Intelligent communication cable network management method and system
By integrating multiple physical communication cable paths into virtual cable paths, the control equipment monitors the virtual cable paths, solving the problem of low monitoring efficiency after the expansion of network scale in the prior art, and achieving more efficient communication cable network failure prevention and maintenance.
Patent Information
- Application Number
- CN202410887665.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-07-03
AI Technical Summary
With the expansion of the network scale, existing communication cable monitoring methods are difficult to achieve efficient failure prevention and stable network operation, especially when multiple physical communication cable paths are complex, it is difficult to effectively monitor and maintain.
The topological information of the communication cable network is obtained through the control device, and multiple physical communication cable paths are fused into a virtual communication cable path, reducing the number of communication transmission nodes that need to be monitored, realizing monitoring of the virtual cable path, thereby improving monitoring efficiency.
In large-scale networks, virtual cable path monitoring technology significantly improves the monitoring efficiency of communication cable networks, and can detect faults more quickly and maintain them to ensure stable network operation.
Smart Images

Figure CN118474016B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of communications, and in particular to an intelligent communication cable network management method and system. Background Art
[0002] With the rapid development of information technology, communication cables play an increasingly important role in modern society. Communication cables are not only the infrastructure for data transmission, but also a key component to ensure information security and network stability. Their performance and safety are directly related to the stability of the entire network and the quality of data transmission. In order to ensure the normal operation of communication cables, monitoring of communication cables can timely discover potential problems, prevent failures, and ensure the continuous operation of the network.
[0003] At present, the monitoring methods of communication cables mainly include monitoring each node connected to the communication cable in the network and the communication cable itself. Node monitoring: Each node in the communication cable network is an important monitoring object. Node monitoring mainly includes real-time monitoring of the physical connection status of the node, the signal quality between nodes, and the working status of the node itself. Through node monitoring, node failures can be discovered in time, thereby ensuring the stable operation of the entire communication cable network. Cable itself monitoring: The monitoring of the communication cable itself mainly includes the physical properties of the cable (such as length, diameter, outer skin integrity, etc.), temperature, voltage, current, capacitance, etc. Cable itself monitoring can help maintenance personnel understand the actual working conditions of the cable and provide a basis for maintenance decisions.
[0004] As the scale of the network expands, more efficient monitoring methods will be needed in the future, which is also a current research issue. Summary of the invention
[0005] The embodiments of the present application provide an intelligent communication cable network management method and system for more efficiently monitoring the communication cable network.
[0006] In order to achieve the above objectives, this application adopts the following technical solutions:
[0007] In a first aspect, an intelligent communication cable network management method is provided, which is applied to a control device, and the communication cable network is controlled by the control device. The method includes: the control device obtains a first network topology of the communication cable network; for every two communication transmission nodes with multiple physical communication cable paths in the first network topology, the control device merges the multiple physical communication cable paths between every two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, wherein the multiple physical communication cable paths also include other communication transmission nodes, and the virtual communication cable paths do not include communication transmission nodes; the control device monitors the transmission status of the communication transmission nodes in the second network topology.
[0008] Optionally, the first network topology includes M communication transmission nodes, M is an integer greater than or equal to 3, and every two communication transmission nodes with multiple physical communication cable paths in the first network topology are communication transmission node #si and communication transmission node #sj, si and sj are different integers ranging from 1 to M, and there are K#si-sj physical communication cable paths between communication transmission node #si and communication transmission node #sj, K#si-sj is an integer greater than 1, and there are ki communication transmission nodes on the i-th physical communication cable path among the K#si-sj physical communication cable paths, i is an integer traversing from 1 to K#si-sj, ki is an integer greater than or equal to 0, and the communication transmission nodes on any two physical communication cable paths among the K#si-sj physical communication cable paths are at least partially different.
[0009] Optionally, the control device merges multiple physical communication cable paths between two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, including: the control device traverses the physical communication cable paths in the first network topology to determine that there are K#si-sj physical communication cable paths that can point from the communication transmission node #si to the communication transmission node #sj; the control device obtains the second network topology by replacing the K#si-sj physical communication cable paths in the first network topology with a virtual communication cable path #si-sj, so that in the second network topology, the communication transmission node #si is connected to the communication transmission node #sj only through one virtual communication cable path #si-sj.
[0010] Optionally, the method also includes: the control device establishes and saves the corresponding relationship between the information of K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj, the information of K#si-sj physical communication cable paths includes the topology information of the K#si-sj physical communication cable paths respectively, the topology information of the i-th physical communication cable path indicates the connection relationship between every two adjacent communication transmission nodes on the i-th physical communication cable path based on the physical communication cable path, and the topology information of the virtual communication cable path #si-sj indicates the connection relationship between the communication transmission node #si and the communication transmission node #sj based on the virtual communication cable path.
[0011] Optionally, the control device monitors the transmission status of the communication transmission nodes in the second network topology, including: for the communication transmission node #si and the communication transmission node #sj, if the control device detects that the communication signal status of the communication transmission node #si and / or the communication transmission node #sj is abnormal, the control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj.
[0012] Optionally, the control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj, including: the control device determines the respective topology information of the K#si-sj physical communication cable paths between the communication transmission node #si and the communication transmission node #sj according to the correspondence between the information of the K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj; the control device monitors the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths.
[0013] Optionally, the control device monitors K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths, including: the control device determines the critical cables and non-critical cables in the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths, the critical cables being cables physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction, and the non-critical cables being cables not physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction; the control device monitors the critical cables or the non-critical cables according to the degree of abnormality of the communication signal status of the communication transmission node #si and / or the communication transmission node #sj.
[0014] Optionally, the control device monitors the critical cable or the non-critical cable according to the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj, including: if the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj is less than the abnormality degree threshold, the control device obtains at least one of the following information returned by the detection point on the critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value; if the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj is greater than or equal to the abnormality degree threshold, the control device obtains at least one of the following information returned by the detection point on the non-critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value.
[0015] Optionally, the communication transmission node #si and / or the communication transmission node #sj are used to convert the analog signal received from the physical communication cable path into a digital signal for processing during transmission, and the abnormal communication signal status of the communication transmission node #si and / or the communication transmission node #sj refers to the digital signal's: phase abnormality, interference and noise abnormality.
[0016] In a second aspect, an intelligent communication cable network management system is provided, the system includes a control device, the communication cable network is controlled by the control device, and the system is configured as follows: the control device obtains a first network topology of the communication cable network; for two communication transmission nodes having multiple communication cable paths in the first network topology, the control device merges the multiple communication cable paths between the two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, the multiple communication cable paths also include other communication transmission nodes, and the virtual communication cable path does not include communication transmission nodes; the control device monitors the transmission status of the communication transmission nodes in the second network topology.
[0017] Optionally, the first network topology includes M communication transmission nodes, M is an integer greater than or equal to 3, and every two communication transmission nodes with multiple physical communication cable paths in the first network topology are communication transmission node #si and communication transmission node #sj, si and sj are different integers ranging from 1 to M, and there are K#si-sj physical communication cable paths between communication transmission node #si and communication transmission node #sj, K#si-sj is an integer greater than 1, and there are ki communication transmission nodes on the i-th physical communication cable path among the K#si-sj physical communication cable paths, i is an integer traversing from 1 to K#si-sj, ki is an integer greater than or equal to 0, and the communication transmission nodes on any two physical communication cable paths among the K#si-sj physical communication cable paths are at least partially different.
[0018] Optionally, the control device merges multiple physical communication cable paths between two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, including: the control device traverses the physical communication cable paths in the first network topology to determine that there are K#si-sj physical communication cable paths that can point from the communication transmission node #si to the communication transmission node #sj; the control device obtains the second network topology by replacing the K#si-sj physical communication cable paths in the first network topology with a virtual communication cable path #si-sj, so that in the second network topology, the communication transmission node #si is connected to the communication transmission node #sj only through one virtual communication cable path #si-sj.
[0019] Optionally, the system is also configured as: the control device establishes and saves the correspondence between the information of K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj, the information of K#si-sj physical communication cable paths includes the topology information of the K#si-sj physical communication cable paths respectively, the topology information of the i-th physical communication cable path indicates the connection relationship between every two adjacent communication transmission nodes on the i-th physical communication cable path based on the physical communication cable path, and the topology information of the virtual communication cable path #si-sj indicates the connection relationship between the communication transmission node #si and the communication transmission node #sj based on the virtual communication cable path.
[0020] Optionally, the control device monitors the transmission status of the communication transmission nodes in the second network topology, including: for the communication transmission node #si and the communication transmission node #sj, if the control device detects that the communication signal status of the communication transmission node #si and / or the communication transmission node #sj is abnormal, the control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj.
[0021] Optionally, the control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj, including: the control device determines the respective topology information of the K#si-sj physical communication cable paths between the communication transmission node #si and the communication transmission node #sj according to the correspondence between the information of the K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj; the control device monitors the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths.
[0022] Optionally, the control device monitors K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths, including: the control device determines the critical cables and non-critical cables in the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths, the critical cables being cables physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction, and the non-critical cables being cables not physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction; the control device monitors the critical cables or the non-critical cables according to the degree of abnormality of the communication signal status of the communication transmission node #si and / or the communication transmission node #sj.
[0023] Optionally, the control device monitors the critical cable or the non-critical cable according to the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj, including: if the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj is less than the abnormality degree threshold, the control device obtains at least one of the following information returned by the detection point on the critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value; if the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj is greater than or equal to the abnormality degree threshold, the control device obtains at least one of the following information returned by the detection point on the non-critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value.
[0024] Optionally, the communication transmission node #si and / or the communication transmission node #sj are used to convert the analog signal received from the physical communication cable path into a digital signal for processing during transmission, and the abnormal communication signal status of the communication transmission node #si and / or the communication transmission node #sj refers to the digital signal's: phase abnormality, interference and noise abnormality.
[0025] In summary, for every two communication transmission nodes in the first network topology that have multiple physical communication cable paths, the control device merges the multiple physical communication cable paths between every two communication transmission nodes into a virtual communication cable path so that the number of communication transmission nodes in the second network topology of the communication cable network can be smaller than that in the first network topology. In the scenario of a large-scale network, the control device only monitors the transmission status of the communication transmission nodes in the second network topology to improve the monitoring efficiency, so as to achieve more efficient monitoring of the communication cable network. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 A schematic diagram of the architecture of an intelligent communication cable network management system provided in an embodiment of the present application;
[0027] Figure 2 A flow chart of an intelligent communication cable network management method provided in an embodiment of the present application;
[0028] Figure 3 A schematic diagram of an application scenario of the intelligent communication cable network management method provided in an embodiment of the present application;
[0029] Figure 4 A schematic diagram of the structure of a control device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0030] In the embodiment of the present application, "indication" may include direct indication and indirect indication, and may also include explicit indication and implicit indication. The information indicated by a certain information (such as the first indication information, the second indication information, or the third indication information, etc. below) is called information to be indicated. In the specific implementation process, there are many ways to indicate the information to be indicated, such as but not limited to, the information to be indicated can be directly indicated, such as the information to be indicated itself or the index of the information to be indicated. The information to be indicated can also be indirectly indicated by indicating other information, wherein there is an association relationship between the other information and the information to be indicated. It is also possible to indicate only a part of the information to be indicated, while the other parts of the information to be indicated are known or agreed in advance. For example, the indication of specific information can also be realized by means of the arrangement order of each information agreed in advance (such as specified by the protocol), thereby reducing the indication overhead to a certain extent. At the same time, the common parts of each information can also be identified and uniformly indicated to reduce the indication overhead caused by indicating the same information separately.
[0031] In addition, the specific indication method may also be various existing indication methods, such as but not limited to the above-mentioned indication methods and various combinations thereof. The specific details of the various indication methods can refer to the prior art and will not be repeated herein. As can be seen from the above, for example, when it is necessary to indicate multiple information of the same type, different indication methods may be used for different information. In the specific implementation process, the desired indication method can be selected according to specific needs. The embodiment of the present application does not limit the selected indication method. In this way, the indication method involved in the embodiment of the present application should be understood to cover various methods that can enable the party to be indicated to obtain the information to be indicated.
[0032] "Pre-definition" or "pre-configuration" can be implemented by pre-saving corresponding codes, tables or other methods that can be used to indicate relevant information in the device, and the embodiments of the present application do not limit the specific implementation method. Among them, "saving" can mean saving in one or more memories. The one or more memories can be set separately or integrated in an encoder or decoder, a processor, or a communication device. The one or more memories can also be partially set separately and partially integrated in a decoder, a processor, or a communication device. The type of memory can be any form of storage medium, which is not limited by the embodiments of the present application.
[0033] The "protocol" involved in the embodiments of the present application may refer to a protocol family in the communication field, a standard protocol with a similar protocol family frame structure, or a related protocol used in future communication systems, and the embodiments of the present application do not make specific limitations on this.
[0034] In the embodiments of the present application, descriptions such as "when...", "in the case of...", "if" and "if" all mean that the device will make corresponding processing under certain objective circumstances. It does not limit the time, nor does it require the device to have a judgment action when implementing it, nor does it mean that there are other limitations.
[0035] In the description of the embodiments of the present application, unless otherwise specified, " / " indicates that the objects associated before and after are in an "or" relationship. For example, A / B can represent A or B; "and / or" in the embodiments of the present application is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. These three situations, where A and B can be singular or plural. In addition, in the description of the embodiments of the present application, unless otherwise specified, "multiple" refers to two or more than two. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single items or plural items. For example, at least one of a, b or c can represent: a, b, c, ab, ac, bc, or abc, where a, b, c can be single or multiple. In addition, in order to facilitate the clear description of the technical solution of the embodiments of the present application, in the embodiments of the present application, the words "first" and "second" are used to distinguish the same or similar items with basically the same functions and effects. Those skilled in the art will appreciate that words such as "first" and "second" do not limit the quantity and execution order, and words such as "first" and "second" do not necessarily limit the difference. At the same time, in the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a concrete way for easy understanding.
[0036] The network architecture and business scenarios described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application, and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. A person of ordinary skill in the art can appreciate that with the evolution of the network architecture and the emergence of new business scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0037] To facilitate understanding of the embodiments of the present application, first Figure 1 The control system applicable to the embodiment of the present application is described in detail by taking the dynamic update system of the wireless communication configuration shown in FIG. Figure 1 A schematic diagram of the architecture of an intelligent communication cable network management system applicable to the method provided in an embodiment of the present application.
[0038] like Figure 1 As shown, the intelligent communication cable network management system may include: a control device and a communication cable network.
[0039] The communication cable network is controlled by a control device, and the communication transmission nodes in the communication cable network are connected to the control device so that the control device can monitor them.
[0040] The control device may be a terminal device, such as a terminal with monitoring and control functions, or a chip or chip system that can be set in the terminal. The terminal may also be called user equipment (UE), access terminal, subscriber unit (subscriberunit), user station, mobile station (MS), mobile station, remote station, remote terminal, mobile device, user terminal, terminal, wireless communication equipment, user agent or user device. The terminal in the embodiments of the present application can be a mobile phone, a cellular phone, a smart phone, a tablet computer, a wireless data card, a personal digital assistant (PDA), a wireless modem, a handheld device (handset), a laptop computer, a machine type communication (MTC) terminal, a computer with wireless transceiver function, a virtual reality (VR) terminal, an augmented reality (AR) terminal, a wireless terminal in industrial control, a wireless terminal in self driving, a wireless terminal in remote medical, a wireless terminal in smart grid, a wireless terminal in transportation safety, a wireless terminal in smart city, a wireless terminal in smart home, a vehicle-mounted terminal, a road side unit (RSU) with terminal function, etc. The terminal of the present application may also be a vehicle-mounted module, a vehicle-mounted module, a vehicle-mounted component, a vehicle-mounted chip or a vehicle-mounted unit built into the vehicle as one or more components or units.
[0041] The communication transmission node may be a forwarding device, such as a switch, a router, a network card, a board, etc. used in a communication cable network.
[0042] The following will be combined Figure 2 The interaction process between the devices in the above system is specifically introduced through the method embodiment. The intelligent communication cable network management method provided by the embodiment of the present application can be applied to the above system, which is specifically introduced below.
[0043] Figure 1 A schematic diagram of a flow chart of an intelligent communication cable network management method provided in an embodiment of the present application. The flow chart of the intelligent communication cable network management method is as follows:
[0044] S201, a control device obtains a first network topology of a communication cable network.
[0045] The first network topology includes M communication transmission nodes, where M is an integer greater than or equal to 3, and two adjacent communication transmission nodes among the M communication transmission nodes can be physically connected via a communication cable to achieve transmission of communication signals. There are many ways for the control device to obtain the first network topology of the communication cable network, such as manually configuring it to the control device, or automatically obtaining it from other devices, without specific limitation.
[0046] S202, for every two communication transmission nodes having multiple physical communication cable paths in the first network topology, the control device merges the multiple physical communication cable paths between every two communication transmission nodes into one virtual communication cable path to obtain a second network topology of the communication cable network.
[0047] The multiple physical communication cable paths also include other communication transmission nodes, while the virtual communication cable path does not include any communication transmission nodes.
[0048] Specifically, the first network topology includes M communication transmission nodes, M is an integer greater than or equal to 3, and every two communication transmission nodes with multiple physical communication cable paths in the first network topology are communication transmission node #si and communication transmission node #sj, si and sj are different integers ranging from 1 to M, and there are K#si-sj physical communication cable paths between communication transmission node #si and communication transmission node #sj, K#si-sj is an integer greater than 1, and there are ki communication transmission nodes on the i-th physical communication cable path among the K#si-sj physical communication cable paths, i is an integer traversing from 1 to K#si-sj, ki is an integer greater than or equal to 0, and the communication transmission nodes on any two physical communication cable paths among the K#si-sj physical communication cable paths are at least partially different.
[0049] For example, Figure 3As shown, the communication transmission nodes include: communication transmission node #s1, communication transmission node #s2, communication transmission node #s3, communication transmission node #s4, communication transmission node #s5, and communication transmission node #s6. The communication cables include: communication cable package #K1, communication cable package #K2, communication cable package #K3, communication cable package #K4, communication cable package #K5, and communication cable package #K6. The transmission direction is toward the communication transmission node #s2, and the physical communication cable path between the communication transmission node #s1 and the communication transmission node #s2 includes: communication cable package #K1, communication cable package #K6→communication cable package #K2, communication cable package #K4→communication cable package #K5, communication cable package #K4→communication cable package #K3→communication cable package #K2.
[0050] On this basis, the control device can traverse the physical communication cable paths in the first network topology to determine that there are K#si-sj physical communication cable paths that can point from the communication transmission node #si to the communication transmission node #sj; the control device obtains the second network topology by replacing the K#si-sj physical communication cable paths in the first network topology with a virtual communication cable path #si-sj, so that in the second network topology, the communication transmission node #si is connected to the communication transmission node #sj only through one virtual communication cable path #si-sj.
[0051] For example, Figure 3 As shown, the above-mentioned physical communication cable path is replaced by a virtual communication cable path #si-sj, which includes a virtual communication cable Kv. In this case, the network topology does not include the communication transmission node #s3 and the communication transmission node #s4, and the control device does not need to monitor the communication transmission node #s3 and the communication transmission node #s4.
[0052] The method also includes: the control device establishes and saves the corresponding relationship between the information of K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj, the information of K#si-sj physical communication cable paths includes the topology information of the K#si-sj physical communication cable paths respectively, the topology information of the i-th physical communication cable path indicates the connection relationship between every two adjacent communication transmission nodes on the i-th physical communication cable path based on the physical communication cable path, and the topology information of the virtual communication cable path #si-sj indicates the connection relationship between the communication transmission node #si and the communication transmission node #sj based on the virtual communication cable path.
[0053] S203: The control device monitors the transmission status of the communication transmission nodes in the second network topology.
[0054] For example, for communication transmission node #si and communication transmission node #sj, if the control device detects that the communication signal status of communication transmission node #si and / or communication transmission node #sj is abnormal, the control device monitors the K#si-sj physical communication cable paths between communication transmission node #si and / or communication transmission node #sj.
[0055] Among them, the communication transmission node #si and / or the communication transmission node #sj are used to convert the analog signal received from the physical communication cable path into a digital signal for processing during transmission. The abnormal communication signal state of the communication transmission node #si and / or the communication transmission node #sj refers to the digital signal: phase abnormality, interference and noise abnormality, such as the difference between the communication signal phase of the communication transmission node #si and / or the communication transmission node #sj and the normal phase is greater than the error threshold, and the difference between the interference and noise of the communication transmission node #si and / or the communication transmission node #sj and the normal interference and noise is greater than the error threshold.
[0056] On this basis, the control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj, including: the control device determines the respective topology information of the K#si-sj physical communication cable paths between the communication transmission node #si and the communication transmission node #sj according to the correspondence between the information of the K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj; the control device monitors the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths.
[0057] For example, the control device can determine the key cables and non-key cables in the K#si-sj physical communication cable paths according to the topology information of each of the K#si-sj physical communication cable paths. The key cables are cables that are physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction, and the non-key cables are cables that are not physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction. Figure 3As shown, the transmission direction is to point to the communication transmission node #s2, the key cables are the communication cable package #K1, the communication cable package #K2, and the communication cable package #K5, and the non-key cables are the communication cable package #K3, the communication cable package #K4, and the communication cable package #K6. For the key cables, if the key cables are abnormal / damaged, it will directly cause the signal phase, interference, and noise abnormalities on the communication transmission node #s2. For the non-key cables, if the non-key cables are abnormal / damaged, taking the communication cable package #K4 as an example, it will directly cause the signal phase, interference, and noise abnormalities on the communication transmission node #s4. Since the communication transmission node #s4 is forwarded in a way that it is first converted into a digital signal, the digital signal is processed and then converted into an analog signal and sent out, the error caused by the conversion at this time will further aggravate the signal abnormality, making the signal phase, interference, and noise abnormalities on the communication transmission node #s2 greater. Based on this, the control device monitors the key cables or monitors the non-key cables according to the abnormal degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj. For example, if the abnormality level of the communication signal status of the communication transmission node #si and / or the communication transmission node #sj is less than the abnormality level threshold, the control device obtains at least one of the following information returned by the detection point on the critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value; if the abnormality level of the communication signal status of the communication transmission node #si and / or the communication transmission node #sj is greater than or equal to the abnormality level threshold, the control device obtains at least one of the following information returned by the detection point on the non-critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value.
[0058] When at least one of the above information is found to be abnormal, the control device can directly report the fault and notify the corresponding maintenance personnel for inspection.
[0059] In summary, for every two communication transmission nodes in the first network topology that have multiple physical communication cable paths, the control device merges the multiple physical communication cable paths between every two communication transmission nodes into a virtual communication cable path so that the number of communication transmission nodes in the second network topology of the communication cable network can be smaller than that in the first network topology. In the scenario of a large-scale network, the control device only monitors the transmission status of the communication transmission nodes in the second network topology to improve the monitoring efficiency, so as to achieve more efficient monitoring of the communication cable network.
[0060] Combination of the above Figure 2 The intelligent communication cable network management method provided by the embodiment of the present application is described in detail. The intelligent communication cable network management system for executing the intelligent communication cable network management method provided by the embodiment of the present application is described below.
[0061] The intelligent communication cable network management system includes a control device, and the communication cable network is controlled by the control device. The system is configured as follows: the control device obtains a first network topology of the communication cable network; for two communication transmission nodes with multiple communication cable paths in the first network topology, the control device merges the multiple communication cable paths between the two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, wherein the multiple communication cable paths also include other communication transmission nodes, and the virtual communication cable path does not include any communication transmission nodes; the control device monitors the transmission status of the communication transmission nodes in the second network topology.
[0062] Optionally, the first network topology includes M communication transmission nodes, M is an integer greater than or equal to 3, and every two communication transmission nodes with multiple physical communication cable paths in the first network topology are communication transmission node #si and communication transmission node #sj, si and sj are different integers ranging from 1 to M, and there are K#si-sj physical communication cable paths between communication transmission node #si and communication transmission node #sj, K#si-sj is an integer greater than 1, and there are ki communication transmission nodes on the i-th physical communication cable path among the K#si-sj physical communication cable paths, i is an integer traversing from 1 to K#si-sj, ki is an integer greater than or equal to 0, and the communication transmission nodes on any two physical communication cable paths among the K#si-sj physical communication cable paths are at least partially different.
[0063] Optionally, the control device merges multiple physical communication cable paths between two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, including: the control device traverses the physical communication cable paths in the first network topology to determine that there are K#si-sj physical communication cable paths that can point from the communication transmission node #si to the communication transmission node #sj; the control device obtains the second network topology by replacing the K#si-sj physical communication cable paths in the first network topology with a virtual communication cable path #si-sj, so that in the second network topology, the communication transmission node #si is connected to the communication transmission node #sj only through one virtual communication cable path #si-sj.
[0064] Optionally, the system is also configured as: the control device establishes and saves the correspondence between the information of K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj, the information of K#si-sj physical communication cable paths includes the topology information of the K#si-sj physical communication cable paths respectively, the topology information of the i-th physical communication cable path indicates the connection relationship between every two adjacent communication transmission nodes on the i-th physical communication cable path based on the physical communication cable path, and the topology information of the virtual communication cable path #si-sj indicates the connection relationship between the communication transmission node #si and the communication transmission node #sj based on the virtual communication cable path.
[0065] Optionally, the control device monitors the transmission status of the communication transmission nodes in the second network topology, including: for the communication transmission node #si and the communication transmission node #sj, if the control device detects that the communication signal status of the communication transmission node #si and / or the communication transmission node #sj is abnormal, the control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj.
[0066] Optionally, the control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj, including: the control device determines the respective topology information of the K#si-sj physical communication cable paths between the communication transmission node #si and the communication transmission node #sj according to the correspondence between the information of the K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj; the control device monitors the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths.
[0067] Optionally, the control device monitors K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths, including: the control device determines the critical cables and non-critical cables in the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths, the critical cables being cables physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction, and the non-critical cables being cables not physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction; the control device monitors the critical cables or the non-critical cables according to the degree of abnormality of the communication signal status of the communication transmission node #si and / or the communication transmission node #sj.
[0068] Optionally, the control device monitors the critical cable or the non-critical cable according to the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj, including: if the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj is less than the abnormality degree threshold, the control device obtains at least one of the following information returned by the detection point on the critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value; if the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj is greater than or equal to the abnormality degree threshold, the control device obtains at least one of the following information returned by the detection point on the non-critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value.
[0069] Optionally, the communication transmission node #si and / or the communication transmission node #sj are used to convert the analog signal received from the physical communication cable path into a digital signal for processing during transmission, and the abnormal communication signal status of the communication transmission node #si and / or the communication transmission node #sj refers to the digital signal's: phase abnormality, interference and noise abnormality.
[0070] Figure 4 This is a schematic diagram of the structure of a control device provided in an embodiment of the present application. For example, the control device may be a terminal, or a chip (system) or other component or assembly that may be provided in a terminal. Figure 4 As shown, the control device 400 may include a processor 401. Optionally, the control device 400 may also include a memory 402 and / or a transceiver 403. The processor 401 is coupled with the memory 402 and the transceiver 403, such as being connected via a communication bus.
[0071] Combine the following Figure 4 The components of the control device 400 are described in detail:
[0072] The processor 401 is the control center of the control device 400, which can be a processor or a general term for multiple processing elements. For example, the processor 401 is one or more central processing units (CPUs), or an application specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present application, such as one or more microprocessors (digital signal processors, DSPs), or one or more field programmable gate arrays (FPGAs).
[0073] Optionally, the processor 401 may execute various functions of the control device 400 by running or executing a software program stored in the memory 402 and calling data stored in the memory 402, such as executing the above Figure 2 The intelligent communication cable network management method shown.
[0074] In a specific implementation, as an embodiment, the processor 401 may include one or more CPUs, such as Figure 4 CPU0 and CPU1 are shown in FIG.
[0075] In a specific implementation, as an embodiment, the control device 400 may also include multiple processors. Each of these processors may be a single-core processor (single-CPU) or a multi-core processor (multi-CPU). The processor here may refer to one or more devices, circuits, and / or processing cores for processing data (such as computer program instructions).
[0076] The memory 402 is used to store the software program for executing the solution of the present application, and the execution is controlled by the processor 401. The specific implementation method can refer to the above method embodiment, which will not be repeated here.
[0077] Optionally, the memory 402 may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical disc, laser disc, optical disc, digital versatile disc, Blu-ray disc, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto. The memory 402 may be integrated with the processor 401, or may exist independently and be controlled through the interface circuit ( Figure 4 (not shown) is coupled to the processor 401, which is not specifically limited in this embodiment of the present application.
[0078] The transceiver 403 is used for communication with other control devices. For example, if the control device 400 is a terminal, the transceiver 403 can be used to communicate with a network device, or with another terminal device. For another example, if the control device 400 is a network device, the transceiver 403 can be used to communicate with a terminal, or with another network device.
[0079] Optionally, the transceiver 403 may include a receiver and a transmitter ( Figure 4 The receiver is used to implement a receiving function, and the transmitter is used to implement a sending function.
[0080] Optionally, the transceiver 403 may be integrated with the processor 401, or may exist independently and control the interface circuit ( Figure 4 (not shown) is coupled to the processor 401, which is not specifically limited in this embodiment of the present application.
[0081] Understandably, Figure 4 The structure of the control device 400 shown in the figure does not constitute a limitation on the control device. The actual control device may include more or fewer components than those shown in the figure, or combine certain components, or arrange the components differently.
[0082] In addition, the technical effects of the control device 400 can refer to the technical effects of the methods described in the above method embodiments, which will not be repeated here.
[0083] It should be understood that the processor in the embodiment of the present application may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0084] It should also be understood that the memory in the embodiments of the present application may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of random access memory (RAM) are available, such as static RAM (SRAM), dynamic random access memory (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDR SDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), and direct RAM bus RAM (DR RAM).
[0085] The above embodiments can be implemented in whole or in part by software, hardware (such as circuits), firmware or any other combination. When implemented using software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (such as infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0086] It should be understood that the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. A and B can be singular or plural. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship, but it may also indicate an "and / or" relationship. Please refer to the context for specific understanding.
[0087] In this application, "at least one" means one or more, and "plurality" means two or more. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single items or plural items. For example, at least one of a, b, or c can mean: a, b, c, ab, ac, bc, or abc, where a, b, and c can be single or multiple.
[0088] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0089] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0090] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0091] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0092] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0093] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0094] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, and other media that can store program codes.
[0095] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. An intelligent communication cable network management method, characterized in that: Applied to a control device, a communication cable network is controlled by the control device, the method comprising: The control device acquires a first network topology of the communication cable network; For every two communication transmission nodes having multiple physical communication cable paths in the first network topology, the control device merges the multiple physical communication cable paths between the every two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, wherein the multiple physical communication cable paths further include other communication transmission nodes, and the virtual communication cable path does not include a communication transmission node; The control device monitors the transmission status of the communication transmission nodes in the second network topology; The control device establishes and saves the correspondence between the information of K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj, the information of the K#si-sj physical communication cable paths includes the topology information of the K#si-sj physical communication cable paths respectively, the topology information of the ith physical communication cable path indicates the connection relationship between every two adjacent communication transmission nodes on the ith physical communication cable path based on the physical communication cable path, and the topology information of the virtual communication cable path #si-sj indicates the connection relationship between the communication transmission node #si and the communication transmission node #sj based on the virtual communication cable path; For the communication transmission node #si and the communication transmission node #sj, if the control device detects that the communication signal status of the communication transmission node #si and / or the communication transmission node #sj is abnormal, the control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj.
2. The method according to claim 1, characterized in that The first network topology includes M communication transmission nodes, M is an integer greater than or equal to 3, and every two communication transmission nodes with multiple physical communication cable paths in the first network topology are the communication transmission node #si and the communication transmission node #sj, si and sj are different integers ranging from 1 to M, and there are K#si-sj physical communication cable paths between the communication transmission node #si and the communication transmission node #sj, K#si-sj is an integer greater than 1, and there are ki communication transmission nodes on the i-th physical communication cable path among the K#si-sj physical communication cable paths, i is an integer traversing from 1 to K#si-sj, ki is an integer greater than or equal to 0, and the communication transmission nodes on any two physical communication cable paths among the K#si-sj physical communication cable paths are at least partially different.
3. The method according to claim 2, characterized in that The control device merges the multiple physical communication cable paths between the two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, including: The control device determines that the K#si-sj physical communication cable paths can point from the communication transmission node #si to the communication transmission node #sj by traversing the physical communication cable paths in the first network topology; The control device obtains the second network topology by replacing the K #si-sj physical communication cable paths in the first network topology with one virtual communication cable path #si-sj, so that in the second network topology the communication transmission node #si is connected to the communication transmission node #sj only through one virtual communication cable path #si-sj.
4. The method according to claim 3, characterized in that The control device monitors the K#si-sj physical communication cable paths between the communication transmission node #si and / or the communication transmission node #sj, including: The control device determines the respective topology information of the K#si-sj physical communication cable paths between the communication transmission node #si and the communication transmission node #sj according to the correspondence between the information of the K#si-sj physical communication cable paths and the topology information of the virtual communication cable path #si-sj; The control device monitors the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths.
5. The method according to claim 4, characterized in that The control device monitors the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths, including: The control device determines the critical cables and non-critical cables in the K#si-sj physical communication cable paths according to the respective topology information of the K#si-sj physical communication cable paths, wherein the critical cables are cables physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction, and the non-critical cables are cables not physically connected to the communication transmission node #si or the communication transmission node #sj in the communication signal transmission direction; The control device monitors the critical cable or the non-critical cable according to the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj.
6. The method according to claim 5, characterized in that The control device monitors the critical cable or the non-critical cable according to the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj, including: If the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj is less than the abnormality degree threshold, the control device obtains at least one of the following information transmitted back by the detection point on the key cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value; If the abnormality degree of the communication signal state of the communication transmission node #si and / or the communication transmission node #sj is greater than or equal to the abnormality degree threshold, the control device obtains at least one of the following information returned by the detection point on the non-critical cable: voltage value, current value, capacitance value, inductance value, or electromagnetic interference value.
7. The method according to any one of claims 1 to 6, characterized in that The communication transmission node #si and / or the communication transmission node #sj are used to convert the analog signal received from the physical communication cable path into a digital signal for processing during transmission. The abnormal communication signal status of the communication transmission node #si and / or the communication transmission node #sj refers to the following digital signal abnormalities: phase abnormality, interference and noise abnormality.
8. An intelligent communication cable network management system, using an intelligent communication cable network management method as claimed in claim 1, characterized in that: The system comprises a control device, the communication cable network is controlled by the control device, and the system is configured to: The control device acquires a first network topology of the communication cable network; For two communication transmission nodes having multiple communication cable paths in the first network topology, the control device merges the multiple communication cable paths between the two communication transmission nodes into a virtual communication cable path to obtain a second network topology of the communication cable network, wherein the multiple communication cable paths further include other communication transmission nodes, and the virtual communication cable path does not include a communication transmission node; The control device monitors the transmission status of the communication transmission nodes in the second network topology.
