Method, device and equipment for object-oriented management of elements of natural resource knowledge
By objectifying natural resources and determining and storing association relationships, the limitations of data dimensions in natural resource management are solved, and the comprehensive space-time-attribute management of natural resources is realized, and data integrity is improved.
Patent Information
- Application Number
- CN202410695804.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-05-31
AI Technical Summary
In the management of natural resources, the object-oriented management of element-oriented knowledge of natural resources cannot fully reflect the spatial-temporal relationship of the tense, location, quantity, quality and ecology of natural resources. Causes insufficient data integrity.
By objectifying multiple natural resources, the correlation relationship between the target object and other objects is determined, including spatial relationships, temporal relationships and business relationships, and the relationship and attribute information are saved to the preset database, using graph databases, Spatial databases and non-relational databases are stored to realize the comprehensive management of natural resource objects.
Break through the data dimension limitations of the traditional layer management model, realize the object-oriented management of factors for natural resource knowledge, fully reflect the space-time-attribute relationship of the tense, location, quantity, quality and ecology of natural resources, and improve the Data integrity.
Smart Images

Figure CN118535748B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of natural resource management, and in particular, relates to a method, device and equipment for object-oriented management of elements of natural resource knowledge. Background Art
[0002] As science and technology continue to advance, the need for management of natural resources such as forests, grasslands, wetlands and oceans is increasing.
[0003] At present, the object-oriented management of elements of natural resource knowledge usually adopts a layer management model, and the data content managed is 2D or 2.5D original data. Although such a layer management model supports the management of spatial characteristics and attribute characteristics of data to a certain extent, due to the limitations of data dimensions of 2D or 2.5D data content, it cannot fully reflect the spatiotemporal-attribute relationship of natural resources' temporality, location, quantity, quality, and ecology.
[0004] In summary, how to provide an element object management strategy for natural resource knowledge to improve the integrity of element object management data for natural resource knowledge has become a technical problem that needs to be urgently solved in the field of natural resource management technology. Summary of the invention
[0005] The main purpose of this application is to provide a method, device and equipment for object-oriented management of elements of natural resource knowledge, and to provide a strategy for object-oriented management of elements of natural resource knowledge, so as to improve the integrity of object-oriented management data of elements of natural resource knowledge.
[0006] In order to achieve the above-mentioned purpose, the present application provides a method for object-oriented management of elements of natural resource knowledge, and the method for object-oriented management of elements of natural resource knowledge comprises:
[0007] Object-oriented processing is performed on multiple natural resources to obtain multiple natural resource objects;
[0008] Determine a first association relationship between the target object and the other object based on the respective comprehensive data of the target object and the other object, wherein the target object is any one of the multiple natural resource objects, the other object is a natural resource object other than the target object among the multiple natural resource objects, and the comprehensive data includes basic status data, planning and control data, business management data and socio-economic data;
[0009] Determining a second association relationship between the target objects at different times based on the dynamic change characteristics of the target objects;
[0010] Determining an object association relationship of the target object based on the first association relationship and the second association relationship, wherein the object association relationship includes an object spatial relationship, an object temporal relationship, and an object business relationship;
[0011] The object association relationship, the attribute information of the target object and the object code of the target object are saved in a preset database to store the target object in the database.
[0012] Optionally, the step of determining the first association relationship between the target object and the other object based on the comprehensive data of each of the target object and the other object includes:
[0013] Based on the basic status data, determining the patch relationship between the land type patches of the target object and other objects;
[0014] Determining the planning control relationship between the land type map of the target object and the planning control based on each of the planning control data;
[0015] Determining the business management relationship between the land class map of the target object and the business management based on each of the business management data;
[0016] Based on each of the socio-economic data, determining the socio-economic relationship between the land type map and the socio-economics of the target object;
[0017] The image spot relationship, the planning control relationship, the business management relationship and the socio-economic relationship are determined as the first association relationship between the target object and the other objects.
[0018] Optionally, the dynamic change characteristics include geometric change relationships, land type change relationships, ownership change relationships and business change relationships.
[0019] Optionally, the spot relationship includes a first spatial relationship and a first temporal relationship, the planning and control relationship includes a second spatial relationship and a second temporal relationship, the business management relationship includes a third spatial relationship, a third temporal relationship and a first business relationship, and the social and economic relationship includes a fourth spatial relationship and a fourth temporal relationship;
[0020] The step of determining the object association relationship of the target object based on the first association relationship and the second association relationship includes:
[0021] Determine the first spatial relationship, the second spatial relationship, the third spatial relationship, the fourth spatial relationship, the geometric change relationship, and the land type change relationship as the object spatial relationship of the target object;
[0022] Determine the first time series relationship, the second time series relationship, the third time series relationship, and the fourth time series relationship as the object time series relationship of the target object;
[0023] The first business relationship, the ownership change relationship and the business change relationship are determined as the object business relationship of the target object.
[0024] Optionally, before the step of saving the object association relationship, the attribute information of the target object and the object code of the target object to a preset database to store the target object in the database, the method further includes:
[0025] Based on preset coding rules and attribute information of the target object, an object code of the target object is determined, wherein the object code includes a spatial grid code, a natural resource classification code, an element classification code, a time code and a sequence code.
[0026] Optionally, the preset database includes a graph database, a spatial database and a non-relational database, the graph database is used to store the object spatial relationship, the object temporal relationship and the object business relationship, the spatial database is used to store the spatial position and attribute information of the target object, and the non-relational database is used to store tile objects and tile forms.
[0027] Optionally, the method further comprises:
[0028] In the case where the natural resource object to be updated is an existing object in the preset database, the time change information of the natural resource object to be updated is added to the preset database, or the time change information and change information of the natural resource object to be updated are added to the preset database, wherein the change information includes one or more of object code inheritance, geometric feature inheritance, basic attribute inheritance, extended attribute inheritance and adjustment, spatial relationship integration and adjustment, and business relationship integration and adjustment;
[0029] When the natural resource object to be updated is not an existing object in the preset database, the construction information of the natural resource object to be updated is newly added to the preset database, wherein the construction information includes object coding, geometric features, basic attributes, extended attributes, spatial relationships, temporal relationships and business relationships.
[0030] In addition, to achieve the above-mentioned purpose, the present application also provides an element object management device for natural resource knowledge, and the element object management device for natural resource knowledge includes:
[0031] An objectification module, used for objectifying a plurality of natural resources to obtain a plurality of natural resource objects;
[0032] A first association module is used to determine a first association relationship between the target object and the other object based on the respective comprehensive data of the target object and the other object, wherein the target object is any one of the multiple natural resource objects, the other object is a natural resource object other than the target object among the multiple natural resource objects, and the comprehensive data includes basic status data, planning and control data, business management data and socio-economic data;
[0033] A second association module, configured to determine a second association relationship between the target objects at different times based on the dynamic change characteristics of the target objects;
[0034] An object association module, configured to determine an object association relationship of the target object based on the first association relationship and the second association relationship, wherein the object association relationship includes an object spatial relationship, an object temporal relationship, and an object business relationship;
[0035] The storage module is used to save the object association relationship, the attribute information of the target object and the object code of the target object to a preset database so as to store the target object in the storage.
[0036] In addition, to achieve the above-mentioned purpose, the present application also provides an element object management device for natural resource knowledge, and the element object management device for natural resource knowledge includes: a memory, a processor, and an element object management program for natural resource knowledge stored in the memory and executable on the processor, and when the element object management program for natural resource knowledge of the element object management device for natural resource knowledge is executed by the processor, the steps of the element object management method for natural resource knowledge as described above are implemented.
[0037] In addition, to achieve the above-mentioned purpose, the present application also provides a computer-readable storage medium, on which is stored a factor object management program for natural resource knowledge, and when the factor object management program for natural resource knowledge is executed by a processor, it implements the steps of the factor object management method for natural resource knowledge as described above.
[0038] The present application obtains multiple natural resource objects by objectifying multiple natural resources, and any one of the multiple natural resource objects is called a target object, and the natural resource objects other than the target object in the multiple natural resource objects are called other objects. Based on the comprehensive data of the target object and the other objects, a first association relationship between the target object and the other objects is determined, wherein the comprehensive data includes basic status data, planning and control data, business management data and socio-economic data; based on the dynamic change characteristics of the target object, a second association relationship between the target objects at different times is determined; based on the first association relationship and the second association relationship, an object association relationship of the target object is determined, wherein the object association relationship includes an object spatial relationship, an object temporal relationship and an object business relationship; the object association relationship, the attribute information of the target object and the object code of the target object are saved in a preset database to store the target object.
[0039] In this way, this application breaks through the limitations of the traditional layer management model in the data dimension, realizes the object-oriented management of elements for natural resource knowledge, and comprehensively reflects the spatiotemporal-attribute relationship of natural resource temporality, location, quantity, quality, and ecology, thereby improving the integrity of the object-oriented management data of elements for natural resource knowledge. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a schematic diagram of the device structure of the hardware operating environment of the element object management device for natural resource knowledge involved in the embodiment of the present application;
[0041] Figure 2 This is a schematic diagram of the steps of the first embodiment of the method for object-oriented management of elements of natural resource knowledge of this application;
[0042] Figure 3 A schematic diagram of the object construction involved in an embodiment of the object-oriented management method for elements of natural resource knowledge of the present application;
[0043] Figure 4 A schematic diagram of the object relationship construction involved in an embodiment of the object-oriented management method for elements of natural resource knowledge of the present application;
[0044] Figure 5 A schematic diagram of an object storage model involved in an embodiment of the method for object-oriented management of elements of natural resource knowledge of the present application;
[0045] Figure 6 A schematic diagram of object node construction involved in an embodiment of the method for object-oriented management of elements of natural resource knowledge of the present application;
[0046] Figure 7Schematic diagram of object update involved in an embodiment of the object-oriented management method of elements of natural resource knowledge of this application
[0047] Figure 8 This is a functional module diagram of an embodiment of the element object management device for natural resource knowledge of the present application.
[0048] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0049] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0050] Reference Figure 1 , Figure 1 This is a schematic diagram of the device structure of the hardware operating environment of the object-oriented management device for elements of natural resource knowledge involved in the embodiment of the present application.
[0051] It should be noted that the embodiments of the present application relate to a natural resource knowledge-oriented element object management device in the field of natural resource management technology. Specifically, the natural resource knowledge-oriented element object management device can be a smart phone, a PC (Personal Computer), a tablet computer, a portable computer, and the like.
[0052] like Figure 1 As shown, the element object management device for natural resource knowledge may include: a processor 1001, such as a CPU, a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (DiSplay), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a Wi-Fi interface). The memory 1005 may be a high-speed RAM memory, or a stable memory (non-volatile memory), such as a disk memory. The memory 1005 may also be a storage device independent of the aforementioned processor 1001. For the convenience of description below, the execution body of the method steps in each embodiment is omitted.
[0053] Those skilled in the art will understand that Figure 1The structure of the element object management device for natural resource knowledge shown in the figure does not constitute a limitation of the element object management device for natural resource knowledge, and may include more or less components than shown in the figure, or a combination of certain components, or a different arrangement of components.
[0054] like Figure 1 As shown, the memory 1005 as a computer storage medium may include an operating system, a network communication module, a user interface module, and an element object management program oriented to natural resource knowledge.
[0055] exist Figure 1 In the terminal shown, the network interface 1004 is mainly used to connect to the backend server and perform data communication with the backend server; the user interface 1003 is mainly used to connect to the client and perform data communication with the client; and the processor 1001 can be used to call the element object management program for natural resource knowledge stored in the memory 1005 and perform the following operations:
[0056] Object-oriented processing is performed on multiple natural resources to obtain multiple natural resource objects;
[0057] Determine a first association relationship between the target object and the other object based on the respective comprehensive data of the target object and the other object, wherein the target object is any one of the multiple natural resource objects, the other object is a natural resource object other than the target object among the multiple natural resource objects, and the comprehensive data includes basic status data, planning and control data, business management data and socio-economic data;
[0058] Determining a second association relationship between the target objects at different times based on the dynamic change characteristics of the target objects;
[0059] Determining an object association relationship of the target object based on the first association relationship and the second association relationship, wherein the object association relationship includes an object spatial relationship, an object temporal relationship, and an object business relationship;
[0060] The object association relationship, the attribute information of the target object and the object code of the target object are saved in a preset database to store the target object in the database.
[0061] Furthermore, the operation of determining the first association relationship between the target object and the other object based on the comprehensive data of each of the target object and the other object includes:
[0062] Based on the basic status data, determining the patch relationship between the land type patches of the target object and other objects;
[0063] Determining the planning control relationship between the land type map of the target object and the planning control based on each of the planning control data;
[0064] Determining the business management relationship between the land class map of the target object and the business management based on each of the business management data;
[0065] Based on each of the socio-economic data, determining the socio-economic relationship between the land type map and the socio-economics of the target object;
[0066] The image spot relationship, the planning control relationship, the business management relationship and the socio-economic relationship are determined as the first association relationship between the target object and the other objects.
[0067] Furthermore, the dynamic change characteristics include geometric change relationships, land type change relationships, ownership change relationships and business change relationships.
[0068] Furthermore, the patch relationship includes a first spatial relationship and a first temporal relationship, the planning and control relationship includes a second spatial relationship and a second temporal relationship, the business management relationship includes a third spatial relationship, a third temporal relationship and a first business relationship, and the social and economic relationship includes a fourth spatial relationship and a fourth temporal relationship;
[0069] The operation of determining the object association relationship of the target object based on the first association relationship and the second association relationship includes:
[0070] Determine the first spatial relationship, the second spatial relationship, the third spatial relationship, the fourth spatial relationship, the geometric change relationship, and the land type change relationship as the object spatial relationship of the target object;
[0071] Determine the first time series relationship, the second time series relationship, the third time series relationship, and the fourth time series relationship as the object time series relationship of the target object;
[0072] The first business relationship, the ownership change relationship and the business change relationship are determined as the object business relationship of the target object.
[0073] Furthermore, before the step of saving the object association relationship, the attribute information of the target object, and the object code of the target object to a preset database to store the target object, the processor 1001 may also be used to call the element object management program for natural resource knowledge stored in the memory 1005 to perform the following operations:
[0074] Based on preset coding rules and attribute information of the target object, an object code of the target object is determined, wherein the object code includes a spatial grid code, a natural resource classification code, an element classification code, a time code and a sequence code.
[0075] Furthermore, the preset database includes a graph database, a spatial database and a non-relational database, the graph database is used to store the object spatial relationship, the object temporal relationship and the object business relationship, the spatial database is used to store the spatial position and attribute information of the target object, and the non-relational database is used to store tile objects and tile forms.
[0076] Furthermore, the processor 1001 may also be used to call the element object management program for natural resource knowledge stored in the memory 1005 to perform the following operations:
[0077] In the case where the natural resource object to be updated is an existing object in the preset database, the time change information of the natural resource object to be updated is added to the preset database, or the time change information and change information of the natural resource object to be updated are added to the preset database, wherein the change information includes one or more of object code inheritance, geometric feature inheritance, basic attribute inheritance, extended attribute inheritance and adjustment, spatial relationship integration and adjustment, and business relationship integration and adjustment;
[0078] When the natural resource object to be updated is not an existing object in the preset database, the construction information of the natural resource object to be updated is newly added to the preset database, wherein the construction information includes object coding, geometric features, basic attributes, extended attributes, spatial relationships, temporal relationships and business relationships.
[0079] Based on the above structure, various embodiments of the element object management method for natural resource knowledge are proposed.
[0080] Please refer to Figure 2 , Figure 2 This is a flowchart of the first embodiment of the method for object-oriented management of elements of natural resource knowledge of the present application. It should be noted that although the logical order is shown in the flowchart, in some cases, the method for object-oriented management of elements of natural resource knowledge of the present application can of course perform the steps shown or described in a different order from that here. In this embodiment, the execution subject of the method for object-oriented management of elements of natural resource knowledge can be a personal computer, a smart phone or other device, which is not limited in this embodiment. The method for object-oriented management of elements of natural resource knowledge includes:
[0081] Step S10, objectifying a plurality of natural resources to obtain a plurality of natural resource objects;
[0082] It should be noted that natural resources can be forests, grasslands, water, wetlands, oceans, minerals, etc. A natural resource object conceptual model is designed in advance, and natural resource objects are defined as NRO (Natural resource objects).
[0083] In this embodiment, a plurality of natural resources are firstly objectified to obtain natural resource objects corresponding to each natural resource.
[0084] Step S20, determining a first association relationship between the target object and the other object based on the respective comprehensive data of the target object and the other object, wherein the target object is any one of the plurality of natural resource objects, the other object is a natural resource object other than the target object among the plurality of natural resource objects, and the comprehensive data includes basic status data, planning and control data, business management data, and socio-economic data;
[0085] It should be noted that comprehensive data include basic status data, planning and control data, business management data and socio-economic data. Basic status data include basic geographic data, geographic national conditions data, land survey data and mineral resources data, etc. Planning and control data include land use planning data, permanent basic farmland data, ecological protection red line data and urban development boundary data, etc. Business management data include real estate registration data, mining rights management data, land supply data and project construction land approval data, etc. Social and economic data include macroeconomic data, population data, industrial structure data and science and technology education data.
[0086] In a specific implementation, a natural resource object extraction data set is established, natural resource object extraction is defined as NROE (Natural resource object extraction), and the natural resource object extraction data set is represented as NROE i {BSr i , PCr i , SMr i , CSr i}, where BSr i is the basic status data, PCr i It is planning and control data, SMr i It is business management data, CSr i It is socio-economic data. i It is expressed as {b1, b2, b3, ...b i}, among which, basic geographic data b1, geographic national conditions data b2, land survey data b3, mineral resources data b4, etc. Specifically, basic status data is the basic information of natural resource objects, including data on geography, national conditions, land survey and mineral resources. These data provide basic information such as spatial distribution, quantity, quality, etc. of natural resource objects, and are an important basis for subsequent analysis and decision-making. Basic geographic data (b1) is used to describe the natural geographical features of the earth's surface, such as topography, landforms, and water systems. Geographic national conditions data (b2) is data that reflects the spatial distribution of natural and human geographical elements on the national surface and their mutual relationships. Land survey data (b3) is data obtained through a comprehensive and systematic survey of the land to obtain detailed information on land use, land cover, soil type, etc. Mineral resources data (b4) is data on the distribution, reserves, quality, etc. of mineral resources, which is of great significance to the development and management of mineral resources; PCr i It is expressed as {p1, p2, p3, ...p i}, among which, land use planning p1, permanent basic farmland p2, ecological protection red line p3, urban development boundary p4, etc. Specifically, planning and control data involve planning and management requirements for natural resource objects, including land use planning, ecological protection red line, urban development boundary and other aspects. These data are used to guide the rational use and protection of natural resources and ensure sustainable development. Land use planning (p1) is to plan the rational use of land resources and clarify the layout and use of various types of land. Permanent basic farmland (p2) represents a long-term and stable cultivated land protection area designated to ensure national food security. The ecological protection red line (p3) is to protect ecological and environmental sensitive areas, restrict development activities, and maintain ecological balance. The urban development boundary (p4) is to define the spatial scope of urban construction and control the disorderly expansion of cities; SMr i It is expressed as {s1, s2, s3, ...s i}, among which, real estate registration data s1, mining rights management data s2, land supply data s3, project construction land approval data s4, etc. Specifically, business management data involves the daily management and business operations of natural resource objects, including real estate registration, mining rights management, land supply data and project construction land approval. These data reflect the status and changes of natural resource objects in the actual management and utilization process. Real estate registration data (s1): records the ownership, location, area and other information of real estate, and is the basic data for the object-oriented management of elements of natural resource knowledge. Mining rights management data (s2): data related to management activities such as application, approval and transfer of mining rights. Land supply data (s3) records the quantity, location, use and other information of land supply, reflecting the supply and demand situation of the land market. Project construction land approval data (s4) is data related to the application and approval process of project construction land; CSr iIt is expressed as {c1, c2, c3, ...c i}, among which, macroeconomic data c1, population data c2, industrial structure data c3, science and technology education data c4, etc. Specifically, socio-economic data reflects the social and economic environment in which natural resources objects are located, including information on macroeconomics, population, industrial structure, science and technology education, etc. These data are of great significance for analyzing the relationship between natural resources and socio-economic development and formulating relevant policies. Macroeconomic data (c1) are data describing the overall economic operation of the country, such as GDP, economic growth rate, etc. Population data (c2) are data on population size, distribution, structure, etc., reflecting the population's demand and pressure on natural resources. Industrial structure data (c3) are data describing the proportion and development status of each industry in the national economy, reflecting the impact of industrial structure on the utilization of natural resources. Science and technology education data (c4) are data on the development status and data in the fields of science and technology and education, reflecting the support and promotion of scientific and technological progress and education level on the object-oriented management and utilization of elements oriented to natural resource knowledge.
[0087] For example, Figure 3 The figure shows a schematic diagram of object construction. Through special investigations on various natural resources, the basic attributes of natural resource objects are extracted, including geometric features, coding, land type, ownership and tense, etc. At the same time, a complete data set corresponding to natural resource objects is formed based on the spatial relationship, temporal relationship and business relationship between natural resource objects.
[0088] In this way, by integrating the four aspects of data, namely basic status data, planning and control data, business management data, and socio-economic data, we can form a comprehensive and in-depth understanding of natural resource objects, and provide strong data support and decision-making basis for the object-oriented management of natural resource knowledge elements.
[0089] In this embodiment, step S20 may include:
[0090] Step S201, based on each of the basic status data, determining the patch relationship between the land type patches of the target object and other objects;
[0091] Step S202, determining the planning control relationship between the land type map of the target object and the planning control based on each of the planning control data;
[0092] Step S203, determining the business management relationship between the land type map of the target object and the business management based on each of the business management data;
[0093] Step S204, determining the socio-economic relationship between the land type map and the socio-economics of the target object based on the socio-economic data;
[0094] Step S205: determining the image patch relationship, the planning control relationship, the business management relationship and the socio-economic relationship as the first association relationship between the target object and the other objects.
[0095] In this embodiment, based on the basic status data of the target object and the basic status data of each other object, the relationship between the land class patches of the target object and the land class patches of each other object is determined (hereinafter referred to as patch relationship for distinction); based on the planning and control data of the target object and the planning and control data of each other object, the relationship between the land class patches of the target object and planning control is determined (hereinafter referred to as planning control relationship for distinction); based on the business management data of the target object and the business management data of each other object, the relationship between the land class patches of the target object and business management is determined (hereinafter referred to as business management relationship for distinction); based on the socio-economic data of the target object and the socio-economic data of each other object, the relationship between the land class patches of the target object and business management is determined (hereinafter referred to as business management relationship for distinction); finally, the patch relationship, planning and control relationship, business management relationship and socio-economic relationship are determined as the first association relationship between the target object and the other objects.
[0096] Step S30, determining a second association relationship between the target objects at different times based on the dynamic change characteristics of the target objects;
[0097] It should be noted that the dynamic change characteristics include geometric change relationships, land type change relationships, ownership change relationships and business change relationships. Geometric change relationships include mergers, cutting and cutting first and then mergers. Land type change relationships include cultivated land becoming construction land, agricultural land becoming unused land, cultivated land becoming non-agricultural land, cultivated land becoming non-grain land, etc. Ownership change relationships include collective becoming state-owned, state-owned becoming collective, etc. Business change relationships include land supply, land use approval, land use control, ecological restoration and law enforcement supervision, etc.
[0098] In this embodiment, the relationship between target objects at different times (hereinafter referred to as the second association relationship for distinction) is determined based on the dynamic change characteristics of the target objects.
[0099] In a specific implementation, the relationship discrimination technique is defined as RIT (Relationship discrimination techniques). Specifically, RIT is defined as i {F1, F2, ... F i}, among which, spatial operation F1, superposition statistics F2, superposition assignment F3, comparative analysis F4, etc., construct the change relationship NROR of natural resource object nodes in any two years i {GCr i ,TCr i,OCr i , BCr i , ...}, GCr i is the geometric change relationship, GCr i is the land type change relationship, OCr i It is a relationship of ownership change, BCr i It is the business change relationship, etc. GCr i It is expressed as {GC1, GC2, ..., GC i}, where merge GC1, cut GC2, cut-merge GC3, etc. Specifically, merge GC1 means two or more objects are merged into a new object. Cut GC2 means an object is split into multiple parts. Cut-merge GC3 means a cut occurs first, and then the cut parts are merged with other objects; TCr i It is expressed as {TC1, TC2, …TC i}, among which, cultivated land becomes construction land TC1, agricultural land becomes unused land TC2, cultivated land becomes non-agricultural land TC3, cultivated land becomes non-grain land TC4, etc. Specifically, cultivated land becomes construction land TC1 reflects the reduction of cultivated land and the increase of construction land in the process of urbanization. Agricultural land becomes unused land TC2 may be caused by land degradation, natural disasters and other reasons. Cultivated land becomes non-agricultural land TC3 usually refers to cultivated land being used for non-agricultural purposes, such as industry, commerce, etc.; OCr i It is expressed as {OC1, OC2, ..., OC i}, among which, collective to state-owned OC1, state-owned to collective OC2, etc. Specifically, collective to state-owned OC1 may be caused by land acquisition, transfer, etc. State-owned to collective OC2 may occur in the process of land return, collective land confirmation, etc.; BCr i It is expressed as {BC1, BC2, ..., BC i}, among which, land supply BC1, land use approval BC2, land use control BC3, ecological restoration BC4, law enforcement supervision BC5, etc. Specifically, land supply BC1 involves land transfer, allocation and other supply methods. Land use approval BC2 involves the approval process for land use applications. Land use control BC3 represents the norms and restrictions on land use behavior. Ecological restoration BC4 is to restore and manage the damaged land. Law enforcement supervision BC5 is to supervise and inspect land use behavior to ensure legality and compliance.
[0100] Thus, by comprehensively applying RIT i By using the technical methods in NROR, we can comprehensively and accurately construct the change relationship of natural resource objects. i , providing strong data support and decision-making basis for the object-oriented management and decision-making of natural resource knowledge elements.
[0101] For example, Figure 4The figure shows a schematic diagram of object relationship construction. The land type map data of any two years are extracted from the natural resource spatiotemporal data. Through spatial calculation and comparative analysis, the set change relationship, land type change relationship and ownership change relationship are obtained. At the same time, the planning or management data and the land type map data of a specific year are extracted from the natural resource spatiotemporal data, and spatial calculation and comparative analysis are performed to obtain the business change relationship. The geometric change relationship, land type change relationship, ownership change relationship and business change relationship are stored in the database to form a natural resource knowledge system.
[0102] Step S40, determining an object association relationship of the target object based on the first association relationship and the second association relationship, wherein the object association relationship includes an object spatial relationship, an object temporal relationship, and an object business relationship;
[0103] It should be noted that the attribute information of natural resource objects includes geometric characteristics, coding, tense and extension, etc. The relationship between natural resource objects (hereinafter referred to as object association relationship for distinction) includes object spatial relationship, object temporal relationship and object business relationship, among which object spatial relationship includes adjacency, intersection, inclusion and connection, object temporal relationship includes geometric changes, land type changes and ownership changes, etc., object business relationship includes spatial planning, land allocation, land supply, land use and supplementary arable land, etc.
[0104] In this embodiment, the patch relationship includes a first spatial relationship and a first temporal relationship, the planning and control relationship includes a second spatial relationship and a second temporal relationship, the business management relationship includes a third spatial relationship, a third temporal relationship and a first business relationship, the social and economic relationship includes a fourth spatial relationship and a fourth temporal relationship, and step S40 may include:
[0105] Step S401, determining the first spatial relationship, the second spatial relationship, the third spatial relationship, the fourth spatial relationship, the geometric change relationship and the land type change relationship as the object spatial relationship of the target object;
[0106] Step S402, determining the first timing relationship, the second timing relationship, the third timing relationship and the fourth timing relationship as the object timing relationship of the target object;
[0107] Step S403: determine the first business relationship, the ownership change relationship and the business change relationship as the object business relationship of the target object.
[0108] In a specific implementation, the natural resource object relationship discrimination is predefined as NRORD (Discrimination of natural resource object relationships), and the dataset of natural resource object relationship discrimination is represented as NRORD. i {BBr i , BPR i ,BSr i , BCr i}, where BBr i It is the historical inheritance and change relationship judgment between the land type patches of the basic status data (i.e. the patch relationship mentioned above), BPr i It is the relationship between the land type map of the basic status data and the planning control data (i.e. the above-mentioned planning control relationship), BSr i It is the relationship between the land type map of the basic status data and the business management data (i.e. the above-mentioned business management relationship), BCr i It is the relationship between the land type map of the basic status data and the social and economic data (that is, the above-mentioned social and economic relationship). i Expressed as {BBSr i ,BBTr i}, where the spatial relationship between land type patches is BBSr i (hereinafter referred to as the first spatial relationship for distinction), the temporal relationship between land type patches BBTr i (hereinafter referred to as the first timing relationship for distinction), specifically, BBSr i (The spatial relationship between land type patches is to analyze the spatial distribution, overlap, and change of land type patches at different time points, and reveal the spatial evolution law of land type patches. i (The temporal relationship between land type patches) characterizes the changing process of land type patches in the time series, including land type conversion, area change, etc., to reveal the dynamic change characteristics of land type patches; BPr i Expressed as {BPSr i , BPTr i}, where the spatial relationship between land type map and planning control is BPSr i (hereinafter referred to as the second spatial relationship for distinction), the temporal relationship between land type map and planning control is BPTr i (hereinafter referred to as the second timing relationship for distinction), specifically, BPSr i (Spatial relationship between land type map and planning control) Characterize the spatial distribution and overlap of land type map and planning control area, and evaluate whether the land type map meets the planning requirements. i(Temporal relationship between land type map and planning control) Characterizes the corresponding relationship between land type map and planning control in time series, and analyzes whether the change of land type map follows the planning time series; BSr i Expressed as {BSSr i ,BSTr i ,BSBr i}, where the spatial relationship between land type patches and business management is BSSr i (hereinafter referred to as the third spatial relationship for distinction), the temporal relationship between land type patches and business management is BSTr i (hereinafter referred to as the third temporal relationship for distinction), the business relationship between land type map and business management is BSBr i (hereinafter referred to as the first business relationship for distinction), specifically, BSSr i (Spatial relationship between land type spots and business management) Characterize and analyze the spatial distribution and relationship between land type spots and business management activities, and reveal the impact of business management on land type spots. i (The temporal relationship between land type patches and business management) Characterizes and studies the corresponding relationship between land type patches and business management activities in the time series, and analyzes the driving effect of business management activities on the changes of land type patches. i (Business relationship between land type map and business management) represents the relationship and mutual influence between land type map and specific business management activities, such as the direct impact of real estate registration, mining rights management, etc. on land type map; BCr i Expressed as {BCSr i , BCTr i}, where the spatial relationship between land type patches and social economy is BCSr i (hereinafter referred to as the fourth spatial relationship for distinction), the temporal relationship between land type patches and social economy is BCTr i (hereinafter referred to as the fourth timing relationship for distinction), specifically, BCSr i (Spatial relationship between land type patches and social economy) Characterize and analyze the spatial distribution and correlation between land type patches and social economic data, and reveal the spatial distribution law between land type patches and social economic activities. i (Temporal relationship between land type patterns and social economy) Characterizes and studies the corresponding relationship between land type patterns and social economic data in time series, and analyzes the impact and mechanism of socioeconomic factors on the changes of land type patterns.
[0109] In this embodiment, the first spatial relationship, the second spatial relationship, the third spatial relationship, the fourth spatial relationship, and the geometric change relationship and the land type change relationship in the dynamic change characteristics are determined as the object spatial relationships of the target object; the first temporal relationship, the second temporal relationship, the third temporal relationship, and the fourth temporal relationship are determined as the object temporal relationships of the target object; the first business relationship and the ownership change relationship and the business change relationship in the dynamic change characteristics are determined as the object business relationships of the target object.
[0110] In one feasible implementation, a predefined natural resource object data set is represented as NRO i {Ar i , Sr. i ,Tr i ,Br i}, where Ar i is the attribute information, Sr i is the object space relation, Tr i is the object temporal relationship, Br i Is an object business relationship. i Expressed as {g i , c i , t i , e i}, where the geometric feature g i , code c i , tense i 、Extension i etc., specific, geometric features (g i ) is used to describe the geometric attributes of resource objects, such as shape, size, and position. i ) is a code or ID that uniquely identifies a resource object, and the tense (t i ) is used to record the time information of resource objects, such as creation time, update time, etc., and the extension (e i ) is other attribute information not explicitly listed; Sr i It is expressed as {adjacent, overlap, ..., inside}, where adjacent, overlap, inside, etc. Specifically, adjacent means that two resource objects are adjacent in space, overlap means that two resource objects have overlapping parts in space, inside means that one resource object is completely inside another resource object, and connect means that two resource objects are connected in space. i It is expressed as {c1, c2, c3, …, c n}, where geometric change c1, land type change c2, ownership change c3, etc. Specifically, geometric change (c1) refers to the change in the geometric characteristics of the resource object, and land type change (c2) refers to the change in the land type or natural resource type of the resource object; Br i It is expressed as {b1, b2, b3, …, b n}, where spatial planning b1, land grant b2, land supply b3, land use b4, supplementary cultivated land b5, etc. Specifically, spatial planning (b1) represents spatial planning information related to resource objects, land grant (b2) represents information related to the approved use of resource objects, land supply (b3) represents information related to the supply or allocation of resource objects, land use (b4) represents information on land use of resource objects, and supplementary cultivated land (b5) represents cultivated land supplement or balance information related to resource objects. In addition, the association and relationship between natural resource objects are constructed by triples as {(NRO i , Sr. i , NRO j ), (NRO i ,Tr i , NRO n ), (NRO i ,Br i , NRO m )}, where (NRO i , Sr. i , NRO j ) indicates NRO i There is a spatial relationship between Sr and NR0j i , (NRO i ,Tr i , NRO n ) indicates NRO i with NRO n There is a certain timing relationship Tr i , (NRO i ,Br i , NRO j ) indicates NRO i With NR0mNRO j There is a business relationship between i Among them, it should be noted that NRO i Represents the i-th natural resource object, and the same applies to the other i.
[0111] In this way, through in-depth analysis and identification of these relationships, we can more comprehensively understand the relationships between natural resource objects, and provide strong data support and decision-making basis for the object-oriented management of elements of natural resource knowledge. At the same time, these relationship identifications can also help to discover the problems and potential risks in the object-oriented management of elements of natural resource knowledge, and provide important references for the formulation of scientific and reasonable policies for the object-oriented management of elements of natural resource knowledge.
[0112] Step S50: Save the object association relationship, the attribute information of the target object and the object code of the target object to a preset database to store the target object.
[0113] It should be noted that objects are stored as spatial graphics in the spatial library and as nodes in the graph database. It is necessary to assign object codes in both databases, establish the association between object nodes and spatial graphics, and construct a relationship map of natural resource objects. After natural resource objects are stored in the library, the quality evaluation of natural resource objects is also included to ensure the standardization, completeness, association, consistency and authenticity of the spatial location, accuracy, object coding, attribute information, association relationship and other contents of various natural resource objects.
[0114] Furthermore, it should be noted that the preset database includes a graph database, a spatial database and a non-relational database. The graph database is used to store node objects, object spatial relationships, object temporal relationships and object business relationships. The spatial database is used to store the spatial position and attribute information of the target object. The non-relational database is used to store tile objects and tile shapes.
[0115] In a specific implementation, a natural resource object storage model is defined in advance, and the natural resource object storage is defined as NROS (Natural resource object storage, natural resource object storage), and the data set of the natural resource object storage is represented as NROS. i {GDr i , SDr i , NSr i ,OCr i}, where GDr i It is a graph database, SDr i It is a spatial database, NSr i It is a non-relational database, NSr i It is the object code. i Expressed as {on i ,os i ,ot i ,ob i …}, where the node object on i , object space relationship osi , object temporal relationshipot i 、Object business relationship ob i etc.;SDr i Expressed as {ob i , gm i ,ai i , ...}, where the graphics object SDr i , geometric shape gm i , attribute information ai i etc.;NSr i Expressed as {to i ,tp i , ...}, tile object to i , the tile form is tp i etc.;OCr i Expressed as {c i}, object code is c i The concatenation of multiple storage form data contents through triples is expressed as {(on i ,OCr i ,os i ), (on i , on i ,ot i ), (ob i ,OCr i ,ob i )}, to achieve complete storage of natural resource objects. Specifically, (on i ,OCr i ,os i ): represents a node object (on i ) through the object code (OCr i ) and object space relationship (os i ) is associated. This association expresses the correspondence between the node object in the graph database and the graphic object in the spatial database. i ,OCr i ,ot i ): represents a node object (on i ) through the object code (OCr i ) and object temporal relationship (ot i ). This association expresses the correspondence between the node object and the object time series information in the graph database, which helps to track and analyze the time changes of natural resource objects. i ,OCr i ,ob i ): represents a graphics object (ob i ) through the object code (OCr i ) and object business relationship (ob i). This association reflects the correspondence between graphic objects and object business information in the spatial database, which helps to comprehensively analyze the changes of natural resource objects in both spatial and temporal dimensions.
[0116] In this way, through the serial expression of these triples, the complete storage and efficient query of natural resource objects can be achieved. At the same time, this design also has good scalability, and more database types and associations can be added according to actual needs to adapt to the object-oriented management needs of natural resource knowledge in different scenarios.
[0117] For example, Figure 5 The figure shows a schematic diagram of the object storage model, which connects the contents of the graph database, spatial database and non-relational database in series based on the object code of the natural resource object. The graph data includes basic entity nodes, entity spatial relationships, entity temporal relationships and entity business relationships, which mainly support the analysis and mining of association relationships; the spatial database includes current hierarchical data, planning hierarchical data and management hierarchical data, which are mainly used to support spatial positioning geometric information; the non-relational database includes current hierarchical data, planning hierarchical data and management hierarchical data, which are mainly used to support spatial visualization expression tile services.
[0118] In this embodiment, before step S50, the method further includes:
[0119] Step A10, determining the object code of the target object based on preset coding rules and the attribute information of the target object, wherein the object code includes a spatial grid code, a natural resource classification code, an element classification code, a time code and a sequence code.
[0120] In this embodiment, each natural resource object is encoded based on a preset spatial grid code, natural resource classification code, element classification code, time code and sequence code to obtain an object code for each natural resource object.
[0121] In a specific implementation, the construction of natural resource object nodes is defined as NROC (Construction of natural resource object nodes), and the data set is represented as NROC i{c1, c2, c3, c4, c5} are used for object coding, where c1 is the spatial grid code, c2 is the natural resource classification code, c3 is the element classification code, c4 is the time code, and c5 is the sequence code. Specifically, the spatial grid code is used to identify the spatial location or network where the natural resource object is located. This can be a code for a geographical area, such as an administrative division code, a grid code, etc. The natural resource classification code is used to identify the resource type of the object, such as land, water, minerals, etc. The element classification code is used to further subdivide the specific type or attribute of the natural resource object, such as cultivated land and forest land in the land type. The time code is used to identify the time attribute of the object, such as the data collection time, update time or effective time. The sequence code is used to distinguish between objects with the same spatial grid code, natural resource classification code, element classification code and time code. When the basic attributes of the object have not changed, the sequence code remains unchanged; when the basic attributes have changed, the sequence code should be updated to reflect the new object. If the basic attributes of the image patch have not changed, the object coding will continue to be used; if the basic attributes have changed, it is considered that a new object has been generated and needs to be recoded.
[0122] For example, Figure 6 The figure shows a schematic diagram of object node construction, in which land type patches and historical patches of the area covered by the patches in the previous year are extracted from the natural resource spatiotemporal data, the current land type patches are compared with the historical patches, and the inheritance and change relationship of the land type patches is judged, and then the current natural resource object is encoded, and the object is stored in the library based on the object code and the object node is constructed, and the object node is associated with the spatial graph; at the same time, planning or management data is extracted from the natural resource spatiotemporal data, and then the planning unit or management unit is extracted, and then the object node is stored in the library, where one unit corresponds to one node, and the generated object node is associated with the spatial graph, so as to construct a natural resource knowledge system based on the stored object nodes.
[0123] The embodiment of the present application obtains multiple natural resource objects by objectifying multiple natural resources, and any one of the multiple natural resource objects is called a target object, and the natural resource objects other than the target object in the multiple natural resource objects are called other objects. Based on the comprehensive data of the target object and the other objects, a first association relationship between the target object and the other objects is determined, wherein the comprehensive data includes basic status data, planning and control data, business management data, and socio-economic data; based on the dynamic change characteristics of the target object, a second association relationship between the target objects at different times is determined; based on the first association relationship and the second association relationship, an object association relationship of the target object is determined, wherein the object association relationship includes an object spatial relationship, an object temporal relationship, and an object business relationship; the object association relationship, attribute information of the target object, and the object code of the target object are saved to a preset database to store the target object.
[0124] In this way, the embodiment of the present application breaks through the limitations of the traditional layer management model in the data dimension, realizes the object-oriented management of elements for natural resource knowledge, and comprehensively reflects the time-space-attribute relationship of the five-in-one natural resource tense, location, quantity, quality, and ecology, thereby improving the integrity of the object-oriented management data of elements for natural resource knowledge.
[0125] Furthermore, based on the above-mentioned first embodiment of the element object management method for natural resource knowledge of the present application, a second embodiment of the element object management method for natural resource knowledge of the present application is proposed.
[0126] In this embodiment, the object-oriented management method of elements of natural resource knowledge of this application further includes:
[0127] Step B10, when the natural resource object to be updated is an existing object in the preset database, the time change information of the natural resource object to be updated is added to the preset database, or the time change information and change information of the natural resource object to be updated are added to the preset database, wherein the change information includes one or more of object code inheritance, geometric feature inheritance, basic attribute inheritance, extended attribute inheritance and adjustment, spatial relationship integration and adjustment, and business relationship integration and adjustment;
[0128] It should be noted that when the existing objects in the preset database have not changed, only the timestamp information of the natural resource object (i.e. the above-mentioned time change information) is changed; when the existing objects in the preset database have changed, the timestamp information and change information of the natural resource object are changed. The change information may be one or more of the time change information, object code inheritance, geometric feature inheritance, basic attribute inheritance, extended attribute inheritance and adjustment, spatial relationship integration and adjustment, and business relationship integration and adjustment.
[0129] In a specific implementation, for unchanged objects: trigger the spatiotemporal process improvement of existing natural resource objects, add a new time version to the existing natural resource objects, define the newly added time change information as NRONT, and the data set expression is NRONT i {NT1, NT2, NT3, ..., NT i}, among which object code inheritance NT1, geometric feature inheritance NT2, basic attribute inheritance NT3, extended attribute inheritance and adjustment NT4, spatial relationship inheritance and adjustment NT5, business relationship inheritance and adjustment NT6, etc. Specifically, the new time version adds a new time version to the existing natural resource object, namely NRONT i {NT1, NT2, NT3, ..., NT i}. This reflects the state of the object at different points in time. Object code inheritance NT1 represents the inheritance of the object code, ensuring that the unique identifier of the object remains unchanged during the update process. Geometric feature inheritance NT2 represents the inheritance of geometric features. If the geometric shape of the object has not changed, the geometric data of the previous version is directly inherited. Basic attribute inheritance NT3 represents the inheritance of basic attributes, such as type, level and other basic information. If it has not changed, it is directly inherited. Extended attribute inheritance and adjustment NT4 involves the inheritance and adjustment of extended attributes, and updates or keeps the extended attributes unchanged according to actual needs. Spatial relationship inheritance and adjustment NT5 focuses on the inheritance and adjustment of spatial relationships, considers whether the relative position relationship between the object and other spatial entities has changed, and makes corresponding updates. Business relationship inheritance and adjustment NT6 handles the inheritance and adjustment of business relationships to ensure that the business attributes of the object are consistent with the actual situation.
[0130] Step B20, when the natural resource object to be updated is not an existing object in the preset database, the construction information of the natural resource object to be updated is added to the preset database, wherein the construction information includes object coding, geometric features, basic attributes, extended attributes, spatial relationships, temporal relationships and business relationships.
[0131] In this embodiment, when the natural resource object to be updated is not an existing object in the preset database, it means that a new natural resource object needs to be added to the preset database, and the construction information of the natural resource object to be updated is added to the preset database. The construction information includes object coding, geometric features, basic attributes, extended attributes, spatial relationships, temporal relationships and business relationships.
[0132] In a specific implementation, for a changed object: triggering the construction of a newly added natural resource object, defining the newly added natural resource object as NRONO, and the data set as NRONO i {NO1, NO2, NO3, ..., NO i}, among which, object code NO1, geometric feature NO2, basic attribute NO3, extended attribute NO4, spatial relationship NO5, temporal relationship NO6, business relationship NO7, etc. Specifically, assign new object code: assign new object code NO1 to the changed object to ensure its uniqueness in the system. Geometric feature NO2 involves the geometric features of the changed object, including the re-acquisition of information such as boundaries, shapes, and areas. Basic attribute NO3 represents the collection of basic attributes, updating or confirming the basic attribute information of the object. Extended attribute NO4 involves the collection of extended attributes, supplementing or updating the extended attributes of the object according to the change situation and business needs. Spatial relationship NO5 focuses on the new spatial relationship between the changed object and other spatial entities to ensure the accuracy and completeness of the spatial relationship. Temporal relationship NO6 handles the construction of temporal relationship, records the time sequence and process of object change, and provides basic data for spatiotemporal analysis. Business relationship NO7 constructs new business relationships of the changed object to reflect its new role and association in the business process.
[0133] For example, Figure 7 The figure shows a schematic diagram of object update, which monitors whether there is data to be updated. Specifically, it can detect data changes such as change investigation, planning data update, and land management data update, and then identify the object change. When the object change is a change of an existing object in the database, the time change information of the existing object is added. When the object change is an object that does not exist in the database, a natural resource object is directly added. Then, based on the newly added information, the natural resource object relationship map is updated for subsequent multi-dimensional query, statistical analysis, knowledge mining and simulation deduction.
[0134] In this way, this application ensures the timeliness and accuracy of natural resource object data by configuring update strategies in two situations, providing strong support for natural resource data management and decision-making.
[0135] In addition, an embodiment of the present application also provides an element object management device for natural resource knowledge.
[0136] Please refer to Figure 8 , Figure 8 This is a functional module diagram of an embodiment of an element object management device for natural resource knowledge of this application, such as Figure 8 As shown, the element object management device of the present application for natural resource knowledge includes:
[0137] The objectification module 10 is used to perform objectification processing on a plurality of natural resources to obtain a plurality of natural resource objects;
[0138] A first association module 20 is used to determine a first association relationship between the target object and the other object based on the respective comprehensive data of the target object and the other object, wherein the target object is any one of the plurality of natural resource objects, the other object is a natural resource object other than the target object among the plurality of natural resource objects, and the comprehensive data includes basic status data, planning control data, business management data and socio-economic data;
[0139] A second association module 30, configured to determine a second association relationship between the target objects at different times based on the dynamic change characteristics of the target objects;
[0140] An object association module 40, configured to determine an object association relationship of the target object based on the first association relationship and the second association relationship, wherein the object association relationship includes an object spatial relationship, an object temporal relationship, and an object business relationship;
[0141] The storage module 50 is used to save the object association relationship, the attribute information of the target object and the object code of the target object to a preset database to store the target object.
[0142] Furthermore, the first associating module 20 is further configured to:
[0143] Based on the basic status data, determining the patch relationship between the land type patches of the target object and other objects;
[0144] Determining the planning control relationship between the land type map of the target object and the planning control based on each of the planning control data;
[0145] Determining the business management relationship between the land class map of the target object and the business management based on each of the business management data;
[0146] Based on each of the socio-economic data, determining the socio-economic relationship between the land type map and the socio-economics of the target object;
[0147] The image spot relationship, the planning control relationship, the business management relationship and the socio-economic relationship are determined as the first association relationship between the target object and the other objects.
[0148] Furthermore, the dynamic change characteristics include geometric change relationships, land type change relationships, ownership change relationships and business change relationships.
[0149] Furthermore, the patch relationship includes a first spatial relationship and a first temporal relationship, the planning and control relationship includes a second spatial relationship and a second temporal relationship, the business management relationship includes a third spatial relationship, a third temporal relationship and a first business relationship, and the social and economic relationship includes a fourth spatial relationship and a fourth temporal relationship;
[0150] The object association module 40 is further used for:
[0151] Determine the first spatial relationship, the second spatial relationship, the third spatial relationship, the fourth spatial relationship, the geometric change relationship, and the land type change relationship as the object spatial relationship of the target object;
[0152] Determine the first time series relationship, the second time series relationship, the third time series relationship, and the fourth time series relationship as the object time series relationship of the target object;
[0153] The first business relationship, the ownership change relationship and the business change relationship are determined as the object business relationship of the target object.
[0154] Furthermore, the object-oriented management device for elements of natural resource knowledge of the present application also includes:
[0155] The coding module is used to determine the object code of the target object based on preset coding rules and the attribute information of the target object, wherein the object code includes a spatial grid code, a natural resource classification code, an element classification code, a time code and a sequence code.
[0156] Furthermore, the preset database includes a graph database, a spatial database and a non-relational database, the graph database is used to store the object spatial relationship, the object temporal relationship and the object business relationship, the spatial database is used to store the spatial position and attribute information of the target object, and the non-relational database is used to store tile objects and tile forms.
[0157] Furthermore, the object-oriented management device for elements of natural resource knowledge of the present application also includes:
[0158] A first updating module is used for, when the natural resource object to be updated is an existing object in the preset database, adding the time change information of the natural resource object to be updated in the preset database, or adding the time change information and change information of the natural resource object to be updated in the preset database, wherein the change information includes one or more of object code inheritance, geometric feature inheritance, basic attribute inheritance, extended attribute inheritance and adjustment, spatial relationship integration and adjustment, and business relationship integration and adjustment;
[0159] The second update module is used to add construction information of the natural resource object to be updated in the preset database when the natural resource object to be updated is not an existing object in the preset database, wherein the construction information includes object coding, geometric features, basic attributes, extended attributes, spatial relationships, temporal relationships and business relationships.
[0160] The present application also provides a computer storage medium, on which is stored a factor object management program for natural resource knowledge. When the factor object management program for natural resource knowledge is executed by a processor, the steps of the factor object management program method for natural resource knowledge as described in any of the above embodiments are implemented.
[0161] The specific embodiments of the computer storage medium of the present application are basically the same as the above-mentioned embodiments of the element object management program method for natural resource knowledge of the present application, and will not be described in detail here.
[0162] The present application also provides a computer program product, which includes a computer program. When the computer program is executed by a processor, it implements the steps of the element object management method of the present application for natural resource knowledge as described in any of the above embodiments, which will not be repeated here.
[0163] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0164] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.
[0165] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus the necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD) as described above, including several instructions for enabling an element object management device for natural resource knowledge (which can be a TWS headset, etc.) to execute the methods described in each embodiment of the present application.
[0166] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A method for object-oriented management of natural resource knowledge elements, characterized in that: The element object management method for natural resource knowledge includes: Object-oriented processing is performed on multiple natural resources to obtain multiple natural resource objects; Determine a first association relationship between the target object and the other object based on the respective comprehensive data of the target object and the other object, wherein the target object is any one of the multiple natural resource objects, the other object is a natural resource object other than the target object among the multiple natural resource objects, and the comprehensive data includes basic status data, planning and control data, business management data and socio-economic data; Determining a second association relationship between the target objects at different times based on the dynamic change characteristics of the target objects; Determining an object association relationship of the target object based on the first association relationship and the second association relationship, wherein the object association relationship includes an object spatial relationship, an object temporal relationship, and an object business relationship; The object association relationship, the attribute information of the target object and the object code of the target object are saved in a preset database to store the target object in the database.
2. The method for object-oriented management of natural resource knowledge elements according to claim 1, characterized in that: The step of determining the first association relationship between the target object and the other object based on the comprehensive data of each of the target object and the other object comprises: Based on the basic status data, determining the patch relationship between the land type patches of the target object and other objects; Determining the planning control relationship between the land type map of the target object and the planning control based on each of the planning control data; Determining the business management relationship between the land class map of the target object and the business management based on each of the business management data; Based on each of the socio-economic data, determining the socio-economic relationship between the land type map and the socio-economics of the target object; The image spot relationship, the planning control relationship, the business management relationship and the socio-economic relationship are determined as the first association relationship between the target object and the other objects.
3. The method for object-oriented management of elements of natural resource knowledge according to claim 2, characterized in that: The dynamic change characteristics include geometric change relationships, land type change relationships, ownership change relationships and business change relationships.
4. The method for object-oriented management of elements of natural resource knowledge according to claim 3, characterized in that: The patch relationship includes a first spatial relationship and a first temporal relationship, the planning and control relationship includes a second spatial relationship and a second temporal relationship, the business management relationship includes a third spatial relationship, a third temporal relationship and a first business relationship, and the social and economic relationship includes a fourth spatial relationship and a fourth temporal relationship; The step of determining the object association relationship of the target object based on the first association relationship and the second association relationship includes: Determine the first spatial relationship, the second spatial relationship, the third spatial relationship, the fourth spatial relationship, the geometric change relationship, and the land type change relationship as the object spatial relationship of the target object; Determine the first time series relationship, the second time series relationship, the third time series relationship, and the fourth time series relationship as the object time series relationship of the target object; The first business relationship, the ownership change relationship and the business change relationship are determined as the object business relationship of the target object.
5. The method for object-oriented management of elements of natural resource knowledge according to claim 1, characterized in that: Before the step of saving the object association relationship, the attribute information of the target object and the object code of the target object to a preset database to store the target object, the method further includes: Based on preset coding rules and attribute information of the target object, an object code of the target object is determined, wherein the object code includes a spatial grid code, a natural resource classification code, an element classification code, a time code and a sequence code.
6. The method for object-oriented management of elements of natural resource knowledge according to claim 1, characterized in that: The preset database includes a graph database, a spatial database and a non-relational database. The graph database is used to store the object spatial relationship, the object temporal relationship and the object business relationship. The spatial database is used to store the spatial position and attribute information of the target object. The non-relational database is used to store tile objects and tile forms.
7. The method for object-oriented management of elements of natural resource knowledge according to any one of claims 1 to 6, characterized in that: The method further comprises: In the case where the natural resource object to be updated is an existing object in the preset database, the time change information of the natural resource object to be updated is added to the preset database, or the time change information and change information of the natural resource object to be updated are added to the preset database, wherein the change information includes one or more of object code inheritance, geometric feature inheritance, basic attribute inheritance, extended attribute inheritance and adjustment, spatial relationship integration and adjustment, and business relationship integration and adjustment; When the natural resource object to be updated is not an existing object in the preset database, the construction information of the natural resource object to be updated is newly added to the preset database, wherein the construction information includes object coding, geometric features, basic attributes, extended attributes, spatial relationships, temporal relationships and business relationships.
8. An element object management device for natural resource knowledge, characterized in that: The element object management device for natural resource knowledge comprises: An objectification module, used for objectifying a plurality of natural resources to obtain a plurality of natural resource objects; A first association module is used to determine a first association relationship between the target object and the other object based on the respective comprehensive data of the target object and the other object, wherein the target object is any one of the multiple natural resource objects, the other object is a natural resource object other than the target object among the multiple natural resource objects, and the comprehensive data includes basic status data, planning and control data, business management data and socio-economic data; A second association module, configured to determine a second association relationship between the target objects at different times based on the dynamic change characteristics of the target objects; An object association module, configured to determine an object association relationship of the target object based on the first association relationship and the second association relationship, wherein the object association relationship includes an object spatial relationship, an object temporal relationship, and an object business relationship; The storage module is used to save the object association relationship, the attribute information of the target object and the object code of the target object to a preset database so as to store the target object in the storage.
9. An element object management device for natural resource knowledge, characterized in that: The element object management device for natural resource knowledge comprises: a memory and a processor, the memory stores an element object management program for natural resource knowledge that can be run on the processor, and the element object management program for natural resource knowledge, when executed by the processor, implements the steps of the element object management method for natural resource knowledge as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a natural resource knowledge-oriented element object management program, which, when executed by a processor, implements the steps of the natural resource knowledge-oriented element object management method as described in any one of claims 1 to 7.
