An intelligent visual perception processing system based on the Internet of Things
By designing an intelligent visual perception processing system based on the Internet of Things in a smart construction site, and using data collection, identification and quantitative rating modules, the problem of low real-time performance of the existing system is solved and more efficient intelligent perception and safety risk monitoring are achieved.
Patent Information
- Application Number
- CN202410867479.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing smart construction site visual perception system has increased computing power requirements and reduced real-time performance under multi-algorithm scene detection, and cannot meet the detection requirements of a large amount of perception data, resulting in insufficient safety risk perception and intelligent perception capabilities.
Design a smart visual perception processing system based on the Internet of Things, including a data information collection module, a perception data identification and judgment module, and a quantitative rating and perception processing module. Data is collected through smart devices, and data cleaning, fusion, and quantitative rating are performed using fuzzy synthesis. The evaluation model provides automated feedback to improve intelligent perception capabilities.
It improves the intelligent perception and detection capabilities of smart construction sites, enhances the real-time and accuracy of perception analysis, and ensures timely monitoring and early warning of safety risks.
Smart Images

Figure CN118410314B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of engineering perception technology, and in particular to an intelligent visual perception processing system based on the Internet of Things. Background Art
[0002] In the existing smart construction site projects, artificial intelligence technology is used to prevent and deal with safety risk issues on the construction site. By using emerging technologies such as the Internet of Things, cloud computing, big data and artificial intelligence, the integration of construction site resources, information sharing and optimization of work processes are achieved. While improving engineering efficiency, it also improves construction quality and safety. However, most smart construction site visual perception systems integrate a large number of IoT monitoring equipment, mobile personnel and construction items, and concentrate too many people, objects and materials in a closed area, resulting in too many influencing factors. In the existing use of artificial intelligence technology to fully supervise abnormal situations in smart construction sites, it will lead to an increase in the computing power demand of visual perception equipment under multiple algorithm scene detection, and the real-time performance will be reduced. A large amount of perception data cannot meet the requirements of implementation detection, and the real-time performance is low. Therefore, it is necessary to design an effective safety risk perception and improve the intelligent perception ability of the construction site based on the Internet of Things. Smart visual perception processing system. Summary of the invention
[0003] The purpose of the present invention is to provide an intelligent visual perception processing system based on the Internet of Things to solve the problems raised in the above background technology.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: an intelligent visual perception processing system based on the Internet of Things, comprising a data information acquisition module, a perception data recognition and judgment module, and a quantitative rating and perception processing module, characterized in that: the data information acquisition module is used to use intelligent devices to collect relevant production factor data information of smart construction sites, the perception data recognition and judgment module is used to pre-process the collected perception data for cleaning and identification, and to perform perception judgment, and the quantitative rating and perception processing module is used to perform quantitative rating of various indicators in the smart construction site and perform automatic perception feedback.
[0005] According to the above technical solution, the data information acquisition module includes: a visual perception area module, a data image sequence acquisition module and a data image enhancement module. The visual perception area module is used to determine the visual perception area for data information perception acquisition, the data image sequence acquisition module is used to acquire data and view image sequences of the engineering construction site, and the data image enhancement module is used to enhance multiple data images.
[0006] According to the above technical solution, the perception data identification and judgment module includes: a data cleaning preprocessing module, an abnormal data identification and judgment module, a sensor data fusion module and a data credibility calculation module. The data cleaning preprocessing module is used to perform data cleaning preprocessing on the sensor-collected perception data, the abnormal data identification and judgment module is used to judge the sensor-collected perception data according to the definition of abnormal data, the sensor data fusion module is used to fuse sensor data, and the data credibility calculation module is used to determine the credibility of sensor data using a support function.
[0007] According to the above technical solution, the quantitative rating and perception processing module includes: a fuzzy comprehensive evaluation module, a reliability calculation module, a comprehensive influence matrix establishment module, and an automatic perception feedback module. The fuzzy comprehensive evaluation module is used to determine the set of evaluation indicators and analyze the grade division of the evaluation standards. The reliability calculation module is used to calculate the reliability of construction site equipment based on data validity and availability. The comprehensive influence matrix establishment module is used to construct a comprehensive influence matrix that calculates the influence, influence, centrality and causality of each element of the smart construction site. The automatic perception feedback module is used to perform automatic perception feedback based on the analysis results of the comprehensive influence matrix.
[0008] According to the above technical solution, the execution method of the intelligent visual perception processing system includes:
[0009] Use smart devices including drones, surveillance cameras, sensors, smart helmets, and laser scanners to collect production factor data information on construction site personnel, construction equipment, and building materials;
[0010] Use laser scanner to create a three-dimensional model and establish a three-dimensional real scene model of the construction site with real texture information;
[0011] Perform pre-processing of cleaning and identification on the collected and sensed data to obtain normal data and abnormal data;
[0012] Based on the multiple monitoring points configured in the smart construction site, the sensor data of each monitoring point is fused and the interference data is identified using the fusion value;
[0013] According to the pre-processed data and fused values, the fuzzy comprehensive evaluation model is used to quantitatively rate each indicator in the smart construction site;
[0014] Automated perception feedback based on comprehensive impact matrix analysis results generates processing marks.
[0015] According to the above technical solution, the method for data information perception and three-dimensional modeling includes:
[0016] Using drones to obtain multi-view image sequences of the construction site based on a determined visual perception area, arranging image control points with set coordinates in the visual measurement area according to the size of the measurement perception range, and setting detection points according to the measurement range to verify the accuracy of the 3D model;
[0017] Collect image sequences, pre-process the sequence images, register and fuse the processed images, and upload the massive amounts of perceived and collected data to the server;
[0018] At the same time, laser scanning equipment including laser transmitters, receivers, time counters, and filters are used to obtain the three-dimensional coordinate data of building components by measuring distance and angle, and to perform all-round scanning to obtain the point cloud data of the components. The point cloud model is established in combination with BIM technology for visual presentation, and the actual construction process is simulated based on the BIM model with all construction information, and multi-channel data images are enhanced.
[0019] According to the above technical solution, the method for cleaning and preprocessing the sensor-collected perception data includes:
[0020] Initialize the parameters including the abnormal data judgment threshold and the validity judgment threshold, judge the data collected and sensed by the sensor according to the definition of abnormal data, monitor whether the data is within the threshold range, monitor abnormal data by accumulating the probability of abnormal data, identify the abnormal data according to the actual number of collected samples, and calculate the effectiveness of the monitoring data;
[0021] When the sensed data value is not within the set range, the measured data is judged according to the abnormal form of the data, and the events corresponding to the monitoring data are mapped. When the monitoring data of multiple adjacent sensors in the same area have the same mapping event, the spatiotemporal correlation method is used to identify abnormal data based on the intrinsic characteristics of the temporal correlation and spatial correlation of the monitoring data, and an abnormal data identification model is established based on the spatiotemporal correlation principle;
[0022] The abnormal data recognition model is used to calculate and judge the statistical deviation between the abnormal fluctuation data and the entire data set, and to judge whether the monitoring data maintains the fluctuation of the set amplitude threshold at two adjacent sampling nodes, that is, the judgment condition based on whether the sensor collected data produces an abnormally large value;
[0023] When using the recognition model to identify measurement and monitoring data, when the probability value of abnormal data reaches the robust threshold, it is judged as abnormal and the probability of abnormal data is accumulated. By utilizing spatial correlation, a request message is sent to its neighboring node through the wireless channel, the data value of the neighboring node is received, and the similarity measurement with the neighboring node is performed to determine whether it is abnormal. When the similarity of the two time series is less than the threshold, it is judged that the two time series are not similar, the data value collected by the sensor is abnormal data, the abnormal data sequence is marked, and a data anomaly reminder is sent; when the probability of abnormal data with an abnormally large value reaches the abnormal data judgment threshold, the data validity judgment is performed simultaneously. When the distance after the similarity measurement of the time series with the neighboring node is greater than the threshold, it is marked as an abnormal data sequence, and a data anomaly reminder is sent.
[0024] According to the above technical solution, the method for performing sensor data fusion includes:
[0025] The support function is used to determine the credibility of sensor data. When the credibility of the sensor is lower than the set threshold, it is eliminated and does not participate in data fusion. When the credibility is within the threshold, the weighted fusion weight is calculated according to the support function to perform multi-sensor data fusion.
[0026] According to the above technical solution, the fuzzy comprehensive evaluation method includes:
[0027] Determine the set of evaluation indicators, analyze the classification of evaluation standards, and use a three-level classification system to assign scores according to the scores. That is, use the probability of abnormal data detection to rate the evaluation indicators for abnormal identification, calculate the reliability of construction site equipment based on data validity and availability, and use the abnormal response rate to measure the event feedback mechanism for evaluation;
[0028] The scoring range of each indicator [0, 10] is divided into three sub-intervals. The value ranges corresponding to the non-standard interval L1, the standard interval L2 and the optimized interval L3 are [0, 3], [3-7], and [7-10] respectively. The expectation of the rating standard is calculated using the average value of the upper and lower limits of the evaluation level value boundary, and the membership function is obtained by adjusting the parameters.
[0029] The cloud model of the evaluation criteria corresponding to the sub-interval is established through the forward cloud generator. The fuzzy degree of the actual evaluation factors is used to select values. The indicator weights are calculated based on the experts in the smart construction site to determine the relationship between the indicators, generate a multi-order matrix, judge the influence of each row element on each column element, and construct a comprehensive influence matrix.
[0030] Calculate the influence, influence, centrality and cause of each element of the smart construction site based on the comprehensive influence matrix;
[0031] After constructing the network hierarchical model of the indicator system, fuzzy operation is performed. The indicator membership matrix is obtained and multiplied with the weight vector of each indicator in the indicator hierarchy to obtain the membership vector of the indicator at this level. After the evaluation membership vector of the evaluation item is obtained, it is multiplied with the initially determined value vectors of each level to obtain the final evaluation score, and the final evaluation level is determined based on the final score.
[0032] According to the above technical solution, the method for automated perception feedback based on the comprehensive influence matrix analysis results includes:
[0033] Upload massive amounts of data to the cloud, and display various types of construction site information through user terminals, so that managers can remotely monitor smart construction sites in real time;
[0034] Further mining and simulation of the feedback data, predictive analysis of the impact of changes in any production factor on quantitative indicators, use artificial intelligence algorithms to identify and judge data information, and automatically provide feedback based on the judgment results;
[0035] By setting the early warning threshold for each management business, once the system is triggered, it will automatically judge and prompt the deviation to complete risk monitoring. When the monitoring value exceeds the set threshold, the system will determine that it is a risky situation and control the monitoring equipment to send out an alarm message using sound, light or voice. It uses video image recognition to monitor abnormal events or behaviors on the smart construction site and automatically identify and warn.
[0036] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention, by providing a data information acquisition module, a perception data identification and judgment module, a quantitative rating and perception processing module, performs pre-processing of cleaning and identification on the collected perception data, and performs data fusion on the sensor data of each monitoring point, uses the fusion value to identify interference data, and uses a fuzzy comprehensive evaluation model to perform quantitative rating on each indicator in the smart construction site according to the preprocessed data and the fused value, thereby improving the intelligent perception capability of the smart construction site, and enhancing the detection capability and perception analysis. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0038] Figure 1 A schematic diagram of the module composition of an intelligent visual perception processing system based on the Internet of Things provided in Example 2 of the present invention. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] Embodiment 1: This embodiment can be applied to the scenario of multi-channel visual perception of a smart construction site. The method can be executed by a smart visual perception processing system based on the Internet of Things provided by this embodiment. The method specifically includes the following steps:
[0041] Collect production factor data information of construction personnel, construction equipment and building materials on smart construction sites through intelligent devices including drones, surveillance cameras, sensors, smart helmets and laser scanners;
[0042] Use laser scanner to create a three-dimensional model and establish a three-dimensional real scene model of the construction site with real texture information;
[0043] Perform pre-processing of cleaning and identification on the collected and sensed data to obtain normal data and abnormal data;
[0044] Based on the multiple monitoring points configured in the smart construction site, the sensor data of each monitoring point is fused and the interference data is identified using the fusion value;
[0045] According to the pre-processed data and the fused value, the fuzzy comprehensive evaluation model is used to quantitatively rate each indicator in the smart construction site;
[0046] Automated perception feedback based on comprehensive impact matrix analysis results generates processing marks.
[0047] In an embodiment of the present invention, a method for data information perception and three-dimensional modeling includes:
[0048] Using drones to obtain multi-view image sequences of the construction site based on a determined visual perception area, arranging image control points with set coordinates in the visual measurement area according to the size of the measurement perception range, and setting detection points according to the measurement range to verify the accuracy of the 3D model;
[0049] Obtain high-definition image sequences from the perspective of drones. In the construction panoramic image stitching based on drone images, collect image sequences, pre-process the sequence images, align and fuse the processed images, combine the topographic map data of the construction site to realize the reality virtualization of the construction site, and finally upload the massive data sensed and collected to the server;
[0050] Using laser scanning equipment including laser transmitters, receivers, time counters, and filters, the three-dimensional coordinate data of building components is obtained by measuring distance and angle, and an all-round scan is performed to obtain the point cloud data of the components. The point cloud model is established in combination with BIM technology for visual presentation, and the actual construction process is simulated based on the BIM model with all construction information, and multi-channel data images are enhanced.
[0051] In an embodiment of the present invention, a method for cleaning and preprocessing sensor-collected perception data includes:
[0052] Initialize the parameters including the abnormal data judgment threshold and the validity judgment threshold, judge the data collected and sensed by the sensor according to the definition of abnormal data, monitor whether the data is within the threshold range, monitor the abnormal data according to the accumulated abnormal data probability, identify the abnormal data according to the actual number of collected samples, and calculate the effectiveness of the monitoring data;
[0053] When the sensed data value is not within the set range, the measured data is judged according to the abnormal form of the data, and the events corresponding to the monitoring data are mapped. When the monitoring data of multiple adjacent sensors in the same area have the same mapping event, the spatiotemporal correlation method is used to identify abnormal data based on the intrinsic characteristics of the temporal correlation and spatial correlation of the monitoring data, and an abnormal data identification model is established based on the spatiotemporal correlation principle;
[0054] The abnormal data recognition model is used to calculate and judge the statistical deviation between the abnormal fluctuation data and the entire data set, and to judge whether the monitoring data maintains the fluctuation of the set amplitude threshold at two adjacent sampling nodes, that is, the judgment condition based on whether the sensor collected data produces an abnormally large value;
[0055] When using the recognition model to identify measurement and monitoring data, when the probability value of abnormal data reaches the robust threshold, it is judged as abnormal and the probability of abnormal data is accumulated. By utilizing spatial correlation, a request message is sent to its neighboring node through the wireless channel, the data value of the neighboring node is received, and the similarity measurement with the neighboring node is performed to determine whether it is abnormal. When the similarity of the two time series is less than the threshold, it is judged that the two time series are not similar, the data value collected by the sensor is abnormal data, the abnormal data sequence is marked, and a data anomaly reminder is sent; when the probability of abnormal data with an abnormally large value reaches the abnormal data judgment threshold, the data validity judgment is performed simultaneously. When the distance after the similarity measurement of the time series with the neighboring node is greater than the threshold, it is marked as an abnormal data sequence, and a data anomaly reminder is sent.
[0056] In an embodiment of the present invention, the method for performing sensor data fusion includes:
[0057] The support function is used to determine the credibility of sensor data. When the credibility of the sensor is lower than the set threshold, it is removed and does not participate in data fusion. When the credibility is within the threshold range, the weight of weighted fusion is calculated according to the support function to perform multi-sensor data fusion.
[0058] In an embodiment of the present invention, the fuzzy comprehensive evaluation method includes:
[0059] Determine the set of evaluation indicators, analyze the classification of evaluation standards, and use a three-level classification system to assign scores according to the scores. That is, use the probability of abnormal data detection to rate the evaluation indicators for abnormal identification. Calculate the reliability of construction site equipment based on data validity and availability. The data validity is the ratio of the number of data after the abnormal data is eliminated to the total number of data collected and sensed. Availability is the ratio of the average normal working time of the equipment to the total time. The abnormal response rate is used to measure the event feedback mechanism for evaluation. The abnormal response rate is the completion rate of abnormal event processing that is marked and effectively processed.
[0060] The scoring range of each indicator [0, 10] is divided into three sub-intervals. The value ranges corresponding to the non-standard interval L1, the standard interval L2 and the optimized interval L3 are [0, 3], [3-7], and [7-10] respectively. The expectation of the rating standard is calculated using the average value of the upper and lower limits of the evaluation level value boundary, and the membership function is obtained by adjusting the parameters.
[0061] The cloud model of the evaluation criteria corresponding to the sub-interval is established through the forward cloud generator. The fuzzy degree of the actual evaluation factors is used to select values. The indicator weights are calculated based on the experts in the smart construction site to determine the relationship between the indicators, generate a multi-order matrix, judge the influence of each row element on each column element, and construct a comprehensive influence matrix.
[0062] The influence, influence, centrality and causality of each element of the smart construction site are calculated based on the comprehensive influence matrix. The influence indicates the degree of influence of the element on other elements, the influence indicates the degree to which the element is affected by other elements, the centrality indicates the comprehensive influence of the element in the system, and the causality indicates whether the element mainly plays an influencing role or an influenced role in the system.
[0063] After constructing the network hierarchical model of the indicator system, fuzzy operation is performed. The indicator membership matrix is obtained and multiplied with the weight vector of each indicator in the indicator hierarchy to obtain the membership vector of the indicator at this level. After the evaluation membership vector of the evaluation item is obtained, it is multiplied with the initially determined value vectors of each level to obtain the final evaluation score, and the final evaluation level is determined based on the final score.
[0064] In an embodiment of the present invention, the method for performing automated perception feedback based on the comprehensive influence matrix analysis result includes:
[0065] Upload massive amounts of data to the cloud, and display various types of construction site information through user terminals, so that managers can remotely monitor smart construction sites in real time;
[0066] Further mining and simulation of the feedback data, predictive analysis of the impact of changes in any production factor on quantitative indicators, use artificial intelligence algorithms to identify and judge data information, and automatically provide feedback based on the judgment results;
[0067] By setting the early warning threshold for each management business, once the system is triggered, it will automatically judge and prompt the deviation to complete the risk monitoring process. When the monitoring value exceeds the set threshold, the system will determine that it is a risky situation and control the monitoring equipment to send out an alarm message using sound, light or voice. It uses video image recognition to monitor abnormal events or behaviors on the smart construction site and automatically identify and warn.
[0068] Embodiment 2: Embodiment 2 of the present invention provides an intelligent visual perception processing system based on the Internet of Things. Figure 1 A schematic diagram of the module composition of an intelligent visual perception processing system based on the Internet of Things provided in the second embodiment of the present invention is shown in FIG. Figure 1 As shown, the system includes:
[0069] Data information collection module, used to collect relevant production factor data information of smart construction sites using smart devices;
[0070] The perception data recognition and judgment module is used to perform pre-processing of cleaning and recognition of the collected perception data, as well as to perform perception judgment;
[0071] The quantitative rating and perception processing module is used to quantify the rating of various indicators in the smart construction site and provide automatic perception feedback.
[0072] In some embodiments of the present invention, the data information acquisition module includes:
[0073] A visual perception area module is used to determine the visual perception area for data information perception and collection;
[0074] The data image sequence acquisition module is used to acquire the data and view image sequence of the construction site;
[0075] The data image enhancement module is used to enhance multiple channels of data images.
[0076] In some embodiments of the present invention, the perception data recognition and judgment module includes:
[0077] A data cleaning and preprocessing module is used to clean and preprocess the sensor-collected perception data;
[0078] An abnormal data identification and judgment module is used to judge the data collected and sensed by the sensor according to the definition of abnormal data;
[0079] Sensor data fusion module, used for fusing sensor data;
[0080] The data credibility calculation module is used to determine the credibility of sensor data using a support function.
[0081] In some embodiments of the present invention, the quantitative rating and perception processing module includes:
[0082] The fuzzy comprehensive evaluation module is used to determine the set of evaluation indicators and analyze the classification of evaluation standards;
[0083] A reliability calculation module is used to calculate the reliability of construction site equipment based on data validity and availability;
[0084] The comprehensive influence matrix establishment module is used to construct a comprehensive influence matrix that calculates the influence, influence, centrality and cause of each element of the smart construction site;
[0085] The automated perception feedback module is used to perform automated perception feedback based on the comprehensive impact matrix analysis results.
[0086] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0087] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An intelligent visual perception processing system based on the Internet of Things, including a data information acquisition module, a perception data recognition and judgment module, a quantitative rating and perception processing module, Features: The data information collection module is used to collect relevant production factor data information of the smart construction site using intelligent devices. The perception data recognition and judgment module is used to perform pre-processing of cleaning and recognition of the collected perception data, as well as to perform perception judgment. The quantitative rating and perception processing module is used to perform quantitative rating of various indicators in the smart construction site and perform automatic perception feedback. The data information acquisition module includes: a visual perception area module, a data image sequence acquisition module and a data image enhancement module. The visual perception area module is used to determine the visual perception area for data information perception acquisition. The data image sequence acquisition module is used to acquire data and view image sequences of the construction site. The data image enhancement module is used to enhance multiple data images. The perception data identification and judgment module includes: a data cleaning preprocessing module, an abnormal data identification and judgment module, a sensor data fusion module and a data credibility calculation module, wherein the data cleaning preprocessing module is used to perform data cleaning preprocessing on the sensor-collected perception data, the abnormal data identification and judgment module is used to distinguish the sensor-collected perception data according to the definition of abnormal data, the sensor data fusion module is used to fuse the sensor data, and the data credibility calculation module is used to determine the credibility of the sensor data using the support function; The quantitative rating and perception processing module includes: a fuzzy comprehensive evaluation module, a reliability calculation module, a comprehensive influence matrix establishment module, and an automated perception feedback module. The fuzzy comprehensive evaluation module is used to determine the set of evaluation indicators and analyze the grade division of the evaluation standards. The reliability calculation module is used to calculate the reliability of the construction site equipment based on data validity and availability. The comprehensive influence matrix establishment module is used to construct a comprehensive influence matrix that calculates the influence, influence, centrality and cause of each element of the smart construction site. The automated perception feedback module is used to perform automated perception feedback based on the analysis results of the comprehensive influence matrix. The fuzzy comprehensive evaluation method comprises: Determine the set of evaluation indicators, analyze the classification of evaluation standards, and use a three-level classification system to assign scores according to the scores. That is, use the probability of abnormal data detection to rate the evaluation indicators for abnormal identification, calculate the reliability of construction site equipment based on data validity and availability, and use the abnormal response rate to measure the event feedback mechanism for evaluation; The scoring range of each indicator [0, 10] is divided into three sub-intervals. The value ranges corresponding to the non-standard interval L1, the standard interval L2 and the optimized interval L3 are [0, 3], [3-7], and [7-10] respectively. The expectation of the rating standard is calculated using the average value of the upper and lower limits of the evaluation level value boundary, and the membership function is obtained by adjusting the parameters. The cloud model of the evaluation criteria corresponding to the sub-interval is established through the forward cloud generator. The fuzzy degree of the actual evaluation factors is used to select values. The indicator weights are calculated based on the experts in the smart construction site to determine the relationship between the indicators, generate a multi-order matrix, judge the influence of each row element on each column element, and construct a comprehensive influence matrix. Calculate the influence, influence, centrality and cause of each element of the smart construction site based on the comprehensive influence matrix; After constructing the network hierarchical model of the indicator system, fuzzy operation is performed. The indicator membership matrix is obtained and multiplied with the weight vector of each indicator in the indicator hierarchy to obtain the membership vector of the indicator at this level. After the evaluation membership vector of the evaluation item is obtained, it is multiplied with the initially determined value vectors of each level to obtain the final evaluation score, and the final evaluation level is determined based on the final score.
2. According to the intelligent visual perception processing system based on the Internet of Things according to claim 1, Features: The execution method of the intelligent visual perception processing system includes: Use smart devices including drones, surveillance cameras, sensors, smart helmets, and laser scanners to collect production factor data information on construction site personnel, construction equipment, and building materials; Use laser scanner to create a three-dimensional model and establish a three-dimensional real scene model of the construction site with real texture information; Perform pre-processing of cleaning and identification on the collected and sensed data to obtain normal data and abnormal data; Based on the multiple monitoring points configured in the smart construction site, the sensor data of each monitoring point is fused and the interference data is identified using the fusion value; According to the pre-processed data and fused values, the fuzzy comprehensive evaluation model is used to quantitatively rate each indicator in the smart construction site; Automated perception feedback based on comprehensive impact matrix analysis results to generate processing marks; The method for data information perception and three-dimensional modeling includes: Using drones to obtain multi-view image sequences of the construction site based on a determined visual perception area, arranging image control points with set coordinates in the visual measurement area according to the size of the measurement perception range, and setting detection points according to the measurement range to verify the accuracy of the 3D model; Collect image sequences, pre-process the sequence images, register and fuse the processed images, and upload the massive amounts of perceived and collected data to the server; At the same time, laser scanning equipment including laser transmitters, receivers, time counters, and filters are used to obtain the three-dimensional coordinate data of building components by measuring distance and angle, and to perform all-round scanning to obtain the point cloud data of the components. The point cloud model is established in combination with BIM technology for visual presentation, and the actual construction process is simulated based on the BIM model with all construction information, and multi-channel data images are enhanced.
3. According to the intelligent visual perception processing system based on the Internet of Things as described in claim 2, Features: Methods for cleaning and preprocessing sensor-collected perception data include: Initialize the parameters including the abnormal data judgment threshold and the validity judgment threshold, judge the data collected and sensed by the sensor according to the definition of abnormal data, monitor whether the data is within the threshold range, monitor abnormal data by accumulating the probability of abnormal data, identify the abnormal data according to the actual number of collected samples, and calculate the effectiveness of the monitoring data; When the sensed data value is not within the set range, the measured data is judged according to the abnormal form of the data, and the events corresponding to the monitoring data are mapped. When the monitoring data of multiple adjacent sensors in the same area have the same mapping event, the spatiotemporal correlation method is used to identify abnormal data based on the intrinsic characteristics of the temporal correlation and spatial correlation of the monitoring data, and an abnormal data identification model is established based on the spatiotemporal correlation principle; The abnormal data recognition model is used to calculate and judge the statistical deviation between the abnormal fluctuation data and the entire data set, and to judge whether the monitoring data maintains the fluctuation of the set amplitude threshold at two adjacent sampling nodes, that is, the judgment condition based on whether the sensor collected data produces an abnormally large value; When using the recognition model to identify measurement and monitoring data, when the probability value of abnormal data reaches the robust threshold, it is judged as abnormal and the probability of abnormal data is accumulated. By utilizing spatial correlation, a request message is sent to its neighboring node through the wireless channel, the data value of the neighboring node is received, and the similarity measurement with the neighboring node is performed to determine whether it is abnormal. When the similarity of the two time series is less than the threshold, it is judged that the two time series are not similar, the data value collected by the sensor is abnormal data, the abnormal data sequence is marked, and a data anomaly reminder is sent; when the probability of abnormal data with an abnormally large value reaches the abnormal data judgment threshold, the data validity judgment is performed simultaneously. When the distance after the similarity measurement of the time series with the neighboring node is greater than the threshold, it is marked as an abnormal data sequence, and a data anomaly reminder is sent.
4. According to the intelligent visual perception processing system based on the Internet of Things as described in claim 3, Features: The method for performing sensor data fusion comprises: The support function is used to determine the credibility of sensor data. When the credibility of the sensor is lower than the set threshold, it is eliminated and does not participate in data fusion. When the credibility is within the threshold, the weighted fusion weight is calculated according to the support function to perform multi-sensor data fusion.
5. According to the intelligent visual perception processing system based on the Internet of Things according to claim 4, Features: The automated perception feedback method based on the comprehensive impact matrix analysis result includes: Upload massive amounts of data to the cloud, and display various types of construction site information through user terminals, so that managers can remotely monitor smart construction sites in real time; Further mining and simulation of the feedback data, predictive analysis of the impact of changes in any production factor on quantitative indicators, use artificial intelligence algorithms to identify and judge data information, and automatically provide feedback based on the judgment results; By setting the early warning threshold for each management business, once the system is triggered, it will automatically judge and prompt the deviation to complete risk monitoring. When the monitoring value exceeds the set threshold, the system will determine that it is a risky situation and control the monitoring equipment to send out an alarm message using sound, light or voice. It uses video image recognition to monitor abnormal events or behaviors on the smart construction site and automatically identify and warn.