A mine ventilation method combined with a monitoring system

By arranging monitoring modules and negative pressure fans underground in coal mines to monitor and respond to ventilation abnormalities in real time, the problem of fresh air supply interruption caused by underground ventilation fan failures in coal mines was solved, and low-cost, low-power fresh air supply in long tunnels was realized. Ensure production safety and economy.

CN118517294BActive Publication Date: 2024-10-15HUAINAN ANENG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410997392.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-15
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

Failure of underground ventilation fans in coal mines leads to interruption of fresh air supply, affecting production safety and economy. Existing high-power fans are prone to problems such as failure, excessive heat, and startup failure. When switching to backup fans, they may fail, causing the air supply to the excavation surface to be interrupted.

Method used

A mining ventilation method combined with a monitoring system is adopted. By arranging monitoring modules in the tunnel, including air pressure, temperature, humidity, gas and wind speed sensors, the data is monitored in real time and compared with the data collection database to determine abnormal conditions and control the alarm module to issue an alarm. And use a negative pressure fan combined with a fan assembly or a separate air supply to ensure the supply of fresh air in the tunnel.

Benefits of technology

It realizes that there is no need to stop work when the fan fails. New air is provided through the negative pressure fan, which solves the problem of insufficient wind speed in the long tunnel, reduces power consumption and usage costs, handles gas abnormalities in a timely manner, and reduces the risk of gas poisoning. The monitoring module follows the excavation. It works on the same surface, saving sensor layout costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118517294B_ABST
    Figure CN118517294B_ABST
Patent Text Reader

Abstract

The invention discloses a mine ventilation method combined with a monitoring system, relates to the field of mine ventilation, and comprises the following steps: S1: arranging a monitoring system, S2: continuously monitoring data, S3: comparing and judging, and S4: adopting emergency measures to ventilate the tunnel. According to abnormal conditions of the monitored data, a negative pressure fan and a fan assembly can be selected to supply air to the tunnel at the same time, or a negative pressure fan can be selected to supply air to the tunnel alone without stopping work, thereby solving the problem of insufficient wind speed in the tunnel when the fan assembly is underpowered, and being particularly suitable for use in longer tunnels; solving the problem that the existing fan assembly cannot provide fresh air to longer tunnels due to maximum power limitation, and based on the negative pressure fan only needing to draw the air in the communication channel into the tunnel, the power consumption is small, and the use cost is greatly reduced. Due to the phenomenon of negative pressure, no matter how far away, the fresh air outside the tunnel can be pressed into the communication channel or the excavation face position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine ventilation, and in particular to a mine ventilation method combined with a monitoring system. Background Art

[0002] At present, the underground fully-mechanized mining face and various tunnel development and excavation of coal mines all rely on the main ventilation fan located on the ground to provide fresh air flow to the excavation face. However, as the coal mine is excavated longer, the main ventilation fan is insufficient to deliver fresh air to the excavation face. At this time, a high-power fan is needed, usually a 2×55kW pressure-type fan is used to ensure that the oxygen concentration in the coal mine is not less than 20%, and the carbon dioxide concentration does not exceed 0.5%. Due to the large power of the 2×55kW pressure-type fan, there are often problems such as failure to stop, excessive heat, and failure to start when switching to the standby fan, which causes the phenomenon of stopping the supply of fresh air to the excavation face, which poses a serious threat to production. These existing hidden dangers of failure seriously affect the economy and safety of the entire mine operation.

[0003] To this end, we provide a mining ventilation method combined with a monitoring system to solve the above problems. Summary of the invention

[0004] In view of the problems existing in the above-mentioned prior art, the present invention provides a mine ventilation method combined with a monitoring system to solve the problem of stopping the supply of fresh air to the excavation face due to a fan failure.

[0005] In order to achieve the above object, the present invention adopts a mining ventilation method combined with a monitoring system, comprising the following steps:

[0006] S1: Arrange the monitoring system. Arrange the monitoring modules in the tunnel. The monitoring modules include air pressure sensors, temperature sensors, humidity sensors, gas sensors, wind speed sensors, voltage sensors and current sensors. The voltage sensors and current sensors are installed on the fan assembly outside the tunnel entrance and are used to monitor the voltage or current of the main fan and the standby fan when they are running. The monitoring submodules formed by the air pressure sensor, temperature sensor, humidity sensor, gas sensor and wind speed sensor are divided into several groups. During the tunnel excavation process of the shield machine, one group of monitoring submodules follows the shield machine, and the remaining groups of monitoring submodules are arranged at equal distances in the tunnel.

[0007] S2: Continuous data monitoring. The monitoring module is used to continuously monitor the environment in the coal mine. The air pressure sensor, temperature sensor, humidity sensor, gas sensor, and wind speed sensor in the monitoring module continuously monitor the air pressure, temperature, humidity, gas type and concentration, and wind speed in the tunnel, and regularly feed back the data to the controller. The controller is connected to the alarm module, and the controller is also connected to the data collection library, which stores data on various indicators within the normal working range of the tunnel;

[0008] S3: Comparison and judgment: compare the data monitored by the monitoring module with the data in the data collection library. When the corresponding position data is not within the data threshold range set in the data collection library, it is judged as data abnormality. The controller controls the alarm module to issue a continuous alarm, notifying the staff to repair or take emergency measures to ventilate the tunnel. When the alarm module issues an alarm, the monitoring module continues to monitor various data and feeds back to the controller in real time. After another data analysis and comparison, if there is no abnormality in the data, the system operates normally and no alarm is issued;

[0009] S4: Take emergency measures to ventilate the tunnel. When abnormal conditions are found after comparing the data detected by the monitoring module with the data in the data collection library, determine the degree of abnormality and select a ventilation method for the tunnel. Use a combination of a fan assembly and a negative pressure fan to supply air to the tunnel, or use a negative pressure fan to supply air to the tunnel independently.

[0010] As a further optimization of the above scheme, the abnormality degree is judged in S4, and the specific ventilation mode in each lane is selected as follows:

[0011] If the wind speed sensor detects that there is still wind in the tunnel, but the wind speed is lower than 0.15m / s, the fan assembly will still run, and the negative pressure fan will be started to vacuum the communication channel in the tunnel, and then the communication channel will be connected to the air supply duct on the fan assembly. At this time, the fresh air outside the tunnel will be pressed into the air supply duct and the communication channel due to the negative pressure, and then the air supply port on the communication channel will be opened to supply fresh air into the tunnel;

[0012] If the wind speed sensor detects that the wind speed in the alley is 0m / s, the fan assembly stops running, and the negative pressure fan is started separately to vacuum the communication channel in the alley, and then the communication channel is connected to the air supply duct on the fan assembly. At this time, the fresh air outside the alley is pressed into the air supply duct and the communication channel due to the negative pressure, and then the air supply port on the communication channel is opened to supply fresh air into the alley.

[0013] As a further optimization of the above scheme, the output end of the controller is connected to the input end of the switch module, the output end of the switch module is connected to the input end of the fan start module, the input end of the controller is connected to the data collection library and the monitoring module, and the alarm module and the monitoring module are both bidirectionally connected to the controller through the wireless communication module.

[0014] As a further optimization of the above scheme, the alarm module includes a first sound and light alarm, a second sound and light alarm, a first electronic display screen and a second electronic display screen. The first sound and light alarm and the first electronic display screen are arranged inside the alley, and the second sound and light alarm and the second electronic display screen are arranged outside the alley.

[0015] As a further optimization of the above scheme, the negative pressure fan is a power part of the coal mine ventilation system, and the ventilation system includes a fan assembly arranged on the ground and supplying fresh air to the excavation face in the first lane or the second lane in the lane, and the fan assembly is connected to an air supply duct, which is arranged in the first lane and the second lane and has an end located at the excavation face;

[0016] The first lane and the second lane are connected by a number of connecting channels, a negative pressure fan is arranged in the connecting channel, two concrete partition walls are arranged on the connecting channel, a second input pipe, an output pipe and a first input pipe are arranged on the negative pressure fan, two first input pipes are arranged, the two first input pipes respectively penetrate the corresponding concrete partition walls and are connected with the interior of the first lane or the second lane, the second input pipe is connected with the interior of the connecting channel, and two connecting pipes with forks are arranged at the end of the output pipe, the two connecting pipes extend into the first lane and the second lane respectively, exhaust ducts are also arranged on the inner walls of the first lane and the second lane, and the exhaust ducts are connected with the connecting pipes.

[0017] As a further optimization of the above solution, an air supply port is arranged on the concrete partition wall, one end of the air supply port is connected to the communication channel, and the other end is connected to the inside of the first lane or the second lane, and a quantity control valve is arranged in the air supply port.

[0018] As a further optimization of the above solution, a shield machine is used for excavation in the first tunnel and the second tunnel, and the working position of the shield machine is the excavation face.

[0019] As a further optimization of the above solution, the fan assembly is arranged 20 m in front of the entrances of the first lane and the second lane.

[0020] As a further optimization of the above solution, the air supply duct and the communication channel are connected via a negative pressure supply duct, and a one-way valve and a solenoid valve are provided in the negative pressure supply duct.

[0021] As a further optimization of the above solution, the gas sensor is an integrated sensor including: a carbon monoxide sensor, a carbon dioxide sensor, a hydrogen sulfide sensor, a methane sensor and a hydrogen sensor.

[0022] The mine ventilation method combined with the monitoring system of the present invention has the following beneficial effects:

[0023] 1. A mine ventilation method combined with a monitoring system of the present invention can select a negative pressure fan and a fan assembly to supply air to the tunnel at the same time, or a negative pressure fan to supply air to the tunnel alone, according to abnormal conditions of monitored data, without stopping work;

[0024] 2. The mine ventilation method combined with the monitoring system of the present invention solves the problem of insufficient wind speed in the tunnel when the fan assembly is underpowered, and is particularly suitable for use in longer tunnels; it solves the problem that the existing fan assembly cannot provide fresh air in longer tunnels due to the maximum power limitation;

[0025] 3. The mine ventilation method combined with the monitoring system of the present invention is based on the fact that the negative pressure fan only needs to draw the air in the communication channel into the tunnel, which has low power consumption and greatly reduces the use cost. Due to the negative pressure phenomenon, no matter how far away, the fresh air outside the tunnel can be pressed into the communication channel or the excavation face position, breaking through the technical barriers;

[0026] 4. A mine ventilation method combined with a monitoring system of the present invention compares the data monitored by the monitoring module with the data in the data collection library. When the corresponding position data is not within the data threshold range set in the data collection library, it is determined that the data is abnormal. The controller controls the alarm module to issue a continuous alarm to notify the staff to repair or take emergency measures to ventilate the tunnel. When the alarm module issues an alarm, the monitoring module continues to monitor various data and feeds back to the controller in real time. After the data is analyzed and compared again, if there is no abnormality in the data, the system operates normally and no alarm is issued;

[0027] 5. A mine ventilation method combined with a monitoring system of the present invention uses a monitoring module to monitor the environment in a coal mine, compares the monitored data with the data in a data collection library, and if an abnormality occurs, an alarm is issued through an alarm module and maintenance is performed; if there is no abnormality, the fan is allowed to operate normally, and during the detection and processing, the monitoring module still operates in real time and continuously issues an alarm to serve the purpose of warning and also to remind maintenance personnel that the equipment has not been properly repaired. Only after the maintenance is completed, the data monitored by the monitoring module is normal, and the system operates normally without issuing an alarm;

[0028] 6. A mining ventilation method combined with a monitoring system of the present invention uses a negative pressure fan arranged in the communication channel, so that the negative pressure fan cooperates with the fan assembly or is used alone to achieve the purpose of sucking fresh air into the communication channel by negative pressure to supply fresh air to the excavation face, thereby compensating for the phenomenon that the fan assembly cannot work normally and safely due to insufficient power or damage, and the negative pressure air supply has low power loss and saves energy;

[0029] 7. A mine ventilation method combined with a monitoring system of the present invention can also reduce the phenomenon of gas poisoning in the first tunnel and the second tunnel based on the setting of a negative pressure fan, and can promptly and quickly deal with the problem of gas abnormality;

[0030] 8. In a mining ventilation method combined with a monitoring system of the present invention, a monitoring module follows the excavation face to perform monitoring work, which replaces the need to set various sensors at equal distances in the first tunnel or the second tunnel, thereby substantially saving costs.

[0031] With reference to the following description and drawings, a specific embodiment of the present invention is disclosed in detail, indicating the manner in which the principles of the present invention can be adopted. It should be understood that the scope of the embodiments of the present invention is not limited thereby, and within the spirit and scope of the appended claims, the embodiments of the present invention include many changes, modifications and equivalents. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a module diagram of the fan monitoring system of the present invention;

[0033] Figure 2 It is a monitoring module diagram of the present invention;

[0034] Figure 3 It is the alarm module diagram of the present invention;

[0035] Figure 4 The fan monitoring system of the present invention is an execution framework diagram;

[0036] Figure 5 A schematic diagram of the ventilation structure of the fan monitoring system of the present invention;

[0037] Figure 6 For the present invention Figure 5 A schematic diagram of the enlarged structure in the middle.

[0038] In the figure: 1. First lane; 2. Second lane; 3. Communication channel; 4. Fan assembly; 5. Shield machine; 6. Concrete partition wall; 7. Negative pressure fan; 8. Air supply duct; 9. Exhaust duct; 10. First input duct; 11. Second input duct; 12. Output duct; 13. Connecting duct; 14. Negative pressure supply duct; 15. Quantity control valve; 16. Air supply port; 17. One-way valve; 18. Solenoid valve. DETAILED DESCRIPTION

[0039] In order to make the purpose, technical solution and advantages of the present invention more clear, the present invention is further described in detail below through the accompanying drawings and embodiments. However, it should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the scope of the present invention.

[0040] It should be noted that when an element is referred to as being "disposed on, provided with" another element, it may be directly on the other element or there may also be a central element. When an element is considered to be "connected, connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. "Fixed connection" means a fixed connection. There are many ways of fixed connection, which are not within the scope of protection of this article. The terms "vertical", "horizontal", "left", "right" and similar expressions used in this article are for illustrative purposes only and do not represent the only implementation method.

[0041] Unless otherwise defined, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs. The terms used in the specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0042] Please refer to the instruction manual Figure 1-6 In order to solve the problem of stopping the supply of fresh air to the excavation face due to a fan failure, the present invention provides a technical solution: a mine ventilation method combined with a monitoring system, comprising the following steps:

[0043] The first step: arranging the monitoring system, arranging the monitoring module in the tunnel, the monitoring module includes an air pressure sensor, a temperature sensor, a humidity sensor, a gas sensor, a wind speed sensor, a voltage sensor and a current sensor, the voltage sensor and the current sensor are installed on the fan assembly 4 outside the tunnel inlet and are used to respectively monitor the voltage or current of the main fan and the standby fan when they are running; the monitoring submodules formed by the air pressure sensor, the temperature sensor, the humidity sensor, the gas sensor and the wind speed sensor are divided into several groups, in the process of using the shield machine to excavate the tunnel, one group of the monitoring submodules follows the shield machine, and the other groups of monitoring submodules are arranged at equal distances in the tunnel;

[0044] Step 2: Continuous data monitoring. The monitoring module is used to continuously monitor the environment in the coal mine. The air pressure sensor, temperature sensor, humidity sensor, gas sensor, and wind speed sensor in the monitoring module continuously monitor the air pressure, temperature, humidity, gas type and concentration, and wind speed in the tunnel, and regularly feed back the data to the controller. The controller is connected to the alarm module, and the controller is also connected to the data collection library, which stores data on various indicators within the normal working range in the tunnel;

[0045] Step 3: Comparison and judgment: compare the data monitored by the monitoring module with the data in the data collection library. When the corresponding position data is not within the data threshold range set in the data collection library, it is judged as data abnormality. The controller controls the alarm module to issue a continuous alarm, notifying the staff to repair or take emergency measures to ventilate the tunnel. When the alarm module issues an alarm, the monitoring module continues to monitor various data and feeds back to the controller in real time. After another data analysis and comparison, if there is no abnormality in the data, the system operates normally and no alarm is issued;

[0046] Step 4: Take emergency measures to ventilate the tunnel. When the data monitored by the monitoring module is compared with the data in the data collection library and an abnormal situation is found, the degree of abnormality is determined. If the wind speed sensor detects that there is still wind in the tunnel, but the wind speed is lower than 0.15m / s, it proves that the fan assembly 4 can still be used, but a partial failure may occur, resulting in insufficient power, or because the tunnel is already very long at this time, the fresh air cannot maintain sufficient power to supply the excavation face, then the negative pressure fan 7 in the ventilation system is started. When the negative pressure fan 7 is started, the communication channel 3 in the tunnel is vacuumed, and then The connecting channel 3 is connected with the air supply duct on the fan assembly 4. At this time, the fresh air outside the tunnel is pressed into the air supply duct and the connecting channel 3 due to the effect of negative pressure. Then the air supply port 16 on the connecting channel 3 is opened to supply fresh air into the tunnel. When the wind speed of the fresh air is between 0.15 and 4 m / s, the fan assembly 4 and the negative pressure fan 7 are maintained to work stably, which solves the problem of insufficient wind speed in the tunnel when the fan assembly 4 is underpowered. It is particularly suitable for use in longer tunnels; it solves the problem that the existing fan assembly 4 cannot provide fresh air to longer tunnels due to maximum power limitation.

[0047] It should be noted that in the prior art, fresh air is usually supplied to longer tunnels by installing fan assemblies 4 in the connecting channels 3 at certain intervals, and the fan assemblies 4 outside the tunnel are used to supply air to the connecting channels 3, and then another set of fan assemblies 4 in the connecting channels 3 are used to supply air to the connecting channels 3 or the excavation face at a farther distance. This not only involves a large number of equipment, high cost, and difficulty in maintenance, but also indirectly prolongs the construction period. Therefore, the present invention adopts an air supply method combining a negative pressure fan 7 with a fan assembly 4, which can achieve the purpose of supplying air to longer tunnels at a low cost, and since the negative pressure fan 7 only needs to draw the air in the connecting channels 3 into the tunnel, the power consumption is small, and the use cost is greatly reduced. Due to the phenomenon of negative pressure, no matter how far away, the fresh air outside the tunnel can be pressed into the connecting channel 3 or the excavation face, breaking through the technical barriers.

[0048] If the wind speed sensor detects that the wind speed in the tunnel is 0m / s, it proves that the fan component is most likely damaged and needs maintenance. When the fan component is damaged, construction cannot be carried out without fresh air supply in the tunnel, and the oxygen concentration is insufficient. At this time, construction is prone to danger. Waiting for maintenance personnel to come for maintenance usually takes about 1 week, because the common phenomenon now is that the mechanical equipment used is purchased directly from the manufacturer, and sometimes even imported from abroad. When large equipment is damaged, the manufacturer can only be notified, and the manufacturer arranges technicians to come for maintenance. Therefore, once the equipment is damaged, the construction period will be greatly delayed.

[0049] In the present invention, a negative pressure fan 7 is arranged in the connecting channel 3. When the fan assembly 4 is damaged, the negative pressure fan 7 is started, and the fresh air outside the lane can be sucked into the corresponding connecting channel 3, and then discharged to the corresponding position in the lane, so as to temporarily provide fresh air without stopping work, and there is sufficient time to wait for the damaged equipment to be repaired; and the negative pressure fan 7 has a lower cost of use than the fan assembly 4, and can also reduce the construction cost; however, even after the negative pressure fan 7 draws negative pressure into the connecting channel 3, only a part of the fresh air enters the connecting lane 3 due to the negative pressure, and pressure storage cannot be performed; therefore, it is also necessary to use it in combination with the fan assembly 4; during normal operation, the negative pressure fan 7 and the fan assembly 4 are first used to pressurize the fresh air of appropriate pressure into the connecting channel 3, and when the fan assembly 4 is damaged, fresh air can be immediately supplied to the lane, and when the fresh air in one connecting channel 3 is used up, the negative pressure fan 7 is started to collect the fresh air in this connecting channel 3 again; during the collection process, the fresh air in the remaining connecting channels 3 is used to supply the lane.

[0050] Therefore, the present invention provides a mining ventilation method combined with a monitoring system, which can select the negative pressure fan 7 and the fan assembly 4 to supply air to the tunnel at the same time, or the negative pressure fan 7 alone to supply air to the tunnel according to the abnormal situation of the monitored data, without stopping work.

[0051] The fan monitoring system used in the mine specifically includes a monitoring module, a controller, a switch module, a fan start module and an alarm module. The output end of the controller is connected to the input end of the switch module, and the output end of the switch module is connected to the input end of the fan start module. The input end of the controller is connected to a data collection library and a monitoring module, and the alarm module and the monitoring module are both bidirectionally connected to the controller through a wireless communication module; the alarm module includes a first sound and light alarm, a second sound and light alarm, a first electronic display screen and a second electronic display screen.

[0052] During specific work, the monitoring module is used to monitor the environment in the coal mine, and the monitored data is compared with the data in the data collection library. If an abnormality occurs, an alarm is issued through the alarm module and maintenance is carried out. If there is no abnormality, the fan is allowed to operate normally.

[0053] It should be noted that during the detection and processing process, the monitoring module still runs in real time and continuously issues alarms to serve as a warning and remind maintenance personnel that the equipment has not been repaired. Only after the equipment is repaired and the data detected by the monitoring module is normal, the system will operate normally without issuing alarms.

[0054] The mine fan monitoring system of the present invention is applied to the tunnels of a coal mine, including a first tunnel 1 and a second tunnel 2, wherein a fan assembly 4 is provided at the ground position, and the fan assembly 4 needs to be arranged 20m away from the entrance of the first tunnel 1 and the second tunnel 2 to ensure that the wind force sucked in is fresh air. The fan assembly 4 includes a main fan and a backup fan, both of which use 2×55kW pressure-type fans; an air supply duct 8 is installed on the inner walls of the first tunnel 1 and the second tunnel 2, and the fresh air pressed by the fan assembly 4 enters the air supply duct 8 and is supplied to the excavation face. The air supply duct 8 is a spliced ​​air duct. As the shield machine 5 extends into the excavation face, the length of the air supply duct 8 is subsequently spliced ​​to supplement the length of the air supply duct 8, so that the fresh air in the air supply duct 8 can always be supplied to the excavation face.

[0055] A communication channel 3 is arranged between the first lane 1 and the second lane 2. The communication channel 3 is used to connect the working surfaces of the first lane 1 and the second lane 2 to facilitate the personnel and equipment in the first lane 1 and the second lane 2 to complement each other. There are several communication channels 3, and the several communication channels 3 are usually arranged at a distance of 200m; and a concrete partition wall 6 is arranged at the position where the communication channel 3 connects the first lane 1 or the second lane 2 to block the air circulation between the first lane 1 and the second lane 2. A normally closed fire door is arranged on the concrete partition wall 6 for the passage of personnel and equipment, which will not be elaborated here.

[0056] In the present invention, a negative pressure fan 7 is additionally provided in the connecting channel 3, and a second input pipe 11, an output pipe 12 and a first input pipe 10 are provided on the negative pressure fan 7. Two first input pipes 10 are provided, and the two first input pipes 10 respectively penetrate the corresponding concrete partition wall 6 and are connected with the interior of the first lane 1 or the second lane 2. The second input pipe 11 is connected to the interior of the connecting channel 3, and two forked connecting pipes 13 are provided at the end of the output pipe 12. The two connecting pipes 13 extend into the first lane 1 and the second lane 2 respectively. Exhaust ducts 9 are also arranged on the inner walls of the first lane 1 and the second lane 2, and the exhaust ducts 9 are connected to the connecting pipe 13.

[0057] During operation, if the shield machine 5 excavates more than 1500m, the fresh air provided to the excavation face by the fan assembly 4 will be greatly reduced, and the wind speed will not reach the minimum 0.15m / s and the maximum 4m / s standard. Therefore, when the excavation depth of the first tunnel 1 or the second tunnel 2 exceeds 1500m, the negative pressure fan 7 can be turned on, and the gas in the communication channel 3 is extracted by the second input pipe 11 and discharged to the outside of the first tunnel 1 or the second tunnel 2 through the output pipe 12, the connecting pipe 13 and the exhaust pipe 9 in turn, so that a negative pressure state is formed in the communication channel 3. In this state, when the negative pressure in the communication channel 3 reaches a certain level, the air supply duct 8 and the communication channel 3 are connected, so that the fresh air in the air supply duct 8 is affected by the negative pressure and is sucked into the communication channel 3 for storage, which greatly reduces the effect of the fan assembly 4. Even when the fan assembly 4 is under-supplied or damaged, it is still possible to ensure that the fresh air enters the communication channel 3 for storage. When there is fresh air in the communication channel 3, the fresh air in the communication channel 3 can be controlled to be gradually supplied to the first lane 1 or the second lane 2, which also provides sufficient time for the maintenance of the fan assembly 4.

[0058] Among them, the air supply duct 8 and the communication channel 3 are connected through a negative pressure supply duct 14, and a one-way valve 17 and a solenoid valve 18 are also provided in the negative pressure supply duct 14. The setting of the one-way valve 17 ensures that the fresh air in the air supply duct 8 is unidirectionally transported to the communication channel 3. The setting of the solenoid valve 18 can control the on-off of the negative pressure supply duct 14, and the air supply duct 8 and the communication channel 3 are connected only when the negative pressure fan 7 is needed. An air supply port 16 is also provided on the concrete partition wall 6, and a quantity control valve 15 is provided in the air supply port 16. When the quantity control valve 15 is opened, the fresh air in the communication channel 3 can be gradually discharged into the first lane 1 and the second lane 2, thereby achieving the purpose of gradually supplying fresh air to the first lane 1 and the second lane 2.

[0059] In actual operation, since the communication channel 3 uses a negative pressure air storage method, the stored air volume is not particularly large and can only be supplied for a period of time. Therefore, in practice, when the negative pressure fan 7 is working, the fan assembly 4 is used in conjunction with the negative pressure fan 7. After a certain amount of fresh air is stored in the communication channel 3, the negative pressure effect cannot be used to supply the fresh air into the communication channel 3. The fan assembly 4 is used to press the fresh air into the communication channel 3 for supply.

[0060] When in use, a certain amount of fresh air can be stored in some of the communication channels 3 in case of emergency, providing sufficient time for repairing the fan assembly 4 to avoid insufficient fresh air supply that delays the excavation progress or safety accidents.

[0061] A pipeline supplying air to the excavation face can also be connected to the air supply port 16, so that the fresh air exhausted from the communication channel 3 can be supplied to the excavation face.

[0062] Furthermore, the provision of the negative pressure fan 7 in the present invention can also reduce the phenomenon of gas poisoning in the first alley 1 and the second alley 2. Specifically, when the monitoring module detects that there is a large amount of toxic gas in a certain area in the first alley 1 and the second alley 2, the negative pressure fan 7 at the corresponding position can be started to suck out the toxic gas in the first alley 1 and the second alley 2 through the first input pipe 10, the output pipe 12, the connecting pipe 13 and the exhaust pipe 9 in turn to avoid safety accidents.

[0063] Furthermore, the first sound and light alarm and the first electronic display screen in the alarm module of the present invention are arranged inside the first lane 1 or the second lane 2, and are used for the staff inside the first lane 1 or the second lane 2 to promptly understand the environmental conditions in the first lane 1 and the working conditions of the fan assembly 4; the second sound and light alarm and the second electronic display screen are arranged outside the first lane 1 or the second lane 2, and are used for the staff outside the first lane 1 or the second lane 2 to promptly understand the environmental conditions in the first lane 1 and the working conditions of the fan assembly 4.

[0064] The air pressure sensor can be used to monitor the air pressure inside the first tunnel 1 or the second tunnel 2, the humidity sensor can be used to monitor the humidity of the gas inside the first tunnel 1 or the second tunnel 2, the temperature sensor can be used to monitor the internal working temperature environment of the first tunnel 1 or the second tunnel 2, and the gas sensor can use an integrated sensor of a carbon monoxide sensor, a carbon dioxide sensor, a hydrogen sulfide sensor, a methane sensor and a hydrogen sensor. The components of each gas in the first tunnel 1 or the second tunnel 2 are collected by the gas sensor, and the proportion of the gas is analyzed and compared by the controller. When the proportion of the harmful gas is greater than a set value, the controller operates the switch module to control the fan assembly 4 to open, and uses the alarm module to sound an alarm for timely processing.

[0065] The wind speed sensor can be used to monitor the wind speed inside the first tunnel 1 or the second tunnel 2, and the safety threshold of the wind speed setting is between 0.15 and 4 m / s; the voltage sensor and the current sensor are both arranged on the fan assembly 4 and are used to monitor the voltage and current of the fan assembly 4 respectively, and determine whether the fan assembly 4 has a fault.

[0066] Among them, the air pressure sensor, humidity sensor, temperature sensor, gas sensor, and wind speed sensor in the monitoring module can be installed on a mobile vehicle to perform monitoring work following the excavation face, replacing the need to set up individual sensors at equal distances in the first tunnel 1 or the second tunnel 2, thereby fully saving costs.

[0067] It should be noted that, for safety considerations, only a plurality of gas sensors need to be provided, and the plurality of gas sensors are arranged in the first tunnel 1 and the second tunnel 2 at equal distances.

[0068] It is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modification, equivalent substitution or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A mine ventilation method combined with a monitoring system, characterized in that: The monitoring system includes a monitoring module, a controller, a switch module, a fan start module and an alarm module. The mine ventilation method includes the following steps: S1: Arranging a monitoring module. Arranging a monitoring module in the tunnel, the monitoring module comprising an air pressure sensor, a temperature sensor, a humidity sensor, a gas sensor, a wind speed sensor, a voltage sensor and a current sensor. The voltage sensor and the current sensor are mounted on a fan assembly (4) outside the tunnel entrance and are used to respectively monitor the voltage and current of a main fan and a standby fan of the fan assembly (4) when they are in operation. The air pressure sensor, the temperature sensor, the humidity sensor, the gas sensor and the wind speed sensor form a monitoring submodule. The monitoring submodules have a plurality of groups. During the tunneling process of the shield machine, one group of the monitoring submodules follows the shield machine, and the remaining groups of the monitoring submodules are arranged at equal distances in the tunnel. S2: Continuous data monitoring. The monitoring module is used to continuously monitor the environment in the coal mine. The air pressure sensor, temperature sensor, humidity sensor, gas sensor, and wind speed sensor in the monitoring module continuously monitor the air pressure, temperature, humidity, gas type and concentration, and wind speed in the tunnel, and regularly feed back the data to the controller. The controller is connected to the alarm module, and the controller is also connected to the data collection library, which stores data on various indicators within the normal working range of the tunnel; S3: Comparison and judgment: compare the data monitored by the monitoring module with the data in the data collection library. When the data at the corresponding position is not within the data threshold range set in the data collection library, it is judged as data abnormality. The controller controls the alarm module to issue a continuous alarm, notifying the staff to take emergency measures to ventilate the tunnel. When the alarm module issues an alarm, the monitoring module continues to monitor various data and feeds back to the controller in real time. After another data analysis and comparison, if there is no abnormality in the data, the system operates normally and no alarm is issued; S4: adopt emergency measures to ventilate the tunnel. When the data monitored by the monitoring module is compared with the data in the data collection database and an abnormal situation is found, the degree of abnormality is determined, and the ventilation method in each tunnel is selected. The fan assembly (4) is combined with the negative pressure fan (7) to supply air to the tunnel, or the negative pressure fan (7) is independently used to supply air to the tunnel. In S4, the abnormality degree is judged and the ventilation mode in each lane is selected as follows: If the wind speed sensor detects that there is still wind in the tunnel, but the wind speed is lower than 0.15 m / s, the fan assembly (4) is still running, and the negative pressure fan (7) is started to evacuate the communication channel (3) in the tunnel, and then the communication channel (3) is connected to the air supply duct on the fan assembly (4). At this time, the fresh air outside the tunnel is pressed into the air supply duct and the communication channel (3) due to the negative pressure, and then the air supply port (16) on the communication channel (3) is opened to supply fresh air into the tunnel; If the wind speed sensor detects that the wind speed in the tunnel is 0 m / s, the fan assembly (4) stops running, and the negative pressure fan (7) is started alone to evacuate the communication channel (3) in the tunnel, and then the communication channel (3) is connected to the air supply duct on the fan assembly (4). At this time, the fresh air outside the tunnel is forced into the air supply duct and the communication channel (3) due to the negative pressure, and then the air supply port on the communication channel (3) is opened to supply fresh air into the tunnel; The negative pressure fan (7) is a power component of a coal mine ventilation system used in the mine ventilation method. The tunnel comprises a first tunnel (1) and a second tunnel (2). The ventilation system comprises a fan assembly (4) arranged on the ground and supplying fresh air to the tunneling face in the first tunnel (1) or the second tunnel (2). The fan assembly (4) is connected to an air supply duct (8). The air supply duct (8) is arranged in the first tunnel (1) and the second tunnel (2) and its end is located at the tunneling face. The first lane (1) and the second lane (2) are connected via a plurality of communication channels (3), a negative pressure fan (7) is arranged in the communication channel (3), two concrete partition walls (6) are arranged on the communication channel (3), a second input pipe (11), an output pipe (12) and a first input pipe (10) are arranged on the negative pressure fan (7), two first input pipes (10) are arranged, the two first input pipes (10) respectively penetrate the corresponding concrete partition walls (6) and are connected to the inside of the first lane (1) or the second lane (2), the second input pipe (11) is connected to the inside of the communication channel (3), and two bifurcated communication pipes (13) are arranged at the end of the output pipe (12), the two communication pipes (13) extend into the first lane (1) and the second lane (2) respectively, and exhaust pipes (9) are arranged on the inner walls of the first lane (1) and the second lane (2), and the exhaust pipes (9) are connected to the communication pipe (13); The concrete partition wall (6) is provided with an air supply port (16), one end of the air supply port (16) is connected to the communication channel (3), and the other end is connected to the inside of the first lane (1) or the second lane (2), and a volume control valve (15) is provided in the air supply port (16); The air supply pipe (8) and the communication channel (3) are connected via a negative pressure supply pipe (14), and a one-way valve (17) and a solenoid valve (18) are provided in the negative pressure supply pipe (14); The air pressure sensor, humidity sensor, temperature sensor, gas sensor and wind speed sensor in the monitoring module are installed on a mobile vehicle and follow the excavation face for monitoring work.

2. A mine ventilation method combined with a monitoring system according to claim 1, characterized in that: The output end of the controller is connected to the input end of the switch module, the output end of the switch module is connected to the input end of the fan start module, the input end of the controller is connected to the data collection library and the monitoring module, and the alarm module and the monitoring module are both bidirectionally connected to the controller through the wireless communication module.

3. A mine ventilation method combined with a monitoring system according to claim 1, characterized in that: The alarm module includes a first sound and light alarm, a second sound and light alarm, a first electronic display screen and a second electronic display screen. The first sound and light alarm and the first electronic display screen are arranged inside the lane, and the second sound and light alarm and the second electronic display screen are arranged outside the lane.

4. A mine ventilation method combined with a monitoring system according to claim 1, characterized in that: A shield machine (5) is used to excavate the first tunnel (1) and the second tunnel (2), and the working position of the shield machine (5) is the excavation face.

5. A mine ventilation method combined with a monitoring system according to claim 1, characterized in that: The fan assembly (4) is arranged at a position 20 m in front of the entrances of the first lane (1) and the second lane (2).

6. A mine ventilation method combined with a monitoring system according to claim 1, characterized in that: The gas sensor is an integrated sensor including a carbon monoxide sensor, a carbon dioxide sensor, a hydrogen sulfide sensor, a methane sensor and a hydrogen sensor.