Assembled wall support device and construction method
By designing a prefabricated wall support device including a hydraulic jack and an inclination detection mechanism, the complex problem of wall verticality detection in prefabricated building construction is solved, the temporary support and inclination adjustment of the wall are realized, and the efficiency is improved Construction efficiency and reduced costs.
Patent Information
- Application Number
- CN202410925166.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-11
AI Technical Summary
In the construction of prefabricated buildings, the existing verticality detection methods for prefabricated walls are complicated and inconvenient, resulting in low construction efficiency and high cost. Moreover, common sensitive scale instruments are easily damaged and costly, making it difficult to be effective at the construction site. application.
Design a prefabricated wall support device that includes a telescopically adjustable hydraulic jack and an inclination detection mechanism. The hydraulic jack is connected to the side wall embedded parts of the prefabricated wall, and the guide beam and adjustment arm are used to detect the inclination, and The horizontal balance structure is used to determine the horizontal inclination to achieve temporary support and adjustment of the prefabricated wall.
This device can not only temporarily support the prefabricated wall, simplifying the construction process, but also detect and adjust the inclination of the wall, improve construction efficiency, reduce costs, and the structural design is easy to use multiple times, which is suitable for green construction requirements.
Smart Images

Figure CN118461930B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of prefabricated building construction, and in particular to a prefabricated wall supporting device and a construction method. Background Art
[0002] At present, the prefabricated walls in my country are divided into prefabricated load-bearing walls and prefabricated non-load-bearing walls according to their structural functions. Among them, prefabricated load-bearing walls include solid load-bearing walls, sandwich insulation external load-bearing walls, double-sided overlapping load-bearing walls, internal load-bearing wall panels, etc.; prefabricated non-load-bearing walls include external wall panels and non-load-bearing internal partition walls. Non-load-bearing internal partition walls include prefabricated lightweight concrete integral wall panels, prefabricated concrete hollow strips, aerated concrete strips, lightweight material partition panels, light steel keel internal partition walls, etc. In addition, according to whether the prefabricated wall has doors and windows, it can be divided into prefabricated walls with doors and windows and prefabricated walls without doors and windows. According to the degree of integration of the prefabricated wall, it can be divided into prefabricated walls with integrated insulation and decoration and ordinary prefabricated walls. Using prefabricated building walls for construction can not only save time, but also be green and environmentally friendly. Since prefabricated walls are constructed in an "assembly" manner, when connecting pieces of prefabricated walls, the prefabricated walls must first be temporarily fixed, and then the verticality of the prefabricated walls must be checked and adjusted. At the construction site, the verticality detection method usually uses the "hanging hammer method" to detect each piece of prefabricated wall. This method requires construction workers to inspect each piece of prefabricated wall from top to bottom in turn; this not only complicates the process and makes construction inconvenient, but also wastes time, increases costs, and reduces construction efficiency. Summary of the invention
[0003] The object of the present invention is to provide a prefabricated wall support device and a construction method, wherein the support device can not only be used to temporarily support the prefabricated wall to facilitate the connection of two adjacent prefabricated walls, but the support device can also detect the inclination of the temporarily supported prefabricated wall, thereby facilitating adjustments by construction personnel, thereby reducing construction procedures, saving time, and improving construction efficiency.
[0004] The objective of the present invention is achieved through the following technical solutions:
[0005] An assembled wall support device comprises a telescopically adjustable first hydraulic jack, one end of the first hydraulic jack is hinged with a support plate for connecting with a side wall embedded part of the assembled wall, the other end of the first hydraulic jack is connected with a movable mechanism for adjusting the first hydraulic jack, and a detection mechanism for detecting inclination is installed and connected to the first hydraulic jack;
[0006] The detection mechanism includes a guide beam, which is movably connected to the first hydraulic jack through a connecting structure, and both ends of the guide beam are movably and telescopically connected to adjustment arms, and one end of the adjustment arm close to the assembled wall is connected to a probe for contacting the assembled wall;
[0007] A horizontal balancing structure for abutting against the assembled wall is connected to the outer shell of the first hydraulic jack at one end close to the assembled wall.
[0008] Preferably, the movable mechanism includes a second hydraulic jack, one end of the second hydraulic jack is hinged to the first hydraulic jack through a fixed seat, the other end of the second hydraulic jack is connected to a support rod for supporting the second hydraulic jack, and the second hydraulic jack is installed and connected to a support structure for supporting and adjusting the second hydraulic jack.
[0009] Preferably, the supporting structure includes a third hydraulic jack, one end of the third hydraulic jack is hinged to the second hydraulic jack through a limit hoop, the other end of the third hydraulic jack is hinged with a slider for driving the third hydraulic jack to move, the bottom end of the slider is connected to a base plate, a sliding groove is provided on the base plate, the slider is slidably adapted to the sliding groove, and the base plate is used to be connected and fixed to the ground.
[0010] Preferably, one end of the bottom plate close to the support rod is connected to a connection seat, and the support rod is hinged to the connection seat;
[0011] A fourth hydraulic jack is arranged at one end of the bottom plate away from the connecting seat, one end of the fourth hydraulic jack is connected to the sliding block, and the other end of the fourth hydraulic jack is fixedly connected to the bottom plate through a pad.
[0012] Preferably, the guide beam is arranged above the bottom plate, the adjustment arm and the guide beam are movably and telescopically arranged, and a scale pointer indicator plate is installed on the guide beam;
[0013] The connection structure comprises an articulated seat, the articulated seat is detachably connected to the first hydraulic jack, the guide beam is connected to the articulated seat via a pin shaft, and a torsion spring for allowing the guide beam to move and reset is provided on the pin shaft.
[0014] Preferably, the end of the probe close to the adjusting arm is connected to a connecting rod, a spring is passed through the connecting rod, the end of the connecting rod away from the probe is connected to a connecting sleeve that can be movably adjusted with the adjusting arm, the end of the connecting rod away from the probe is used to be movably passed through the hollow cavity of the connecting sleeve, one end of the spring is connected to the probe, and the other end of the spring is connected to the end of the connecting sleeve close to the connecting rod.
[0015] Preferably, the adjusting arm at the bottom end of the guide beam is connected to a hanging weight via a wire.
[0016] Preferably, a vertical balance beam is provided at one end of the guide beam away from the support plate, and the vertical balance beam is connected to the housing of the first hydraulic jack at one end away from the support plate through a detachably connected connecting hoop, and sliding beams are respectively connected to the upper and lower parts of the end of the vertical balance beam close to the guide beam, and sliding blocks are respectively slidably adapted on the sliding beams;
[0017] One end of the sliding block close to the vertical balance beam is connected to a movable sliding shaft, and the other end of the movable sliding shaft can movably pass through the vertical balance beam. A deformation spring is respectively passed through the movable sliding shaft, one end of the deformation spring is connected to the sliding block, and the other end of the deformation spring is used to contact the vertical balance beam;
[0018] One end of the sliding block close to the vertical balance beam is hinged with a hinge rod, and the other end of the hinge rod is hinged with the vertical balance beam.
[0019] Preferably, the horizontal balancing structure comprises horizontal guide movable beams connected to both sides of the housing of one end of the first hydraulic jack close to the support plate, and the horizontal guide movable beams are all centrally arranged;
[0020] A horizontal sliding rod is slidably adapted in the hollow cavity of the horizontally guided movable beam, and a movable slot is provided at one end of the horizontally guided movable beam close to the support plate, and a fixed connecting rod that can slide along the movable slot is provided in the movable slot, and one end of the fixed connecting rod is used to be connected to the horizontal sliding rod, and the other end of the fixed connecting rod is conically arranged for abutting against the assembled wall.
[0021] A construction method for an assembled wall, the construction steps are as follows:
[0022] S1. Prefabricate the prefabricated wall at the prefabrication site, and embed the embedded parts for connecting with the supporting plate of the supporting device on the side wall of the prefabricated prefabricated wall. After the prefabricated prefabricated wall is cured and qualified, it is transported to the construction site, and the prefabricated prefabricated wall is lifted to the designed position by a lifting machine;
[0023] S2. Fix the bottom plate of the support device to the floor panel by bolts or welding, place the support device at a suitable position between the floor panel and the assembled wall, then adjust the height of the support device, connect the support plate of the support device to the embedded parts of the assembled wall for temporary stability; support the two sides of the assembled wall with supporting steel pipes, and temporarily support and stabilize the assembled wall piece by piece; adjust the detection mechanism of the support device to the initial position;
[0024] S3. When two adjacent prefabricated walls need to be connected in sequence, the detection mechanism of the support device is observed and compared with the initial adjustment position to determine whether the prefabricated wall has an inclination; the horizontal balance structure of the support device is observed and compared with the initial adjustment position to determine whether the prefabricated wall is inclined in the horizontal direction;
[0025] S31. A detection mechanism for detecting inclination is installed on the first hydraulic jack of the support device. The guide beam of the detection mechanism is movably connected to the first hydraulic jack. Adjustment arms are movably and telescopically connected at both ends of the guide beam. A probe for contacting the assembled wall is connected to one end of the adjustment arm close to the assembled wall. A connecting rod is connected to one end of the probe close to the adjustment arm. A spring is passed through the connecting rod. An end of the connecting rod away from the probe is connected to a connecting sleeve movably and adjustable to the adjustment arm. The two probes are subjected to the inclination force of the assembled wall, which is transmitted to the connecting sleeve through the connecting rod and the spring, and then transmitted to the guide beam by the connecting sleeve. Since the guide beam is subjected to the inclination force of the assembled wall, the guide beam is deflected, and then the scale pointer of the scale pointer indicator disk on the guide beam is deflected. The scale pointer of the scale pointer indicator disk does not point to the zero scale. It is judged that the assembled wall is tilted in the vertical direction, and vertical adjustment is required.
[0026] S32. A horizontal balancing structure for abutting against the assembled wall is connected to the outer shell of the first hydraulic jack of the supporting device at one end close to the assembled wall, and the horizontal guiding movable beams on both sides of the horizontal balancing structure are both centrally arranged; a horizontal sliding rod is slidably adapted in the hollow cavity of the horizontal guiding movable beam, and a movable notch is provided at one end of the horizontal guiding movable beam close to the supporting plate, and a fixed connecting rod that can slide along the movable notch is provided in the movable notch, one end of the fixed connecting rod is used to be connected to the horizontal sliding rod, and the other end of the fixed connecting rod is conically arranged for abutting against the assembled wall; the conically arranged ends of the two fixed connecting rods are respectively extended into the holes reserved when the assembled wall is prefabricated, so that the end faces of the two initial horizontal sliding rods close to the horizontal guiding movable beams where they are slid are coplanar; if the assembled wall is horizontally tilted during subsequent construction, it is judged whether the assembled wall is horizontally tilted by observing the initial positions of the end faces of the two horizontal sliding rods and the horizontal guiding movable beam, and if it is tilted, horizontal adjustment is required.
[0027] The beneficial effect of the present invention is that the support device can not only be used to temporarily support and limit the assembled wall, but also detect the inclination of the assembled wall, so as to ensure the quality and safety of the construction. The specific structural design of the support device includes a telescopically adjustable first hydraulic jack, one end of the first hydraulic jack is hinged with a support plate for connecting to the side wall embedded parts of the assembled wall, the other end of the first hydraulic jack is connected to a movable mechanism for adjusting the first hydraulic jack, and the first hydraulic jack is installed with a detection mechanism for inclination detection; by fixing the set movable mechanism to the floor panel, it is used to support and limit the entire support device, and the movable mechanism can adjust the height position of the first hydraulic jack to meet the needs of assembled walls of different heights. The prefabricated wall is a prefabricated wall, and the first hydraulic jack is capable of adjusting the support plate connected to the top of the first hydraulic jack, so that the support plate is connected to the embedded parts of the side wall of the prefabricated wall, and then the connection between the movable mechanism and the first hydraulic jack and the connection between the support plate and the embedded parts of the side wall of the prefabricated wall are fixed and reinforced, thereby realizing temporary support of the prefabricated wall by the support device, and then the detection mechanism is used to detect whether the prefabricated wall is within the vertical and horizontal range allowed by the design. If it exceeds the vertical and horizontal range allowed by the design, adjustments are made to ensure the quality of construction. On the whole, the support device can not only be used to temporarily support the prefabricated wall, which is convenient for the connection of two adjacent prefabricated walls, but also the support device can detect the inclination of the temporarily supported prefabricated wall, which is convenient for construction personnel to make adjustments, thereby reducing construction procedures, saving time, and improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the connection structure of an assembled wall support device of the present invention;
[0029] Figure 2 It is a schematic diagram of the connection structure of the detection mechanism of an assembled wall support device of the present invention;
[0030] Figure 3 It is an exploded schematic diagram of a connection structure portion of a detection mechanism of an assembled wall support device of the present invention;
[0031] In the figure, 1-the first hydraulic jack, 2-the second hydraulic jack, 3-the third hydraulic jack, 4-the bottom plate, 5-the fourth hydraulic jack, 11-the support plate, 12-the guide beam, 13-the adjusting arm, 14-the probe, 15-the scale pointer indicator plate, 16-the hinged seat, 21-the support rod, 31-the slider, 111-the vertical balance beam, 112-the sliding beam, 113-the sliding block, 114-the movable sliding shaft, 115-the deformation spring, 121-the horizontal guide movable beam, 122-the horizontal sliding rod, 123-the fixed connecting rod, 131-the hanging hammer, 141-the connecting rod, 142-the spring, and 143-the connecting sleeve. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0033] like Figures 1 to 3 As shown, a prefabricated wall support device can not only be used to temporarily support and limit the prefabricated wall, but also detect the inclination of the prefabricated wall (including horizontal and vertical directions) to ensure the quality of construction. The specific structural design of the support device includes a telescopically adjustable first hydraulic jack 1, one end of the first hydraulic jack 1 is hinged with a support plate 11 for connecting to the embedded parts of the side wall of the prefabricated wall, the other end of the first hydraulic jack 1 is connected to a movable mechanism for adjusting the first hydraulic jack 1, and a detection mechanism for inclination detection is installed on the first hydraulic jack 1; the movable mechanism is fixed to the floor panel to support and limit the entire support device, and the movable mechanism can adjust the height position of the first hydraulic jack 1 to meet the needs of prefabricated walls of different heights, and the first hydraulic jack 1 can adjust the height of the first hydraulic jack 1. The support plate 11 connected to the end of the jack 1 is connected to the side wall embedded parts of the prefabricated wall, and then the connection between the movable mechanism and the first hydraulic jack 1 and the connection between the support plate 11 and the side wall embedded parts of the prefabricated wall are fixed and reinforced, so as to realize temporary support of the prefabricated wall through the support device. With the construction of the prefabricated wall and the subsequent construction processes, the prefabricated wall will "tilt". At this time, the detection mechanism designed on the support device can be used to detect and determine whether the prefabricated wall tilts during the construction process (beyond the tilt range allowed by the design). If tilt occurs, the prefabricated wall is adjusted to meet the requirements of the construction design.
[0034] Furthermore, when the support device is used to temporarily support the assembled wall:
[0035] First, the prefabricated wall is prefabricated in the prefabrication yard, and the embedded parts for connecting with the support plate 11 of the support device are embedded in the side wall of the prefabricated prefabricated wall. After the prefabricated prefabricated wall is cured and qualified, it is transported to the construction site, and the prefabricated prefabricated wall is hoisted to the designed position by a hoisting machine;
[0036] Then, the support device is fixedly installed at a position with a suitable distance from the assembled wall by bolts or welding, and the bottom end of the support device is fixed to the floor panel or the ground; in order to realize the fixed installation and adjustment of the support device, the end of the first hydraulic jack 1 of the support device away from the support plate 11 (assembled wall) is adjustably connected with a movable mechanism for adjusting the first hydraulic jack 1, and the bottom end connection structure of the movable mechanism is connected and fixed to the floor panel or the ground. In the embodiment, the movable mechanism includes a second hydraulic jack 2, one end of the second hydraulic jack 2 is hinged to the first hydraulic jack 1 through a fixed seat, the other end of the second hydraulic jack 2 is connected to a support rod 21 for supporting and connecting the second hydraulic jack 2, and the second hydraulic jack 2 is installed and connected with a support structure for supporting and adjusting the second hydraulic jack 2, and the second hydraulic jack 2 is adjusted and supported by the set support structure, so that the support device can meet the temporary support of assembled walls of different heights. Connect the support plate 11 of the support device to the embedded parts of the assembled wall for temporary stability; use support steel pipes to support both sides of the assembled wall to temporarily support and stabilize the assembled wall piece by piece; adjust the detection mechanism of the support device to the initial position;
[0037] Subsequently, when two adjacent prefabricated walls need to be connected in sequence, the detection mechanism of the support device is observed and judged, and the position at this time is compared with the adjusted initial position:
[0038] Then, observe whether the scale pointer of the scale pointer indicator plate 15 of the support device points to the zero scale (whether the scale pointer of the scale pointer indicator plate 15 "points to zero", this technology is the prior art); and observe the contact between the probes 14 connected to the two adjustment arms 13 close to one side of the assembled wall and the assembled wall respectively, to detect and determine whether the assembled wall is vertical, if not vertical, adjust the vertical direction; and observe the relative position of the horizontal sliding rod 122 slidingly adapted in the hollow cavity of the two horizontal guide movable beams 121 and the end of the horizontal guide movable beam 121, if there is a relative displacement, adjust the horizontal direction. And it should be noted that although there are already "sensitive scale instruments that can directly judge the inclination" on the market, due to the complex construction site and many external factors, this "sensitive scale instrument" is easy to damage, and it cannot measure "deflection and inclination" after it is broken. The cost of using this "sensitive scale instrument" will be greatly increased, and it is not applicable at the construction site.
[0039] Further, in an embodiment in which temporary support and inclination judgment are performed specifically by the support device, when the second hydraulic jack 2 is adjusted and supported by the support structure, the support structure includes a third hydraulic jack 3 capable of telescopic adjustment, one end of the third hydraulic jack 3 is hinged to the second hydraulic jack 2 through a limit hoop, and the other end of the third hydraulic jack 3 is hinged with a slider 31 for driving the third hydraulic jack 3 to move, the bottom end of the slider 31 is connected to a base plate 4, a slide groove is provided on the base plate 4, the slider 31 is slidably adapted to the slide groove, and the base plate 4 is used to be connected and fixed to the ground or floor panel; a connecting seat is connected to one end of the base plate 4 close to the support rod 21, the support rod 21 is hinged to the connecting seat, and the other end of the support rod 21 is connected to the second hydraulic jack 2; and a fourth hydraulic jack 5 is arranged at one end of the base plate 4 away from the connecting seat, one end of the fourth hydraulic jack 5 is connected to the slider 31, and the other end of the fourth hydraulic jack 5 is fixedly connected to the base plate 4 through a pad. In this way, when it is necessary to adjust the supporting device to temporarily support the limited assembled wall, at this time, by controlling and adjusting the extension and contraction of the fourth hydraulic jack 5, the slider 31 connected to the other end of the fourth hydraulic jack 5 is driven to slide along the slide groove opened on the bottom plate 4, and the bottom end of the slider 31 is limited and stuck on the slide groove to prevent the slider 31 from sliding out of the slide groove; the sliding of the slider 31 drives the third hydraulic jack 3 to move, and adjusts the extension and contraction of the third hydraulic jack 3 to drive the third hydraulic jack 3 to rotate through the connecting seat hinged by the support rod 21 through one end of the second hydraulic jack 2 hingedly connected by the limiting hoop, and adjusts the third hydraulic jack 3 and the second hydraulic jack 2 to the optimal suitable supporting angle range, thereby ensuring the overall stability of the support; and, through on-site measurement, it is determined that the piece of assembled wall has been "installed in place", and at the same time, the detection mechanism of the supporting device is adjusted to the design allowed position; then subsequent assembled wall construction is carried out. It should be noted that the third hydraulic jack 3 and the second hydraulic jack 2 are adjusted to the optimal suitable support angle range, which can be appropriately adjusted according to design calculations or construction experience, and the specific angles of each supporting structure are not described in detail here.
[0040] Place the support device at a suitable position between the floor panel and the prefabricated wall, adjust the height position of the support device, and then adjust the extension of the first hydraulic jack 1 which is connected to the movable mechanism and can be telescopically adjusted, so as to drive the support plate 11 connected to the other end of the first hydraulic jack 1 to move toward one end of the prefabricated wall, and connect the support plate 11 to the embedded parts embedded in the side of the prefabricated wall by bolts, and temporarily connect the prefabricated wall with the support device. In order to maintain stability, the two sides of the prefabricated wall are reinforced and supported with supporting steel pipes, and the prefabricated walls are temporarily supported and stabilized piece by piece in the designed position in turn. After all the prefabricated walls of a wall are suspended and temporarily supported at the designed position by the supporting device, when two adjacent prefabricated walls need to be connected in sequence, the prefabricated wall constructed in front will "tilt" due to the influence of subsequent construction on the previous prefabricated wall, such as vibration external force, connection force, etc. In order to meet the design requirements and save construction time, the detection mechanism on the supporting device can be used to judge whether the prefabricated wall constructed in front is tilted (whether it exceeds the tilt allowed by the design).
[0041] The detection mechanism is judged by observation. If the inclination exceeds the design allowable inclination, the prefabricated wall is fine-tuned to meet the requirements. During the adjustment, the "fixed" connection position of each piece of the prefabricated wall needs to be "loosened" to a certain extent to make it have a certain degree of mobility, which is convenient for fine-tuning.
[0042] In the embodiment, the detection mechanism for verticality detection installed and connected to the first hydraulic jack 1 of the support device includes a guide beam 12, which is movably connected to the first hydraulic jack 1 through a connection structure, and the two ends of the guide beam 12 are movably and telescopically connected with an adjustment arm 13, and the end of the adjustment arm 13 close to the assembled wall is connected with a probe 14 for contacting the assembled wall. The two ends of the first hydraulic jack 1 are reinforced for connection to make it fixed; through the principle of "lever plus gravity", the contact between the probes 14 on the two adjustment arms 13 and the assembled wall is observed to determine whether the assembled wall is in the allowable verticality range; the housing of the first hydraulic jack 1 close to the assembled wall is connected with a horizontal balance structure for contacting the assembled wall, and the relative position of the horizontal balance structure and the initial adjustment is compared to determine whether the assembled wall has "horizontal movement". Take the "temporary support" of the assembled wall by the support device as an example.
[0043] Determine whether the prefabricated wall is within the allowable vertical range: the guide beam 12 of the support device is arranged above the base plate 4, the adjusting arm 13 and the guide beam 12 are movably and telescopically arranged, and a scale pointer indicator plate 15 is installed on the guide beam 12; and the arranged connection structure includes an articulated seat 16, the articulated seat 16 is detachably connected to the first hydraulic jack 1, the guide beam 12 is connected to the articulated seat 16 through a pin shaft, and a torsion spring for allowing the guide beam 12 to be movable and reset is passed through the pin shaft; and the adjusting arm 13 at the bottom end of the guide beam 12 is connected to a hanging hammer 131 through a wire. Initially, the pendulum 131 is suspended and installed on the adjusting arm 13 at the bottom end of the guide beam 12, and the center of gravity of the pendulum 131 is on the same axis as the center of gravity of the guide beam 12. In this way, when the guide beam 12 and the connecting line of the centers of gravity of the two adjusting arms 13 coincide, the guide beam 12, the adjusting arm 13 and the pendulum 131 are vertical under the action of gravity, that is, the probes 14 respectively connected to the two adjusting arms 13 are on the same vertical plane; that is, when the first hydraulic jack 1 is horizontal and perpendicular to the guide beam 12, the two probes 14 are "vertically coplanar" with one end face of the support plate 11 close to the assembled wall.
[0044] In the embodiment, the end of the probe 14 close to the adjustment arm 13 is connected to a connecting rod 141, a spring 142 is inserted into the connecting rod 141, and the end of the connecting rod 141 away from the probe 14 is connected to a connecting sleeve 143 that can be movably adjusted with the adjustment arm 13. The end of the connecting rod 141 away from the probe 14 is used to be movably inserted into the hollow cavity of the connecting sleeve 143, one end of the spring 142 is connected to the probe 14, and the other end of the spring 142 is connected to the end of the connecting sleeve 143 close to the connecting rod 141; the end of the connecting sleeve 143 away from the probe 14 can be connected to the adjustment arm 13 Active adjustment is performed so that the distance between the probe 14 and the temporarily supported and stable prefabricated wall can be adjusted according to actual conditions, so that the two probes 14 are in the best and most suitable position, so that when the two probes 14 are in contact with the prefabricated wall at the beginning, the guide beam 12 is parallel to the prefabricated wall, and the pointer on the scale pointer indicator plate 15 indicates the "zero scale" position; and, at the beginning, the adjustment arm 13 at the bottom end of the guide beam 12 is "coaxial" with the guide beam 12 through the pendant 131 connected by a wire, that is, the pendant 131 and the guide beam 12 are on the same vertical line.
[0045] At the same time, a vertical balance beam 111 is provided at the end of the guide beam 12 away from the support plate. The vertical balance beam 111 is connected to the outer shell of the end of the first hydraulic jack away from the support plate through a detachable connecting hoop. The upper and lower parts of the end of the vertical balance beam 111 close to the guide beam 12 are respectively connected with sliding beams 112, and sliding blocks 113 are respectively slidably adapted on the sliding beams 112; the end of the sliding block 113 close to the vertical balance beam 111 is connected with a movable sliding shaft 114, and the other end of the movable sliding shaft 114 can movably pass through the vertical balance beam 111, and deformation springs 115 are respectively penetrated on the movable sliding shaft 114, one end of the deformation spring 115 is connected to the sliding block 113, and the other end of the deformation spring 115 is used to contact the vertical balance beam 111, so that the sliding block 113 is "reset" to the initial design position through the deformation spring 115; the end of the sliding block 113 close to the vertical balance beam 111 is hinged with a hinged rod, and the other end of the hinged rod is hinged to the vertical balance beam 111. Initially, the two movable sliding shafts 114 arranged up and down just pass through the vertical balance beam 111 , that is, the end faces of the two movable sliding shafts 114 are “coplanar” (on the same plane) with the end face of the vertical balance beam 111 away from the guide beam 12 .
[0046] When the prefabricated wall tilts in the "vertical direction" due to the "slight" tilt of the prefabricated wall, the guide beam 12, which contacts the upper and lower parts of the supporting side of the prefabricated wall through the probes 14 at the upper and lower ends, rotates along the hinge seat 16, so that the adjustment arms 13 at both ends of the guide beam 12 also tilt, and then the probes 14 respectively connected to the two adjustment arms 13 shift synchronously. It is observed whether the pointer in the scale pointer indicator plate 15 connected to the middle position of the guide beam 12 "deflects" to judge whether the prefabricated wall tilts. The specific description is as follows:
[0047] When it is found that the guide beam 12 "connected" to the first hydraulic jack 1 has changed its "position" from that during the initial adjustment, that is, the prefabricated wall has tilted (beyond the tilt range allowed by the design), the pointer in the scale pointer indicator plate 15 is "deflected". The guide beam 12 "deflects" through the probes 14 respectively arranged at the upper and lower ends under the action of the tilt of the prefabricated wall, thereby causing the pointer in the scale pointer indicator plate 15 to "deflect", so that the pointer in the scale pointer indicator plate 15 does not "point to zero", indicating that the prefabricated wall has tilted and exceeded the tilt range allowed by the design.
[0048] However, the "specific degree of inclination" cannot be determined by the "deflection" of the pointer in the scale pointer indicator plate 15 alone, so the vertical balance beam 111 and its corresponding connection structure designed by the support device come into play. Since the pointer on the scale pointer indicator plate 15 indicates the "zero scale" position during the initial adjustment, the assembled wall has already tilted in the vertical direction, and the tilt force of the assembled wall pushes the probe 14 to drive the guide beam 12 to rotate, so that the relative "rotational inclination" position of the scale pointer indicator plate 15 and the guide beam 12 and the vertical balance beam 111 can be used to judge:
[0049] If the upper part of the assembled wall tilts toward one side of the supporting device, the upper side of the assembled wall abuts against the upper contact probe 14, and the upper probe 14 drives the guide beam 12 to tilt along with the tilted side of the assembled wall through the upper adjustment arm 13 under the action of the external force. At this time, the pointer on the scale pointer indicator plate 15 deflects, indicating that the assembled wall has tilted (exceeding the tilt range allowed by the design). However, the deflection of the pointer of the scale pointer indicator plate 15 cannot indicate the specific direction of the tilt, so the vertical balance beam 111 comes into play at this time; since in this example, the upper part of the assembled wall tilts toward the supporting device, One side of the device is inclined, so the upper part of the guide beam 12 "relatively moves" toward the upper part of the vertical balance beam 111, and the upper part of the guide beam 12 "relatively moves away" from the lower part of the vertical balance beam 111 (that is, moves relatively toward one side of the assembled wall); therefore, the sliding block 113 hinged to the upper part of the guide beam 12 through the hinge rod pushes the sliding block 113 to move toward one side of the vertical balance beam 111 under the "limiting guiding action" of the sliding beam 112 under the relative movement force of the guide beam 12, thereby driving the movable sliding shaft 114 connected to the sliding beam 112 to "move" through the sliding beam 112, so that the end of the movable sliding shaft 114 away from the sliding beam 112 is relatively close to the initial position. In contrast, it exceeds the "certain length" of the end of the vertical balance beam 111 away from the guide beam 12; and the movable sliding shaft 114 arranged at the bottom, because the sliding beam 112 drives the movable sliding shaft 114 connected to the sliding beam 112 to "move" toward the end close to the assembled wall, the lower movable sliding shaft 114 enters the vertical balance beam 111 by a "certain length" compared with the initial position. Therefore, according to the relative "moving distance" of the upper movable sliding shaft 114 and the lower movable sliding shaft 114 and the vertical balance beam 111 in the initial position, in this embodiment, since it is the "upper movable sliding shaft 114" The movable shaft 114 moves relative to the vertical balance beam 111, while the lower movable sliding shaft 114 moves away from the vertical balance beam 111", which means that the upper part of the prefabricated wall is inclined toward one side of the supporting device; similarly, if the upper part of the prefabricated wall is inclined toward one side of the supporting device, the judgment principle is the same, but it becomes "the lower movable sliding shaft 114 is compared with the initial position of the vertical balance beam 111, and exceeds the end of the vertical balance beam 111 away from the guide beam 12 by a "certain length", and the upper movable sliding shaft 114 is compared with the initial position of the vertical balance beam 111, and enters the vertical balance beam 111 by a "certain length"". This specific implementation method is not described in detail here.
[0050] Furthermore, the horizontal inclination of the prefabricated wall is observed and judged by the horizontal balance structure. In the embodiment, the horizontal balance structure includes horizontal guide movable beams 121 connected to both sides of the outer shell of the first hydraulic jack close to the support plate, and the horizontal guide movable beams 121 are all through-set; a horizontal sliding rod 122 is slidably adapted in the hollow cavity of the horizontal guide movable beam 121, and a movable notch is provided at one end of the horizontal guide movable beam 121 close to the support plate, and a fixed connecting rod 123 that can slide along the movable notch is provided in the movable notch, one end of the fixed connecting rod 123 is used to connect with the horizontal sliding rod 122, and the other end of the fixed connecting rod 123 is conically set to abut against the prefabricated wall. Initially, one end of the two fixed connecting rods 123 with a conical setting is respectively extended into the "hole" reserved when the prefabricated wall is prefabricated, and the horizontal sliding rod 122 is installed and designed according to the actual length, and the fixed connecting rod 123 and the horizontal sliding rod 122 are detachably installed and connected, so as to facilitate the insertion of the fixed connecting rod 123 into the "hole" reserved when the prefabricated wall is prefabricated. In the embodiment, the initial two horizontal sliding rods 122 are "coplanar" with the end faces of the horizontal guide movable beam 121 where they are slid; if in the subsequent construction, under the influence of external factors, the prefabricated wall undergoes "horizontal tilt" (beyond the allowable range of horizontal tilt), it is judged by observing the initial positions of the end faces of the two horizontal sliding rods 122 and the horizontal guide movable beam 121. Here, one of the horizontal tilts is used as an example:
[0051] If the assembled wall tilts "towards the left" (beyond the horizontal tilt range allowed by the design), the assembled wall moves relatively to the left, and the fixed connecting rods 123 extending into the "holes" on the left and right sides of the assembled wall will be relatively displaced relative to the horizontal guide movable beam 121. That is, the fixed connecting rod 123 connected on the left moves relatively to the left with the assembled wall, thereby driving the horizontal sliding rod 122 connected to the fixed connecting rod 123 to move to the left, and then the horizontal sliding rod 122 on the left moves a certain distance to the left relative to the initial position of the horizontal guide movable beam 121 on the left, and the horizontal sliding rod 122 on the right moves a certain distance to the left relative to the initial position of the horizontal guide movable beam 121 on the left, and the horizontal sliding rod 122 on the right moves a certain distance to the left relative to the initial position of the horizontal guide movable beam 121 on the left, and the horizontal sliding rod 122 on the left ... The sliding rod 122 has also moved a certain distance to the left relative to the initial position of the right horizontal guiding movable beam 121, that is, the right horizontal sliding rod 122 has entered the hollow cavity of the right horizontal guiding movable beam 121 a certain distance relative to the initial position of the right horizontal guiding movable beam 121; therefore, according to the comparison between the horizontal guiding movable beam 121 and the horizontal sliding rod 122 slidably arranged in the hollow cavity and the initial position, it can be judged that the piece of prefabricated wall is tilted "horizontally to the left"; similarly, the piece of prefabricated wall is tilted "to the right", and the judgment principle is the same, and no further specific explanation is given here.
[0052] Further, after judging that the prefabricated wall has tilted according to the above observation, it is adjusted. The specific adjustment can be based on: lifting the prefabricated wall by lifting equipment, and then "fine-tuning" with manual cooperation; observing the positions of the two movable sliding shafts 114 and the vertical balance beam 111, and the two horizontal guide movable beams 121 and the horizontal sliding rods 122 respectively slidably set in the hollow cavity; when it is observed that the two movable sliding shafts 114 return to the initial position of the vertical balance beam 111, and the horizontal sliding rods 122 return to the initial position of the horizontal guide movable beams 121 connected to them, it means that the adjustment is in place, the prefabricated wall is returned to the right position, and then the two prefabricated walls are "permanently fixed", and the connection seams of the adjacent two prefabricated walls are constructed. After fine-tuning the prefabricated walls one by one, after meeting the inclination requirements allowed by the design, each adjacent prefabricated wall is connected in turn, so as to realize the connection of all prefabricated walls of a wall into a whole, thereby ensuring the requirements of force and quality. From the perspective of the entire support device design, the support device can not only be used to temporarily support the prefabricated wall, facilitating the connection of two adjacent prefabricated walls, but also can detect the inclination (including vertical and horizontal directions) of the temporarily supported prefabricated wall, thereby facilitating the construction personnel to make adjustments, thereby reducing the construction process, saving time, and improving construction efficiency. The structure, rods and other materials of the support device are also easy to obtain and process during construction, with low cost, reducing the frequency of construction measurement (instead of the frequency of setting up measuring instruments multiple times), and can be reused multiple times to meet the requirements of green construction.
[0053] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the present invention is not limited to the specific details of the embodiments in the above description. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications, and these simple modifications all belong to the protection scope of the present invention. At the same time, the various embodiments of the present invention can also be arbitrarily combined, as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.
Claims
1. An assembled wall support device, characterized in that: It comprises a telescopically adjustable first hydraulic jack, one end of which is hinged with a support plate for connecting with the embedded parts of the side wall of the assembled wall, the other end of which is connected with a movable mechanism for adjusting the first hydraulic jack, and a detection mechanism for detecting the inclination is installed on the first hydraulic jack; The detection mechanism includes a guide beam, which is movably connected to the first hydraulic jack through a connecting structure, and both ends of the guide beam are movably and telescopically connected to adjustment arms, and one end of the adjustment arm close to the assembled wall is connected to a probe for contacting the assembled wall; A horizontal balancing structure for abutting against the assembled wall is connected to the outer shell of the first hydraulic jack at one end close to the assembled wall; A vertical balance beam is arranged at one end of the guide beam away from the support plate, and the vertical balance beam is connected to the housing of the first hydraulic jack at one end away from the support plate through a detachably connected connection hoop, and sliding beams are respectively connected to the upper and lower parts of the end of the vertical balance beam close to the guide beam, and sliding blocks are respectively slidably adapted on the sliding beams; One end of the sliding block close to the vertical balance beam is connected to a movable sliding shaft, and the other end of the movable sliding shaft can movably pass through the vertical balance beam. A deformation spring is respectively passed through the movable sliding shaft, one end of the deformation spring is connected to the sliding block, and the other end of the deformation spring is used to contact the vertical balance beam; One end of the sliding block close to the guide beam is hinged with a hinge rod, and the other end of the hinge rod is hinged with the guide beam; The horizontal balancing structure comprises horizontal guide movable beams connected to both sides of the housing of one end of the first hydraulic jack close to the support plate, and the horizontal guide movable beams are all centrally arranged; A horizontal sliding rod is slidably adapted in the hollow cavity of the horizontally guided movable beam, and a movable slot is provided at one end of the horizontally guided movable beam close to the support plate, and a fixed connecting rod that can slide along the movable slot is provided in the movable slot, and one end of the fixed connecting rod is used to be connected to the horizontal sliding rod, and the other end of the fixed connecting rod is conically arranged for abutting against the assembled wall.
2. The assembled wall support device according to claim 1, characterized in that: The movable mechanism includes a second hydraulic jack, one end of the second hydraulic jack is hinged to the first hydraulic jack through a fixed seat, the other end of the second hydraulic jack is connected to a support rod for supporting the second hydraulic jack, and the second hydraulic jack is installed and connected to a support structure for supporting and adjusting the second hydraulic jack.
3. The assembled wall support device according to claim 2, characterized in that: The supporting structure includes a third hydraulic jack, one end of the third hydraulic jack is hinged to the second hydraulic jack through a limit hoop, the other end of the third hydraulic jack is hinged with a slider for driving the third hydraulic jack to move, the bottom end of the slider is connected to a base plate, a sliding groove is provided on the base plate, the slider is slidably adapted to the sliding groove, and the base plate is used to be connected and fixed to the ground.
4. The assembled wall support device according to claim 3, characterized in that: One end of the bottom plate close to the support rod is connected to a connection seat, and the support rod is hinged to the connection seat; A fourth hydraulic jack is arranged at one end of the bottom plate away from the connecting seat, one end of the fourth hydraulic jack is connected to the sliding block, and the other end of the fourth hydraulic jack is fixedly connected to the bottom plate through a pad.
5. The assembled wall support device according to claim 4, characterized in that: The guide beam is arranged above the bottom plate, the adjustment arm and the guide beam are movably and telescopically arranged, and a scale pointer indicator plate is installed on the guide beam; The connection structure comprises an articulated seat, the articulated seat is detachably connected to the first hydraulic jack, the guide beam is connected to the articulated seat via a pin shaft, and a torsion spring for allowing the guide beam to move and reset is provided on the pin shaft.
6. The assembled wall support device according to claim 5, characterized in that: The end of the probe close to the adjusting arm is connected to a connecting rod, a spring is passed through the connecting rod, the end of the connecting rod away from the probe is connected to a connecting sleeve that can be movably adjusted with the adjusting arm, the end of the connecting rod away from the probe is used to be movably passed through the hollow cavity of the connecting sleeve, one end of the spring is connected to the probe, and the other end of the spring is connected to the end of the connecting sleeve close to the connecting rod.
7. The assembled wall support device according to claim 6, characterized in that: The adjusting arm at the bottom end of the guide beam is connected with a hanging hammer through a wire.
8. A construction method for applying the assembled wall support device according to any one of claims 1 to 7, characterized in that: The construction steps are as follows: S1. Prefabricate the prefabricated wall at the prefabrication site, and embed the embedded parts for connecting with the supporting plate of the supporting device on the side wall of the prefabricated prefabricated wall. After the prefabricated prefabricated wall is cured and qualified, it is transported to the construction site, and the prefabricated prefabricated wall is lifted to the designed position by a lifting machine; S2. Fix the bottom plate of the support device to the floor panel by bolts or welding, place the support device at a suitable position between the floor panel and the assembled wall, then adjust the height of the support device, connect the support plate of the support device to the embedded parts of the assembled wall for temporary stability; support the two sides of the assembled wall with supporting steel pipes, and temporarily support and stabilize the assembled wall piece by piece; adjust the detection mechanism of the support device to the initial position; S3. When two adjacent prefabricated walls need to be connected in sequence, the detection mechanism of the support device is observed and compared with the initial adjustment position to determine whether the prefabricated wall has an inclination; the horizontal balance structure of the support device is observed and compared with the initial adjustment position to determine whether the prefabricated wall is inclined in the horizontal direction; S31. A detection mechanism for detecting inclination is installed on the first hydraulic jack of the support device. The guide beam of the detection mechanism is movably connected to the first hydraulic jack. Adjustment arms are movably and telescopically connected at both ends of the guide beam. A probe for contacting the assembled wall is connected to one end of the adjustment arm close to the assembled wall. A connecting rod is connected to one end of the probe close to the adjustment arm. A spring is passed through the connecting rod. An end of the connecting rod away from the probe is connected to a connecting sleeve movably and adjustable to the adjustment arm. The two probes are subjected to the inclination force of the assembled wall, which is transmitted to the connecting sleeve through the connecting rod and the spring, and then transmitted to the guide beam by the connecting sleeve. Since the guide beam is subjected to the inclination force of the assembled wall, the guide beam is deflected, and then the scale pointer of the scale pointer indicator disk on the guide beam is deflected. The scale pointer of the scale pointer indicator disk does not point to the zero scale. It is judged that the assembled wall is tilted in the vertical direction, and vertical adjustment is required. S32. A horizontal balancing structure for abutting against the assembled wall is connected to the outer shell of the first hydraulic jack of the supporting device at one end close to the assembled wall, and the horizontal guiding movable beams on both sides of the horizontal balancing structure are both centrally arranged; a horizontal sliding rod is slidably adapted in the hollow cavity of the horizontal guiding movable beam, and a movable notch is provided at one end of the horizontal guiding movable beam close to the supporting plate, and a fixed connecting rod that can slide along the movable notch is provided in the movable notch, one end of the fixed connecting rod is used to be connected to the horizontal sliding rod, and the other end of the fixed connecting rod is conically arranged for abutting against the assembled wall; the conically arranged ends of the two fixed connecting rods are respectively extended into the holes reserved when the assembled wall is prefabricated, so that the end faces of the two initial horizontal sliding rods close to the horizontal guiding movable beams where they are slid are coplanar; if the assembled wall is horizontally tilted during subsequent construction, it is judged whether the assembled wall is horizontally tilted by observing the initial positions of the end faces of the two horizontal sliding rods and the horizontal guiding movable beam, and if it is tilted, horizontal adjustment is required.