A method for renovating and utilizing a large-scale old building while retaining its appearance

By strengthening and opening window holes, internal construction is carried out, and the curtain wall and glass window sash are used to protect the appearance of the old building, the problem of dismantling medium and high-stiff components of large-sized old building renovation is solved, and functional transformation and environmental stability are improved.

CN118564103BActive Publication Date: 2024-12-06BEIJING FOURTH CONSTR & ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411049990.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-12-06
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

During the renovation process, large-sized old buildings need to use high-rigid but cannot be disassembled components, which cannot be reconstructed by reassembly and reassembly. The old building structure is aging and the appearance is dilapidated, making it difficult to make in-depth renovation of the building without any deep renovation. Solve its transformation problem under the circumstances.

Method used

Using the method of strengthening the old building, by opening curtain wall windows and side window holes on the exterior wall, installing curtain walls and glass window sashes, conducting internal construction and wrapping decorative materials to protect and renovate the exterior of the building, and at the same time, without affecting the bearing capacity of the old building. Nesting construction of new buildings.

Benefits of technology

It realizes functional transformation of large-sized old buildings on the basis of retaining the building's appearance, solves the problems of mechanical passage and material transportation during construction, improves the environmental stability of the new building, and protects the appearance of the old building through decorative materials. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118564103B_ABST
    Figure CN118564103B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of construction measures for existing buildings, and discloses a method for renovating and utilizing large-scale old buildings while retaining the appearance of the buildings. The idea of ​​separating function from appearance is adopted to renovate large-scale old buildings. Only the outer shell of the old building is retained, and the function of the building is realized by the newly built building inside the outer shell, so that the old building not only does not need to bear new loads, but also only the roof and decorative materials are left for the loads it originally carried, and even the load-bearing structure of the old building can meet the demand. The window openings of the curtain wall windows and side windows of special sizes are used to overcome the interference problem caused by the nesting of the new and old two-story buildings on the construction, so that the construction of the nested buildings is feasible and the internal ventilation and lighting problems are overcome after the construction; the old buildings are wrapped with new decorative materials that imitate the appearance of the old buildings, so that the dilapidated appearance of the old buildings is completely refurbished and protected at the same time; the above three points are combined to complete the renovation of large-scale old buildings while retaining the appearance of the buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction measures for existing buildings, and in particular to a method for renovating and utilizing a large-sized old building while retaining the building appearance. Background Art

[0002] The fate of most old buildings is to be demolished to make way for the construction of new buildings, but there are some old buildings with special significance that need to be changed in use while retaining their original appearance, which requires in-depth renovation of the buildings.

[0003] Considering that the old building itself has been seriously aged, its structural strength has seriously declined, and its appearance is very shabby. These problems are difficult to solve without deep transformation of the building itself. Therefore, the transformation of old buildings often needs to be carried out by dismantling them into parts and reassembling them. During the dismantling process, the building parts can be tested separately and the parts that do not meet the strength standards or are seriously damaged can be replaced. The internal reinforcement treatment or the internal layout of the building can be changed to adapt to the changes in the use of the building. A typical case is the Tiananmen Gate Tower, which was transformed in this way after the founding of the People's Republic of China, from its original old and shaky appearance to its current appearance that can stably carry a large number of people and equipment.

[0004] However, this method of demolition and modification is not applicable to some large-scale old buildings. The biggest problem is that in large-scale old buildings, due to their large size, they have low rigidity, are prone to deformation, and have difficulty meeting strength standards. In order to maintain their shape, they often need to use components such as reinforced concrete beams and columns / shear walls that have high rigidity but are not suitable for disassembly into parts. In addition, as old buildings have been around for a long time, construction specifications may change. Buildings in some places may not be allowed to be reassembled into their original size after being disassembled into parts due to height restrictions and other factors.

[0005] Take the Jinyu Xingfa Science Park project in the northern area of ​​Beijing Huairou Science City as an example. The project site is Xingfa Cement Factory, which was built in the early 1990s and contributed a large amount of building materials to Beijing's urban construction. It is an important industrial heritage site. Therefore, the buildings there need to be transformed into research facilities of the nearby Beijing Yanqi Lake Institute of Applied Mathematics while retaining their appearance. The warehouse needs to be converted into a multi-story supercomputer room. The warehouse is a typical single-story large-span building with weak bearing capacity and is very dilapidated. It is completely unable to bear the added floor slabs and complex electronic equipment. At the same time, its interior cannot meet the environmental requirements of supercomputer equipment, and its brick-concrete composite structure is not allowed to be dismantled and reassembled. Similar problems are common in the transformation of three batches of industrial heritage sites across the country. What is more fatal is that even if the protection of industrial heritage sites is not considered, due to the local height restriction policy, it is not feasible to demolish the building and rebuild a building in the shape of the original building. Summary of the invention

[0006] The invention provides a method for renovating and utilizing a large-sized old building while retaining the building appearance.

[0007] The technical problem to be solved is: in the process of renovation and utilization of large-scale old buildings, it is impossible to repair and renovate by dismantling them into parts and then reassembling them, because high-rigidity but non-destructible components such as reinforced concrete beams and columns or shear walls are needed to maintain the shape of the building.

[0008] In order to solve the above technical problems, the present invention adopts the following technical solution: a method for renovating and utilizing a large-sized old building while retaining the building appearance, comprising the following steps:

[0009] Step 1: Strengthen the old building to ensure that it has a qualified bearing capacity during and after the subsequent opening of the exterior wall;

[0010] Step 2: Open window openings for curtain wall windows and side windows on the exterior wall of the old building;

[0011] The curtain wall window is a window formed by installing a transparent curtain wall in the window opening, and the window opening of the curtain wall window meets the following conditions:

[0012] Condition 21: Access to all vehicles and machinery required for construction inside the old building;

[0013] Condition 22: Set up on the sunny side of the old building;

[0014] Condition 23: The old building components around the window opening do not fall off;

[0015] The window opening of the side window meets the following conditions:

[0016] Condition 24: Set at intervals around the outer wall of the old building;

[0017] Condition 25: The top is higher than the top floor of the new building to be built inside the old building, and the bottom is lower than the bottom ceiling of the new building to be built inside the old building;

[0018] Step 3: Drive vehicles and machinery required for the internal construction of the old building into the old building along the window openings of the curtain wall windows, and construct the new building inside the old building; the new building is not connected to the old building, there is a gap between the outer wall of the new building and the outer wall of the old building for people to pass, and the top floor of the new building is an open-top structure without a roof;

[0019] The materials and concrete pump pipes required for the construction of the new building are hoisted into the old building through the window opening of the side window closest to the current construction location, the muck is loaded and transported out through the window opening of the curtain wall window, and the waste materials other than the muck are hoisted out through the window opening of the side window closest to the waste materials;

[0020] Step 4: Install curtain walls in the window openings of the curtain wall windows, install glass sashes and / or shutters in the window openings of the side windows, clean the exterior walls of the old building, and then wrap the exterior walls of the old building with a layer of decorative material that imitates the original appearance of the exterior walls of the old building and protects the exterior walls of the old building.

[0021] Furthermore, in step 1, according to the different exterior wall structures of the old buildings, the reinforcement process of the buildings is divided into the following three working conditions:

[0022] Working condition 1: If the exterior wall of the old building is a non-load-bearing wall, a lintel is installed in the wall groove at the top of the window opening of the side window, and the window opening of the curtain wall window extends upward to the roof;

[0023] Working condition 2: If the exterior wall of the old building is a load-bearing wall and is a reinforced concrete structure, grooves are cut in the exterior wall of the old building to install concealed columns and lintels are installed at the top of the window openings of the curtain wall windows for reinforcement;

[0024] Working condition 3: If the exterior wall of the old building is a load-bearing wall and a masonry structure, grooves are cut in the exterior wall of the old building to install concealed columns, and grooves are cut in the wall at the top of the window openings of the side windows to install lintels for reinforcement, and the window openings of the curtain wall windows extend all the way up to the roof;

[0025] Furthermore, in working conditions one to three, if a beam is broken during the process of drilling a hole in the outer wall of the old building, a new beam is installed above the broken beam close to the roof.

[0026] Furthermore, the curtain wall in the curtain wall window is fixed in the following manner:

[0027] A reinforced concrete ground beam is buried in the ground below the curtain wall, a sky beam is set at the top of the curtain wall adjacent to the roof, and inner columns are set at intervals in the curtain wall. The upper and lower ends of the inner columns are fixedly connected to the ground beam and the sky beam respectively;

[0028] The ground beam is provided with an inlay groove for fixing the bottom of the curtain wall, or is anchored with a bracket for fixing the bottom of the curtain wall;

[0029] The left and right sides of the curtain wall are fixedly connected to the outer walls of the old building.

[0030] Furthermore, the curtain wall window has a door frame in the keel grid, and a glass door leaf is installed in the door frame as a new door for the old building; the original door of the old building is removed and replaced with a glass door.

[0031] Further, in step 3, the floor of the new building horizontally extends outward to the position of the outer wall of the old building to form a suspended indoor corridor, wherein the indoor corridor is a cantilevered corridor, and the joint between the cantilevered end of the cantilevered corridor and the outer wall of the old building is covered by a flexible decorative panel, and the decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor and has no connection with the outer wall of the old building;

[0032] The gap between the curtain wall windows and the new building is arranged as a foyer.

[0033] Furthermore, if the old building is a multi-story building, step 2 also includes the step of demolishing the floor slab of the second floor. During the construction process of step 3, the new building is constructed layer by layer from bottom to top. Each time a new floor is constructed, a floor slab of the old building is demolished.

[0034] Furthermore, the window holes of the side windows are opened by cutting with a water saw and the hole walls are made smooth and flat, and the glass window sashes of the side windows are directly supported on the hole walls.

[0035] Furthermore, the outer wall of the old building is a plain brick wall, and the decorative material in step 4 is a PK brick affixed to the outer wall of the old building.

[0036] Furthermore, the non-top floor of the new building is a computer room for centrally installing computer and / or data center cabinets. The air inlet and outlet of the cabinet radiator are both shutters on the top of the side windows, and the bottom of the side windows with shutters is a glass window.

[0037] Compared with the prior art, the method for renovating and utilizing a large-sized old building with the building appearance preserved in the present invention has the following beneficial effects:

[0038] In the present invention, the idea of ​​separating function from appearance is adopted to renovate large-scale old buildings. The old building only retains its shell to maintain the building appearance, and the function of the building is realized by the newly built building inside the shell. As a result, the old building does not need to bear new loads, and the load it originally carried is only the roof and decorative materials. Even the load-bearing structure of the old building can meet the demand.

[0039] At the same time, by using the special-sized curtain wall windows and side window openings, the interference problem caused by the nesting of the old and new buildings was overcome (construction vehicles and equipment could not enter, building materials and waste materials could not be hoisted, and the concrete pouring pump pipe was blocked), making the construction of this nested building feasible, and overcoming the ventilation and lighting problems inside the nested building after construction;

[0040] The old building is wrapped with new decorative materials that imitate the appearance of the old building, so that the dilapidated appearance of the old building is completely renovated and protected at the same time;

[0041] The above three points are combined to complete the renovation of large-scale old buildings while retaining the building's appearance. At the same time, the double-layer nested structure makes the internal environment of the new building more stable (the new building does not need to face direct sunlight, wind, rain, snow, and dust), which can better meet various occasions with high requirements for environmental stability, including computer rooms. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 A plan view of a building in a method for renovating and utilizing a large-sized old building while retaining the building appearance according to the present invention;

[0043] Figure 2 This is a structural diagram of a section of the exterior wall of an old building including side windows;

[0044] Figure 3 This is a structural diagram of a curtain wall window;

[0045] In the figure, 1-old building, 11-curtain wall window, 12-side window, 2-new building, 3-foyer, 4-interior corridor. DETAILED DESCRIPTION

[0046] Take the Jinyuxingfa Science Park project in the northern area of ​​Beijing Huairou Science City as an example. Figure 1 As shown, a method for renovating and utilizing a large-sized old building with a preserved building appearance comprises the following steps:

[0047] Step 1: Strengthen the old building 1 so that its bearing capacity is qualified during and after the subsequent opening of the external wall;

[0048] Since it is necessary to drill holes in the outer wall of the old building 1 to avoid interference caused by the nesting of the inner and outer buildings, the bearing capacity of the outer wall of the old building 1 will decrease, so it is necessary to reinforce it in advance before drilling the holes. At the same time, if the old building 1 itself is already a dangerous building, additional reinforcement can be carried out during this process. The reinforcement plan is formulated based on the previous exploration and simulation calculation process.

[0049] Step 2: Opening window openings for curtain wall windows 11 and side windows 12 on the exterior wall of the old building 1;

[0050] like Figure 2 As shown, the curtain wall window 11 is a window formed by installing a transparent curtain wall (usually a glass curtain wall, or a polycarbonate curtain wall) in the window opening. The window opening of the curtain wall window 11 meets the following conditions:

[0051] Condition 21: All vehicles and machinery required for construction inside the old building 1 can pass through;

[0052] Here, we usually choose a narrow wall of an old building, demolish the entire wall and replace it with a glass curtain wall.

[0053] Condition 22: Set up on the sunny side of old building 1;

[0054] The glass curtain wall here is the main lighting channel, located on the south side of the building in the northern hemisphere and on the north side of the building in the southern hemisphere.

[0055] Condition 23: No components of the old building 1 around the window opening fall off;

[0056] The curtain wall window 11 is a very special structure. It is not attached to the wall like a conventional curtain wall, but installed like a window. Therefore, its glass needs to be fixed by the keel grid, and the periphery also needs to be fixed. The old building 1 component around the window hole needs to fix the edge of the curtain wall window 11, and it must be ensured that it can be stable after the hole is opened.

[0057] like Figure 3 As shown, the window opening of the side window 12 meets the following conditions:

[0058] Condition 24: Set at intervals around the outer wall of the old building 1;

[0059] This requirement is for ventilation and lighting, and secondly to ensure that all construction locations can find a nearby side window 12 window opening.

[0060] Condition 25: The top is higher than the top floor of the new building 2 to be built inside the old building 1, and the bottom is lower than the bottom ceiling of the new building 2 to be built inside the old building 1;

[0061] Since the window openings of the side windows 12 need to transport various materials, they need to be high enough and low enough to meet the needs of construction on all floors.

[0062] Step 3: Drive the vehicles and machinery required for the internal construction of the old building 1 into the old building 1 along the window opening of the curtain wall window 11, and construct the new building 2 inside the old building 1; there is no connection between the new building 2 and the old building 1 to ensure that the load on the new building 2 will not be transferred to the old building 1.

[0063] There is a gap between the outer wall of the new building 2 and the outer wall of the old building 1 for people to pass through. Since there is no connection between the new building 2 and the old building 1, there is a gap between the two. Here, it is ensured that the gap can be passed by pedestrians so that these gaps can be used as corridors to make up for the problem caused by the reduced size of the new building 2 due to being inside the old building 1.

[0064] The top floor of New Building 2 is an open structure without a roof;

[0065] The construction of the roof of the top floor of the new building 2 will be seriously interfered by the lack of roof of the old building 1, and the construction cannot be completed normally. Therefore, the roof of the new building 2 is simply abandoned and the roof of the old building 1 is directly used. If the roof of the old building 1 is damaged, it should be renovated, that is, the roof board should be replaced. Unlike the exterior wall, the roof itself does not need to bear loads other than its own weight, so the roof board can be easily replaced.

[0066] The materials and concrete pump pipes required during the construction of the new building 2 are hoisted into the old building 1 along the window opening of the side window 12 closest to the current construction position, the muck is loaded and transported out along the window opening of the curtain wall window 11, and the waste materials other than the muck are hoisted out along the window opening of the side window 12 closest to the waste materials;

[0067] The dense window openings with specially adjusted sizes and positions here can ensure that the construction process of the new building 2 inside is not interfered by the old building 1 outside.

[0068] Step 4: Install the curtain wall in the window opening of the curtain wall window 11, install glass window sashes and / or shutters in the window opening of the side window 12, clean the exterior wall of the old building 1, and then wrap the exterior wall of the old building 1 with a layer of decorative material that imitates the original appearance of the exterior wall of the old building 1 and protects the exterior wall of the old building 1.

[0069] The exterior of the old building 1 is not only dilapidated, but also undergoing continuous weathering. Therefore, we choose to directly wrap it with a layer of decorative materials, which can not only completely complete the renovation of the building's exterior at a lower cost and in a shorter time, but also interrupt the weathering process of the building.

[0070] In step 1, according to the different exterior wall structures of the old building 1, the reinforcement process of the building is divided into the following three working conditions:

[0071] Working condition 1: If the outer wall of the old building 1 is a non-load-bearing wall, a lintel is installed in a groove in the wall at the top of the window opening of the side window 12, and the window opening of the curtain wall window 11 extends upward to the roof;

[0072] This embodiment belongs to this working condition. The outer wall of the old building 1 is a brick-concrete structure, including brick walls and reinforced concrete hidden columns embedded in the brick walls. The brick walls themselves do not bear weight, but the reinforced concrete hidden columns bear the roof. The roof has a row of plane trusses, and the two ends of each plane truss fall on a reinforced concrete hidden column.

[0073] The reason why the lintel is installed here is that the non-load-bearing wall is relatively fragile regardless of its form, and the top of the window hole cannot support itself after the window hole is opened. However, it is too expensive to install a lintel at the window hole position of the curtain wall window 11 to support the fragile wall above, so here it is chosen to directly dismantle the outer wall where the window hole of the curtain wall window is located to the top. The lintel here is basically not load-bearing, so the end can be connected to the reinforced concrete hidden column of the old building 1.

[0074] Working condition 2: If the outer wall of the old building 1 is a load-bearing wall and is a reinforced concrete structure, grooves are cut in the outer wall of the old building 1 to install concealed columns and lintels are installed at the tops of the window openings of the curtain wall windows 11 for reinforcement;

[0075] Here, because a hole is opened in the load-bearing wall, the bearing capacity is reduced, and hidden columns need to be installed in it to reinforce it. However, since the reinforced concrete wall will not drop blocks after the hole is opened, there is no need to install a lintel on the top of the window hole after the window hole is opened.

[0076] Working condition three: If the outer wall of the old building 1 is a load-bearing wall and a masonry structure, grooves are cut in the outer wall of the old building 1 to install hidden columns, and grooves are cut in the wall at the top of the window opening of the side window 12 to install lintels for reinforcement to prevent the blocks from falling, and the window opening of the curtain wall window 11 extends upward to the roof to avoid the high cost of large-span lintels to support the fragile wall above.

[0077] In addition to reinforced concrete walls and masonry walls, there are also board walls and rammed earth walls, but these are used for temporary buildings. The reason why Old Building 1 can be called Old Building 1 is that there is a hidden premise, that is, it is a permanent building. Therefore, the exterior walls of Old Building 1 usually only have masonry structures and reinforced concrete structures. However, if you encounter structures other than these two, you should uniformly handle them according to working condition three.

[0078] Furthermore, in working conditions 1 to 3, if a beam is broken during the process of drilling a hole on the outer wall of the old building 1, a new beam is installed above the broken beam close to the roof to compensate for the reduced bearing capacity caused by the broken beam.

[0079] The curtain wall in the curtain wall window 11 is fixed in the following manner:

[0080] like Figure 2As shown, a reinforced concrete ground beam is buried under the curtain wall, a sky beam is set at the top of the curtain wall adjacent to the roof, and inner columns are set at intervals in the curtain wall. The upper and lower ends of the inner columns are fixedly connected to the ground beam and the sky beam respectively;

[0081] The ground beam is provided with an inlay groove for fixing the bottom of the curtain wall, or a bracket for fixing the bottom of the curtain wall is anchored;

[0082] The left and right sides of the curtain wall are fixedly connected to the outer wall of the old building 1.

[0083] Here, the curtain wall is fixed in a stable square frame similar to a window frame. At the same time, a keel grid is installed in this stable square frame. The glass in the curtain wall is inlaid in the keel grid in a soft inlay edging way. The keel grid here fixes the glass, and the soft inlay edging is to ensure that the glass in the curtain wall is not damaged when thermal expansion and contraction occur. Of course, if a polycarbonate curtain wall is used, the soft inlay edging method can be omitted.

[0084] The keel grid of the curtain wall window 11 is provided with a door frame, and a glass door leaf is installed in the door frame as a new door of the old building 1; the original door of the old building 1 is removed and replaced with a glass door.

[0085] The doors here also serve as lighting windows for the building.

[0086] In step three, the floor of the new building 2 extends horizontally outward to the outer wall of the old building 1, forming a suspended indoor corridor 4. The indoor corridor 4 is a cantilevered corridor. The joint between the cantilevered end of the cantilevered corridor and the outer wall of the old building 1 is covered with a flexible decorative panel. The decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor and has no connection with the outer wall of the old building 1.

[0087] The gap between the curtain wall window 11 and the new building 2 is arranged as a lobby 3.

[0088] If the old building 1 is a multi-story building, step 2 further includes the step of removing the floor slab of the second floor so that the vehicle can drive into the old building 1;

[0089] During the construction process of step 3, the new building 2 is constructed layer by layer from bottom to top. Each time a new building 2 is constructed, a floor slab of the old building 1 is demolished.

[0090] This process is not only to ensure normal construction, but also to remove the loads other than the decorative materials on the roof and shell of the old building 1. If it is a single-story building, there are loads other than decorative materials on its exterior wall, which are removed here.

[0091] In this embodiment, the window hole of the side window 12 is opened by cutting with a water saw and the hole wall is made smooth and flat, and the glass window sash of the side window 12 is directly supported on the hole wall.

[0092] The exterior wall of the old building 1 is a plain brick wall, and the decorative material in step 4 is a PK brick attached to the exterior wall of the old building 1. Here, a PK brick is used as a plate to simulate the appearance of a plain brick wall.

[0093] If there are tiles on the exterior wall of the old building 1, you can re-tile it. If there are stone slabs on the exterior wall of the old building 1, you can clean and repair them and then apply real stone paint. If the exterior wall of the old building 1 is a plain concrete wall, re-apply a layer of plain concrete. If the exterior wall of the old building 1 is lime plastered, remove it and re-plaster it.

[0094] The non-top floor of the new building 2 is a computer room for centrally installing computer and / or data center cabinets. The air inlet and outlet of the cabinet radiator are both shutters on the top of the side window 12. The bottom of the side window 12 with shutters is a glass window.

[0095] Here, the characteristic that the internal environment of the non-top floor of the nested building is more stable than that of a conventional building is fully utilized. In order to ensure the beautiful appearance of the building, it is chosen not to open additional shutters for radiator ventilation, but to select a part of the side window 12 as a shutter for ventilation.

[0096] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A method for renovating and utilizing a large-sized old building while retaining the building's appearance, characterized in that: The following steps are involved: Step 1: Strengthen the old building (1) to ensure that it has a qualified bearing capacity during and after the subsequent opening of the exterior wall; Step 2: Opening window openings for curtain wall windows (11) and side windows (12) on the exterior wall of the old building (1); The curtain wall window (11) is a window formed by installing a transparent curtain wall in a window opening, and the window opening of the curtain wall window (11) meets the following conditions: Condition 21: Access to all vehicles and machinery required for construction inside the old building (1); Condition 22: Set up on the sunny side of the old building (1); Condition 23: Old buildings around window openings (1) No components fall off; The window opening of the side window (12) satisfies the following conditions: Condition 24: Set at intervals around the exterior wall of the old building (1); Condition 25: The top is higher than the top floor of the new building (2) to be built inside the old building (1), and the bottom is lower than the bottom ceiling of the new building (2) to be built inside the old building (1); Step 3: driving vehicles and machinery required for the internal construction of the old building (1) into the old building (1) along the window opening of the curtain wall window (11), and constructing the new building (2) inside the old building (1); the new building (2) is not connected to the old building (1), there is a gap between the outer wall of the new building (2) and the outer wall of the old building (1) for people to pass, and the top floor of the new building (2) is an open-top structure without a roof; The materials and concrete pump pipes required for the construction of the new building (2) are hoisted into the old building (1) through the window opening of the side window (12) closest to the current construction position, the muck is loaded and transported out through the window opening of the curtain wall window (11), and the waste materials other than the muck are hoisted out through the window opening of the side window (12) closest to the waste materials; Step 4: Install a curtain wall in the window opening of the curtain wall window (11), install glass window sashes and / or shutters in the window opening of the side window (12), clean the exterior wall of the old building (1), and then wrap the exterior wall of the old building (1) with a layer of decorative material that imitates the original appearance of the exterior wall of the old building (1) and protects the exterior wall of the old building (1).

2. A method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: In step 1, according to the different exterior wall structures of the old building (1), the reinforcement process of the building is divided into the following three conditions: Working condition 1: If the exterior wall of the old building (1) is a non-load-bearing wall, a lintel is installed in a groove in the wall at the top of the window opening of the side window (12), and the window opening of the curtain wall window (11) extends upward to the roof; Working condition 2: If the outer wall of the old building (1) is a load-bearing wall and is a reinforced concrete structure, grooves are cut in the outer wall of the old building (1) to install concealed columns and lintels are installed at the tops of the window openings of the curtain wall windows (11) for reinforcement; Working condition 3: If the outer wall of the old building (1) is a load-bearing wall and is a masonry structure, a groove is made in the outer wall of the old building (1) to install a concealed column, and a groove is made in the wall at the top of the window opening of the side window (12) to install a lintel for reinforcement, and the window opening of the curtain wall window (11) extends upward to the roof; Furthermore, in working conditions 1 to 3, if a beam is broken during the process of drilling a hole in the outer wall of the old building (1), a new beam is installed above the broken beam close to the roof.

3. The method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: The curtain wall in the curtain wall window (11) is fixed in the following manner: A reinforced concrete ground beam is buried in the ground below the curtain wall, a sky beam is set at the top of the curtain wall adjacent to the roof, and inner columns are set at intervals in the curtain wall. The upper and lower ends of the inner columns are fixedly connected to the ground beam and the sky beam respectively; The ground beam is provided with an inlay groove for fixing the bottom of the curtain wall, or is anchored with a bracket for fixing the bottom of the curtain wall; The left and right sides of the curtain wall are fixedly connected to the outer wall of the old building (1).

4. A method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 3, characterized in that: The curtain wall window (11) has a door frame in the keel grid, and a glass door leaf is installed in the door frame as a new door of the old building (1); the original door of the old building (1) is removed and replaced with a glass door.

5. The method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: In step 3, the floor slab of the new building (2) is horizontally extended outward to the position of the outer wall of the old building (1), forming a suspended indoor corridor (4), wherein the indoor corridor (4) is a cantilevered corridor, and the joint between the cantilevered end of the cantilevered corridor and the outer wall of the old building (1) is covered by a flexible decorative panel, wherein the decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor and has no connection with the outer wall of the old building (1); The gap between the curtain wall window (11) and the new building (2) is arranged as a lobby (3).

6. The method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: If the old building (1) is a multi-storey building, step 2 also includes the step of demolishing the floor slab of the second floor. During the construction process of step 3, the new building (2) is constructed layer by layer from bottom to top. Each time a new building (2) is constructed, a layer of the floor slab of the old building (1) is demolished.

7. The method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: The window hole of the side window (12) is opened by cutting with a water saw and the hole wall is made smooth and flat, and the glass window sash of the side window (12) is directly supported on the hole wall.

8. The method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: The outer wall of the old building (1) is a plain brick wall, and the decorative material in step 4 is a PK brick affixed to the outer wall of the old building (1).

9. The method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: The non-top floor of the new building (2) is a computer room for centrally installing computer and / or data center cabinets. The air inlet and outlet of the cabinet radiator are both shutters at the top of the side window (12). The bottom of the side window (12) with the shutter is a glass window.