Peak-shaving method and application of new energy power system based on MINLP including energy dispatch team
Through the energy dispatch team method based on MINLP, the problems of equipment wear, high cost and environmental impact in peak shaving of new energy power systems are solved, the stability of the system and the efficient use of new energy are achieved, and the sustainable development of the power system is promoted. .
Patent Information
- Application Number
- CN202410494903.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-24
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-04-24
AI Technical Summary
Existing peak-shaving technologies for new energy power systems have problems such as mechanical wear and tear of equipment, high costs, environmental impact, and unsustainability, making it difficult to effectively cope with the intermittency and unpredictability of new energy sources.
The energy dispatch team method based on MINLP is adopted to create a dispatch team of multiple energy storage devices, determine the dispatch team size according to the demand of the power system and the volatility of new energy, use the MINLP model to build a dispatch strategy, and monitor and optimize the dispatch strategy in real time to ensure System stability and maximum utilization of new energy.
It improves the economy and reliability of the power system, optimizes resource allocation, reduces energy waste, effectively copes with the uncertainty and volatility of new energy power generation, and promotes the efficient integration of new energy and the sustainable development of the power system.
Smart Images

Figure CN118399418B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of peak-shaving methods for new energy power systems, and specifically relates to a peak-shaving method for new energy power systems based on MINLP including an energy dispatching team and its application. Background Art
[0002] In the current energy transformation process, the integration and operation of new energy power systems face unprecedented challenges. Although renewable energy sources such as wind and solar power are highly praised for their cleanliness and sustainability, their intermittent and unpredictable nature puts tremendous pressure on the stable operation of the power grid. To meet this challenge, researchers have been exploring effective peak-shaving methods.
[0003] Existing peak-shaving technologies mainly rely on traditional peak-shaving power sources such as gas turbines, pumped storage power stations, and battery energy storage systems. For example, gas turbines are widely used for load balancing and frequency regulation due to their fast start-stop and adjustment capabilities. However, these technologies have some inherent limitations. First, frequent start-stop and load changes may cause mechanical wear and thermal stress on equipment, shortening equipment life. Second, the operation of gas turbines depends on fossil fuels such as natural gas, which not only increases operating costs, but may also increase greenhouse gas emissions, which is contrary to emission reduction goals.
[0004] Although pumped storage power stations can provide large-scale energy storage and long dispatch time, they have high construction costs, limited geographical locations, and long construction periods. In addition, although battery energy storage systems have fast response speeds, they currently still face challenges such as high costs, limited lifespans, and environmental impacts. Summary of the invention
[0005] In view of the deficiencies of the prior art, the object of the present invention is to provide a peak-shaving method for a new energy power system including an energy dispatching team based on MINLP.
[0006] The technical solution of the present invention is as follows:
[0007] One of the present inventions is a peak-shaving method for a new energy power system including an energy dispatching team based on MINLP, comprising: creating an energy dispatching team composed of multiple energy storage devices, and determining the scale of the energy dispatching team according to the demand of the power system and the volatility of new energy; considering the decision variables and parameters of the new energy power system and the energy dispatching team, using MINLP to determine the objective function and form an energy dispatching strategy model; according to the prediction of new energy power generation and load demand, using the MINLP solver to solve the dispatching strategy model, determine the global optimal solution, and formulate an energy dispatching strategy; using the energy dispatching strategy to operate the energy dispatching team and the power system, and real-time monitoring of the parameters of the new energy power system, and optimizing the energy dispatching strategy.
[0008] This method is an advanced energy management strategy that creates an energy dispatch team composed of multiple energy storage devices and determines its size according to the needs of the power system and the volatility of new energy. This method comprehensively considers the decision variables and parameters of the new energy power system and its energy dispatch team, uses MINLP to build a comprehensive energy dispatch strategy model, and finds the global optimal solution through the solver to formulate an efficient energy dispatch strategy. In actual operation, this strategy can not only monitor system parameters in real time, but also optimize and adjust according to real-time data to ensure the stable operation of the power system and the maximum utilization of new energy. The advantage of this method is that it can improve the economy and reliability of the power system, optimize resource allocation, reduce energy waste, and effectively deal with the uncertainty and volatility of new energy generation, thereby promoting the efficient integration of new energy and the sustainable development of the power system.
[0009] The second aspect of the present invention is to provide a new energy power system peak load regulation system based on MINLP including an energy dispatching team, comprising:
[0010] Energy dispatch team module: configured as an energy dispatch team composed of various energy storage devices, and obtains energy dispatch team data;
[0011] Energy dispatch strategy model calculation module: configured to determine and calculate the objective function using MINLP;
[0012] Energy dispatch strategy formulation module: configured to formulate new energy dispatch strategy using solution results;
[0013] Monitoring module: configured to monitor the power generation, load demand and energy storage equipment status of the new energy power system in real time; Optimization module: configured to optimize the new energy scheduling strategy based on parameter collection and analysis.
[0014] The third aspect of the present invention is to provide a peak-shaving device for a new energy power system based on MINLP including an energy dispatching team. The device for the peak-shaving method for a new energy power system based on MINLP including an energy dispatching team is communicatively connected to a peak-shaving system for a new energy power system based on MINLP including an energy dispatching team.
[0015] A fourth aspect of the present invention is to provide a computer-readable medium having a computer program stored thereon, which, when executed by a processor, implements a peak-shaving method for a new energy power system including an energy dispatching team based on MINLP.
[0016] The beneficial effect of the present invention is that by creating an energy dispatching team composed of multiple energy storage devices and determining its size according to the needs of the power system and the volatility of new energy, the present method can establish a flexible and efficient peak-shaving system. This method can not only improve the adaptability and stability of the system, but also maximize the use of new energy for power generation and reduce the phenomenon of wind and solar power abandonment.
[0017] This method determines the objective function and forms a scheduling strategy model through MINLP, which can comprehensively consider various factors in the system, such as the state of energy storage equipment, renewable energy power generation, load demand, etc., making the scheduling strategy model more comprehensive and accurate. The MINLP method can handle complex problems involving integer variables and nonlinear constraints, providing more accurate optimization results.
[0018] This method uses the MINLP solver to solve the scheduling strategy model, which can determine the global optimal solution and formulate a scientific and reasonable energy scheduling strategy. This method not only has the advantages of a global optimal solution, but also has the real-time performance and the ability to optimize the scheduling strategy, providing a scientific basis for the system's peak shifting and peak regulation.
[0019] This method uses real-time monitoring and optimization algorithms to make the system have strong real-time and responsiveness, and can respond to changes and abnormal situations in the system operation in a timely manner to ensure the stability and reliability of the system. By continuously optimizing the dispatch strategy of the energy dispatch team, the system can be continuously improved and upgraded during operation, so that the performance and efficiency of the system can be continuously improved. This method reduces the need for human intervention, reduces operating costs, improves the operating efficiency of the system, and provides strong support for the sustainable development of new energy power systems. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a flow chart of the peak-shaving method of the new energy power system including the energy dispatch team based on MINLP;
[0021] Figure 2 This is a flow chart of step S100 of the present invention;
[0022] Figure 3 This is a flow chart of step S200 of the present invention;
[0023] Figure 4 This is a flow chart of step S300 of the present invention;
[0024] Figure 5 This is a flow chart of step S400 of the present invention. DETAILED DESCRIPTION
[0025] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific embodiments:
[0026] Example 1
[0027] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0028] Figure 1 It is a flow chart of the peak regulation method of the new energy power system based on MINL including reserve energy. Figure 1 The present invention provides a peak-shaving method for a new energy power system based on MINLP including an energy dispatching team, comprising:
[0029] S100 is to create an energy dispatch team and determine its size. Specifically, it is to create an energy dispatch team composed of various energy storage devices and determine the size of the energy dispatch team according to the needs of the power system and the volatility of new energy.
[0030] S200 is to determine the objective function and form a dispatch strategy model, specifically, to consider the decision variables and parameters of the new energy power system, to determine the objective function by using mixed integer nonlinear programming (MINLP), and to form a dispatch strategy model;
[0031] S300 is to use the MINLP solver to solve the dispatch strategy model, specifically, according to the forecast of renewable energy power generation and load demand, use the MINLP solver to solve the dispatch strategy model, determine the global optimal solution, and formulate the energy dispatch strategy;
[0032] S400 is used to operate the energy dispatching team and the power system and optimize the dispatching strategy. Specifically, it uses the energy dispatching strategy to operate the energy dispatching team and the power system, and monitors the power generation, load demand and energy storage equipment status of the new energy power system in real time to optimize the energy dispatching strategy.
[0033] Detailed descriptions of the individual steps are described below:
[0034] The S100 describes the first step of the peak-shifting method for the new energy power system, which is to create an energy dispatching team composed of various energy storage devices and determine its scale. Through S100, an effective energy dispatching team can be established for the new energy power system and the appropriate scale can be determined, laying the foundation for the subsequent peak-shifting strategy formulation and implementation, while having the advantages of comprehensive consideration of system requirements, flexibility and improved system stability.
[0035] like Figure 2 As shown, the specific steps include:
[0036] S110 is for selecting and classifying energy storage equipment. Specifically, when building an energy dispatch team for a new energy power system, it is first necessary to select and classify the available energy storage equipment, and determine the energy storage equipment that best suits the needs of the new energy power system by evaluating the performance indicators and applicable scenarios of various energy storage technologies.
[0037] The key to this step is to identify and evaluate different types of energy storage technologies, including but not limited to battery energy storage systems (such as lithium-ion batteries, flow batteries), pumped storage power stations, compressed air energy storage (CAES), flywheel energy storage, etc. Each energy storage technology has its own specific technical characteristics, such as energy density, power density, response time, life cycle and cost. The specific needs of the new energy power system should be considered when selecting, such as the need for rapid response capabilities and the need for large-scale energy storage.
[0038] This step ensures that the energy dispatch team can meet the diverse needs of the power system and improve the flexibility and reliability of the system. For example, a new energy power system is mainly composed of wind and solar energy, which have large fluctuations, especially at night and on windless days. In order to balance this volatility, the system needs to introduce energy storage equipment. Lithium-ion battery energy storage systems can be selected because they have high energy density and fast response capabilities, which are suitable for handling short-term fluctuations; at the same time, pumped storage power stations can be selected, which are suitable for large-scale energy storage and handling long-term energy storage needs.
[0039] S120 is to determine the size of the energy dispatching team, specifically to determine the size of the energy dispatching team according to the demand of the new energy power system and the volatility of new energy.
[0040] This step involves forecasting renewable energy generation, analyzing load demand, and configuring energy storage equipment. By analyzing historical data and predicting future trends, the required energy storage capacity and power support can be estimated.
[0041] This step ensures that the energy dispatch team can meet system needs while avoiding resource waste and over-investment through reasonable size setting. For example, the analysis shows that during the summer peak period, load demand will be 20% higher than the average level, while solar power generation will drop by 30%. Based on these data, it is determined that additional energy storage capacity is needed to fill this gap, requiring the addition of 100MWh of lithium-ion battery energy storage and 200MWh of pumped storage.
[0042] S130 is the integration of energy dispatching team and new energy power system, specifically the integration of energy dispatching team formed by various energy storage devices and new energy power system. During the integration process, it is necessary to ensure that the energy storage equipment can interact with the power grid seamlessly, respond to the dispatching instructions of the power grid, and ensure the maximum utilization of new energy.
[0043] In order to achieve seamless integration of energy storage equipment and the power grid, an energy management system (EMS) is used. The system can receive real-time power generation data from wind farms and solar power stations, as well as demand data from the load side. EMS combines this data with the real-time status of the energy storage equipment, automatically issues dispatch instructions, and directs the energy storage equipment to charge or discharge at the appropriate time to balance the supply and demand of the power grid. The integrated energy dispatch team can be used as part of the power system to improve the absorption capacity of new energy and reduce the phenomenon of wind and solar power abandonment.
[0044] The S200 describes the second step of the peak-shifting method of the new energy power system, that is, considering the decision variables and parameters of the new energy power system and the energy dispatching team, using mixed integer nonlinear programming (MINLP) to determine the objective function, and forming an energy dispatching strategy model. By considering the decision variables and parameters, various factors in the system can be comprehensively considered, including the state of energy storage equipment, the power generation of new energy, load demand, etc., so that the dispatching strategy model is more comprehensive and accurate. The MINLP method can handle complex problems involving integer variables and nonlinear constraints, can more accurately describe the actual operation of the new energy power system, and improve the optimization effect of the dispatching strategy. By determining a suitable objective function, the optimization direction of the dispatching strategy model can be effectively guided, so that the system can operate at a lower cost or higher efficiency, and the overall performance of the system can be improved.
[0045] like Figure 3 As shown, the specific steps include:
[0046] S210 is to define decision variables and parameters. The decision variables include the output of new energy units, start and stop status, charge and discharge status of energy storage equipment, scheduling time, and power distribution of transmission lines. Parameters include the predicted output of new energy, load demand, technical parameters of generator sets, time and space distribution of new energy power generation, fluctuation of load demand, and capacity limit of transmission lines. It is represented by the following elements:
[0047] x i : The i-th decision variable, such as the output of a new energy unit;
[0048] a i : coefficients associated with decision variables, such as the power generation cost coefficient;
[0049] b i : System parameters, such as capacity limitations of transmission lines;
[0050] c i : Other possible system parameters, such as the discharge efficiency of the energy storage device.
[0051] This step needs to consider the actual operation and dispatch requirements of the power system, as well as the volatility of renewable energy, by defining decision variables. By deeply understanding the operation mechanism of the power system and the characteristics of renewable energy, the comprehensiveness and accuracy of decision variables can be ensured. Clearly defined decision variables provide a basis for subsequent optimization and help build a model that can reflect the actual situation of the system.
[0052] S220. Construction of the objective function. The objective function usually consists of multiple terms, each of which is a function of the decision variables. Considering minimizing the system operating cost, including power generation cost, energy storage cost and demand response cost terms, the objective function is determined using mixed integer nonlinear programming (MINLP).
[0053] The objective function is expressed as:
[0054]
[0055] Among them, f(x) is the operating cost of the new energy power system, g i (x i ) is the decision variable x i A nonlinear function, x i is the i-th decision variable, a i is the coefficient associated with the decision variable, n is the number of power generation methods;
[0056] In this step, it is necessary to balance the weights and priorities among various objectives. This objective function can guide the formulation of dispatch strategies and ensure the economy and sustainability of power system operation.
[0057] S230. Construct constraints. The constraints can be expressed as:
[0058] f(p, Q, S, T, other parameters)≤0
[0059] Among them, P is the output of the new energy unit and the energy dispatch team, Q is the charging and discharging status of the energy storage equipment, S is the dispatch time, T is the power distribution of the transmission line, and f is a nonlinear function of decision variables, system parameters and other parameters.
[0060] In this framework, the elements defined by S210 and the objective function f(x) and constraints h constructed by S220 are i They are closely integrated to form a complete energy dispatch strategy model, which is used to optimize the peak load regulation strategy of the new energy power system.
[0061] S240. The energy dispatch strategy model is:
[0062]
[0063] Among them, Min C is the minimum cost of the operation of the new energy power system and the energy dispatching team, C storage,j is the unit cost of the j-th energy storage device, ΔQ j is the scheduling change of the j-th energy storage device, E storage,j is the efficiency of the jth energy storage device, η charge,j is the charging efficiency of the jth energy storage device, η discharge,j is the discharge efficiency of the jth energy storage device, E k is the cost per unit of emissions, C emission is the total emission of the system, m is the number of energy storage devices; P is the number of emissions.
[0064] The S300 uses the MINLP solver to solve the scheduling strategy model according to the forecast of renewable energy power generation and load demand, determines the global optimal solution, and formulates the energy scheduling strategy. Through S300, the renewable energy power system uses the MINLP solver to solve the scheduling strategy model according to the forecast of renewable energy power generation and load demand, determines the global optimal solution and formulates the scheduling strategy, which provides a scientific basis for the peak load shifting and peak load regulation of the system, and has the advantages of global optimal solution, real-time performance and optimized scheduling strategy.
[0065] like Figure 4 As shown, the specific steps include:
[0066] S310 is data preparation and model verification. Specifically, before solving the model, the accuracy and completeness of all input data must be ensured. The data includes new energy generation forecasts, load demand data, equipment parameters, etc. At the same time, the model built in step 200 is verified through historical collection data to ensure that it correctly reflects the actual operation of the power system and the demand for peak load regulation.
[0067] This step ensures the accuracy and reliability of the model solution and avoids poor scheduling strategies caused by data errors or model defects.
[0068] S320 selects the MINLP solver. Specifically, considering that the energy scheduling strategy model has complex nonlinear characteristics and a large number of integer variables, the Gurobi solver is selected because it shows powerful solving ability and efficient computing performance when dealing with such problems.
[0069] S330 is to set the solution parameters. Specifically, after selecting the solver, you need to set the solution parameters, such as the number of iterations, tolerance, branch and bound strategy, etc. These parameters will affect the efficiency of the solution process and the accuracy of the results. Reasonable parameter settings can speed up the solution and improve the quality of the solution. Set the number of iterations to 10,000 and the tolerance to 1% to ensure the accuracy of the solution results.
[0070] S340. Run the Gurobi solver to solve the model. During the solving process, the solver gradually narrows the feasible domain and searches for the optimal solution through branch and bound and cutting plane algorithms. The solver continuously updates the estimated value of the optimal solution during the iteration process and outputs the final result after the stop condition is met.
[0071] S350 is result analysis and strategy formulation. Specifically, after the solution is completed, the result needs to be analyzed to verify whether it meets all constraints and ensure that it is the global optimal solution. Then, a specific energy scheduling strategy is formulated based on the solution results.
[0072] The S400 uses the energy dispatching strategy to operate the energy dispatching team, and monitors the power generation, load demand and energy storage equipment status of the new energy power system in real time to optimize the energy dispatching strategy. The real-time monitoring and optimization algorithm in this step can make the system have strong real-time and responsiveness, and can respond to changes and abnormal situations in the operation of the system in a timely manner to ensure the stability and reliability of the system. By continuously optimizing the dispatching strategy of the energy dispatching team, the system can be continuously improved and upgraded during operation, so that the performance and efficiency of the system can be continuously improved. The need for human intervention is reduced, the operating cost is reduced, and the operating efficiency of the system is improved.
[0073] like Figure 5 As shown, the specific steps include:
[0074] S410 is to implement the dispatching strategy, specifically, to apply the energy dispatching strategy formulated in step 300 to the actual operation of the power system. This includes adjusting the output of the generator set and controlling the charging and discharging operation of the energy storage device. It is necessary to ensure that the dispatching strategy matches the operating mechanism of the actual power system, including the precise control of the power generation equipment and the energy storage equipment.
[0075] S420 is for real-time monitoring of system operation status. Specifically, it is necessary to monitor the operation status of the new energy power system in real time while implementing the strategy. The monitoring content includes key indicators such as power generation, load demand and energy storage equipment status. Real-time monitoring helps to discover and diagnose problems in a timely manner, ensure stable operation of the system, and provide data support for subsequent optimization.
[0076] S430 is data collection and analysis, specifically collecting and analyzing the data generated during the implementation of the scheduling strategy, including actual power generation, load demand changes, charging and discharging conditions of energy storage equipment, etc. Data analysis can be used to evaluate the actual effect of the scheduling strategy and provide a basis for further optimization.
[0077] S440 is the optimization of dispatch strategy, which is to evaluate and optimize the existing dispatch strategy based on the collected data and system operation status. The optimization of dispatch strategy can further improve the economy and adaptability of the power system, so that it can better cope with the volatility and uncertainty of new energy.
[0078] Example 2
[0079] Based on the above operation steps, a complete embodiment operation process is provided. A new energy power system includes 5 wind turbines, 3 solar power arrays and a thermal power plant, and the thermal power plant needs to calculate the startup and shutdown costs. The system needs to perform peak load regulation within a day (24 hours) to cope with the volatility and unpredictability of new energy power generation.
[0080] S100. Create and size an energy dispatch team:
[0081] S110. Select and classify energy storage devices. Select lithium-ion batteries and pumped storage as energy storage devices.
[0082] The response time for lithium-ion batteries is 15 minutes, and for pumped storage it is 1 hour.
[0083] S120. Determine the size of the energy dispatch team. By analyzing historical data, it is predicted that during peak hours (18:00-22:00), load demand will be 20% higher than the average level, while renewable energy generation will drop by 30%.
[0084] The average hourly load demand is 60MWh and the renewable energy power generation is 20MWh.
[0085] Therefore, during peak hours, the additional demand is 60MWh*20%=12MWh, and the renewable energy generation is reduced to 20MWh*30%=6MWh.
[0086] An additional 18MWh of electricity support is needed to meet the additional demand and compensate for the reduction in renewable energy generation.
[0087] Lithium-ion batteries and pumped hydro have an efficiency of 100%, and the decision was made to deploy 60MWh of lithium-ion battery energy storage and 120MWh of pumped hydro.
[0088] S130. The integrated energy dispatching team and the new energy power system deploy an energy management system (EMS) to receive and process power generation and load data in real time and issue dispatching instructions.
[0089] S200. Build a scheduling strategy model
[0090] S210. Define decision variables and parameters
[0091] Decision variables:
[0092] x wind (t): wind power output at hour t (MWh).
[0093] x solar (t): solar power output at hour t (MWh).
[0094] x thermal (t): thermal power output in hour t (MWh).
[0095] x battery (t): discharge capacity of lithium-ion battery in the tth hour (MWh).
[0096] x pumped (t): discharge of pumped storage at hour t (MWh).
[0097] parameter:
[0098] P wind : Maximum output of wind power.
[0099] P solar : Maximum output of solar energy.
[0100] P thermal : Maximum output of thermal power.
[0101] P battery : Maximum discharge capacity of lithium-ion battery.
[0102] P pumped : Maximum discharge capacity of pumped storage.
[0103] S220. Construct objective function Objective function: Minimize total cost, including power generation cost and energy storage cost.
[0104]
[0105] Among them, f(x) is the operating cost of the new energy power system, C wind is the unit power generation cost of wind power, that is, the cost of wind power per megawatt-hour (MWh); c solar is the unit cost of solar power generation, i.e. the cost of solar power per megawatt-hour (MWh); c thermal is the unit cost of thermal power generation, i.e. the cost of thermal power generation per megawatt-hour (MWh), c battery is the unit discharge cost of lithium-ion battery energy storage, that is, the cost of battery discharge per megawatt-hour (MWh); c pumped : Unit discharge cost of pumped storage, i.e. the cost of discharging pumped storage per megawatt-hour (MWh);
[0106] S230. Constructing power supply and demand balance constraints:
[0107]
[0108] Power generation constraints:
[0109] x wind (t)≤P wind
[0110] x solar (t)≤P solar
[0111] x thermal (t)≤P thermal
[0112] Energy storage limitation constraints:
[0113] x battery (t)≤P battery
[0114] x pumped (t)≤P pumped
[0115] S240. Determine to form a scheduling strategy model;
[0116]
[0117] Among them, MinC is the minimum cost of the operation of the new energy power system and the energy dispatching team, C storage,j is the unit cost of the j-th energy storage device, ΔQ j is the scheduling change of the j-th energy storage device, E stoage,j is the efficiency of the jth energy storage device, η charge,j is the charging efficiency of the jth energy storage device, η discharge,j is the discharge efficiency of the jth energy storage device, E k is the cost per unit of emissions, C emission is the total discharge of the system.
[0118] S300. Solving the Scheduling Strategy Model Using the MINLP Solver
[0119] S310. Data preparation and model verification: Collect new energy generation forecast and load demand data. Verify whether the model correctly reflects the actual operation of the power system.
[0120] S320. Select MINLP solver: Select Gurobi solver.
[0121] S330. Set solution parameters: number of iterations: 10,000 times. Tolerance: 1%.
[0122] S340. Run Gurobi solver: Input the model, decision variables, objective function and constraints. The solver runs and outputs the optimal solution.
[0123] The output result is: wind power and solar energy have the highest output during the daytime (06:00-18:00) to utilize the abundant wind and solar energy.
[0124] Thermal power has the highest output at night and during peak load periods (18:00-22:00) to compensate for the shortfall in renewable energy generation.
[0125] Lithium-ion batteries are charged during peak hours of renewable energy generation and discharged during peak load hours.
[0126] Pumped storage charges during periods of low load and discharges during periods of peak load.
[0127] S350: Result analysis and strategy formulation: Analyze the solution results to ensure that all constraints are met. Formulate energy scheduling strategies.
[0128] The specific scheduling strategies are as follows:
[0129] 06:00-18:00: Wind power output 50MWh, solar power output 30MWh, thermal power output 10MWh, lithium-ion battery charging 20MWh.
[0130] 18:00-22:00: Wind power output 10MWh, solar power output 5MWh, thermal power output 40MWh, lithium-ion battery discharge 20MWh, pumped storage discharge 30MWh.
[0131] S400: Strategy implementation and monitoring Apply the dispatch strategy to the actual power system operation. Implement real-time monitoring, collect data and make adjustments based on actual conditions to output energy dispatch strategy.
[0132] Example 3
[0133] The peak load regulation system of the new energy power system based on MINLP including energy dispatching team includes:
[0134] Energy dispatch team module: configured as an energy dispatch team composed of various energy storage devices, and obtains energy dispatch team data;
[0135] Energy dispatch strategy model calculation module: configured to determine and calculate the objective function using MINLP;
[0136] Energy dispatch strategy formulation module: configured to formulate new energy dispatch strategy using solution results;
[0137] Monitoring module: configured to monitor the power generation, load demand and energy storage equipment status of the new energy power system in real time; Optimization module: configured to optimize the new energy scheduling strategy based on parameter collection and analysis.
[0138] Example 4
[0139] A new energy power system peak-shaving device based on a MINLP energy dispatching team, wherein the new energy power system peak-shaving device based on a MINLP energy dispatching team is communicatively connected with a new energy power system peak-shaving system based on a MINLP energy dispatching team.
[0140] Example 5
[0141] A computer-readable medium stores a computer program, which implements the method described in Example 1 when executed by a processor.
[0142] The basic principles of the present application are described above in conjunction with specific embodiments. However, it should be noted that the advantages, strengths, effects, etc. mentioned in the present application are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. are required by each embodiment of the present application. In addition, the specific details disclosed above are only for the purpose of illustration and ease of understanding, not for limitation, and the above details do not limit the present application to being implemented by adopting the above specific details.
[0143] The block diagrams of the devices, apparatuses, equipment, and systems involved in this application are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagram. As will be appreciated by those skilled in the art, these devices, apparatuses, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including", "comprising", "having", etc. are open words, referring to "including but not limited to", and can be used interchangeably with them. The words "or" and "and" used here refer to the words "and / or" and can be used interchangeably with them, unless the context clearly indicates otherwise. The words "such as" used here refer to the phrase "such as but not limited to", and can be used interchangeably with them.
[0144] It should also be noted that in the apparatus, device and method of the present application, each component or each step can be decomposed and / or recombined. Such decomposition and / or recombination should be regarded as equivalent solutions of the present application.
[0145] The above description of the disclosed aspects is provided to enable any person skilled in the art to make or use the present application. Various modifications to these aspects will be readily apparent to those skilled in the art, and the general principles defined herein may be applied to other aspects without departing from the scope of the present application. Therefore, the present application is not intended to be limited to the aspects shown herein, but rather to the widest scope consistent with the principles and novel features of the present invention.
[0146] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A new energy power system peak-shaving method based on MINLP with energy dispatch team, characterized in that: include: Create an energy dispatch team composed of various energy storage devices, and determine the size of the energy dispatch team based on the needs of the power system and the volatility of new energy; The energy dispatching team includes a battery energy storage system, a pumped storage power station, a compressed air energy storage, and a flywheel energy storage, and calculates and obtains the dispatching changes of the battery energy storage system, the pumped storage power station, the compressed air energy storage, and the flywheel energy storage; Considering the decision variables and parameters of the new energy power system and the energy dispatch team, the objective function is determined using MINLP to form an energy dispatch strategy model; Among them, the energy scheduling strategy model is: Among them, Min C is the minimum cost of the operation of the new energy power system and the energy dispatch team, Minimize f(x) is the minimum cost of the operation of the new energy power system, and C storage,j is the unit cost of the j-th energy storage device, ΔQ j is the scheduling change of the j-th energy storage device, E storage,j is the efficiency of the jth energy storage device, η charge,j is the charging efficiency of the jth energy storage device, η discharge,j is the discharge efficiency of the jth energy storage device, E k is the cost per unit of emissions, C emission is the total emission of the system, m is the number of energy storage devices; P is the number of emissions; According to the forecast of renewable energy power generation and load demand, the MINLP solver is used to solve the scheduling strategy model, determine the global optimal solution, and formulate the energy scheduling strategy; Use energy dispatch strategies to operate energy dispatch teams and power systems, monitor new energy power system parameters in real time, and optimize energy dispatch strategies; The energy dispatch team is selected and classified based on energy density, power density, response time, life cycle and cost characteristics; The scheduling variation of the battery energy storage system is: Among them, P c Represents charging power, t c Indicates charging time, P d represents the discharge power, t d represents the discharge time, η1 is the battery efficiency; The dispatch change of the pumped storage power station is: E s =m·g·h-η2·m·g·h, where m is the mass of water, g is the acceleration of gravity, h is the water head height difference, and η2 is the conversion efficiency of the pumped storage power station; The scheduling change of the compressed air energy storage is: Among them, P com represents the compression power, t com represents the compression time, P ex represents the expansion power, t ex represents the expansion time, η3 is the compressed air efficiency, and the scheduling change of the flywheel energy storage is: Where I is the moment of inertia of the flywheel, ω and ω' are the angular velocities during storage and release, respectively, and η4 is the flywheel energy storage efficiency; The energy dispatching team and the new energy power system are integrated with an energy management system.
2. The peak-shaving method for a new energy power system based on MINLP including an energy dispatching team according to claim 1 is characterized in that: The energy scheduling strategy model is formed including: Define decision variables and parameters for renewable energy power systems and energy dispatch teams; Among them, the decision variables include the output of new energy units and energy dispatch teams, start and stop status, charging and discharging status of energy storage equipment, dispatch time, and power allocation of transmission lines; Among them, the parameters include the predicted output of renewable energy, load demand, technical parameters of generator sets, spatiotemporal distribution of renewable energy generation, fluctuations in load demand, and capacity limitations of transmission lines; And use MINLP to determine the objective function, the objective function is expressed as: Among them, f(x) is the operating cost of the new energy power system, g i (x i ) is the decision variable x i A nonlinear function, x i is the i-th decision variable, α i is the coefficient associated with the decision variable, n is the number of power generation methods; And the constraints are expressed as: f(P, Q, S, T, other parameters) ≤ 0, Among them, P is the output of the new energy unit and the energy dispatch team, Q is the charging and discharging status of the energy storage equipment, S is the dispatch time, T is the power distribution of the transmission line, and f is a nonlinear function of the decision variables and system parameters.
3. The peak-shaving method for a new energy power system based on MINLP including an energy dispatching team according to claim 1 is characterized in that: The energy dispatch strategy formulation step includes: Prepare energy dispatch team and new energy power system data and verify energy dispatch strategy model; and selecting the Gurobi solver as the objective function solver of the energy scheduling strategy model, setting the solution parameters and running the solution; And formulate specific energy scheduling strategies based on the solution results.
4. The peak-shaving method for a new energy power system based on MINLP including an energy dispatching team according to claim 3 is characterized in that: The setting of solution parameters includes setting the number of iterations and setting the tolerance; The number of iterations is ≥ 10,000 and the tolerance is ≤ 1%.
5. The peak-shaving method of a new energy power system based on MINLP including an energy dispatching team according to claim 1 is characterized in that: The real-time monitored parameters of the new energy power system include: power generation, load demand and energy storage equipment status, and the actual effect of the scheduling strategy is evaluated through parameter collection and analysis.
6. A peak-shaving system using the peak-shaving method for a new energy power system based on MINLP including an energy dispatching team according to any one of claims 1 to 5, comprising: Energy dispatch team module: configured as an energy dispatch team composed of various energy storage devices, and obtains energy dispatch team data; Energy dispatch strategy model calculation module: configured to determine and calculate the objective function using MINLP; Energy dispatch strategy formulation module: configured to formulate new energy dispatch strategy using solution results; Monitoring module: configured to monitor the power generation, load demand and energy storage equipment status of the new energy power system in real time; Optimization module: configured to optimize the new energy dispatch strategy based on parameter collection and analysis.
7. A device for peak load regulation of new energy power system based on MINLP including energy dispatch team, characterized in that: The peak-shaving device of the new energy power system based on MINLP including energy dispatching team is communicatively connected with the peak-shaving system of the new energy power system based on MINLP including energy dispatching team described in claim 6.
8. A computer readable medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.
