A machine room inspection control method based on inspection robot

By analyzing the operating data and load fluctuations of the equipment in the computer room, optimizing the inspection route and power management, the problem of low inspection efficiency caused by differences in the status of equipment inside the computer room was solved, and efficient and reliable inspection control was achieved.

CN118550224BActive Publication Date: 2024-11-26STATE GRID SHANDONG ELECTRIC POWER CO LIJIN COUNTY POWER SUPPLY CO
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410525337.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2024-11-26
Estimated Expiration
2044-04-29

AI Technical Summary

Technical Problem

In existing technologies, the inspection and fault handling efficiency of the equipment to be inspected and managed inside the computer room is low due to differences in operating status and load rate, and the inspection route cannot be optimized according to the differentiated needs of the equipment.

Method used

By analyzing historical operating data of equipment inside the computer room, the operating status values ​​and load fluctuations of the equipment are determined, the inspection processing time and route are optimized, and the optimal inspection route is determined by combining the power management and recharging reliability of the inspection robot.

Benefits of technology

It enables differentiated inspections based on equipment status and load fluctuations, improving the reliability and efficiency of inspections and ensuring the accuracy of inspection routes and the reliability of power replenishment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118550224B_ABST
    Figure CN118550224B_ABST
Patent Text Reader

Abstract

The present invention provides a computer room inspection control method based on an inspection robot, which belongs to the technical field of non-electric variable control, and specifically comprises: taking the to-be-inspected management equipment whose operating status value does not meet the requirements as the problem screening equipment, and determining the inspection processing time of different problem screening equipment according to the fluctuation of the operating load and the operating status value of different problem screening equipment, determining the distance between the inspection location and the energy replenishment location corresponding to the inspection robot at different safety power thresholds through different alternative inspection routes, and determining the optimal inspection route of the inspection robot in combination with the operating status values ​​of different inspection management equipment and the inspection touch time, and performing inspection control of the inspection robot based on the optimal inspection route, thereby ensuring the reliability of the inspection processing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of non-electric variable control, and in particular relates to a machine room inspection control method based on an inspection robot. Background Art

[0002] In order to ensure the reliability of power system operation, various types of computer rooms are set up inside power companies to meet the operational reliability of power equipment and power communication equipment, such as relay protection equipment, switchgear and power communication equipment. However, at the same time, due to the large number of computer rooms and the relatively scattered distribution areas of different computer rooms, how to achieve reliable operation and maintenance management of computer rooms has become a technical problem that needs to be solved urgently.

[0003] In order to solve the above technical problems, the configuration of the inspection robot in the existing technical solution can greatly improve the efficiency and reliability of the inspection processing of the computer room. Specifically, the invention patent CN202110891260.2 "A working adjustment method of an inspection robot based on a regression analysis algorithm" and the invention patent CN202110542945.6 "Path planning method, device and storage medium for a cross-regional inspection robot" both provide specific solutions for how to realize the inspection route control of the inspection robot in the computer room. However, it is not difficult to find out through analysis that there are the following technical problems:

[0004] There are certain differences in the operating status of the equipment to be inspected and managed inside the computer room. At the same time, for different power equipment or power communication equipment with inspection management, there are differences in load rates in different time periods, and there are certain differences in the probability of failure based on different load rates. Therefore, if the inspection time cannot be determined differently according to the operating status of the equipment to be inspected and managed inside the computer room, the efficiency of handling the fault problems of the equipment to be inspected and managed cannot be guaranteed.

[0005] In view of the above technical problems, the present invention provides a machine room inspection control method based on an inspection robot. Summary of the invention

[0006] To achieve the purpose of the present invention, the present invention adopts the following technical solutions:

[0007] According to one aspect of the present invention, a machine room inspection control method based on an inspection robot is provided.

[0008] A machine room inspection control method based on an inspection robot, characterized in that it specifically includes:

[0009] S1 determines the operation status values ​​of different management devices to be inspected according to the historical operation data of the management devices to be inspected in the computer room. When the operation status value of the management device to be inspected does not meet the requirements, proceed to the next step;

[0010] S2 regards the to-be-inspected management devices whose operating status values ​​do not meet the requirements as screening problem devices, and determines the inspection processing time of different screening problem devices according to the fluctuation of the operating load and the operating status values ​​of different screening problem devices;

[0011] S3 determines the inspection processing power consumption of the inspection robot according to the distribution of different inspection management equipment to be inspected in the computer room and the inspection processing time of different inspection management equipment to be inspected, and when it is determined based on the inspection processing power consumption that the remaining power of the inspection robot meets the requirements, proceeds to the next step;

[0012] S4 determines the distance between the inspection location and the charging location corresponding to different safety power thresholds of the inspection robot through different alternative inspection routes, and determines the optimal inspection route of the inspection robot in combination with the operating status values ​​of different inspection management equipment and the inspection touch time, and performs inspection control of the inspection robot based on the optimal inspection route.

[0013] A further technical solution is that the equipment to be inspected and managed includes but is not limited to relay protection equipment, switch cabinets and power information equipment.

[0014] A further technical solution is that the historical operation data of the management device to be inspected includes the historical inspection times of the management device to be inspected and the historical inspection times including inspection fault data.

[0015] A further technical solution is that the operating status value of the management device to be inspected ranges from 0 to 1, wherein when the operating status value of the management device to be inspected is less than a preset safety status threshold, it is determined that the operating status value of the management device to be inspected does not meet the requirements.

[0016] A further technical solution is that when the inspection processing power consumption of the inspection robot is greater than the remaining power of the inspection robot or the deviation between the remaining power of the inspection robot and the inspection processing power consumption of the inspection robot is less than a preset power consumption deviation threshold, it is determined that the remaining power of the inspection robot does not meet the requirements.

[0017] A further technical solution is that the safety power threshold is determined according to the rated power of the inspection robot, and specifically, the safety power threshold is determined according to a set percentage of the rated power of the inspection robot.

[0018] A further technical solution is that the method for determining the optimal inspection route of the inspection robot is:

[0019] Determine the energy replenishment reliability of different inspection routes by using the distances between the inspection locations and the energy replenishment locations corresponding to different safety power thresholds of the inspection robot;

[0020] Determine the inspection processing reliability of different inspection routes based on the operating status values ​​of different inspection management devices and the inspection contact time;

[0021] The comprehensive reliability of different inspection routes is determined by the energy replenishment reliability and inspection processing reliability of different inspection routes, and the optimal inspection route of the inspection robot is determined by using the comprehensive reliability.

[0022] On the other hand, the present invention provides a computer system, comprising: a memory and a processor connected in communication, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, it executes the above-mentioned computer room inspection control method based on the inspection robot.

[0023] The beneficial effects of the present invention are:

[0024] 1. The inspection processing time of different problem screening devices is determined according to the fluctuation of the operating load and the operating status value of the different problem screening devices, which realizes the determination of the inspection processing time from two perspectives: the fluctuation of the operating load and the operating status value. It not only ensures the occurrence of unstable operating status of the problem screening devices due to large fluctuation of the operating load, but also screens the problem screening devices with problems in the operating status by considering the operating status value, thereby realizing the difference in the inspection processing time of different problem screening devices and ensuring the reliability of the inspection processing.

[0025] 2. The optimal inspection route of the inspection robot is determined based on the distance between the inspection location and the charging location corresponding to different safety power thresholds of the inspection robot, the operating status values ​​of different inspection management equipment, and the inspection reach time. This not only takes into account the difference in the charging reliability of different inspection routes caused by the difference in the distance between the inspection location and the charging location, but also takes into account the difference in inspection processing reliability caused by the inspection reach time of the inspection management equipment with unstable operating status values, thereby ensuring the accuracy of the inspection route of the inspection robot and the reliability of charging.

[0026] Other features and advantages will be described in the following description, and partly become apparent from the description, or understood by practicing the invention. The purpose and other advantages of the invention are realized and obtained by the structures particularly pointed out in the description and the drawings.

[0027] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.

[0029] Figure 1 It is a flow chart of a machine room inspection control method based on an inspection robot;

[0030] Figure 2 It is a flow chart of a method for determining the operating status value of the equipment to be inspected and managed;

[0031] Figure 3 The present invention is a flow chart of a method for determining the inspection processing time for screening problem equipment. DETAILED DESCRIPTION

[0032] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.

[0033] For ease of understanding, the scheme will be described below through Example 1 and Example 2.

[0034] Example 1

[0035] To solve the above problems, according to one aspect of the present invention, Figure 1 According to one aspect of the present invention, a machine room inspection control method based on an inspection robot is provided, which is characterized by specifically comprising:

[0036] S1 determines the operation status values ​​of different management devices to be inspected according to the historical operation data of the management devices to be inspected in the computer room. When the operation status value of the management device to be inspected does not meet the requirements, proceed to the next step;

[0037] Specifically, the equipment to be inspected and managed includes but is not limited to relay protection equipment, switch cabinets and power information equipment.

[0038] Furthermore, the historical operation data of the management device to be inspected includes the historical inspection times of the management device to be inspected and the historical inspection times including inspection fault data.

[0039] In one possible embodiment, Figure 2 As shown, the method for determining the operating status value of the management device to be inspected is:

[0040] The historical inspection times including the inspection fault data are used as the historical fault inspection times, and the fault types corresponding to different historical fault inspection times are determined according to the inspection fault data of different historical fault inspection times;

[0041] The problem evaluation quantity of different fault types is performed by the number of historical fault inspections matched by different fault types and the interval length between the number of historical fault inspections matched by the fault types;

[0042] Obtain the number of historical fault inspections of the to-be-inspected management device within a preset time and the proportion of the historical fault inspections in the historical inspections, and determine the state evaluation amount of the to-be-inspected management device within the preset time in combination with the type of fault type of the to-be-inspected management device within the preset time and the time interval between different historical fault inspections;

[0043] The operating status value of the management device to be inspected is determined based on the status evaluation amount of the management device to be inspected within a preset time and the evaluation amounts of different types of problems of the management device to be inspected.

[0044] Furthermore, the operating status value of the management device to be inspected ranges from 0 to 1, wherein when the operating status value of the management device to be inspected is less than a preset safety status threshold, it is determined that the operating status value of the management device to be inspected does not meet the requirements.

[0045] In another possible embodiment, the method for determining the operating status value of the management device to be inspected is:

[0046] S11 uses the historical inspection times containing the inspection fault data as the historical fault inspection times, and determines whether the historical fault inspection times of the device to be inspected and managed meet the requirements. If so, it is determined that the operating status value of the device with inspection fault management meets the requirements. If not, proceed to the next step;

[0047] S12 determines the fault types corresponding to different historical fault inspection times according to the inspection fault data of different historical fault inspection times, and judges whether there is a fault type whose historical fault inspection times do not meet the requirements. If yes, proceed to step S14, if not, proceed to the next step;

[0048] S13 obtains the number of historical fault inspections of the to-be-inspected management device within the preset time and the proportion of the historical fault inspections in the historical inspections, and determines the state evaluation amount of the to-be-inspected management device within the preset time in combination with the type of fault type of the to-be-inspected management device within the preset time and the time interval between different historical fault inspections, and judges whether the state evaluation amount of the to-be-inspected management device within the preset time meets the requirements, if so, determines that the operating state value of the fault management device with inspection meets the requirements, if not, proceeds to the next step;

[0049] S14 performs problem evaluation on different fault types through the number of historical fault inspections matched by different fault types and the interval duration between the number of historical fault inspections matched by the fault types, and determines the operating status value of the management device to be inspected based on the status evaluation of the management device to be inspected within a preset time and the different types of problem evaluations of the management device to be inspected.

[0050] Furthermore, when the operating status value of the management device to be inspected meets the requirement, the inspection processing duration of the management device to be inspected is determined based on a preset inspection duration.

[0051] In another possible embodiment, the method for determining the operating status value of the management device to be inspected is:

[0052] S21 uses the historical inspection times containing the inspection fault data as the historical fault inspection times, determines the fault types corresponding to different historical fault inspection times according to the inspection fault data of different historical fault inspection times, and judges whether the types of the fault types meet the requirements. If not, proceed to step S24. If yes, proceed to the next step.

[0053] S22 performs problem assessment on different fault types by the number of historical fault inspections matched by different fault types and the interval between the number of historical fault inspections matched by the fault types, and determines whether there is a fault type whose fault assessment does not meet the requirements. If so, proceed to the next step; if not, determine whether the operating status value of the management device to be inspected meets the requirements;

[0054] S23 uses the fault type whose fault assessment amount does not meet the requirements as the screening fault type, and determines whether the number of historical fault inspections of the screening fault type within the preset time meets the requirements. If so, proceed to the next step; if not, determine that the operating status value of the management device to be inspected meets the requirements;

[0055] S24 obtains the number of historical fault inspections of the to-be-inspected management device within a preset time, the proportion of the historical fault inspections in the historical inspections, and the proportion of the historical fault inspections in the historical inspections, and determines the state evaluation amount of the to-be-inspected management device within the preset time in combination with the type of fault type of the to-be-inspected management device within the preset time and the time interval between different historical fault inspections;

[0056] S25 determines the operating status value of the management device to be inspected based on the status evaluation amount of the management device to be inspected within a preset time and the evaluation amounts of different types of problems of the management device to be inspected.

[0057] S2 regards the to-be-inspected management devices whose operating status values ​​do not meet the requirements as screening problem devices, and determines the inspection processing time of different screening problem devices according to the fluctuation of the operating load and the operating status values ​​of different screening problem devices;

[0058] Specifically, Figure 3 As shown, the method for determining the inspection processing time for screening problem equipment is:

[0059] Determine the fluctuation time of the operating load of the problem screening equipment based on the fluctuation of the operating load of the problem screening equipment, and determine the fluctuation amount of the operating load of the problem screening equipment in combination with the operating load rate of the problem screening equipment at different fluctuation times and the variation of the operating load rate;

[0060] The inspection processing time of the problem screening equipment is determined according to the operation load fluctuation amount and the operation status value of the problem screening equipment.

[0061] Further, determining the inspection processing time of the problem screening equipment according to the operation load fluctuation amount and the operation status value of the problem screening equipment specifically includes:

[0062] Determine the corresponding inspection matching processing time of the problem screening device according to the operation status value of the problem screening device, and determine the time correction factor of the problem screening device based on the operation load fluctuation of the problem screening device;

[0063] The inspection processing time for screening problematic devices is determined by using the time correction factor and the inspection matching processing time.

[0064] In another possible embodiment, the method for determining the inspection processing time for screening problematic devices is:

[0065] Obtaining the running status value of the problem-screening device, and determining whether the running status value of the problem-screening device is less than a preset running status limit value, if so, determining the inspection processing time of the problem-screening device based on a second preset processing time, if not, proceeding to the next step;

[0066] Determine the fluctuation time of the running load of the problem-screening device based on the fluctuation of the running load of the problem-screening device, and judge whether the number of the fluctuation time of the running load of the problem-screening device meets the requirement; if so, determine the inspection processing time of the problem-screening device based on the second preset processing time; if not, proceed to the next step;

[0067] The number of fluctuation moments whose interval time is less than the preset interval time is determined by the interval time of different fluctuation moments of the running load of the problem screening equipment, and the fluctuation moment evaluation amount of the problem screening equipment is determined in combination with the interval time of the fluctuation moments whose interval time is less than the preset interval time and the average interval time of the fluctuation moments, and it is judged whether the fluctuation moment evaluation amount of the problem screening meets the requirements, if so, proceed to the next step, if not, determine the inspection processing time of the problem screening equipment based on the second preset processing time;

[0068] Determine the operating load fluctuation amount of the problem screening equipment based on the number of fluctuation moments of the problem screening equipment, the operating load rate at different fluctuation moments, and the variation of the operating load rate, and judge whether the operating load fluctuation amount of the problem screening equipment meets the requirement, if so, proceed to the next step, if not, determine the inspection processing time of the problem screening equipment based on the second preset processing time;

[0069] The inspection processing time of the problem screening equipment is determined according to the operation load fluctuation amount and the operation status value of the problem screening equipment.

[0070] In another possible embodiment, the method for determining the inspection processing time for screening problematic devices is:

[0071] Determine the peak operation time of the operation load of the problem-screening device through the operation data of the operation load of the problem-screening device, and judge whether the quantity ratio of the peak operation time of the operation load meets the requirement, if so, proceed to the next step, if not, determine the inspection processing time of the problem-screening device based on the second preset processing time;

[0072] Determine the fluctuation time of the running load of the problem-screening device based on the fluctuation of the running load of the problem-screening device, and judge whether the number ratio of the fluctuation time of the running load meets the requirement, if so, proceed to the next step, if not, determine the inspection processing time of the problem-screening device based on the second preset processing time;

[0073] The number of peak moments whose interval time is less than the preset interval time is determined by the interval time of different peak operating moments of the running load of the problem screening equipment, and the peak moment evaluation amount of the problem screening equipment is determined in combination with the interval time of the peak moments whose interval time is less than the preset interval time and the average interval time of the peak moments, and it is judged whether the peak moment evaluation amount of the problem screening meets the requirements, if so, proceed to the next step, if not, determine the inspection processing time of the problem screening equipment based on the second preset processing time;

[0074] The number of fluctuation moments whose interval time is less than the preset interval time is determined by the interval time of different fluctuation moments of the running load of the problem screening equipment, and the fluctuation moment evaluation amount of the problem screening equipment is determined in combination with the interval time of the fluctuation moments whose interval time is less than the preset interval time and the average interval time of the fluctuation moments, and it is judged whether the fluctuation moment evaluation amount of the problem screening meets the requirements, if so, proceed to the next step, if not, determine the inspection processing time of the problem screening equipment based on the second preset processing time;

[0075] Determine the operating load fluctuation amount of the problem screening equipment based on the number of fluctuation moments of the problem screening equipment, the operating load rate at different fluctuation moments, and the variation of the operating load rate, and judge whether the operating load fluctuation amount of the problem screening equipment meets the requirement, if so, proceed to the next step, if not, determine the inspection processing time of the problem screening equipment based on the second preset processing time;

[0076] The number of peak moments of the problem screening equipment is obtained, and the inspection processing time of the problem screening equipment is determined in combination with the operation load fluctuation amount, operation status value, fluctuation moment evaluation amount and peak moment evaluation amount of the problem screening equipment.

[0077] S3 determines the inspection processing power consumption of the inspection robot according to the distribution of different inspection management equipment to be inspected in the computer room and the inspection processing time of different inspection management equipment to be inspected, and when it is determined based on the inspection processing power consumption that the remaining power of the inspection robot meets the requirements, proceeds to the next step;

[0078] Specifically, the method for determining the power consumption of the inspection process is:

[0079] The power consumption of the inspection robot on the inspection route is determined based on the distribution of different management devices to be inspected in the machine room;

[0080] Determining the equipment inspection power consumption of the inspection robot based on the inspection processing time of different management equipment to be inspected;

[0081] The inspection processing power consumption of the inspection robot is determined by the power consumption of the equipment inspection of the inspection robot and the power consumption on the inspection route.

[0082] Furthermore, when the inspection processing power consumption of the inspection robot is greater than the remaining power of the inspection robot or the deviation between the remaining power of the inspection robot and the inspection processing power consumption of the inspection robot is less than a preset power consumption deviation threshold, it is determined that the remaining power of the inspection robot does not meet the requirements.

[0083] S4 determines the distance between the inspection location and the charging location corresponding to different safety power thresholds of the inspection robot through different alternative inspection routes, and determines the optimal inspection route of the inspection robot in combination with the operating status values ​​of different inspection management equipment and the inspection touch time, and performs inspection control of the inspection robot based on the optimal inspection route.

[0084] Specifically, the safety power threshold is determined according to the rated power of the inspection robot, and specifically, the safety power threshold is determined according to a set percentage of the rated power of the inspection robot.

[0085] Furthermore, the method for determining the optimal inspection route of the inspection robot is:

[0086] Determine the energy replenishment reliability of different inspection routes by using the distances between the inspection locations and the energy replenishment locations corresponding to different safety power thresholds of the inspection robot;

[0087] Determine the inspection processing reliability of different inspection routes based on the operating status values ​​of different inspection management devices and the inspection contact time;

[0088] The comprehensive reliability of different inspection routes is determined by the energy replenishment reliability and inspection processing reliability of different inspection routes, and the optimal inspection route of the inspection robot is determined by using the comprehensive reliability.

[0089] In another possible embodiment, the method for determining the optimal inspection route of the inspection robot is:

[0090] Determine whether there is an inspection location on the inspection route where the distance between the inspection location and the energy replenishment location does not meet the requirement by using the distance between the inspection location and the energy replenishment location corresponding to the inspection robot at different safety power thresholds. If so, determine that the inspection route does not belong to the optimal inspection route. If not, proceed to the next step.

[0091] Determine the problem management device in the inspection management device based on the operation status values ​​of different inspection management devices, and judge whether the number of problem management devices whose inspection touch time does not meet the requirement meets the requirement. If so, determine that the inspection route does not belong to the optimal inspection route. If not, proceed to the next step.

[0092] The energy replenishment reliability of the inspection route is determined by the distance between the inspection location and the energy replenishment location corresponding to different safety power thresholds of the inspection robot, and whether the energy replenishment reliability of the inspection route meets the requirements is judged. If not, it is determined that the inspection route does not belong to the optimal inspection route. If so, proceed to the next step;

[0093] Determine the inspection processing reliability of the inspection route based on the operation status values ​​of different inspection management devices and the inspection touch time, and judge whether the inspection processing reliability of the inspection route meets the requirements. If not, determine that the inspection route does not belong to the optimal inspection route. If so, proceed to the next step;

[0094] The comprehensive reliability of different inspection routes is determined by the energy replenishment reliability and inspection processing reliability of different inspection routes, and the optimal inspection route of the inspection robot is determined by using the comprehensive reliability.

[0095] Example 2

[0096] On the other hand, the present invention provides a computer system, comprising: a memory and a processor connected in communication, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, it executes the above-mentioned computer room inspection control method based on the inspection robot.

[0097] The present invention achieves the following technical effects:

[0098] 1. The inspection processing time of different problem screening devices is determined according to the fluctuation of the operating load and the operating status value of the different problem screening devices, which realizes the determination of the inspection processing time from two perspectives: the fluctuation of the operating load and the operating status value. It not only ensures the occurrence of unstable operating status of the problem screening devices due to large fluctuation of the operating load, but also screens the problem screening devices with problems in the operating status by considering the operating status value, thereby realizing the difference in the inspection processing time of different problem screening devices and ensuring the reliability of the inspection processing.

[0099] 2. The optimal inspection route of the inspection robot is determined based on the distance between the inspection location and the charging location corresponding to different safety power thresholds of the inspection robot, the operating status values ​​of different inspection management equipment, and the inspection reach time. This not only takes into account the difference in the charging reliability of different inspection routes caused by the difference in the distance between the inspection location and the charging location, but also takes into account the difference in inspection processing reliability caused by the inspection reach time of the inspection management equipment with unstable operating status values, thereby ensuring the accuracy of the inspection route of the inspection robot and the reliability of charging.

[0100] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0101] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0102] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.

Claims

1. A machine room inspection control method based on an inspection robot, characterized in that: Specifically include: Determine the operation status values ​​of different management devices to be inspected according to the historical operation data of the management devices to be inspected in the computer room. When the operation status value of the management device to be inspected does not meet the requirements, proceed to the next step. The devices to be inspected whose operating status values ​​do not meet the requirements are regarded as problem devices for screening, and the inspection processing time of different problem devices for screening is determined according to the fluctuation of the operating load and the operating status values ​​of different problem devices for screening; According to the distribution of different inspection management equipment in the computer room and the inspection processing time of different inspection management equipment, the inspection processing power consumption of the inspection robot is determined, and when it is determined based on the inspection processing power consumption that the remaining power of the inspection robot meets the requirements, the next step is entered; Determine the distance between the inspection location and the charging location corresponding to different safety power thresholds of the inspection robot through different alternative inspection routes, and determine the optimal inspection route of the inspection robot in combination with the operating status values ​​of different inspection management devices and the inspection reach duration, and perform inspection control of the inspection robot based on the optimal inspection route; The method for determining the operating status value of the management equipment to be inspected is: The historical inspection times including the inspection fault data are used as the historical fault inspection times, and the fault types corresponding to different historical fault inspection times are determined according to the inspection fault data of different historical fault inspection times; The problem evaluation quantity of different fault types is performed by the number of historical fault inspections matched by different fault types and the interval length between the number of historical fault inspections matched by the fault types; Obtain the number of historical fault inspections of the to-be-inspected management device within a preset time and the proportion of the historical fault inspections in the historical inspections, and determine the state evaluation amount of the to-be-inspected management device within the preset time in combination with the type of fault type of the to-be-inspected management device within the preset time and the time interval between different historical fault inspections; The operating status value of the management device to be inspected is determined based on the status evaluation amount of the management device to be inspected within a preset time and the evaluation amounts of different types of problems of the management device to be inspected.

2. A machine room inspection control method based on an inspection robot as claimed in claim 1, characterized in that: The equipment to be inspected and managed includes but is not limited to relay protection equipment, switch cabinets and power information equipment.

3. A machine room inspection control method based on an inspection robot as claimed in claim 1, characterized in that: The historical operation data of the management device to be inspected includes the historical inspection times of the management device to be inspected and the historical inspection times including inspection fault data.

4. A machine room inspection control method based on an inspection robot as claimed in claim 1, characterized in that: The operating status value of the management device to be inspected ranges from 0 to 1, wherein when the operating status value of the management device to be inspected is less than a preset safety status threshold, it is determined that the operating status value of the management device to be inspected does not meet the requirements.

5. The machine room inspection control method based on the inspection robot according to claim 1, characterized in that: When the running status value of the management device to be inspected meets the requirement, the inspection processing duration of the management device to be inspected is determined based on the preset inspection duration.

6. A machine room inspection control method based on an inspection robot as claimed in claim 1, characterized in that: The method for determining the inspection processing time of screening problem equipment is: Determine the fluctuation time of the operating load of the problem screening equipment based on the fluctuation of the operating load of the problem screening equipment, and determine the fluctuation amount of the operating load of the problem screening equipment in combination with the operating load rate of the problem screening equipment at different fluctuation times and the variation of the operating load rate; The inspection processing time of the problem screening equipment is determined according to the operation load fluctuation amount and the operation status value of the problem screening equipment.

7. A machine room inspection control method based on an inspection robot as claimed in claim 6, characterized in that: Determining the inspection processing time of the problem screening equipment according to the operation load fluctuation amount and the operation status value of the problem screening equipment specifically includes: Determine the corresponding inspection matching processing time of the problem screening device according to the operation status value of the problem screening device, and determine the time correction factor of the problem screening device based on the operation load fluctuation of the problem screening device; The inspection processing time for screening problematic devices is determined by using the time correction factor and the inspection matching processing time.

8. A machine room inspection control method based on an inspection robot as claimed in claim 1, characterized in that: The method for determining the power consumption of the inspection process is: The power consumption of the inspection robot on the inspection route is determined based on the distribution of different management devices to be inspected in the machine room; Determining the equipment inspection power consumption of the inspection robot based on the inspection processing time of different management equipment to be inspected; The inspection processing power consumption of the inspection robot is determined by the power consumption of the equipment inspection of the inspection robot and the power consumption on the inspection route.

9. A computer system comprising: A memory and a processor connected in communication, and a computer program stored in the memory and capable of running on the processor, characterized in that: when the processor runs the computer program, it executes a machine room inspection control method based on an inspection robot as described in any one of claims 1-8.

Citation Information

Patent Citations

  • Path planning method and device of cross-regional inspection robot and storage medium

    CN113253729A

  • Inspection robot work adjustment method based on regression analysis algorithm

    CN113625712A

  • Transformer substation equipment inspection method, system and device and computer readable storage medium

    CN108038935A

  • Electric power inspection time prediction method, device and system

    CN112288132A

  • Inspection path planning method and device, electronic equipment and storage medium

    CN116007647A