results of the power consumption data of each area in the city can be obtained. Then, the power consumption details information of each building in the above-mentioned building power consumption details information set is subjected to abnormal detection processing to obtain an abnormal power consumption information group. Thus, the power consumption data of each building with abnormalities can be obtained. Finally, in response to determining that the network transmission index data meets the preset transmission conditions, the above-mentioned three-dimensional urban power consumption model, the above-mentioned regional power consumption index information set and the above-mentioned abnormal power consumption information group are determined as the urban power consumption portrait, and the above-mentioned urban power consumption portrait is sent to the monitoring terminal for displaying the above-mentioned urban power consumption portrait in the preset urban power consumption monitoring interface. In this way, a city power consumption portrait that is easy to display intuitively and comprehensively can be obtained. Therefore, the urban power consumption portrait display method of some embodiments of the present disclosure can greatly reduce the number of two-dimensional charts and reduce the complexity of the chart structure by embedding the power consumption data of each building in the city into the city map, and combining the power index data and the abnormal power consumption data. Thus, the city's power consumption situation can be fed back more intuitively and comprehensively. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that components and elements are not necessarily drawn to scale.
[0016] Figure 1 is a flow chart of some embodiments of the method for displaying a city electricity consumption portrait according to the present disclosure;
[0017] Figure 2 It is a structural schematic diagram of some embodiments of the urban electricity consumption image display device according to the present disclosure;
[0018] Figure 3 It is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present disclosure. DETAILED DESCRIPTION
[0019] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.
[0020] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.
[0021] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.
[0022] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0023] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.
[0024] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0025] Figure 1The process 100 of some embodiments of the method for displaying a city electricity consumption portrait according to the present disclosure is shown. The method for displaying a city electricity consumption portrait comprises the following steps:
[0026] Step 101, obtaining a building electricity consumption details information set and city building outline vector data corresponding to a target city.
[0027] In some embodiments, the execution subject (such as a computing device) of the urban power consumption portrait display method can obtain the building power consumption detail information set and the urban building outline vector data corresponding to the target city through a wired connection method or a wireless connection method. Among them, the above-mentioned target city may be a city in which the urban power consumption portrait is to be displayed. The above-mentioned urban power consumption portrait may be a feature set of the corresponding urban power consumption data. The building power consumption detail information in the above-mentioned building power consumption detail information set may be information on the power consumption of the corresponding building in the past week. The building power consumption detail information in the above-mentioned building power consumption detail information set may include a building identification, building power consumption and an attribution area identification. The above-mentioned building identification may be a unique identification of a building in the target city. The above-mentioned building power consumption may be the power consumption of the building. For example, when the building is a 30-story residential building, the building power consumption may be the total power consumption of the entire building. The above-mentioned attribution area identification may be a unique identification of the administrative area where the building is located. For example, the above-mentioned attribution area identification may be the code of the xx district under the jurisdiction of the target city. The above-mentioned urban building outline vector data may be data of vector graphics describing the shape and structure of the building. The above-mentioned urban building outline vector data may include a building attribute information set. Among them, the building attribute information in the above-mentioned building attribute information set may be information on the attributes of the corresponding building. The building attribute information in the building attribute information set may include a building identification, a building number of floors, and a building height. The building number of floors may be the number of floors of a building. The building height may be the height of a building. It should be noted that the wireless connection method may include but is not limited to 3G / 4G connection, WiFi connection, Bluetooth connection, WiMAX connection, Zigbee connection, UWB (ultra wideband) connection, and other wireless connection methods currently known or to be developed in the future.
[0028] Step 102: Based on the building electricity usage details information set, the building attribute information set is updated to obtain an updated building attribute information set corresponding to the urban building outline vector data.
[0029] In some embodiments, the execution subject may update the building attribute information set based on the building electricity usage details information set to obtain an updated building attribute information set corresponding to the urban building outline vector data. The updated building attribute information set may be a building attribute information set with added electricity information. For each building attribute information in the building attribute information set, the following steps may be performed:
[0030] In the first step, the building electricity usage details information matching the building attribute information is selected from the building electricity usage details information set as the target building electricity usage details information, wherein matching the building attribute information may be that the building identifier included in the building electricity usage details information is the same as the building identifier included in the building attribute information.
[0031] The second step is to determine the target electricity interval information corresponding to the target building electricity consumption details information based on the preset electricity interval information set. The electricity interval information in the electricity interval information set may be information on electricity value intervals. The electricity value interval may be a pre-set interval consisting of various continuous electricity values. The electricity interval information that matches the target building electricity consumption details information is selected from the electricity interval information set as the target electricity interval information. Matching the target building electricity consumption details information may be: among the various electricity values corresponding to the electricity interval information, there is an electricity value that is the same as the building electricity consumption included in the target building electricity consumption details information.
[0032] In a third step, the building attribute information and the target power interval information are determined as updated building attribute information.
[0033] Step 103, determine and update the power color information group corresponding to the building attribute information set.
[0034] In some embodiments, the execution subject may determine the power color information group corresponding to the updated building attribute information set in various ways, wherein the power color information in the power color information group may represent information on the color corresponding to the power.
[0035] In some optional implementations of some embodiments, each updated building attribute information in the updated building attribute information set may also include an electricity type identifier. The electricity type identifier may be a unique identifier of an electricity value interval. For example, when the electricity type identifier is "2", the corresponding electricity value interval may be 1 kilo-degree to 10 kilo-degree. The execution subject may determine the electricity color information group corresponding to the updated building attribute information set by following the steps below:
[0036] The first step is to select the color band information that meets the preset power type condition from the preset color band information group. Wherein, each color band information in the above-mentioned color band information group may include a color data sequence. The above-mentioned color data sequence may be an ordered set of RGB (Red Green Blue) colors arranged in order from cold colors to warm colors and from light to dark. Each color band information in the above-mentioned color band information group may also include a resource type identifier. The above-mentioned resource type identifier may be a unique identifier of a resource type. The above-mentioned resource type may represent the resource to which the data to be drawn belongs. For example, when the above-mentioned resource is an electric power resource, the above-mentioned resource type identifier may be "electricity". The above-mentioned preset power type condition may be that the resource type identifier included in the color band information represents the electric power resource.
[0037] In the second step, each power type identifier corresponding to the updated building attribute information set is determined as a power type identifier set, and the number of each power type identifier in the power type identifier set is determined as the power type number.
[0038] In the third step, the quotient of the sequence length corresponding to the color data sequence and the number of the power types is determined as the step value.
[0039] Step 4: Generate a color sorting value set based on the step value and the number of power types. The color sorting value in the color sorting value set may be the sequence number of the color data in the color data sequence. Specifically, the following steps may be performed:
[0040] The first sub-step is to randomly select a color data from the previous step value color data in the above color data sequence as the starting color data.
[0041] The second sub-step is to determine the serial number corresponding to the starting color data as the serial number value, and to add the serial number value as the initial color sorting value to a preset initial color sorting value set, wherein the initial color sorting value set may be an ordered set initialized to an empty set.
[0042] The third sub-step is to initialize the value of a preset counter to 1. The counter can be used to record the number of the determined initial color sorting values.
[0043] The fourth sub-step is to perform the following update sequence value generation steps based on the sequence value and the counter:
[0044] Sub-step one, in response to determining that the value of the counter is less than the number of power types, determining the sum of the sequence value and the step value as an updated sequence value, and adding the updated sequence value as an initial color sorting value to the initial color sorting value set.
[0045] Sub-step 2, updating the value of the counter, and using the updated sequence number value as the sequence number value, and executing the updated sequence number value generation step again. The sum of the value of the counter and 1 can be determined as the updated count value, and the updated count value can be used as the value of the counter, and the updated sequence number value can be used as the sequence number value, and the updated sequence number value generation step can be executed again.
[0046] Optionally, the execution subject may also determine the initial color sorting value set as the color sorting value set in response to determining that the value of the counter is equal to the number of power types.
[0047] Step 5: Generate a power color information group based on the color data sequence, the color sort value set and the power type identification set. Specifically, the following steps can be performed:
[0048] In the first sub-step, the power type identifiers in the power type identifier set are sorted according to the order of the power value intervals corresponding to the power type identifiers from small to large by a preset sorting algorithm to obtain a power type identifier sequence.
[0049] As an example, the above sorting algorithm may include but is not limited to at least one of the following: bubble sort, quick sort.
[0050] In the second sub-step, for each power type identifier in the power type identifier sequence, the following steps are performed:
[0051] Sub-step 1: Select a color sorting value that matches the power type identifier from the color sorting value set as a target color sorting value. Matching the power type identifier may be that the arrangement sequence number of the color sorting value in the color sorting value set is the same as the arrangement sequence number of the power type identifier in the power type identifier sequence.
[0052] Sub-step 2: Select color data with a sequence number equal to the target color sort value from the color data sequence.
[0053] Sub-step three: determining the above-mentioned power type identification and the selected color data as power color information.
[0054] Step 104: construct a three-dimensional urban electricity consumption model based on the urban building outline vector data and the power color information group.
[0055] In some embodiments, the execution subject may construct a three-dimensional city electricity consumption model based on the city building outline vector data and the power color information group. The three-dimensional city electricity consumption model may be a three-dimensional model that distinguishes the power consumption of each building in the city by color texture. The three-dimensional city electricity consumption model may be constructed based on the city building outline vector data and the power color information group by a preset three-dimensional model construction tool.
[0056] Optionally, the execution entity may export the three-dimensional urban electricity consumption model into an OBJ (Object) format file for storage or display.
[0057] As an example, the three-dimensional model building tool may be a GIS (Geographic Information System) tool.
[0058] Step 105, generating a regional power consumption index information set based on a preset power index algorithm information set, urban division structure data and building power consumption details information set.
[0059] In some embodiments, the execution subject may generate a regional power consumption index information set based on a preset power index algorithm information set, urban division structure data, and the building power consumption details information set. The power index algorithm information in the power index algorithm information set may include, but is not limited to, a power index identifier, input parameter information, an algorithm interface identifier, and an indicator type identifier. The power index identifier may be a unique identifier of a power index. The power index may be an indicator related to power consumption. For example, the power index may include, but is not limited to, at least one of the following: total power consumption, average power consumption, year-on-year value of power consumption, and month-on-month value of power consumption. The input parameter information may be information of input parameters of the corresponding algorithm. The algorithm interface identifier may be a unique identifier of an interface for calling an algorithm program. The indicator type identifier may be a unique identifier of an indicator type. The indicator type may be one of the following: a vertical type and a horizontal type. The vertical type may represent a power index used for statistical analysis of power consumption within a single administrative region. The horizontal type may represent a power index used for statistical analysis of power consumption between administrative regions. The urban division structure data may represent the hierarchical relationship between administrative divisions at all levels in a city. The regional electricity consumption index information in the above-mentioned regional electricity consumption index information set may be information on electricity indexes corresponding to administrative regions.
[0060] In some optional implementations of some embodiments, the above-mentioned urban zoning structure data may include a city identifier and a regional division information set. Among them, the above-mentioned city identifier may be a unique identifier of the above-mentioned target city. The regional division information in the above-mentioned regional division information set may include a division area identifier and a subordinate area identifier group. The above-mentioned division area identifier may be a unique identifier of a division area. The above-mentioned division area may be an administratively divided area. For example, the above-mentioned division area may be xx district or xx village. The subordinate area identifier in the above-mentioned subordinate area identifier group may be a unique identifier of a subordinate area. The above-mentioned subordinate area may be a division area of the next level. Each subordinate area corresponding to the subordinate area identifier group belongs to the division area corresponding to the above-mentioned division area identifier. The above-mentioned execution subject may generate a regional power consumption index information set based on a preset power index algorithm information set, urban zoning structure data and the above-mentioned building power consumption details information set through the following steps:
[0061] The first step is to classify and process each power indicator algorithm information in the above-mentioned power indicator algorithm information set to obtain a vertical power indicator algorithm information group and a horizontal power indicator algorithm information group. Among them, the vertical power indicator algorithm information in the above-mentioned vertical power indicator algorithm information group can be power indicator algorithm information with a vertical indicator type. The horizontal power indicator algorithm information in the above-mentioned horizontal power indicator algorithm information group can be power indicator algorithm information with a horizontal indicator type. First, select each power indicator algorithm information with a corresponding indicator type of the vertical type from the above-mentioned power indicator algorithm information set as the vertical power indicator algorithm information group. Then, select each power indicator algorithm information with a corresponding indicator type of the horizontal type from the above-mentioned power indicator algorithm information set as the horizontal power indicator algorithm information group.
[0062] In the second step, for each area division information in the area division information set, the following steps are performed:
[0063] In the first sub-step, the building electricity usage details information matching the above-mentioned regional division information is selected from the above-mentioned building electricity usage details information set as the regional building electricity usage details information, and the regional building electricity usage details information set is obtained. Wherein, matching the above-mentioned regional division information may be: the area represented by the belonging area identifier included in the building electricity usage details information belongs to the divided area represented by the divided area identifier included in the above-mentioned regional division information.
[0064] The second sub-step is to generate regional vertical power consumption index information based on the vertical power index algorithm information group and the regional building power consumption details information set. The regional vertical power consumption index information may be information on the value of each vertical type of power index in the corresponding region. The following steps are specifically performed:
[0065] Sub-step one, for each vertical power index algorithm information in the above-mentioned vertical power index algorithm information group, generate the first input parameter data through the preset input parameter parsing interface according to the corresponding power index identifier and the regional building power consumption details information set, and through the algorithm interface corresponding to the above-mentioned algorithm interface identifier, execute the algorithm corresponding to the above-mentioned vertical power index algorithm information according to the above-mentioned first input parameter data to obtain the power index result. Among them, the above-mentioned input parameter parsing interface can encapsulate a parameter parsing method and a data acquisition method. The above-mentioned parameter parsing method can be used to parse the input parameter information and determine whether it is necessary to obtain additional demand data. The above-mentioned data acquisition method can be used to obtain the input data required by the algorithm. For example, when the power index algorithm also needs other demand data (such as regional vertical power consumption index information in historical periods), it can be obtained through the data acquisition method. The above-mentioned first input parameter data can be the data to be input into the algorithm.
[0066] Sub-step two: determining the division area identifier corresponding to the above-mentioned area division information and each obtained power index result as the regional vertical power consumption index information.
[0067] The third step is to determine the regional horizontal comparison index information corresponding to each horizontal power index algorithm information in the horizontal power index algorithm information group based on the generated vertical power index information of each region, and obtain the regional horizontal comparison index information group. Among them, the regional horizontal comparison index information in the regional horizontal comparison index information group can be the result of comparing the power consumption data between each region. For each horizontal power index algorithm information in the horizontal power index algorithm information group, perform the following steps:
[0068] The first sub-step is to generate second input parameter data through the above-mentioned input parameter parsing interface according to the corresponding power index identifier and the vertical power consumption index information of each region. The above-mentioned second input parameter data can be the data to be input into the algorithm.
[0069] In the second sub-step, the algorithm corresponding to the horizontal power index algorithm information is executed according to the second input parameter data through the algorithm interface corresponding to the algorithm interface identifier included in the horizontal power index algorithm information to obtain the regional horizontal comparison index information.
[0070] The fourth step is to determine the generated vertical power consumption index information of each region and each regional horizontal comparison index information in the above regional horizontal comparison index information group as regional power consumption index information to obtain a regional power consumption index information set.
[0071] Step 106, performing abnormality detection processing on each building electricity usage detail information in the building electricity usage detail information set to obtain an abnormal electricity usage information group.
[0072] In some embodiments, the execution subject may perform abnormal detection processing on each building electricity usage detail information in the building electricity usage detail information set in various ways to obtain an abnormal electricity usage information group. The abnormal electricity usage information in the abnormal electricity usage information group may be information that the building's electricity usage is higher or lower than a preset electricity usage range. The preset electricity usage range may be determined based on historical electricity usage data.
[0073] In some optional implementations of some embodiments, the execution subject may perform abnormality detection processing on each building electricity usage detail information in the building electricity usage detail information set to obtain an abnormal electricity usage information group through the following steps:
[0074] The first step is to obtain a historical long-term city electricity consumption information sequence and a historical short-term city electricity consumption information sequence. Among them, the above-mentioned historical long-term city electricity consumption information sequence can be an ordered set of each city electricity consumption information arranged according to the electricity consumption time corresponding to the historical long-term time range. The above-mentioned historical long-term time range can be a time period of a preset long-term duration earlier than the time period corresponding to the above-mentioned building electricity consumption details information set. The above-mentioned preset long-term duration can be a preset duration. For example, the above-mentioned preset long-term duration can be 2 years. The above-mentioned city electricity consumption information can include but is not limited to the city building identification, consumption date, daily power consumption, maximum power consumption per hour on the day, and minimum power consumption per hour on the day. The above-mentioned city building identification can be a unique identification of a building in the target city. The above-mentioned consumption date can be the electricity consumption date of the corresponding building. The above-mentioned daily power consumption can be the power consumption of the corresponding building in a single day. The above-mentioned maximum power consumption per hour on the day can be the maximum power consumption consumed per hour on the corresponding consumption date in a day. The above-mentioned minimum power consumption per hour on the day can be the minimum power consumption consumed per hour on the corresponding consumption date in a day. The above-mentioned historical short-term city electricity consumption information sequence may be an ordered set of each city electricity consumption information arranged according to the electricity consumption time corresponding to the historical short-term time range. The above-mentioned historical short-term time range may be a time period of a preset short-term duration earlier than the time period corresponding to the above-mentioned building electricity consumption details information set. The above-mentioned preset short-term duration may be a preset duration. For example, the above-mentioned preset short-term duration may be 2 months. The historical long-term city electricity consumption information sequence and the historical short-term city electricity consumption information sequence may be obtained from a preset database. Among them, the above-mentioned preset database may be a preset database for storing historical city electricity consumption information.
[0075] The second step is to generate a first city electricity consumption information set corresponding to the target period based on the above historical long-term city electricity consumption information sequence. The above target period is the time period corresponding to the above building electricity consumption details information set. The first city electricity consumption information in the above first city electricity consumption information set may be information on the electricity consumption of the corresponding building in the target period predicted based on long-term historical electricity consumption data. The first city electricity consumption information set corresponding to the target period may be generated based on the above historical long-term city electricity consumption information sequence by a preset long-term time series prediction method.
[0076] As an example, the above-mentioned long-term time series prediction method can be but is not limited to one of the following: a moving average method, a differential autoregressive moving average model.
[0077] The third step is to generate a second city electricity consumption information set corresponding to the target period based on the historical short-term city electricity consumption information sequence. The second city electricity consumption information in the second city electricity consumption information set may be the electricity consumption information of the corresponding building in the target period predicted based on the short-term historical electricity consumption data.
[0078] In some optional implementations of some embodiments, the execution subject may generate a second city electricity consumption information set corresponding to the target period based on the historical short-term city electricity consumption information sequence through the following steps:
[0079] Step 1: Classify the above historical short-term urban electricity consumption information sequence to obtain each same-building short-term electricity consumption information sequence. Each same-building short-term electricity consumption information sequence may be a sequence of electricity consumption information corresponding to the same building arranged in chronological order. First, the above historical short-term urban electricity consumption information sequence may be classified according to the urban building identification included in each historical short-term urban electricity consumption information to obtain the same-building short-term electricity consumption information sequence.
[0080] Step 2: For each short-term electricity consumption information sequence of the same building, perform the following steps:
[0081] Sub-step 1: normalize the short-term electricity consumption information sequence of the same building to obtain a normalized short-term electricity consumption information sequence. The normalized short-term electricity consumption information sequence may be a short-term electricity consumption information sequence of the same building whose included numerical fields are normalized within a preset numerical range. The preset numerical range may be a value range of a preset numerical type. The short-term electricity consumption information sequence of the same building may be normalized by a preset normalization method to obtain a normalized short-term electricity consumption information sequence.
[0082] As an example, the preset numerical interval may be [0, 1]. The normalization method may be a deviation normalization method.
[0083] Sub-step 2, converting each normalized short-term electricity consumption information in the above normalized short-term electricity consumption information sequence to obtain a same-building short-term electricity consumption feature vector sequence. Among them, the same-building short-term electricity consumption feature vectors in the above same-building short-term electricity consumption feature vector sequence correspond one-to-one to the normalized short-term electricity consumption information in the above normalized short-term electricity consumption information sequence. The same-building short-term electricity consumption feature vectors in the above same-building short-term electricity consumption feature vector sequence can represent the corresponding normalized short-term electricity consumption information. For each normalized short-term electricity consumption information in the above normalized short-term electricity consumption information sequence, perform the following steps:
[0084] In a first sub-step, the normalized short-term power consumption information is updated by a preset non-numeric data encoding method to obtain updated short-term power consumption information. The non-numeric data encoding method may be a method for converting non-numeric data into a code. The updated short-term power consumption information may be non-numeric data replaced by the encoded normalized short-term power consumption information.
[0085] As an example, the above-mentioned non-numeric data encoding processing method may include but is not limited to at least one of the following: a one-hot encoding method based on a bag-of-words model, and a date encoding method based on year, month, and day.
[0086] In the second sub-step, each field value included in the updated short-term electricity consumption information is concatenated to obtain single-day electricity consumption coded data, and the single-day electricity consumption coded data is vectorized to obtain the short-term electricity consumption feature vector of the same building.
[0087] Sub-step three, determine the global change feature vector, the power increase deviation feature vector and the power decrease deviation feature vector corresponding to the above normalized short-term power consumption information sequence. Among them, the above global change feature vector can characterize the average power consumption trend of consecutive power consumption days. The above power increase deviation feature vector can characterize the characteristics of the power consumption deviating from the average power consumption level and showing an upward trend. The above power decrease deviation feature vector can characterize the characteristics of the power consumption deviating from the average power consumption level and showing a downward trend. Specifically, the following steps can be performed:
[0088] In the first sub-step, the average power sequence corresponding to the above normalized short-term power consumption information sequence is determined according to the preset time window length by a preset moving average method, and the vector representation of the above average power sequence is determined as a global change feature vector. The above time window length may be the number of days corresponding to the preset time window. For example, when the consumption date is "2022-03-21" and the time window length is 5, the time period corresponding to the above time window is "2022-03-17" to "2022-03-21".
[0089] The second sub-step is to determine the standard deviation of power consumption corresponding to each normalized short-term power consumption information in the normalized short-term power consumption information sequence by using a preset standard deviation formula according to the average power sequence and the time window length. The standard deviation of power consumption may be the standard deviation of each power consumption corresponding to the time window of the corresponding consumption date.
[0090] The third sub-step is to perform the following steps for each normalized short-term power consumption information in the normalized short-term power consumption information sequence:
[0091] In the first step, the average electricity quantity matching the above-mentioned normalized short-term electricity consumption information is selected from the above-mentioned average electricity quantity sequence as the target average electricity quantity.
[0092] In the second step, the product of the power consumption standard deviation corresponding to the normalized short-term power consumption information and the preset adjustment coefficient is determined as the fluctuation range value. The preset adjustment coefficient may be a pre-set coefficient for adjusting the intensity of power fluctuation.
[0093] In the third step, the sum of the target average power and the fluctuation range is determined as the power deviation upper limit value.
[0094] The fourth step is to determine the difference between the target average power and the fluctuation range as the power deviation lower limit value.
[0095] The fourth sub-step is to determine the individual power deviations from the upper limit values corresponding to the above normalized short-term power usage information sequence as a power deviation from the upper limit value sequence, and to determine the individual power deviations from the lower limit values corresponding to the above normalized short-term power usage information sequence as a power deviation from the lower limit value sequence.
[0096] The fifth sub-step is to normalize the above-mentioned electric quantity deviation upper limit value sequence and the above-mentioned electric quantity deviation lower limit value sequence through the above-mentioned normalization method and deviation normalization method to obtain a normalized electric quantity deviation upper limit value sequence and a normalized electric quantity deviation lower limit value sequence.
[0097] The sixth sub-step is to vectorize the above normalized electric quantity deviation sequence from the upper limit value to obtain the electric quantity increase deviation characteristic vector, and to vectorize the above normalized electric quantity deviation sequence from the lower limit value to obtain the electric quantity decrease deviation characteristic vector.
[0098] Sub-step 4: splicing the above-mentioned global change feature vector, the above-mentioned power increase deviation feature vector and the above-mentioned power decrease deviation feature vector to obtain the power change feature vector. The above-mentioned power change feature vector can represent the change trend of power. The above-mentioned global change feature vector, the above-mentioned power increase deviation feature vector and the above-mentioned power decrease deviation feature vector can be spliced by vertical splicing to obtain the power change feature vector.
[0099] Sub-step 5: Input the short-term electricity consumption feature vector sequence of the same building and the electricity consumption change feature vector into a pre-trained feature extraction network to obtain a local feature extraction result. The feature extraction network may be a convolutional neural network for extracting nonlinear local features.
[0100] Sub-step 6: Input the local feature extraction result into a pre-trained bidirectional long short-term memory network to obtain a power consumption prediction result. The power consumption prediction result may be a set of normalized predicted power consumptions corresponding to the target time period. The normalized predicted power consumption may be predicted power consumption normalized using a preset numerical interval.
[0101] Sub-step 7: convert the above power consumption forecast results to obtain the second city power consumption information. First, for each normalized predicted power consumption in the above power consumption forecast results, determine the predicted power consumption corresponding to the above normalized predicted power consumption by the inverse operation of the above normalization method. Then, the sum of the determined predicted power consumptions is determined as the second city power consumption information.
[0102] Step 4: for each piece of building electricity usage details information in the above building electricity usage details information set, perform the following steps to generate abnormal electricity usage information in the abnormal electricity usage information group:
[0103] In the first sub-step, the first city electricity information matching the building electricity details information is selected from the first city electricity information set as the first building electricity information. The matching with the building electricity details information may be that the city building identifier corresponding to the first city electricity information is the same as the building identifier included in the building electricity details information.
[0104] The second sub-step is to select the second city electricity information that matches the building electricity details information from the second city electricity information set as the second building electricity information. The information that matches the building electricity details information may be that the city building identifier corresponding to the second city electricity information is the same as the building identifier included in the building electricity details information.
[0105] The third sub-step is to determine the power interval information corresponding to the first building power information and the second building power information. The power interval information can represent the power value interval. First, in response to determining that the first power consumption included in the first building power information is greater than or equal to the second power consumption included in the second building power information, the first power consumption included in the first building power information is determined as the upper power consumption limit, and the second power consumption included in the second building power information is determined as the lower power consumption limit. Then, in response to determining that the first power consumption included in the first building power information is less than the second power consumption included in the second building power information, the first power consumption included in the first building power information is determined as the lower power consumption limit, and the second power consumption included in the second building power information is determined as the upper power consumption limit. Finally, the city building identification corresponding to the first building power information, the lower power consumption limit and the upper power consumption limit are determined as the power interval information.
[0106] The fourth sub-step is to determine the abnormal power consumption information corresponding to the above-mentioned building power consumption details information based on the above-mentioned power consumption interval information. First, in response to determining that the building power consumption included in the above-mentioned building power consumption details information is less than the above-mentioned power consumption lower limit included in the above-mentioned power consumption interval information, the preset abnormal decrease flag and the above-mentioned building power consumption details information are determined as abnormal power consumption information. Among them, the above-mentioned preset abnormal decrease flag can indicate that the power consumption of the corresponding building is lower than the preset power range. Then, in response to determining that the building power consumption included in the above-mentioned building power consumption details information is greater than the above-mentioned power consumption upper limit included in the above-mentioned power consumption interval information, the preset abnormal increase flag and the above-mentioned building power consumption details information are determined as abnormal power consumption information. Among them, the above-mentioned preset abnormal increase flag can indicate that the power consumption of the corresponding building is higher than the preset power range.
[0107] The above abnormal power consumption information group generation step and its related contents, as an inventive point of an embodiment of the present disclosure, solve the technical problem 2 mentioned in the background technology, "the generated urban power consumption portrait is difficult to accurately reflect the urban power consumption situation". The reasons why the generated urban power consumption portrait is difficult to accurately reflect the urban power consumption situation are often as follows: since the same-month data is used to reflect the change trend of the current power data, it is usually difficult to set a fixed same-month threshold for abnormal identification of the power data, which makes the accuracy of the abnormal analysis result low. If the above problem is solved, the generated urban power consumption portrait can accurately reflect the urban power consumption situation. In order to achieve this effect, first, the urban power consumption is predicted by the historical long-term urban power consumption information sequence and the historical short-term urban power consumption information sequence. Thus, time series prediction data with trend, seasonality and periodicity can be obtained, and time series prediction data with short-term fluctuation trend can also be obtained. Then, for each building, a more reasonable power interval can be determined according to the corresponding two prediction results, and the corresponding power data can be identified as abnormal according to the power interval. Thus, the accuracy of the abnormal analysis results can be improved. Because when the historical short-term electricity data fluctuates greatly, if the prediction is made through the time series decomposition method, the prediction result will be less accurate. Therefore, this step also extracts the trend characteristics of the historical short-term electricity data from three dimensions: the global average trend of electricity, the upward deviation trend of electricity, and the downward deviation trend of electricity. Then, the local features are extracted through the convolutional neural network, and finally the electricity consumption prediction result is obtained through the bidirectional feature extraction network prediction, thereby improving the accuracy of the abnormal analysis results. Therefore, the generated urban electricity consumption portrait can more accurately reflect the urban electricity consumption situation.
[0108] Step 107, in response to determining that the network transmission index data meets the preset transmission conditions, the three-dimensional urban power consumption model, the regional power consumption index information set and the abnormal power consumption information group are determined as the urban power consumption portrait, and the urban power consumption portrait is sent to the monitoring terminal for display in the preset urban power consumption monitoring interface.
[0109] In some embodiments, the execution subject may determine the three-dimensional city power consumption model, the regional power consumption index information set and the abnormal power consumption information group as a city power consumption portrait in response to determining that the network transmission index data meets the preset transmission conditions, and send the city power consumption portrait to the monitoring terminal for displaying the city power consumption portrait in the preset city power consumption monitoring interface. Among them, the network transmission index data may include but is not limited to transmission rate, bandwidth utilization, and network delay. The preset transmission condition may be that the transmission rate included in the network transmission index data is greater than the preset rate value and the network delay included is less than the preset delay value. The preset rate value may be the lower limit of the preset transmission rate. The preset delay value may be the upper limit of the preset delay. The monitoring terminal may be a terminal for displaying the city power consumption portrait to feedback the city power consumption situation. The preset city power consumption monitoring interface may be a preset interface for monitoring city power consumption data.
[0110] It should be noted that when the network transmission indicator data meets the preset transmission conditions, the network status is good and suitable for transmitting large amounts of data. In addition, in addition to the method for determining the network status based on the transmission rate and network delay provided in this solution, technical personnel in this field can also set different solutions to determine the network status according to the specific network structure in practice.
[0111] Optionally, the three-dimensional urban electricity consumption model may include data of various building elements. The building element data may characterize the building elements constituting the three-dimensional urban electricity consumption model. Each building electricity consumption detail information in the building electricity consumption detail information set may include a land type identifier. The land type identifier may be an identifier of the electricity consumption type. The land type may be, but is not limited to, one of the following: residential land, commercial land, industrial land. The execution subject may also perform the following steps:
[0112] In the first step, in response to receiving the graphic selection information for each building element data in the three-dimensional urban power consumption model, the building power consumption detail information matching the graphic selection information is selected from the building power consumption detail information set as the target building power consumption detail information, and the target building power consumption detail information set is obtained. The graphic selection information may be the information of the building identification corresponding to each building element circled in the three-dimensional urban power consumption model by the monitoring personnel through the graphic at the monitoring terminal. Matching the graphic selection information may be that the building identification included in the building power consumption detail information is the same as any building identification corresponding to the graphic selection information.
[0113] The second step is to obtain a building electricity usage details information set corresponding to the target building electricity usage details information set in the same period. The building electricity usage details information set in the same period may be a target building electricity usage details information set of the same period of the previous year obtained from a preset database.
[0114] The third step is to determine the classified building electricity information group set corresponding to the target building electricity information set based on the land type identifier included in each building electricity information set, and determine the classified building electricity information group set corresponding to the same period building electricity information set. Each classified building electricity information group in the classified building electricity information group set may be each target building electricity information set corresponding to the same land type. Each classified building electricity information group in the classified building electricity information group set may be each building electricity information set corresponding to the same land type.
[0115] The fourth step is to determine the first sub-type electricity information corresponding to each classified building electricity information group in the above-mentioned classified building electricity information group set, and obtain the first sub-type electricity information set. Among them, the first sub-type electricity information can be the summary information of each classified building electricity information in the corresponding classified building electricity information group. For each classified building electricity information group in the above-mentioned classified building electricity information group set, the sum of the building electricity consumption corresponding to the above-mentioned classified building electricity information group is determined as the total classified electricity, and the land type identifier corresponding to the above-mentioned classified building electricity information group and the above-mentioned total classified electricity are determined as the first sub-type electricity information.
[0116] The fifth step is to determine the second sub-type electricity information corresponding to each classified building electricity information group in the above-mentioned classified building electricity information group set, and obtain the second sub-type electricity information set. Among them, the second sub-type electricity information can be the summary information of each classified building electricity information in the corresponding classified building electricity information group. For each classified building electricity information group in the above-mentioned classified building electricity information group set, the sum of the building electricity consumption corresponding to the above-mentioned classified building electricity information group is determined as the classified total electricity, and the land use type identifier corresponding to the above-mentioned classified building electricity information group and the above-mentioned classified total electricity are determined as the second sub-type electricity information.
[0117] The sixth step is to generate a year-on-year electricity information set based on the first sub-type electricity information set and the second sub-type electricity information set. Among them, each year-on-year electricity information in the above-mentioned year-on-year electricity information set can be the year-on-year information of the total electricity of the land use type. The year-on-year electricity information set can be generated based on the first sub-type electricity information set and the second sub-type electricity information set through a preset year-on-year data generation interface. The above-mentioned year-on-year data generation interface can be encapsulated with a year-on-year data generation method. The above-mentioned year-on-year data generation method can be a method for generating year-on-year electricity information according to the first sub-type electricity information and the second sub-type electricity information corresponding to the same land use type through a preset year-on-year growth calculation formula.
[0118] The seventh step is to send the electricity consumption year-on-year information set to the monitoring terminal so as to draw an electricity consumption year-on-year graph in the statistical result panel. The statistical result panel can be a panel in the preset city electricity consumption monitoring interface.
[0119] Optionally, the above execution entity may further perform the following steps:
[0120] The first step is to generate target building distribution path information in response to receiving associated distribution path request information for any building element data in the above-mentioned three-dimensional urban electricity consumption model, based on a preset building distribution path information set and the above-mentioned any building element data. Among them, the associated distribution path request information may be information requesting to display the distribution line associated with the building. The building distribution path information in the above-mentioned building distribution path information set may include a building identifier and a distribution line identifier. The above-mentioned distribution line identifier may be a unique identifier of the distribution line. The above-mentioned target building distribution path information may be information on the distribution line of the corresponding building. Select the building distribution path information whose building identifier is the same as the building identifier corresponding to the above-mentioned any building element data from the above-mentioned building distribution path information set.
[0121] The second step is to obtain the current load number, rated load number and distribution network model corresponding to the distribution path information of the target building. The current load number may be the actual load when the distribution line is in operation. The rated load number may be the maximum load when the distribution line is in normal operation. The distribution network model may be a three-dimensional model corresponding to the distribution line. According to the distribution line identifier included in the distribution path information of the target building, the database may be searched to obtain the current load number, rated load number and distribution network model.
[0122] The third step is to determine the load rate information corresponding to the current load number and the rated load number. The load rate information may be the load rate information of the distribution line. First, the ratio of the current load number to the rated load number is determined as the distribution path load rate. Then, the distribution path identifier and the distribution path load rate are determined as the load rate information.
[0123] The fourth step is to send the distribution network model and the load rate information to the monitoring terminal, so as to superimpose the distribution network model and the three-dimensional urban power consumption model, and display the load rate information in the preset urban power consumption monitoring interface. The monitoring terminal can superimpose the distribution network model and the three-dimensional urban power consumption model through the WebGL (Web Graphics Library) drawing protocol, and display the load rate information in the preset urban power consumption monitoring interface.
[0124] Optionally, the above execution entity may further perform the following steps:
[0125] The first step is to generate a city electricity snapshot image group corresponding to the above-mentioned three-dimensional city electricity consumption model in response to determining that the above-mentioned network transmission indicator data does not meet the above-mentioned preset transmission conditions. Among them, the city electricity snapshot images in the above-mentioned city electricity snapshot image group can be two-dimensional images of different angles corresponding to the three-dimensional city electricity consumption model. The city electricity snapshot image group can be generated according to the above-mentioned three-dimensional city electricity consumption model through a preset image generation interface. Among them, the above-mentioned image generation interface can encapsulate a multi-perspective image generation method. The above-mentioned multi-perspective image generation method can generate a city electricity snapshot image group according to the above-mentioned three-dimensional city electricity consumption model and a preset angle group by calling the Blender three-dimensional graphics image tool. The above-mentioned preset angle group can be a set of pre-set light source angles.
[0126] In the second step, for each city electricity consumption snapshot image in the above city electricity consumption snapshot image group, the following steps are performed:
[0127] In the first sub-step, the color data corresponding to the above-mentioned power color information group are converted to obtain a converted color data group. The converted color data in the above-mentioned converted color data group may be color data in the HSL (HueSaturation Lightness) color space. The color data corresponding to the above-mentioned power color information group may be converted to obtain a converted color data group by using an RGB to HSL color conversion method.
[0128] The second sub-step is to perform binarization processing on each pixel in the above-mentioned city electricity consumption snapshot image based on the above-mentioned conversion color data group to obtain a binary electricity consumption image. The above-mentioned binary electricity consumption image can be a black and white image. First, for each pixel in the above-mentioned city electricity consumption snapshot image, in response to determining that the conversion color data corresponding to the above-mentioned pixel exists in the above-mentioned conversion color data group, the value of the above-mentioned pixel is updated to 0, and in response to determining that the conversion color data corresponding to the above-mentioned pixel does not exist in the above-mentioned conversion color data group, the value of the above-mentioned pixel is updated to 255.
[0129] The third sub-step is to generate a building area value based on the binary land image. The building area value may be the number of pixels occupied by the visible area of the building in the urban electricity snapshot image. The number of pixels in the binary land image whose pixel values are 0 may be determined as the building area value.
[0130] In the third step, a building area value that satisfies a preset sorting condition is selected from the determined building area values as a target area value, and a target area value group is obtained. The preset sorting condition may be that the sequence number of the building area value in the building area value sequence is less than or equal to the preset number of images to be displayed. The preset number of images to be displayed may be a preset number of images to be displayed. The building area value sequence may be a sequence of building area values arranged from large to small.
[0131] The fourth step is to determine the city electricity consumption snapshot images corresponding to the target region area value group as the target city electricity consumption snapshot image group.
[0132] The fifth step is to determine the preset network status prompt information, the target city power consumption snapshot image group, the regional power consumption index information set and the abnormal power consumption information group as the city power consumption portrait, and send the city power consumption portrait to the monitoring terminal for display. Among them, the preset network status prompt information can be information prompting to switch networks. For example, the preset network status prompt information can be "The current network is poor. If you need to load the original image data, please switch the network and try again."
[0133] The above-mentioned target city electricity consumption snapshot image group generation step and its related content, as an inventive point of the embodiment of the present disclosure, solve the technical problem three mentioned in the background technology, "it is difficult to timely feedback the city electricity consumption situation". The reasons for the difficulty in timely feedback of the city electricity consumption situation are often as follows: Since the city electricity consumption image usually has a large amount of data, when the network environment is poor, it usually takes a long time to transmit data and render the page, which makes it difficult to timely feedback the city electricity consumption situation. If the above problems are solved, the effect of timely feedback of the city electricity consumption situation can be achieved. In order to achieve this effect, first, for the three-dimensional city electricity consumption model with a large data scale, the snapshot images of each model corresponding to different angles are generated by server-side rendering. Then, according to the color texture of each building, the image area occupied by the building that can be displayed in each snapshot image is determined. Finally, each snapshot image with a large area of the building image that can be displayed is selected for sending to the monitoring terminal for display. In this way, the amount of data to be transmitted can be greatly reduced, so that when the transmission network environment is poor, there is no need to spend a lot of time on transmission time and model rendering, so that the city electricity consumption situation can be timely fed back. Furthermore, when the network environment is poor, the user experience can also be improved.
[0134] The above-mentioned embodiments of the present disclosure have the following beneficial effects: through the urban power consumption image display method of some embodiments of the present disclosure, information overload can be reduced and the urban power consumption situation can be intuitively fed back. Specifically, the reason for information overload and difficulty in intuitively feeding back the urban power consumption situation is that due to the space limitation and dimension limitation of the two-dimensional chart, when the amount of data included in the urban power consumption image is large or the data dimension is large, if the two-dimensional chart is still used for display, the number of two-dimensional charts will increase or the structure will become complicated. Based on this, the urban power consumption image display method of some embodiments of the present disclosure first obtains the building power consumption detail information set and the urban building outline vector data corresponding to the target city. Among them, the above-mentioned urban building outline vector data includes a building attribute information set. Thus, the detailed power consumption data and urban geographic information data of the city can be obtained, which is convenient for the subsequent multi-dimensional display of the power consumption data. Secondly, based on the above-mentioned building power consumption detail information set, the above-mentioned building attribute information set is updated to obtain the updated building attribute information set corresponding to the above-mentioned urban building outline vector data. Thus, the detailed power consumption data can be embedded in the urban geographic information data for subsequent display in the urban area map. Then, determine the power color information group corresponding to the above-mentioned updated building attribute information set. This makes it convenient to highlight and distinguish power-consuming buildings with different power consumption in the urban area map from the color texture dimension. Afterwards, a three-dimensional urban power consumption model is constructed based on the above-mentioned urban building outline vector data and the above-mentioned power color information group. Thus, a three-dimensional model that integrates urban power consumption data with less space occupation can be obtained, which is convenient for intuitive display of the power consumption data of each building. Then, based on the preset power index algorithm information set, urban zoning structure data and the above-mentioned building power consumption details information set, a regional power consumption index information set is generated. Thus, the statistical analysis results of the power consumption data of each area in the city can be obtained. Then, the power consumption details information of each building in the above-mentioned building power consumption details information set is subjected to abnormal detection processing to obtain an abnormal power consumption information group. Thus, the power consumption data of each building with abnormalities can be obtained. Finally, in response to determining that the network transmission index data meets the preset transmission conditions, the above-mentioned three-dimensional urban power consumption model, the above-mentioned regional power consumption index information set and the above-mentioned abnormal power consumption information group are determined as the urban power consumption portrait, and the above-mentioned urban power consumption portrait is sent to the monitoring terminal for displaying the above-mentioned urban power consumption portrait in the preset urban power consumption monitoring interface. In this way, a city power consumption portrait that is easy to display intuitively and comprehensively can be obtained. Therefore, the urban power consumption portrait display method of some embodiments of the present disclosure can greatly reduce the number of two-dimensional charts and reduce the complexity of the chart structure by embedding the power consumption data of each building in the city into the city map, and combining the power index data and the abnormal power consumption data. Thus, the city's power consumption situation can be fed back more intuitively and comprehensively.
[0135] Further references Figure 2As an implementation of the methods shown in the above figures, the present disclosure provides some embodiments of a city electricity consumption image display device. These device embodiments are similar to Figure 1 Corresponding to the method embodiments shown, the city electricity consumption portrait display device 200 can be specifically applied to various electronic devices.
[0136] like Figure 2 As shown, in some embodiments, the urban electricity consumption portrait display device 200 includes: an acquisition unit 201, an update processing unit 202, a first determination unit 203, a construction unit 204, a generation unit 205, an abnormality detection processing unit 206, and a second determination and sending unit 207. Among them, the acquisition unit 201 is configured to obtain the building electricity consumption details information set and the urban building outline vector data corresponding to the target city, wherein the above-mentioned urban building outline vector data includes a building attribute information set; the update processing unit 202 is configured to update the above-mentioned building attribute information set based on the above-mentioned building electricity consumption details information set to obtain an updated building attribute information set corresponding to the above-mentioned urban building outline vector data; the first determination unit 203 is configured to determine the power color information group corresponding to the above-mentioned updated building attribute information set; the construction unit 204 is configured to construct a three-dimensional urban electricity consumption model based on the above-mentioned urban building outline vector data and the above-mentioned power color information group; the generation unit 205 is configured to It is configured to generate a regional electricity consumption index information set based on a preset power index algorithm information set, urban zoning structure data and the above-mentioned building electricity consumption detail information set; the abnormality detection processing unit 206 is configured to perform abnormality detection processing on each building electricity consumption detail information in the above-mentioned building electricity consumption detail information set to obtain an abnormal electricity consumption information group; the second determination and sending unit 207 is configured to determine the above-mentioned three-dimensional urban electricity consumption model, the above-mentioned regional electricity consumption index information set and the above-mentioned abnormal electricity consumption information group as a city electricity consumption portrait in response to determining that the network transmission index data meets the preset transmission conditions, and send the above-mentioned city electricity consumption portrait to the monitoring terminal for displaying the above-mentioned city electricity consumption portrait in the preset city electricity consumption monitoring interface.
[0137] It is understandable that the units recorded in the city electricity consumption image display device 200 are similar to the reference Figure 1 Therefore, the operations, features and beneficial effects described above for the method are also applicable to the urban electricity consumption image display device 200 and the units included therein, and will not be described in detail here.
[0138] Further references Figure 3 , which shows a structural schematic diagram of an electronic device 300 suitable for implementing some embodiments of the present disclosure. Figure 3 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.
[0139] like Figure 3 As shown, the electronic device 300 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 301, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 302 or a program loaded from a storage device 308 to a random access memory (RAM) 303. In the RAM 303, various programs and data required for the operation of the electronic device 300 are also stored. The processing device 301, the ROM 302, and the RAM 303 are connected to each other via a bus 304. An input / output (I / O) interface 305 is also connected to the bus 304.
[0140] Typically, the following devices may be connected to the I / O interface 305: an input device 306 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 307 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 308 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 309. The communication device 309 may allow the electronic device 300 to communicate with other devices wirelessly or by wire to exchange data. Figure 3 The electronic device 300 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 3 Each block shown in the figure may represent one device, or may represent multiple devices as required.
[0141] In particular, according to some embodiments of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present disclosure include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In some such embodiments, the computer program can be downloaded and installed from the network through the communication device 309, or installed from the storage device 308, or installed from the ROM 302. When the computer program is executed by the processing device 301, the above-mentioned functions defined in the method of some embodiments of the present disclosure are executed.
[0142] It should be noted that the computer-readable medium mentioned above in some embodiments of the present disclosure may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present disclosure, the computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, device or device. In some embodiments of the present disclosure, the computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer readable signal media may also be any computer readable medium other than computer readable storage media, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.
[0143] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.
[0144] The above-mentioned computer-readable medium may be included in the above-mentioned device; or it may exist independently without being assembled into the electronic device. The above-mentioned computer-readable medium carries one or more programs. When the above-mentioned one or more programs are executed by the electronic device, the electronic device: obtains the building electricity consumption details information set and the urban building outline vector data corresponding to the target city, wherein the above-mentioned urban building outline vector data includes a building attribute information set; based on the above-mentioned building electricity consumption details information set, updates the above-mentioned building attribute information set to obtain an updated building attribute information set corresponding to the above-mentioned urban building outline vector data; determines the electric quantity color information group corresponding to the above-mentioned updated building attribute information set; based on the above-mentioned urban building outline vector data and the above-mentioned electric quantity color information group, Construct a three-dimensional urban electricity consumption model; generate a regional electricity consumption index information set based on a preset power index algorithm information set, urban zoning structure data and the above-mentioned building electricity consumption detail information set; perform abnormal detection processing on each building electricity consumption detail information in the above-mentioned building electricity consumption detail information set to obtain an abnormal electricity consumption information group; in response to determining that the network transmission index data meets the preset transmission conditions, determine the above-mentioned three-dimensional urban electricity consumption model, the above-mentioned regional electricity consumption index information set and the above-mentioned abnormal electricity consumption information group as a city electricity consumption portrait, and send the above-mentioned city electricity consumption portrait to a monitoring terminal for displaying the above-mentioned city electricity consumption portrait in a preset city electricity consumption monitoring interface.
[0145] Computer program code for performing the operations of some embodiments of the present disclosure may be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, Smalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0146] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0147] The units described in some embodiments of the present disclosure may be implemented by software or by hardware. The described units may also be set in a processor, for example, it may be described as: a processor includes an acquisition unit, an update processing unit, a first determination unit, a construction unit, a generation unit, an anomaly detection processing unit, a second determination and a sending unit. The names of these units do not constitute a limitation on the units themselves in some cases. For example, the acquisition unit may also be described as "a unit for acquiring a building electricity consumption detail information set and a city building outline vector data corresponding to a target city".
[0148] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0149] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the embodiments of the present disclosure.
Claims
1. A method for displaying a city electricity consumption image, comprising: Acquire a building electricity consumption details information set and city building outline vector data corresponding to the target city, wherein the city building outline vector data includes a building attribute information set; Based on the building electricity usage details information set, the building attribute information set is updated to obtain an updated building attribute information set corresponding to the urban building outline vector data; Determine the power color information group corresponding to the updated building attribute information set; Constructing a three-dimensional urban electricity consumption model based on the urban building outline vector data and the power color information group; Generate a regional electricity consumption index information set based on a preset electricity index algorithm information set, urban zoning structure data and the building electricity consumption details information set; Performing abnormality detection processing on each building electricity usage detail information in the building electricity usage detail information set to obtain an abnormal electricity usage information group; In response to determining that the network transmission index data meets the preset transmission condition, determining the three-dimensional city power consumption model, the regional power consumption index information set and the abnormal power consumption information group as a city power consumption portrait, and sending the city power consumption portrait to a monitoring terminal for displaying the city power consumption portrait in a preset city power consumption monitoring interface; The abnormality detection process is performed on each building electricity usage detail information in the building electricity usage detail information set to obtain an abnormal electricity usage information group, including: Obtaining historical long-term urban electricity consumption information sequence and historical short-term urban electricity consumption information sequence; Based on the historical long-term city electricity consumption information sequence, a first city electricity consumption information set corresponding to a target period is generated, wherein the target period is a time period corresponding to the building electricity consumption details information set, and the first city electricity consumption information in the first city electricity consumption information set is information on electricity consumption of the corresponding building in the target period predicted based on long-term historical electricity consumption data; Based on the historical short-term city electricity consumption information sequence, generating a second city electricity consumption information set corresponding to the target period, wherein the second city electricity consumption information in the second city electricity consumption information set is information on electricity consumption of the corresponding building in the target period predicted based on the short-term historical electricity consumption data; For each building electricity usage detail information in the building electricity usage detail information set, the following steps are performed to generate abnormal electricity usage information in the abnormal electricity usage information group: Selecting first city electricity usage information that matches the building electricity usage detailed information from the first city electricity usage information set as first building electricity usage information; Selecting second city electricity usage information that matches the building electricity usage detailed information from the second city electricity usage information set as second building electricity usage information; Determine the power interval information corresponding to the first building power usage information and the second building power usage information; Based on the power interval information, determining abnormal power consumption information corresponding to the building power consumption detailed information; The step of generating a second city electricity consumption information set corresponding to the target period based on the historical short-term city electricity consumption information sequence includes: Classify and process the historical short-term urban electricity consumption information sequence to obtain short-term electricity consumption information sequences of each building; For each sequence of short-term electricity consumption information of the same building, perform the following steps: Normalizing the short-term power consumption information sequence of the same building to obtain a normalized short-term power consumption information sequence; Converting each normalized short-term power consumption information in the normalized short-term power consumption information sequence to obtain a short-term power consumption feature vector sequence of the same building; Determine a global change feature vector, a power increase deviation feature vector, and a power decrease deviation feature vector corresponding to the normalized short-term power consumption information sequence; The global change feature vector, the power increase deviation feature vector and the power decrease deviation feature vector are concatenated to obtain a power change feature vector; Inputting the short-term electricity consumption feature vector sequence of the same building and the electricity consumption change feature vector into a pre-trained feature extraction network to obtain a local feature extraction result; Inputting the local feature extraction result into a pre-trained bidirectional long short-term memory network to obtain a power consumption prediction result, wherein the power consumption prediction result is a set of normalized predicted power consumptions corresponding to the target time period; The power consumption prediction result is converted to obtain the second city power consumption information.
2. The method according to claim 1, wherein: Each updated building attribute information in the updated building attribute information set includes an electric quantity type identifier; And the determining the power color information group corresponding to the updated building attribute information set includes: Selecting color band information that meets a preset power type condition from a preset color band information group, wherein each color band information in the color band information group includes a color data sequence; Determine each power type identifier corresponding to the updated building attribute information set as a power type identifier set, and determine the number of each power type identifier in the power type identifier set as the power type number; Determine the quotient of the sequence length corresponding to the color data sequence and the number of the power types as a step value; Generate a color sort value set based on the step value and the number of power types; A power color information group is generated based on the color data sequence, the color sort value set and the power type identification set.
3. The method according to claim 1, wherein: The urban division structure data includes a city identification and a regional division information set; And the regional power consumption index information set is generated based on the preset power index algorithm information set, the urban division structure data and the building power consumption details information set, including: Classifying and processing each power index algorithm information in the power index algorithm information set to obtain a vertical power index algorithm information group and a horizontal power index algorithm information group; For each area division information in the area division information set, the following steps are performed: Selecting the building electricity usage details information matching the regional division information from the building electricity usage details information set as the regional building electricity usage details information, and obtaining the regional building electricity usage details information set; Generate regional vertical power consumption index information based on the vertical power index algorithm information group and the regional building power consumption details information set; Based on the generated vertical power consumption index information of each region, determine the regional horizontal comparison index information corresponding to each horizontal power index algorithm information in the horizontal power index algorithm information group to obtain the regional horizontal comparison index information group; The generated vertical power consumption index information of each region and each horizontal comparison index information of each region in the horizontal comparison index information group are determined as regional power consumption index information to obtain a regional power consumption index information set.
4. The method according to claim 1, wherein: The three-dimensional urban electricity consumption model includes data of various building elements, and each building electricity consumption detail information in the building electricity consumption detail information set includes a land type identifier; and the method further includes: In response to receiving graphic selection information for each building element data in the three-dimensional urban electricity consumption model, selecting building electricity consumption detail information matching the graphic selection information from the building electricity consumption detail information set as target building electricity consumption detail information, and obtaining the target building electricity consumption detail information set; Acquire a building electricity usage detail information set corresponding to the target building electricity usage detail information set; Based on the land type identifier included in each building electricity usage details information, determine the classified building electricity usage information group set corresponding to the target building electricity usage details information set, and determine the classified building electricity usage information group set corresponding to the same period building electricity usage details information set; Determine the first sub-type electricity information corresponding to each classified building electricity information group in the classified building electricity information group set to obtain a first sub-type electricity information set; Determine the second sub-type electricity information corresponding to each classified building electricity information group in the classified building electricity information group set to obtain a second sub-type electricity information set; Generate a year-on-year electricity quantity information set based on the first classification-based electricity quantity information set and the second classification-based electricity quantity information set; The year-on-year electricity consumption information set is sent to the monitoring terminal so as to draw a year-on-year electricity consumption graph in a statistical result panel, wherein the statistical result panel is a panel in the preset city electricity consumption monitoring interface.
5. The method according to claim 4, wherein: The method further comprises: In response to receiving a request for associated power distribution path information for any building element data in the three-dimensional urban power consumption model, generating target building power distribution path information according to a preset building power distribution path information set and the any building element data; Obtaining the current load number, rated load number and distribution network model corresponding to the target building distribution path information; Determine load rate information corresponding to the current load number and the rated load number; The power distribution network model and the load rate information are sent to the monitoring terminal for superimposing the power distribution network model and the three-dimensional urban power consumption model, and displaying the load rate information in the preset urban power consumption monitoring interface.
6. A city electricity consumption image display device, comprising: An acquisition unit is configured to acquire a building electricity consumption detail information set and city building outline vector data corresponding to a target city, wherein the city building outline vector data includes a building attribute information set; An update processing unit is configured to update the building attribute information set based on the building electricity usage details information set to obtain an updated building attribute information set corresponding to the urban building outline vector data; A first determining unit is configured to determine a power color information group corresponding to the updated building attribute information set; A construction unit configured to construct a three-dimensional urban electricity consumption model based on the urban building outline vector data and the power color information group; A generating unit configured to generate a regional power consumption index information set based on a preset power index algorithm information set, urban zoning structure data and the building power consumption detail information set; an abnormality detection processing unit, configured to perform abnormality detection processing on each building electricity usage detail information in the building electricity usage detail information set to obtain an abnormal electricity usage information group; a second determining and sending unit, configured to, in response to determining that the network transmission index data meets a preset transmission condition, determine the three-dimensional city power consumption model, the regional power consumption index information set, and the abnormal power consumption information group as a city power consumption portrait, and send the city power consumption portrait to a monitoring terminal, so that the city power consumption portrait is displayed in a preset city power consumption monitoring interface; The abnormality detection process is performed on each building electricity usage detail information in the building electricity usage detail information set to obtain an abnormal electricity usage information group, including: Obtaining historical long-term urban electricity consumption information sequence and historical short-term urban electricity consumption information sequence; Based on the historical long-term city electricity consumption information sequence, a first city electricity consumption information set corresponding to a target period is generated, wherein the target period is a time period corresponding to the building electricity consumption details information set, and the first city electricity consumption information in the first city electricity consumption information set is information on electricity consumption of the corresponding building in the target period predicted based on long-term historical electricity consumption data; Based on the historical short-term city electricity consumption information sequence, generating a second city electricity consumption information set corresponding to the target period, wherein the second city electricity consumption information in the second city electricity consumption information set is information on electricity consumption of the corresponding building in the target period predicted based on the short-term historical electricity consumption data; For each building electricity usage detail information in the building electricity usage detail information set, the following steps are performed to generate abnormal electricity usage information in the abnormal electricity usage information group: Selecting first city electricity usage information that matches the building electricity usage detailed information from the first city electricity usage information set as first building electricity usage information; Selecting second city electricity usage information that matches the building electricity usage detailed information from the second city electricity usage information set as second building electricity usage information; Determine the power interval information corresponding to the first building power usage information and the second building power usage information; Based on the power interval information, determining abnormal power consumption information corresponding to the building power consumption detailed information; The step of generating a second city electricity consumption information set corresponding to the target period based on the historical short-term city electricity consumption information sequence includes: Classify and process the historical short-term urban electricity consumption information sequence to obtain short-term electricity consumption information sequences of each building; For each sequence of short-term electricity consumption information of the same building, perform the following steps: Normalizing the short-term power consumption information sequence of the same building to obtain a normalized short-term power consumption information sequence; Converting each normalized short-term power consumption information in the normalized short-term power consumption information sequence to obtain a short-term power consumption feature vector sequence of the same building; Determine a global change feature vector, a power increase deviation feature vector, and a power decrease deviation feature vector corresponding to the normalized short-term power consumption information sequence; The global change feature vector, the power increase deviation feature vector and the power decrease deviation feature vector are concatenated to obtain a power change feature vector; Inputting the short-term electricity consumption feature vector sequence of the same building and the electricity consumption change feature vector into a pre-trained feature extraction network to obtain a local feature extraction result; Inputting the local feature extraction result into a pre-trained bidirectional long short-term memory network to obtain a power consumption prediction result, wherein the power consumption prediction result is a set of normalized predicted power consumptions corresponding to the target time period; The power consumption prediction result is converted to obtain the second city power consumption information.
7. An electronic device comprising: one or more processors; a storage device having one or more programs stored thereon, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 5.
8. A computer readable medium having a computer program stored thereon, wherein: When the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Operation method of city power consumption map for power system load monitoring
CN108959424A
