Information processing method and system based on hydropower automatic generation control test
By obtaining multiple samples and reference control strategies from the hydropower control sample sequence to be tested and combining candidate control schemes for simulation control testing, the problem of inaccurate test results in the prior art is solved, and more efficient and accurate hydropower automatic Power generation control test.
Patent Information
- Application Number
- CN202410648042.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-05-23
AI Technical Summary
The existing hydropower generation control testing methods cannot fully cover all possible operating conditions and failure modes, and fail to make full use of the information in the prior test hydropower control samples, resulting in inaccurate and comprehensive test results.
By obtaining multiple samples from the hydropower control sample sequence to be tested, and determining the adaptive basic control scheme from multiple reference control strategies, combining candidate control schemes for simulation control tests, adjusting the prior test hydropower control sample sequence, and iteratively conducting tests , to improve the accuracy and comprehensiveness of the test.
It improves the accuracy and efficiency of automatic hydropower generation control testing, improves the authenticity and comprehensiveness of the test results, and can more accurately evaluate the effects of different control plans.
Smart Images

Figure CN118550237B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to an information processing method and system based on hydropower automatic power generation control test. Background Art
[0002] With the continuous progress and development of hydropower technology, automatic power generation control of hydropower stations has become the key to improving power generation efficiency and stability. However, in the actual hydropower generation control process, due to the influence of various factors, such as changes in water flow, unstable unit status, and fluctuations in grid load, hydropower station power generation control faces many challenges.
[0003] In traditional hydropower generation control testing, the test method based on experimental data or historical data is usually adopted. However, this method often cannot fully cover all possible operating conditions and failure modes, so there may be potential risks and hidden dangers in actual operation.
[0004] In order to solve this problem, methods based on information processing and simulation control testing have gradually attracted attention in recent years. This type of method evaluates the effectiveness and stability of the control strategy by conducting simulation control tests on the hydropower control samples to be tested. However, when determining the control strategy, the existing information processing methods often only consider a single control scheme, while ignoring the adaptability and complementarity between different control schemes.
[0005] In addition, the existing simulation control test methods have not fully utilized the information in the prior test hydropower control sample sequence. This prior information contains a lot of valuable test results and experience, which can provide important reference and reference for subsequent tests. Summary of the invention
[0006] In view of this, the purpose of this application is to provide an information processing method and system based on hydropower automatic power generation control testing, which aims to improve the accuracy and comprehensiveness of simulation control testing by comprehensively utilizing multiple reference control strategies and information in prior test hydropower control sample sequences, and to more effectively evaluate the effects of different control schemes.
[0007] According to a first aspect of the present application, there is provided an information processing method based on a hydropower automatic generation control test, the method comprising:
[0008] Acquire multiple hydropower control samples to be tested from a sequence of hydropower control samples to be tested, and determine multiple reference control strategies;
[0009] Traversing each of the multiple hydropower control samples to be tested, and determining multiple basic control schemes suitable for the traversed hydropower control samples to be tested from multiple reference control strategies;
[0010] If the multiple basic control schemes include candidate control schemes, simulated control tests are performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate simulated control test results of the traversed hydropower control samples to be tested; the candidate control scheme is determined by statistically testing the simulated control test results in the hydropower control sample sequence;
[0011] The priori test hydropower control sample sequence is adjusted according to the simulation control test results associated with each of the multiple hydropower control samples to be tested, and the simulation control test is iteratively performed on the hydropower control samples to be tested in the hydropower control sample sequence to be tested until the simulation control test is completed for all the hydropower control samples to be tested in the hydropower control sample sequence to be tested.
[0012] In a possible implementation manner of the first aspect, if the multiple basic control schemes include a candidate control scheme, performing a simulation control test on the traversed hydropower control samples to be tested according to the multiple basic control schemes, and generating simulation control test results of the traversed hydropower control samples to be tested, includes:
[0013] Obtaining candidate control schemes corresponding to a priori test hydropower control sample sequences, and determining test activation requirements for the candidate control schemes;
[0014] If the candidate control scheme is included in multiple basic control schemes and meets the test activation requirements, a simulated control test is performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate a simulated control test result of the traversed hydropower control samples to be tested.
[0015] In a possible implementation of the first aspect, the test results of the simulated control test results of the candidate control scheme configured in the priori test hydropower control sample sequence meet the emergency strategy deployment requirements;
[0016] If the candidate control scheme is included in the multiple basic control schemes and meets the test activation requirements, a simulation control test is performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested, including:
[0017] If the candidate control scheme is included in the multiple basic control schemes, the test data corresponding to the candidate control scheme is obtained; the test data corresponding to the candidate control scheme is generated by binding the traversed hydropower control sample to be tested with the candidate control scheme;
[0018] If the test data corresponding to the candidate control scheme meets the test activation requirement, a simulation control test is performed on the traversed hydropower control samples to be tested according to a plurality of basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested;
[0019] and, if the candidate control scheme is not included in the plurality of basic control schemes, obtaining a non-emergency strategy deployment requirement;
[0020] If the test data respectively associated with the multiple basic control schemes meet the non-emergency strategy deployment requirements, a simulation control test is performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested;
[0021] The test data respectively associated with the multiple basic control schemes are generated after binding the traversed hydropower control samples to be tested with the multiple basic control schemes respectively.
[0022] In a possible implementation manner of the first aspect, determining a plurality of basic control schemes adapted to the traversed hydropower control samples to be tested from a plurality of reference control strategies includes:
[0023] Binding the traversed hydropower control samples to be tested with multiple reference control strategies respectively to generate test data associated with each of the multiple reference control strategies;
[0024] Based on the test data associated with each of the multiple reference control strategies, strategy solutions are extracted from the multiple reference control strategies to generate multiple basic control solutions that are compatible with the traversed hydropower control samples to be tested.
[0025] In a possible implementation manner of the first aspect, the traversed hydropower control samples to be tested include control data of the equipment to be tested; and the binding test of the traversed hydropower control samples to be tested with multiple reference control strategies respectively to generate test data associated with each of the multiple reference control strategies includes:
[0026] Performing simulation control on the control data of the device to be tested respectively with a plurality of reference control strategies, and generating device simulation control test results associated with each of the plurality of reference control strategies;
[0027] Acquire a control strategy evaluation network; the control strategy evaluation network is updated and generated based on the simulation control test results in the prior test hydropower control sample sequence;
[0028] According to the control strategy evaluation network, correlation tests are respectively performed on the equipment simulation control test results respectively associated with a plurality of reference control strategies, and test data respectively associated with the plurality of reference control strategies are generated.
[0029] In a possible implementation of the first aspect, acquiring a control strategy evaluation network includes:
[0030] Obtaining a control strategy evaluation network with initialization parameters and a priori test hydropower control sample sequence; the simulation control test results in the priori test hydropower control sample sequence include priori test equipment control data and a priori control scheme for the priori test equipment control data;
[0031] According to the control strategy evaluation network of the initialization parameters, the a priori test device control data and the a priori control scheme corresponding to the a priori test device control data are traversed to perform correlation test, and test data of the a priori test device control data is generated;
[0032] The control strategy evaluation network with the initialization parameters is trained based on the test data of the priori test equipment control data to generate a control strategy evaluation network.
[0033] In a possible implementation of the first aspect, extracting strategy solutions from multiple reference control strategies based on test data associated with each of the multiple reference control strategies to generate multiple basic control solutions that are compatible with the traversed hydropower control samples to be tested includes:
[0034] Obtain test data evaluation criteria;
[0035] Based on the test data associated with each of the multiple reference control strategies, extracting multiple target control schemes that meet the test data evaluation criteria from the multiple reference control strategies;
[0036] Based on the multiple target control schemes, multiple basic control schemes adapted to the traversed hydropower control samples to be tested are generated.
[0037] In a possible implementation manner of the first aspect, performing a simulation control test on the traversed hydropower control samples to be tested according to a plurality of basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested includes:
[0038] Obtain a test scenario instance, and determine a reference simulator and a reference instruction set;
[0039] According to the reference simulator, based on the reference instruction set and traversing the test scenario instance, a simulation control test is performed to generate a target simulation test result of the test scenario instance;
[0040] Obtaining the expected control result of the test scenario instance; the expected control result includes a plurality of expected control data generated by traversing the test scenario instance and performing simulated control tests according to different control test strategies;
[0041] Determine a first characteristic cost between the target simulation test result and a plurality of expected control data, and a second characteristic cost between the plurality of expected control data;
[0042] If the first feature cost is consistent with the second feature cost, determining the reference simulator as a control test simulator, and outputting the reference instruction set as a test instruction set;
[0043] According to the control test simulator, based on the test instruction set and multiple basic control schemes, a simulated control test is performed on the traversed hydropower control samples to be tested, and a simulation test result of the traversed hydropower control samples to be tested is generated;
[0044] Acquire simulation test result evaluation criteria, adjust the simulation test results according to the simulation test result evaluation criteria, generate adjusted simulation test results, and generate simulation control test results of the traversed hydropower control samples to be tested based on the adjusted simulation test results.
[0045] In a possible implementation manner of the first aspect, the adjusting the priori test hydropower control sample sequence according to the simulation control test results associated with each of the plurality of hydropower control samples to be tested, and iteratively performing simulation control tests on the hydropower control samples to be tested in the hydropower control sample sequence to be tested until all the hydropower control samples to be tested in the hydropower control sample sequence to be tested have completed simulation control tests, including:
[0046] The simulation control test results associated with each of the multiple hydropower control samples to be tested are stored in the prior test hydropower control sample sequence, and the step of obtaining multiple hydropower control samples to be tested from the hydropower control sample sequence to be tested is returned to execute until the simulation control test is completed for all the hydropower control samples to be tested in the hydropower control sample sequence to be tested.
[0047] According to the second aspect of the present application, a hydropower control test system is provided, which includes a machine-readable storage medium and a processor, wherein the machine-readable storage medium stores machine-executable instructions, and when the processor executes the machine-executable instructions, the hydropower control test system implements the aforementioned information processing method based on hydropower automatic power generation control test.
[0048] According to a third aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer-executable instructions, and when the computer-executable instructions are executed, the aforementioned information processing method based on hydropower automatic power generation control test is implemented.
[0049] According to any one of the above aspects, the technical effect of the present application is:
[0050] The embodiment of the present application obtains multiple hydropower control samples to be tested from the sequence of hydropower control samples to be tested, and determines multiple reference control strategies, and then determines a basic control scheme that is compatible with each hydropower control sample to be tested from the multiple reference control strategies, so as to more accurately simulate the actual situation and improve the accuracy of the test. By introducing a candidate control scheme, the candidate control scheme is determined by the simulation control test results in the statistical prior test hydropower control sample sequence, so that the previous test results and experience can be introduced into the current test, and the test process and results are further optimized. According to the simulation control test results, the prior test hydropower control sample sequence is adjusted, and the test is iteratively tested, so that the test process and results can be continuously optimized, so that the test results are closer to the actual situation. As a result, not only the efficiency of the hydropower automatic power generation control test is improved, but also the accuracy and authenticity of the test are improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other corresponding drawings can be obtained based on these drawings without paying creative work.
[0052] Figure 1 A flow chart of an information processing method based on a hydropower automatic generation control test provided in an embodiment of the present application;
[0053] Figure 2 A schematic diagram of the component structure of a hydropower control test system provided in an embodiment of the present application for implementing the above-mentioned information processing method based on hydropower automatic power generation control test is shown. DETAILED DESCRIPTION
[0054] The embodiments of the present application are described below in conjunction with the drawings in the present application. It should be understood that the implementation methods described below in conjunction with the drawings are exemplary descriptions for explaining the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions of the embodiments of the present application.
[0055] Those skilled in the art will appreciate that, unless specifically stated, the singular forms "one", "said", and "the" used herein may also include plural forms. It should be further understood that the terms "including" and "comprising" used in the embodiments of the present application refer to that the corresponding features can be implemented as the presented features, information, data, steps, operations, elements and / or components, but do not exclude the implementation as other features, information, data, steps, operations, elements, components and / or combinations thereof supported by the technical field. It should be understood that when an element is "connected" or "coupled" to another element, the element may be directly connected or coupled to the other element, or may refer to the element and the other element establishing a connection relationship through an intermediate element. In addition, the "connection" or "coupling" used herein may include wireless connection or wireless coupling. The term "and / or" used herein indicates at least one of the items defined by the term, for example, "A and / or B" may be implemented as "A", or as "B", or as "A and B".
[0056] In order to make the purpose, technical solution and advantages of the present application clearer, the implementation mode of the present application will be further described in detail with reference to the accompanying drawings. The technical solution of the embodiment of the present application and the technical effect produced by the technical solution of the present application are explained below by describing several exemplary implementation modes. It should be pointed out that the following implementation modes can refer to, draw lessons from or combine with each other, and the same terms, similar features and similar implementation steps in different implementation modes are not described repeatedly.
[0057] Figure 1 The flowchart of the information processing method and system based on the hydropower automatic generation control test provided by the embodiment of the present application is shown. It should be understood that in other embodiments, the order of some steps in the information processing method based on the hydropower automatic generation control test of this embodiment can be shared with each other according to actual needs, or some steps can be omitted or maintained. The detailed steps of the information processing method based on the hydropower automatic generation control test include:
[0058] Step S110 , obtaining a plurality of hydropower control samples to be tested from a sequence of hydropower control samples to be tested, and determining a plurality of reference control strategies.
[0059] In detail, the sequence of hydropower control samples to be tested is a sequence including multiple hydropower control samples to be tested, each of which represents a specific hydropower station operating environment and control requirements. These hydropower control samples to be tested may include various parameters of the hydropower station, such as water level, flow, generator status, grid requirements, etc.
[0060] The hydropower control sample to be tested is a separate sample in the sequence of hydropower control samples to be tested, representing a specific hydropower station operation environment and control requirements. For example, a hydropower control sample to be tested may represent a specific operation scenario of "the water level of the hydropower station is at a medium level and the grid demand is stable".
[0061] The reference control strategy is a set of predefined control strategies, usually developed based on industry best practices and expert experience, and is used as a benchmark for matching with the hydropower control sample to be tested. For example, suppose there are three reference control strategies: Strategy A focuses on fast frequency regulation, Strategy B focuses on power factor control, and Strategy C is a comprehensive control strategy. These strategies will be used to match with the hydropower control sample to be tested.
[0062] That is, in this embodiment, the server extracts a sequence of hydropower control samples to be tested from the database, and the sequence of hydropower control samples to be tested includes operation data and control demand samples of multiple different hydropower stations. At the same time, the server loads a set of predefined reference control strategies, which are previously developed based on industry best practices and expert experience, and are used for subsequent matching with the hydropower control samples to be tested.
[0063] Step S120 , traversing each of the multiple hydropower control samples to be tested, and determining multiple basic control schemes suitable for the traversed hydropower control samples to be tested from multiple reference control strategies.
[0064] In detail, the basic control scheme is a specific control scheme obtained by matching the hydropower control sample to be tested with the reference control strategy, and is a control strategy customized for the specific hydropower station operating environment and control requirements. For example, for the hydropower control sample to be tested of "the water level of the hydropower station is medium and the grid demand is stable", the server may select strategy C as the basic control scheme because it may provide the most stable operating effect in this scenario.
[0065] The candidate control scheme is a control scheme that has performed well in previous simulation control tests and may become the key to future optimization control strategies. It is usually activated and applied to the control of hydropower plants when specific conditions are met. For example, suppose in previous tests, strategy B performed well when the grid load changes rapidly. Then, when encountering similar scenarios, strategy B may be selected as a candidate control scheme.
[0066] Simulation control testing is a control test of a hydropower station in a simulated environment, which aims to evaluate the performance of different control strategies. By simulating the operating environment of an actual hydropower station, the response of the hydropower station under various control strategies can be observed and recorded. For example, the server can apply strategies A, B, and C to the hydropower control sample to be tested in a simulated environment and observe which strategy performs best under the sample conditions.
[0067] The test data is data collected in the simulation control test, reflecting a detailed record of the operating status of the hydropower station under different control strategies, such as performance indicators such as response time, control accuracy, and stability.
[0068] Therefore, in this embodiment, the server starts to process the hydropower control samples to be tested one by one. For each hydropower control sample to be tested, the server analyzes the specific control requirements and operating conditions of the hydropower control to be tested, and then selects several basic control schemes that are most suitable for the current sample from the predefined reference control strategies. For example, for a hydropower station sample that needs to respond quickly to changes in grid load, the server can select a basic control scheme that includes functions such as fast frequency regulation and power factor control.
[0069] Step S130: If the multiple basic control schemes include candidate control schemes, simulated control tests are performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate simulated control test results of the traversed hydropower control samples to be tested. The candidate control scheme is determined by statistically testing the simulated control test results in the hydropower control sample sequence.
[0070] In this embodiment, after determining the basic control scheme that is suitable for the current hydropower control sample to be tested, the server can check whether these basic control schemes include candidate control schemes. Candidate control schemes are those that have been proven to perform well under specific circumstances in previous tests. If a candidate control scheme is included and the candidate control scheme meets the activation conditions of the current test environment (for example, the grid frequency fluctuation exceeds a certain threshold), the server will use this candidate control scheme and other basic control schemes to perform a simulated control test on the current hydropower control sample to be tested. During the test, the server can record various performance indicators, such as response time, control accuracy, etc., and finally generate a simulated control test result report.
[0071] Step S140, adjusting the priori test hydropower control sample sequence according to the simulation control test results associated with each of the multiple hydropower control samples to be tested, and iteratively performing simulation control tests on the hydropower control samples to be tested in the hydropower control sample sequence to be tested until all the hydropower control samples to be tested in the hydropower control sample sequence to be tested have completed the simulation control tests.
[0072] In this embodiment, after completing the simulation control test of a hydropower control sample to be tested, the server can add the test results to the prior test hydropower control sample sequence for subsequent analysis and optimization of the control strategy. Then, the server can continue to process the next hydropower control sample to be tested, repeating the process of steps S120 and S130. When all the hydropower control samples to be tested have completed the simulation control test, the server can summarize and analyze the entire test process and make necessary adjustments and optimizations to the control strategy based on the test results. This process is iterative, and the server can continuously update and optimize the control strategy to improve the operating efficiency and stability of the hydropower station.
[0073] For example, the server may find that under certain grid load conditions, the response time of a candidate control scheme is too long, causing the hydropower station to be unable to respond to grid changes in a timely manner. To address this problem, the server can optimize the candidate control scheme or select other more suitable control schemes to replace the candidate control scheme. The optimized control strategy will be added to the server's strategy library for subsequent hydropower station control tasks.
[0074] Based on the above steps, the embodiment of the present application obtains multiple hydropower control samples to be tested from the hydropower control sample sequence to be tested, and determines multiple reference control strategies, and then determines a basic control scheme that is compatible with each hydropower control sample to be tested from multiple reference control strategies, so as to more accurately simulate the actual situation and improve the accuracy of the test. By introducing a candidate control scheme, the candidate control scheme is determined by the simulation control test results in the statistical prior test hydropower control sample sequence, so that the previous test results and experience can be introduced into the current test, and the test process and results are further optimized. According to the simulation control test results, the prior test hydropower control sample sequence is adjusted, and the test is iteratively tested, which can continuously optimize the test process and results, so that the test results are closer to the actual situation. As a result, not only the efficiency of the hydropower automatic power generation control test is improved, but also the accuracy and authenticity of the test are improved.
[0075] In a possible implementation, step S130 may include:
[0076] Step S131, obtaining candidate control schemes corresponding to the priori test hydropower control sample sequence, and determining test activation requirements of the candidate control schemes.
[0077] In this embodiment, the server first accesses the prior test hydropower control sample sequence stored internally, which records the hydropower control tests conducted in the past and the corresponding control schemes, especially those marked candidate control schemes. Candidate control schemes usually perform well in previous tests and may become the key to optimizing control strategies in the future.
[0078] After obtaining the candidate control schemes, the server further reads the test activation requirements associated with these candidate control schemes. The test activation requirements are a series of conditions used to determine under what circumstances this candidate control scheme should be triggered or applied. These conditions may include specific hydropower station operating conditions, external environmental factors (such as water level, flow, grid demand, etc.), or coordination requirements with other control schemes.
[0079] Step S132: If the candidate control scheme is included in multiple basic control schemes and meets the test activation requirements, simulated control tests are performed on the traversed hydropower control samples to be tested according to multiple basic control schemes to generate simulated control test results for the traversed hydropower control samples to be tested.
[0080] The server can then detect whether the multiple basic control schemes applicable to the currently traversed hydropower control sample to be tested include the candidate control scheme obtained in step 1. If included, the server can further determine whether the candidate control scheme meets its test activation requirements.
[0081] Assume that the server finds that for the current hydropower control sample to be tested, there is indeed a candidate control scheme included in the basic control scheme, and the current test environment (such as the water level of the hydropower station, the load demand of the power grid, etc.) just meets the activation conditions of the candidate control scheme.
[0082] In this case, the server can start a simulated control test. For example, multiple basic control schemes including candidate control schemes can be used to simulate the operation of the hydropower control sample currently to be tested. In this process, the server can simulate the operating environment of the actual hydropower station, observe and record the response of the hydropower station under the action of various control schemes, such as the output power of the generator set, the opening and closing status of the sluice gate, and the water level change.
[0083] After the simulation control test is completed, the server can generate a detailed simulation control test result report. This report will include data on various performance indicators, such as response time, control accuracy, stability, etc., as well as detailed records of the operating status of the hydropower station under different control schemes. This information will be used for subsequent control strategy optimization and decision support.
[0084] In a possible implementation, the test results of the simulated control test results of the candidate control scheme configured in the priori test hydropower control sample sequence meet the emergency strategy deployment requirements.
[0085] Step S132 may include:
[0086] Step S1321: if the candidate control scheme is included in the multiple basic control schemes, obtain test data corresponding to the candidate control scheme. The test data corresponding to the candidate control scheme is generated by binding the traversed hydropower control samples to be tested with the candidate control scheme.
[0087] Step S1322: If the test data corresponding to the candidate control scheme meets the test activation requirements, a simulation control test is performed on the traversed hydropower control samples to be tested according to multiple basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested.
[0088] And, in step S1323, if the candidate control scheme is not included in the multiple basic control schemes, a non-emergency strategy deployment requirement is obtained.
[0089] Step S1324: If the test data respectively associated with the multiple basic control schemes meet the non-emergency strategy deployment requirements, simulated control tests are performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate simulated control test results for the traversed hydropower control samples to be tested.
[0090] In this embodiment, a series of prior test hydropower control sample sequences have been stored in the server, and these prior test hydropower control samples have included simulation control test results using candidate control schemes. The server can check these test results to confirm whether they meet the preset emergency strategy deployment requirements. For example, if a candidate control scheme shows excellent stability and response speed in the simulation test, and meets the requirements of rapid response and stable operation of the hydropower station in emergency situations, then the scheme is deemed to meet the emergency strategy deployment requirements.
[0091] When the server is processing the hydropower control sample to be tested, if it is found that a candidate control scheme is included in multiple basic control schemes, the server further obtains the test data corresponding to the candidate control scheme. These test data are generated by binding the hydropower control sample to be tested with the candidate control scheme and can include multiple indicators such as control accuracy, response time, and system stability.
[0092] After obtaining the test data of the candidate control scheme, the server can determine whether the data meets the test activation requirements. If it does, for example, the test data shows that the candidate control scheme performs well under certain conditions, then the server will use this candidate control scheme and other basic control schemes to perform simulated control tests on the hydropower control samples currently being traversed. This process simulates the control environment of an actual hydropower station to verify the actual effect of the control scheme.
[0093] If the server finds that the candidate control scheme is not included in the multiple basic control schemes when processing the hydropower control sample to be tested, it will instead obtain non-emergency policy deployment requirements. These non-emergency policy deployment requirements can be more relaxed and focus on the normal operation of the hydropower station rather than emergency response.
[0094] The server can check the test data associated with each basic control scheme to confirm whether they meet the requirements of non-emergency strategy deployment. If they do, the server will use these basic control schemes to perform simulated control tests on the currently traversed hydropower control samples to be tested. During the test, the server can record various performance indicators and finally generate simulated control test results. These simulated control test results will be used to evaluate the advantages and disadvantages of the control schemes and provide decision support for the actual operation of the hydropower station.
[0095] The test data associated with the multiple basic control schemes are generated by binding the traversed hydropower control samples to be tested with the multiple basic control schemes. These test data provide an important basis for the server to evaluate the effects of different control schemes.
[0096] In a possible implementation, step S120 may include:
[0097] Step S121 , binding the traversed hydropower control samples to be tested with a plurality of reference control strategies respectively to generate test data associated with the plurality of reference control strategies respectively.
[0098] Step S122 , extracting strategy solutions from the multiple reference control strategies based on the test data associated with each of the multiple reference control strategies, and generating multiple basic control solutions that are compatible with the traversed hydropower control samples to be tested.
[0099] In this embodiment, the server binds these hydropower control samples to be tested with each reference control strategy one by one, and performs tests in a simulation environment.
[0100] During the test, the server can simulate the actual operation of the hydropower station, observe and record the response of the hydropower station under each reference control strategy, such as the output power change of the generator set, the opening and closing status of the sluice gate, the water level change of the reservoir, etc. These tests are designed to evaluate the performance of different reference control strategies under specific sample conditions.
[0101] After the binding test, the server can collect a large amount of test data. These test data reflect the various operating indicators and performance parameters of the hydropower station under the action of different reference control strategies. The server can organize and analyze these test data and generate an associated test data report for each reference control strategy. These test data reports may include data on the response time, control accuracy, stability, energy consumption, and other aspects of the control strategy. These data provide an important reference for the subsequent strategy solution extraction.
[0102] After obtaining the test data of each reference control strategy, the server can use this data to conduct in-depth analysis and evaluation of the reference control strategy. By comparing the performance of different strategies under the same sample conditions, the server can identify which strategies have advantages in specific scenarios.
[0103] In this process, the server can use some optimization algorithms or machine learning models to help extract the most effective control schemes, which may combine the advantages of multiple reference control strategies to adapt to different hydropower station operating conditions and external environmental conditions.
[0104] After extracting the strategy solutions, the server can generate multiple basic control solutions that are suitable for the traversed hydropower control samples to be tested. These solutions are customized based on the previous test data and strategy evaluation results, aiming to ensure that the hydropower station can achieve efficient and stable control in various operating scenarios. These basic control solutions can include a series of control instructions, parameter settings, and priority sorting to guide the actual operation of the hydropower station. The server can store these solutions in the database and wait for them to be called and executed as needed during actual operation.
[0105] In a possible implementation manner, the traversed hydropower control samples to be tested include control data of the equipment to be tested. Step S121 may include:
[0106] Step S1211 , performing simulation control on the control data of the device to be tested and a plurality of reference control strategies respectively, and generating device simulation control test results respectively associated with the plurality of reference control strategies.
[0107] Step S1212, obtaining a control strategy evaluation network. The control strategy evaluation network is updated and generated based on the simulation control test results in the priori test hydropower control sample sequence.
[0108] Step S1213, performing correlation tests on the equipment simulation control test results associated with each of the multiple reference control strategies according to the control strategy evaluation network, and generating test data associated with each of the multiple reference control strategies.
[0109] In this embodiment, the control data of the device to be tested may include the current state of the device, operating parameters, external environmental conditions, etc. Then, the server binds the control data of the device to be tested to each reference control strategy one by one, and performs simulated control in a simulated environment.
[0110] During the simulation control process, the server can simulate the operating status and results of the equipment under the control of these strategies according to the logic and algorithm of each reference control strategy. For example, a reference control strategy can adjust the operating parameters of the equipment according to the current load of the equipment and the external ambient temperature. The server will simulate the operating status of the equipment according to these data in the simulation environment and observe its response and control effect.
[0111] After the simulation control, the server can generate the equipment simulation control test results associated with each reference control strategy. These results can include the equipment's operating status, performance indicators (such as response time, control accuracy, etc.), energy consumption data, etc. under various reference control strategies. The server can store these results in a database for subsequent analysis and evaluation.
[0112] The server can obtain a pre-trained control strategy evaluation network from its own storage system. This evaluation network is updated and generated based on the simulated control test results in the prior test hydropower control sample sequence. During the training process, the evaluation network has learned how to evaluate the performance of the control strategy based on the simulated control test results.
[0113] The server can use the control strategy evaluation network to perform a correlation test on the device simulation control test results associated with each reference control strategy. The purpose of this test is to evaluate the correlation between each reference control strategy and the device simulation control test results, that is, to determine the effectiveness and applicability of each strategy in controlling the device.
[0114] During the correlation test, the evaluation network analyzes the various indicators in the device simulation control test results, such as the device's operating status, performance indicators, etc., and matches and compares them with the corresponding reference control strategies. In this way, the server can find reference control strategies that are highly correlated with the device simulation control test results, as well as those that may not be suitable for the current device status or external environment.
[0115] Based on the results of the correlation test, the server can generate test data associated with each reference control strategy. These data include not only the various indicators in the equipment simulation control test results, but also the performance evaluation results of each strategy by the evaluation network. These data provide an important reference for subsequent strategy selection and optimization.
[0116] Through the above steps, the server can use the control data of the device to be tested and multiple reference control strategies to perform simulated control tests, and use the control strategy evaluation network to perform correlation analysis and evaluation on the test results, and finally generate detailed test data associated with each reference control strategy. These data will help the server make more accurate and efficient control decisions in actual operation.
[0117] In a possible implementation, step S1212 may include:
[0118] Step S1212-1, obtaining a control strategy evaluation network with initialized parameters and a priori test hydropower control sample sequence. The simulation control test results in the priori test hydropower control sample sequence include priori test equipment control data and a priori control scheme for the priori test equipment control data.
[0119] Step S1212-2, based on the control strategy evaluation network of the initialization parameters, traverse the a priori test device control data and the a priori control scheme corresponding to the a priori test device control data to perform correlation testing, and generate test data for the a priori test device control data.
[0120] Step S1212-3, training the control strategy evaluation network of the initialization parameters based on the test data of the priori test equipment control data to generate a control strategy evaluation network.
[0121] In this embodiment, the server first obtains a control strategy evaluation network with initialization parameters from a preset storage location or an external source. The control strategy evaluation network may be just a framework or a model with basic functions in the initial state, and further training is required to improve its performance.
[0122] At the same time, the server also obtains a priori test hydropower control sample sequence. This priori test hydropower control sample sequence contains data collected in past hydropower control experiments, including various equipment control data and control schemes used for these data, namely, priori control schemes. These data provide valuable experience knowledge for subsequent network training.
[0123] The server starts to use the control strategy evaluation network with initialized parameters to perform correlation test on the prior test device control data and its corresponding prior control scheme. In this process, the server can analyze each sample data one by one and input it into the control strategy evaluation network together with the corresponding control scheme.
[0124] The control strategy evaluation network processes these input data based on its current parameters and algorithms, and tries to find the correlation between the device control data and the prior control scheme. This process is designed to allow the evaluation network to learn and understand which control scheme is effective and which may not work well under different device control data.
[0125] After the correlation test, the server can generate a test data about the prior test equipment control data. This data includes the correlation analysis results of the control strategy evaluation network for each sample, such as the correlation score between the control scheme and the equipment control data, the effectiveness evaluation of the control scheme, etc. These test data not only reflect the performance of the control strategy evaluation network under the current parameters, but also provide important feedback information for subsequent network training.
[0126] The server can train the control strategy evaluation network with initialized parameters based on the test data generated in the previous step. During the training process, the server can adjust the parameters and weights of the control strategy evaluation network to enable it to better learn and understand the relationship between the device control data and the effective control scheme.
[0127] Training can include multiple iterations, and after each cycle, the server evaluates whether the network's performance has improved and adjusts the training strategy accordingly. In this way, the control strategy evaluation network can gradually improve its ability to evaluate the effectiveness of control strategies.
[0128] After multiple rounds of training and optimization, the server will eventually generate a well-trained control strategy evaluation network. This control strategy network has learned how to evaluate the effectiveness of different control strategies based on equipment control data, and can provide valuable strategy selection suggestions in the subsequent hydropower control process.
[0129] The server can save this trained control strategy evaluation network in a safe location so that it can be called up at any time when needed. When faced with a new hydropower control task, the server can use this control strategy evaluation network to quickly screen out the control strategy that best suits the current equipment status and external environment.
[0130] In a possible implementation, step S122 may include:
[0131] Step S1221, obtaining test data evaluation criteria.
[0132] Step S1222: extracting multiple target control schemes that meet the test data evaluation criteria from the multiple reference control strategies based on the test data associated with each of the multiple reference control strategies.
[0133] Step S1223: generating a plurality of basic control schemes adapted to the traversed hydropower control samples to be tested according to the plurality of target control schemes.
[0134] In this embodiment, the server first obtains the test data evaluation criteria from a preset database or configuration file. These test data evaluation criteria can be formulated by experts in the field of hydropower control based on historical experience and actual needs, and are used to evaluate the performance of the control strategy. The test data evaluation criteria can include control accuracy, response time, stability, energy consumption, and other aspects.
[0135] For example, the control accuracy standard may require that the control strategy be able to keep the fluctuation range of the hydropower station's output power within a certain limit; the response time standard may require that the control strategy be able to complete the adjustment within a specified time after receiving the control command; and the stability standard may require that the control strategy be able to maintain the stable operation of the hydropower station in the face of external disturbances.
[0136] Next, the server already has test data associated with multiple reference control strategies, which reflect the performance indicators of the hydropower station under different control strategies. Now, the server will analyze these test data one by one according to the evaluation criteria obtained previously.
[0137] The server can compare the test data of each reference control strategy with the evaluation criteria and select those control strategies that meet or exceed the evaluation criteria. For example, if the test data of a reference control strategy shows that it has met the preset evaluation criteria in terms of control accuracy and response time, then this strategy will be considered as a target control solution.
[0138] Through this process, the server can select target control schemes with excellent performance from a large number of reference control strategies, providing a high-quality candidate set for subsequent basic control scheme generation.
[0139] After screening out the target control schemes that meet the evaluation criteria, the server can further analyze the adaptability between these schemes and the hydropower control samples to be tested. The server can consider the specific conditions and requirements of the samples to be tested, such as the geographical location, climate conditions, water resources status of the hydropower station, and special control requirements that may exist in the samples.
[0140] Based on these analyses, the server can select the control strategy that best suits the current sample to be tested from the target control scheme, or combine the advantages of multiple target control schemes to generate a new basic control scheme. These basic control schemes will be optimized for the specific conditions of the sample to be tested to ensure the best control effect in actual operation.
[0141] Ultimately, the server can generate multiple basic control schemes that are compatible with the traversed hydropower control samples to be tested. These schemes will serve as control guidance in the subsequent actual operation of the hydropower station to ensure the stable and efficient operation of the hydropower station.
[0142] In a possible implementation, step S1324 includes:
[0143] Step S1324-1, obtain a test scenario instance, and determine a reference simulator and a reference instruction set.
[0144] In this embodiment, the server first obtains a specific test scenario instance from a test scenario library. This test scenario instance can be an operation scenario of a hydropower station under specific weather and water flow conditions. Then, the server can determine a reference simulator that can simulate the actual operating environment of the hydropower station. At the same time, the server will also determine a reference instruction set that includes various operations and control instructions that need to be executed in the simulation test.
[0145] Step S1324-2, according to the reference simulator, based on the reference instruction set and traversing the test scenario instance, perform simulation control testing to generate a target simulation test result of the test scenario instance.
[0146] In this embodiment, the server uses the selected reference simulator to perform a simulated control test in the test scenario instance according to the reference instruction set. In this process, the reference simulator simulates the actual operating conditions of the hydropower station and performs corresponding control operations according to the instruction set. After the test is completed, the server can collect the data generated by the simulator, which reflects the operating performance and control effect of the hydropower station in a specific scenario, that is, the target simulation test result.
[0147] Step S1324-3, obtaining the expected control result of the test scenario instance. The expected control result includes a plurality of expected control data generated by traversing the test scenario instance and performing simulation control tests according to different control test strategies.
[0148] In this embodiment, the server can obtain the expected control results of the test scenario instance from a preset database. These expected control results are generated through simulated control tests under different control test strategies, representing the ideal operating state and control effect that the hydropower station should achieve under different control strategies. These expected control data include but are not limited to output power, water level changes, equipment status, etc.
[0149] Step S1324-4, determining the first characteristic cost between the target simulation test result and a plurality of expected control data, and the second characteristic cost between the plurality of expected control data.
[0150] In this embodiment, the server can calculate the characteristic difference between the target simulation test result and each expected control data, and this difference is called the first characteristic cost. At the same time, the server also calculates the characteristic difference between each expected control data, and this difference is called the second characteristic cost. These characteristic costs reflect the degree of deviation between the simulation test result and the expected result.
[0151] Step S1324-5: if the first feature cost is consistent with the second feature cost, the reference simulator is determined as a control test simulator, and the reference instruction set is output as a test instruction set.
[0152] If the server finds that the first characteristic cost between a certain expected control data and the target simulation test result is consistent with the second characteristic cost between the expected control data and other expected control data, then the server can determine the current reference simulator as the control test simulator and use the reference instruction set as the test instruction set. This means that the simulator and instruction set can more accurately simulate the actual operation status and control effect of the hydropower station in a specific scenario.
[0153] Step S1324-6: According to the control test simulator, based on the test instruction set and multiple basic control schemes, simulated control tests are performed on the traversed hydropower control samples to be tested, and simulation test results of the traversed hydropower control samples to be tested are generated.
[0154] In this embodiment, the server can use a determined control test simulator and test instruction set, combined with the previously generated basic control scheme, to perform a simulated control test on the traversed hydropower control samples. In this process, the simulator will perform corresponding control operations according to the basic control scheme and generate simulation test results. These results reflect the operating performance and control effect of the hydropower station under different basic control schemes.
[0155] Step S1324-7, obtaining simulation test result evaluation criteria, adjusting the simulation test results according to the simulation test result evaluation criteria, generating adjusted simulation test results, and generating simulation control test results of the traversed hydropower control samples to be tested based on the adjusted simulation test results.
[0156] In this embodiment, the server can obtain a set of simulation test result evaluation criteria, which define how to evaluate the accuracy and reliability of the simulation test results. According to these criteria, the server can adjust the original simulation test results to eliminate possible errors and deviations. The adjusted simulation test results will more accurately reflect the actual operating conditions and control effects of the hydropower station in a specific scenario. Finally, the server can generate simulation control test results of the traversed hydropower control samples to be tested based on these adjusted simulation test results.
[0157] In a possible implementation, step S140 may include: storing the simulation control test results associated with each of the multiple hydropower control samples to be tested in the prior test hydropower control sample sequence, returning to execute the step of obtaining multiple hydropower control samples to be tested from the hydropower control sample sequence to be tested, until all the hydropower control samples to be tested in the hydropower control sample sequence to be tested have completed the simulation control test.
[0158] In this embodiment, after executing a round of simulation control test, the server obtains simulation control test results associated with multiple hydropower control samples to be tested, which include performance data and operating status of the hydropower station under different control schemes.
[0159] The server first associates the simulation control test results of each hydropower control sample to be tested with the sample. These results can include data on power generation efficiency, response time, stability, etc. The server then stores these hydropower control samples associated with the simulation test results into the prior test hydropower control sample sequence. This sequence now contains not only the hydropower control samples themselves, but also the performance data of these samples in the simulation test.
[0160] After completing the storage of the simulation control test results, the server can return to the step of obtaining a new hydropower control sample to be tested from the sequence of hydropower control samples to be tested. This means that the server begins to prepare for the next round of simulation control testing. In this process, the server can select a new sample to be tested from the updated prior test hydropower control sample sequence.
[0161] The server now enters an iterative testing process, continuously obtaining the hydropower control samples to be tested from the prior test hydropower control sample sequence and performing simulation control tests on these samples. After each test is completed, the new simulation test results will be stored back in the prior test hydropower control sample sequence for subsequent iterations.
[0162] This iterative process will continue until the server has traversed and completed the simulation control test of all the hydropower control samples to be tested in the prior test hydropower control sample sequence. In this process, the server continuously accumulates the performance data of various control schemes on different hydropower control samples, which will provide important reference for the subsequent control strategy optimization and selection. When the last hydropower control sample to be tested completes the simulation control test, the entire iterative process ends.
[0163] Figure 2 A hydropower control test system 100 provided in an embodiment of the present application is shown, including a processor 1001 and a memory 1003 and program code stored in the memory 1003, and the processor 1001 executes the above program code to implement the steps of the information processing method based on hydropower automatic power generation control test.
[0164] Figure 2 The hydropower control test system 100 shown includes: a processor 1001 and a memory 1003. The processor 1001 and the memory 1003 are connected, such as through a bus 1002. Optionally, the hydropower control test system 100 may also include a transceiver 1004, which can be used for data interaction between the hydropower control test system and other hydropower control test systems, such as data transmission and / or data reception. It should be noted that in actual scheduling, the transceiver 1004 is not limited to one, and the structure of the hydropower control test system 100 does not constitute a limitation on the embodiments of the present application.
[0165] Processor 1001 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the transaction records disclosed in this application. Processor 1001 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0166] The bus 1002 may include a path to transmit information between the above components. The bus 1002 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 1002 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 2 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0167] The memory 1003 can be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), magnetic disk storage medium, other magnetic storage devices, or any other medium that can be used to have or store program code and can be read by a computer, without limitation herein.
[0168] The memory 1003 is used to store program codes for executing the embodiments of the present application, and the execution is controlled by the processor 1001. The processor 1001 is used to execute the program codes stored in the memory 1003 to implement the steps shown in the above method embodiments.
[0169] An embodiment of the present application provides a computer-readable storage medium having program code stored thereon. When the program code is executed by a processor, the steps of the aforementioned method embodiment and the corresponding transaction records can be implemented.
[0170] It should be understood that, although each operation step is indicated by arrows in the flowchart of the embodiment of the present application, the implementation order of these steps is not limited to the order indicated by the arrows. Unless there is a clear description in this article, in some implementation scenarios of the embodiment of the present application, the implementation steps in each flowchart can be performed in other orders based on demand. In addition, some or all of the steps in each flowchart may include multiple sub-steps or multiple stages according to the actual implementation scenario. Some or all of these sub-steps or stages can be executed at the same time, and each sub-step or stage in these sub-steps or stages can also be executed at different times respectively. In different scenarios at the execution time, the execution order of these sub-steps or stages can be flexibly configured based on demand, and the embodiment of the present application does not limit this.
[0171] The above is only an optional implementation method for some implementation scenarios of the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the technical concept of the scheme of the present application, other similar implementation methods based on the technical ideas of the present application are also within the protection scope of the embodiments of the present application.
Claims
1. An information processing method based on hydropower automatic generation control test, characterized in that: The method comprises: Acquire multiple hydropower control samples to be tested from a sequence of hydropower control samples to be tested, and determine multiple reference control strategies; Traversing each of the multiple hydropower control samples to be tested, and determining multiple basic control schemes suitable for the traversed hydropower control samples to be tested from multiple reference control strategies; If the multiple basic control schemes include candidate control schemes, simulated control tests are performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate simulated control test results of the traversed hydropower control samples to be tested; the candidate control scheme is determined by statistically testing the simulated control test results in the hydropower control sample sequence; The priori test hydropower control sample sequence is adjusted according to the simulation control test results associated with each of the multiple hydropower control samples to be tested, and the simulation control test is iteratively performed on the hydropower control samples to be tested in the hydropower control sample sequence to be tested until the simulation control test is completed for all the hydropower control samples to be tested in the hydropower control sample sequence to be tested.
2. The information processing method based on hydropower automatic generation control test according to claim 1 is characterized in that: If the multiple basic control schemes include the candidate control scheme, performing a simulation control test on the traversed hydropower control samples to be tested according to the multiple basic control schemes, and generating simulation control test results of the traversed hydropower control samples to be tested, including: Obtaining candidate control schemes corresponding to a priori test hydropower control sample sequences, and determining test activation requirements for the candidate control schemes; If the candidate control scheme is included in multiple basic control schemes and meets the test activation requirements, a simulated control test is performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate a simulated control test result of the traversed hydropower control samples to be tested.
3. The information processing method based on hydropower automatic generation control test according to claim 2 is characterized in that: The test results of the simulated control test results of the candidate control scheme configured in the prior test hydropower control sample sequence meet the emergency strategy deployment requirements; If the candidate control scheme is included in the multiple basic control schemes and meets the test activation requirements, a simulation control test is performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested, including: If the candidate control scheme is included in the multiple basic control schemes, the test data corresponding to the candidate control scheme is obtained; the test data corresponding to the candidate control scheme is generated by binding the traversed hydropower control sample to be tested with the candidate control scheme; If the test data corresponding to the candidate control scheme meets the test activation requirement, a simulation control test is performed on the traversed hydropower control samples to be tested according to a plurality of basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested; and, if the candidate control scheme is not included in the plurality of basic control schemes, obtaining a non-emergency strategy deployment requirement; If the test data respectively associated with the multiple basic control schemes meet the non-emergency strategy deployment requirements, a simulation control test is performed on the traversed hydropower control samples to be tested according to the multiple basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested; The test data respectively associated with the multiple basic control schemes are generated after binding the traversed hydropower control samples to be tested with the multiple basic control schemes respectively.
4. The information processing method based on hydropower automatic generation control test according to claim 1 is characterized in that: The step of determining a plurality of basic control schemes adapted to the traversed hydropower control samples to be tested from a plurality of reference control strategies comprises: Binding the traversed hydropower control samples to be tested with multiple reference control strategies respectively to generate test data associated with each of the multiple reference control strategies; Based on the test data associated with each of the multiple reference control strategies, strategy solutions are extracted from the multiple reference control strategies to generate multiple basic control solutions that are compatible with the traversed hydropower control samples to be tested.
5. The information processing method based on hydropower automatic generation control test according to claim 4 is characterized in that: The traversed hydropower control samples to be tested include control data of the equipment to be tested; the binding test of the traversed hydropower control samples to be tested with multiple reference control strategies respectively to generate test data associated with each of the multiple reference control strategies includes: Performing simulation control on the control data of the device to be tested respectively with a plurality of reference control strategies, and generating device simulation control test results associated with each of the plurality of reference control strategies; Acquire a control strategy evaluation network; the control strategy evaluation network is updated and generated based on the simulation control test results in the prior test hydropower control sample sequence; According to the control strategy evaluation network, correlation tests are respectively performed on the equipment simulation control test results respectively associated with a plurality of reference control strategies, and test data respectively associated with the plurality of reference control strategies are generated.
6. The information processing method based on hydropower automatic generation control test according to claim 5 is characterized in that: The acquisition control strategy evaluation network comprises: Obtaining a control strategy evaluation network with initialization parameters and a priori test hydropower control sample sequence; the simulation control test results in the priori test hydropower control sample sequence include priori test equipment control data and a priori control scheme for the priori test equipment control data; According to the control strategy evaluation network of the initialization parameters, the a priori test device control data and the a priori control scheme corresponding to the a priori test device control data are traversed to perform correlation test, and test data of the a priori test device control data is generated; The control strategy evaluation network with the initialization parameters is trained based on the test data of the priori test equipment control data to generate a control strategy evaluation network.
7. The information processing method based on hydropower automatic generation control test according to claim 4 is characterized in that: The extracting of strategy solutions from the multiple reference control strategies based on the test data associated with each of the multiple reference control strategies to generate multiple basic control solutions that are compatible with the traversed hydropower control samples to be tested includes: Obtain test data evaluation criteria; Based on the test data associated with each of the multiple reference control strategies, extracting multiple target control schemes that meet the test data evaluation criteria from the multiple reference control strategies; Based on the multiple target control schemes, multiple basic control schemes adapted to the traversed hydropower control samples to be tested are generated.
8. The information processing method based on hydropower automatic generation control test according to claim 1 is characterized in that: The performing of simulation control test on the traversed hydropower control samples to be tested according to a plurality of basic control schemes to generate simulation control test results of the traversed hydropower control samples to be tested includes: Obtain a test scenario instance, and determine a reference simulator and a reference instruction set; According to the reference simulator, based on the reference instruction set and traversing the test scenario instance, a simulation control test is performed to generate a target simulation test result of the test scenario instance; Obtaining the expected control result of the test scenario instance; the expected control result includes a plurality of expected control data generated by traversing the test scenario instance and performing simulated control tests according to different control test strategies; Determine a first characteristic cost between the target simulation test result and a plurality of expected control data, and a second characteristic cost between the plurality of expected control data; If the first feature cost is consistent with the second feature cost, determining the reference simulator as a control test simulator, and outputting the reference instruction set as a test instruction set; According to the control test simulator, based on the test instruction set and multiple basic control schemes, a simulated control test is performed on the traversed hydropower control samples to be tested, and a simulation test result of the traversed hydropower control samples to be tested is generated; Acquire simulation test result evaluation criteria, adjust the simulation test results according to the simulation test result evaluation criteria, generate adjusted simulation test results, and generate simulation control test results of the traversed hydropower control samples to be tested based on the adjusted simulation test results.
9. The information processing method based on hydropower automatic generation control test according to any one of claims 1 to 8, characterized in that: The method of adjusting the priori test hydropower control sample sequence according to the simulation control test results associated with each of the plurality of hydropower control samples to be tested, and iteratively performing simulation control tests on the hydropower control samples to be tested in the hydropower control sample sequence to be tested until all the hydropower control samples to be tested in the hydropower control sample sequence to be tested have completed the simulation control tests, includes: The simulation control test results associated with each of the multiple hydropower control samples to be tested are stored in the prior test hydropower control sample sequence, and the step of obtaining multiple hydropower control samples to be tested from the hydropower control sample sequence to be tested is returned to execute until the simulation control test is completed for all the hydropower control samples to be tested in the hydropower control sample sequence to be tested.
10. A hydropower control test system, characterized in that: It comprises a processor and a computer-readable storage medium, wherein the computer-readable storage medium stores machine-executable instructions, and when the machine-executable instructions are executed by the processor, the information processing method based on the hydropower automatic generation control test described in any one of claims 1 to 9 is implemented.