A foundation construction method for silt geology
By using a treatment agent to stir the artificial soil in the silt soil foundation and inserting steel sheet piles, combined with a waterproof isolation layer, the problem of poor earthquake resistance and subsidence of the silt soil foundation was solved, and efficient and stable foundation construction was achieved.
Patent Information
- Application Number
- CN202410946497.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-16
AI Technical Summary
In the construction of silt soil foundations, existing technologies are difficult to effectively deal with the problems of high moisture content, high compressibility and low strength of silt soils, resulting in poor foundation earthquake resistance, long-term subsidence, and high construction depth and cost.
The conveying treatment agent is used to stir the silty soil to prepare artificial soil, and U-shaped steel sheet piles and steel pipe piles are placed at the base, and a waterproof isolation layer is laid to improve the strength and waterproofness of the foundation and extend its service life.
By preparing high-strength, waterproof artificial soil and base structures, the earthquake resistance and service life of the foundation are significantly improved, the construction period is shortened, the cost is reduced, and the problem of silt soil foundation subsidence is solved.
Smart Images

Figure SMS_1
Abstract
Description
Technical Field
[0001] The invention belongs to the field of building foundation construction, and in particular relates to a foundation construction method in silt geology. Background Art
[0002] In the field of construction engineering, foundation construction is a key link to ensure the stability and safety of buildings. With the acceleration of urbanization and the continuous advancement of infrastructure construction, more and more engineering projects need to be built on silt soil foundations. Silt soil or soft soil has become a common problem in construction projects. When facing silt soil, construction faces greater challenges.
[0003] Silt soil usually has the characteristics of high water content, high compressibility, low strength and low permeability, and the soil needs to be hardened to meet the building bearing requirements.
[0004] If the silt soil is not handled properly, it will lead to uneven settlement of the building and subsidence of the building foundation in the future. At the very least, it will cause the building to crack and tilt. At worst, it will endanger the structural safety and use function of the building, and endanger the safety of life and property.
[0005] In order to solve the problem of foundation soil quality, the construction industry is constantly researching and improving foundation treatment technology, aiming to improve the engineering properties of silt soil. These include: soil replacement technology, using hard soil materials to replace silt soil, which results in the problem of silt soil waste and nowhere to discharge; using drainage consolidation technology, accelerating the discharge of water by setting up drainage channels, and pressurizing the silt to consolidate, thereby improving the strength and stability of the foundation, but the soil strength is not high and cannot meet the requirements of high-rise building construction; using reinforcement technology, such as deep mixing piles and high-pressure rotary jet piles, can make the silt soil more solid and enhance its bearing capacity, but there are problems such as limited mixing surface and uneven base soil. Generally, the foundation treatment depth does not exceed 15m. Construction above 15m is difficult and the construction cost is greatly increased.
[0006] Even with various treatment methods for silt geology, the foundation still has long-term creep, resulting in poor earthquake resistance of the foundation and buildings, and the problem of building foundation sinking is still emerging. Therefore, it is necessary to continuously innovate and improve construction technology to ensure the successful construction of safe, reliable and stable buildings on silt soil foundations and promote the sustainable development of the construction industry. Summary of the invention
[0007] The existing foundation construction of silt geology still has the problems of great difficulty in treatment, inadequate treatment, large creep of the soil after treatment, poor foundation seismic resistance, and foundation subsidence caused by long-term use. The present invention provides a foundation construction method for silt geology, which adopts a method of conveying a treatment agent to stir the silt soil and extract slurry, quickly taking out the silt soil, adjusting the consistency and compounding it with other materials to prepare artificial soil, thereby improving the strength of the backfill soil and thus improving the strength of the foundation; U-shaped steel sheet piles and steel pipe piles are placed in the base of the foundation to improve the strength of the base; a waterproof isolation layer is laid on the base of the foundation, which can effectively prevent water seepage in the base, extend the service life of the foundation, and prevent deformation of the foundation; the backfilled artificial soil is prepared using special materials, has good strength and impermeability, and extends the service life of the foundation. The specific technical scheme is as follows:
[0008] A foundation construction method for silt geology, the foundation construction method comprising the following steps:
[0009] S1, surface treatment:
[0010] On the foundation working surface, the surface muddy soil is excavated to form a shallow foundation pit; the excavated muddy soil is used to prepare artificial soil I;
[0011] The preparation method of the artificial soil I is as follows: using fly ash to adjust the water content of silty soil to less than 40wt%; according to the mass ratio, silty soil: slag: waste refractory brick slag: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = (100-120): (10-20): (30-50): (20-35): (15-20): (3-8), the silty soil, slag, waste refractory brick slag, machine-made sand, No. 90 asphalt and trimethylsiloxy silicate are uniformly mixed at 100° C. to 120° C., loaded into a mold tank, cooled, pressed into blocks to obtain blocks, and stacked for storage; when the foundation pit is backfilled, the blocks are taken out for crushing to obtain artificial soil I;
[0012] S2, stirring and pumping:
[0013] A mixing pile machine is used to mix the silty soil downward in the shallow foundation pit. The mixing head of the mixing pile machine is supplied with a treatment agent. After mixing, flowing mud is formed, and the flowing mud is pumped out by a mud pump. The mud is mixed and pumped downward in layers until the designed depth is reached to prepare the base. The pumped-out flowing mud is used to prepare artificial soil II.
[0014] The mass ratio of the components of the treatment agent is water: alkylphenol polyoxyethyl ether: dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate: sodium polyacrylate: silicone defoamer = (100-120): (5-8): (2-5): (20-25): (1.5-3.5);
[0015] The preparation method of the artificial soil II is as follows: adding fly ash, quicklime and acrylic acid associative thickener to the extracted flowing mud, adjusting the water content to less than 40wt%, and obtaining thickened soil; according to the mass ratio, thickened soil: slag: clay: waste concrete: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = (100-120): (10-20): (10-20): (30-50): (20-30): (10-15): (3-8), uniformly mixing the thickened soil, slag, clay, waste concrete, machine-made sand, No. 90 asphalt, and trimethylsiloxy silicate at 100° C. to 120° C., loading into a mold tank, cooling, pressing into blocks, obtaining blocks, and stacking and storing; when the foundation pit is backfilled, taking the blocks and crushing them to obtain artificial soil II;
[0016] S3, laying the base waterproof layer;
[0017] Asphalt sand is laid on the foundation surface, and then concrete is laid, which forms a base waterproof layer after solidification;
[0018] S4, layered backfill:
[0019] The artificial soil I is backfilled in layers into the foundation pit, and the backfill and compaction thickness of each layer is 1.5m to 2m. After compaction, a mesh steel bar layer is laid on the surface; until the artificial soil I is fully backfilled; when the thickness of the top layer of artificial soil I is less than 1.5m to 2m, artificial soil II is used to make up for it; then artificial soil II is used to continue backfilling the foundation pit in layers, and the backfill and compaction thickness of each layer is 1.5m to 2m. After compaction, a mesh steel bar layer is laid on the surface; until the foundation pit is backfilled, a high-strength foundation is formed.
[0020] In S1 of the above foundation construction method, the depth of the shallow foundation pit is 1.5m to 2m; the maximum particle size of the slag does not exceed 1cm; the maximum particle size of the waste refractory brick slag does not exceed 1cm; the maximum particle size of the machine-made sand does not exceed 3mm.
[0021] In S1 of the above foundation construction method, the maximum particle size of the artificial soil I does not exceed 3 cm.
[0022] In S2 of the above-mentioned foundation construction method, the amount of the treatment agent added is sufficient to make the moisture content of the silty soil between 55% and 65%; the depth of each layer of mixing, slurrying and slurrying treatment is 1.5m to 2m; after each layer of mixing, slurrying and slurrying treatment, guard sheet piles are anchored on the slope of the foundation pit to prevent the side walls of the foundation pit from collapsing and reduce water seepage in the foundation pit; the slope of the foundation pit is stepped, and the height of each step is 1.5m to 2m.
[0023] In S2 of the above foundation construction method, during the mixing and slurrying and slurry extraction process, when the amount of water seepage in the foundation pit is large or it is rainy and water accumulates in the foundation pit, a pump is used to drain the water in time to extract the excess water.
[0024] In S2 of the above foundation construction method, the amount of quicklime used shall not exceed 0.5 times the amount of fly ash used; and the amount of acrylic acid associative thickener used shall not exceed 0.1 times the amount of fly ash used.
[0025] In S2 of the above foundation construction method, the maximum particle size of the slag does not exceed 0.5 cm; the maximum particle size of the waste concrete does not exceed 0.5 cm; and the maximum particle size of the machine-made sand does not exceed 3 mm.
[0026] In S2 of the above foundation construction method, the maximum particle size of the artificial soil II does not exceed 1.5 cm.
[0027] In S2 of the above foundation construction method, when the depth of the silty soil layer is not more than 15m, mixing, slurrying and slurrying are carried out until the silty soil layer is treated and the hard soil layer is exposed, the hard soil layer is compacted, and then U-shaped steel sheet piles and steel pipe piles are driven in to form a base; when the depth of the silty soil layer is more than 15m, the maximum depth of mixing, slurrying and slurrying treatment is 14m~15m, and the silty soil below the depth of 14m~15m is mixed by a pile mixing machine, and the mixing head of the pile mixing machine is supplied with silt curing agent. 60min~80min after mixing, U-shaped steel sheet piles and steel pipe piles are driven in at the mixing surface position, and the soil is finally set and solidified to form a base of cement soil mixing piles; the U-shaped steel sheet piles are driven in at the edge of the bottom surface of the foundation pit, and the steel pipe piles are driven in an array in the middle of the bottom surface of the foundation pit.
[0028] In S3 of the above foundation construction method, the thickness of the asphalt sand is 0.4m to 0.6m, and the thickness of the concrete is 0.4m to 0.6m.
[0029] In S4 of the above foundation construction method, the position of the steel bars of the mesh steel bar layer avoids the design position of the foundation piles; and the mesh diameter of the mesh steel bar layer is 1.4 to 1.6 times the diameter of the foundation piles.
[0030] The above-mentioned foundation construction method for mud geology also includes:
[0031] S5, foundation pile construction, using cast-in-place pile construction method or prefabricated pile construction method:
[0032] Cast-in-place pile construction method: drill pile holes in the foundation, place steel cages, and then pour concrete into the steel cages to form foundation piles;
[0033] Prefabricated pile construction method: Use prefabricated piles, drive the prefabricated piles into the foundation through a pile driver to form foundation piles;
[0034] S6, Capping Construction:
[0035] Tie up the steel bars for the foundation and pour concrete for the foundation.
[0036] In S5 of the above foundation construction method, the depth of the foundation piles is less than the depth of the base waterproof layer.
[0037] The invention provides a foundation construction method for silt geology, which has the following beneficial effects compared with the prior art:
[0038] 1. The method of the present invention treats silty soil and adopts a conveying treatment agent to promote the fluidity of silty soil stirring. It is easy to stir evenly and has good fluidity. The silty soil can be smoothly extracted without digging and the soil can be quickly discharged, thus shortening the construction period.
[0039] 2. The method of the present invention digs out 1.5m to 2m of the surface muddy soil on the foundation working surface to form a shallow foundation pit in order to leave space for conveying the treatment agent and stirring to prevent the treatment agent from overflowing.
[0040] 3. The method of the present invention uses fly ash to adjust the moisture content of the excavated surface muddy soil, and then mixes it with slag, waste refractory brick slag, machine-made sand, No. 90 asphalt and trimethylsiloxysilicate, presses it into blocks, prepares block materials, and piles them for storage, which is more convenient for storage, and there is no need to dig pits to store muddy soil. The muddy soil is reused to prepare high-strength and waterproof artificial soil, which can effectively improve the foundation strength and waterproofness of soil backfill. Among them, No. 90 asphalt has good adhesion and waterproofness; trimethylsiloxysilicate has good film-forming properties, and when used in combination with No. 90 asphalt, it has good waterproofness, prevents the foundation soil from absorbing water and freezing and thawing deformation, and prolongs the service life of the foundation. In addition, trimethylsiloxysilicate also has the function of thickening and improving the mixing and workability of materials, so that the preparation of artificial soil materials is more homogeneous, thereby ensuring the foundation strength.
[0041] Fourth, the components of the treatment agent are water, alkylphenol polyoxyethyl ether, dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate, sodium polyacrylate and silicone defoamer, which can soften the soil well, promote the compatibility of various components of the soil, make the mixing and slurrying smoother, and shorten the construction period; and the alkylphenol polyoxyethyl ether, dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate, and sodium polyacrylate components in the treatment agent can promote mixing and workability in the subsequent preparation of artificial soil.
[0042] 5. The flowing mud adopts fly ash, quicklime and acrylic acid associative thickener to adjust the water content. The addition of acrylic acid associative thickener can reduce the amount of fly ash and quicklime, and improve the consistency and facilitate agglomeration during subsequent mixing and briquetting. In addition, the acrylic acid associative thickener is used in combination with alkylphenol polyoxyethyl ether, dipalmitoyloxyethyl hydroxyethyl methylammonium methyl sulfate and sodium polyacrylate as treating agents in the flowing mud, which helps to improve the mixing and workability of the materials, make the materials easy to agglomerate and have uniform material quality. It is not easy to produce a large amount of fine powder during crushing, and can ensure a larger and uniform particle size.
[0043] 6. The thickened soil is mixed with slag, clay, waste concrete, machine-made sand, No. 90 asphalt, and trimethylsiloxysilicate, pressed into blocks, and piled for storage; it is more convenient for storage, and there is no need to dig pits to store flowing mud. The flowing mud is reused to prepare high-strength and waterproof artificial soil, which can effectively improve the foundation strength and waterproofness of soil backfill. Among them, No. 90 asphalt has good adhesion and waterproofness; trimethylsiloxysilicate has good film-forming properties. When used in combination with No. 90 asphalt, it has good waterproofness, prevents the foundation soil from absorbing water and freezing and thawing, and extends the service life of the foundation. In addition, trimethylsiloxysilicate also has the function of thickening and improving the mixing and workability of materials, making the preparation of artificial soil materials more homogeneous, thereby ensuring the foundation strength.
[0044] 7. Driving U-shaped steel sheet piles and steel pipe piles at the mixing surface can help improve the base strength. During the initial setting period of the soil after mixing, driving U-shaped steel sheet piles and steel pipe piles can be driven in more smoothly without damaging the U-shaped steel sheet piles and steel pipe piles, and will not affect the final setting strength of the soil.
[0045] 8. Laying 0.4m to 0.6m thick asphalt sand on the foundation surface, and then laying 0.4m to 0.6m thick concrete, can form a good waterproof isolation layer to prevent groundwater from seeping into the artificial soil of the foundation, prevent the foundation from absorbing water, and prevent deformation due to repeated freezing and thawing under natural conditions; effectively extend the service life of the foundation.
[0046] 9. After each layer of artificial soil is backfilled and compacted, a grid steel bar layer is laid on the surface, which can play a good role in soil restraint, improve foundation strength, and assist in enhancing foundation bearing capacity.
[0047] 10. The high strength characteristics of artificial soil I and artificial soil II can support a thicker backfill height per layer (1.5m~2m), effectively saving the number of backfill times and shortening the backfill period.
[0048] 11. The maximum particle size of artificial soil I is designed to be no more than 3 cm, and the maximum particle size of artificial soil II is designed to be no more than 1.5 cm; under the condition of ensuring soil strength, it can well support the construction of subsequent cast-in-place pile foundation or prefabricated pile foundation.
[0049] 12. The designed depth of the foundation piles should be smaller than the depth of the base waterproof layer to ensure that the foundation piles will not damage the base waterproof layer and ensure the long-term waterproofness of the base. DETAILED DESCRIPTION
[0050] The present invention is further described below in conjunction with specific implementation cases, but the present invention is not limited to these embodiments.
[0051] Example 1
[0052] A foundation construction method for silt geology comprises the following steps:
[0053] S1, surface treatment:
[0054] On the foundation working surface, dig out 1.5m of the surface muddy soil to form a shallow foundation pit; the excavated muddy soil is used to prepare artificial soil I;
[0055] The preparation method of artificial soil I is as follows: using fly ash to adjust the water content of silty soil to less than 40wt%; according to the mass ratio, silty soil: slag: waste refractory brick slag: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = 100:10:30:20:15:3, silty soil, slag, waste refractory brick slag, machine-made sand, No. 90 asphalt and trimethylsiloxy silicate are mixed evenly at 100°C, loaded into a mold tank, and after cooling, pressed into blocks to obtain blocks, which are piled and stored; when the foundation pit is backfilled, the blocks are taken for crushing, and the maximum crushing particle size is 2.2cm, so as to obtain artificial soil I;
[0056] Among them, the maximum particle size of slag is 0.8cm; the maximum particle size of waste refractory brick slag is 1cm; and the maximum particle size of machine-made sand is 1.5mm.
[0057] S2, stirring and pumping:
[0058] A mixing pile machine is used to mix the silty soil downward in the shallow foundation pit. The mixing head of the mixing pile machine is supplied with a treatment agent. After mixing, flowing mud is formed, and the flowing mud is pumped out by a mud pump; the mud is mixed downward in layers to make slurry and pump out slurry. The treatment depth of each layer is 1.5m. The pumped out flowing mud is used to prepare artificial soil II; after each layer of slurry is pumped out, the guard sheet piles are anchored on the foundation pit slope to prevent the side wall of the foundation pit from collapsing and reduce water seepage in the foundation pit; the foundation pit slope is stepped, and the height of each step is 1.5m;
[0059] The mass ratio of the components of the treatment agent is water: alkylphenol polyoxyethyl ether: dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate: sodium polyacrylate: silicone defoamer = 100:5:2:20:1.5;
[0060] The amount of treatment agent added is to make the water content of silty soil between 55% and 65%. During the mixing and slurrying process, when the amount of seepage in the foundation pit is large or it is rainy and water accumulates in the foundation pit, a pump is used to drain the water in time to extract the excess water.
[0061] The preparation method of artificial soil II is as follows: fly ash, quicklime and acrylic acid associative thickener are added to the extracted flowing mud to adjust the water content to less than 40wt% to obtain thickened soil; the amount of quicklime is not more than 0.5 times the amount of fly ash; the amount of acrylic acid associative thickener is not more than 0.1 times the amount of fly ash;
[0062] According to the mass ratio, densified soil: slag: clay: waste concrete: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = 100:10:10:30:20:10:3, the densified soil, slag, clay, waste concrete, machine-made sand, No. 90 asphalt, and trimethylsiloxy silicate are mixed evenly at 100°C, loaded into a mold tank, and after cooling, pressed into blocks to obtain blocks, which are piled and stored; when the foundation pit is backfilled, the blocks are taken for crushing, and the maximum crushing particle size is 1.0 cm to obtain artificial soil II;
[0063] Among them, the maximum particle size of slag is 0.5cm; the maximum particle size of waste concrete is 0.3cm; the maximum particle size of machine-made sand does not exceed 3mm;
[0064] The depth of the silty soil layer in this embodiment is 13.5m. The slurry is stirred and pumped until the silty soil layer is processed and the hard soil layer is exposed. The hard soil layer is compacted, and then 6m U-shaped steel sheet piles and 6m steel pipe piles are driven in. The U-shaped steel sheet piles are driven in succession at the edge of the bottom of the foundation pit, and the steel pipe piles are driven in an array in the middle of the bottom of the foundation pit, with a spacing of 2m between adjacent steel pipe piles to form a base.
[0065] S3, laying the base waterproof layer;
[0066] Lay 0.5m thick asphalt sand on the foundation surface, and then lay 0.5m thick concrete, which will form a waterproof layer after solidification.
[0067] S4, layered backfill:
[0068] The artificial soil I is backfilled in layers into the foundation pit, and the thickness of each layer is 1.5m. After compaction, a mesh steel bar layer is laid on the surface until the artificial soil I is fully backfilled. The thickness of the top layer of artificial soil I is less than 1.5m, so it is supplemented with artificial soil II. Then, artificial soil II is used to backfill the foundation pit in layers, and the thickness of each layer is 1.5m. After compaction, a mesh steel bar layer is laid on the surface until the foundation pit is backfilled, forming a high-strength foundation.
[0069] Among them, the steel bar position of the mesh steel bar layer avoids the design position of the foundation pile; the mesh diameter of the mesh steel bar layer is 1.5 times the diameter of the foundation pile.
[0070] S5, foundation pile construction:
[0071] Cast-in-place pile construction method: drill pile holes in the foundation, place a steel cage, and then pour concrete into the steel cage to form foundation piles. The depth of the foundation piles is less than the depth of the base waterproof layer.
[0072] S6, Capping Construction:
[0073] Tie up the steel bars for the foundation and pour concrete for the foundation.
[0074] Example 2
[0075] A foundation construction method for silt geology comprises the following steps:
[0076] S1, surface treatment:
[0077] At the foundation working surface, 1.8m of the surface muddy soil is excavated to form a shallow foundation pit; the excavated muddy soil is used to prepare artificial soil I;
[0078] The preparation method of artificial soil I is as follows: using fly ash to adjust the water content of silty soil to less than 40wt%; according to the mass ratio, silty soil: slag: waste refractory brick slag: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = 110:15:40:28:16:6, silty soil, slag, waste refractory brick slag, machine-made sand, No. 90 asphalt and trimethylsiloxy silicate are mixed evenly at 110°C, loaded into a mold tank, and after cooling, pressed into blocks to obtain blocks, which are piled and stored; when the foundation pit is backfilled, the blocks are taken for crushing, and the maximum crushing particle size is 3cm to obtain artificial soil I;
[0079] Among them, the maximum particle size of slag is 1cm; the maximum particle size of waste refractory brick slag is 0.9cm; and the maximum particle size of machine-made sand is 2.6mm.
[0080] S2, stirring and pumping:
[0081] A mixing pile machine is used to mix the silty soil downward in the shallow foundation pit. The mixing head of the mixing pile machine is supplied with a treatment agent. After mixing, flowing mud is formed, and the flowing mud is pumped out by a mud pump; the mud is mixed downward in layers to make slurry and pump out slurry. The treatment depth of each layer is 1.8m. The pumped out flowing mud is used to prepare artificial soil II; after each layer of slurry is pumped out, the guard sheet piles are anchored on the foundation pit slope to prevent the side wall of the foundation pit from collapsing and reduce water seepage in the foundation pit; the foundation pit slope is stepped, and the height of each step is 1.8m;
[0082] The mass ratio of the components of the treatment agent is water: alkylphenol polyoxyethyl ether: dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate: sodium polyacrylate: silicone defoamer = 110:7:3:22:2;
[0083] The amount of treatment agent added is to make the water content of silty soil between 55% and 65%. During the mixing and slurrying process, when the amount of seepage in the foundation pit is large or it is rainy and water accumulates in the foundation pit, a pump is used to drain the water in time to extract the excess water.
[0084] The preparation method of artificial soil II is as follows: fly ash, quicklime and acrylic acid associative thickener are added to the extracted flowing mud to adjust the water content to less than 40wt% to obtain thickened soil; the amount of quicklime is not more than 0.5 times the amount of fly ash; the amount of acrylic acid associative thickener is not more than 0.1 times the amount of fly ash;
[0085] According to the mass ratio, densified soil: slag: clay: waste concrete: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = 110:15:15:40:25:12:5, the densified soil, slag, clay, waste concrete, machine-made sand, No. 90 asphalt, and trimethylsiloxy silicate are mixed evenly at 110°C, loaded into a mold tank, and after cooling, pressed into blocks to obtain blocks, which are piled and stored; when the foundation pit is backfilled, the blocks are taken for crushing, and the maximum crushing particle size is 1.5 cm to obtain artificial soil II;
[0086] Among them, the maximum particle size of slag is 0.3cm; the maximum particle size of waste concrete is 0.4cm; the maximum particle size of machine-made sand does not exceed 2.2mm;
[0087] The depth of the silty soil layer in this embodiment is 19.6m, and the maximum depth of the mixing, slurrying and slurry extraction treatment is 14.4m. The silty soil below the depth of 14.4m is mixed by a pile mixing machine, and the mixing head of the pile mixing machine is supplied with a silt solidifying agent; 80min after mixing, 6m U-shaped steel sheet piles and 6m steel pipe piles are driven into the mixing surface position, the U-shaped steel sheet piles are driven continuously at the edge of the bottom surface of the foundation pit, and the steel pipe piles are driven in an array in the middle of the bottom surface of the foundation pit, with a spacing of 2m between adjacent steel pipe piles; after the soil is finally solidified, a cement soil mixing pile base is formed.
[0088] S3, laying the base waterproof layer;
[0089] 0.4m thick asphalt sand is laid on the foundation surface, and then 0.6m thick concrete is laid to form a waterproof layer after solidification.
[0090] S4, layered backfill:
[0091] The artificial soil I is backfilled in layers into the foundation pit, and the thickness of each layer is 1.8m. After the backfilling is completed, a mesh steel bar layer is laid on the surface; until the backfilling of the artificial soil I is completed; when the thickness of the top layer of artificial soil I is less than 1.8m, artificial soil II is used to make up for it; then artificial soil II is used to continue backfilling the foundation pit in layers, and the thickness of each layer is 1.8m. After the backfilling is completed, a mesh steel bar layer is laid on the surface; until the backfilling of the foundation pit is completed, a high-strength foundation is formed;
[0092] Among them, the steel bar position of the mesh steel bar layer avoids the design position of the foundation pile; the mesh diameter of the mesh steel bar layer is 1.4 times the diameter of the foundation pile.
[0093] S5, foundation pile construction:
[0094] Prefabricated pile construction method: Use prefabricated pile bodies, drive the prefabricated pile bodies into the foundation through a pile driver to form foundation piles. The depth of the foundation piles is less than the depth of the base waterproof layer.
[0095] S6, Capping Construction:
[0096] Tie up the steel bars for the foundation and pour concrete for the foundation.
[0097] Example 3
[0098] A foundation construction method for silt geology comprises the following steps:
[0099] S1, surface treatment:
[0100] On the foundation working surface, dig out 2m of the surface muddy soil to form a shallow foundation pit; the excavated muddy soil is used to prepare artificial soil I;
[0101] The preparation method of artificial soil I is as follows: using fly ash to adjust the water content of silty soil to less than 40wt%; according to the mass ratio, silty soil: slag: waste refractory brick slag: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = 120:20:50:35:20:8, silty soil, slag, waste refractory brick slag, machine-made sand, No. 90 asphalt and trimethylsiloxy silicate are mixed evenly at 120°C, loaded into a mold tank, and after cooling, pressed into blocks to obtain blocks, which are piled and stored; when the foundation pit is backfilled, the blocks are taken for crushing, and the maximum crushing particle size is 2.8cm, so as to obtain artificial soil I;
[0102] Among them, the maximum particle size of slag is 0.9cm; the maximum particle size of waste refractory brick slag is 0.8cm; and the maximum particle size of machine-made sand is 2.5mm.
[0103] S2, stirring and pumping:
[0104] A mixing pile machine is used to mix the silty soil downward in the shallow foundation pit. The mixing head of the mixing pile machine is supplied with a treatment agent. After mixing, flowing mud is formed, and the flowing mud is pumped out by a mud pump; the mud is mixed downward in layers, and the processing depth of each layer is 2m. The pumped flowing mud is used to prepare artificial soil II; after each layer of slurry is pumped out, the guard sheet piles are anchored on the foundation pit slope to prevent the side wall of the foundation pit from collapsing and reduce water seepage in the foundation pit; the foundation pit slope is stepped, and the height of each step is 2m;
[0105] The mass ratio of the components of the treatment agent is water: alkylphenol polyoxyethyl ether: dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate: sodium polyacrylate: silicone defoamer = 120:8:5:25:3.5;
[0106] The amount of treatment agent added is to make the water content of silty soil between 55% and 65%. During the mixing and slurrying process, when the amount of seepage in the foundation pit is large or it is rainy and water accumulates in the foundation pit, a pump is used to drain the water in time to extract the excess water.
[0107] The preparation method of artificial soil II is as follows: fly ash, quicklime and acrylic acid associative thickener are added to the extracted flowing mud to adjust the water content to less than 40wt% to obtain thickened soil; the amount of quicklime is not more than 0.5 times the amount of fly ash; the amount of acrylic acid associative thickener is not more than 0.1 times the amount of fly ash;
[0108] According to the mass ratio, densified soil: slag: clay: waste concrete: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = 120:20:20:50:30:15:8. The densified soil, slag, clay, waste concrete, machine-made sand, No. 90 asphalt and trimethylsiloxy silicate are mixed evenly at 120°C, loaded into a mold tank, and pressed into blocks after cooling to obtain blocks, which are piled and stored; when the foundation pit is backfilled, the blocks are taken for crushing, and the maximum crushing particle size is 1.2 cm to obtain artificial soil II;
[0109] Among them, the maximum particle size of slag is 0.4cm; the maximum particle size of waste concrete is 0.5cm; the maximum particle size of machine-made sand does not exceed 2.4mm;
[0110] In this embodiment, the depth of the silty soil layer is 17.3m, and the maximum depth of the mixing, slurrying and slurry extraction treatment is 14m. The silty soil below the depth of 14m is mixed by a pile mixing machine, and the mixing head of the pile mixing machine is supplied with a silt solidifying agent; 60min after mixing, 6m U-shaped steel sheet piles and 6m steel pipe piles are driven into the mixing surface position, the U-shaped steel sheet piles are driven continuously at the edge of the bottom surface of the foundation pit, and the steel pipe piles are driven in an array in the middle of the bottom surface of the foundation pit, with a spacing of 2m between adjacent steel pipe piles; after the soil is finally solidified, a cement soil mixing pile base is formed.
[0111] S3, laying the base waterproof layer;
[0112] A 0.6m thick layer of asphalt sand is laid on the foundation surface, followed by a 0.4m thick layer of concrete, which forms a waterproof layer after solidification.
[0113] S4, layered backfill:
[0114] The artificial soil I is backfilled in layers into the foundation pit, and the thickness of each layer is 2m. After compaction, a mesh steel bar layer is laid on the surface until the artificial soil I is fully backfilled. When the thickness of the top layer of artificial soil I is less than 2m, artificial soil II is used to make up for it. Then artificial soil II is used to continue backfilling the foundation pit in layers, and the thickness of each layer is 2m. After compaction, a mesh steel bar layer is laid on the surface until the foundation pit is backfilled, forming a high-strength foundation.
[0115] Among them, the steel bar position of the mesh steel bar layer avoids the design position of the foundation pile; the mesh diameter of the mesh steel bar layer is 1.6 times the diameter of the foundation pile.
[0116] S5, foundation pile construction:
[0117] Cast-in-place pile construction method: drill pile holes in the foundation, place a steel cage, and then pour concrete into the steel cage to form foundation piles. The depth of the foundation piles is less than the depth of the base waterproof layer.
[0118] S6, Capping Construction:
[0119] Tie up the steel bars for the foundation and pour concrete for the foundation.
[0120] Example 4
[0121] A foundation construction method for silt geology comprises the following steps:
[0122] S1, surface treatment:
[0123] On the foundation working surface, dig out 1.5m of the surface muddy soil to form a shallow foundation pit; the excavated muddy soil is used to prepare artificial soil I;
[0124] The preparation method of artificial soil I is as follows: using fly ash to adjust the water content of silty soil to less than 40wt%; according to the mass ratio, silty soil: slag: waste refractory brick slag: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = 105:12:35:22:16:4, silty soil, slag, waste refractory brick slag, machine-made sand, No. 90 asphalt and trimethylsiloxy silicate are mixed evenly at 100°C, loaded into a mold tank, and after cooling, pressed into blocks to obtain blocks, which are piled and stored; when the foundation pit is backfilled, the blocks are taken for crushing, and the maximum crushing particle size is 2.6cm, so as to obtain artificial soil I;
[0125] Among them, the maximum particle size of slag is 0.6cm; the maximum particle size of waste refractory brick slag is 0.7cm; and the maximum particle size of machine-made sand is 2.1mm.
[0126] S2, stirring and pumping:
[0127] A mixing pile machine is used to mix the silty soil downward in the shallow foundation pit. The mixing head of the mixing pile machine is supplied with a treatment agent. After mixing, flowing mud is formed, and the flowing mud is pumped out by a mud pump; the mud is mixed downward in layers to make slurry and pump out slurry. The treatment depth of each layer is 1.5m. The pumped out flowing mud is used to prepare artificial soil II; after each layer of slurry is pumped out, the guard sheet piles are anchored on the foundation pit slope to prevent the side wall of the foundation pit from collapsing and reduce water seepage in the foundation pit; the foundation pit slope is stepped, and the height of each step is 1.5m;
[0128] The mass ratio of the components of the treatment agent is water: alkylphenol polyoxyethyl ether: dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate: sodium polyacrylate: silicone defoamer = 105:7:4:22:2.2;
[0129] The amount of treatment agent added is to make the water content of silty soil between 55% and 65%. During the mixing and slurrying process, when the amount of seepage in the foundation pit is large or it is rainy and water accumulates in the foundation pit, a pump is used to drain the water in time to extract the excess water.
[0130] The preparation method of artificial soil II is as follows: fly ash, quicklime and acrylic acid associative thickener are added to the extracted flowing mud to adjust the water content to less than 40wt% to obtain thickened soil; the amount of quicklime is not more than 0.5 times the amount of fly ash; the amount of acrylic acid associative thickener is not more than 0.1 times the amount of fly ash;
[0131] According to the mass ratio, densified soil: slag: clay: waste concrete: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = 110:12:14:42:26:12:7. The densified soil, slag, clay, waste concrete, machine-made sand, No. 90 asphalt and trimethylsiloxy silicate are mixed evenly at 115°C, loaded into a mold tank, and pressed into blocks after cooling to obtain blocks, which are piled and stored; when the foundation pit is backfilled, the blocks are taken for crushing, and the maximum crushing particle size is 1.4 cm to obtain artificial soil II;
[0132] Among them, the maximum particle size of slag is 0.5cm; the maximum particle size of waste concrete is 0.5cm; the maximum particle size of machine-made sand does not exceed 2.6mm;
[0133] In this embodiment, the depth of the silty soil layer is 15m. The slurry is stirred and pumped until the silty soil layer is processed and the hard soil layer is exposed. The hard soil layer is compacted, and then 6m U-shaped steel sheet piles and 6m steel pipe piles are driven in. The U-shaped steel sheet piles are driven in succession at the edge of the bottom of the foundation pit, and the steel pipe piles are driven in an array in the middle of the bottom of the foundation pit, with a distance of 2m between adjacent steel pipe piles to form a base.
[0134] S3, laying the base waterproof layer;
[0135] 0.5m thick asphalt sand is laid on the foundation surface, and then 0.4m thick concrete is laid to form a waterproof layer after solidification.
[0136] S4, layered backfill:
[0137] The artificial soil I is backfilled in layers into the foundation pit, and the thickness of each layer is 1.5m. After compaction, a mesh steel bar layer is laid on the surface until the artificial soil I is fully backfilled. The thickness of the top layer of artificial soil I is less than 1.5m, so it is supplemented with artificial soil II. Then, artificial soil II is used to backfill the foundation pit in layers, and the thickness of each layer is 1.5m. After compaction, a mesh steel bar layer is laid on the surface until the foundation pit is backfilled, forming a high-strength foundation.
[0138] Among them, the steel bar position of the mesh steel bar layer avoids the design position of the foundation pile; the mesh diameter of the mesh steel bar layer is 1.6 times the diameter of the foundation pile.
[0139] S5, foundation pile construction:
[0140] Prefabricated pile construction method: Use prefabricated pile bodies, drive the prefabricated pile bodies into the foundation through a pile driver to form foundation piles. The depth of the foundation piles is less than the depth of the base waterproof layer.
[0141] S6, Capping Construction:
[0142] Tie up the steel bars for the foundation and pour concrete for the foundation.
[0143] The acrylic acid associative thickener used in the above-mentioned Examples 1 to 4 is an acrylic acid associative thickener of Guangdong Nuoyi Chemical Co., Ltd., model NY-936, with a solid content of 72%, and the main components are acrylic acid, functional associative monomers, and cross-linking agents. The sludge solidifying agent is a sludge solidifying agent of Qingdao Huide Xinke Building Materials Co., Ltd., model HD-124, and the main component of the sludge solidifying agent is cement. The state of the sludge solidifying agent is gray powder; the pH value is 8; non-toxic and harmless.
[0144] The slag used in the above-mentioned Examples 1 to 4 is solid waste generated in the metallurgical process. Waste refractory brick slag is the powder after the waste refractory brick is crushed. Machine-made sand is sand after the stone is crushed. Asphalt No. 90 is the national standard 90# road petroleum asphalt, Maoming Yuanzhuo Petrochemical Co., Ltd., specification 90#A, needle penetration 80mm, elongation 112cm, softening point 62°C, flash point 265°C. Trimethylsiloxysilicate is trimethylsiloxysilicate of Guangzhou Bailijia Technology Co., Ltd., model MQ-1600.
[0145] The alkylphenol polyoxyethyl ether used in the above-mentioned Examples 1 to 4 is the alkylphenol polyoxyethyl ether of Jiangsu Hai'an Petrochemical Plant, model Nongru X-100, pH value is 7; HLB value: 14.5; cloud point: 66°C. Dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate is an ester quaternary ammonium salt, provided by Guangzhou Muqi Biotechnology Co., Ltd., item number 90, pH value 4.2, active matter 90%. Sodium polyacrylate is sodium polyacrylate from Gongyi Jiezhiyuan Water Treatment Materials Co., Ltd., model JZY-SN512. The silicone defoamer is the silicone defoamer from Jiangsu Xiangtai Yingxin Technology Co., Ltd., model XT-SP701G.
[0146] The U-shaped steel sheet piles used in the above-mentioned Examples 1 to 4 are U-shaped steel sheet piles of Liaoning Zizhu Group, model SPU-V. The steel pipe piles are steel pipe piles of Shandong Xinyongtong Metal Manufacturing Co., Ltd., with customized sizes and material Q235B. The mesh steel bars are mesh bundled steel bars, and the diameter of the steel bars is φ8mm. The asphalt sand is the asphalt sand of Shandong Xintai Road Construction Geotechnical Materials Co., Ltd., with customized particle size, and the raw materials are asphalt and sand. The concrete is C30 concrete.
[0147] According to the composite foundation load test and soil (rock) foundation load test in the Technical Specification for Building Foundation Testing JGJ340, the foundation was tested in layers, and the average results are shown in Table 1 below:
[0148] Table 1 Foundation performance test results (average value)
[0149]
[0150] It can be seen from the above results that the foundation of each embodiment has good bearing capacity and can support the construction of high-rise or large buildings.
Claims
1. A foundation construction method for silt geology, characterized in that: The foundation construction method includes the following steps: S1, surface treatment: On the foundation working surface, the surface muddy soil is excavated to form a shallow foundation pit; the excavated muddy soil is used to prepare artificial soil I; The preparation method of the artificial soil I is as follows: using fly ash to adjust the water content of silty soil to less than 40wt%; according to the mass ratio, silty soil: slag: waste refractory brick slag: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = (100-120): (10-20): (30-50): (20-35): (15-20): (3-8), the silty soil, slag, waste refractory brick slag, machine-made sand, No. 90 asphalt and trimethylsiloxy silicate are uniformly mixed at 100° C. to 120° C., loaded into a mold tank, cooled, pressed into blocks to obtain blocks, and stacked for storage; when the foundation pit is backfilled, the blocks are taken out for crushing to obtain artificial soil I; S2, stirring and pumping: A mixing pile machine is used to mix the silty soil downward in the shallow foundation pit. The mixing head of the mixing pile machine is supplied with a treatment agent. After mixing, flowing mud is formed, and the flowing mud is pumped out by a mud pump. The mud is mixed and pumped downward in layers until the designed depth is reached to prepare the base. The pumped-out flowing mud is used to prepare artificial soil II. The mass ratio of the components of the treatment agent is water: alkylphenol polyoxyethyl ether: dipalmitoyloxyethyl hydroxyethyl methyl ammonium methyl sulfate: sodium polyacrylate: silicone defoamer = (100-120): (5-8): (2-5): (20-25): (1.5-3.5); The preparation method of the artificial soil II is as follows: adding fly ash, quicklime and acrylic acid associative thickener to the extracted flowing mud, adjusting the water content to less than 40wt%, and obtaining thickened soil; according to the mass ratio, thickened soil: slag: clay: waste concrete: machine-made sand: No. 90 asphalt: trimethylsiloxy silicate = (100-120): (10-20): (10-20): (30-50): (20-30): (10-15): (3-8), uniformly mixing the thickened soil, slag, clay, waste concrete, machine-made sand, No. 90 asphalt, and trimethylsiloxy silicate at 100° C. to 120° C., loading into a mold tank, cooling, pressing into blocks, obtaining blocks, and stacking and storing; when the foundation pit is backfilled, taking the blocks and crushing them to obtain artificial soil II; S3, laying the base waterproof layer; Asphalt sand is laid on the foundation surface, and then concrete is laid, which forms a base waterproof layer after solidification; S4, layered backfill: The artificial soil I is backfilled in layers into the foundation pit, and the backfill and compaction thickness of each layer is 1.5m to 2m. After compaction, a mesh steel bar layer is laid on the surface; until the artificial soil I is fully backfilled; when the thickness of the top layer of artificial soil I is less than 1.5m to 2m, artificial soil II is used to make up for it; then artificial soil II is used to continue backfilling the foundation pit in layers, and the backfill and compaction thickness of each layer is 1.5m to 2m. After compaction, a mesh steel bar layer is laid on the surface; until the backfilling of the foundation pit is completed; and the foundation is formed.
2. A foundation construction method for mud geology according to claim 1, characterized in that: In S1, the depth of the shallow foundation pit is 1.5m to 2m; the maximum particle size of the slag does not exceed 1cm; the maximum particle size of the waste refractory brick slag does not exceed 1cm; the maximum particle size of the machine-made sand does not exceed 3mm.
3. The method for foundation construction in muddy geology according to claim 1, characterized in that: In S1, the maximum particle size of the artificial soil I does not exceed 3 cm.
4. The method for foundation construction in muddy geology according to claim 1, characterized in that: In S2, the amount of the treatment agent added is sufficient to make the water content of the silty soil between 55% and 65%; the depth of each layer of mixing, slurrying and slurrying treatment is 1.5m to 2m; after each layer of mixing, slurrying and slurrying treatment, the guard sheet piles are anchored on the slope of the foundation pit, and the slope of the foundation pit is stepped, with each step height of 1.5m to 2m.
5. The method for foundation construction in muddy geology according to claim 1, characterized in that: In S2, the amount of quicklime used is no more than 0.5 times the amount of fly ash used; and the amount of acrylic acid associative thickener used is no more than 0.1 times the amount of fly ash used.
6. The method for foundation construction in muddy geology according to claim 1, characterized in that: In S2, the maximum particle size of the slag does not exceed 0.5 cm; the maximum particle size of the waste concrete does not exceed 0.5 cm; and the maximum particle size of the machine-made sand does not exceed 3 mm.
7. The method for foundation construction in muddy geology according to claim 1, characterized in that: In S2, the maximum particle size of the artificial soil II does not exceed 1.5 cm.
8. The method for foundation construction in muddy geology according to claim 1, characterized in that: In S2, when the depth of the silty soil layer is not more than 15m, the slurry is stirred and pumped until the silty soil layer is treated and the hard soil layer is exposed, the hard soil layer is compacted, and then U-shaped steel sheet piles and steel pipe piles are driven in to form a base; when the depth of the silty soil layer is more than 15m, the maximum depth of the slurry is 14m-15m, and the silty soil below the depth of 14m-15m is stirred by a pile mixer, and the mixing head of the pile mixer is supplied with silt curing agent. After 60min-80min of stirring, U-shaped steel sheet piles and steel pipe piles are driven in at the mixing surface position, and the soil is finally solidified to form the base of the cement soil mixing piles; the U-shaped steel sheet piles are driven in at the edge of the bottom surface of the foundation pit, and the steel pipe piles are driven in array in the middle of the bottom surface of the foundation pit; In S3, the thickness of the asphalt sand is 0.4m to 0.6m, and the thickness of the concrete is 0.4m to 0.6m; In S4, the position of the steel bars of the mesh steel bar layer avoids the design position of the foundation pile; and the mesh diameter of the mesh steel bar layer is 1.4 to 1.6 times the diameter of the foundation pile.
9. The method for foundation construction in muddy geology according to claim 1, characterized in that: The foundation construction method also includes: S5, foundation pile construction, using cast-in-place pile construction method or prefabricated pile construction method: Cast-in-place pile construction method: drill pile holes in the foundation, place steel cages, and then pour concrete into the steel cages to form foundation piles; Prefabricated pile construction method: Use prefabricated piles, drive the prefabricated piles into the foundation through a pile driver to form foundation piles; S6, Capping Construction: Tie up the steel bars for the foundation and pour concrete for the foundation.
10. A foundation construction method for mud geology according to claim 9, characterized in that: In S5, the depth of the foundation pile is less than the depth of the base waterproof layer.