Prefabricated assembled wall structure for housing construction
By introducing the cooperation between the guide shell and the guide hole in the prefabricated wall panel, the gravity of the wall vertical plate is used to straighten the connecting steel bars, and the coaxiality is improved through the support base and adjustment mechanism, which solves the installation difficulties caused by the bending of the steel bars. problem, improving the installation efficiency and cement fixation effect.
Patent Information
- Application Number
- CN202411001522.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-25
AI Technical Summary
During the installation process of prefabricated wall panels, the steel bars are easy to bend, causing the connecting bars to be unable to enter the prefabricated holes, requiring construction workers to manually straighten, which is complicated and not conducive to installation.
A prefabricated wall structure including a guide shell and a guide hole is designed. Through the cooperation of the guide shell and the guide hole, the gravity of the wall vertical plate is used to straighten the connecting steel bars, and through the support base and adjustment mechanism Improve the coaxiality between the connecting steel bars and the installation holes and simplify the installation process.
It improves the installation efficiency of connecting steel bars, reduces manual alignment steps, enhances the fixed support effect of cement on connecting steel bars, and simplifies the construction process.
Smart Images

Figure CN118531925B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building walls, and in particular to a prefabricated assembled wall structure for a house building. Background Art
[0002] Prefabricated wall panels are reinforced concrete panels that are processed in prefabrication plants or construction sites for building assembly. They are usually made of concrete, steel bars and other materials. Prefabricated wall panels can be directly transported to the site for installation, thus saving construction time and labor costs. Common prefabricated wall panels include prestressed concrete wall panels and hollow block wall panels. Prefabricated concrete wall panels are widely used in industrial plants, residential buildings, commercial buildings and other fields.
[0003] Common prefabricated wall panels include a wall base plate, a wall upright plate and connecting steel bars. The wall upright plate is vertically installed on the wall base plate through the connecting steel bars, and then the construction workers apply cement between the wall base plate and the wall upright plate for reinforcement.
[0004] For example, in the Chinese patent with announcement number CN208329254U, entitled Prefabricated Wall and Assembled Wall, a first cage-shaped member forms a plurality of connecting ribs extending out of the prefabricated wall body at the top of the prefabricated wall body, the connecting ribs extend into the prefabricated holes formed in the second support plate and are fixedly connected to the second support plate, and the top edge of the lower wall and the bottom edge of the upper wall are connected by an adhesive layer.
[0005] Regarding the above-mentioned related technologies, since the steel bars will bend during the production process, some of the connecting bars will not be able to enter the prefabricated holes when multiple connecting bars are installed. The construction workers are required to manually straighten the connecting bars and try to install them again. This operation is complicated and is not conducive to the installation of prefabricated walls. Summary of the invention
[0006] In view of this, the present invention provides a prefabricated assembled wall structure for a house building, aiming to solve the technical problem that the connecting bars cannot enter the prefabricated holes.
[0007] A prefabricated assembled wall structure for a house building provided by the present invention comprises a wall base plate, which is vertically fixedly connected with connecting steel bars; a wall upright plate, which is used to be vertically installed on the wall base plate through the connecting steel bars, the bottom wall of the wall upright plate is provided with a guide hole, and the top wall inside the guide hole is provided with a mounting hole, and both the guide hole and the mounting hole can allow the connecting steel bars to pass through; a guide shell is arranged between the wall base plate and the wall upright plate, the outer side wall of the guide shell can cooperate with the inner side wall of the guide hole, the guide shell is provided with a first slide groove through which the connecting steel bars can pass, the side wall of the first slide groove is fixedly connected with a first connecting plate, the first connecting plate is fixedly connected with a first support plate at one end away from the side wall of the first slide groove, and the bottom wall of the first support plate abuts against the top wall of the connecting steel bars.
[0008] By adopting the above technical scheme, the guide shell and the guide hole can straighten the connecting steel bars when installing the wall vertical plate to the wall bottom plate. At the same time, the connecting steel bars and the guide shell move synchronously close to the central axis of the guide hole, thereby improving the coaxiality of the connecting steel bars and the installation hole, which is facilitating the installation of the connecting steel bars into the installation hole.
[0009] Optionally, the connecting steel bar sliding sleeve is provided with a support seat, the outer wall of the support seat can abut and cooperate with the inner wall of the guide shell, the support seat is provided with a second sliding groove for allowing the connecting steel bar to slide through, and the inner wall of the second sliding groove is fixedly connected with a second support plate that can abut against the connecting steel bar.
[0010] By adopting the above technical solution, the guide shell falls onto the support seat, and the outer wall of the support seat abuts against the inner wall of the guide shell, so that when the wall vertical panel moves downward, the guide hole moves horizontally closer to the support seat, thereby increasing the coaxiality of the guide hole and the support seat, and further increasing the coaxiality of the installation hole and the connecting steel bar.
[0011] Optionally, an adjustment mechanism is provided between the support base and the wall bottom plate, and the adjustment mechanism is used to adjust the support base to a parallel state relative to the wall bottom plate.
[0012] By adopting the above technical solution, when the wall upright plate is installed on the support seat, the wall upright plate can be made perpendicular to the wall bottom plate.
[0013] Optionally, the adjustment mechanism includes a support screw, and a plurality of the support screws are arranged along the circumference of the connecting steel bar, each support screw is threadedly connected to the support seat, the side wall fixing sleeve of the support screw is provided with a fastening nut, and the bottom wall of the support screw is fixedly connected with an adjustment rod that can abut against the top wall of the wall bottom plate.
[0014] By adopting the above technical solution, construction workers rotate the fastening nuts one by one, and the support screws and the fastening nuts rotate synchronously to adjust the distance between the bottom wall of each adjusting rod and the support seat, and multiple adjusting rods cooperate with each other to reduce the angle between the support seat and the wall bottom plate.
[0015] Optionally, the wall vertical panel is provided with a feed trough for allowing cement to flow, the feed trough is connected to the inside of the mounting hole, the mounting hole is fixedly connected with a detection trough, and the detection trough is arranged above the feed trough for detecting the amount of cement in the mounting hole.
[0016] By adopting the above technical solution, after cement is poured into the gap between the wall bottom plate and the wall vertical plate and the inside of the installation hole, the cement will be output through the detection groove, thereby detecting whether the cement pouring is complete.
[0017] Optionally, the outer wall and the inner wall of the guide shell are parallel to each other in the shape of a truncated cone, and the angle between the outer wall of the guide shell and the top wall of the wall bottom plate is 40° to 70°.
[0018] By adopting the above technical solution, the cement side wall poured into the interior of the guide shell has a taper, thereby increasing the supporting effect of the cement on the connecting steel bars.
[0019] Optionally, the support seat is provided with a material delivery hole, and cement flows through the material delivery hole to between the wall bottom plate and the wall vertical plate.
[0020] By adopting the above technical solution, cement flows through the guide holes to between the wall bottom plate and the wall vertical plate, so that the cement supports the wall bottom plate and fixes the wall bottom plate and the wall vertical plate.
[0021] Optionally, a support ring for supporting the guide shell is fixedly connected to the lower end of the support seat.
[0022] By adopting the above technical solution, the support ring supports the wall upright plate through the guide shell, so that a gap exists between the wall bottom plate and the wall upright plate.
[0023] In summary, compared with the prior art, the present invention includes at least one of the following beneficial technical effects:
[0024] 1. The guide housing and guide hole use the gravity of the wall vertical plate to straighten the connecting steel bar when the wall vertical plate is installed to the wall bottom plate. At the same time, the connecting steel bar and the guide housing move synchronously close to the central axis of the guide hole, which improves the coaxiality of the connecting steel bar and the installation hole, and is conducive to installing the connecting steel bar into the installation hole. At the same time, it saves the construction workers the step of manually straightening the connecting steel bar, and improves the efficiency of installing the wall vertical plate.
[0025] 2. When the wall vertical panel continues to move downward, the guide shell falls onto the support seat, and the outer wall of the support seat abuts against the inner wall of the guide shell, so that when the wall vertical panel moves downward, the guide hole moves closer to the support seat in the horizontal direction, thereby increasing the coaxiality of the guide hole and the support seat, further increasing the coaxiality of the installation hole and the connecting steel bar, and improving the fixed support effect of the cement in the installation hole on the connecting steel bar. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present invention;
[0027] Figure 2 A schematic diagram of the internal structure of a wall vertical plate according to an embodiment of the present invention;
[0028] Figure 3 For the embodiment of the present invention Figure 2 A partial enlarged view of the middle area A;
[0029] Figure 4 A schematic diagram of the internal structure of the guide housing and the support base according to an embodiment of the present invention;
[0030] Figure 5 It is a cross-sectional view of a support seat according to an embodiment of the present invention.
[0031] Explanation of the accompanying drawings: 1. Wall bottom plate; 11. Connecting steel bars; 2. Wall vertical plate; 21. Guide hole; 22. Mounting hole; 23. Feed trough; 24. Detection trough; 3. Guide shell; 31. First slide groove; 32. First connecting plate; 33. First support plate; 4. Support seat; 41. Second slide groove; 42. Second support plate; 43. Feed hole; 44. Support ring; 5. Adjustment mechanism; 51. Support screw; 52. Fastening nut; 53. Adjustment rod. DETAILED DESCRIPTION
[0032] To make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the following will be combined with the embodiments of the present invention. Figure 1-Figure 5 , the technical scheme of the embodiment of the present invention is clearly and completely described. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.
[0033] This embodiment provides a prefabricated assembled wall structure for a building. Figure 1 and Figure 2 A prefabricated assembled wall structure for a building includes a wall bottom plate 1, and a plurality of connecting steel bars 11 are vertically fixedly connected to the wall bottom plate 1, and the connecting steel bars 11 are prefabricated in the wall bottom plate 1. A wall vertical plate 2 is arranged above the wall bottom plate 1, and the wall vertical plate 2 is vertically installed on the wall bottom plate 1 through the connecting steel bars 11. The bottom wall of the wall vertical plate 2 is provided with truncated cone-shaped guide holes 21, and the number of the guide holes 21 is equal to the number of the connecting steel bars 11. Each guide hole 21 is provided with a mounting hole 22 on the top wall, and the mounting hole 22 is connected to the inside of the guide hole 21, and the cross section of the mounting hole 22 is circular, and both the guide hole 21 and the mounting hole 22 can allow the connecting steel bars 11 to pass through.
[0034] Reference Figure 2 and Figure 3A guide shell 3 is arranged between the wall bottom plate 1 and the wall vertical plate 2. The number of the guide shells 3 is equal to the number of the connecting steel bars 11. The outer wall of the guide shell 3 can cooperate with the inner wall of the guide hole 21. The guide shell 3 is provided with a first slide groove 31 through which the connecting steel bars 11 can pass. The side wall of the first slide groove 31 is fixedly connected with a plurality of first connecting plates 32 along the circumferential direction. All the first connecting plates 32 are fixedly connected with a first support plate 33 at one end away from the side wall of the first slide groove 31. The bottom wall of the first support plate 33 abuts against the top wall of the connecting steel bar 11.
[0035] First, the construction workers place the wall bottom plate 1 on a horizontal plane and make the connecting steel bar 11 face vertically upwards, and then place a guide housing 3 on the top wall of each connecting steel bar 11 so that the bottom wall of the first support plate 33 abuts against the top wall of the connecting steel bar 11. Then install the wall vertical plate 2, and correspond each guide housing 3 to a guide hole 21. Place the wall vertical plate 2 downward so that the side wall of the guide hole 21 abuts against the outer wall of the guide housing 3. The bending of the connecting steel bar 11 will cause the central axis of the guide hole 21 and the guide housing 3 to not coincide. Continue to move the wall vertical plate 2 downward, and the side wall of the guide hole 21 continues to abut and overlap with the outer wall of the guide housing 3. In this process, the central axes of the guide hole 21 and the guide housing 3 move closer to each other in the horizontal direction and then overlap, thereby straightening the connecting steel bar 11.
[0036] At the same time, the connecting steel bar 11 abuts against the side wall of the first slide groove 31, so that the guide housing 3 drives the connecting steel bar 11 to move close to the central axis of the guide hole 21. The wall vertical plate 2 continues to move downward, and the wall vertical plate 2 interacts with the connecting steel bar 11 based on its own gravity to crush the first connecting plate 32, so that the first support plate 33 is separated from the guide housing 3, so that the connecting steel bar 11 passes through the first slide groove 31, passes through the guide housing 3 and enters the installation hole 22, so that the wall vertical plate 2 is installed to the wall bottom plate 1 through the connecting steel bar 11.
[0037] The guide housing 3 and the guide hole 21 use the gravity of the wall vertical plate 2 to straighten the connecting steel bar 11 when the wall vertical plate 2 is installed on the wall bottom plate 1. At the same time, the connecting steel bar 11 and the guide housing 3 move synchronously close to the central axis of the guide hole 21, thereby improving the coaxiality of the connecting steel bar 11 and the installation hole 22, which is conducive to installing the connecting steel bar 11 into the installation hole 22. At the same time, it saves the construction personnel the step of manually straightening the connecting steel bar 11, thereby improving the efficiency of installing the wall vertical plate 2.
[0038] Reference Figure 2 , Figure 4 and Figure 5The connecting steel bar 11 is slidably sleeved with a support seat 4, and the outer side wall of the support seat 4 can cooperate with the inner side wall of the guide housing 3. The support seat 4 is provided with a second slide groove 41 for the connecting steel bar 11 to slide through, and the side wall of the second slide groove 41 is fixedly connected with a second support plate 42 that can abut against the connecting steel bar 11 along the circumferential direction, and the distance between the two second support plates 42 facing each other is less than the diameter of the connecting steel bar 11. Therefore, when the support seat 4 is sleeved on the connecting steel bar 11, the second support plate 42 abuts against the top wall of the connecting steel bar 11, and when the support seat 4 moves downward, the second support plate 42 is bent and deformed upward, so that the end of the second support plate 42 away from the side wall of the second slide groove 41 abuts against the side wall of the connecting steel bar 11, thereby fastening and supporting the connecting steel bar 11, thereby limiting the horizontal movement of the support seat 4 relative to the connecting steel bar 11.
[0039] The diameter of the first slide groove 31 is larger than the diameter of the connecting steel bar 11, and when the guide housing 3 and the guide hole 21 cooperate to align the connecting steel bar 11, the side wall of the first slide groove 31 continues to abut against the side wall of the connecting steel bar 11. When the wall vertical plate 2 continues to move downward, the guide housing 3 falls onto the support seat 4, and the outer wall of the support seat 4 abuts against the inner wall of the guide housing 3, so that when the wall vertical plate 2 moves downward, the central axis of the guide hole 21 moves horizontally close to the central axis of the support seat 4, thereby increasing the coaxiality of the guide hole 21 and the support seat 4, and further increasing the coaxiality of the mounting hole 22 and the connecting steel bar 11.
[0040] Since the position of the connection steel bar 11 prefabricated on the wall bottom plate 1 is fixed, the relative position of the wall upright plate 2 and the wall bottom plate 1 can be adjusted according to the connection steel bar 11, so as to improve the accuracy of the installation position of the wall upright plate 2.
[0041] Reference Figure 2 and Figure 4 An adjustment mechanism 5 is provided between the support seat 4 and the wall bottom plate 1, and the adjustment mechanism 5 is used to adjust the support seat 4 to a parallel state relative to the wall bottom plate 1. The adjustment mechanism 5 includes a support screw 51, and a plurality of support screws 51 are provided along the circumference of the connecting steel bar 11, and each support screw 51 is threadedly connected to the support seat 4. A fastening nut 52 is provided on the side wall of the support screw 51, and the fastening nut 52 is provided below the support seat 4. The bottom wall of the support screw 51 is fixedly connected to an adjustment rod 53 that can abut against the top wall of the wall bottom plate 1.
[0042] The construction workers rotate the fastening nuts 52 one by one, and the support screws 51 and the fastening nuts 52 rotate synchronously to change the distance between the bottom wall of the adjusting rod 53 and the support seat 4. The movement of a single supporting screw 51 can change the angle between the support seat 4 and the wall bottom plate 1. Multiple adjusting rods 53 cooperate with each other to reduce the angle between the support seat 4 and the wall bottom plate 1.
[0043] Reference Figure 2 and Figure 5 The wall vertical plate 2 is provided with a feed trough 23 for flowing cement, the feed trough 23 is connected to the inside of the mounting hole 22, the mounting hole 22 is fixedly connected with a detection trough 24, the detection trough 24 is arranged above the feed trough 23, and is used to detect the amount of cement in the mounting hole 22. The support seat 4 is provided with a feed hole 43, and a support ring 44 for supporting the guide housing 3 is fixedly connected to the lower end of the support seat 4, and the cement flows between the wall bottom plate 1 and the wall vertical plate 2 through the feed hole 43.
[0044] The support ring 44 supports the wall upright plate 2 through the guide housing 3, so that there is a gap between the wall bottom plate 1 and the wall upright plate 2. The construction personnel pour cement into the feed trough 23, and the cement flows to between the wall bottom plate 1 and the wall upright plate 2 through the mounting hole 22, the guide hole 21 and the feed hole 43 in sequence, so that the cement supports the wall bottom plate 1 and fixes the wall bottom plate 1 and the wall upright plate 2. The support seat 4 increases the coaxiality between the mounting hole 22 and the connecting steel bar 11, thereby improving the fixing and supporting effect of the cement in the mounting hole 22 on the connecting steel bar 11.
[0045] After cement is poured into the gap between the wall bottom plate 1 and the wall vertical plate 2 and the inside of the installation hole 22, the cement will be output through the detection groove 24, thereby detecting whether the cement pouring is complete.
[0046] Reference Figure 4 The outer wall and the inner wall of the guide housing 3 are parallel to each other in a truncated cone shape, and the angle between the outer wall of the guide housing 3 and the top wall of the wall bottom plate 1 is 40° to 70°. The cement side wall poured inside the guide housing 3 has a taper, thereby increasing the supporting effect of the cement on the connecting steel bars 11.
[0047] The implementation principle of a prefabricated assembled wall structure of a house building in an embodiment of the present invention is as follows: first, the construction personnel place the wall bottom plate 1 on a horizontal plane and make the connecting steel bar 11 face vertically upward, then place a guide housing 3 on the top wall of each connecting steel bar 11, then each guide housing 3 corresponds to a guide hole 21, and place the wall vertical plate 2 downward so that the side wall of the guide hole 21 abuts against the outer side wall of the guide housing 3. Move the wall vertical plate 2 downward, and the side wall of the guide hole 21 continues to abut and overlap with the outer side wall of the guide housing 3. In this process, the central axis of the guide hole 21 and the guide housing 3 move relative to each other in the horizontal direction and then overlap, so as to straighten the connecting steel bar 11.
[0048] The wall vertical plate 2 continues to move downward, and the wall vertical plate 2 interacts with the connecting steel bar 11 to crush the first connecting plate 32, so that the first supporting plate 33 is separated from the guide housing 3, so that the connecting steel bar 11 passes through the first slide groove 31 and passes through the guide housing 3 and enters the installation hole 22. The guide housing 3 falls onto the support seat 4, and the support ring 44 supports the guide housing 3 and the wall vertical plate 2. The construction personnel pour cement into the feed trough 23, and the cement flows to between the wall bottom plate 1 and the wall vertical plate 2 through the installation hole 22, the guide hole 21 and the feed hole 43 in sequence, so that the cement supports the wall bottom plate 1 and fixes the wall bottom plate 1 and the wall vertical plate 2.
[0049] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0050] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.
Claims
1. A prefabricated assembled wall structure for a house, comprising a wall bottom plate (1), connecting steel bars (11) and a wall vertical plate (2), It is characterized in that Also includes: A guide hole (21) is formed on the bottom wall of the wall vertical plate (2); a mounting hole (22) is formed on the top wall of the guide hole (21); and both the guide hole (21) and the mounting hole (22) can allow the connecting steel bar (11) to pass through; The guide housing (3) is arranged between the wall bottom plate (1) and the wall vertical plate (2); the outer wall of the guide housing (3) can cooperate with the inner wall of the guide hole (21); the guide housing (3) is provided with a first slide groove (31) for allowing the connecting steel bar (11) to pass through; the side wall of the first slide groove (31) is fixedly connected with a first connecting plate (32); the first connecting plate (32) is fixedly connected with a first support plate (33) at one end away from the side wall of the first slide groove (31); the bottom wall of the first support plate (33) abuts against the top wall of the connecting steel bar (11); the connecting steel bar (11) is slidably sleeved with a support seat (4); the outer wall of the support seat (4) can abut against the inner wall of the guide housing (3); the support seat (4) is provided with a second slide groove (41) for allowing the connecting steel bar (11) to slide through; the inner wall of the second slide groove (41) is fixedly connected with a second support plate (42) that can abut against the connecting steel bar (11).
2. A prefabricated assembled wall structure for a building according to claim 1, Features: An adjustment mechanism (5) is provided between the support seat (4) and the wall bottom plate (1), and the adjustment mechanism (5) is used to adjust the support seat (4) to a parallel state relative to the wall bottom plate (1).
3. A prefabricated assembled wall structure for a building according to claim 2, Features: The adjustment mechanism (5) comprises a support screw (51), a plurality of the support screws (51) are arranged along the circumference of the connecting steel bar (11), each support screw (51) is threadedly connected to the support seat (4), a fastening nut (52) is provided on a side wall fixing sleeve of the support screw (51), and an adjustment rod (53) capable of abutting against the top wall of the wall bottom plate (1) is fixedly connected to the bottom wall of the support screw (51).
4. A prefabricated assembled wall structure for a building according to claim 1, Features: The wall vertical plate (2) is provided with a feed trough (23) for allowing cement to flow, the feed trough (23) being connected to the inside of the mounting hole (22), the mounting hole (22) being fixedly connected with a detection trough (24), the detection trough (24) being arranged above the feed trough (23) and being used to detect the amount of cement in the mounting hole (22).
5. A prefabricated assembled wall structure for a building according to claim 1, Features: The outer wall and the inner wall of the guide housing (3) are parallel to each other in the shape of a truncated cone, and the angle between the outer wall of the guide housing (3) and the top wall of the wall bottom plate (1) is 40° to 70°.
6. A prefabricated assembled wall structure for a building according to claim 1, Features: The support seat (4) is provided with a material delivery hole (43), and cement flows through the material delivery hole (43) to between the wall bottom plate (1) and the wall vertical plate (2).
7. The prefabricated wall structure of a building according to claim 1, Features: A support ring (44) for supporting the guide housing (3) is fixedly connected to the lower end of the support seat (4).