A method for constructing a foundation

Through the tamping mode and tamping hammer adjustment technology for different foundation types, the problems of poor foundation tamping effect and low efficiency are solved, and more efficient tamping effect and foundation stability are achieved.

CN118407397BActive Publication Date: 2024-10-18LUOYANG NENGHUI AUTOMATION EQUIP TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410888648.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-18
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

The problems of poor compaction effect and low efficiency during foundation compaction, especially in foundation types such as large-area foundation pits or strip foundation trenches, lead to unstable foundations.

Method used

Use different tamping modes to treat the foundation. Select the appropriate tamping method according to the type of foundation, such as the first tamping mode with a quincunx distribution and the second tamping mode with a vortex linear shape. By adjusting the center of gravity and inclination angle of the tamping hammer, the staggered The compaction points of the layer are compacted efficiently.

Benefits of technology

It improves the tamping effect and efficiency of the foundation and ensures the stability and construction efficiency of the foundation. Especially in complex foundation types such as large-area foundation pits or strip foundation trenches, the tamping effect is significantly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118407397B_ABST
    Figure CN118407397B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of foundation construction, and in particular to a construction method of a foundation, which includes the following steps: S1, construction preparation; S2, measurement and layout; S3, excavation and transportation of soft soil; S4, foundation compaction; S5, replacement and compaction of cushion layers layer by layer; S51, obtaining the type of foundation, and naming the cushion layers of odd-numbered layers as normal layers, and naming the cushion layers of even-numbered layers as staggered layers; S52, if the foundation is a large-area foundation pit or a strip foundation trench, compacting the normal layer and the staggered layer according to a first compaction mode; S53, if the foundation is an independent column foundation, compacting the normal layer and the staggered layer according to a second compaction mode; S6, project acceptance. Thus, by setting the first compaction mode and the second compaction mode, the foundations in different situations can be processed, and then by adjusting the tamping point positions of different replacement layers, the compaction degree of the replaced foundation is better, the service life is longer, and the bearing capacity is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation construction, and in particular to a construction method of a foundation. Background Art

[0002] Before foundation construction, the ground of the foundation needs to be compacted to increase the compactness of the ground. Compacting the ground can ensure that the foundation will not collapse after pouring concrete. Foundation compaction is one of the important steps to ensure the stability and durability of the building.

[0003] According to the reinforcement principle, applicable conditions and construction technology, the methods of compacting the foundation can be divided into the cushion replacement method and other methods. The cushion replacement method means that when the bearing capacity and deformation of the poor foundation cannot meet the requirements of the building, and the thickness of the soft soil layer is not very large, the soft soil layer within a certain range below the bottom of the foundation can be partially or completely excavated, and then replaced in layers with sand with higher strength (gravel, plain soil, gray soil, blast furnace slag, fly ash) or other stable and non-corrosive materials, and compacted (tamped, vibrated) to the required density.

[0004] In the process of compacting the cushion layer, the positions of the compaction points in each layer are basically the same, resulting in poor compaction effect in the gaps between the compaction pits, which can easily cause an unstable foundation. Summary of the invention

[0005] Based on this, it is necessary to provide a foundation construction method to address the problems of poor compaction effect and low compaction efficiency in the current foundation compaction process.

[0006] The above purpose is achieved through the following technical solutions:

[0007] A method for constructing a foundation, the method comprising the following steps:

[0008] Step S1, construction preparation;

[0009] Step S2, measuring and setting out;

[0010] Step S3: excavating and transporting soft soil;

[0011] Step S4, compacting the foundation;

[0012] Step S5, the cushion layer is replaced and compacted layer by layer;

[0013] Step S51, obtaining the type of the foundation, and naming the cushion layer of the odd-numbered layers as the normal layer, and the cushion layer of the even-numbered layers as the staggered layer, or naming the cushion layer of the odd-numbered layers as the staggered layer, and the cushion layer of the even-numbered layers as the normal layer;

[0014] Step S52: if the foundation is a large-area foundation pit or a strip foundation trench, compacting the normal layer and the staggered layer according to a first compaction mode;

[0015] Step S53: if the foundation is an independent column foundation, compacting the normal layer and the staggered layer according to a second compaction mode;

[0016] Step S6: Project acceptance.

[0017] Further, the first compaction mode comprises the following steps:

[0018] Step S521, plan the tamping points of the normal layer and the staggered layer in a plum blossom-shaped distribution, and the adjacent tamping points are tangent or close to each other, and are arranged one tamping after another in the first pass, and the tamping positions of the second pass are staggered with the tamping positions of the first pass, and the tamping points of the normal layer and the staggered layer are compacted respectively in this cyclic order.

[0019] Further, the second compaction mode comprises the following steps:

[0020] Step S531, planning the tamping points of the normal layer and the staggered layer;

[0021] Step S532, adjacent tamping points of the normal layer are tangent or close to each other, and are compacted in a sequence of one tamping after another;

[0022] Step S533, obtaining the number N of tamping points of the staggered layers;

[0023] Step S534: when the number N of the tamping points of the staggered layers is less than or equal to a preset number, tamping the tamping points of the staggered layers according to a first tamping procedure;

[0024] Step S535: When the number N of the tamping points of the staggered layers is greater than the preset number, tamping the tamping points of the staggered layers according to a second tamping procedure.

[0025] Further, the first compaction procedure comprises the following steps:

[0026] Step S5341, compact the tamping points of the staggered layer in sequence in a spiral linear path from the periphery to the middle, and the tamping points of the staggered layer are set in the gaps between the tamping points of the four adjacent normal layers and in the gaps between the tamping points of the two outermost adjacent normal layers and the foundation.

[0027] Further, the second compaction procedure comprises the following steps:

[0028] Step S5351, compacting the compacting points of the staggered layer in sequence in a spiral linear path from the periphery to the middle, and the compacting points of the staggered layer are arranged in the gaps between the compacting points of the four adjacent normal layers.

[0029] Further, when there is an overlapping portion between a subsequent tamping point of the staggered layer and a tamping point adjacent thereto, the center of gravity of the tamping hammer is adjusted to be closer to the subsequent tamping point, and the tamping hammer is inclined toward the subsequent tamping point.

[0030] Furthermore, the tilt angle and center of gravity offset of the rammer are positively correlated with the depth of the ramming point.

[0031] Furthermore, the tilt angle and center of gravity offset of the rammer are positively correlated with the area of ​​the overlapping portion.

[0032] Furthermore, the rammer is configured as a truncated cone structure, and a lifting ring is provided on the top thereof, and the lifting ring can slide elastically in the axial direction, and a bottom plate is provided at the bottom thereof, and the bottom plate can slide elastically in the axial direction, and a first clamping portion is provided at the bottom of the lifting ring and the top of the bottom plate; a weight block is provided between the lifting ring and the bottom plate, and the weight block can slide elastically in the radial direction, and second clamping portions are provided at the upper and lower ends of the weight block, and the second clamping portion can be coupled with the first clamping portion to limit the movement of the weight block.

[0033] Furthermore, when the staggered layer is compacted by using a cantilever crane, a mast crane or a gantry crane, the compaction points of the staggered layer are compacted in sequence in an S-shaped path from outside to inside.

[0034] The beneficial effects of the present invention are:

[0035] The present invention relates to a construction method for a foundation. In the process of treating the foundation, when the foundation is a large-area foundation pit or a strip foundation trench, a normal layer and an interlaced layer are compacted according to a first compaction mode; when the foundation is an independent column foundation, a second compaction mode is used to compact the normal layer and the interlaced layer. Thus, a compaction method can be reasonably selected according to the current type of foundation, so that the compaction efficiency is improved while the compaction effect is guaranteed.

[0036] Furthermore, when there is an overlapping part between the subsequent tamping point of the staggered layer and the adjacent tamping point, by adjusting the center of gravity of the rammer to be closer to the subsequent tamping point and tilting the rammer toward the subsequent tamping point, while ensuring good contact between the rammer and the subsequent tamping point, the non-overlapping part of the tamping point is compacted in a targeted manner, thereby helping to obtain a better compaction effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1A schematic diagram of a process flow of a foundation construction method provided by an embodiment of the present invention;

[0038] Figure 2 A schematic diagram of the distribution of tamping points in a normal layer or staggered layer in a first tamping mode of a foundation construction method provided by an embodiment of the present invention;

[0039] Figure 3 A schematic diagram of the distribution of tamping points of a normal layer in a second tamping mode of a foundation construction method provided by an embodiment of the present invention;

[0040] Figure 4 A schematic diagram of the distribution of tamping points of staggered layers in a first tamping procedure of a foundation construction method provided by an embodiment of the present invention;

[0041] Figure 5 A schematic diagram of the distribution of tamping points when a normal layer and an interlaced layer overlap in a first tamping procedure of a foundation construction method provided by an embodiment of the present invention;

[0042] Figure 6 Schematic diagram of the tamping order of the staggered layers in the first tamping procedure of the foundation construction method provided by one embodiment of the present invention Figure 1 ;

[0043] Figure 7 Schematic diagram of the tamping order of the staggered layers in the first tamping procedure of the foundation construction method provided by one embodiment of the present invention Figure 2 ;

[0044] Figure 8 A schematic diagram of the distribution of tamping points when a normal layer and an interlaced layer overlap in the second tamping procedure of the foundation construction method provided by one embodiment of the present invention;

[0045] Fig. 9 Schematic diagram of the tamping order of the staggered layers in the second tamping procedure of the foundation construction method provided by one embodiment of the present invention Figure 1 ;

[0046] Fig.10 Schematic diagram of the tamping order of the staggered layers in the second tamping procedure of the foundation construction method provided by one embodiment of the present invention Figure 2 ;

[0047] Fig.11 A schematic diagram of the three-dimensional structure of a rammer used in a foundation construction method provided by an embodiment of the present invention;

[0048] Fig.12 A schematic cross-sectional view of a rammer used in a foundation construction method provided in one embodiment of the present invention;

[0049] Fig.13 A schematic diagram of a three-dimensional cross-sectional structure of a rammer with a base removed, which is used in a construction method for a foundation provided in an embodiment of the present invention;

[0050] Fig.14 A schematic cross-sectional view of a rammer when it is tilted and hoisted, used in a foundation construction method provided by an embodiment of the present invention;

[0051] Fig.15 A schematic cross-sectional view of a rammer in free fall used in a foundation construction method provided by an embodiment of the present invention;

[0052] Fig.16 A schematic diagram of the cross-sectional structure of a rammer when it falls to the ground, used in a foundation construction method provided in one embodiment of the present invention.

[0053] in:

[0054] 100. Foundation;

[0055] 200, rammer; 210, base; 211, lifting ear; 220, lifting ring; 221, first compression spring; 230, mounting seat; 240, bottom plate; 250, weight block; 251, second compression spring; 260, support rod; 270, support seat; 271, third compression spring; 280, lifting rope. DETAILED DESCRIPTION

[0056] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below through embodiments and in conjunction with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0057] The serial numbers assigned to the components herein, such as "first", "second", etc., are only used to distinguish the objects described and do not have any order or technical meaning. The "connection" and "coupling" mentioned in this application, unless otherwise specified, include direct and indirect connections (couplings). In the description of the present invention, it should be understood that the orientation or position relationship indicated by the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc. are based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present invention.

[0058] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0059] like Figure 1 As shown, Figure 1 A schematic flow chart of a foundation construction method provided by an embodiment of the present invention, wherein the foundation construction method is configured to include the following steps:

[0060] Step S1, construction preparation;

[0061] Specifically, construction preparation can be set to include the following operations:

[0062] 1. Identify the soil properties and geological phenomena of the stratum to be replaced;

[0063] 2. Understand the distribution range and depth of upper ditches, ponds, caves, etc., as well as the distribution range and direction of underground pipelines, air-raid shelters and underground obstacles;

[0064] 3. Find out the composition, scope, thickness, uniformity, filling age and method of the fill;

[0065] 4. Find out the burial conditions, types, and depth of groundwater;

[0066] 5. Design the cushion layer and determine the machinery to be used based on the actual situation on site.

[0067] Step S2, measuring and setting out;

[0068] Specifically, before construction, the surveying team will lay out the boundary lines of the replacement range and mark them to avoid damage and re-spacing during construction. The leveled ground must be measured for elevation to determine the depth of earth excavation.

[0069] Step S3, excavating and transporting soft soil;

[0070] Specifically, soft soil excavation and transportation can be set to include the following operations:

[0071] 1. Excavate and transport soft soil according to the replacement range and depth;

[0072] 2. Before excavation and transportation, water, electricity, communication, roads and site leveling should be done well, and all soft soil layers, garbage, turf, etc. that are not suitable for filling should be excavated;

[0073] 3. When the groundwater level is higher than the bottom of the foundation, drainage and precipitation measures should be adopted. At this time, attention should be paid to the stability of the slope to prevent the collapse of soil and mixing with sand and gravel;

[0074] Step S4, compacting the foundation;

[0075] Specifically, the compaction of the foundation 100 may be configured to include the following operations:

[0076] 1. Before replacing the filling, compact the excavated foundation 100;

[0077] 2. Before replacing the filling, the trench should be inspected first; the loose soil should be removed, and the slope must be stable to prevent soil collapse; if there are holes, ditches, wells and tombs below 100 of the foundation near both sides of the foundation pit (trench), they should be filled before the cushion layer is made;

[0078] Step S5, the cushion layer is replaced and compacted layer by layer;

[0079] Specifically, the cushion replacement can be set to include the following operations:

[0080] 1. When excavating the foundation pit and laying the sand cushion layer, it is necessary to avoid disturbing the surface of the soft soil layer, otherwise the structure of the pit bottom soil will be damaged during construction, and its strength will be significantly reduced, so that under the action of the building load, a large additional settlement will be generated; therefore, the foundation pit should be backfilled in time after excavation, and should not be exposed for too long or soaked in water, and the pit bottom should be prevented from being trampled;

[0081] 2. The bottom surface of the sand and gravel cushion layer should be laid at the same elevation. If the depth is different, the 100 soil surface of the foundation pit foundation should be dug into steps (stairs) or slopes for overlap. The overlap should be compacted. The construction should be carried out in the order of deep first and shallow later.

[0082] 3. For artificial graded sand and gravel cushion, the sand and gravel should be mixed evenly before paving and compacting. When using fine sand as the filler of the cushion, attention should be paid to the influence of groundwater, and it is not advisable to use the flat vibration method or the plugging vibration method;

[0083] 4. The optimal moisture content of sand and gravel can be controlled according to different construction methods, and the optimal moisture content is determined by site tests.

[0084] Step S51, obtaining the type of the foundation, and naming the cushion layer of the odd-numbered layers as the normal layer, and the cushion layer of the even-numbered layers as the staggered layer, or naming the cushion layer of the odd-numbered layers as the staggered layer, and the cushion layer of the even-numbered layers as the normal layer;

[0085] Step S52: if the foundation is a large-area foundation pit or a strip foundation trench, compacting the normal layer and the staggered layer according to a first compaction mode;

[0086] Specifically, a trial tamping should be carried out before construction to determine relevant technical parameters, such as the weight of the rammer, the bottom diameter and the drop distance, the final sinking amount and the corresponding number of tamping strokes and the total sinking amount; the final sinking amount refers to the average tamping amount of the soil surface per blow in the last two blows, which should be 10 to 20 mm for clay and collapsible loess, 5 to 10 mm for sandy soil, and should not exceed 10 to 20 mm for fine-grained soil; the drop distance should be greater than 4 m, generally 4 to 6 m; the number of tamping strokes is determined by the trial tamping, usually 1 to 2 times more than the number determined by the trial tamping, generally 8 to 12 times; the effective impact depth of the compacted soil is generally about 1.5 times the diameter of the heavy hammer.

[0087] Before compaction, the elevation of the bottom of the trench or pit should be higher than the design elevation. The thickness of the reserved soil layer can be the total settlement during the trial compaction plus 50 to 100 mm. The slope of the foundation trench or pit should be appropriately slowed down.

[0088] When tamping, the moisture content of the foundation soil should be controlled within the optimal moisture content range. If the moisture content of the surface layer is too high, measures such as spreading dry soil, broken bricks, quicklime powder or replacing the soil can be taken; if the moisture content is too low, appropriate watering should be done, and tamping can only be carried out after one day and one night when the water has completely penetrated into the soil.

[0089] In this embodiment, the first compaction mode is configured to include the following steps:

[0090] Step S521, plan the tamping points of the normal layer and the staggered layer in a plum blossom-shaped distribution, and the adjacent tamping points are tangent or close to each other, and are arranged one tamping after another in the first pass, and the tamping positions of the second pass are staggered with the tamping positions of the first pass, and the tamping points of the normal layer and the staggered layer are compacted respectively in this cyclic order.

[0091] Specifically, for example, fourteen tamping points are set in both the normal layer and the staggered layer, and the tamping points in the same row of the same layer are all tangent to each other. Figure 2 As shown, the first row and the third row are each provided with three tamping points, the second row and the fourth row are each provided with four tamping points, and the tamping points of adjacent rows are staggered in the horizontal direction, wherein the circles with thick lines in the figure are the tamping positions for the first time, and the circles with dotted lines and thin lines in the figure are the tamping positions for the second time.

[0092] During the compaction process, first compact the three tamping points in the first row horizontally from left to right, then compact the four tamping points in the second row horizontally from right to left, then compact the three tamping points in the third row horizontally from left to right, and finally compact the four tamping points in the fourth row horizontally from right to left. This is the first pass, and each tamping point can be compacted multiple times to increase the compactness of the current layer.

[0093] Then tamp the four tamping points in the first row horizontally from left to right, and then tamp the three tamping points in the second row horizontally from right to left, and then tamp the four tamping points in the third row horizontally from left to right, and finally tamp the three tamping points in the fourth row horizontally from right to left. This is the second time, and each tamping point can be tamped multiple times to increase the compactness of the current layer.

[0094] Repeat the first and second cycles in this way to complete the compaction of the current layer.

[0095] Step S53: if the foundation is an independent column foundation, compacting the normal layer and the staggered layer according to a second compaction mode;

[0096] In this embodiment, the second compaction mode is configured to include the following steps:

[0097] Step S531, planning the tamping points of the normal layer and the staggered layer;

[0098] Step S532, adjacent tamping points of the normal layer are tangent or close to each other, and are compacted in a sequence of one tamping after another;

[0099] Specifically, a normal layer is provided with sixteen tamping points, and the tamping points in the same row of the same layer are all tangent to each other. Figure 3 As shown, each row is provided with four tamping points, and the tamping points of adjacent rows are arranged correspondingly in the horizontal direction.

[0100] During the compaction process, first compact the four tamping points in the first row horizontally from left to right, then compact the four tamping points in the second row horizontally from right to left, then compact the four tamping points in the third row horizontally from left to right, and finally compact the four tamping points in the fourth row horizontally from right to left. This is a small cycle, and multiple small cycles are used as a large cycle for compaction, and each tamping point in each small cycle can be compacted multiple times to improve the compactness of the current normal layer.

[0101] Step S533, obtaining the number N of tamping points of the staggered layers;

[0102] Step S534: when the number N of the tamping points of the staggered layers is less than or equal to a preset number, tamping the tamping points of the staggered layers according to a first tamping procedure;

[0103] Specifically, the preset number is a set number and can be set according to needs; when the number N of the tamping points of the staggered layers is less than or equal to the preset number, it means that the area of ​​the foundation 100 corresponding to the staggered layers is small, and the edge position of the foundation 100 has a greater impact on the overall firmness of the foundation 100. Therefore, the tamping points of the staggered layers can be compacted through the first compaction procedure to ensure the stability of the foundation 100.

[0104] In this embodiment, the first compaction procedure is configured to include the following steps:

[0105] Step S5341, compact the tamping points of the staggered layer in sequence in a spiral linear path from the periphery to the middle, and the tamping points of the staggered layer are set in the gaps between the tamping points of the four adjacent normal layers and in the gaps between the tamping points of the two outermost adjacent normal layers and the foundation.

[0106] Specifically, take the example of setting twenty-one tamping points in the staggered layer. Figure 4 and Figure 5 As shown, the nine middle tamping points are set in the gaps between the tamping points of four adjacent normal layers, and the twelve outer tamping points are set in the gaps between the tamping points of the two outermost adjacent normal layers and the foundation, where the thick circles in the figure are the tamping positions of the staggered layers, and the dotted and thin circles are the tamping positions of the normal layers.

[0107] During the compaction process, Figure 6 As shown, first tamp the three tamping points in the first row from left to right along the horizontal direction, then tamp the three tamping points in the fifth column along the vertical direction from top to bottom, then tamp the three tamping points in the fifth row along the horizontal direction from right to left, then tamp the three tamping points in the first column along the vertical direction from bottom to top, then tamp the remaining three tamping points in the second row along the horizontal direction from left to right, then tamp the remaining three tamping points in the fourth column along the vertical direction from top to bottom. The remaining two tamping points are compacted, and then the remaining two tamping points in the fourth row are compacted in the horizontal direction from right to left, and then the remaining tamping point in the third row is compacted in the vertical direction from bottom to top, and then the last tamping point in the third row is compacted in the horizontal direction. This is a small vortex line cycle, and multiple small cycles are used as a large cycle for compaction, and each tamping point in each small cycle can be compacted multiple times to improve the compactness of the current staggered layer and the compactness of the gap in the previous normal layer.

[0108] It can be understood that, for the foundation 100 with the same area, the normal layer and the staggered layer in the first compaction mode are both provided with sixteen first-time tamping points and sixteen second-time tamping points, that is, for one normal layer and one staggered layer, a total of sixty-four tamping times are required; and the normal layer under the first compaction procedure is provided with sixteen tamping points, and the staggered layer is provided with twenty-one tamping points, that is, for one normal layer and one staggered layer, a total of thirty-seven tamping times are required, and since the tamping points of the staggered layer are all provided between the tamping points of the normal layer and in the gaps between the tamping points and the foundation 100, the first compaction procedure can not only achieve the compaction effect of the first compaction mode, but also save more time.

[0109] Step S535: When the number N of the tamping points of the staggered layers is greater than the preset number, tamping the tamping points of the staggered layers according to a second tamping procedure.

[0110] Specifically, when the number N of tamping points in the staggered layers is greater than a preset number, it means that the area of ​​the foundation 100 corresponding to the staggered layers is larger, and the edge position of the foundation 100 has little effect on the overall firmness of the foundation 100. Therefore, the tamping points of the staggered layers can be compacted through a second compaction procedure to improve the construction efficiency of the foundation 100.

[0111] In this embodiment, the second compaction procedure is configured to include the following steps:

[0112] Step S5351, compacting the compacting points of the staggered layer in sequence in a spiral linear path from the periphery to the middle, and the compacting points of the staggered layer are arranged in the gaps between the compacting points of the four adjacent normal layers.

[0113] Specifically, take the staggered layer with nine tamping points as an example. Figure 8 As shown, nine tamping points are all set in the gaps between the tamping points of four adjacent normal layers, wherein the circles with thick lines are the tamping positions of the staggered layers, and the circles with dotted lines and thin lines are the tamping positions of the normal layers.

[0114] During the compaction process, Fig. 9 As shown, firstly, the three tamping points of the first row are compacted in sequence from left to right along the horizontal direction, and then the two tamping points of the third column are compacted in sequence from top to bottom along the vertical direction, and then the two tamping points of the third row are compacted in sequence from right to left along the horizontal direction, and then one tamping point of the first column is compacted in sequence from bottom to top along the vertical direction, and then one tamping point of the second row is compacted in sequence from left to right along the horizontal direction. This is a small vortex line cycle, and multiple small cycles are used as a large cycle for compaction, and each tamping point in each small cycle can be compacted multiple times to improve the compactness of the current staggered layer and the compactness of the gap of the previous normal layer.

[0115] It can be understood that, for the foundation 100 with the same area, the normal layer and the staggered layer in the first compaction mode are both provided with sixteen first-time tamping points and sixteen second-time tamping points, that is, for one normal layer and one staggered layer, a total of sixty-four tamping times are required; and the normal layer in the second compaction procedure is provided with sixteen tamping points, and the staggered layer is provided with nine tamping points, that is, for one normal layer and one staggered layer, a total of twenty-five tamping times are required, and since the tamping points of the staggered layer are all provided between the tamping points of the normal layer and in the gaps between the tamping points and the foundation 100, the second compaction procedure can approximately achieve the compaction effect of the first compaction procedure, and save more time.

[0116] It is understandable that since the first compaction mode has more tamping times, when the height of the tamping hammer remains unchanged, the second compaction mode can compact the gaps between the tamping points, but since the number of tamping times is less, the total tamping energy is smaller. At this time, the height of the tamping hammer in the second compaction mode can be increased to further ensure the compaction effect.

[0117] Step S6: Project acceptance.

[0118] Specifically, during the project acceptance process, the compaction quality of the cushion layer can be inspected by methods such as static load test, static penetration test, standard penetration test, light penetration test, dynamic penetration test and on-site sampling for physical and mechanical properties test.

[0119] Among them, the principle of the static load test method is to determine the bearing capacity and deformation modulus of the cushion layer according to the measured data of the static load of the cushion layer; the principle of the static penetration test method is to determine the bearing capacity and density of the cushion layer according to the specific penetration resistance curve data of the on-site static penetration test; the principle of the standard penetration test method is to convert the bearing capacity and density of the cushion layer from the number of penetration hammer blows of the standard penetration test; the principle of the light penetration test method is to determine the bearing capacity, deformation modulus and density of the cushion layer by using the number of hammer blows of the light penetration test; the principle of the dynamic penetration test method is to determine the bearing capacity, deformation modulus and density of the cushion layer according to the number of hammer blows of the dynamic penetration test; the principle of the on-site sampling for physical and mechanical properties test method is to inspect the density of the cushion layer after completion and estimate the bearing capacity and deformation modulus of the cushion layer.

[0120] In some embodiments, when there is overlap between tamping points, the bottom surface of the hammer will be tilted, resulting in loose contact with the soil, functional loss, and reduced compaction efficiency. In order to reduce the problem of poor compaction effect caused by this problem, when there is an overlap between a subsequent tamping point of the staggered layer and an adjacent tamping point, the center of gravity of the tamping hammer is adjusted to be closer to the subsequent tamping point, and the tamping hammer is tilted toward the subsequent tamping point.

[0121] Specifically, Figure 6As shown, when tamping the fifth tamping point from left to right in the second row, since the third tamping point from left to right in the first row has been tamped, there will be a height difference between the two tamping points, and there is an overlapping part between the two tamping points. The overlapping part consumes less energy of the tamping hammer. Therefore, the energy of the tamping hammer can be concentrated on the remaining part of the fifth tamping point from left to right in the second row, that is, the center of gravity of the tamping hammer is closer to the tamping point, and the tamping hammer is tilted toward the tamping point, so that most of the energy of the tamping hammer acts on the tamping point to ensure the overall compaction effect.

[0122] Similarly, when tamping the second tamping point from left to right in the second row, since the first tamping point from left to right in the first row and the first tamping point from top to bottom in the first column have been tamped, there will be a height difference between the second tamping point from left to right in the second row and the first tamping point from left to right in the first row and the first tamping point from top to bottom in the first column, and there is an overlapping part between the second tamping point from left to right in the second row and the first tamping point from left to right in the first row and the first tamping point from top to bottom in the first column. The overlapping part consumes less energy of the tamping hammer, so that the energy of the tamping hammer can be concentrated on the remaining part of the second tamping point from left to right in the second row, that is, the center of gravity of the tamping hammer is closer to the tamping point, and the tamping hammer is tilted toward the tamping point, so that most of the energy of the tamping hammer acts on the tamping point, so as to ensure the overall compaction effect.

[0123] In a further embodiment, the tilt angle and the center of gravity offset of the tamping hammer are both positively correlated with the depth of the tamping point.

[0124] Specifically, when the depth of the tamping point is deeper, there will be a greater height difference between the subsequent tamping point and the adjacent tamping point. When the height of the tamping hammer remains unchanged, the energy can be concentrated on the remaining part of the tamping point by increasing the inclination angle and center of gravity offset of the tamping hammer, thereby ensuring the overall compaction effect.

[0125] In other embodiments, the tilt angle of the rammer and the center of gravity offset are both positively correlated with the area of ​​the overlapping portion.

[0126] Specifically, when the area of ​​the overlapping portion is larger, in order to ensure the overall compaction effect, the energy can be more concentrated on the remaining part of the compaction point by increasing the inclination angle and the center of gravity offset of the rammer.

[0127] In other embodiments, the rammer 200 is configured as a truncated cone structure, and a hanging ring 220 is provided on the top thereof, and the hanging ring 220 can slide elastically along the axial direction, and a bottom plate 240 is provided at the bottom thereof, and the bottom plate 240 can slide elastically along the axial direction. Specifically, as Fig.11 , Fig.12 and Fig.13As shown, the rammer 200 is configured as a base 210 with a truncated cone shape and an annular mounting seat 230. The base 210 is configured to be coaxially inserted into the mounting seat 230 during installation and fixedly connected to the mounting seat 230 by screws. Two lifting ears 211 are symmetrically arranged on the circumferential side wall of the base 210. The lifting ears 211 are used to connect the lifting rope 280. Four through holes that are interconnected are coaxially opened inside the base 210. For ease of description, the four through holes are named as the first hole, the second hole, the third hole and the fourth hole in sequence from the small end of the base 210 to the large end. The first hole and the second hole are both configured as circular holes, and the diameter of the first hole is smaller than the diameter of the second hole, and they are coaxially arranged. The third hole and the fourth hole are both configured as square holes, and the long side of the third hole is smaller than the long side of the fourth hole, and the short side of the third hole is larger than the short side of the fourth hole. The line connecting the centers of the third hole and the fourth hole coincides with the axis of the first hole. The mounting seat 230 is configured to be open at the top and open at the bottom.

[0128] The lifting ring 220 is configured to have a base portion and a semicircular lifting portion, wherein the base portion is configured to have a first column, a second column and a first plate, the first column and the second column are coaxially arranged, the third plate is fixedly connected to the bottom of the second column, and the center of the third plate passes through the axis of the second column, and the diameter of the first column is equal to the diameter of the first hole, the diameter of the second column is equal to the diameter of the second hole, and the plate surface size of the first plate is equal to the cross-sectional size of the third hole, so as to limit the base portion to only be able to slide axially, the cross-section of the lifting portion is configured to be circular, and both ends thereof are fixedly connected to the end surface of the first column to facilitate the connection of the lifting rope 280; the bottom plate 240 is configured to be a cross-shaped plate structure, and is inserted into the bottom opening of the mounting seat 230; more specifically, a first compression spring 221 is inserted into the second hole, one end of the first compression spring 221 is fixedly connected to the top wall surface of the second hole, and the other end is fixedly connected to the top end surface of the second column, and the first compression spring 221 is used to provide a driving force for the lifting ring 220 to slide elastically along the axial direction.

[0129] The bottom of the hanging ring 220 and the top of the bottom plate 240 are both provided with a first clamping portion, specifically, as Fig.12 As shown, the first clamping portion is configured as a columnar structure with a semicircular cross section, and a plurality of first clamping portions are arranged at equal intervals on the bottom of the first plate and the top plate surface of the bottom plate 240, and the two end surfaces of the first clamping portion and the two opposite side wall surfaces of the first plate and the two opposite side wall surfaces of the bottom plate 240 are all arranged to coincide with each other; a weight block 250 is arranged between the lifting ring 220 and the bottom plate 240, and the weight block 250 can slide elastically in the radial direction, specifically, as Fig.13As shown, the weight block 250 is configured as a block structure; to facilitate the installation of the weight block 250, a support rod 260 and a support seat 270 are inserted into the fourth hole, wherein the support rod 260 is configured as a round rod structure, and one end abuts against one of the side walls of the fourth hole, and the other end abuts against another opposite side wall of the fourth hole, the axis of the support rod 260 is perpendicular to the axis of the base 210, and the axis of the base 210 passes through the middle of the support rod 260 and is located in the same plane as the axis of the support rod 260, and the weight block 250 is configured to be sleeved on the support rod 260 during installation, and can slide along the support rod 260; The two lifting ears 211 are symmetrically arranged about the support rod 260 to facilitate the adjustment of the position of the weight 250; the support seat 270 is arranged as a block structure, and there are two of them, which are symmetrically arranged at the bottom of both ends of the support rod 260; more specifically, two second compression springs 251 are sleeved on the support rod 260, and the two second compression springs 251 are respectively arranged on both sides of the weight 250 to provide a driving force for the weight 250 to slide elastically in the radial direction; more specifically, each support seat 270 is provided with a third compression spring 271 inside, and one end abuts against the bottom plate 240 to provide a driving force for the bottom plate 240 to slide elastically in the axial direction.

[0130] Second clamping parts are provided at both upper and lower ends of the weight block 250, and the second clamping parts can be connected with the first clamping parts to limit the movement of the weight block 250. Specifically, the second clamping parts have the same structure as the first clamping parts, and multiple second clamping parts are evenly spaced on the upper and lower end surfaces of the weight block 250, and the two end surfaces of the second clamping parts are respectively overlapped with the front and rear end surfaces of the weight block 250.

[0131] During use, if Fig.12 As shown, firstly, three lifting ropes 280 are used to connect the lifting ring 220 and the two lifting ears 211 respectively, and then the three lifting ropes 280 are retracted to lift the rammer 200 horizontally. At this time, the top plate surface of the first plate and the top wall surface of the third hole coincide with each other, the first compression spring 221 is in a compressed state, the first plate and the weight block 250 are in a disengaged state, and under the action of the third compression spring 271, part of the bottom wall surface of the bottom plate 240 coincides with the top wall surface of the mounting seat 230, the bottom plate 240 and the weight block 250 are in a disengaged state, and the weight block 250 is located in the middle of the support rod 260 under the action of the second compression springs 251 on both sides; as shown in FIG. Fig.14 As shown, the length of the hanging rope 280 on the left hanging ear 211 is then continuously retracted, so that the rammer 200 is tilted to the right as a whole. At this time, the retracted length of the hanging rope 280 is positively correlated with the depth of the tamping point and the area of ​​the overlapping part of the tamping point. That is to say, the larger the area of ​​the overlapping part of the tamping point, the longer the retracted length of the hanging rope 280, thereby making the tilt angle of the rammer 200 larger and the center of gravity offset larger. Under the action of gravity, the weight block 250 will tilt to the right, thereby stretching the second compression spring 251 on the left and compressing the second compression spring 251 on the right. Fig.15 As shown, the three suspension ropes 280 are then released simultaneously. During the free fall of the rammer 200, the first compression spring 221 is reset so that the first plate and the weight 250 are in a clamping state to limit the movement of the weight 250; Fig.16 As shown, when the rammer 200 falls to the ground, since the center of gravity of the rammer 200 is biased to the right, most of the energy of the rammer 200 is concentrated on the right side, so that the non-overlapping part of the tamping point can be targetedly compacted, and under the squeezing action of the ground, the bottom plate 240 retracts into the inside of the mounting seat 230, so that the bottom plate 240 and the weight block 250 are in a clamping state to limit the movement of the weight block 250, and the third compression spring 271 is in a compressed state.

[0132] During resetting, three lifting ropes 280 are used to respectively connect the lifting ring 220 and the two lifting ears 211, and then the three lifting ropes 280 are retracted to lift the rammer 200 horizontally. In the process of the rammer 200 being lifted off the ground, the lifting ring 220 first moves upward in the vertical direction until the top plate surface of the first plate and the top wall surface of the third hole coincide with each other, the first compression spring 221 is in a compressed state, and the first plate and the weight block 250 are in a disengaged state. When the rammer 200 is lifted off the ground, the third compression spring 271 drives the bottom plate 240 to partially extend out of the mounting seat 230, so that the bottom plate 240 and the weight block 250 are in a disengaged state, and the second compression spring 251 on the right side drives the weight block 250 to move to the middle part of the support rod 260 for the next use.

[0133] In other embodiments, when a cantilever crane, a mast crane or a gantry crane is used to tamp the staggered layers, the tamping points of the staggered layers are tamped in sequence in an S-shaped path from outside to inside.

[0134] Specifically, during the compaction process, Figure 7 As shown, firstly, the three tamping points in the first row are compacted in sequence from left to right along the horizontal direction, and then the five tamping points in the second row are compacted in sequence from right to left along the horizontal direction, and then the five tamping points in the third row are compacted in sequence from left to right along the horizontal direction, and then the five tamping points in the fourth row are compacted in sequence from right to left along the horizontal direction, and then the three tamping points in the fifth row are compacted in sequence from left to right along the horizontal direction. This is an S-shaped small cycle, and multiple small cycles are used as a large cycle for compaction, and each tamping point in each small cycle can be compacted multiple times to improve the compactness of the current staggered layer and the compactness of the gap in the previous normal layer.

[0135] like Fig.10As shown, firstly, the three tamping points in the first row are compacted in sequence from left to right along the horizontal direction, and then the middle tamping point in the third column is compacted in the vertical direction, and then the two tamping points in the second row are compacted in sequence from right to left along the horizontal direction, and then the last tamping point in the first column is compacted in the vertical direction, and then the two tamping points in the third row are compacted in sequence from left to right along the horizontal direction. This is an S-shaped small cycle, and compaction is carried out with multiple small cycles as a large cycle, and each tamping point in each small cycle can be compacted multiple times to improve the compactness of the current staggered layer and the compactness of the gap in the previous normal layer.

[0136] It is understood that when a cantilever or mast crane or gantry crane is used to tamp the staggered layers, Figure 7 and Fig.10 The order shown can improve efficacy.

[0137] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0138] The above-described embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.

Claims

1. A construction method for a foundation, characterized in that: The construction method of the foundation comprises the following steps: Step S1, construction preparation; Step S2, measuring and setting out; Step S3, excavating and transporting soft soil; Step S4, compacting the foundation; Step S5, the cushion layer is replaced and compacted layer by layer; Step S51, obtaining the type of the foundation, and naming the cushion layer of the odd-numbered layers as the normal layer, and the cushion layer of the even-numbered layers as the staggered layer, or naming the cushion layer of the odd-numbered layers as the staggered layer, and the cushion layer of the even-numbered layers as the normal layer; Step S52: if the foundation is a large-area foundation pit or a strip foundation trench, compacting the normal layer and the staggered layer according to a first compaction mode; Step S53: if the foundation is an independent column foundation, compacting the normal layer and the staggered layer according to a second compaction mode; Step S6: project acceptance; The first compaction mode comprises the following steps: Step S521, planning the tamping points of the normal layer and the staggered layer in a quincunx-shaped distribution, with adjacent tamping points being tangent or close to each other, and tamping positions of the second pass and the first pass being staggered in a manner such that the tamping points of the normal layer and the staggered layer are compacted respectively in a cyclic order; The second compaction mode comprises the following steps: Step S531, planning the tamping points of the normal layer and the staggered layer; Step S532, adjacent tamping points of the normal layer are tangent or close to each other, and are compacted in a sequence of one tamping after another; Step S533, obtaining the number N of tamping points of the staggered layers; Step S534: when the number N of the tamping points of the staggered layers is less than or equal to a preset number, tamping the tamping points of the staggered layers according to a first tamping procedure; Step S535, when the number N of the tamping points of the staggered layer is greater than the preset number, tamping the tamping points of the staggered layer according to the second tamping procedure; The first compaction procedure comprises the following steps: Step S5341, compacting the tamping points of the staggered layer in sequence in a spiral linear path from the periphery to the middle, wherein the tamping points of the staggered layer are arranged at the gaps between the tamping points of four adjacent normal layers and at the gaps between the tamping points of two adjacent normal layers located at the outermost part and the foundation; The second compaction procedure comprises the following steps: Step S5351, tamping the tamping points of the staggered layer in sequence in a spiral linear path from the periphery to the middle, wherein the tamping points of the staggered layer are arranged at the gaps between the tamping points of four adjacent normal layers; When there is an overlapping portion between a subsequent tamping point of the staggered layer and an adjacent tamping point, the center of gravity of the tamping hammer is adjusted to be closer to the subsequent tamping point, and the tamping hammer is tilted toward the subsequent tamping point; The rammer is configured as a truncated cone structure, and a lifting ring is provided on the top thereof, and the lifting ring can slide elastically in the axial direction, and a base plate is provided at the bottom thereof, and the base plate can slide elastically in the axial direction, and a first clamping portion is provided at the bottom of the lifting ring and the top of the base plate; a weight block is provided between the lifting ring and the base plate, and the weight block can slide elastically in the radial direction, and second clamping portions are provided at the upper and lower ends of the weight block, and the second clamping portion can be engaged with the first clamping portion to limit the movement of the weight block.

2. The construction method of foundation according to claim 1, characterized in that: The tilt angle and center of gravity offset of the rammer are both positively correlated with the depth of the ramming point.

3. The construction method of foundation according to claim 1, characterized in that: The tilt angle and center of gravity offset of the rammer are both positively correlated with the area of ​​the overlapping portion.

4. The construction method of foundation according to claim 1, characterized in that: When the staggered layer is compacted by using a cantilever crane, a mast crane or a gantry crane, the compaction points of the staggered layer are compacted in sequence in an S-shaped path from outside to inside.