IT operation and maintenance management method and IT operation and maintenance management device
By classifying and analyzing the historical data of the data center, building a risk prediction model, monitoring and evaluating risks in real time, it solves the problems of single operation and maintenance monitoring and unreasonable resource allocation in IT operation and maintenance management, and achieves efficient operation and maintenance management. and risk warning.
Patent Information
- Application Number
- CN202411027270.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-30
AI Technical Summary
In the existing IT operation and maintenance management, the operation and maintenance monitoring means are single, the troubleshooting efficiency is low, the resource allocation is unreasonable, it is difficult to fully reflect the system operating status, and the stability of the physical environment where the equipment is located is ignored.
By extracting the historical data of the data center from the database, classifying, sorting, calculating and analyzing, obtaining normal data groups and fault data groups, building a risk prediction model, monitoring and evaluating risks in real time, setting thresholds to distinguish risk situations, and achieving automation and intelligence. Optimized operation and maintenance management.
It improves the execution efficiency of operation and maintenance tasks, optimizes resource allocation, reduces the occurrence of failures, reduces operation and maintenance costs, enhances risk warning capabilities, and realizes hierarchical risk management.
Smart Images

Figure CN118550573B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data analysis technology, and in particular to an IT operation and maintenance management method and an IT operation and maintenance management device. Background Art
[0002] Data analysis technology is a process that uses mathematical statistical methods to establish a data set from a large amount of collected data, and then summarizes, analyzes, and digests this data set. It aims to maximize the efficiency of the data, obtain useful information, and summarize it into a conclusion to achieve the purpose of research or management.
[0003] Data analysis technology is widely used in various industries and fields. However, the current IT operation and maintenance management still has the following problems: the operation and maintenance monitoring means are single. Traditional operation and maintenance monitoring means mainly rely on single data sources such as log analysis and performance monitoring, which are difficult to fully reflect the operating status of the system; the troubleshooting efficiency is low, and operation and maintenance personnel often need to manually analyze a large amount of logs and performance data, and the troubleshooting process is time-consuming and labor-intensive; resource allocation is unreasonable. In the IT operation and maintenance process, resource allocation is often based on experience or subjective judgment, resulting in low resource utilization and high cost. There is no prediction model and resource optimization cannot be achieved; only focusing on whether the performance status of the equipment is normal, ignoring whether the physical environment in which the equipment is located is stable. To this end, the present invention proposes an IT operation and maintenance management method and an IT operation and maintenance management device. Summary of the invention
[0004] The purpose of the present invention is to solve the problems in the background technology and to propose an IT operation and maintenance management method and an IT operation and maintenance management device.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] IT operation and maintenance management methods, including:
[0007] Step 1: extract historical data of the data center from the database, classify and sort, and perform calculation and analysis to obtain a normal data group and a fault data group; trace the normal data group and the fault data group to obtain a first data group and a second data group;
[0008] Step 2: Process and analyze the first data group and the second data group to obtain characteristic values of the first data group and the second data group respectively;
[0009] Step 3: Conduct modeling analysis based on the characteristic values of the first data group and the second data group to construct a risk prediction model;
[0010] Step 4: Divide the monitoring cycle for real-time monitoring and regularly collect the operation data of the data center room;
[0011] Step 5: Obtain the original data from the monitoring platform, input it into the risk prediction model after preprocessing, make risk score predictions, and set thresholds to distinguish risk situations.
[0012] It should be noted that the application objects of the IT operation and maintenance management method and the IT operation and maintenance management device in the embodiments of the present invention can be the operation and maintenance management of the IT infrastructure of the data center. Specifically, it can be to conduct in-depth analysis of the collected operation data through data analysis technology and data mining algorithms, identify potential problems and anomalies, determine whether the data center is in a normal state, and predict possible failures and risks. Through automated and intelligent operation and maintenance means, human intervention can be reduced, and the execution efficiency of operation and maintenance tasks can be improved, which is conducive to optimizing resource allocation and reducing the occurrence of failures, thereby reducing the operation and maintenance costs of the enterprise.
[0013] Furthermore, historical data of the data center is extracted from the database, and classified, sorted, calculated and analyzed to obtain a normal data group and a fault data group; the process of tracing the normal data group and the fault data group to obtain the first data group and the second data group includes:
[0014] When extracting historical data from a data center, determine key information; wherein the key information includes equipment performance status data, physical environment status data, and timestamp information;
[0015] The equipment performance status data is classified as a direct indicator to measure the equipment performance status, and the physical environment status data is classified as an auxiliary indicator to reflect the physical environment status of the data center. Both the direct indicator and the auxiliary indicator are accompanied by a timestamp information as a label indicator for sorting and tracing the historical data of the data center.
[0016] When calculating and analyzing direct indicators and auxiliary indicators, the weighted mean parameter is calculated using the formula :
[0017] ,in, In the formula, Represents the value of the i-th key information data point; represents the weight of the i-th key information data point; i represents the number of the key information data point; s represents the total number of key information data points; It represents a regulation factor between 0 and 1; IF represents the importance factor of the indicator; HP represents the performance factor based on historical data;
[0018] Calculate the weighted standard deviation parameter using the formula :
[0019] ;
[0020] Based on the weighted mean parameter and weighted standard deviation parameter, the normal data group and the fault data group of each indicator are determined:
[0021] Where, WNLB represents the lower limit of the weighted normal distribution, and WNUB represents the upper limit of the weighted normal distribution; if the value of the indicator is lower than the lower limit of the normal operating range of the indicator or higher than the upper limit of the normal operating range of the indicator, it is considered abnormal; if the value of the indicator is within the normal operating range of the indicator, it is considered normal; h represents a pre-selected multiple, which is used to determine the boundary between the normal data group and the fault data group;
[0022] The normal data group and the faulty data group of each indicator are traced in combination with the label indicator, and the normal data group and the faulty data group after tracing are marked as the first data group and the second data group respectively.
[0023] Furthermore, the device performance status data includes CPU usage, memory usage, disk I / O speed, storage device read and write speed, system response time and throughput, and the physical environment status data includes temperature, humidity, air quality, and power usage in the data center.
[0024] Furthermore, the process of processing and analyzing the first data group to obtain the characteristic value of the first data group includes:
[0025] Based on the first data group, an n×m matrix X is introduced; wherein the matrix X is a two-dimensional matrix; each column represents a variable, i.e., a quantitative index of the direct index and the auxiliary index of the first data group, and m represents the number of quantitative indexes; each row represents an observation value, i.e., a sample data point value of the variable, and n represents the number of observation values;
[0026] It is understandable that the variables of the first data group are specifically device performance status data (CPU usage, memory usage, disk I / O speed, storage device read / write speed, system response time and throughput) and physical environment status data (temperature, humidity, air quality, power usage in the data center); obviously, the observed values are the specific values of the data of the above variables;
[0027] Then we have the covariance matrix: In the formula, represents the covariance matrix; T represents the transpose of the matrix; N represents the total number of observations;
[0028] Solving the characteristic equation ,get and v; where, It is a symbol in mathematics that represents the definite root of a determinant and is used to represent the value of a matrix determinant; represents the eigenvalue of the first data set; v represents the eigenvector; represents the identity matrix;
[0029] All eigenvalues Sort in descending order and retain the largest k eigenvalues;
[0030] Select the eigenvectors corresponding to the largest k eigenvalues and construct the transformation matrix ; Where k represents the number of maximum eigenvalues;
[0031] Use the transformation matrix A to map the data to the new coordinate system and get the new data matrix ;in, ;
[0032] New data matrix The columns are the eigenvalues of the first data group, representing the main change pattern in the data. The eigenvalues of the first data group are extracted. ; Wherein, p represents the number of characteristic values of the first data group.
[0033] Furthermore, the process of processing and analyzing the second data group to obtain the characteristic value of the second data group includes:
[0034] extracting values of direct indicators and auxiliary indicators from the second data set;
[0035] Set constraints based on label indicators:
[0036] In the formula, U1 and U2 represent the direct index and auxiliary index values after weighted processing; represents the average value of U1 and U2 in the time window; t represents the current time point, that is, the time point at which the average value of U1 and U2 in the time window is calculated; L represents the length of the time window; Indicates that U1 and U2 are time Function of is the integral variable, representing any time point within the time window [tL, t]; is the infinitesimal increment of the integral, indicating Small changes in Indicates that in [tL, t] The expression to be integrated; Indicates the normalization factor of the integration result; express The preset average threshold of is used to determine whether the data center is in a fault state; Indicates fault characteristic value;
[0037] Convert the fault characteristic value into a numerical fault characteristic value:
[0038] In the formula, is a numerical fault characteristic value of the second data group, indicating the extent to which the value of the second data group exceeds its average threshold; represents the maximum value function selected to make the fault characteristic value always non-negative, wherein, if the value of the second data group does not exceed its average threshold, that is, , then the fault characteristic value is 0;
[0039] For example, assuming that the average value of U1 and U2 in the time window is 80% and the preset average threshold is 70%, then , indicating that U1 and U2 in the time window exceed the average threshold by 10%; this value is used to quantify the degree to which the data center deviates from the normal state.
[0040] Furthermore, the process of modeling and analyzing the characteristic values of the first data group and the second data group to construct a risk prediction model includes:
[0041] Get two sets of data sets ,in, a data set representing a first data set, a data set representing a second data set;
[0042] The information gain ratio is used as a criterion for predicting the risk level of a data center computer room. The specific analysis formula is as follows:
[0043] In the formula, It is the conditional entropy, which means that when the eigenvalue b is known, the data set uncertainty; Indicates the size of the data subset obtained by segmenting the eigenvalue b by value j; Representation dataset size; represents information gain; It represents the information gain ratio, which evaluates the importance of each feature by comparing its information gain with its intrinsic value (i.e., the entropy of the feature), so as to balance the deviation of information gain and make the selection of features more robust;
[0044] Count all information gain ratios and sort them in descending order;
[0045] Select the features with the highest information gain ratio as split attributes and regard them as input features of the logistic regression model; wherein the selected features are used for data preparation of the training set and the validation set;
[0046] The input features selected by the analysis results of the information gain ratio are combined to train the logistic regression model. When training the model, the original data set is divided into E parts, and one part is set aside as the validation set each time, and the rest is used as the training set. Each division is random, and the data set is balanced between the divisions. The training process is as follows:
[0047] Define the loss function and use the gradient descent formula to update the logistic regression model parameters:
[0048] In the formula, represents the result value of the loss function; β represents the logistic regression model parameter vector, including all weights; M represents the total number of input features; q represents the number of input features; β0 represents the intercept part of the logistic regression model parameters, which does not depend on the constant value of any feature, that is, the predicted value when all feature values are 1; represents the qth input feature value; Represents the step size, which is used to control the size of each iteration update step and determine the speed of descent; Represents the target value corresponding to the qth input feature value;
[0049] Collect multiple features after training and count the number of prediction results;
[0050] Repeat E times, and finally take the average prediction result value for integration to form a comprehensive risk prediction model for data center computer rooms.
[0051] Furthermore, the process of dividing the monitoring cycle into real-time monitoring and regularly collecting the operation data of the data center computer room includes:
[0052] Determine the monitoring objects, including equipment performance status data and physical environment status data;
[0053] Establish a data transmission channel, that is, transmit data to the cloud monitoring platform in real time through the network or other means;
[0054] For equipment performance status data, the monitoring cycle is divided according to the importance and operating characteristics of the equipment: high-frequency monitoring for key equipment; medium-frequency monitoring for important equipment; low-frequency monitoring for general equipment; at the same time, for physical environment status data, the monitoring frequency is adjusted in combination with seasonal and weather changes;
[0055] Utilize the automation function of the monitoring platform to set triggers and automatically collect raw data on equipment performance status and physical environment status data.
[0056] Furthermore, the process of obtaining the raw data from the monitoring platform, pre-processing it and inputting it into the risk prediction model, making risk score predictions, and setting thresholds to distinguish risk situations includes:
[0057] Extract the collected raw data from the monitoring platform and perform preprocessing operations; the preprocessing operations specifically include cleaning, denoising, and standardizing the collected raw data to ensure data quality;
[0058] Load the preprocessed data into the risk prediction model input layer and set the corresponding parameters; the preprocessed data has been stored in a matrix form, with rows representing input sample features and columns representing the number of sample features;
[0059] After receiving the input data, the risk prediction model outputs the probability value of each category. Since the risk prediction model is a multi-classification model, the output layer has F nodes, corresponding to the probability values of F categories, recorded as , and satisfies ;
[0060] When scoring the probability value, the probability value is defined as G, and 0≤G≤1; several thresholds are set to distinguish different risk levels, namely Q1, Q2, Q3, and Q4, where 0<Q1<Q2<Q3<Q4≤1; when G≤Q1, a very low risk label is generated, when Q1<G≤Q1, a low risk label is generated, when Q2<G≤Q3, a medium risk label is generated, and when G>Q3, a high risk label is generated; further analysis is performed through the risk scoring function, In the formula, RS represents the value of the risk score function; They represent the highest possible score for low risk level, the highest possible score for medium risk level, and the highest possible score for high risk level. The setting is based on a series of operation and maintenance indicators. By quantifying various operation and maintenance indicators, it can accurately reflect the quality and efficiency of operation and maintenance. If a high risk is predicted, an early warning will be triggered immediately and the operation and maintenance personnel will be notified to make adjustments.
[0061] IT operation and maintenance management device, including:
[0062] The data extraction and processing analysis module is used to extract the historical data of the data center from the database, and classify and analyze it, so as to obtain the normal data group and the fault data group; trace the normal data group and the fault data group to obtain the first data group and the second data group;
[0063] The feature value extraction module is used to process and analyze the first data group and the second data group to obtain feature values of the first data group and the second data group respectively;
[0064] The risk prediction model building module is used to perform modeling analysis based on the characteristic values of the first data group and the second data group to build a risk prediction model;
[0065] The real-time monitoring and data collection module is used to divide the monitoring cycle for real-time monitoring and regularly collect the operating data of the data center room;
[0066] The risk assessment and early warning module is used to obtain the original data of the monitoring platform, input it into the risk prediction model after preprocessing, make risk score predictions, and set thresholds to distinguish risk situations.
[0067] Compared with the existing technology, the advantages of the IT operation and maintenance management method and IT operation and maintenance management device provided by the present invention are:
[0068] The present invention obtains the first data group and the second data group by classifying, arranging, calculating, analyzing and tracing the historical data of the data center, thereby improving the data processing efficiency and ensuring the comprehensiveness and accuracy of the data; by processing and analyzing the two data groups, the characteristic values thereof are obtained, thereby reducing the complexity of subsequent model construction;
[0069] The present invention constructs a risk prediction model by modeling and analyzing the characteristic values of the first data group and the second data group, thereby realizing an automated process from data to prediction and improving the efficiency and accuracy of risk management; by dividing the monitoring cycle for real-time monitoring and regularly collecting the operating data of the data center computer room, the latest data source is provided for risk prediction;
[0070] The present invention predicts through risk scoring and sets thresholds to distinguish risk situations, thus providing a quantitative basis for risk management, facilitating decision making, helping to achieve hierarchical management of risks, and improving operation and maintenance efficiency.
[0071] To sum up, the present invention can improve operation and maintenance efficiency, enhance risk warning capabilities, and optimize resource allocation by collecting historical data, real-time monitoring, quantitative analysis, and predicting risks according to actual conditions, thereby ensuring the normal operation of subsequent IT operation and maintenance management methods and IT operation and maintenance management devices. BRIEF DESCRIPTION OF THE DRAWINGS
[0072] Figure 1 This is a flow chart of the IT operation and maintenance management method proposed by the present invention.
[0073] Figure 2 This is a module diagram of the IT operation and maintenance management device proposed by the present invention. DETAILED DESCRIPTION
[0074] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0075] See also Figure 1 The present invention provides an IT operation and maintenance management method, comprising:
[0076] Step 1: extract historical data of the data center from the database, classify and sort, and perform calculation and analysis to obtain a normal data group and a fault data group; trace the normal data group and the fault data group to obtain a first data group and a second data group;
[0077] Step 2: Process and analyze the first data group and the second data group to obtain characteristic values of the first data group and the second data group respectively;
[0078] Step 3: Conduct modeling analysis based on the characteristic values of the first data group and the second data group to construct a risk prediction model;
[0079] Step 4: Divide the monitoring cycle for real-time monitoring and regularly collect the operation data of the data center room;
[0080] Step 5: Obtain the original data from the monitoring platform, input it into the risk prediction model after preprocessing, make risk score predictions, and set thresholds to distinguish risk situations.
[0081] It should be noted that the application objects of the IT operation and maintenance management method and the IT operation and maintenance management device in the embodiments of the present invention can be the operation and maintenance management of the IT infrastructure of the data center. Specifically, it can be to conduct in-depth analysis of the collected operation data through data analysis technology and data mining algorithms, identify potential problems and anomalies, determine whether the data center is in a normal state, and predict possible failures and risks. Through automated and intelligent operation and maintenance means, human intervention can be reduced, and the execution efficiency of operation and maintenance tasks can be improved, which is conducive to optimizing resource allocation and reducing the occurrence of failures, thereby reducing the operation and maintenance costs of the enterprise.
[0082] See also Figure 1 The present invention provides an IT operation and maintenance management method. In the step 1, historical data of a data center is extracted from a database, and classified, sorted, and calculated and analyzed to obtain a normal data group and a fault data group; the step of tracing the normal data group and the fault data group to obtain a first data group and a second data group includes:
[0083] Step 101: When extracting historical data of a data center, determine key information; wherein the key information includes equipment performance status data, physical environment status data, and timestamp information;
[0084] In step 101, the device performance status data includes CPU usage, memory usage, disk I / O speed, storage device read / write speed, system response time and throughput, and the physical environment status data includes temperature, humidity, air quality, and power usage in the data center;
[0085] Step 102: Classify the equipment performance status data as a direct indicator for measuring the equipment performance status, and classify the physical environment status data as an auxiliary indicator reflecting the physical environment status of the data center; wherein both the direct indicator and the auxiliary indicator are accompanied by a timestamp information as a label indicator for sorting and tracing the historical data of the data center;
[0086] Step 103: When calculating and analyzing the direct indicators and auxiliary indicators, the weighted mean parameter is calculated using the formula :
[0087] ,in, In the formula, Represents the value of the i-th key information data point; represents the weight of the i-th key information data point; i represents the number of the key information data point; s represents the total number of key information data points; It represents a regulation factor between 0 and 1; IF represents the importance factor of the indicator; HP represents the performance factor based on historical data;
[0088] Calculate the weighted standard deviation parameter using the formula :
[0089] ;
[0090] Based on the weighted mean parameter and weighted standard deviation parameter, the normal data group and the fault data group of each indicator are determined:
[0091] Where, WNLB represents the lower limit of the weighted normal distribution, and WNUB represents the upper limit of the weighted normal distribution; if the value of the indicator is lower than the lower limit of the normal operating range of the indicator or higher than the upper limit of the normal operating range of the indicator, it is considered abnormal; if the value of the indicator is within the normal operating range of the indicator, it is considered normal; h represents a pre-selected multiple, which is used to determine the boundary between the normal data group and the fault data group;
[0092] Step 104: trace the normal data group and the faulty data group of each indicator in combination with the label indicator, and mark the normal data group and the faulty data group after tracing as the first data group and the second data group, respectively.
[0093] See also Figure 1 The present invention provides an IT operation and maintenance management method. In step 2, the steps of performing processing and analysis based on the first data group and the second data group to obtain the characteristic values of the first data group and the second data group respectively include:
[0094] Step 201: introduce an n×m matrix X based on the first data set; wherein the matrix X is a two-dimensional matrix; each column represents a variable, i.e., a quantitative index of the direct index and the auxiliary index of the first data set, and m represents the number of quantitative indexes; each row represents an observation value, i.e., a sample data point value of the variable, and n represents the number of observation values;
[0095] In step 201, the variables of the first data group are specifically device performance status data (CPU usage, memory usage, disk I / O speed, storage device read / write speed, system response time and throughput) and physical environment status data (temperature, humidity, air quality, power usage in the data center); obviously, the observed values are specific values of the data of the above variables;
[0096] Step 202, then there is a covariance matrix: In the formula, represents the covariance matrix; T represents the transpose of the matrix; N represents the total number of observations;
[0097] Step 203: Solve the characteristic equation ,get and v; where, It is a symbol in mathematics that represents the definite root of a determinant and is used to represent the value of a matrix determinant; represents the eigenvalue of the first data set; v represents the eigenvector; represents the identity matrix;
[0098] Step 204: All eigenvalues Sort in descending order and retain the largest k eigenvalues;
[0099] Step 205: Select the eigenvectors corresponding to the largest k eigenvalues and construct the transformation matrix ; Where k represents the number of maximum eigenvalues;
[0100] Step 206: Use transformation matrix A to map the data to a new coordinate system to obtain a new data matrix ;in, ;
[0101] Step 207: New data matrix The columns are the eigenvalues of the first data group, representing the main change pattern in the data. The eigenvalues of the first data group are extracted. ; Wherein, p represents the number of eigenvalues of the first data set;
[0102] Step 208: extracting values of direct indicators and auxiliary indicators from the second data group;
[0103] Step 209: Set constraints based on label indicators:
[0104] In the formula, U1 and U2 represent the direct index and auxiliary index values after weighted processing; represents the average value of U1 and U2 in the time window; t represents the current time point, that is, the time point at which the average value of U1 and U2 in the time window is calculated; L represents the length of the time window; Indicates that U1 and U2 are time Function of is the integral variable, representing any time point within the time window [tL, t]; is the infinitesimal increment of the integral, indicating Small changes in Indicates that in [tL, t] The expression to be integrated; Indicates the normalization factor of the integration result; express The preset average threshold of is used to determine whether the data center is in a fault state; Indicates fault characteristic value;
[0105] Step 210: convert the fault characteristic value into a numerical fault characteristic value:
[0106] In the formula, is a numerical fault characteristic value of the second data group, indicating the extent to which the value of the second data group exceeds its average threshold; represents the maximum value function selected to make the fault characteristic value always non-negative, wherein, if the value of the second data group does not exceed its average threshold, that is, , then the fault characteristic value is 0;
[0107] For example, assuming that the average value of U1 and U2 in the time window is 80% and the preset average threshold is 70%, then , indicating that U1 and U2 in the time window exceed the average threshold by 10%; this value is used to quantify the degree to which the data center deviates from the normal state.
[0108] See also Figure 1 The present invention provides an IT operation and maintenance management method, wherein the step of modeling and analyzing the characteristic values of the first data group and the second data group in step three to construct a risk prediction model includes:
[0109] Step 301: Obtain two data sets ,in, a data set representing a first data set, a data set representing a second data set;
[0110] Step 302: Use the information gain ratio as a criterion for predicting the risk level of the data center computer room, wherein the specific analysis formula is as follows:
[0111] In the formula, It is the conditional entropy, which means that when the eigenvalue b is known, the data set uncertainty; Indicates the size of the data subset obtained by segmenting the eigenvalue b by value j; Representation dataset size; represents information gain; It represents the information gain ratio, which evaluates the importance of each feature by comparing its information gain with its intrinsic value (i.e., the entropy of the feature), so as to balance the deviation of information gain and make the selection of features more robust;
[0112] Step 303: Count all information gain ratios and arrange them in descending order;
[0113] Step 304: Select features with higher information gain ratios as split attributes and regard them as input features of the logistic regression model; wherein the selected features are used for data preparation of the training set and the validation set;
[0114] Step 305: train a logistic regression model based on the input features selected by the analysis result of the information gain ratio; when training the model, the original data set is divided into E parts, and each time a part is reserved as a validation set, and the rest is used as a training set; each division is random, and the data set is balanced between the divisions; the training process is as follows:
[0115] Define the loss function and use the gradient descent formula to update the logistic regression model parameters:
[0116] In the formula, represents the result value of the loss function; β represents the logistic regression model parameter vector, including all weights; M represents the total number of input features; q represents the number of input features; β0 represents the intercept part of the logistic regression model parameters, which does not depend on the constant value of any feature, that is, the predicted value when all feature values are 1; represents the qth input feature value; Represents the step size, which is used to control the size of each iteration update step and determine the speed of descent; Represents the target value corresponding to the qth input feature value;
[0117] Step 306: Count the number of prediction results of the trained multiple feature sets;
[0118] Step 307, repeat E times, and finally take the average prediction result value for integration to form a comprehensive risk prediction model for the data center computer room.
[0119] See also Figure 1 The present invention provides an IT operation and maintenance management method, wherein the step of dividing the monitoring cycle for real-time monitoring and regularly collecting the operation data of the data center computer room in step 4 includes:
[0120] Step 401: determine the monitoring object, including equipment performance status data and physical environment status data;
[0121] Step 402: Establish a data transmission channel, that is, transmit data to the cloud monitoring platform in real time through the network or other means;
[0122] Step 403: For the equipment performance status data, the monitoring cycle is divided according to the importance and operation characteristics of the equipment: high-frequency monitoring is performed on key equipment; medium-frequency monitoring is performed on important equipment; and low-frequency monitoring is performed on general equipment. At the same time, for the physical environment status data, the monitoring frequency is adjusted in combination with seasonal and weather changes.
[0123] Step 404: Using the automation function of the monitoring platform, set triggers to automatically collect raw data of equipment performance status and physical environment status data.
[0124] See also Figure 1 The present invention provides an IT operation and maintenance management method. The steps of obtaining the original data of the monitoring platform in step 5, inputting it into the risk prediction model after preprocessing, performing risk score prediction, and setting thresholds to distinguish risk situations include:
[0125] Step 501: extract the collected raw data from the monitoring platform and perform preprocessing operations;
[0126] In step 501, the preprocessing operation specifically includes cleaning, denoising, and standardizing the collected raw data to ensure data quality;
[0127] Step 502: Load the preprocessed data into the risk prediction model input layer and set corresponding parameters; wherein the preprocessed data has been stored in a matrix form, with rows representing input sample features and columns representing the number of sample features;
[0128] Step 503: After receiving the input data, the risk prediction model outputs the probability value of each category; based on the fact that the risk prediction model is a multi-classification model, the output layer has F nodes, corresponding to the probability values of F categories, respectively, denoted as , and satisfies ;
[0129] Step 504: When the probability value is scored for risk, the probability value is defined as G, and 0≤G≤1; several thresholds are set to distinguish different risk levels, namely Q1, Q2, Q3, and Q4, where 0<Q1<Q2<Q3<Q4≤1; when G≤Q1, a very low risk label is generated, when Q1<G≤Q1, a low risk label is generated, when Q2<G≤Q3, a medium risk label is generated, and when G>Q3, a high risk label is generated; further analysis is performed through the risk scoring function, In the formula, RS represents the value of the risk score function; They represent the highest possible score for low risk level, the highest possible score for medium risk level, and the highest possible score for high risk level. The setting is based on a series of operation and maintenance indicators. By quantifying various operation and maintenance indicators, it can accurately reflect the quality and efficiency of operation and maintenance. If a high risk is predicted, an early warning will be triggered immediately and the operation and maintenance personnel will be notified to make adjustments.
[0130] In the embodiment of the present invention, by extracting the historical data of the data center, and classifying, arranging, calculating and analyzing, and tracing the source, the normal data group and the fault data group are distinguished and obtained, and the first data group and the second data group are further obtained, which lays the foundation for subsequent analysis. By deeply processing and analyzing the first data group and the second data group, the key feature values that can characterize the data characteristics are extracted using the feature engineering method, which are used for subsequent modeling and analysis, and are important inputs for building a risk prediction model. By building a risk prediction model, the difference between normal and fault data can be learned, and the ability to predict the future operation risk of the data center computer room can be obtained. By dividing the monitoring cycle and collecting the operation data of the data center computer room in real time, the timed trigger method is used to ensure the timeliness and accuracy of the data, and the latest data source is provided for risk prediction. Through the prediction of risk scores, reasonable thresholds are set to distinguish different risk situations, and early warning information is generated according to the evaluation results, and relevant personnel are notified in time to take corresponding measures to reduce potential risks. In summary, the example of the present invention involves data collection and analysis, result generation and intelligent prediction decision-making, which solves the technical problems of insufficient comprehensive monitoring and intelligent management in IT operation and maintenance management in existing solutions. In actual situations, more data and context information may be needed to make specific decisions and optimization plans.
[0131] See also Figure 2 The present invention provides an IT operation and maintenance management device, comprising:
[0132] The data extraction and processing analysis module is used to extract the historical data of the data center from the database, and classify and analyze it, so as to obtain the normal data group and the fault data group; trace the normal data group and the fault data group to obtain the first data group and the second data group;
[0133] The feature value extraction module is used to process and analyze the first data group and the second data group to obtain feature values of the first data group and the second data group respectively;
[0134] The risk prediction model building module is used to perform modeling analysis based on the characteristic values of the first data group and the second data group to build a risk prediction model;
[0135] The real-time monitoring and data collection module is used to divide the monitoring cycle for real-time monitoring and regularly collect the operating data of the data center room;
[0136] The risk assessment and early warning module is used to obtain the original data of the monitoring platform, input it into the risk prediction model after preprocessing, make risk score predictions, and set thresholds to distinguish risk situations.
[0137] In addition, the formulas involved in the above are all calculated by removing dimensions and taking their numerical values. They are a formula that is closest to the actual situation obtained by collecting a large amount of data and performing software simulation. The proportional coefficient in the formula and the various preset thresholds in the analysis process are set by technical personnel in this field according to actual conditions or obtained by simulating a large amount of data; the size of the proportional coefficient is to quantify each parameter to obtain a specific value for subsequent comparison. The size of the proportional coefficient depends on the amount of sample data and the preliminary setting of the corresponding processing coefficient for each group of sample data by technical personnel in this field; as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0138] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device embodiment, since it is basically based on the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0139] For the convenience of description, the above device is described in various units according to their functions. Of course, when implementing the present application, the functions of each unit can be implemented in the same or multiple software and / or hardware.
[0140] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0141] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0142] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0143] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0144] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
[0145] Finally: The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. IT operation and maintenance management methods, Features: Step 1: extract historical data of the data center from the database, classify and sort, and perform calculation and analysis to obtain a normal data group and a fault data group; trace the normal data group and the fault data group to obtain a first data group and a second data group; Step 2: Process and analyze the first data group and the second data group to obtain characteristic values of the first data group and the second data group respectively; Step 3: Conduct modeling analysis based on the characteristic values of the first data group and the second data group to construct a risk prediction model; Step 4: Divide the monitoring cycle for real-time monitoring and regularly collect the operation data of the data center room; Step 5: Obtain the raw data from the monitoring platform, input it into the risk prediction model after preprocessing, make risk score predictions, and set thresholds to distinguish risk situations; In the step 1, historical data of the data center is extracted from the database, and classified, sorted, calculated and analyzed to obtain a normal data group and a fault data group; The process of tracing the normal data group and the fault data group to obtain the first data group and the second data group includes: When extracting historical data from a data center, determine key information; wherein the key information includes equipment performance status data, physical environment status data, and timestamp information; The equipment performance status data is classified as a direct indicator to measure the equipment performance status, and the physical environment status data is classified as an auxiliary indicator to reflect the physical environment status of the data center. Both the direct indicator and the auxiliary indicator are accompanied by a timestamp information as a label indicator for sorting and tracing the historical data of the data center. When calculating and analyzing direct indicators and auxiliary indicators, the weighted mean parameter is calculated using the formula : ,in, In the formula, Represents the value of the i-th key information data point; represents the weight of the i-th key information data point; i represents the number of the key information data point; s represents the total number of key information data points; It represents a regulation factor between 0 and 1; IF represents the importance factor of the indicator; HP represents the performance factor based on historical data; Calculate the weighted standard deviation parameter using the formula : ; Based on the weighted mean parameter and weighted standard deviation parameter, the normal data group and the fault data group of each indicator are determined: Where, WNLB represents the lower limit of the weighted normal distribution, and WNUB represents the upper limit of the weighted normal distribution; if the value of the indicator is lower than the lower limit of the normal operating range of the indicator or higher than the upper limit of the normal operating range of the indicator, it is considered abnormal; if the value of the indicator is within the normal operating range of the indicator, it is considered normal; h represents a pre-selected multiple, which is used to determine the boundary between the normal data group and the fault data group; Tracing the normal data group and the faulty data group of each indicator in combination with the label indicator, and marking the normal data group and the faulty data group after tracing as the first data group and the second data group respectively; The process of processing and analyzing the first data group to obtain the characteristic value of the first data group in step 2 includes: Based on the first data group, an n×m matrix X is introduced; wherein the matrix X is a two-dimensional matrix; each column represents a variable, i.e., a quantitative index of the direct index and the auxiliary index of the first data group, and m represents the number of quantitative indexes; each row represents an observation value, i.e., a sample data point value of the variable, and n represents the number of observation values; Then we have the covariance matrix: In the formula, represents the covariance matrix; T represents the transpose of the matrix; N represents the total number of observations; Solving the characteristic equation ,get and v; where, It is a symbol in mathematics that represents the definite root of a determinant and is used to represent the value of a matrix determinant; represents the eigenvalue of the first data set; v represents the eigenvector; represents the identity matrix; All eigenvalues Sort in descending order and retain the largest k eigenvalues; Select the eigenvectors corresponding to the largest k eigenvalues and construct the transformation matrix ; Where k represents the number of maximum eigenvalues; Use the transformation matrix A to map the data to the new coordinate system and get the new data matrix ;in, ; New data matrix The columns are the eigenvalues of the first data group, representing the main change pattern in the data. The eigenvalues of the first data group are extracted. ; Wherein, p represents the number of eigenvalues of the first data set; The process of processing and analyzing the second data group to obtain the characteristic value of the second data group in step 2 includes: extracting values of direct indicators and auxiliary indicators from the second data set; Set constraints based on label indicators: In the formula, U1 and U2 represent the direct index and auxiliary index values after weighted processing; represents the average value of U1 and U2 in the time window; t represents the current time point, that is, the time point at which the average value of U1 and U2 in the time window is calculated; L represents the length of the time window; Indicates that U1 and U2 are time Function of is the integral variable, representing any time point within the time window [tL, t]; is the infinitesimal increment of the integral, indicating Small changes in Indicates that in [tL, t] The expression to be integrated; Indicates the normalization factor of the integration result; express The preset average threshold of is used to determine whether the data center is in a fault state; Indicates fault characteristic value; Convert the fault characteristic value into a numerical fault characteristic value: In the formula, is a numerical fault characteristic value of the second data group, indicating the extent to which the value of the second data group exceeds its average threshold; represents the maximum value function selected to make the fault characteristic value always non-negative; The process of performing modeling analysis based on the characteristic values of the first data group and the second data group to construct a risk prediction model includes: Get two sets of data sets ,in, a data set representing a first data set, a data set representing a second data set; The information gain ratio is used as a criterion for predicting the risk level of a data center computer room. The specific analysis formula is as follows: In the formula, It is the conditional entropy, which means that when the eigenvalue b is known, the data set uncertainty; Indicates the size of the data subset obtained by segmenting the eigenvalue b by value j; Representation dataset size; represents information gain; represents the information gain ratio; Count all information gain ratios and sort them in descending order; Select the features with the highest information gain ratio as split attributes and regard them as input features of the logistic regression model; wherein the selected features are used for data preparation of the training set and the validation set; Combined with the input features selected by the analysis results of the information gain ratio, the logistic regression model is trained; the training process is as follows: Define the loss function and use the gradient descent formula to update the logistic regression model parameters: In the formula, represents the result value of the loss function; β represents the logistic regression model parameter vector, including all weights; M represents the total number of input features; q represents the number of input features; β0 represents the intercept part of the logistic regression model parameters, which does not depend on the constant value of any feature, that is, the predicted value when all feature values are 1; represents the qth input feature value; Represents the step size, which is used to control the size of each iteration update step and determine the speed of descent; Represents the target value corresponding to the qth input feature value; Collect multiple features after training and count the number of prediction results; Repeat E times, and finally take the average prediction result value for integration to form a comprehensive risk prediction model for data center computer rooms.
2. According to the IT operation and maintenance management method of claim 1, Features: Equipment performance status data includes CPU usage, memory usage, disk I / O speed, storage device read and write speed, system response time and throughput. Physical environment status data includes temperature, humidity, air quality and power usage in the data center.
3. According to the IT operation and maintenance management method of claim 1, Features: In step 4, the process of dividing the monitoring cycle for real-time monitoring and regularly collecting the operation data of the data center computer room includes: Determine the monitoring objects, including equipment performance status data and physical environment status data; Establish a data transmission channel, that is, transmit data to the cloud monitoring platform in real time through the network or other means; For equipment performance status data, the monitoring cycle is divided according to the importance and operating characteristics of the equipment: high-frequency monitoring for key equipment; medium-frequency monitoring for important equipment; low-frequency monitoring for general equipment; at the same time, for physical environment status data, the monitoring frequency is adjusted in combination with seasonal and weather changes; Utilize the automation function of the monitoring platform to set triggers and automatically collect raw data on equipment performance status and physical environment status data.
4. According to the IT operation and maintenance management method of claim 3, Features: In step 5, the process of obtaining the original data from the monitoring platform, inputting it into the risk prediction model after preprocessing, performing risk score prediction, and setting thresholds to distinguish risk situations includes: Extract the collected raw data from the monitoring platform and perform preprocessing operations; Load the preprocessed data into the risk prediction model input layer and set the corresponding parameters; the preprocessed data has been stored in a matrix form, with rows representing input sample features and columns representing the number of sample features; After receiving the input data, the risk prediction model outputs the probability value of each category. Since the risk prediction model is a multi-classification model, the output layer has F nodes, corresponding to the probability values of F categories, recorded as , and satisfies ; When scoring the probability value, the probability value is defined as G, and 0≤G≤1; several thresholds are set to distinguish different risk levels, namely Q1, Q2, Q3, and Q4, where 0<Q1<Q2<Q3<Q4≤1; when G≤Q1, a very low risk label is generated, when Q1<G≤Q1, a low risk label is generated, when Q2<G≤Q3, a medium risk label is generated, and when G>Q3, a high risk label is generated; further analysis is performed through the risk scoring function, In the formula, RS represents the value of the risk score function; They respectively represent the highest score for the low risk level, the highest score for the medium risk level, and the highest score that may be achieved for the high risk level. If a high risk is predicted, an early warning will be triggered immediately and the operation and maintenance personnel will be notified to make adjustments. 5.IT operation and maintenance management device, It is characterized in that Applied to the IT operation and maintenance management method as claimed in any one of claims 1 to 4, the device comprises: The data extraction and processing analysis module is used to extract the historical data of the data center from the database, and classify and analyze it, so as to obtain the normal data group and the fault data group; trace the normal data group and the fault data group to obtain the first data group and the second data group; The feature value extraction module is used to process and analyze the first data group and the second data group to obtain feature values of the first data group and the second data group respectively; The risk prediction model building module is used to perform modeling analysis based on the characteristic values of the first data group and the second data group to build a risk prediction model; The real-time monitoring and data collection module is used to divide the monitoring cycle for real-time monitoring and regularly collect the operating data of the data center room; The risk assessment and early warning module is used to obtain the original data of the monitoring platform, input it into the risk prediction model after preprocessing, make risk score predictions, and set thresholds to distinguish risk situations.
Citation Information
Patent Citations
Operation and maintenance management method and system based on artificial intelligence
CN117390536A
Data center infrastructure operation and maintenance management method
CN117391675A
Intelligent power grid safety management system and method
CN117996946A
Intelligent operation and maintenance cloud platform for industrial equipment
CN118154174A
System operation and maintenance decision support system based on artificial intelligence
CN118278778A
Cited By
Operation and maintenance management method and system based on digital twinning
CN119850195A
Operation and Maintenance Management Method and System Based on Digital Twin
CN119850195B