A method, medium and equipment for site selection and line optimization of railway tunnels in complex mountainous areas
By establishing weighted directed graphs and tunnel door and tunnel body optimization models in complex mountainous railway construction, and using Dijkstra's algorithm to optimize paths, the problem of low efficiency in the existing technology has been solved and efficient tunnel location selection has been achieved. Optimizing the route direction improves construction efficiency and program quality.
Patent Information
- Application Number
- CN202410916847.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-10
AI Technical Summary
In complex mountainous railway construction, existing intelligent line selection methods are inefficient and difficult to efficiently search for feasible tunnel locations, resulting in a waste of computing time and resources, and it is easy to miss valuable solutions.
By determining the line selection area, establishing a weighted directed graph, using Dijkstra's algorithm to optimize the path, and combining the cost and stability models of the tunnel gate and tunnel body, we can efficiently search for tunnel location and route direction.
It achieves efficient search for feasible tunnel locations in complex mountainous railway construction, quickly finds optimized route plans, avoids waste of resources, and ensures economy and stability.
Smart Images

Figure CN118504806B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway tunnels, and in particular to a method, medium and equipment for site selection and line optimization of railway tunnels in complex mountainous areas. Background Art
[0002] Railway line selection and design is the core work of coordinating the construction and operation of the entire railway project. Its main task is to find a line plan with the best multi-objective function (such as safety, economy, etc.) under the constraints of multi-dimensional complex environment (such as terrain, geology, etc.) and multiple coupling constraints (such as line design specifications and structural construction requirements, etc.). Railway construction is gradually transforming from conventional railways in plain areas to high-speed railways in complex mountainous areas. The increasingly complex construction environment and the substantial improvement of railway design standards have increased the requirements for the smoothness of railway lines, and a large number of long and large tunnels are inevitable in complex mountainous areas. At this time, the feasible area suitable for laying out tunnel portals is severely reduced, and many factors affecting the suitability of tunnel locations such as terrain and geology need to be considered. The evaluation factors of tunnel location suitability such as economy and stability are difficult to quantify. Manual designers need to spend a lot of time and energy to find feasible line plans and corresponding tunnel layouts, and it is easy to miss valuable plans.
[0003] In this regard, existing intelligent route selection methods often generate route plans first, lay out tunnel locations based on the generated route plans, then detect the feasibility of the plans based on route design constraints, and then eliminate or adjust unfeasible plans, and evaluate the suitability of feasible route plans based on the route environment. This is essentially a "trial and error method" that performs an indiscriminate search of the entire route selection area during the route generation process, which can easily waste a lot of computing time and resources in areas that are not suitable for tunnel layout.
[0004] Therefore, there is an urgent need for an intelligent search method for the site selection optimization and route orientation of railway tunnels in complex mountainous areas, which can efficiently search for feasible tunnel locations and obtain optimized tunnel site selection and route orientation solutions. Summary of the invention
[0005] The purpose of the present invention is to provide a more efficient and reasonable method for optimizing the site selection and route of railway tunnels in complex mountainous areas. The specific technical scheme is as follows:
[0006] A method for selecting a site and optimizing a railway tunnel in a complex mountainous area comprises the following steps:
[0007] Step S1: Determine the route selection area, determine the mountain area that must be crossed in the form of a tunnel based on the route accessibility analysis, and then determine the area in the mountain area where a continuous long tunnel group needs to be laid out based on the tight slope and gentle slope areas of the route selection and the maximum allowable tunnel length requirements;
[0008] Step S2: determining the environmental factors affecting the portal and tunnel body of the tunnel, and establishing a tunnel site selection optimization model including portal and tunnel body optimization;
[0009] Step S3: constructing a tunnel portal candidate pool based on the line selection area, and abstracting the line selection area into a weighted directed graph according to different connection modes of the portals therein;
[0010] Step S4: solving the weights for cost and stability in the weighted directed graph, and using the Dijkstra algorithm to solve the optimal path solution from the starting point to the end point of the line.
[0011] Preferably, the step S1 specifically includes:
[0012] Determine the route selection area and abstract it into a series of grids. According to the route accessibility analysis, the grids that the route must pass through in the form of tunnels are obtained. The expression is as follows:
[0013] ;
[0014] ;
[0015] ;
[0016] Where: For the a grid that must be traversed in the form of a tunnel; is the elevation of the starting point; is the elevation of the end point; For the route from the starting point to the The maximum allowed elevation value for each grid; For the route from the end point to the The maximum allowed elevation value for each grid; For the The distance from the grid to the starting point; For the The distance from the grid to the end point; is the maximum allowable slope of the line; is the maximum allowable line expansion coefficient;
[0017] According to the natural slope of the starting and ending points of the route Maximum allowable slope of the line The relationship between the selection of tight slope and gentle slope areas:
[0018] ;
[0019] Where: is the distance between the start and end points of the line; if , then it is a tight slope area; if , then it is a gentle slope area;
[0020] For tight slope areas, if the length of the line connecting the starting point and the end point of the line that falls within the area formed by the grid that must be traversed in the form of a tunnel exceeds the maximum allowable length of the tunnel, a continuous long tunnel group will appear in this line selection area;
[0021] For gentle slope areas, when the thinnest width of this area exceeds the maximum allowable length of the tunnel, the line needs to pass through in the form of a continuous long tunnel group.
[0022] Preferably, the tunnel site selection optimization model includes a tunnel portal optimization model and a tunnel body optimization model, and the establishment steps are as follows:
[0023] The position of the tunnel portal is determined by its plane coordinates Determine its cost Including tunnel excavation cost Cost of supporting structure , its stability Slope from tunnel portal , Slope and lithology Determine; then the tunnel optimization model expression is as follows:
[0024] Minimize the cost of the portal ;
[0025] Maximize the stability of the portal ;
[0026] ;
[0027] in, Indicates that it is subject to constraints. The tunnel portal is located in a concave terrain. It cannot be located in the surface geological disaster area;
[0028] The location of the tunnel body is determined by the location of its starting and ending portals. Determine; the cost of the cave Including tunnel excavation cost Cost of its supporting structure , the stability of the cave Affected by underground stress, the vertical pressure of the tunnel is extracted Lateral bias force Two indicators are used to quantitatively evaluate its stability; the tunnel optimization model expression is as follows:
[0029] Minimize the cost of the tunnel ;
[0030] Maximize the stability of the cave ;
[0031] ;
[0032] in, Indicates the height difference constraint between the starting point and the end point of the tunnel. Indicates that the length of the tunnel body meets the maximum allowable tunnel length constraint.
[0033] Preferably, the construction of the tunnel portal candidate pool is specifically as follows:
[0034] Define an 8-domain template, and place the center of the 8-domain template on the grid of the selected area. If there are 5-8 grids in the 8-domain template with surface elevation higher than the central grid, the area suitable for placing the tunnel portal at the grid where the template is located is obtained; then all the areas suitable for placing the tunnel portal in the selected area are obtained.
[0035] Preferably, the weighted directed graph includes two parts, from the tunnel portal starting point to the end point and from the tunnel portal end point to the starting point. The tunnel portal starting point and the end point are connected to form a tunnel line segment, and the tunnel portal end point and the starting point are connected to form other line segments.
[0036] The cost of the tunnel section is equal to the sum of the cost of the tunnel body and its starting and ending portals;
[0037] The stability of a tunnel section is equal to the sum of the stability of the tunnel body and its starting and ending portals;
[0038] The cost and stability of the other line sections are obtained by a traditional line optimization model.
[0039] Preferably, the specific steps for solving the weights for cost and stability in the weighted directed graph are as follows:
[0040] For the weighted directed graph of the objective function including cost and stability, the relative weights of cost and stability are solved by using the objective weighting method. as follows:
[0041] ;
[0042] In the formula, is the standard deviation of the cost or stability of all edges in the weighted directed graph; is the correlation coefficient of cost or stability;
[0043] Solve the weights of all tunnel segments and other segments of the weighted directed graph as follows:
[0044] ;
[0045] In the formula, is the relative weight of the cost; is the relative weight of stability; is the normalized value of the construction cost; is the normalized value of stability.
[0046] Preferably, the environmental factors affecting the construction of tunnel portals and tunnel bodies are as follows:
[0047] The suitability of the tunnel portal is determined by the topography, slope, aspect and lithology; the suitability of the tunnel body is affected by the burial depth and surrounding rock grade.
[0048] The application of the technical solution of the present invention has the following beneficial effects:
[0049] (1) The present invention discloses a method for site selection and route optimization of railway tunnels in complex mountainous areas, including determining a route selection area, determining a mountain area that must be traversed in the form of a tunnel according to route accessibility analysis, and then determining an area in the mountain area where a continuous long tunnel group needs to be laid out according to the tight slope and gentle slope areas of the route selection and the maximum allowable tunnel length requirements; determining environmental factors affecting the construction of tunnel portals and tunnel bodies, and establishing a tunnel site selection optimization model including portal and tunnel body optimization; constructing a tunnel portal candidate pool based on the route selection area, and abstracting the route selection area into a weighted directed graph according to different connection methods of the tunnel portals; solving the weights for cost and stability in the weighted directed graph, and using the Dijkstra algorithm to solve the optimal path plan from the start point to the end point of the route. Through the method of the present invention, the controlling mountain area where a continuous long tunnel group needs to be laid out is identified, and the route selection area is abstracted into a weighted directed graph to search for an optimized route plan, which can efficiently search for feasible tunnel locations, and realize tunnel site selection optimization and route direction. Intelligent search is efficient and fast at the same time.
[0050] (2) The present invention takes into account many factors that affect the suitability of tunnel locations, such as topography and geology, as well as factors for evaluating the suitability of tunnel locations, such as economy and stability, and quantifies the above-mentioned multiple parameters. In the context of an increasingly complex construction environment and a substantial improvement in railway design standards, the present invention can quickly search for feasible areas suitable for arranging tunnel portals, and is less likely to miss valuable solutions.
[0051] The present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the aforementioned complex mountain railway tunnel site selection and line optimization method is implemented.
[0052] The present invention also provides an electronic device, comprising: a processor; and a memory for storing executable instructions of the processor; wherein the processor is configured to execute the aforementioned complex mountain railway tunnel site selection and route optimization method by executing the executable instructions.
[0053] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0055] Figure 1 It is a flow chart of a method for selecting a site and optimizing a railway tunnel in a complex mountainous area according to an embodiment of the present invention;
[0056] Figure 2 This is a schematic diagram of the mountain area where a continuous long tunnel group needs to be laid out;
[0057] Figure 3 It is a weighted directed graph abstracted from the line selection environment;
[0058] Figure 4 It is a schematic diagram of the optimization path direction. DETAILED DESCRIPTION
[0059] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
[0060] Example:
[0061] refer to Figure 1 A method for site selection and line optimization of railway tunnels in complex mountainous areas is described below by taking a certain complex mountainous high-speed railway section as an example. The aviation distance between the starting point and the end point of the high-speed railway section is 141.2km, the maximum elevation difference of the terrain in the line selection area is 4000m, and a continuous mountain area spans between the starting point and the end point.
[0062] Step S1: Determine the route selection area, determine the mountain area that must be crossed in the form of a tunnel based on the route accessibility analysis, and then determine the area in the mountain area where a continuous long tunnel group needs to be laid out based on the tight slope and gentle slope areas of the route selection and the maximum allowable tunnel length requirements;
[0063] Among them, after determining the line selection area, it is necessary to abstract the line selection area into a series of grids. According to the line accessibility analysis, the grids that the line must pass through in the form of tunnels are obtained. The expression is as follows:
[0064] ;
[0065] ;
[0066] ;
[0067] Where: For the a grid that must be traversed in the form of a tunnel; is the elevation of the starting point; is the elevation of the end point; For the route from the starting point to the The maximum allowed elevation value for each grid; For the route from the end point to the The maximum allowed elevation value for each grid; For the The distance from the grid to the starting point; For the The distance from the grid to the end point; is the maximum allowable slope of the line; is the maximum allowable line expansion coefficient;
[0068] In this embodiment, the grid is 90m in size, the starting elevation of the line is 875m, the end elevation is 1846m, the maximum allowable slope is 20‰, and the maximum allowable line expansion coefficient is 1.2. According to the formula, the proportion of grids that must be traversed in the form of tunnels accounts for 82.6% of the entire grid.
[0069] refer to Figure 2 , which is a schematic diagram of the control mountain area where a continuous long tunnel group needs to be laid out, according to the natural slope of the starting and ending points of the line Maximum allowable slope of the line The relationship between the selection of tight slope and gentle slope areas:
[0070] ;
[0071] Where: is the distance between the start and end points of the line; if , then it is a tight slope area; if , then it is a gentle slope area;
[0072] Calculate the natural slope of the starting and ending points of the line according to the formula is 6.8‰, , so this area is a gentle slope area.
[0073] For tight slope areas, if the length of the line connecting the start and end points of the line that falls within the area formed by the grid that must be traversed in the form of a tunnel exceeds the maximum allowable length of the tunnel, a continuous long tunnel group will appear in this line selection area; for gentle slope areas, when the thinnest width of this area exceeds the maximum allowable length of the tunnel, the line needs to pass through it in the form of a continuous long tunnel group. The maximum allowable length of the tunnel in this railway section is 30km, and the thinnest width of the grid area that must be traversed by tunnels is 54.8km, so the line needs to pass through this area in the form of a continuous long tunnel group.
[0074] Step S2: determining the environmental factors affecting the portal and tunnel body of the tunnel, and establishing a tunnel site selection optimization model including portal and tunnel body optimization;
[0075] The topographic conditions, lithology and distribution of surface geological disasters in this study area are known. The location of the tunnel portal is preliminarily determined by the topographic conditions around the portal. The portal is located at the boundary of the mountain range or in a depression in the middle of the mountain range. The slope and slope direction of the tunnel portal determine the bias and stability of the portal section. The portal should avoid the surface geological disaster area as much as possible or take certain treatment measures. Therefore, this embodiment determines that the suitability of the tunnel portal is affected by the terrain, slope, slope direction, and lithology;
[0076] If the tunnel is buried too shallowly, it is easy to cause bias pressure problems, and if it is buried too deep, it is easy to cause high ground stress problems, etc. The tunnel is not disturbed by surface geological disasters, and its stability depends on the underground geological conditions, such as surrounding rock grade, rock burst, etc. Therefore, this embodiment considers that the suitability of the tunnel is affected by the burial depth and surrounding rock grade.
[0077] The tunnel site selection optimization model includes a tunnel portal optimization model and a tunnel body optimization model, and the establishment steps are as follows:
[0078] The position of the tunnel portal is determined by its plane coordinates Determine its cost Including tunnel excavation cost Cost of supporting structure , its stability Slope from tunnel portal , Slope and lithology Decision: To ensure that the tunnel portal is located in a depression And cannot be in the surface geological disaster area ;
[0079] The portal optimization model expression is as follows. In this embodiment, the unit price of tunnel portal excavation and the unit price of supporting structure are determined, the slope and slope direction at the portal are obtained according to the terrain distribution, and the lithology at the portal is obtained according to the geological distribution, and the calculation parameters of the following formula are obtained:
[0080] ;
[0081] ;
[0082] ;
[0083] The location of the tunnel body is determined by the location of its starting and ending portals. Determine; the cost of the cave Including tunnel excavation cost Cost of supporting structure , the stability of the cave Affected by underground stress, the vertical pressure of the tunnel is extracted Lateral bias force Two indicators are used to quantitatively evaluate its stability; at the same time, the height difference between the starting point and the end point of the tunnel must also be met. The length of the tunnel body also needs to meet the requirements of the maximum allowable tunnel length. ;
[0084] The tunnel optimization model expression is as follows, and by determining the tunnel excavation unit price, tunnel support structure form, and surrounding rock grade distribution according to surrounding rock lithology, the following calculation parameters are obtained:
[0085] ;
[0086] ;
[0087] .
[0088] Step S3: Based on the line selection area, a tunnel portal candidate pool is constructed. According to the different connection modes of the portals, the line selection area is abstracted into a weighted directed graph. Figure 3 , which are:
[0089] Define an 8-domain template, place the center of the 8-domain template on the grid of the line selection area, and if there are 5-8 grids in the 8-domain template whose surface elevation is higher than the center grid, obtain the area suitable for placing the tunnel portal at the grid where the template is located; and then obtain all the areas suitable for placing the tunnel portal in the line selection area. In this embodiment, after scanning the entire line selection area using the 8-domain template, 1236 grids suitable for laying out the tunnel portal are obtained.
[0090] The weighted directed graph includes two parts, from the portal start point to the end point and from the portal end point to the start point. The portal start point and the end point are connected to form a tunnel line segment, and the portal end point and the start point are connected to form other line segments. The cost and stability of the tunnel segment are equal to the sum of the corresponding values of the tunnel body and its start and end portals, that is, the cost weight and stability weight of the edge are calculated according to the portal optimization model and the tunnel body optimization model formula. The cost and stability of other line segments are obtained by the traditional line optimization model.
[0091] Among them, the starting point of the entire line is also regarded as the starting point of the tunnel gate, and the end point of the entire line is also regarded as the end point of the tunnel gate.
[0092] Step S4: solving the weights for cost and stability in the weighted directed graph, and using the Dijkstra algorithm to solve the optimal path solution from the starting point to the end point of the line.
[0093] Among them, the specific steps for solving the weights of cost and stability in the weighted directed graph are as follows:
[0094] For the weighted directed graph of the objective function including cost and stability, the relative weights of cost and stability are solved by using the objective weighting method. as follows:
[0095] ;
[0096] In the formula, is the standard deviation of the cost or stability of all edges in the weighted directed graph; is the correlation coefficient of cost or stability;
[0097] Solve the weights of all tunnel segments and other segments of the weighted directed graph as follows:
[0098] ;
[0099] In the formula, is the relative weight of the cost; is the relative weight of stability; is the normalized value of the construction cost; is the normalized value of stability.
[0100] Finally, the Dijkstra algorithm is used to solve the final optimized path direction. Figure 4 .
[0101] This embodiment also discloses a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the method for site selection and line optimization of railway tunnels in a complex mountainous area described in this embodiment is implemented.
[0102] This embodiment also discloses an electronic device, including:
[0103] processor;
[0104] and a memory for storing executable instructions for the processor;
[0105] The processor is configured to execute the complex mountain railway tunnel site selection and route optimization method as described in this embodiment by executing the executable instructions.
[0106] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for site selection and line optimization of railway tunnels in complex mountainous areas, characterized in that: The following steps are involved: Step S1: Determine the route selection area, determine the mountain area that must be crossed in the form of a tunnel based on the route accessibility analysis, and then determine the area in the mountain area where a continuous long tunnel group needs to be laid out based on the tight slope area, gentle slope area and maximum allowable tunnel length requirements of the selected route; Step S2: determining the environmental factors affecting the portal and tunnel body of the tunnel, and establishing a tunnel site selection optimization model including portal and tunnel body optimization; Step S3: constructing a tunnel portal candidate pool based on the line selection area, and abstracting the line selection area into a weighted directed graph according to different connection modes of the portals in the tunnel portal candidate pool; Step S4: solving the weights for cost and stability in the weighted directed graph, and using the Dijkstra algorithm to solve the optimal path solution from the starting point to the end point of the line; The step S1 specifically comprises: Determine the route selection area and abstract it into a series of grids. According to the route accessibility analysis, the grids that the route must pass through in the form of tunnels are obtained. The expression is as follows: H i >min(H Smax ,H Emax ); H Smax =H S +G max ·L Si ·γ max ; H Emax =H E +G max ·L Ei ·γ max ; Where: H i is the i-th grid that must be traversed in the form of a tunnel; H S is the elevation of the starting point; H E is the elevation of the end point; H Smax H is the maximum allowable elevation of the line from the starting point to the i-th grid; Emax L is the maximum allowable elevation of the line from the end point to the i-th grid; Si is the distance from the i-th grid to the starting point; L Ei is the distance from the ith grid to the end point; G max is the maximum allowable slope of the line; max is the maximum allowable line expansion coefficient; According to the natural slope G at the start and end of the line P The maximum allowable slope of the line G max The relationship between the tight slope area and the gentle slope area is distinguished by: Where: L SE is the distance between the starting point and the end point of the line; if G P ≥G max , then it is a tight slope area; if G P <G max , then it is a gentle slope area; For tight slope areas, if the length of the line connecting the starting point and the end point of the line that falls within the area formed by the grid that must be traversed in the form of a tunnel exceeds the maximum allowable length of the tunnel, a continuous long tunnel group will appear in this line selection area; For gentle slope areas, when the thinnest width of this area exceeds the maximum allowable tunnel length, the line needs to pass through in the form of a continuous long tunnel group; The tunnel site selection optimization model includes a tunnel portal optimization model and a tunnel body optimization model, and the establishment steps are as follows: The position of the tunnel portal is determined by its plane coordinates (X P ,Y P ) Determine the cost of the tunnel gate F CP Including the cost of tunnel excavation C PE Cost of supporting structure C PS , the stability of the portal F SP The slope S of the tunnel portal G , slope direction S D and lithology S L Determine; then the tunnel optimization model expression is as follows: Minimize the cost of the portalMinimize:F CP (X P ,Y P )=C PE +C PS ; Maximize the stability of the portal SP (X P ,Y P )=S G +S D +S L ; s.t.G PT (X P ,Y P )≤0,G PH (X P ,Y P )≤0; Among them, st means subject to constraints, G PT The tunnel portal is located in a concave terrain, G PH It cannot be located in the surface geological disaster area; The location of the tunnel body is determined by the location of the portals at its starting point and end point (X TS ,Y TS ,X TE ,Y TE ) Determine; tunnel construction cost F CT Including tunnel excavation cost C TE The cost of its supporting structure C TS , tunnel stability F ST Affected by underground stress, the vertical pressure S of the tunnel is extracted. V and lateral bias force S B Two indicators are used to quantitatively evaluate its stability; the tunnel optimization model expression is as follows: Minimize the cost of the tunnel: Minimize:F CT (X TS ,Y TS ,X TE ,Y TE )=C TE +C TS ; Maximize the stability of the cave: Maximize:F ST (X TS ,Y TS ,X TE ,Y TE )=S V +S B ; s.t.G TE (X TS ,Y TS ,X TE ,Y TE )≤0,G TL (X TS ,Y TS ,X TE ,Y TE )≤0; Among them, G TE Indicates the height difference constraint between the starting point and the end point of the tunnel body, G TL Indicates that the length of the tunnel body meets the maximum allowable tunnel length constraint; The construction of the tunnel portal candidate pool is specifically as follows: Define an 8-domain template, place the center of the 8-domain template on the grid of the selected line area, if there are 5-8 grids in the 8-domain template with surface elevation higher than the center grid, obtain the area suitable for placing the tunnel portal at the grid where the template is located; then obtain all the areas suitable for placing the tunnel portal in the selected line area; The weighted directed graph in step S3 includes two parts: the tunnel portal starting point to the end point and the tunnel portal end point to the starting point. The tunnel portal starting point and the end point are connected to form a tunnel line segment, and the tunnel portal end point and the starting point are connected to form other line segments. The cost of a tunnel section is equal to the sum of the cost of the tunnel body and its starting and ending portals; The stability of a tunnel section is equal to the sum of the stability of the tunnel body and its starting and ending portals; The cost and stability of other line sections are obtained by the traditional line optimization model; The specific steps for solving the weights for cost and stability in a weighted directed graph are as follows: For the weighted directed graph of the objective function including cost and stability, the relative weight ω of cost and stability is solved by the objective weighting method as follows: ω=s d ·(1-p); In the formula, σ d is the standard deviation of the cost or stability of all edges in the weighted directed graph; ρ is the correlation coefficient of cost or stability; Solve the weights F of all tunnel segments and other segments of the weighted directed graph C as follows: F C =ω1·x1+ω2·x2; In the formula, ω1 is the relative weight of construction cost; is the relative weight of stability; x1 is the normalized value of construction cost; x2 is the normalized value of stability.
2. A method for site selection and line optimization of railway tunnels in complex mountainous areas according to claim 1, characterized in that: The environmental factors that affect the construction of tunnel portals and tunnel bodies are as follows: The suitability of the tunnel portal takes into account the influence of terrain, slope, slope direction and rock properties; the suitability of the tunnel body takes into account the influence of burial depth and surrounding rock grade.
3. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for site selection and route optimization of railway tunnels in complex mountainous areas as described in any one of claims 1-2 is implemented.
4. An electronic device, characterized in that: include: processor; and a memory for storing executable instructions for the processor; Wherein, the processor is configured to execute the complex mountain railway tunnel site selection and route optimization method as described in any one of claims 1-2 by executing the executable instructions.