A method and system for preventing and controlling groundwater pollution

By obtaining pollutant isolines and prevention and control action vectors, the location of groundwater treatment wells is optimized, which solves the problems of low treatment efficiency and high cost in groundwater pollution prevention and control, and achieves the best overall prevention and control efficiency under limited well locations.

CN118551901BActive Publication Date: 2024-10-25TECH CENT FOR SOIL AGRI & RURAL ECOLOGY & ENVIRONMENT MINIST OF ECOLOGY & ENVIRONMENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410994939.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-25
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

In the prevention and control of groundwater pollution, it is difficult to effectively optimize the setting of groundwater treatment wells with existing technology, resulting in low treatment efficiency, high cost, and complex diffusion of pollutants. Especially in the case of multiple pollution sources, how to improve the use efficiency of each treatment well is a challenge.

Method used

By obtaining pollutant isolines, determining the target prevention and control range and prevention and control action vectors, we optimize the location of groundwater treatment wells to ensure that the well locations cover key areas and are suitable for treatment capacity. We combine curtain walls and pollutant diffusion models for global optimization. settings, reducing the limit on the number of treatment wells.

Benefits of technology

It achieves maximum treatment efficiency under a limited number of treatment wells, reduces computational complexity, adapts to different pollutant diffusion areas and distribution conditions, achieves a balance between prevention and control costs and effects, and improves the overall efficiency of groundwater pollution prevention and control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118551901B_ABST
    Figure CN118551901B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for preventing and controlling groundwater pollution, the method comprising: obtaining pollutant contours for each pollution source; determining a target prevention and control range; determining a prevention and control action vector for each target prevention and control range; and setting groundwater treatment wells based on a set of prevention and control action vectors of the pollution source. Based on the relative positions of multi-source pollution sources and curtain prevention and control walls, the present invention can achieve the best global prevention and control efficiency under the guidance of global optimization settings with a limited number of groundwater treatment wells set.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of groundwater optimization and prevention, and in particular, relates to a groundwater pollution prevention and control method and system. Background Art

[0002] Pollution barrier technology mainly blocks the seepage of polluted groundwater and blocks, retains and degrades pollutants by building barrier walls or laying barrier materials, thereby reducing and removing the potential risks of pollutants to the human body and the environment. As a risk prevention and control technology with low environmental risk, low cost and high efficiency, barrier technology is widely used in contaminated sites in my country. Common pollution barriers are to inject cement, bentonite and concrete into the formation in the form of slurry by penetration grouting or jet grouting to form a blocking curtain.

[0003] Groundwater treatment wells are wells used in groundwater pollution control. They can be pumping wells or injection wells. They are used to control and remove pollutants in groundwater and are also one of the representative technologies for ex situ remediation of groundwater. By laying a certain number of groundwater treatment wells at the contaminated site, underground pollution sources or polluted plumes are captured and pumped out of the ground, and then treated with ground equipment, the treated groundwater that meets the standards is re-injected into the ground or discharged into the pipe network.

[0004] The combination of curtain barrier wall and groundwater treatment well can achieve good results. When the relative positions of pollutants and curtain barrier wall are fixed, how to design and arrange groundwater treatment wells around them needs to consider more factors, including the hydrogeological conditions of the site, the migration and transformation characteristics of pollutants, the distribution range of pollution sources and pollution plumes, and potential groundwater receptors. The setting of groundwater treatment wells may have problems such as long repair time, high power consumption and maintenance costs, and possible migration of pollutants. In order to improve efficiency and reduce costs, optimizing the setting is an effective way to improve treatment efficiency. Its layout is very critical and requires efficient control of the flow of underground polluted water bodies. In other words, the factors that need to be considered in the prevention and control of groundwater pollution are very complicated. More importantly, there is a clear difference between groundwater and surface water. The groundwater pollution is strongly affected and affected by the external environment. When an area is polluted, driven by vertical surface infiltration and lateral underground runoff, pollutants will spread to deep pollution with groundwater. Due to the concealment and complexity of the underground environment, contaminated soil and groundwater are difficult to be discovered in time. Like surface water, groundwater is also facing a severe situation, mainly from the infiltration of surface water or soil water. The groundwater pollution is not only numerous and complex in components detected, but also the degree of pollution is constantly deepening. Groundwater pollution is spreading from point pollution and belt pollution to surface pollution, from shallow penetration to deep layers, and pollution is becoming more and more common. Especially in the case of multi-source pollution sources, the problem of prevention and control settings becomes more complicated. In the case of multi-source pollution sources, the types of pollutants are complex. As the pollutants spread, it is difficult and inefficient to carry out comprehensive treatment on them; how to improve the actual use efficiency of each treatment well under the limitation of a limited number of treatment wells is also crucial and overlooked. Based on the above problems, the present invention is based on the relative positions of multi-source pollution sources and curtain prevention and control walls, and under the guidance of global optimization settings, it can bring the best global prevention and control efficiency under the limited number of groundwater treatment wells. Summary of the invention

[0005] The present invention aims to improve the problems existing in the above-mentioned prior art, that is, the present invention discloses a method and system for preventing and controlling groundwater pollution, the method comprising:

[0006] Step S1: obtaining pollutant contour lines for each pollution source; for each pollution source, the pollutant concentrations at the locations of its pollutant contour lines are equal;

[0007] Step S2: Determine the target prevention and control range; the target prevention and control range is a pollutant diffusion area suitable for pollutant treatment; specifically: for each pollution source, if there is a pollutant isoline interval within which the pollutant concentration and the corresponding pollutant type fall within the pollutant treatment range, it will be used as the target pollutant isoline interval; if the target pollutant isoline intervals corresponding to multiple pollution sources overlap, and the pollutant treatment ranges corresponding to the target pollutant isoline intervals are associated or fall within the pollutant treatment range after overlap, the overlapping area range will be used as the target prevention and control range, and the pollution source corresponding to the overlapping target pollutant isoline intervals is called the associated pollution source corresponding to the target prevention and control range; the target prevention and control range is a two-dimensional spatial range for further determining the location of the pollutant treatment well; wherein: the pollutant treatment range is a pollutant concentration range suitable for groundwater treatment well treatment for a pollutant type; when two different pollutant treatment ranges are associated, they are suitable for sequential or simultaneous treatment; the pollutant treatment range is pre-set according to the treatment capacity of the pollutant treatment well;

[0008] Step S3: Determine the prevention and control action vector for each target prevention and control range; the step specifically includes the following steps:

[0009] Step S3A1: obtaining an untreated target control range, and dividing the untreated target control range to obtain a plurality of sub-areas;

[0010] Step S3A2: determining a position point in each sub-region; specifically: taking the central position point of the sub-region as the determined position point;

[0011] Step S3A3: Starting from each location point, setting a connection line between each associated pollution source corresponding to the untreated target prevention and control range; obtaining the intersection point between the connection lines;

[0012] Step S3A4: For each intersection c, calculate the sum of the areas enclosed by the intersection c and each of the two associated pollution sources s1 and s2 , select the intersection point with the smallest sum of the enclosed areas as the target location; specifically: use the following formula (1) to calculate the sum of the enclosed areas: ;in: is the location of the intersection point c; is the location of the associated pollution sources s1 and s2; is the set of associated pollution sources corresponding to the untreated target prevention and control range; is the adjustment factor;

[0013] (1);

[0014] Step S3A5: connecting each associated pollution source location and the target location to form a prevention and control action vector of the associated pollution source;

[0015] Step S3A6: Determine whether all target control areas have been processed. If yes, proceed to the next step; otherwise, return to step S3A1;

[0016] Step S4: De-duplication of the control action vector set; specifically: merging the control action vectors of all pollution sources to form a control action vector set; merging and de-duplicating the control action vectors in the control action vector set whose angles are less than the angle threshold;

[0017] Step S5: Setting a groundwater treatment well based on the prevention and control action vector set of the pollution source; specifically: taking the end positions of all the prevention and control action vectors in the prevention and control action vector set as the candidate setting positions; clustering all the candidate setting positions; taking the cluster center position as the setting position; and setting a groundwater treatment well at the setting position.

[0018] Furthermore, there are two or more pollution sources.

[0019] Furthermore, the types of pollutants produced by different pollution sources are the same or different.

[0020] Furthermore, a curtain barrier wall is provided in the downstream area of ​​the groundwater pollution source.

[0021] Furthermore, the step S2 also includes: pre-processing the target control range, and deleting the target control range whose size is smaller than a preset value.

[0022] Furthermore, the connecting line is a straight line or an arc.

[0023] Furthermore, the adjustment coefficient .

[0024] A groundwater pollution prevention and control system is used to implement the above-mentioned groundwater pollution prevention and control method.

[0025] A groundwater pollution prevention and control server is used to implement the above-mentioned groundwater pollution prevention and control method.

[0026] An artificial intelligence analysis server, wherein the artificial intelligence analysis server is used to implement the above-mentioned groundwater pollution prevention and control method.

[0027] The beneficial effects of the present invention include:

[0028] (1) By determining the target control range and control action vector, the location of the treatment wells can be planned more reasonably to ensure that they can effectively cover the key areas and are suitable for the actual treatment capacity of the treatment wells. Further consideration is given to the diffusion direction of pollutants and the location of the treatment wells is optimized through quantitative calculation. With a limited number of treatment wells, the optimal configuration of treatment wells for different pollutants under different diffusion laws can be considered to maximize the treatment capacity of each treatment well and improve the overall treatment efficiency.

[0029] (2) De-duplication of pollution control vectors is performed globally, and location clustering based on pollution control vectors is performed to make the final location suitable for the actual location capacity, reducing the complexity of subsequent calculations, so that different treatment well settings can be matched with different pollutant diffusion area sizes and distribution conditions, with strong adaptability and compatibility;

[0030] (3) Based on the synchronous update of the pollutant diffusion model for each individual pollution source and the repeated iterative setting of the actual setting location, the global optimization setting based on the curtain isolation wall and the underground control well is realized; a better balance is achieved between the control cost and the control effect. Under the guidance of the global optimization setting, the best global control efficiency can be achieved with a limited number of groundwater treatment wells. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 A schematic diagram of a groundwater pollution prevention and control method provided by the present invention. DETAILED DESCRIPTION

[0032] The specific embodiments of the present invention are described in detail below. The illustrative embodiments and descriptions are only used to explain the present invention, but not to limit the present invention.

[0033] The present invention provides a method and system for preventing and controlling groundwater pollution. Figure 1 As shown, the method comprises the following steps:

[0034] Step S1: Obtain pollutant contour lines for each pollution source; for each pollution source, the pollutant concentration at the position of its pollutant contour line is equal; that is, the pollutant concentrations in two adjacent pollutant contour line intervals are within the same pollutant concentration interval range;

[0035] Preferably: the pollution sources are two or more, and the types of pollutants generated by different pollution sources are the same or different; the pollutant types here include pollutant components and / or proportions; that is, if the proportions are different when the pollutant components are the same, they are also regarded as different pollutant types;

[0036] Preferably: a curtain barrier wall is provided in the downstream area of ​​the groundwater of the pollution source to isolate the spread of pollutants;

[0037] Preferably: starting from each pollution source, multiple monitoring points are selected in the diffusion area of ​​the pollutants along the groundwater flow direction to monitor the pollutant concentration data, so that for the same pollution source, when it diffuses to different positions of the same pollutant contour line, the concentration of the pollutant is equal;

[0038] Alternatively: according to the location information of the pollution source and its pollutant migration and diffusion model, the monitoring information for each pollution source is solved by simulation, and the pollutant contour information is constructed based on the monitoring information; wherein: the monitoring information includes the pollutant type and / or concentration information corresponding to the monitoring location;

[0039] Step S2: Determine the target control range; the target control range is a pollutant diffusion area suitable for pollutant treatment, and is suitable for setting up pollutant treatment wells within the target control range; specifically: for each pollution source, if there is a pollutant isoline interval whose pollutant concentration and the pollutant type of the corresponding pollution source fall within the pollutant treatment range, it is used as the target pollutant isoline interval; if the target pollutant isoline intervals corresponding to multiple pollution sources overlap, and the pollutant treatment ranges corresponding to the target pollutant isoline intervals are associated or fall within the pollutant treatment range after overlap, the overlapping area is used as the target control range, and the pollution source corresponding to the overlapping target pollutant isoline interval is called the associated pollution source corresponding to the target control range; the target control range is a two-dimensional space range for further determining the location of the pollutant treatment well (of course, it can also be a three-dimensional space, and the prevention and control methods are similar, which will not be described in detail here); wherein: the pollutant treatment range is a pollutant concentration range suitable for groundwater treatment well treatment for a pollutant type; and when two different pollutant treatment ranges are associated, they are suitable for associated treatments such as sequential treatment or simultaneous treatment, and at this time, the two corresponding pollutant treatment ranges are considered to be associated;

[0040] The pollutant treatment range is pre-set according to the treatment capacity of the pollutant treatment well. The pollutant type, proportion and concentration range corresponding to the pollutant treatment range are suitable for the treatment capacity of the pollutant treatment well.

[0041] Preferred: When the target pollutant contour line intervals do not overlap, they are directly used as the target control range;

[0042] Preferably, step S2 further comprises: sorting the target control range; specifically, obtaining the number of target pollutant contour intervals that overlap corresponding to the target control range and the size of the target control range; sorting the target control range based on the number and size, so that the more the number and / or the larger the size, the higher the ranking; conversely, the fewer the number and / or the larger the size, the higher the ranking;

[0043] Preferably: the step S2 further comprises: pre-processing the target control range, deleting the target control range whose size is smaller than a preset value;

[0044] Step S3: Determine the prevention and control action vector for each target prevention and control range;

[0045] The steps specifically include the following steps:

[0046] Step S3A1: obtaining an untreated target control range, and dividing the untreated target control range to obtain K sub-areas;

[0047] The obtaining of an untreated target control range specifically comprises: obtaining an untreated target control range in a sorted order;

[0048] Alternatively: the obtaining of an untreated target control range is specifically: obtaining a range with the smallest average distance from all pollution sources from the untreated target control range;

[0049] The untreated target control range is divided to obtain K sub-areas, specifically: a uniform grid is used as a mask of the untreated target control range to divide the untreated target control range into K sub-areas, and the sizes of the sub-areas are the same or different; at this time, the sizes of the obtained sub-areas are basically the same, and there may be small-sized areas that cannot cover the boundary uniform grid at the boundary position of the untreated target control range; after the division, dense sub-areas are formed; these small-sized areas can be deleted without processing; of course, more precise division can be made in combination with the topography and hydrological address characteristics, so that the diffusion mode in the sub-area is uniform;

[0050] Alternatively: the untreated target control range is divided to obtain K sub-areas, specifically: the untreated target control range is divided in a uniformly distributed manner to obtain K sub-areas of equal size; K is a preset value; thereby the untreated target control range is divided into equal and continuous areas; wherein: the K value is positively correlated with the size of the untreated target control range;

[0051] Step S3A2: Determine a position point in each sub-region; specifically: take the central position point of the sub-region as the determined position point; of course, the position in the sub-region that is most suitable for setting the treatment well may also be taken as the determined position point;

[0052] Alternatively: the position point closest to the curtain barrier wall in the sub-area is taken as the determined position point; the curtain barrier wall is set at the downstream of the pollution source; the curtain barrier wall is a barrier barrier with a complete structure formed by grouting material and is made of barrier material, which meets the low permeability standard and has a permeability coefficient lower than ;

[0053] Step S3A3: Starting from each location point, setting a connection line between each associated pollution source corresponding to the untreated target prevention and control range; obtaining the intersection point between the connection lines;

[0054] Preferably: the connecting line is a straight line or an arc; the deviation direction of the arc is toward a direction suitable for setting up a treatment well, or a direction of a large and serious pollution source;

[0055] Step S3A4: For each intersection c, calculate the sum of the areas enclosed by the intersection c and each of the two associated pollution sources s1 and s2 , select the intersection point with the smallest sum of the enclosed areas as the target location; specifically: use the following formula (1) to calculate the sum of the enclosed areas: ;in: is the location of the intersection point c; is the location of the associated pollution sources s1 and s2; is the set of associated pollution sources corresponding to the untreated target prevention and control range; is the adjustment factor;

[0056] (1);

[0057] Preferred: is the preset value; adjustment factor ;

[0058] Alternatively: the area of ​​the enclosed region is the area of ​​the circular region enclosed by the intersection c and each of the two associated pollution sources s1 and s2;

[0059] Preferably: the calculation method of the enclosed area is selected according to the distribution of the pollutant contour lines of the associated pollution sources s1 and s2; so that the enclosed area includes more areas where the pollutant contour lines decrease slowly, and contains fewer areas where the pollutant contour lines decrease quickly; specifically: the intersection point is vertically projected onto the straight line between S1 and S2, and the decreasing speed of the pollutant contour lines on both sides of the straight line is determined. ; and are the decreasing speeds of the pollutant contour lines facing the pollution source S1 and S2 respectively; the sum of the enclosed areas is calculated using the following formulas (2)-(4): ; and is the adjustment factor;

[0060] (2);

[0061] (3);

[0062] (4);

[0063] Preferred: and is the default value; ;

[0064] Preferably: the calculation method of the area of ​​the enclosed region is selected according to the distribution of the pollutant contour lines of the associated pollution sources s1 and s2; so that the enclosed area includes more areas with high pollutant concentration (serious pollution) and fewer areas with low pollutant concentration (light pollution); specifically: the sum of the areas of the enclosed regions is calculated using the following formulas (2)-(3), (5): ;in: are the pollutant concentrations emitted by pollution sources S1 and S2, respectively;

[0065] (5);

[0066] Alternatively, select U intersections with the smallest sum of enclosed areas as target locations; U is a preset value;

[0067] Step S3A5: connecting each associated pollution source location and target location to form a prevention and control action vector for the pollution source;

[0068] Step S3A6: Determine whether all target control ranges have been processed. If yes, proceed to the next step, otherwise, return to step S3A1. After completing this step, the control action vector of each pollution source constitutes a control action vector set. It can be seen that the control action vector is set along the groundwater flow direction.

[0069] Preferably: when there is one associated pollution source in the untreated target control range, a position point is determined from the untreated target control range, and a line from the pollution source to the position point in the untreated target control range is connected to form a control action vector;

[0070] Step S4: de-duplication of the control action vector set; specifically: merging the control action vectors of all pollution sources to form a control action vector set; merging and de-duplication of the control action vectors in the control action vector set whose angle is less than the angle threshold; obviously, the angle threshold is a preset value, for example: 1 to 10 degrees;

[0071] Alternative: De-duplication is performed on the control action vector set of each pollution source separately; this method can be used when the number of pollution sources is small but the number of pollutant treatment wells to be set is large. The specific de-duplication method is the same as the method of merging set processing;

[0072] Preferably: the angle threshold is a preset value, which is determined according to the positional relationship between the pollution source and the curtain barrier wall;

[0073] The step S4 specifically includes the following steps:

[0074] Step S41: For any two control action vectors and , calculate the vector angle between them ;

[0075] Specifically, the vector angle between the two control action vectors is calculated based on the following equations (6) to (8); where: is the control action vector number; They are respectively the control action vectors The starting point (that is, the pollution source coordinates) and the end point coordinates (that is, the target location coordinates); They are respectively the control action vectors The starting and ending point coordinates;

[0076] (6);

[0077] (7);

[0078] (8);

[0079] Step S42: Obtaining vector angle Closest angle threshold And less than or equal to the angle threshold Two control vectors and , merge and remove duplicates; until there is no vector angle in the prevention and control action vector set Closest angle threshold And less than or equal to the angle threshold Two control vectors and until;

[0080] The merging and deduplication are specifically as follows: deleting two prevention and control action vectors from the prevention and control action vector set and Any one of , to perform deduplication;

[0081] Replaceable; the merging and deduplication thereof are specifically as follows: determining the control action vector set and the two control action vectors respectively and The number of control effect vectors whose vector angle is less than or equal to the angle threshold, and the control effect vector corresponding to the larger number is selected or Delete them and keep the corresponding control effect vectors of the smaller ones or , for deduplication;

[0082] Alternatively, the merging and deduplication thereof are specifically as follows: two control action vectors are calculated respectively and Length and , according to the relationship between the length of the prevention and control action vector, the average distance LL between the pollution source and the curtain barrier wall, and the optimal number of groundwater treatment wells NB, determine the merging and de-duplication methods;

[0083] Going a step further: Determining the average control length ; It is divided into the following 3 methods;

[0084] (1) If and , then the control action vector corresponding to the larger length is deleted, and the control action vector corresponding to the smaller length is retained;

[0085] (2) If and , then the control action vector corresponding to the smaller length is deleted, and the control action vector corresponding to the larger length is retained;

[0086] (3) If and ,or and , then these two control action vectors are retained;

[0087] Alternative: If and ,or and , then delete and The control effect vector corresponding to the larger difference is retained, and the control effect vector corresponding to the smaller difference is retained;

[0088] Step S5: setting a groundwater treatment well based on the prevention and control action vector set of the pollution source; specifically: taking the end positions of all the prevention and control action vectors in the prevention and control action vector set as the candidate setting positions; clustering all the candidate setting positions; taking the cluster center position as the setting position; and setting the groundwater treatment well at the setting position;

[0089] Preferably: determine the optimal number of groundwater treatment wells, cluster all candidate setting locations based on the number of groundwater treatment wells; make the number of clusters formed equal to the optimal number of groundwater treatment wells; select actual setting locations where groundwater treatment wells can be set around the cluster center location, so that the actual setting location is as close to the cluster center location as possible; determine the candidate setting location closest to the actual setting location; determine the prevention and control action vector and target prevention and control range corresponding to the candidate setting location, and use the groundwater treatment well based on the pollutant treatment range corresponding to the target prevention and control range;

[0090] Alternatively, the step S5 is specifically: setting a groundwater treatment well by iterative optimization; the step S5 specifically includes the following steps:

[0091] Step S51: determining the initial number of clusters; for example, determining that the initial number of clusters is equal to 2;

[0092] Preferably: obtaining an average distance LL between the pollution source and the curtain barrier wall; determining an initial number of clusters in based on the average distance; presetting a corresponding relationship between the average distance and the initial number of clusters, and determining the initial number of clusters by querying the corresponding relationship;

[0093] Step S52: taking the end positions of all the prevention and control action vectors in the prevention and control action vector set as the positions to be selected; clustering all the positions to be selected; making the number of clusters formed equal to the initial number of clusters;

[0094] Step S53: Determine the location of the cluster center of the cluster with the most cluster elements;

[0095] Step S54: selecting actual setting positions for groundwater treatment wells around the cluster center position, so that the actual setting positions are as close to the cluster center position as possible; updating the actual setting positions, and determining whether the number of actual setting positions is equal to the optimal number of groundwater treatment wells, if yes, then ending; otherwise, proceeding to the next step;

[0096] Step S55: adding a groundwater treatment well to the pollutant migration and diffusion model according to the actual setting position; returning to step S1;

[0097] In each iteration process from step S1 to S5, an actual setting position is formed, and the pollutant diffusion model for a single pollution source is synchronously updated to form the basis for the next iteration, until the number of groundwater treatment wells is equal to the number of groundwater treatment wells that actually need to be set, thereby achieving global optimization settings based on curtain isolation walls and underground prevention and control wells; Obviously, more groundwater treatment wells may bring more prevention and control effects, but will inevitably bring higher prevention and control costs. Under the guidance of the global optimization setting, the best global prevention and control efficiency can be achieved under a limited number of groundwater treatment wells.

[0098] Based on the same inventive concept, the present invention also provides a groundwater pollution prevention and control system, the system is used to complete the above-mentioned groundwater pollution prevention and control method; the groundwater pollution prevention and control system includes multiple pollution sources, curtain isolation walls and groundwater treatment wells; the curtain isolation walls are arranged at the downstream position of the pollution source; a groundwater treatment well is arranged in the area between the pollution source and the curtain isolation wall; the groundwater treatment well is used to carry out pollution prevention and control treatment on groundwater; the above-mentioned groundwater pollution prevention and control method is used to select a suitable setting position of the groundwater treatment well;

[0099] Preferably: the groundwater prevention and control system is arranged on an artificial intelligence analysis server; a pollutant diffusion model for a single pollution source is arranged on the artificial intelligence analysis server; the pollutant diffusion model for a single pollution source is relatively easy to obtain, and the present invention can perform prevention and control settings for multiple pollution sources in the pollutant diffusion model for a single pollution source;

[0100] A computer program (also referred to as a program, software, software application, script, or code) can be written in any form of a programming language, including an assembled or interpreted language, a declarative or procedural language, and it can be deployed in any form, including as a stand-alone program or as a module, component, subroutine, object, or other unit suitable for use in a computing environment. A computer program may, but need not, correspond to a file in a file system. A program can be stored in a portion of a file that holds other programs or data (e.g., one or more scripts stored in a markup language document), in a single file dedicated to the program, or in multiple collaborative files (e.g., files storing one or more modules, subroutines, or code portions). A computer program can be deployed to execute on one computer or on multiple computers located at one site or distributed across multiple sites and interconnected by a communication network.

[0101] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0102] The present invention is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0103] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0104] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0105] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

[0106] The "range" disclosed in the present invention is defined in the form of a lower limit and an upper limit, and a given range is defined by selecting a lower limit and an upper limit, and the selected lower limit and upper limit define the boundaries of the particular range. The range defined in this way can be inclusive or exclusive of the end values, and can be arbitrarily combined, that is, any lower limit can be combined with any upper limit to form a range. For example, if a range of 10 to 50 is listed for a specific parameter, it is understood that the range of 10 to 40 and 20 to 50 is also expected. In addition, if the minimum range values ​​1 and 2 are listed, and if the maximum range values ​​3, 4 and 5 are listed, the following ranges can all be expected: 1 to 3, 1 to 4, 1 to 5, 2 to 3, 2 to 4 and 2 to 5. In this application, unless otherwise specified, the range of values ​​"a to b" represents an abbreviation of any real number combination between a and b, where a and b are both real numbers. For example, the range of values ​​"0 to 5" means that all real numbers between "0 to 5" have been fully listed in this article, and "0 to 5" is only an abbreviation of these numerical combinations.

[0107] Unless otherwise specified, all embodiments and optional embodiments of the present application can be combined with each other to form a new technical solution.

[0108] Unless otherwise specified, all technical features and optional technical features of this application can be combined with each other to form a new technical solution.

[0109] If there is no special explanation, all steps of the present application can be performed sequentially or randomly, preferably sequentially. For example, the method includes steps (a) and (b), which means that the method may include steps (a) and (b) performed sequentially, or may include steps (b) and (a) performed sequentially. For example, the method may further include step (c), which means that step (c) may be added to the method in any order. For example, the method may include steps (a), (b) and (c), or may include steps (a), (c) and (b), or may include steps (c), (a) and (b), etc.

[0110] If there is no special explanation, the "include" and "comprising" mentioned in this application are open-ended or closed-ended. For example, the "include" and "comprising" may mean that other components not listed may also be included or only the listed components may be included or only the listed components may be included.

[0111] Unless otherwise specified, the reaction is carried out at room temperature and pressure.

[0112] Unless otherwise specified, all parts or percentages are by weight.

[0113] In the present invention, all substances used are known substances and can be purchased or synthesized by known methods.

[0114] In the present invention, the devices or equipment used are all conventional devices or equipment known in the art and are commercially available.

[0115] The above describes the embodiments of the present invention in detail. However, the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.

Claims

1. A method for preventing and controlling groundwater pollution, characterized in that: The method comprises the following steps: Step S1: obtaining pollutant contour lines for each pollution source; for each pollution source, the pollutant concentrations at the locations of its pollutant contour lines are equal; Step S2: Determine the target prevention and control range; the target prevention and control range is the pollutant diffusion area range suitable for pollutant treatment; specifically: for each pollution source, if there is a pollutant contour line interval whose pollutant concentration and its corresponding pollutant type fall within the pollutant treatment range, then it is used as the target pollutant contour line interval; if the target pollutant contour line intervals corresponding to multiple pollution sources overlap, and the pollutant treatment ranges corresponding to the target pollutant contour line intervals are associated or fall within the pollutant treatment range after overlap, then the overlapping area range is used as the target prevention and control range, and the pollution source corresponding to the overlapping target pollutant contour line interval is called the associated pollution source corresponding to the target prevention and control range; wherein: the pollutant treatment range is the pollutant concentration range suitable for groundwater treatment well treatment for a pollutant type; when two different pollutant treatment ranges are associated, they are suitable for sequential treatment or simultaneous treatment; the pollutant treatment range is pre-set according to the treatment capacity of the pollutant treatment well; Step S3: Determine the prevention and control action vector for each target prevention and control range; specifically includes the following steps: Step S3A1: obtaining an untreated target control range, and dividing the untreated target control range to obtain a plurality of sub-areas; Step S3A2: determining a position point in each sub-region; specifically: taking the central position point of the sub-region as the determined position point; Step S3A3: Starting from each location point, setting a connection line between each associated pollution source corresponding to the untreated target prevention and control range; obtaining the intersection point between the connection lines; Step S3A4: For each intersection c, calculate the sum of the areas enclosed by the intersection c and each of the two associated pollution sources s1 and s2 , select the intersection point with the smallest sum of the enclosed areas as the target location; specifically: use the following formula (1) to calculate the sum of the enclosed areas: ;in: is the location of the intersection point c; is the location of the associated pollution sources s1 and s2; is the set of associated pollution sources corresponding to the untreated target prevention and control range; is the adjustment factor; (1); Step S3A5: connecting each associated pollution source location and the target location to form a prevention and control action vector of the associated pollution source; Step S3A6: Determine whether all target control areas have been processed. If yes, proceed to the next step; otherwise, return to step S3A1; Step S4: De-duplication of the control action vector set; specifically: merging the control action vectors of all pollution sources to form a control action vector set; merging and de-duplicating the control action vectors in the control action vector set whose angles are less than the angle threshold; The angle threshold is determined based on the positional relationship between the pollution source and the curtain barrier wall; Step S5: Setting a groundwater treatment well based on the prevention and control action vector set of the pollution source; specifically: taking the end positions of all the prevention and control action vectors in the prevention and control action vector set as the candidate setting positions; clustering all the candidate setting positions; taking the cluster center position as the setting position; and setting a groundwater treatment well at the setting position.

2. A method for preventing and controlling groundwater pollution according to claim 1, characterized in that: The pollution sources are two or more.

3. A method for preventing and controlling groundwater pollution according to claim 2, characterized in that: The types of pollutants produced by different pollution sources are the same or different.

4. A method for preventing and controlling groundwater pollution according to claim 3, characterized in that: A curtain barrier wall is set up in the downstream area of ​​the groundwater pollution source.

5. A method for preventing and controlling groundwater pollution according to claim 4, characterized in that: The step S2 also includes: pre-processing the target control range, and deleting the target control range whose size is smaller than a preset value.

6. A method for preventing and controlling groundwater pollution according to claim 5, characterized in that: The connecting line is a straight line or an arc.

7. A method for preventing and controlling groundwater pollution according to claim 6, characterized in that: Adjustment factor.

8. A groundwater pollution prevention and control system, characterized in that: The groundwater pollution prevention and control system is used to implement a groundwater pollution prevention and control method as described in any one of claims 1 to 7.

9. A groundwater pollution prevention and control server, characterized in that: The groundwater pollution prevention and control server is used to implement a groundwater pollution prevention and control method described in any one of claims 1 to 7.

10. An artificial intelligence analysis server, characterized in that: The artificial intelligence analysis server is used to implement a groundwater pollution prevention and control method as described in any one of claims 1 to 7.