A method and system for controlling aerial work platform safety based on variable amplitude angle
By obtaining and analyzing the parameters and construction information of the aerial work platform and calculating the amplitude angle value, the problem of failure to comprehensively analyze the load situation in the existing technology is solved, the safety and work efficiency of the aerial work platform are improved, and the operation cost is reduced .
Patent Information
- Application Number
- CN202410635990.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-05-22
AI Technical Summary
The existing safety control method of aerial operation platform based on amplitude angle failed to comprehensively analyze the load conditions of the aerial operation platform, resulting in the inability to accurately calculate the amplitude angle, affecting the control safety.
By obtaining the parameters of the aerial work platform, construction weather conditions and construction information, extracting and classifying the platform construction characteristic data, calculating the construction load data, and calculating the amplitude angle value based on the load data and the original angle value for optimization and control.
Provides more accurate and scientific decision-making basis, reduces operational risks, improves operational safety, optimizes control processes, reduces errors, reduces operational costs, and predicts potential maintenance needs.
Smart Images

Figure CN118550234B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of platform control, and in particular to a method and system for safely controlling an aerial work platform based on a variable amplitude angle. Background Art
[0002] Aerial work platform is a general term for various equipment specially used to perform work tasks in the air. It is widely used in construction, maintenance, installation, cleaning and other occasions that require personnel or equipment to reach high places to perform operations. The main purpose of aerial work platform is to provide a safe and stable working environment, reduce or eliminate the safety risks brought by the use of traditional climbing equipment such as ladders and scaffolding. With the development of technology, modern aerial work platforms have also added more intelligent elements, such as remote control systems, automatic stabilization systems, etc., which further improve the accuracy and safety of operations.
[0003] The luffing angle refers to the angle at which the working arm of the aerial work platform rotates in the horizontal plane, and the luffing angle determines the working range of the aerial work platform. A larger luffing angle means that the platform can cover a wider horizontal area, so that it can operate in complex environments. At the same time, changes in the luffing angle will affect the stability of the platform. At extreme luffing angles, the platform may become unstable due to the shift of the center of gravity, so precise control and structural design are required to ensure the safety of operation.
[0004] However, the existing aerial work platform safety control method based on variable amplitude angle does not conduct a comprehensive analysis of the load condition of the aerial work platform when it is used, resulting in the inability of the existing aerial work platform safety control method based on variable amplitude angle to accurately calculate the variable amplitude angle of the aerial work platform when it is used, making the accuracy of the aerial work platform safety control method based on variable amplitude angle not ideal when it is used, which greatly affects the safety of the aerial work platform during control and use.
[0005] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention
[0006] In view of the problems in the related art, the present invention proposes a safety control method and system for an aerial work platform based on variable amplitude angle to overcome the above-mentioned technical problems existing in the existing related art.
[0007] To this end, the specific technical solution adopted by the present invention is as follows:
[0008] According to one aspect of the present invention, a method and system for controlling the safety of an aerial work platform based on a variable amplitude angle are provided, comprising the following steps:
[0009] S1. Obtaining aerial work platform parameters, construction weather conditions and aerial work platform construction information;
[0010] S2. Based on the aerial work platform parameters, obtain the original load parameters and the original angle value of the aerial work platform;
[0011] S3. Extracting platform construction characteristic data according to the aerial work platform construction information, and calculating construction load data based on the platform construction characteristic data, construction weather conditions and original load parameters of the aerial work platform;
[0012] S4, based on the construction load data and the original angle value of the aerial work platform, calculating the amplitude angle value of the aerial work platform generated during construction;
[0013] S5. Analyze the amplitude angle value of the aerial work platform, and optimize the control of the aerial work platform based on the analysis results.
[0014] As a preferred solution, according to the construction information of the aerial work platform, the platform construction characteristic data is extracted, and the construction load data is calculated based on the platform construction characteristic data, the construction weather conditions and the original load parameters of the aerial work platform, including the following steps:
[0015] S31, setting a construction data extraction rule, and extracting platform construction feature data from the aerial work platform construction information based on the construction data extraction rule;
[0016] S32, classifying the platform construction feature data, and assigning weights to the classification results of the platform construction feature data to obtain a construction feature influence set;
[0017] S33, substituting the construction feature influence set into the original load parameters of the aerial work platform to calculate the operation load data;
[0018] S34, analyzing the impact of weather conditions on the construction work, and calculating the construction load data based on the analyzed impact value of the weather conditions on the construction work and the operation load data.
[0019] As a preferred solution, the platform construction feature data is classified, and the classification results of the platform construction feature data are weighted. The construction feature influence set is obtained, which includes the following steps:
[0020] S321. Preset a classification standard for platform construction feature data, and classify the platform construction feature data based on the classification standard for platform construction feature data;
[0021] S322, setting a feature weighting rule, and weighting the platform construction feature data in the platform construction feature data classification result based on the feature weighting rule;
[0022] S323. Integrate the platform construction feature data weighting results to obtain the construction feature influence set.
[0023] As a preferred solution, substituting the construction feature influence set into the original load parameters of the aerial work platform to calculate the operating load data includes the following steps:
[0024] S331, performing data cleaning on the construction feature influence set, and merging the construction feature influence set after data cleaning with the original load parameters of the aerial work platform;
[0025] S332, calculating the platform operation comprehensive load value based on the result of combining the construction feature influence set and the original load parameters of the aerial work platform;
[0026] S333, simulating and verifying the comprehensive load value of platform operation, and optimizing and adjusting the comprehensive load value of high platform operation based on the simulation verification result;
[0027] S334. Use the optimized and adjusted platform operation comprehensive load value as operation load data.
[0028] As a preferred solution, based on the combined result of the construction feature influence set and the original load parameters of the aerial work platform, the calculation of the platform operation comprehensive load value includes the following steps:
[0029] S3321. Normalize the construction feature influence set and the original load parameters of the aerial work platform;
[0030] S3322. Based on the normalized construction feature influence set and the original load parameters of the aerial work platform, the total platform load is calculated by a regression algorithm;
[0031] S3323, extracting the aerial work platform node information in the aerial work platform parameters, and presetting the node load weight ratio;
[0032] S3324, calculating the node load value of the aerial work platform node information based on the total platform load value and the load weight ratio;
[0033] S3325. Verify the total platform load value and the node load value, and summarize the verified total platform load value and the node load value to generate a comprehensive platform operation load value.
[0034] As a preferred solution, based on the normalized construction feature influence set and the original load parameters of the aerial work platform, the calculation formula for calculating the total platform load through the regression algorithm is:
[0035] ;
[0036] in, W is the total platform load;
[0037] The intercept value of the construction feature impact concentration feature impact;
[0038] The construction characteristics affect the concentration of i The construction characteristics influence the value;
[0039] is the original load parameter of the aerial work platform;
[0040] N is the total number of construction feature influence sets.
[0041] As a preferred solution, analyzing the impact of weather conditions on construction work, and calculating the construction load data based on the analysis of the impact value of weather conditions on construction work and the operation load data includes the following steps:
[0042] S341, pre-processing the impact of weather conditions on construction operations, and evaluating the impact value of weather conditions on construction operations after pre-processing;
[0043] S342, unifying the construction operation weather condition impact value and the operation load data, and merging the unified construction operation weather condition impact value and the operation load data to obtain the operation impact data;
[0044] S343, constructing a construction load model by using a multivariate linear regression algorithm, and substituting the operation impact data into the construction load model to calculate the construction load data;
[0045] S344, performing simulation verification on the construction load data, and optimizing and adjusting the construction load data based on the simulation verification results.
[0046] As a preferred solution, based on the construction load data and the original angle value of the aerial work platform, calculating the amplitude angle value of the aerial work platform generated during construction includes the following steps:
[0047] S41, extracting the node load value and the aerial work platform node information in the construction load data, and calculating the construction node moment;
[0048] S42, calculating the amplitude angle value of the aerial work platform based on the construction node moment and the original angle value of the aerial work platform;
[0049] S43. Verify the amplitude angle value of the aerial work platform, and optimize and adjust the amplitude angle value of the aerial work platform after verification.
[0050] As a preferred solution, based on the construction node moment and the original angle value of the aerial work platform, calculating the amplitude angle value of the aerial work platform includes the following steps:
[0051] S421, summing up the construction node moments to obtain the total moment of the construction nodes of the aerial work platform;
[0052] S422, setting a platform moment of inertia rule, and calculating an angle change value of the aerial work platform based on the platform moment of inertia rule and a total moment of a construction node of the aerial work platform;
[0053] S423, combining the original angle value of the aerial work platform with the angle change value of the aerial work platform to obtain the amplitude angle value of the aerial work platform.
[0054] According to another aspect of the present invention, there is provided a safety control system for an aerial work platform based on a variable amplitude angle, the system comprising:
[0055] Parameter acquisition module, used to obtain aerial work platform parameters, construction weather conditions and aerial work platform construction information;
[0056] The original parameter module is used to obtain the original load parameters and the original angle value of the aerial work platform based on the parameters of the aerial work platform;
[0057] The platform load module is used to extract the platform construction characteristic data according to the aerial work platform construction information, and calculate the construction load data based on the platform construction characteristic data, the construction weather conditions and the original load parameters of the aerial work platform;
[0058] The luffing angle module is used to calculate the luffing angle value of the aerial work platform generated during construction based on the construction load data and the original angle value of the aerial work platform;
[0059] Safety control module, used to analyze the amplitude angle value of the aerial work platform and optimize the control of the aerial work platform based on the analysis results;
[0060] The parameter acquisition module, the original parameter module, the platform load module, the amplitude angle module and the safety control module are connected in sequence.
[0061] The beneficial effects of the present invention are:
[0062] 1. The present invention ensures the consistency of data and the effectiveness of comparison during analysis through standardized processing, and performs weighted and comprehensive analysis on various factors, providing a more accurate and scientific basis for decision-making. At the same time, by accurately calculating and analyzing the load and angle changes of the aerial work platform, the operational risks are reduced and the operational safety is improved.
[0063] 2. The present invention reduces operation time and improves work efficiency by optimizing control, reduces erroneous operations, improves work efficiency, and reduces long-term operating costs. At the same time, by analyzing load data and angle changes, potential maintenance needs are predicted to reduce unexpected downtime, and by optimizing control processes, dependence on professional skills is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0065] Figure 1 is a method flow chart of a method for safely controlling an aerial work platform based on a variable amplitude angle according to an embodiment of the present invention;
[0066] Figure 2 The system block diagram of a safety control system for an aerial work platform based on variable amplitude angle according to an embodiment of the present invention.
[0067] In the figure:
[0068] 1. Parameter acquisition module; 2. Original parameter module; 3. Platform load module; 4. Variable amplitude angle module; 5. Safety control module. DETAILED DESCRIPTION
[0069] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0070] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0071] According to an embodiment of the present invention, a method and system for safely controlling an aerial work platform based on a variable amplitude angle are provided.
[0072] The present invention is further described with reference to the accompanying drawings and specific embodiments. According to one embodiment of the present invention, Figure 1 As shown, the aerial work platform safety control method based on the variable amplitude angle according to an embodiment of the present invention includes the following steps:
[0073] S1. Obtaining aerial work platform parameters, construction weather conditions and aerial work platform construction information;
[0074] Specifically, obtain technical manuals from the manufacturers of aerial work platforms, including detailed parameters of the platform, such as maximum working height, maximum platform height, maximum operating range, rated load, model and key parameters. If the company has an equipment management system, query the detailed parameters and historical maintenance records of each aerial work platform in the equipment management system, and contact the manufacturer or supplier directly to obtain the latest and most accurate aerial work platform parameter information.
[0075] Obtain real-time and forecasted weather conditions through the official website of the Meteorological Bureau, mobile applications or professional weather service providers, and set up a weather station at the construction site to monitor weather parameters such as wind speed, temperature, humidity, and air pressure in real time. Check the construction log to understand the operation records of the aerial work platform, including the operation time, location, and content of the operation. Communicate with the operators to obtain their feedback and suggestions on the use of the aerial work platform. If the aerial work platform is equipped with a monitoring system, understand the actual use of the platform through the playback of monitoring videos, and check the operation plan to understand the upcoming aerial work platform construction projects and schedules.
[0076] S2. Based on the aerial work platform parameters, obtain the original load parameters and the original angle value of the aerial work platform;
[0077] Specifically, use a floor scale or professional weighing equipment to weigh the aerial work platform to obtain its empty weight. According to the rated load and working height of the aerial work platform, calculate its original load parameters, such as the maximum working load, maximum working radius, etc., through physical formulas and engineering experience, and refer to the technical manual or user guide provided by the manufacturer to obtain the rated load and maximum working radius and other parameters of the aerial work platform. If the aerial work platform is equipped with sensors and monitoring systems, use these devices to monitor the load of the platform in real time. Use angle measuring instruments, such as levels and inclinometers, to directly measure the angles of the working arm and working platform of the aerial work platform. If the aerial work platform is equipped with a modern control system, read the current working arm angle and working platform angle through the control system, and refer to the technical manual or user guide provided by the manufacturer to obtain parameters such as the maximum working angle and operating range of the aerial work platform.
[0078] S3. Extracting platform construction characteristic data according to the aerial work platform construction information, and calculating construction load data based on the platform construction characteristic data, construction weather conditions and original load parameters of the aerial work platform;
[0079] Specifically, according to the construction information of the aerial work platform, the platform construction characteristic data is extracted, and the construction load data is calculated based on the platform construction characteristic data, the construction weather conditions and the original load parameters of the aerial work platform, including the following steps:
[0080] S31, setting a construction data extraction rule, and extracting platform construction feature data from the aerial work platform construction information based on the construction data extraction rule;
[0081] Identify which parameters are key to the platform construction characteristics, such as working height, working radius, platform load, working environment, etc., and determine the data source, including equipment records, operator reports, monitoring system data, etc., develop a standard format for data recording and storage to ensure data accuracy and consistency, set data quality standards, such as data accuracy, completeness and timeliness, and determine the frequency of data updates to ensure data real-time and effectiveness, extract platform construction characteristic data from aerial work platform construction information, and collect relevant data from various data sources according to the set data extraction rules.
[0082] Clean and preprocess the collected data, including removing outliers, filling missing values, unifying data formats, etc. Use data extraction rules to extract platform construction feature data from the preprocessed data, verify the extracted feature data to ensure its accuracy and reliability, and store the extracted and verified platform construction feature data in an appropriate data management system or database
[0083] Specifically, the platform construction characteristic data includes environmental classification, which divides the working environment into indoor, outdoor, urban center, suburban, mountainous, etc. For each environment type, define relevant parameters such as wind speed, temperature range, humidity, visibility, etc., and determine where to obtain these environmental parameters, such as weather station data, on-site monitoring equipment, etc. At the same time, formulate how to extract these parameters from the raw data, such as through API interface calls, database queries or file imports.
[0084] S32, classifying the platform construction feature data, and assigning weights to the classification results of the platform construction feature data to obtain a construction feature influence set;
[0085] Specifically, the platform construction feature data is classified, and the classification results of the platform construction feature data are weighted to obtain the construction feature influence set, which includes the following steps:
[0086] S321. Preset a classification standard for platform construction feature data, and classify the platform construction feature data based on the classification standard for platform construction feature data;
[0087] Specifically, we need to understand the business needs of aerial work platform construction, including the working environment, work tasks, safety requirements, etc. Based on the business needs, we need to determine which features are critical, such as working height, working radius, platform load, wind speed, temperature, etc., and develop classification standards for each key feature. For example, for working height, we can divide it into several categories: low-altitude work, medium-altitude work, and high-altitude work, such as low-altitude work, working height below 5 meters, medium-altitude work, working height between 5 meters and 20 meters, and high-altitude work, working height over 20 meters. We can also test the effectiveness of the classification standards in actual applications and make adjustments based on feedback.
[0088] Collect construction data of aerial work platforms, including work records, environmental monitoring data, etc., clean the collected data to remove errors and outliers, extract preset classification features from the cleaned data, and classify the extracted feature data into corresponding categories according to the preset classification standards. Verify the classification results to ensure the accuracy of the classification, and optimize the classification standards and classification methods based on the verification results.
[0089] S322, setting a feature weighting rule, and weighting the platform construction feature data in the platform construction feature data classification result based on the feature weighting rule;
[0090] Specifically, through historical data analysis, we can identify which features have a stronger correlation with construction quality and efficiency, and select appropriate weight allocation methods, such as hierarchical analysis method, data-driven method, etc. Then, based on the selected weight allocation method, we can formulate specific weighting rules, such as working height, with a weight of 0.5, working radius, with a weight of 0.3, and platform load, with a weight of 0.2. In actual applications, we can test the rationality of the weighting rules and make adjustments based on feedback.
[0091] Ensure that the classification results of feature data are clear and accurate. Calculate the weight of each feature according to the set weighting rules. For example, assign the calculated weight to the corresponding feature data and verify the rationality of the weight allocation result to ensure that the weight allocation reflects the importance and actual impact of the feature. Use the weighted feature data for subsequent data analysis and decision-making processes.
[0092] S323. Integrate the platform construction feature data weighting results to obtain the construction feature influence set.
[0093] Specifically, ensure that all feature data are in the same format and have been classified and weighted according to the previous steps, normalize the feature weights to ensure that the sum of all weights is 1, and combine the data of each feature with its corresponding weight. This is achieved by creating a data structure where each column represents a feature, each row represents an observation, and contains weight information.
[0094] For each feature, calculate its average impact among all observations by multiplying the data of each feature by its weight and then finding the average. Then, sort the features based on the calculated average impact to identify which features have the greatest impact on construction activities. Based on business needs, set a threshold to distinguish which features are considered to have significant impacts. Features with impacts exceeding the threshold and their data are integrated into an impact set, which will serve as the focus of subsequent analysis and decision-making.
[0095] Specifically, ensure that the data on working height, working radius and platform load are complete and have been processed according to the classification and weighting steps, and ensure that the sum of the weights is 1. For example, if there are other features, ensure that the weights of all features add up to 1. Create a data structure that contains the working height, working radius and platform load data of each observation, as well as the corresponding weights. For each feature, calculate its influence. For example, the influence of working height = working height data * working height weight. Sort the features according to the calculated influence to determine which features have the greatest impact on construction activities. Then set a threshold. For example, only when the influence of a feature exceeds 0.1 is it considered to have a significant impact. The features and their data whose influence exceeds the threshold are integrated into an influence set.
[0096] S33, substituting the construction feature influence set into the original load parameters of the aerial work platform to calculate the operation load data;
[0097] Specifically, substituting the construction feature influence set into the original load parameters of the aerial work platform to calculate the operation load data includes the following steps:
[0098] S331, performing data cleaning on the construction feature influence set, and merging the construction feature influence set after data cleaning with the original load parameters of the aerial work platform;
[0099] Specifically, check the data in the construction characteristics impact concentration, identify any outliers, errors or duplicate records, and for missing data, choose a method to fill in the missing values based on the actual situation, such as using the mean, median, mode or regression analysis, etc. For outliers, determine whether they are entry errors or real data, and decide whether to retain, correct or delete them based on the circumstances, and standardize the data to make it comparable, such as converting data in different units to the same unit, and ensure that the cleaned data is accurate and reliable through cross-validation or other methods.
[0100] Ensure that the data formats of the construction feature impact set and the original load parameters of the aerial work platform are consistent, such as column name, data type, etc. Create a new data structure to store the merged data, merge the cleaned construction feature impact set and the original load parameters of the aerial work platform according to certain keys such as timestamp, job number, etc. Check the merged data to ensure that there is no data loss or duplication, and perform necessary cleaning and sorting to verify the integrity and consistency of the merged data to ensure the accuracy and reliability of the data.
[0101] Specifically, check the data in the two datasets to ensure that there are no errors or outliers. If there are missing values, fill them according to the actual situation. Standardize the data, such as converting the job height from meters to feet. Ensure that the column names and units of the two datasets are consistent. Merge the two datasets into a new data structure based on keys such as job numbers or timestamps. Check the merged data to ensure that there is no data loss or duplication. Verify the integrity and consistency of the merged data.
[0102] S332, calculating the platform operation comprehensive load value based on the result of combining the construction feature influence set and the original load parameters of the aerial work platform;
[0103] Specifically, based on the combined result of the construction feature influence set and the original load parameters of the aerial work platform, the calculation of the platform operation comprehensive load value includes the following steps:
[0104] S3321. Normalize the construction feature influence set and the original load parameters of the aerial work platform;
[0105] Specifically, for each feature, calculate its minimum and maximum values among all observations. For example, for the influence data of working height, if the minimum value is 0.2 and the maximum value is 0.8, the normalized influence is (influence - 0.2) / (0.8 - 0.2). Check the normalized data to ensure that all values are in the range of [0, 1], and record the normalization method used and the calculated parameters.
[0106] S3322. Based on the normalized construction feature influence set and the original load parameters of the aerial work platform, the total platform load is calculated by a regression algorithm;
[0107] Specifically, based on the normalized construction feature influence set and the original load parameters of the aerial work platform, the calculation formula for calculating the total platform load through the regression algorithm is:
[0108] ;
[0109] in, W is the total platform load;
[0110] The intercept value of the construction feature impact concentration feature impact;
[0111] The construction characteristics affect the concentration of i The construction characteristics influence the value;
[0112] is the original load parameter of the aerial work platform;
[0113] N is the total number of construction feature influence sets.
[0114] S3323, extracting the aerial work platform node information in the aerial work platform parameters, and presetting the node load weight ratio;
[0115] Specifically, identify which are the node information in the aerial work platform parameters, such as working height, working radius, load conditions, etc., collect data related to these nodes, including real-time monitoring data, historical records, equipment logs, etc., clean and preprocess the collected data to ensure the accuracy and consistency of the data, extract key node information from the preprocessed data, and then through historical data analysis, identify which nodes have a stronger correlation with platform performance and safety, select appropriate weight distribution methods, such as hierarchical analysis method, data-driven method, etc. According to the selected weight distribution method, formulate specific node load weight ratios, for example, working height, weight ratio is 0.4, working radius, weight ratio is 0.3, load condition, weight ratio is 0.3 verification and adjustment, and test the rationality of the weight ratios in actual applications, and adjust them according to feedback.
[0116] S3324, calculating the node load value of the aerial work platform node information based on the total platform load value and the load weight ratio;
[0117] Specifically, determine the total overall load value of the aerial work platform, including data on working height, working radius, load conditions, etc. According to the previously preset node load weight ratio, multiply the load of each node by its weight. For example, if the weight ratio of the working height is 0.4, then the load value of the working height is the actual value of the working height multiplied by 0.4. For each node, repeat the above steps to calculate the load value of each node, add up the load values of all nodes, and get the total load value of the platform.
[0118] Specifically, assuming that the total platform load value is 100, the working height load value = the actual working height value * 0.4, the working radius load value = the actual working radius value * 0.3, and the load condition load value = the actual load condition value * 0.2. Assuming that the actual working height value is 30, the actual working radius value is 25, and the actual load condition value is 20, then the working height load value = 30 * 0.4 = 12, the working radius load value = 25 * 0.3 = 7.5, and the load condition load value = 20 * 0.2 = 4. Add the node load values calculated above to get the total load value of the platform, and the total load value = 12 + 7.5 + 4 = 23.5.
[0119] S3325. Verify the total platform load value and the node load value, and summarize the verified total platform load value and the node load value to generate a comprehensive platform operation load value.
[0120] Specifically, check the calculation process and data source of the total platform load and node load values to ensure there are no calculation errors or data entry errors, and use different methods or data sources to verify the load values, such as through actual measurements, historical data comparison or expert evaluation, to identify and investigate any abnormal or unexpected load values to determine whether they are real situations or erroneous data, and ensure the consistency between the total platform load and the node load values, that is, the total platform load should be equal to the sum of the node load values.
[0121] The verified total platform load value and node load value are integrated into a unified data structure, and further statistical analysis is performed on the node load value, such as calculating the average value, standard deviation, etc. to generate comprehensive load indicators. Then, based on the analysis requirements, a comprehensive platform operation load value is generated. This may be a single value or a comprehensive indicator system containing multiple indicators. The generated comprehensive load value is verified to ensure that it reflects the actual operating status of the platform, and the generation process and results of the comprehensive load value are recorded to provide a basis for subsequent analysis and decision-making.
[0122] Specifically, the working height load value, working radius load value and load condition load value are integrated into a data structure, the average load value of the three nodes is calculated, and a comprehensive load index is generated. Assuming that the working height load value is 12, the working radius load value is 7.5, and the load condition load value is 4, the comprehensive load value = (12 + 7.5 + 4) / 3 = 8.17, ensuring that the comprehensive load value 8.17 reflects the actual operating status of the platform, and recording the generation process and results of the comprehensive load value.
[0123] S333, simulating and verifying the comprehensive load value of platform operation, and optimizing and adjusting the comprehensive load value of high platform operation based on the simulation verification result;
[0124] Specifically, according to the actual operating environment and conditions of the platform, one or more simulation models are established to simulate the working state of the platform, the comprehensive load value of the platform operation and other relevant parameters and variables are input into the simulation model, the simulation model is run to simulate the operation of the platform under different working states, and the results of the simulation operation are analyzed to evaluate the performance and accuracy of the comprehensive load value in the simulation environment, and the simulation results are compared with the actual operating data of the platform to verify the rationality and effectiveness of the comprehensive load value.
[0125] Based on the results of the simulation verification, identify any problems or deficiencies in the comprehensive load value during the simulation, conduct in-depth analysis of the causes of the problems, whether they are due to the calculation method of the load value, improper weight distribution, or the limitations of the simulation model, and propose targeted adjustment plans, such as adjusting the weight distribution, improving the calculation method or optimizing the simulation model. Based on the adjustment plan, re-simulate and verify, test the performance of the adjusted comprehensive load value, and based on the results of the re-simulation verification, continue to optimize and adjust the comprehensive load value until the expected accuracy and practicality requirements are met.
[0126] Specifically, when it is found that there is a large deviation between the simulation results of the comprehensive load value under certain working heights and load conditions and the actual data, the reason is analyzed to be that the weight distribution of the working height and load conditions is not accurate enough or the simulation model fails to fully consider certain actual working conditions. It is decided to adjust the weight distribution of the working height and load conditions, and improve the simulation model to better reflect the actual working conditions. According to the adjustment plan, the simulation model is re-run, the adjusted comprehensive load value is tested, and then the comprehensive load value is continued to be adjusted according to the results of the re-simulation verification until the simulation results are more consistent with the actual data.
[0127] S334. Use the optimized and adjusted platform operation comprehensive load value as operation load data.
[0128] Specifically, before applying the optimized and adjusted comprehensive load value to the operation, ensure that all data has been verified and is accurate and reliable, convert the comprehensive load value into a data format suitable for use by the operation management system or decision support system, and then integrate the comprehensive load value into the operation management system of the aerial work platform to ensure that the system can receive and process this data.
[0129] During the platform operation process, the comprehensive load value is monitored in real time to promptly detect any abnormal load or load conditions that exceed the safety range. The comprehensive load value is combined with the early warning system. When the load value exceeds the preset safety threshold, the system can automatically issue a warning and provide operational guidance based on the comprehensive load value to help operators make safer operating decisions. The comprehensive load value is used to formulate and adjust the platform's maintenance plan to ensure necessary maintenance and inspection during periods of higher loads. The relationship between the comprehensive load value and platform performance is regularly evaluated for continuous optimization and improvement.
[0130] Verify the accuracy of the comprehensive load value and ensure that all data is up-to-date and reliable. Convert the comprehensive load value into a format that can be recognized by the operation management system. Through database records, integrate the comprehensive load value into the operation management system of the aerial work platform, so that the operator can view the load value in real time on the operation interface. The operator can monitor the comprehensive load value in real time through the system and receive an early warning when the load value approaches or exceeds the safety threshold. The operator adjusts the operation strategy according to the comprehensive load value, such as reducing the working height or load to maintain safe operation. The maintenance team adjusts the maintenance plan according to the comprehensive load value to ensure necessary maintenance and inspection after the load peak period.
[0131] S34, analyzing the impact of weather conditions on the construction work, and calculating the construction load data based on the analyzed impact value of the weather conditions on the construction work and the operation load data.
[0132] Specifically, analyzing the impact of weather conditions on construction operations, and calculating construction load data based on the analysis of the impact value of weather conditions on construction operations and the operation load data includes the following steps:
[0133] S341, pre-processing the impact of weather conditions on construction operations, and evaluating the impact value of weather conditions on construction operations after pre-processing;
[0134] Specifically, collect historical weather data related to construction work, including temperature, humidity, wind speed, precipitation, visibility, etc., check the collected weather data, remove or correct erroneous, abnormal or missing values, convert the original weather data into a format suitable for analysis, such as converting text descriptions into numerical codes, extract or construct features that are helpful for analysis from the original data, such as combining temperature and humidity to generate a heat index, standardize weather data to facilitate comparison across different dimensions and magnitudes, select or develop a model to evaluate the impact of weather on construction work, such as linear regression, decision tree or machine learning model, use historical data to train and evaluate the model, and verify the accuracy of the model through methods such as cross-validation, use the trained model to calculate the impact value of construction work under different weather conditions, analyze the evaluation results, identify the weather factors that have the greatest impact on construction work, and determine the extent of their impact, and use the evaluation results for decision support for construction work, such as adjusting the work plan to adapt to adverse weather conditions.
[0135] Specifically, data such as temperature, humidity, wind speed, precipitation and visibility were collected, and some obviously erroneous records, such as summer data with negative temperatures, were removed. Weather descriptions such as cloudy were converted into numerical codes, the heat index was calculated and the combined effects of temperature and humidity were considered, all weather data were standardized to the range of 0-1, and these preprocessed data were used to evaluate the impact of weather conditions on construction operations. A random forest model was selected to evaluate the impact of weather on construction operations. The model was trained using historical data, and the accuracy of the model was verified through cross-validation. The model was used to calculate the impact of construction operations under different weather conditions. The analysis results showed that wind speed and precipitation were the factors that had the greatest impact on construction operations. Based on the evaluation results, the construction team adjusted the work plan under weather conditions with higher wind speeds or heavier precipitation.
[0136] S342, unifying the construction operation weather condition impact value and the operation load data, and merging the unified construction operation weather condition impact value and the operation load data to obtain the operation impact data;
[0137] Specifically, ensure that the construction work weather condition impact value and the operation load data have the same data format and unit, align the two sets of data according to the timestamp or date, ensure that the corresponding data points reflect the same time period, standardize all data variables to eliminate the impact of dimensions so that the data can be directly compared, check the completeness and accuracy of the data, remove any outliers or missing data, and perform interpolation or other data cleaning methods when necessary.
[0138] Create a new data framework to merge the weather impact value and operation load data into the same data structure. Each row of data contains the weather impact value and operation load value at the same time point. Use database management tools or data processing software to merge the data according to timestamps or identifiers. After merging the data, re-verify the consistency and accuracy of the data to ensure that no errors are introduced during the merging process. Perform a comprehensive analysis of the merged data to identify the correlation between weather conditions and operation loads and their combined impact on construction operations, and apply statistical models or machine learning methods to further analyze the data, such as using multiple regression to analyze the impact of weather factors and operation loads on construction efficiency. Based on the analysis results, generate a detailed report and use these comprehensive data to provide operational guidance to help the project management team make operational decisions under different weather conditions. The data set includes date, temperature, wind speed, precipitation, number of workers, and equipment utilization rate. Apply a multiple linear regression model to analyze how these variables jointly affect construction efficiency. Based on the model results, optimize the construction plan, such as reducing external operations when high temperature or high wind speed weather is predicted.
[0139] S343, constructing a construction load model by using a multivariate linear regression algorithm, and substituting the operation impact data into the construction load model to calculate the construction load data;
[0140] Specifically, variables related to the construction load are selected, such as the number of workers, equipment utilization rate, material consumption, construction progress, etc., and historical construction data, including variables and corresponding construction load data, are collected. The collected data are then preprocessed by cleaning, filling missing values, converting data formats, and performing feature selection and feature conversion. A construction load model is established using a multivariate linear regression algorithm. For example, construction load = β0 + β1 (number of workers) + β2 (equipment utilization rate) + β3 (material consumption) + β4 (construction progress) + ε. The model is trained using historical data, and the regression coefficients are estimated. The accuracy of the model is verified through methods such as cross-validation and goodness of fit testing. New operation impact data are collected, including the variables selected when building the model, and the new data are preprocessed to ensure that its format is consistent with the model input requirements. The preprocessed operation impact data is substituted into the established construction load model, and the construction load data, i.e., the predicted construction load value, is calculated based on the model output.
[0141] S344, performing simulation verification on the construction load data, and optimizing and adjusting the construction load data based on the simulation verification results.
[0142] Specifically, according to the characteristics and needs of the construction project, build one or more simulation models. These models should be able to simulate the actual construction environment and conditions, such as using simulation software or professional construction management software, input the construction load data as input parameters into the simulation model, including but not limited to the number of workers, equipment utilization rate, material consumption, etc., run the simulation model, simulate different construction scenarios and conditions, and pay attention to the performance of the construction load data under different conditions, conduct a detailed analysis of the simulation results, identify whether the performance of the construction load data in the simulation is as expected, check whether there are any abnormal or illogical data performance, compare the simulation results with the actual construction data, and verify the accuracy of the simulation and the validity of the construction load data.
[0143] Based on the simulation results, identify any significant problems or deviations from expectations, such as overestimation or underestimation of construction loads, and conduct in-depth analysis of possible causes of the problems, including errors in input data, inaccuracies in the model, or the influence of external factors. Based on the cause of the problem, formulate specific adjustment strategies, including adjusting input data, modifying model parameters, or improving data collection and processing methods. After making necessary adjustments to the construction load data, re-simulate to verify the effect of the adjustment and continue to optimize and adjust based on the new simulation results. This process requires multiple iterations to ensure that the accuracy and practicality of the construction load data are optimized, and record the entire simulation verification and optimization adjustment process, including the model used, problems encountered, measures taken, and final results.
[0144] S4, based on the construction load data and the original angle value of the aerial work platform, calculating the amplitude angle value of the aerial work platform generated during construction;
[0145] Specifically, based on the construction load data and the original angle value of the aerial work platform, calculating the amplitude angle value of the aerial work platform generated during construction includes the following steps:
[0146] S41, extracting the node load value and the aerial work platform node information in the construction load data, and calculating the construction node moment;
[0147] Specifically, ensure access to construction load data containing node load values and aerial work platform node information, including node location, load size, direction of action, etc., organize and format the data for easy processing, identify the required node load values and related platform node information. Specifically, it is necessary to identify the position coordinates of each node (such as x, y, and z axis coordinates), the load on the node and its direction of action, determine the rotation axis for torque calculation in construction operations, calculate the lever arm length based on the position coordinates of each node and the position of the rotation axis, and the lever arm is the shortest distance from the node to the rotation axis, obtained through geometric calculation, and use the above formula to calculate the torque of each node.
[0148] S42, calculating the amplitude angle value of the aerial work platform based on the construction node moment and the original angle value of the aerial work platform;
[0149] Specifically, based on the construction node moment and the original angle value of the aerial work platform, calculating the amplitude angle value of the aerial work platform includes the following steps:
[0150] S421, summing up the construction node moments to obtain the total moment of the construction nodes of the aerial work platform;
[0151] Specifically, ensure that the torque of each node has been calculated, including the magnitude and direction of the force. For each node, record or extract its torque value, and pay attention to the influence of the direction of the torque on the total torque. Before calculating the total torque, it is necessary to confirm the direction of each torque. The torque can be clockwise or counterclockwise, which is determined according to the rotation axis and the direction of the force. Ensure that the directions of all torques are correctly identified and considered before merging. Vector synthesize the torque vectors of all nodes, that is, sum all the torques relative to the same rotation axis, where counterclockwise torque is positive and clockwise torque is negative.
[0152] S422, setting a platform moment of inertia rule, and calculating an angle change value of the aerial work platform based on the platform moment of inertia rule and a total moment of a construction node of the aerial work platform;
[0153] Specifically, ensure that the torque of each node has been calculated, including the magnitude and direction of the force. For each node, record or extract its torque value, and pay attention to the impact of the direction of the torque on the total torque. Before calculating the total torque, you need to confirm the direction of each torque. The torque is clockwise or counterclockwise, which is determined according to the rotation axis and the direction of the force. Ensure that the directions of all torques are correctly identified and considered before merging. Perform vector synthesis on the torque vectors of all nodes, that is, sum all the torques relative to the same rotation axis, where counterclockwise torque is positive and clockwise torque is negative.
[0154] S423, combining the original angle value of the aerial work platform with the angle change value of the aerial work platform to obtain the amplitude angle value of the aerial work platform.
[0155] Specifically, in order to ensure the original angle value and angle change value of the aerial work platform. The original angle is the angular position of the platform at a certain reference moment, and the angle change value is the change in the platform angle from that moment, and the original angle value is added to the angle change value. Since the angle calculation may cause the angle to overflow, that is, exceed 360 degrees or be less than 0 degrees, the final angle value needs to be adjusted to ensure that it is within the standard range of 0 to 360 degrees.
[0156] S43. Verify the amplitude angle value of the aerial work platform, and optimize and adjust the amplitude angle value of the aerial work platform after verification.
[0157] Specifically, the actual angle of the platform is obtained through actual measurement tools (such as an inclinometer or inclinometer), and then these measured values are compared with the calculated amplitude angle value, and the error between the calculated value and the measured value is analyzed to determine whether the error is within an acceptable range. If the error exceeds the preset threshold, it is necessary to further investigate the source of the error, which may be the calculation method, data input error or inaccuracy of the measuring equipment, and set up a feedback mechanism to ensure that any error information received can be used to correct and improve the angle calculation process. If systematic errors are found, it may be necessary to adjust the model or algorithm for angle calculation, including adjusting the relevant angle conversion factors or considering the influence of additional environmental factors, check and update the accuracy of the input data, for example, ensure that the angle change value is accurately recorded and transmitted, and all sensors are calibrated. After any adjustment, repeat the verification process to ensure that the adjustment effectively reduces the error, and conduct a series of operation tests in a controlled environment to verify the performance of the adjusted angle value in actual operation.
[0158] S5. Analyze the amplitude angle value of the aerial work platform, and optimize the control of the aerial work platform based on the analysis results.
[0159] Specifically, sufficient luffing angle data should be collected, which should include angle values under different operating conditions, such as angle records under different loads and weather conditions. The collected angle data should be statistically analyzed, including calculation of the average value, standard deviation, error range, etc., to identify the regular performance of the angle value and any abnormal fluctuations, and use time series analysis or other advanced analysis techniques to identify trends and patterns in angle changes, for example, whether there are systematic deviations, periodic changes, etc., and analyze factors that may affect the accuracy of the luffing angle, such as mechanical wear, control system delays, environmental impacts on wind speed and temperature, etc. Based on the analysis results, the mathematical model used for angle control is optimized. model or control algorithm. For example, if the angle deviation is found to be related to the load size, adjust the control algorithm to automatically compensate for the load change, adjust the control system parameters, such as the proportional, integral and differential parameters of the controller, to improve the response speed and reduce overshoot, and implement updates in the control system software, including new control strategies and algorithms, ensure that all updates are rigorously tested, establish a real-time feedback system that can continuously monitor operating data and automatically adjust control parameters to adapt to the changing operating environment and conditions, and test the new control strategy in a simulation environment before implementing any major adjustments to confirm its effectiveness. After success, conduct field verification to evaluate its performance in actual operation.
[0160] According to another embodiment of the present invention, Figure 2The invention provides a safety control system for an aerial work platform based on a variable amplitude angle, the system comprising:
[0161] Parameter acquisition module 1, used to obtain aerial work platform parameters, construction weather conditions and aerial work platform construction information;
[0162] The original parameter module 2 is used to obtain the original load parameters and the original angle value of the aerial work platform based on the parameters of the aerial work platform;
[0163] The platform load module 3 is used to extract the platform construction characteristic data according to the aerial work platform construction information, and calculate the construction load data based on the platform construction characteristic data, the construction weather conditions and the original load parameters of the aerial work platform;
[0164] The amplitude angle module 4 is used to calculate the amplitude angle value of the aerial work platform generated during construction based on the construction load data and the original angle value of the aerial work platform;
[0165] Safety control module 5, used to analyze the amplitude angle value of the aerial work platform and optimize the control of the aerial work platform based on the analysis results;
[0166] The parameter acquisition module 1, the original parameter module 2, the platform load module 3, the amplitude angle module 4 and the safety control module 5 are connected in sequence.
[0167] To sum up, with the help of the above-mentioned technical scheme of the present invention, the present invention ensures the consistency of data and the effectiveness of comparison during analysis through standardized processing, and weights and comprehensively analyzes various factors, providing a more accurate and scientific basis for decision-making, while reducing operational risks and improving operational safety by accurately calculating and analyzing the load and angle changes of the aerial work platform.
[0168] In addition, the present invention reduces operation time and improves work efficiency by optimizing control, reduces erroneous operations, improves work efficiency, and reduces long-term operating costs. At the same time, it reduces unexpected downtime by analyzing load data and angle changes and predicting potential maintenance needs, and reduces dependence on professional skills by optimizing control processes.
[0169] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A safety control method for an aerial work platform based on variable amplitude angle, characterized in that: The following steps are involved: S1. Obtaining aerial work platform parameters, construction weather conditions and aerial work platform construction information; S2. Based on the aerial work platform parameters, obtain the original load parameters and the original angle value of the aerial work platform; S3. Extracting platform construction characteristic data according to the aerial work platform construction information, and calculating construction load data based on the platform construction characteristic data, construction weather conditions and original load parameters of the aerial work platform; The method of extracting platform construction characteristic data according to the aerial work platform construction information, and calculating the construction load data based on the platform construction characteristic data, construction weather conditions and the original load parameters of the aerial work platform includes the following steps: S31, setting a construction data extraction rule, and extracting platform construction feature data from the aerial work platform construction information based on the construction data extraction rule; S32, classifying the platform construction feature data, and assigning weights to the classification results of the platform construction feature data to obtain a construction feature influence set; S33, substituting the construction feature influence set into the original load parameters of the aerial work platform to calculate the operation load data; S34, analyzing the impact of weather conditions on the construction work, and calculating the construction load data based on the analyzed impact value of the weather conditions on the construction work and the operation load data; S4, based on the construction load data and the original angle value of the aerial work platform, calculating the amplitude angle value of the aerial work platform generated during construction; S5. Analyze the amplitude angle value of the aerial work platform, and optimize the control of the aerial work platform based on the analysis results.
2. The method for controlling the aerial work platform safety based on the variable amplitude angle according to claim 1 is characterized in that: The platform construction feature data is classified, and the classification results of the platform construction feature data are weighted to obtain the construction feature influence set The following steps are involved: S321. Preset a classification standard for platform construction feature data, and classify the platform construction feature data based on the classification standard for platform construction feature data; S322, setting a feature weighting rule, and weighting the platform construction feature data in the platform construction feature data classification result based on the feature weighting rule; S323. Integrate the platform construction feature data weighting results to obtain the construction feature influence set.
3. The method for controlling the aerial work platform safety based on the variable amplitude angle according to claim 1 is characterized in that: Substituting the construction feature influence set into the original load parameters of the aerial work platform to calculate the operation load data comprises the following steps: S331, performing data cleaning on the construction feature influence set, and merging the construction feature influence set after data cleaning with the original load parameters of the aerial work platform; S332, calculating the platform operation comprehensive load value based on the result of combining the construction feature influence set and the original load parameters of the aerial work platform; S333, simulating and verifying the comprehensive load value of platform operation, and optimizing and adjusting the comprehensive load value of high platform operation based on the simulation verification result; S334. Use the optimized and adjusted platform operation comprehensive load value as operation load data.
4. The method for controlling the aerial work platform safety based on the variable amplitude angle according to claim 3 is characterized in that: The calculation of the platform operation comprehensive load value based on the merging result of the construction feature influence set and the original load parameter of the aerial work platform comprises the following steps: S3321. Normalize the construction feature influence set and the original load parameters of the aerial work platform; S3322. Based on the normalized construction feature influence set and the original load parameters of the aerial work platform, the total platform load is calculated by a regression algorithm; S3323, extracting the aerial work platform node information in the aerial work platform parameters, and presetting the node load weight ratio; S3324, calculating the node load value of the aerial work platform node information based on the total platform load value and the load weight ratio; S3325. Verify the total platform load value and the node load value, and summarize the verified total platform load value and the node load value to generate a comprehensive platform operation load value.
5. The method for controlling the aerial work platform safety based on the variable amplitude angle according to claim 4 is characterized in that: Based on the normalized construction feature influence set and the original load parameters of the aerial work platform, the calculation formula for the total platform load is calculated by regression algorithm: ; in, W is the total platform load; The intercept value of the construction feature impact concentration feature impact; The construction characteristics affect the concentration of i The construction characteristics influence the value; is the original load parameter of the aerial work platform; N is the total number of construction feature influence sets.
6. The method for controlling the aerial work platform safety based on the variable amplitude angle according to claim 1 is characterized in that: The analyzing the impact of weather conditions on construction work and calculating the construction load data based on the analysis of the impact value of weather conditions on construction work and the operation load data comprises the following steps: S341, pre-processing the impact of weather conditions on construction operations, and evaluating the impact value of weather conditions on construction operations after pre-processing; S342, unifying the construction operation weather condition impact value and the operation load data, and merging the unified construction operation weather condition impact value and the operation load data to obtain the operation impact data; S343, constructing a construction load model by using a multivariate linear regression algorithm, and substituting the operation impact data into the construction load model to calculate the construction load data; S344, performing simulation verification on the construction load data, and optimizing and adjusting the construction load data based on the simulation verification results.
7. The method for controlling the aerial work platform safety based on the variable amplitude angle according to claim 1 is characterized in that: The method of calculating the amplitude angle value of the aerial work platform generated during construction based on the construction load data and the original angle value of the aerial work platform comprises the following steps: S41, extracting the node load value and the aerial work platform node information in the construction load data, and calculating the construction node moment; S42, calculating the amplitude angle value of the aerial work platform based on the construction node moment and the original angle value of the aerial work platform; S43. Verify the amplitude angle value of the aerial work platform, and optimize and adjust the amplitude angle value of the aerial work platform after verification.
8. The method for controlling the aerial work platform safety based on the variable amplitude angle according to claim 7 is characterized in that: The method of calculating the amplitude angle value of the aerial work platform based on the construction node torque and the original angle value of the aerial work platform comprises the following steps: S421, summing up the construction node moments to obtain the total moment of the construction nodes of the aerial work platform; S422, setting a platform moment of inertia rule, and calculating an angle change value of the aerial work platform based on the platform moment of inertia rule and a total moment of a construction node of the aerial work platform; S423, combining the original angle value of the aerial work platform with the angle change value of the aerial work platform to obtain the amplitude angle value of the aerial work platform.
9. A safety control system for aerial work platforms based on variable amplitude angle, used to implement the safety control method for aerial work platforms based on variable amplitude angle according to any one of claims 1 to 8, characterized in that: The system includes: Parameter acquisition module, used to obtain aerial work platform parameters, construction weather conditions and aerial work platform construction information; The original parameter module is used to obtain the original load parameters and the original angle value of the aerial work platform based on the parameters of the aerial work platform; The platform load module is used to extract the platform construction characteristic data according to the aerial work platform construction information, and calculate the construction load data based on the platform construction characteristic data, the construction weather conditions and the original load parameters of the aerial work platform; The luffing angle module is used to calculate the luffing angle value of the aerial work platform generated during construction based on the construction load data and the original angle value of the aerial work platform; Safety control module, used to analyze the amplitude angle value of the aerial work platform and optimize the control of the aerial work platform based on the analysis results; The parameter acquisition module, the original parameter module, the platform load module, the amplitude variation angle module and the safety control module are connected in sequence.
