A kind of pile foundation of industrial and civil buildings and its construction technology
By using structures such as guide rings, inserting columns and limiting plates on the construction pile foundation, the deviation problem during the construction process of existing construction piles is solved, the stability and construction quality of the pile foundation are improved, and the stability of the building is ensured and durability.
Patent Information
- Application Number
- CN202411008241.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The tapered bottoms of existing building piles tend to deviate from the designed position during construction, resulting in inaccurate installation of pile foundations and affecting the stability of the building.
It adopts a structure including a guide ring, pile foundation outer cylinder, connecting cylinder and pile foundation inner cylinder. The pile foundation outer cylinder is straightened through the guide ring. The insertion column penetrates the pile foundation outer cylinder to increase lateral stability and passes through the concrete. The sealing groove and flow groove ensure the pouring and flow of concrete, and the design of the limit plate and connecting insert block ensures the fixed position and connectivity of the insert column.
It improves the verticality and stability of the pile foundation, ensures the accuracy and sealing of the structure, enhances the stability and reliability of the overall structure, improves construction efficiency and quality, and enhances the strength and toughness of concrete.
Smart Images

Figure CN118531828B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pile foundations, in particular to a pile foundation for industrial and civil buildings and a construction process thereof. Background Art
[0002] Industrial and civil architecture refers to a type of building that combines engineering technology and civil construction technology. This type of building usually includes industrial plants, warehouses, commercial buildings, etc. It has a certain industrial nature and takes into account people's living and use needs. Pile foundation is a common foundation engineering structure used to support the weight of buildings or other engineering structures and transfer the load to the underground soil. It is usually composed of concrete or reinforced concrete piles. By driving the piles deep into the ground, they bear the weight of the building and disperse it into the soil. Pile foundations are particularly useful when soil conditions are poor or when they need to bear large loads, and can provide better stability and bearing capacity.
[0003] In the existing construction process, most building piles have the same diameter at the top and bottom and a conical bottom. Although this structure simplifies the construction process and reduces construction difficulty and cost, its pointed conical bottom is easy to deviate from the designed position during construction, resulting in inaccurate pile foundation installation, which in turn affects the stability of the entire building. Summary of the invention
[0004] The purpose of the present invention is to solve the problem that in the existing construction process, most of the building piles have the same diameter at the top and bottom and are tapered at the bottom. Although this structure simplifies the construction process and reduces the construction difficulty and cost, its pointed tapered bottom is easy to deviate from the designed position during the construction process, resulting in inaccurate installation of the pile foundation, which in turn affects the stability of the entire building. A pile foundation for industrial and civil buildings and a construction process thereof are provided.
[0005] To achieve the above object, the present invention provides the following technical solutions: a civil construction pile foundation and a construction process thereof, comprising: a pre-drilled hole opened on the ground, wherein a construction pile is inserted into the pre-drilled hole;
[0006] The building pile comprises a guide ring, a pile foundation outer cylinder, a connecting cylinder and a pile foundation inner cylinder;
[0007] The pile foundation outer tube is inserted into the guide ring and penetrates the guide ring, and an insert column is penetrated in the pile foundation outer tube;
[0008] The guide ring is embedded in the top of the pre-drilled hole, and the top surface of the guide ring is flush with the ground, so as to straighten the pile foundation outer cylinder inserted into the pre-drilled hole;
[0009] The connecting tube is inserted into the outer tube of the pile foundation, and a plurality of the plug posts are inserted through the side wall of the outer tube of the pile foundation, and the opposite sides of the plurality of plug posts are plugged into each other, wherein when the connecting tube moves downward, the plug posts are pushed to move horizontally and be inserted into the soil;
[0010] The pile foundation inner tube is inserted into the connecting tube, and the pile foundation inner tube is located in the center of the connecting tube.
[0011] As a further solution of the present invention: a guiding strip 1 which is plugged into the outer surface of the pile foundation outer tube is fixedly connected inside the guiding ring, a connecting plate is fixedly connected to the outer surface of the guiding ring, and a plug pile is connected through the top of the connecting plate.
[0012] As a further solution of the present invention: the outer surface of the pile foundation outer tube is provided with a guiding slot 1 adapted to one end of the guiding insertion strip, the inner wall of the pile foundation outer tube is provided with a concrete sealing groove 1, one side of the concrete sealing groove is provided with a guiding slot 2, the guiding slot 2 is provided on the inner wall of the pile foundation outer tube, the inner wall of the pile foundation outer tube is provided with a receiving groove for accommodating the tail end of the inserted column when the inserted column passes through the pile foundation outer tube, and the inner wall of the pile foundation outer tube is provided with a flow groove connected to the receiving groove to allow concrete to flow therein.
[0013] As a further solution of the present invention: the end face of the column is provided with an outflow hole for allowing the concrete to flow out during the pouring process, so as to increase the connectivity between the column and the external soil after the column passes through the outer tube of the pile foundation. One end of the column is fixedly connected to a limiting plate, and the limiting plates are provided in two groups, which are symmetrically distributed on the end face of the column, one group of limiting plates is fixedly connected to a connecting block on the side end, and the other group of limiting plates is provided with a connecting slot on the side end, the connecting block is adapted to the connecting slot, and when the connecting block is inserted into the receiving groove, the outflow hole is connected to the receiving groove.
[0014] As a further solution of the present invention: the columns are arranged in several groups, wherein five groups of columns are arranged on the same horizontal plane, and when the five groups of columns are in the outer tube of the pile foundation, the connecting blocks and connecting slots of two adjacent groups of limiting plates are plugged in.
[0015] As a further solution of the present invention: a concrete sealing groove 2 connected to a concrete sealing groove 1 is provided on the outer surface of the connecting tube, a guide strip 2 connected to a guide slot 2 is provided on one side of the concrete sealing groove, the guide strip 2 is fixedly connected to the connecting tube, and a guide strip 3 connected to an inner tube of the pile foundation is fixedly connected to the inner wall of the connecting tube.
[0016] As a further solution of the present invention: the outer surface of the pile foundation inner tube is fixedly connected with a guide plug block which is three-plugged with the guide plug strip, and the outer side of the pile foundation inner tube is provided with a through groove for concrete circulation, and the through groove penetrates the pile foundation inner tube.
[0017] As a further solution of the present invention: a mounting plate is fixedly connected to the inner wall of the pile foundation inner tube, a connecting steel bar is penetrated and connected to the mounting plate, and a steel mesh tube is arranged inside the pile foundation inner tube to increase the strength and toughness of the concrete structure.
[0018] As a further solution of the present invention: comprising the following steps:
[0019] S1. First, conduct geological surveys to determine soil conditions and groundwater levels, then design a pile foundation plan based on the needs of the building, clean up the construction site, ensure the safety of the construction area, and prepare the required materials and equipment. According to the design requirements, mark the position and center point of each pile on the ground, use a drill or other drilling equipment to drill pre-drilled holes on the pile positions, and embed the guide ring on the surface of the pre-drilled hole so that the top surface of the guide ring is flush with the ground;
[0020] S2. After that, the pile foundation outer tube is inserted into the guide ring, and the pile foundation outer tube is completely inserted into the pre-drilled hole by the pile driver, and then the connecting tube is inserted into the pile foundation outer tube, and the connecting tube is completely inserted into the pile foundation outer tube by the pile driver again. During the insertion of the connecting tube, the conical surface at the bottom of the connecting tube abuts against the tail end of the plug column in the pile foundation outer tube, so that the plug column penetrates the pile foundation outer tube and is inserted into the external soil, and then the pile foundation inner tube is completely inserted into the connecting tube;
[0021] S3. Finally, pour concrete into the guiding ring to fill the connecting tube and flow into the concrete sealing groove and the circulation groove. The circulation groove passes through the receiving groove connected to it and the outflow hole connected to the receiving groove, so that the concrete flows out from the outflow hole and enters the external soil. After the concrete is completely solidified, the building pile is connected to the base through the connecting steel bar to ensure firmness and reliability.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] 1. In the present invention, the guide ring can be used to straighten the pile foundation outer cylinder inserted into the pre-drilled hole to prevent it from tilting during the insertion into the pre-drilled hole, thereby ensuring the verticality of the pile foundation outer cylinder and improving the stability of the pile foundation;
[0024] 2. In the present invention, the outer tube of the pile foundation provides support and bearing function to ensure the verticality and stability of the building pile, and the guide slot and concrete sealing slot provided thereon help to ensure the accuracy and sealing of the structure. The receiving slot and flow slot are provided inside the outer tube, which is conducive to the pouring and flow of concrete and improves the construction efficiency and quality;
[0025] 3. In the present invention, the lateral stability and bending stiffness of the structure are increased by inserting the column. The fixed position and connectivity of the column are ensured by the design of the limit plate, the connecting plug block and the connecting slot, thereby enhancing the stability and reliability of the overall structure. The outflow hole opened on the end face of the column helps to control the flow of concrete during pouring and ensure connectivity with external soil.
[0026] 4. The connecting tube in the present invention provides a connection between the outer tube of the pile foundation and the inner tube of the pile foundation, thereby enhancing the integrity and stability of the structure. The concrete sealing groove provided thereon is conducive to the pouring and sealing of concrete, thereby ensuring the integrity and durability of the structure.
[0027] 5. The inner tube of the pile foundation in the present invention provides internal support and backing, ensuring the stability and bearing capacity of the overall structure. The through grooves and wire mesh tubes arranged thereon increase the strength and toughness of the concrete structure, and improve the compressive resistance and durability of the overall structure. Connecting steel bars are arranged inside, which helps to enhance the connectivity and stability of the inner tube of the pile foundation with other components. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the overall structure of a pile foundation for civil buildings and its construction process according to the present invention;
[0029] Figure 2 It is a structural schematic diagram of a guide ring in a pile foundation for civil buildings and its construction process according to the present invention;
[0030] Figure 3 It is a structural schematic diagram of a pile foundation outer cylinder in a civil building pile foundation and its construction process described in the present invention;
[0031] Figure 4 It is a schematic diagram of the internal structure of the pile foundation outer tube in a pile foundation for civil buildings and its construction process according to the present invention;
[0032] Figure 5 It is a structural schematic diagram of a pile foundation for civil buildings and a limit plate in its construction process according to the present invention;
[0033] Figure 6 It is a structural schematic diagram of a pile foundation for civil buildings and a column insertion process thereof in the present invention;
[0034] Figure 7 It is a structural schematic diagram of a connecting tube in a pile foundation for civil buildings and its construction process according to the present invention;
[0035] Figure 8 It is a structural schematic diagram of a pile foundation inner tube in a civil building pile foundation and its construction process according to the present invention;
[0036] Fig. 9 The invention discloses a structural schematic diagram of a connecting plate in a pile foundation for a civil building and its construction process.
[0037] In the figure: 1. pre-drilled hole; 2. guide ring; 21. guide insert one; 22. connecting plate; 23. pile; 3. pile foundation outer tube; 31. guide slot one; 32. concrete sealing slot one; 33. guide slot two; 34. receiving slot; 35. flow slot; 4. insert column; 41. outflow hole; 42. limit plate; 43. connecting insert block; 44. connecting slot; 5. connecting tube; 51. concrete sealing slot two; 52. guide insert two; 53. guide insert three; 6. pile foundation inner tube; 61. through slot; 62. mounting plate; 63. wire mesh tube; 64. reinforcement; 65. guide insert block. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal connection of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. The following is an explanation of an embodiment of the present invention based on the overall structure of the present invention.
[0040] Reference Figure 1 to Figure 2 In an embodiment of the present invention, a civil construction pile foundation and a construction process thereof include: a pre-drilled hole 1 opened on the ground, a construction pile inserted into the pre-drilled hole 1;
[0041] The building pile comprises a guide ring 2, a pile foundation outer tube 3, a connecting tube 5 and a pile foundation inner tube 6;
[0042] The pile foundation outer tube 3 is vertically inserted into the guide ring 2 and penetrates the guide ring 2. The pile foundation outer tube 3 is penetrated by an insert column 4.
[0043] The guide ring 2 is embedded in the top of the pre-drilled hole 1 and connected to the ground, and the top surface of the guide ring 2 is flush with the ground to straighten the pile foundation outer cylinder 3 inserted into the pre-drilled hole 1 to prevent the pile foundation outer cylinder 3 from tilting during the insertion of the pre-drilled hole 1;
[0044] The connecting tube 5 is vertically inserted into the pile foundation outer tube 3, and a plurality of plug posts 4 are inserted through the side wall of the pile foundation outer tube 3, and the opposite sides of the plurality of plug posts 4 are plugged into each other. When the connecting tube 5 moves downward, the conical surface at the bottom end of the connecting tube 5 abuts against the rear end of the plug post 4, so that the plug post 4 penetrates the pile foundation outer tube 3, pushing the plug post 4 to move horizontally and insert into the soil;
[0045] The pile foundation inner tube 6 is vertically inserted into the connecting tube 5 so that the pile foundation inner tube 6 is located in the center of the connecting tube 5 when the concrete is poured.
[0046] Reference Figure 2 A guiding insert 21 is fixedly connected inside the guiding ring 2 and is plugged into the outer surface of the pile foundation outer tube 3. There are multiple groups of guiding inserts 21, which are evenly distributed on the inner wall of the guiding ring 2. A connecting plate 22 is fixedly connected to the outer surface of the guiding ring 2. There are four groups of connecting plates 22, which are symmetrically distributed on the outer surface of the guiding ring 2. A group of plug piles 23 is connected to the top of each group of connecting plates 22.
[0047] By adopting the above solution: the pile foundation outer tube 3 inserted into the pre-drilled hole 1 can be straightened by the guide ring 2 to prevent it from tilting during the insertion into the pre-drilled hole 1, thereby ensuring the verticality of the pile foundation outer tube 3 and improving the stability of the pile foundation.
[0048] Reference Figure 3 to Figure 4 A guiding slot 31 matched with the guiding insert strip 21 is provided on the outer surface of the pile foundation outer tube 3, a concrete sealing slot 32 is provided on the inner wall of the pile foundation outer tube 3, and multiple groups of concrete sealing slots 32 are provided. A group of guiding slots 2 33 is provided between every two groups of concrete sealing slots 1 32, and the guiding slots 2 33 are provided on the inner wall of the pile foundation outer tube 3. A receiving slot 34 for receiving the tail end of the inserted column 4 when the inserted column 4 passes through the pile foundation outer tube 3 is provided on the inner wall of the pile foundation outer tube 3, and multiple groups of receiving slots 34 are provided. A flow slot 35 connected with the receiving slot 34 is provided on the inner wall of the pile foundation outer tube 3 to allow concrete to flow therein, and multiple groups of flow slots 35 are provided, and each group of flow slots 35 is connected with multiple groups of receiving slots 34 in the same vertical direction.
[0049] The above scheme is adopted: the support and bearing function is provided by the pile foundation outer tube 3 to ensure the verticality and stability of the building pile, and the guide slots and concrete sealing slots opened thereon help to ensure the accuracy and sealing of the structure. The receiving slots 34 and the flow slots 35 are arranged inside, which are conducive to the pouring and flow of concrete and improve the construction efficiency and quality.
[0050] Reference Figures 5 and 6 The end face of the plug column 4 is provided with an outflow hole 41 for connecting with the external soil after the plug column 4 passes through the pile foundation outer tube 3. One end of the plug column 4 passing through the pile foundation outer tube 3 is a conical surface, and one end of the plug column 4 is fixedly connected to a limiting plate 42. The limiting plates 42 are provided with two groups, which are symmetrically distributed on the end face of the plug column 4. One group of limiting plates 42 is fixedly connected to a connecting plug block 43 at the side end, and the other group of limiting plates 42 is provided with a connecting slot 44 at the side end, and the connecting plug block 43 is adapted to the connecting slot 44. The connecting block 43 is an arc-shaped block, the connecting slot 44 is an arc-shaped slot, and when the connecting block 43 is inserted into the receiving groove 34, the outflow hole 41 is connected with the receiving groove 34, and the plug-in column 4 is provided with several groups, among which five groups of plug-in columns 4 are provided on the same horizontal plane. When the five groups of plug-in columns 4 are in the pile foundation outer tube 3, the connecting blocks 43 and the connecting slots 44 of the two adjacent groups of limiting plates 42 are plugged in. When the conical surface at the bottom end of the connecting tube 5 is inserted between the five groups of plug-in columns 4, the plug-in relationship between the connecting block 43 and the connecting slot 44 is released.
[0051] The above scheme is adopted: the lateral stability and bending stiffness of the structure are increased by the insertion column 4, and the fixed position and connectivity of the insertion column 4 are ensured through the design of the limiting plate 42, the connecting plug block 43 and the connecting slot 44, thereby enhancing the stability and reliability of the overall structure. The outflow hole 41 opened on the end face of the insertion column 4 helps to control the flow during the concrete pouring process and ensure the connectivity with the external soil.
[0052] Reference Figure 7 A concrete sealing groove 2 51 connected to the concrete sealing groove 1 32 is provided on the outer surface of the connecting tube 5. A guiding strip 2 52 plugged into the guiding slot 2 33 is provided on one side of the concrete sealing groove 2. The guiding strip 2 52 is fixedly connected to the connecting tube 5. A guiding strip 3 53 plugged into the pile foundation inner tube 6 is fixedly connected to the inner wall of the connecting tube 5. There are multiple groups of guiding strips 3 53, which are evenly distributed on the inner wall of the connecting tube 5.
[0053] By adopting the above scheme, the connecting tube 5 provides a connection between the pile foundation outer tube 3 and the pile foundation inner tube 6, thereby strengthening the integrity and stability of the structure. The concrete sealing groove opened thereon is conducive to the pouring and sealing of concrete, thereby ensuring the integrity and durability of the structure.
[0054] Reference Figures 8 to 9The outer surface of the pile foundation inner tube 6 is fixedly connected with a guide plug 65 plugged with the guide plug strip 353. A through groove 61 for concrete circulation is opened on the outer side of the pile foundation inner tube 6. The through groove 61 penetrates the pile foundation inner tube 6. There are multiple groups of through grooves 61. A mounting plate 62 is fixedly connected to the inner wall of the pile foundation inner tube 6. There are two groups of mounting plates 62, which are symmetrically distributed at both ends of the pile foundation inner tube 6. The mounting plate 62 is a large-character shape. The mounting plate 62 is penetrated and connected with a connecting steel bar 64. There are multiple groups of connecting steel bars 64. A wire mesh tube 63 is arranged inside the pile foundation inner tube 6 to increase the strength and toughness of the concrete structure.
[0055] The above scheme is adopted: the pile foundation inner tube 6 provides internal support and backing, ensuring the stability and bearing capacity of the overall structure. The through grooves 61 and wire mesh tubes 63 arranged thereon increase the strength and toughness of the concrete structure, and improve the compressive resistance and durability of the overall structure. Connecting steel bars 64 are arranged inside to help enhance the connectivity and stability of the pile foundation inner tube 6 with other components.
[0056] The working principle of the present invention is: firstly, geological survey is carried out to determine the soil conditions and groundwater level, then the pile foundation scheme is designed according to the needs of the building, and the construction site is cleaned to ensure the safety of the construction area, and then the required materials and equipment are prepared, and the position and center point of each pile position are marked on the ground according to the design requirements, and a drilling rig or other drilling equipment is used to drill a pre-drilled hole 1 on the pile position, and a guide ring 2 is embedded in the surface of the pre-drilled hole 1 so that the top surface of the guide ring 2 is flush with the ground, and then the pile foundation outer tube 3 is inserted into the guide ring 2, and the pile foundation outer tube 3 is completely inserted into the pre-drilled hole 1 by a pile driver, and then the connecting tube 5 is inserted into the pile foundation outer tube 3, and the connecting tube 5 is completely inserted into the pile foundation outer tube again by the pile driver 3, during the insertion process of the connecting tube 5, the conical surface at the bottom of the connecting tube 5 abuts against the tail end of the plug column 4 in the pile foundation outer tube 3, so that the plug column 4 penetrates the pile foundation outer tube 3 and is inserted into the external soil, and then the pile foundation inner tube 6 is completely inserted into the connecting tube 5, and finally concrete is poured into the guiding ring 2, so that the concrete fills the connecting tube 5 and flows into the concrete sealing groove and the circulation groove 35, and the circulation groove 35 passes through the receiving groove 34 connected to it and the outflow hole 41 connected to the receiving groove 34, so that the concrete flows out from the outflow hole 41 and enters the external soil. After the concrete is completely solidified, the building pile is connected to the cap through the connecting steel bar 64 to ensure firmness and reliability; the pile foundation outer tube 3 inserted into the pre-drilled hole 1 can be supported by the guiding ring 2 The outer tube 3 of the pile foundation is provided with support and bearing capacity to ensure the verticality and stability of the building pile, and the guide slot and concrete sealing slot provided thereon are helpful to ensure the accuracy and sealing of the structure. The receiving slot 34 and the flow slot 35 are provided inside the pile foundation to facilitate the pouring and flow of concrete, improve the construction efficiency and quality, increase the lateral stability and bending stiffness of the structure through the insertion column 4, ensure the fixed position and connectivity of the insertion column 4 through the design of the limiting plate 42, the connecting plug block 43 and the connecting slot 44, enhance the stability and reliability of the overall structure, and the end face of the insertion column 4 is provided with a The outflow hole 41 helps to control the flow of concrete during pouring and ensure connectivity with external soil. The connecting tube 5 provides a connection between the pile foundation outer tube 3 and the pile foundation inner tube 6, thereby enhancing the integrity and stability of the structure. The concrete sealing groove provided thereon is conducive to the pouring and sealing of concrete, thereby ensuring the integrity and durability of the structure. The pile foundation inner tube 6 provides internal support and backing, thereby ensuring the stability and bearing capacity of the overall structure. The through groove 61 and the wire mesh tube 63 provided thereon increase the strength and toughness of the concrete structure, thereby improving the compressive resistance and durability of the overall structure. A connecting steel bar 64 is provided inside, thereby enhancing the connectivity and stability of the pile foundation inner tube 6 with other components.
[0057] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A pile foundation for industrial and civil buildings, comprising: A pre-drilled hole (1) opened on the ground, characterized in that a building pile is inserted into the pre-drilled hole (1); The building pile comprises a guide ring (2), a pile foundation outer cylinder (3), a connecting cylinder (5) and a pile foundation inner cylinder (6); The pile foundation outer tube (3) is inserted into the guide ring (2) and penetrates the guide ring (2); an insertion column (4) is penetrated in the pile foundation outer tube (3); The guide ring (2) is embedded in the top of the pre-drilled hole (1), and the top surface of the guide ring (2) is flush with the ground, so as to straighten the pile foundation outer cylinder (3) inserted into the pre-drilled hole (1); The connecting tube (5) is inserted into the pile foundation outer tube (3), and the plurality of plug posts (4) are inserted through the side wall of the pile foundation outer tube (3), and the opposite sides of the plurality of plug posts (4) are plugged into each other, wherein when the connecting tube (5) moves downward, the plug posts (4) are pushed to move horizontally and be inserted into the soil; The pile foundation inner tube (6) is inserted into the connecting tube (5), and the pile foundation inner tube (6) is located in the middle of the connecting tube (5); the guide ring (2) is fixedly connected to the inside with a guide plugging strip (21) plugged into the outer surface of the pile foundation outer tube (3); the outer surface of the guide ring (2) is fixedly connected to a connecting plate (22), and the top of the connecting plate (22) is penetrated and connected with a plug pile (23); the outer surface of the pile foundation outer tube (3) is provided with a guide slot (21) adapted to the guide plugging strip (21). (31), the inner wall of the pile foundation outer tube (3) is provided with a concrete sealing groove (32), one side of the concrete sealing groove (32) is provided with a second guiding slot (33), the second guiding slot (33) is provided on the inner wall of the pile foundation outer tube (3), the inner wall of the pile foundation outer tube (3) is provided with a receiving slot (34) for receiving the tail end of the inserted column (4) when the inserted column (4) passes through the pile foundation outer tube (3), the inner wall of the pile foundation outer tube (3) is provided with a slot connected to the receiving slot (34), so that the concrete can be inserted into the pile foundation outer tube (3) The plug column (4) has a flow groove (35) for flowing therein; the end surface of the plug column (4) is provided with an outflow hole (41) so that the concrete can flow out from the outflow hole (41) during the pouring process; after the plug column (4) passes through the pile foundation outer cylinder (3), the concrete is connected to the external soil; one end of the plug column (4) is fixedly connected to a limit plate (42); two groups of limit plates (42) are provided and symmetrically distributed on the end surface of the plug column (4); one group of limit plates (42) has a side end fixedly connected to a connecting plug block (43); and the other group of limit plates A connecting slot (44) is provided at the side end of the pile foundation (42), the connecting plug block (43) is matched with the connecting slot (44), and when the connecting plug block (43) is inserted into the receiving slot (34), the outflow hole (41) is connected with the receiving slot (34); the plug column (4) is provided in a plurality of groups, wherein five groups of plug columns (4) are provided on the same horizontal plane, and when the five groups of plug columns (4) are located in the pile foundation outer tube (3), the connecting plug blocks (43) and the connecting slots (44) of two adjacent groups of limiting plates (42) are plugged in.
2. A pile foundation for civil construction according to claim 1, characterized in that: The outer surface of the connecting tube (5) is provided with a second concrete sealing groove (51) which is in communication with the first concrete sealing groove (32); one side of the second concrete sealing groove (51) is provided with a second guiding insert (52) which is plugged into the second guiding slot (33); the second guiding insert (52) is fixedly connected to the connecting tube (5); and the inner wall of the connecting tube (5) is fixedly connected with a third guiding insert (53) which is plugged into the pile foundation inner tube (6).
3. A pile foundation for civil construction according to claim 2, characterized in that: A guide plug block (65) plugged into the guide plug strip 3 (53) is fixedly connected to the outer surface of the pile foundation inner tube (6). A through groove (61) for concrete to flow is provided on the outer side of the pile foundation inner tube (6). The through groove (61) penetrates the pile foundation inner tube (6).
4. The pile foundation for civil construction according to claim 3, characterized in that: The inner wall of the pile foundation inner tube (6) is fixedly connected to a mounting plate (62), and a connecting steel bar (64) is penetrated and connected to the mounting plate (62). A steel mesh tube (63) is arranged inside the pile foundation inner tube (6) to increase the strength and toughness of the concrete structure.
5. The construction process of a pile foundation for industrial and civil buildings according to claim 1, characterized in that: The following steps are involved: S1. First, conduct geological surveys to determine soil conditions and groundwater levels, then design a pile foundation plan based on building requirements, clean up the construction site, ensure the safety of the construction area, and prepare the required materials and equipment. According to design requirements, mark the position and center point of each pile position on the ground, use a drill or other drilling equipment to drill a pre-drilled hole (1) on the pile position, and embed the guide ring (2) on the surface of the pre-drilled hole (1) so that the top surface of the guide ring (2) is flush with the ground; S2. After that, the pile foundation outer tube (3) is inserted into the guide ring (2), and the pile foundation outer tube (3) is completely inserted into the pre-drilled hole (1) by a pile driver, and then the connecting tube (5) is inserted into the pile foundation outer tube (3), and the connecting tube (5) is again completely inserted into the pile foundation outer tube (3) by a pile driver. During the insertion process of the connecting tube (5), the conical surface of the bottom of the connecting tube (5) abuts against the tail end of the plug column (4) in the pile foundation outer tube (3), so that the plug column (4) penetrates the pile foundation outer tube (3) and is inserted into the external soil, and then the pile foundation inner tube (6) is completely inserted into the connecting tube (5); S3. Finally, concrete is poured into the guiding ring (2) so that the concrete fills the connecting tube (5) and flows into the concrete sealing groove and the circulation groove (35). The circulation groove (35) passes through the receiving groove (34) connected thereto and the outflow hole (41) connected to the receiving groove (34), so that the concrete flows out from the outflow hole (41) and enters the external soil. After the concrete is completely solidified, the building pile is connected to the foundation through the connecting steel bar (64) to ensure firmness and reliability.