One-stop warehouse visualization management method and system

Through a one-stop warehousing visual management method, multi-dimensional preset material feature indicators and warehouse data are used to generate warehousing scheduling solutions, solving the problem of poor adaptability and accuracy of warehousing materials into scheduling and improving the quality of warehousing management.

CN118469449BActive Publication Date: 2024-11-05AEROSPACE JICHUANG IOT RES INST (NANJING) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410925557.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-05
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

In the prior art, the storage of materials stored in the warehouse have low adaptability and poor accuracy, resulting in the storage of materials stored in the warehouse have low quality.

Method used

Adopt a one-stop warehousing visual management method, collect basic information of materials to be stored through multi-dimensional preset material feature indicators, perform multi-level classification, build visual models based on warehouse structure and real-time warehousing data, identify idle warehouses, and use materials The inbound scheduling algorithm generates the inbound scheduling plan to realize material inbound management.

Benefits of technology

It improves the adaptability and accuracy of scheduling of materials in warehouses and improves the quality of storing of storing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118469449B_ABST
    Figure CN118469449B_ABST
Patent Text Reader

Abstract

The present invention discloses a one-stop warehouse visualization management method and system, which relates to the field of data processing, wherein the method comprises: collecting basic information of materials to be stored, obtaining a material feature information set; performing multi-level classification of materials to be stored based on the material feature information set, obtaining multiple material partitions; modeling based on warehouse structure data and real-time warehouse data, constructing a first warehouse visualization model; identifying idle storage locations based on the first warehouse visualization model, obtaining a second warehouse visualization model; performing storage scheduling for multiple material partitions according to a material storage scheduling algorithm based on idle storage scheduling equipment information and the second warehouse visualization model, obtaining a material storage scheduling plan; performing storage management for multiple material partitions according to the material storage scheduling plan. The method solves the technical problem that the storage material storage scheduling in the prior art has low adaptability and poor accuracy, resulting in poor storage material storage scheduling quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing, and in particular to a one-stop warehouse visualization management method and system. Background Art

[0002] Inbound scheduling is one of the important links in warehouse management. Inbound scheduling is an important link to ensure that goods can enter the warehouse smoothly and efficiently. Through reasonable inbound scheduling, the damage rate of goods can be minimized, the allocation of warehouse resources can be optimized, and the level of warehouse management can be improved. In the prior art, there are technical problems such as low adaptability and poor accuracy of warehouse material inbound scheduling, which leads to poor quality of warehouse material inbound scheduling. Summary of the invention

[0003] The present application provides a one-stop warehouse visualization management method and system. The method solves the technical problem that the prior art has low adaptability and poor accuracy in the scheduling of warehouse material entry, which leads to poor quality of warehouse material entry scheduling. The method achieves the technical effect of improving the adaptability and accuracy of warehouse material entry scheduling, improving the effect of warehouse material entry scheduling, and improving the quality of warehouse management.

[0004] In view of the above problems, the present application provides a one-stop warehouse visualization management method and system.

[0005] In a first aspect, the present application provides a one-stop warehouse visualization management method, wherein the method is applied to a one-stop warehouse visualization management system, and the method includes: obtaining materials to be stored in a target warehouse; collecting basic information of the materials to be stored according to multi-dimensional preset material characteristic indicators to obtain a material characteristic information set, wherein the multi-dimensional preset material characteristic indicators include material attributes, material measurements and material storage conditions; performing multi-level classification of the materials to be stored based on the material characteristic information set to obtain multiple material partitions; obtaining warehouse structure data, real-time warehouse data, and idle warehouse scheduling equipment information of the target warehouse; modeling based on the warehouse structure data and the real-time warehouse data to construct a first warehouse visualization model; identifying idle warehouse locations based on the first warehouse visualization model to obtain a second warehouse visualization model; performing warehouse scheduling on the multiple material partitions according to a material warehouse scheduling algorithm based on the idle warehouse scheduling equipment information and the second warehouse visualization model to obtain a material warehouse scheduling plan; and performing warehouse management on the multiple material partitions according to the material warehouse scheduling plan.

[0006] In the second aspect, the present application also provides a one-stop warehouse visualization management system, wherein the system includes: a material acquisition module, the material acquisition module is used to obtain the materials to be stored in the target warehouse; a material feature collection module, the material feature collection module is used to collect the basic information of the materials to be stored according to the multi-dimensional preset material feature indicators, and obtain a material feature information set, wherein the multi-dimensional preset material feature indicators include material attributes, material measurements and material storage conditions; a material classification module, the material classification module is used to perform multi-level classification of the materials to be stored based on the material feature information set to obtain multiple material partitions; a data acquisition module, the data acquisition module is used to obtain the warehouse structure data and real-time storage data of the target warehouse, so as to obtain the warehouse structure data and real-time storage data of the target warehouse. and idle warehousing scheduling equipment information; a visualization model acquisition module, the visualization model acquisition module is used to model based on the warehouse structure data and the real-time warehousing data to construct a first warehouse visualization model; an idle warehouse position identification module, the idle warehouse position identification module is used to identify idle warehousing warehouse positions based on the first warehouse visualization model to obtain a second warehouse visualization model; an warehousing scheduling module, the warehousing scheduling module is used to perform warehousing scheduling for the multiple material partitions according to the material warehousing scheduling algorithm based on the idle warehousing scheduling equipment information and the second warehouse visualization model to obtain a material warehousing scheduling plan; an warehousing management module, the warehousing management module is used to perform warehousing management for the multiple material partitions according to the material warehousing scheduling plan.

[0007] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0008] Through multi-dimensional preset material characteristic indicators, the basic information of the materials to be entered is collected to obtain the material characteristic information set; based on the material characteristic information set, the materials to be entered are classified into multiple levels to obtain multiple material partitions; modeling is performed according to the warehouse structure data and real-time storage data to build the first warehouse visualization model; the idle storage positions of the first warehouse visualization model are identified to obtain the second warehouse visualization model; based on the idle storage scheduling equipment information and the second warehouse visualization model, the storage scheduling of multiple material partitions is performed according to the material storage scheduling algorithm to obtain the material storage scheduling plan, and the storage management of multiple material partitions is performed according to the material storage scheduling plan. The technical effect of improving the adaptability and accuracy of the storage material storage scheduling, improving the storage material storage scheduling effect, and improving the storage management quality is achieved.

[0009] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings of the embodiments of the present invention are briefly introduced below. Obviously, the drawings in the following description only relate to some embodiments of the present invention, but are not intended to limit the present invention.

[0011] Figure 1 A flowchart of a one-stop warehouse visualization management method for this application;

[0012] Figure 2 This is a structural diagram of a one-stop warehouse visualization management system for this application. DETAILED DESCRIPTION

[0013] This application provides a one-stop warehouse visualization management method and system. It solves the technical problem that the material storage scheduling in the prior art has low adaptability and poor accuracy, resulting in poor quality of the material storage scheduling. It achieves the technical effect of improving the adaptability and accuracy of the material storage scheduling, improving the material storage scheduling effect, and improving the quality of warehouse management.

[0014] Embodiment 1

[0015] Please see attached Figure 1 The present application provides a one-stop warehouse visualization management method, wherein the method is applied to a one-stop warehouse visualization management system, and the method specifically comprises the following steps:

[0016] Obtain the materials to be stored in the target warehouse;

[0017] According to the multi-dimensional preset material characteristic indicators, basic information of the material to be stored is collected to obtain a material characteristic information set, wherein the multi-dimensional preset material characteristic indicators include material attributes, material measurements and material storage conditions;

[0018] The target warehouse can be any warehouse that uses the one-stop warehouse visualization management system to perform intelligent material warehousing scheduling. The materials to be stored include multiple goods to be stored in the target warehouse.

[0019] Furthermore, basic information of the materials to be stored is collected according to the multi-dimensional preset material characteristic indicators to obtain a material characteristic information set. Among them, the multi-dimensional preset material characteristic indicators include material attributes, material measurements and material storage conditions. Material attributes refer to the type of goods. Material measurements refer to the size and weight of goods. Material storage conditions refer to the storage environment temperature requirements, storage environment humidity requirements, storage environment ventilation requirements, etc. of the goods. The material characteristic information set includes multiple goods characteristic information corresponding to multiple goods to be stored in the materials to be stored. Each piece of goods characteristic information includes the type of goods information, the size of goods (the length, width and height of the goods), the weight of goods, and the storage condition information of the goods corresponding to the goods to be stored. The storage condition information of goods includes the storage environment temperature requirement information, the storage environment humidity requirement information, the storage environment ventilation requirement information, etc. corresponding to the goods to be stored.

[0020] Based on the material feature information set, the materials to be stored are classified into multiple levels to obtain multiple material partitions;

[0021] The material to be stored is classified into multiple levels based on the material feature information set to obtain multiple material partitions, including:

[0022] Perform feature recognition according to the material feature information set to obtain a material attribute information set, a material measurement information set, and a material storage condition information set;

[0023] Classify the materials to be stored based on the material attribute information set to obtain a primary classification result of the materials;

[0024] Classify the first-level material classification result based on the material measurement information set to obtain a second-level material classification result;

[0025] The material secondary classification result is classified based on the material storage condition information set to generate the multiple material partitions.

[0026] Feature identification is performed on the material feature information set, that is, multiple product type information in the material feature information set is recorded as a material attribute information set, multiple product size information and multiple product weight information in the material feature information set are added to the material measurement information set, and multiple product storage condition information in the material feature information set is added to the material storage condition information set.

[0027] Further, the materials to be entered are classified according to the material attribute information set, that is, multiple goods to be entered with the same product type information in the materials to be entered are classified into one category to obtain the first-level material classification result. The first-level material classification result includes multiple first-level material groups. Each first-level material group includes multiple goods to be entered with the same product type information in the materials to be entered. Then, the first-level material classification result is classified according to the material measurement information set, that is, the goods to be entered with the same product size information and product weight information in each first-level material group are classified into one category to obtain the second-level material classification result. The second-level material classification result includes multiple second-level material groups. Each second-level material group includes multiple goods to be entered with the same product type information, product size information, and product weight information. Furthermore, the second-level material classification result is classified according to the material storage condition information set, that is, the goods to be entered with the same product storage condition information in each second-level material group are classified into one category to obtain multiple material partitions. Each material partition includes multiple incoming goods with the same product type information, product size information, product weight information, and product storage condition information. The incoming materials are classified into multiple levels through the material feature information set, which improves the adaptability of the material incoming scheduling in the warehouse.

[0028] Obtain warehouse structure data, real-time storage data, and idle warehousing scheduling equipment information of the target warehouse;

[0029] Modeling is performed based on the warehouse structure data and the real-time warehouse data to construct a first warehouse visualization model;

[0030] Identify idle storage locations based on the first warehouse visualization model to obtain a second warehouse visualization model;

[0031] Connect to the one-stop warehouse visualization management system to retrieve the warehouse structure data, real-time warehouse data, and idle warehousing scheduling equipment information of the target warehouse. Among them, the warehouse structure data includes the warehouse floor plan (length, width, height, floor area, etc.) and shelf layout information (number of shelves, shelf position, shelf size structure, etc.) corresponding to the target warehouse. The real-time warehouse data includes the storage location, type of goods, size of goods, weight of goods, etc. corresponding to each real-time storage product of the target warehouse. The idle warehousing scheduling equipment information includes the equipment type, equipment location, equipment model and specifications, etc. corresponding to each idle warehousing scheduling equipment (stackers in idle state, shunting RGV trolleys, etc.) of the target warehouse.

[0032] Further, the warehouse structure data and the real-time storage data are uploaded to the BIM modeling system, and the BIM modeling system performs modeling according to the warehouse structure data and the real-time storage data to construct a first warehouse visualization model. The BIM modeling system includes BIM modeling software in the prior art. The first warehouse visualization model includes a three-dimensional simulation model corresponding to the warehouse structure data and the real-time storage data. Then, the first warehouse visualization model is used to identify idle storage locations, that is, the idle storage locations in the first warehouse visualization model are marked to obtain a second warehouse visualization model. The second warehouse visualization model includes the first warehouse visualization model with the idle storage location mark.

[0033] Based on the idle storage scheduling equipment information and the second warehouse visualization model, the plurality of material partitions are scheduled for storage according to a material storage scheduling algorithm to obtain a material storage scheduling plan;

[0034] Wherein, based on the idle storage scheduling equipment information and the second warehouse visualization model, the storage scheduling of the multiple material partitions is performed according to the material storage scheduling algorithm to obtain the material storage scheduling plan, including:

[0035] Obtaining a multi-dimensional preset position-storage constraint index, wherein the multi-dimensional preset position-storage constraint index includes a position-hard storage constraint index and a position-soft storage constraint index;

[0036] Based on the multi-dimensional preset warehouse location-storage constraint index, the second warehouse visualization model is rendered with storage constraint features of idle incoming warehouse locations to generate a third warehouse visualization model;

[0037] The material warehousing scheduling algorithm includes: connecting to the one-stop warehouse visualization management system and reading the multi-dimensional preset warehouse location-warehousing constraint indicators. The multi-dimensional preset warehouse location-warehousing constraint indicators include warehouse location-hard warehouse constraint indicators and warehouse location-soft warehouse constraint indicators. The warehouse location-hard warehouse constraint indicators include the maximum warehouse storage product size and the maximum warehouse storage product weight corresponding to the warehouse location. The warehouse location-soft warehouse constraint indicators include the warehouse environment temperature, warehouse environment humidity, and warehouse environment ventilation conditions corresponding to the warehouse location.

[0038] Further, the storage constraint features of the idle storage locations are rendered for the second warehouse visualization model according to the multi-dimensional preset location-storage constraint index, that is, information is collected for each idle storage location in the second warehouse visualization model according to the multi-dimensional preset location-storage constraint index to obtain multiple idle location storage constraints, and the multiple idle location storage constraints are input into the second warehouse visualization model, and the second warehouse visualization model is marked according to the multiple idle location storage constraints to obtain the third warehouse visualization model. Among them, each idle location storage constraint includes the maximum storage product size information (the length, width, and height of the maximum storage product), the maximum storage product weight information, the storage environment temperature information, the storage environment humidity information, and the storage environment ventilation information corresponding to each idle storage location in the second warehouse visualization model. The third warehouse visualization model includes the second warehouse visualization model with multiple idle location storage constraint identifiers.

[0039] Based on the pre-built storage bin fitness evaluation channel, and according to the third warehouse visualization model, material storage bin configuration is performed on the multiple material partitions to obtain a material storage bin solution;

[0040] Wherein, based on the pre-constructed storage location fitness evaluation channel, according to the third warehouse visualization model, the material storage location is configured for the multiple material partitions to obtain the material storage location plan, including:

[0041] Based on the third warehouse visualization model, verify the supply and demand matching degree of incoming warehouse locations according to the multiple material partitions to obtain a warehouse supply and demand matching degree verification operator;

[0042] Among them, based on the third warehouse visualization model, the warehouse supply and demand matching degree verification is performed according to the multiple material partitions to obtain the warehouse supply and demand matching degree verification operator, including:

[0043] Performing storage space demand analysis based on the multiple material partitions to obtain material storage space demand;

[0044] Performing storage space analysis of idle incoming warehouse locations based on the third warehouse visualization model to obtain idle warehouse locations-storage space;

[0045] Based on the material storage space demand and the idle storage space, a matching degree of storage space supply and demand is obtained;

[0046] Determining whether the position supply and demand matching degree satisfies the position supply and demand matching constraint;

[0047] If the warehouse supply and demand matching degree does not meet the warehouse supply and demand matching constraint, the warehouse supply and demand matching degree verification operator obtained is warehouse supply and demand matching degree-unqualified, and a warehousing warehouse warning instruction is generated.

[0048] The material warehousing scheduling algorithm also includes: obtaining material storage space requirements by performing storage space requirements analysis on multiple material partitions. For example, when performing storage space requirements analysis on multiple material partitions, storage space calculation is performed on each item to be stored in each material partition (multiplication calculation is performed on the length, width, and height of the item), multiple item storage space parameters corresponding to multiple items to be stored are obtained, and the sum of the multiple item storage space parameters is output as the material storage space requirements. Similarly, the storage space analysis of idle storage locations is performed on the third warehouse visualization model, that is, storage space calculation is performed on each idle storage location in the third warehouse visualization model (multiplication calculation is performed on the length, width, and height of the largest storage item), multiple location storage space parameters corresponding to multiple idle storage locations are obtained, and multiple location storage space parameters are output as idle location-storage space.

[0049] Further, the material storage space demand and the idle warehouse-storage space are compared to obtain the warehouse supply and demand matching degree. For example, when comparing the material storage space demand and the idle warehouse-storage space, the ratio of the idle warehouse-storage space to the material storage space demand can be output as the warehouse supply and demand matching degree. Then, it is judged whether the warehouse supply and demand matching degree meets the warehouse supply and demand matching constraint, and a warehouse supply and demand matching degree verification operator is generated. The warehouse supply and demand matching constraint includes a warehouse supply and demand matching degree range pre-set and determined by the one-stop warehouse visualization management system. The warehouse supply and demand matching degree verification operator includes warehouse supply and demand matching degree-unqualified / warehouse supply and demand matching degree-qualified. If the warehouse supply and demand matching degree meets the warehouse supply and demand matching constraint, the warehouse supply and demand matching degree verification operator obtained is warehouse supply and demand matching degree-qualified. If the bin supply and demand matching degree does not meet the bin supply and demand matching constraint, the bin supply and demand matching degree verification operator is obtained as bin supply and demand matching degree - unqualified, and a storage bin warning instruction is generated. The storage bin warning instruction is used to indicate that the bin supply and demand matching degree is unqualified and the target warehouse has insufficient free storage space.

[0050] By verifying the matching degree of supply and demand of incoming warehouse positions in the target warehouse, the warehouse supply and demand matching degree verification operator is obtained, and the incoming warehouse position warning instructions are adaptively generated, which improves the reliability of warehouse material incoming scheduling and improves the quality of warehouse management.

[0051] If the bin supply and demand matching degree verification operator is bin supply and demand matching degree - qualified, the material storage bin configuration instruction is obtained;

[0052] Based on the material storage bin configuration instruction, multiple random material storage bin configurations are performed according to the third warehouse visualization model and the multiple material partitions to construct a storage bin configuration decision space;

[0053] Based on the incoming warehouse location configuration decision space, obtaining a first incoming warehouse location configuration decision;

[0054] The material warehousing scheduling algorithm also includes: when the bin supply and demand matching degree verification operator is the bin supply and demand matching degree-qualified, generating a material warehousing bin configuration instruction. The material warehousing bin configuration instruction is used to characterize that the bin supply and demand matching degree is qualified, and the free storage space of the target warehouse is sufficient for the storage of the incoming materials. Then, based on the material warehousing bin configuration instruction, multiple random warehousing bin matching is performed for each incoming goods in multiple material partitions according to multiple free storage locations in the third warehouse visualization model, and the warehousing bin configuration decision space is obtained, and the warehousing bin configuration decision space is randomly selected to obtain the first warehousing bin configuration decision. Among them, the warehousing bin configuration decision space includes multiple warehousing bin configuration decisions. Each warehousing bin configuration decision includes a matching storage location corresponding to each incoming goods in multiple material partitions (each incoming goods corresponds to a matching free storage location). The first warehousing bin configuration decision is a random warehousing bin configuration decision in the warehousing bin configuration decision space.

[0055] Performing fitness evaluation on the first incoming warehouse location configuration decision based on the incoming warehouse location fitness evaluation channel to obtain a first warehouse location configuration fitness evaluation operator;

[0056] The step of performing fitness evaluation on the first incoming warehouse location configuration decision based on the incoming warehouse location fitness evaluation channel to obtain a first warehouse location configuration fitness evaluation operator includes:

[0057] Based on the first incoming warehouse location configuration decision, feature recognition is performed on the third warehouse visualization model and the material feature information set to obtain a plurality of location-configuration storage constraints and a plurality of location-configuration material constraints;

[0058] Obtaining a multi-dimensional bin fitness evaluation index, wherein the multi-dimensional bin fitness evaluation index includes bin configuration space fitness, bin configuration load fitness and bin configuration storage environment fitness;

[0059] Based on the multi-dimensional bin fitness evaluation index, construct the incoming bin fitness evaluation channel and bin fitness evaluation weighted constraint;

[0060] Based on the incoming warehouse location fitness evaluation channel, generating multiple location-configuration fitness evaluation results according to the multiple location-configuration storage constraints and the multiple location-configuration material constraints;

[0061] Based on the bin fitness evaluation weighted constraint, weighted calculations are performed on the multiple bin-configuration fitness evaluation results to obtain multiple bin-configuration fitnesses;

[0062] Based on the multiple bin-configuration fitnesses, the first bin configuration fitness evaluation operator is generated.

[0063] Determining whether the first storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator;

[0064] If the first storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator, the material storage location plan is generated according to the first storage location configuration decision.

[0065] The material warehousing scheduling algorithm also includes: according to the first warehousing location configuration decision, feature identification is performed on the third warehouse visualization model and the material feature information set respectively, that is, data extraction is performed on the third warehouse visualization model according to each matching storage location in the first warehousing location configuration decision, and multiple location-configuration storage constraints are obtained. Each location-configuration storage constraint includes an idle location storage constraint corresponding to the matching storage location. At the same time, data extraction is performed on the material feature information set according to the goods to be stored corresponding to each matching storage location in the first warehousing location configuration decision, and multiple location-configuration material constraints are obtained. Each location-configuration material constraint includes the product feature information of the goods to be stored corresponding to each matching storage location in the first warehousing location configuration decision.

[0066] Further, according to the multi-dimensional warehouse fitness evaluation index, a warehouse fitness evaluation weighted constraint is constructed. The multi-dimensional warehouse fitness evaluation index includes warehouse configuration space fitness, warehouse configuration load-bearing fitness and warehouse configuration storage environment fitness. The warehouse fitness evaluation weighted constraint includes the warehouse configuration space fitness-weight, warehouse configuration load-bearing fitness-weight and warehouse configuration storage environment fitness-weight pre-set and determined by the one-stop warehouse visualization management system. Then, historical data query is performed according to the multi-dimensional warehouse fitness evaluation index to obtain multiple warehouse fitness evaluation records. Each warehouse fitness evaluation record includes historical warehouse-configuration storage constraints, historical warehouse-configuration material constraints, and historical warehouse configuration space fitness evaluation values, historical warehouse configuration load-bearing fitness evaluation values, and historical warehouse configuration storage environment fitness evaluation values ​​corresponding to the historical warehouse-configuration storage constraints and historical warehouse-configuration material constraints. Furthermore, according to the BP neural network, multiple warehouse fitness evaluation records are continuously self-trained and learned until the convergence state, and the warehouse fitness evaluation channel can be obtained. The BP neural network is a multi-layer feedforward neural network trained according to the error back propagation algorithm. The basic principle of the error back propagation algorithm is that the BP neural network can perform forward calculation and reverse calculation. During forward calculation, the input information is processed layer by layer from the input layer through multiple layers of neurons and turned to the output layer. The state of each layer of neurons only affects the state of the next layer of neurons. If the expected output cannot be obtained in the output layer, the reverse calculation is turned to return the error signal along the original connection path, and the error signal is minimized by modifying the weights of each neuron. The warehouse fitness evaluation channel includes the input layer, hidden layer, and output layer.

[0067] Furthermore, multiple bin-configuration storage constraints and multiple bin-configuration material constraints are matched to obtain multiple bin fitness evaluation sources. Each bin fitness evaluation source includes a bin-configuration storage constraint and a bin-configuration material constraint corresponding to the bin-configuration storage constraint. Subsequently, multiple bin fitness evaluation sources are input into a pre-constructed incoming bin fitness evaluation channel, and the incoming bin fitness evaluation channel evaluates multiple bin fitness evaluation sources according to a multi-dimensional bin fitness evaluation index to obtain multiple bin-configuration fitness evaluation results. Each bin-configuration fitness evaluation result includes a bin configuration space fitness evaluation value, a bin configuration load-bearing fitness evaluation value, and a bin configuration storage environment fitness evaluation value corresponding to each bin fitness evaluation source.

[0068] Further, according to the bin fitness evaluation weighted constraint, weighted calculations are performed on the multiple bin-configuration fitness evaluation results to obtain multiple bin-configuration fitnesses, and the multiple bin-configuration fitnesses are output as a first bin configuration fitness evaluation operator. The first bin configuration fitness evaluation operator includes multiple bin-configuration fitnesses corresponding to the first warehousing bin configuration decision. For example, when weighted calculation is performed on multiple bin-configuration fitness evaluation results according to the bin fitness evaluation weighted constraint, the product of the bin configuration space fitness-weight and the bin configuration space fitness evaluation value is output as a weighted bin configuration space fitness evaluation value, the product of the bin configuration bearing fitness-weight and the bin configuration bearing fitness evaluation value is output as a weighted bin configuration bearing fitness-weight, the product of the bin configuration storage environment fitness-weight and the bin configuration storage environment fitness evaluation value is output as a weighted bin configuration storage environment fitness evaluation value, and the sum of the weighted bin configuration space fitness evaluation value, the weighted bin configuration bearing fitness-weight, and the weighted bin configuration storage environment fitness evaluation value is output as the bin-configuration fitness.

[0069] Further, the bin configuration fitness constraint operator includes a bin-configuration fitness range pre-set and determined by the one-stop warehouse visualization management system. It is judged whether the multiple bin-configuration fitnesses in the first bin configuration fitness evaluation operator satisfy the bin configuration fitness constraint operator. If the multiple bin-configuration fitnesses in the first bin configuration fitness evaluation operator all satisfy the bin configuration fitness constraint operator, then the first bin configuration fitness evaluation operator satisfies the bin configuration fitness constraint operator, and the first storage bin configuration decision is output as a material storage bin plan.

[0070] Wherein, judging whether the first bin configuration fitness evaluation operator satisfies the bin configuration fitness constraint operator includes:

[0071] If the first bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, obtaining a first configuration iterative optimization instruction;

[0072] Based on the first configuration iteration optimization instruction, according to the incoming storage location configuration decision space, a second incoming storage location configuration decision is retrieved;

[0073] Performing fitness evaluation on the second incoming storage location configuration decision based on the incoming storage location fitness evaluation channel to obtain a second storage location configuration fitness evaluation operator;

[0074] Determining whether the second storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator;

[0075] If the second storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator, generating the material storage location plan according to the second storage location configuration decision;

[0076] If the second storage location configuration fitness evaluation operator does not satisfy the storage location configuration fitness constraint operator, a second configuration iterative optimization instruction is obtained, and the incoming storage location configuration decision space is continuously iteratively optimized according to the second configuration iterative optimization instruction until the material incoming storage location plan is obtained.

[0077] The material warehousing scheduling algorithm also includes: if any one of the bin-configuration fitness in the first bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, then the first bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, and a first configuration iteration optimization instruction is obtained. The first configuration iteration optimization instruction is an instruction information used to characterize that the first bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, and it is necessary to iteratively optimize the warehousing bin configuration decision space. Then, based on the first configuration iteration optimization instruction, the warehousing bin configuration decision space is randomly selected to obtain a second warehousing bin configuration decision, and the second warehousing bin configuration decision is fitness evaluated according to the warehousing bin fitness evaluation channel to obtain a second bin configuration fitness evaluation operator. The second warehousing bin configuration decision can be a random warehousing bin configuration decision in the warehousing bin configuration decision space. Moreover, the second warehousing bin configuration decision is different from the first warehousing bin configuration decision. The second bin configuration fitness evaluation operator includes multiple bin-configuration fitnesses corresponding to the second storage bin configuration decision. The second bin configuration fitness evaluation operator is obtained in the same manner as the first bin configuration fitness evaluation operator, which will not be described in detail here.

[0078] Further, it is judged whether the multiple bin-configuration fitnesses in the second bin configuration fitness evaluation operator satisfy the bin configuration fitness constraint operator. If the multiple bin-configuration fitnesses in the second bin configuration fitness evaluation operator all satisfy the bin configuration fitness constraint operator, then the second bin configuration fitness evaluation operator satisfies the bin configuration fitness constraint operator, and the second incoming bin configuration decision is output as a material incoming bin plan. If any bin-configuration fitness in the second bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, then the second bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, and a second configuration iterative optimization instruction is obtained, and the incoming bin configuration decision space is continued to be iteratively optimized according to the second configuration iterative optimization instruction until the material incoming bin plan is obtained. The second configuration iterative optimization instruction is an instruction information used to characterize that the second bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, and it is necessary to continue to iteratively optimize the incoming bin configuration decision space.

[0079] By iteratively optimizing the decision space of incoming warehouse location configuration, the material incoming warehouse location plan that meets the warehouse location configuration fitness constraint operator is obtained, which improves the fitness and accuracy of the material incoming warehouse location configuration and improves the quality of material incoming warehouse scheduling.

[0080] Based on the material storage location plan, material storage location characteristics are identified to obtain material storage location correlation distribution;

[0081] Based on the material storage location association distribution and the idle storage scheduling equipment information, a storage equipment configuration scheduling plan is generated according to a pre-built storage equipment configuration scheduling channel;

[0082] The material warehousing scheduling plan is generated based on the material warehousing location plan and the warehousing equipment configuration scheduling plan.

[0083] The multiple material partitions are managed for warehousing according to the material warehousing scheduling plan.

[0084] The material entry scheduling algorithm also includes: identifying the material entry location characteristics of the material entry location plan, that is, marking the real-time location and matching storage location corresponding to each item to be entered in the material entry location plan, and obtaining the material entry location association distribution. Then, the material entry location association distribution and the idle entry scheduling equipment information are input into the pre-built entry equipment configuration scheduling channel to obtain the entry equipment configuration scheduling plan, and the material entry scheduling plan is combined with the material entry location plan to obtain the material entry scheduling plan, and the entry management of multiple material partitions is performed according to the material entry scheduling plan. Thereby improving the adaptability and accuracy of the material entry scheduling of the warehouse. Among them, the material entry location association distribution includes the real-time location and matching storage location corresponding to each item to be entered in the material entry location plan. The entry equipment configuration scheduling plan includes the equipment transportation goods, equipment operation parameters (operating speed, load, voltage, current, etc.), equipment transportation routes, etc. corresponding to each idle entry scheduling equipment. The material entry scheduling plan includes the material entry location plan and the entry equipment configuration scheduling plan.

[0085] For example, when constructing a storage equipment configuration scheduling channel, historical data is read based on the material storage location association distribution and idle storage scheduling equipment information to obtain multiple storage equipment configuration scheduling records. Each storage equipment configuration scheduling record includes the historical material storage location association distribution, historical idle storage scheduling equipment information, and historical storage equipment configuration scheduling plan. According to the fully connected neural network, multiple storage equipment configuration scheduling records are cross-supervised trained to obtain the storage equipment configuration scheduling channel. The fully connected neural network is also called a multi-layer perceptron. The fully connected neural network is an artificial neural network structure with a relatively simple connection method. The storage equipment configuration scheduling channel includes an input layer, a hidden layer, and an output layer.

[0086] In summary, the one-stop warehouse visualization management method provided by this application has the following technical effects:

[0087] Through multi-dimensional preset material characteristic indicators, the basic information of the materials to be entered is collected to obtain the material characteristic information set; based on the material characteristic information set, the materials to be entered are classified into multiple levels to obtain multiple material partitions; modeling is performed according to the warehouse structure data and real-time storage data to build the first warehouse visualization model; the idle storage positions of the first warehouse visualization model are identified to obtain the second warehouse visualization model; based on the idle storage scheduling equipment information and the second warehouse visualization model, the storage scheduling of multiple material partitions is performed according to the material storage scheduling algorithm to obtain the material storage scheduling plan, and the storage management of multiple material partitions is performed according to the material storage scheduling plan. The technical effect of improving the adaptability and accuracy of the storage material storage scheduling, improving the storage material storage scheduling effect, and improving the storage management quality is achieved.

[0088] Embodiment 2

[0089] Based on the one-stop warehouse visualization management method in the above embodiment, the present invention also provides a one-stop warehouse visualization management system, see the attached Figure 2 , the system comprising:

[0090] A material acquisition module, which is used to obtain materials to be stored in the target warehouse;

[0091] A material feature collection module, the material feature collection module is used to collect basic information of the material to be stored according to multi-dimensional preset material feature indicators to obtain a material feature information set, wherein the multi-dimensional preset material feature indicators include material attributes, material measurements and material storage conditions;

[0092] A material classification module, the material classification module is used to perform multi-level classification on the materials to be stored based on the material feature information set to obtain multiple material partitions;

[0093] A data acquisition module, the data acquisition module is used to obtain warehouse structure data, real-time storage data, and idle warehousing scheduling equipment information of the target warehouse;

[0094] A visualization model acquisition module, wherein the visualization model acquisition module is used to perform modeling based on the warehouse structure data and the real-time warehouse data to construct a first warehouse visualization model;

[0095] An idle warehouse position identification module, the idle warehouse position identification module is used to identify idle warehouse positions based on the first warehouse visualization model to obtain a second warehouse visualization model;

[0096] A storage scheduling module, the storage scheduling module is used to perform storage scheduling on the multiple material partitions according to the material storage scheduling algorithm based on the idle storage scheduling equipment information and the second warehouse visualization model, and obtain a material storage scheduling plan;

[0097] The warehousing management module is used to manage the warehousing of the multiple material partitions according to the material warehousing scheduling plan.

[0098] Furthermore, the material classification module is also used for:

[0099] Perform feature recognition according to the material feature information set to obtain a material attribute information set, a material measurement information set, and a material storage condition information set;

[0100] Classify the materials to be stored based on the material attribute information set to obtain a primary classification result of the materials;

[0101] Classify the first-level material classification result based on the material measurement information set to obtain a second-level material classification result;

[0102] The material secondary classification result is classified based on the material storage condition information set to generate the multiple material partitions.

[0103] Furthermore, the warehousing scheduling module is also used for:

[0104] Obtaining a multi-dimensional preset position-storage constraint index, wherein the multi-dimensional preset position-storage constraint index includes a position-hard storage constraint index and a position-soft storage constraint index;

[0105] Based on the multi-dimensional preset warehouse location-storage constraint index, the second warehouse visualization model is rendered with storage constraint features of idle incoming warehouse locations to generate a third warehouse visualization model;

[0106] Based on the pre-built storage bin fitness evaluation channel, and according to the third warehouse visualization model, material storage bin configuration is performed on the multiple material partitions to obtain a material storage bin solution;

[0107] Based on the material storage location plan, material storage location characteristics are identified to obtain material storage location correlation distribution;

[0108] Based on the material storage location association distribution and the idle storage scheduling equipment information, a storage equipment configuration scheduling plan is generated according to a pre-built storage equipment configuration scheduling channel;

[0109] The material warehousing scheduling plan is generated based on the material warehousing location plan and the warehousing equipment configuration scheduling plan.

[0110] Furthermore, the warehousing scheduling module is also used for:

[0111] Based on the third warehouse visualization model, verify the supply and demand matching degree of incoming warehouse locations according to the multiple material partitions to obtain a warehouse supply and demand matching degree verification operator;

[0112] If the bin supply and demand matching degree verification operator is bin supply and demand matching degree - qualified, the material storage bin configuration instruction is obtained;

[0113] Based on the material storage bin configuration instruction, multiple random material storage bin configurations are performed according to the third warehouse visualization model and the multiple material partitions to construct a storage bin configuration decision space;

[0114] Based on the incoming warehouse location configuration decision space, obtaining a first incoming warehouse location configuration decision;

[0115] Performing fitness evaluation on the first incoming warehouse location configuration decision based on the incoming warehouse location fitness evaluation channel to obtain a first warehouse location configuration fitness evaluation operator;

[0116] Determining whether the first storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator;

[0117] If the first storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator, the material storage location plan is generated according to the first storage location configuration decision.

[0118] Furthermore, the warehousing scheduling module is also used for:

[0119] Performing storage space demand analysis based on the multiple material partitions to obtain material storage space demand;

[0120] Performing storage space analysis of idle incoming warehouse locations based on the third warehouse visualization model to obtain idle warehouse locations-storage space;

[0121] Based on the material storage space demand and the idle storage space, a matching degree of storage space supply and demand is obtained;

[0122] Determining whether the position supply and demand matching degree satisfies the position supply and demand matching constraint;

[0123] If the warehouse supply and demand matching degree does not meet the warehouse supply and demand matching constraint, the warehouse supply and demand matching degree verification operator obtained is warehouse supply and demand matching degree-unqualified, and a warehousing warehouse warning instruction is generated.

[0124] Furthermore, the warehousing scheduling module is also used for:

[0125] Based on the first incoming warehouse location configuration decision, feature recognition is performed on the third warehouse visualization model and the material feature information set to obtain a plurality of location-configuration storage constraints and a plurality of location-configuration material constraints;

[0126] Obtaining a multi-dimensional bin fitness evaluation index, wherein the multi-dimensional bin fitness evaluation index includes bin configuration space fitness, bin configuration load fitness and bin configuration storage environment fitness;

[0127] Based on the multi-dimensional bin fitness evaluation index, construct the incoming bin fitness evaluation channel and bin fitness evaluation weighted constraint;

[0128] Based on the incoming warehouse location fitness evaluation channel, generating multiple location-configuration fitness evaluation results according to the multiple location-configuration storage constraints and the multiple location-configuration material constraints;

[0129] Based on the bin fitness evaluation weighted constraint, weighted calculations are performed on the multiple bin-configuration fitness evaluation results to obtain multiple bin-configuration fitnesses;

[0130] Based on the multiple bin-configuration fitnesses, the first bin configuration fitness evaluation operator is generated.

[0131] Furthermore, the warehousing scheduling module is also used for:

[0132] If the first bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, obtaining a first configuration iterative optimization instruction;

[0133] Based on the first configuration iteration optimization instruction, according to the incoming storage location configuration decision space, a second incoming storage location configuration decision is retrieved;

[0134] Performing fitness evaluation on the second incoming storage location configuration decision based on the incoming storage location fitness evaluation channel to obtain a second storage location configuration fitness evaluation operator;

[0135] Determining whether the second storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator;

[0136] If the second storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator, generating the material storage location plan according to the second storage location configuration decision;

[0137] If the second storage location configuration fitness evaluation operator does not satisfy the storage location configuration fitness constraint operator, a second configuration iterative optimization instruction is obtained, and the incoming storage location configuration decision space is continuously iteratively optimized according to the second configuration iterative optimization instruction until the material incoming storage location plan is obtained.

[0138] A one-stop warehouse visualization management system provided by an embodiment of the present invention can execute a one-stop warehouse visualization management method provided by any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method.

[0139] The modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be realized; in addition, the specific names of the functional modules are only for the convenience of distinguishing each other and are not used to limit the scope of protection of the present invention.

[0140] The present application provides a one-stop warehouse visualization management method, wherein the method is applied to a one-stop warehouse visualization management system, and the method includes: collecting basic information of materials to be stored through multi-dimensional preset material characteristic indicators to obtain a material characteristic information set; performing multi-level classification of materials to be stored based on the material characteristic information set to obtain multiple material partitions; modeling according to warehouse structure data and real-time warehouse data to construct a first warehouse visualization model; identifying idle storage locations for the first warehouse visualization model to obtain a second warehouse visualization model; based on idle storage scheduling equipment information and the second warehouse visualization model, performing storage scheduling for multiple material partitions according to the material storage scheduling algorithm to obtain a material storage scheduling plan, and performing storage management for multiple material partitions according to the material storage scheduling plan. The method solves the technical problem that the storage material storage scheduling has low adaptability and poor accuracy in the prior art, resulting in poor quality of storage material storage scheduling. The method achieves the technical effect of improving the adaptability and accuracy of storage material storage scheduling, improving the storage material storage scheduling effect, and improving the storage management quality.

[0141] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.

Claims

1. A one-stop warehouse visualization management method, characterized in that: The method comprises: Obtain the materials to be stored in the target warehouse; According to the multi-dimensional preset material characteristic indicators, basic information of the material to be stored is collected to obtain a material characteristic information set, wherein the multi-dimensional preset material characteristic indicators include material attributes, material measurements and material storage conditions; Based on the material feature information set, the materials to be stored are classified into multiple levels to obtain multiple material partitions; Obtain warehouse structure data, real-time storage data, and idle warehousing scheduling equipment information of the target warehouse; Modeling is performed based on the warehouse structure data and the real-time warehouse data to construct a first warehouse visualization model; Identify idle storage locations based on the first warehouse visualization model to obtain a second warehouse visualization model; Based on the idle storage scheduling equipment information and the second warehouse visualization model, the plurality of material partitions are scheduled for storage according to a material storage scheduling algorithm to obtain a material storage scheduling plan; Performing warehousing management on the multiple material partitions according to the material warehousing scheduling plan; Based on the material feature information set, the materials to be stored are classified into multiple levels to obtain multiple material partitions, including: Perform feature recognition according to the material feature information set to obtain a material attribute information set, a material measurement information set, and a material storage condition information set; Classify the materials to be stored based on the material attribute information set to obtain a primary classification result of the materials; Classify the first-level material classification result based on the material measurement information set to obtain a second-level material classification result; Classifying the secondary material classification results based on the material storage condition information set to generate the multiple material partitions; Based on the idle storage scheduling equipment information and the second warehouse visualization model, the plurality of material partitions are scheduled for storage according to a material storage scheduling algorithm to obtain a material storage scheduling plan, including: Obtaining a multi-dimensional preset position-storage constraint index, wherein the multi-dimensional preset position-storage constraint index includes a position-hard storage constraint index and a position-soft storage constraint index; Based on the multi-dimensional preset warehouse location-warehousing constraint index, the second warehouse visualization model is rendered with storage constraint features of idle incoming warehouse locations to generate a third warehouse visualization model; Based on the pre-built storage bin fitness evaluation channel, and according to the third warehouse visualization model, material storage bin configuration is performed on the multiple material partitions to obtain a material storage bin solution; Based on the material storage location plan, material storage location characteristics are identified to obtain material storage location correlation distribution; Based on the material storage location association distribution and the idle storage scheduling equipment information, a storage equipment configuration scheduling plan is generated according to a pre-built storage equipment configuration scheduling channel; The material warehousing scheduling plan is generated based on the material warehousing location plan and the warehousing equipment configuration scheduling plan.

2. The method according to claim 1, characterized in that Based on the pre-built storage bin fitness evaluation channel, and according to the third warehouse visualization model, material storage bin configuration is performed on the multiple material partitions to obtain a material storage bin solution, including: Based on the third warehouse visualization model, verify the supply and demand matching degree of incoming warehouse locations according to the multiple material partitions to obtain a warehouse supply and demand matching degree verification operator; If the bin supply and demand matching degree verification operator is bin supply and demand matching degree - qualified, the material storage bin configuration instruction is obtained; Based on the material storage bin configuration instruction, multiple random material storage bin configurations are performed according to the third warehouse visualization model and the multiple material partitions to construct a storage bin configuration decision space; Based on the incoming warehouse location configuration decision space, obtaining a first incoming warehouse location configuration decision; Performing fitness evaluation on the first incoming warehouse location configuration decision based on the incoming warehouse location fitness evaluation channel to obtain a first warehouse location configuration fitness evaluation operator; Determining whether the first storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator; If the first storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator, the material storage location plan is generated according to the first storage location configuration decision.

3. The method according to claim 2, characterized in that Based on the third warehouse visualization model, the supply and demand matching degree of the incoming warehouse is verified according to the multiple material partitions to obtain the warehouse supply and demand matching degree verification operator, including: Performing storage space demand analysis based on the multiple material partitions to obtain material storage space demand; Performing storage space analysis of idle incoming warehouse locations based on the third warehouse visualization model to obtain idle warehouse locations-storage space; Based on the material storage space demand and the idle storage space, a matching degree of storage space supply and demand is obtained; Determining whether the position supply and demand matching degree satisfies the position supply and demand matching constraint; If the warehouse supply and demand matching degree does not meet the warehouse supply and demand matching constraint, the warehouse supply and demand matching degree verification operator obtained is warehouse supply and demand matching degree-unqualified, and a warehousing warehouse warning instruction is generated.

4. The method according to claim 2, characterized in that Performing fitness evaluation on the first incoming warehouse location configuration decision based on the incoming warehouse location fitness evaluation channel to obtain a first warehouse location configuration fitness evaluation operator includes: Based on the first incoming warehouse location configuration decision, feature recognition is performed on the third warehouse visualization model and the material feature information set to obtain a plurality of location-configuration storage constraints and a plurality of location-configuration material constraints; Obtaining a multi-dimensional bin fitness evaluation index, wherein the multi-dimensional bin fitness evaluation index includes bin configuration space fitness, bin configuration load fitness and bin configuration storage environment fitness; Based on the multi-dimensional bin fitness evaluation index, construct the incoming bin fitness evaluation channel and bin fitness evaluation weighted constraint; Based on the incoming warehouse location fitness evaluation channel, generating multiple location-configuration fitness evaluation results according to the multiple location-configuration storage constraints and the multiple location-configuration material constraints; Based on the bin fitness evaluation weighted constraint, weighted calculations are performed on the multiple bin-configuration fitness evaluation results to obtain multiple bin-configuration fitnesses; Based on the multiple bin-configuration fitnesses, the first bin configuration fitness evaluation operator is generated.

5. The method according to claim 2, characterized in that Determining whether the first bin configuration fitness evaluation operator satisfies the bin configuration fitness constraint operator includes: If the first bin configuration fitness evaluation operator does not satisfy the bin configuration fitness constraint operator, obtaining a first configuration iterative optimization instruction; Based on the first configuration iteration optimization instruction, according to the incoming storage location configuration decision space, a second incoming storage location configuration decision is retrieved; Performing fitness evaluation on the second incoming storage location configuration decision based on the incoming storage location fitness evaluation channel to obtain a second storage location configuration fitness evaluation operator; Determining whether the second storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator; If the second storage location configuration fitness evaluation operator satisfies the storage location configuration fitness constraint operator, generating the material storage location plan according to the second storage location configuration decision; If the second storage location configuration fitness evaluation operator does not satisfy the storage location configuration fitness constraint operator, a second configuration iterative optimization instruction is obtained, and the incoming storage location configuration decision space is continuously iteratively optimized according to the second configuration iterative optimization instruction until the material incoming storage location plan is obtained.

6. A one-stop warehouse visualization management system, characterized in that: The system is used to perform the method according to any one of claims 1 to 5, and the system comprises: A material acquisition module, which is used to obtain materials to be stored in the target warehouse; A material feature collection module, the material feature collection module is used to collect basic information of the material to be stored according to multi-dimensional preset material feature indicators to obtain a material feature information set, wherein the multi-dimensional preset material feature indicators include material attributes, material measurements and material storage conditions; A material classification module, the material classification module is used to perform multi-level classification on the materials to be stored based on the material feature information set to obtain multiple material partitions; A data acquisition module, the data acquisition module is used to obtain warehouse structure data, real-time storage data, and idle warehousing scheduling equipment information of the target warehouse; A visualization model acquisition module, wherein the visualization model acquisition module is used to perform modeling based on the warehouse structure data and the real-time warehouse data to construct a first warehouse visualization model; An idle warehouse position identification module, the idle warehouse position identification module is used to identify idle warehouse positions based on the first warehouse visualization model to obtain a second warehouse visualization model; A storage scheduling module, the storage scheduling module is used to perform storage scheduling on the multiple material partitions according to the material storage scheduling algorithm based on the idle storage scheduling equipment information and the second warehouse visualization model, and obtain a material storage scheduling plan; The warehousing management module is used to manage the warehousing of the multiple material partitions according to the material warehousing scheduling plan.