An information data supervision management system and method based on information processing
Through the application of data classification processing and supervision and management models on the industrial project management platform, the soft destruction and hard destruction of data are realized, the problems of data security risks and complex destruction processes in the existing technology are solved, and the data processing capabilities are improved.
Patent Information
- Application Number
- CN202411060578.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technology is difficult to effectively achieve classified destruction of enterprise core data in the field of data supervision, there are data security risks, and the data file destruction process is complex and costly.
By building an industrial project management platform, setting storage thresholds, performing data classification processing, using data overwriting methods to achieve soft destruction of data, and performing secondary classification based on the data supervision and management model, and finally achieving hard destruction of data through degaussing, incineration and other methods.
It improves data security capabilities, reduces data security risks, simplifies the data destruction process, and solves the problems of technical complexity and high cost.
Smart Images

Figure CN118568062B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of information data processing, and in particular to an information data supervision management system and method based on information processing. Background Art
[0002] With the continuous development of technology, information productivity has gradually replaced the original productivity. As a synonym for the new era, information productivity refers to the cultivation and development of computer-based intelligent tools as new productivity. It is based on modern communication, network, and database technologies, and summarizes the various elements of the research object into a database for specific groups of people to use in life, work, study, and decision-making assistance. It is a technology that combines various behaviors closely related to human beings. In the technical field of the combination of industry and informatization, the use of data processing activities to achieve linkage between industrial equipment and projects has become one of the main means of digital construction.
[0003] Among them, data processing activities include not only data collection, storage, use, processing, transmission, provision, and disclosure, but also data security issues during data use. Data security includes not only data encryption, access control, backup and recovery, and many other tasks aimed at maintaining data integrity, but also processing tasks aimed at completely destroying data integrity. With the rapid development of informatization, a large amount of original data has begun to be redundant in various servers. For the processing of redundant data, deletion, formatting, partitioning, and file shredding are usually adopted. However, from the current technical point of view, the above common methods can achieve data recovery. For the core original project data and confidential data of the enterprise, there are still certain risks. Therefore, what means are used to achieve the classified destruction of data, so as to reduce data security risks on the one hand, and solve the technical complexity, cumbersome procedures, and high cost of data file destruction on the other hand, is one of the unresolved issues in the field of informatization data supervision. Summary of the invention
[0004] The purpose of the present invention is to provide an information data supervision management system and method based on information processing to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: an information data supervision and management method based on information processing, the method comprising the following steps:
[0006] S1. Build an industrial project management platform, generate project data based on each project, aggregate the data to the temporary storage platform for project data, set a storage threshold, and activate an alarm when the amount of data stored in the temporary storage platform for project data exceeds the storage threshold;
[0007] S2. The system receives the alarm signal, classifies and processes the project data of the temporary storage platform, and forms data reflux and data soft destruction based on the project completion status corresponding to each project data;
[0008] S3. Obtain historical data on data destruction, build a data supervision management model, and reclassify the data in the data reflow to form the first reflow data and cloud disk data;
[0009] S4. Feedback the first reflux data to the temporary storage cloud platform for project data, store the cloud disk data in an external hard disk, and monitor the project completion status corresponding to each project data in each external hard disk to form hard data destruction.
[0010] According to the above technical solution, in steps S1-S2, the project data refers to the data generated during the operation of any project, and the project name is marked in the attributes of the data, and one item of data corresponds to one project;
[0011] The project refers to the smallest unit in the industrial project management platform; that is, each task corresponds to a project, and the project, regardless of size, is determined only by whether it can exist independently;
[0012] The project completion status based on the project data corresponding to each project refers to:
[0013] If the project and related projects corresponding to the project data have been completed, the project data will be soft-destroyed; if the project and related projects corresponding to the project data have not been completed, data reflux will be formed;
[0014] The associated projects refer to the data connections between the projects;
[0015] The data reflux refers to feeding the data back to the temporary storage platform of the project data for reclassification and processing;
[0016] The soft data destruction refers to the use of data overwriting to write random non-confidential data into the project data to be processed, and the use of a binary method to repeatedly overwrite the binary form of the original project data with meaningless, irregular, random non-confidential data to achieve soft data destruction.
[0017] According to the above technical solution, the construction of the data supervision management model includes:
[0018] Obtain historical data on data destruction, including the number of associated projects of the project data and the interval time when the project data is called, and form a set of record data for any destroyed project data A ,in, Refers to the number of associated data of project data A. Refers to the interval time when the project data is called, which is counted into the collection in chronological order;
[0019] The number of associated items and the interval time between item data calls are obtained for any data in the data reflow, and item data with the same number of associated items are selected from the historical data for training, wherein the training includes:
[0020] Randomly select N groups of project data as input samples, and randomly select M initial cluster centers from the N groups of project data, where M is less than N; take the total duration of each group of project data as the first classification plan for the project data, and distribute the N groups of project data to the M initial cluster centers. The first classification plan refers to solving the difference between the total duration of each group of project data and each of the M initial cluster centers, and selecting the initial cluster center with the smallest absolute value of the difference as the initial distribution cluster center of the project data.
[0021] According to the above technical solution, it also includes:
[0022] Calculate the minimum inter-class distance and the maximum intra-class distance among the assigned M initial cluster centers:
[0023] ;
[0024] ;
[0025] in, , Represent the minimum inter-class distance and the maximum intra-class distance respectively; respectively
[0026] Represents any two initial cluster centers among the M initial cluster centers; Respectively represent The average distance from the sample data in to other cluster centers; represent Sample data in ;
[0027] If the current intra-class distance in a cluster center is greater than the maximum intra-class distance, the cluster center is split; when all cluster centers are no longer classified, if the current inter-class distance in a cluster center is less than the minimum inter-class distance, all cluster centers that meet the conditions are merged;
[0028] Output the final number of cluster centers, recorded as the initial number of centroids K, and feed it back to the system model. The system model randomly selects K project data from N groups of project data as cluster centers based on the initial number of centroids K.
[0029] Calculate the distance between the input sample and each cluster center, and divide the sample into the cluster corresponding to the cluster center closest to it:
[0030]
[0031] Among them, y represents the distance from the input sample to the center of each cluster; Refers to the interval time at which the input sample project data is called; Refers to the interval time when the project data of the cluster center is called;
[0032] Calculate the mean of all samples in each cluster, and use the mean to update the cluster center, calculate the minimum value of the sum of squared errors within the current cluster; set the threshold of the sum of squared errors within the cluster at the same time. If the minimum value of the sum of squared errors within the current cluster is greater than or equal to the threshold of the sum of squared errors within the cluster, redistribute the input samples with the updated cluster center. Each redistribution is recorded as an iteration. Stop when the threshold of the number of iterations is met or the minimum value of the sum of squared errors within all current clusters is less than the threshold of the sum of squared errors within the cluster, and output all current cluster centers.
[0033] The data of any data reflow is distributed to the output cluster center. According to the sample data in the current cluster center, if the number of sample data in the cluster center that is called more than n times exceeds one-half of the number of sample data in the cluster, the current data reflow data is marked as the data to be analyzed. If it does not exceed one-half, it is sent to the cloud disk to form cloud disk data. The data to be analyzed is further processed, and the average value T of the n+1th interval time of the project data in which the sample data in the cluster center is called more than n times is calculated. At the same time, the difference between the last call time of the data to be analyzed and the current time is calculated. If the difference is greater than the average value T, it is sent to the cloud disk to form cloud disk data. If the difference is not greater than the average value T, the first reflow data is formed.
[0034] According to the above technical solution, in step S4, it also includes:
[0035] The monitoring of the project completion status corresponding to each project data in each external hard disk refers to:
[0036] When the project and related projects corresponding to the project data have been completed, the project data will be hard destroyed;
[0037] The hard destruction of data refers to demagnetization, incineration and external force crushing. The physical carrier recording confidential data is completely destroyed by physical destruction or chemical corrosion, thereby fundamentally solving the problem of data leakage.
[0038] An information data supervision and management system based on information processing, the system comprises: an industrial project data management module, a project data early warning prompt module, a data first processing module, a data reflux processing module and a data supervision and management module;
[0039] The industrial project data management module is used to build an industrial project management platform, form project data based on each project, and aggregate it to the project data temporary storage cloud platform; the project data early warning prompt module is used to set a storage threshold, and when the amount of data stored in the project data temporary storage cloud platform exceeds the storage threshold, an alarm is activated; the first data processing module is used to receive an alarm signal, classify and process the project data of the project data temporary storage cloud platform, and form data reflow and data soft destruction based on the project completion status corresponding to each project data; the data reflow processing module is used to receive the data provided by the data reflow, obtain historical data on data destruction, build a data supervision management model, and secondary classify the data in the data reflow to form the first reflow data and cloud disk data; the data supervision management module is used to feed back the first reflow data to the project data temporary storage cloud platform, store the cloud disk data to an external hard disk, and monitor the project completion status corresponding to each project data in each external hard disk to form data hard destruction;
[0040] The output end of the industrial project data management module is connected to the input end of the project data early warning prompt module; the output end of the project data early warning prompt module is connected to the input end of the data first processing module; the output end of the data first processing module is connected to the input end of the data backflow processing module; the output end of the data backflow processing module is connected to the input end of the data supervision management module.
[0041] According to the above technical solution, the industrial project data management module includes a platform management unit and a temporary storage unit;
[0042] The platform management unit is used to construct an industrial project management platform and form project data based on each project; the temporary storage unit is used to receive the aggregated project data and construct a temporary storage platform for project data;
[0043] The output end of the platform management unit is connected to the input end of the temporary storage unit.
[0044] According to the above technical solution, the first data processing module includes a data reflow unit and a data soft destruction unit;
[0045] The data reflux unit is used to receive the alarm signal, classify and process the project data of the temporary storage platform of the project data, and if the project corresponding to the project data and the related project are not completed, data reflux is formed; the data soft destruction unit is used to soft destroy the project data if the project corresponding to the project data and the related project have been completed;
[0046] The output end of the data backflow unit is connected to the input end of the data soft destruction unit.
[0047] According to the above technical solution, the data backflow processing module includes a model building unit and a cloud disk unit;
[0048] The model building unit is used to receive data provided by the data return flow, obtain historical data on data destruction, build a data supervision management model, and secondary classify the data in the data return flow; the cloud disk unit is used to build a cloud disk and form cloud disk data;
[0049] The output end of the model building unit is connected to the input end of the cloud disk unit.
[0050] According to the above technical solution, the data supervision management module includes a feedback unit and a data hard destruction unit;
[0051] The feedback unit is used to feed back the first reflux data to the temporary storage cloud platform for project data, and store the cloud disk data in the external hard disk; the data hard destruction unit is used to monitor the project completion status corresponding to each project data in each external hard disk, and form data hard destruction;
[0052] The output end of the feedback unit is connected to the input end of the data hard destruction unit.
[0053] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention can provide a data storage solution under a data storage platform where industrial and information technology are linked, perform primary classification of data, realize data soft destruction and data reflow, and at the same time, based on the secondary classification, realize the preparation for data reflow and data hard destruction again, realize the classified destruction of data, improve data security capabilities, and adopt different destruction methods in different situations, which also solves the problems of complex technology and cumbersome procedures for data file destruction, and provides good data processing capabilities in the field of industrial and information data supervision. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0055] Figure 1 It is a flow chart of an information data supervision management method based on information processing of the present invention. DETAILED DESCRIPTION
[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0057] See also Figure 1 In the first embodiment of the present invention, a method for supervising and managing information data based on information processing is provided, the method comprising: constructing an industrial project management platform, forming project data based on each project, aggregating the project data to a temporary storage platform for project data, setting a storage threshold, and starting an alarm when the amount of data stored in the temporary storage platform for project data exceeds the storage threshold; the system receives an alarm signal, classifies and processes the project data of the temporary storage platform for project data, and forms data reflux and data soft destruction based on the project completion status corresponding to each project data;
[0058] The project data refers to the data generated during the operation of any project. The project name is marked in the data attributes, and one item of data corresponds to one project.
[0059] The project refers to the smallest unit in the industrial project management platform; for example, in engineering construction, taking the pipeline line as an example, the trench backfilling, water pressure test, flushing and disinfection are all one project, which is based on the instructions of the level in the system, that is, for each step in the entire project, a corresponding project is generated;
[0060] The project completion status based on the project data corresponding to each project refers to:
[0061] If the project and related projects corresponding to the project data have been completed, the project data will be soft-destroyed; if the project and related projects corresponding to the project data have not been completed, data reflux will be formed;
[0062] The associated projects refer to the data connections between the projects;
[0063] The data reflux refers to feeding the data back to the temporary storage platform of the project data for reclassification and processing;
[0064] The soft data destruction refers to the use of data overwriting to write random non-confidential data into the project data to be processed, and the use of a binary method to repeatedly overwrite the binary form of the original project data with meaningless, irregular, random non-confidential data to achieve soft data destruction.
[0065] Obtain historical data on data destruction, build a data supervision and management model, and reclassify the data in the data return flow to form the first return data and cloud disk data;
[0066] The construction of the data supervision management model includes:
[0067] Obtain historical data on data destruction, including the number of associated projects of the project data and the interval time when the project data is called, and form a set of record data for any destroyed project data A ,in, Refers to the number of associated data of project data A. Refers to the interval time when the project data is called, which is counted into the collection in chronological order;
[0068] The number of associated items and the interval time between item data calls are obtained for any data in the data reflow, and item data with the same number of associated items are selected from the historical data for training, wherein the training includes:
[0069] Randomly select N groups of project data as input samples, and randomly select M initial cluster centers from the N groups of project data, where M is less than N; take the total duration of each group of project data as the first classification plan for the project data, and distribute the N groups of project data to the M initial cluster centers. The first classification plan refers to solving the difference between the total duration of each group of project data and each of the M initial cluster centers, and selecting the initial cluster center with the smallest absolute value of the difference as the initial distribution cluster center of the project data.
[0070] Also includes:
[0071] Calculate the minimum inter-class distance and the maximum intra-class distance among the assigned M initial cluster centers:
[0072] ;
[0073] ;
[0074] in, , Represent the minimum inter-class distance and the maximum intra-class distance respectively; respectively
[0075] Represents any two initial cluster centers among the M initial cluster centers; Respectively represent The average distance from the sample data in to other cluster centers; represent Sample data in ;
[0076] If the current intra-class distance in a cluster center is greater than the maximum intra-class distance, the cluster center is split; when all cluster centers are no longer classified, if the current inter-class distance in a cluster center is less than the minimum inter-class distance, all cluster centers that meet the conditions are merged;
[0077] Output the final number of cluster centers, recorded as the initial number of centroids K, and feed it back to the system model. The system model randomly selects K project data from N groups of project data as cluster centers based on the initial number of centroids K.
[0078] Calculate the distance between the input sample and each cluster center, and divide the sample into the cluster corresponding to the cluster center closest to it:
[0079]
[0080] Among them, y represents the distance from the input sample to the center of each cluster; Refers to the interval time at which the input sample project data is called; Refers to the interval time when the project data of the cluster center is called;
[0081] Calculate the mean of all samples in each cluster, and use the mean to update the cluster center, calculate the minimum value of the sum of squared errors within the current cluster; set the threshold of the sum of squared errors within the cluster at the same time. If the minimum value of the sum of squared errors within the current cluster is greater than or equal to the threshold of the sum of squared errors within the cluster, redistribute the input samples with the updated cluster center. Each redistribution is recorded as an iteration. Stop when the threshold of the number of iterations is met or the minimum value of the sum of squared errors within all current clusters is less than the threshold of the sum of squared errors within the cluster, and output all current cluster centers.
[0082] The data of any data reflow is distributed to the output cluster center. According to the sample data in the current cluster center, if the number of sample data in the cluster center that is called more than n times exceeds one-half of the number of sample data in the cluster, the current data reflow data is marked as the data to be analyzed. If it does not exceed one-half, it is sent to the cloud disk to form cloud disk data. The data to be analyzed is further processed, and the average value T of the n+1th interval time of the project data in which the sample data in the cluster center is called more than n times is calculated. At the same time, the difference between the last call time of the data to be analyzed and the current time is calculated. If the difference is greater than the average value T, it is sent to the cloud disk to form cloud disk data. If the difference is not greater than the average value T, the first reflow data is formed.
[0083] Feed the first reflux data back to the temporary storage cloud platform for project data, store the cloud disk data in an external hard disk, and monitor the project completion status corresponding to each project data in each external hard disk to form hard data destruction.
[0084] The monitoring of the project completion status corresponding to each project data in each external hard disk refers to:
[0085] When the project and related projects corresponding to the project data have been completed, the project data will be hard destroyed;
[0086] The data hard destruction refers to demagnetization, incineration and external force crushing.
[0087] In the second embodiment, an information data supervision and management system based on information processing is provided, which includes: an industrial project data management module, a project data early warning prompt module, a data first processing module, a data reflux processing module and a data supervision and management module;
[0088] The industrial project data management module is used to build an industrial project management platform, form project data based on each project, and aggregate it to the project data temporary storage cloud platform; the project data early warning prompt module is used to set a storage threshold, and when the amount of data stored in the project data temporary storage cloud platform exceeds the storage threshold, an alarm is activated; the first data processing module is used to receive an alarm signal, classify and process the project data of the project data temporary storage cloud platform, and form data reflow and data soft destruction based on the project completion status corresponding to each project data; the data reflow processing module is used to receive the data provided by the data reflow, obtain historical data on data destruction, build a data supervision management model, and secondary classify the data in the data reflow to form the first reflow data and cloud disk data; the data supervision management module is used to feed back the first reflow data to the project data temporary storage cloud platform, store the cloud disk data to an external hard disk, and monitor the project completion status corresponding to each project data in each external hard disk to form data hard destruction;
[0089] The output end of the industrial project data management module is connected to the input end of the project data early warning prompt module; the output end of the project data early warning prompt module is connected to the input end of the data first processing module; the output end of the data first processing module is connected to the input end of the data backflow processing module; the output end of the data backflow processing module is connected to the input end of the data supervision management module.
[0090] The industrial project data management module includes a platform management unit and a temporary storage unit;
[0091] The platform management unit is used to construct an industrial project management platform and form project data based on each project; the temporary storage unit is used to receive the aggregated project data and construct a temporary storage platform for project data;
[0092] The output end of the platform management unit is connected to the input end of the temporary storage unit.
[0093] The data first processing module includes a data reflow unit and a data soft destruction unit;
[0094] The data reflux unit is used to receive the alarm signal, classify and process the project data of the temporary storage platform of the project data, and if the project corresponding to the project data and the related project are not completed, data reflux is formed; the data soft destruction unit is used to soft destroy the project data if the project corresponding to the project data and the related project have been completed;
[0095] The output end of the data backflow unit is connected to the input end of the data soft destruction unit.
[0096] The data backflow processing module includes a model building unit and a cloud disk unit;
[0097] The model building unit is used to receive data provided by the data return flow, obtain historical data on data destruction, build a data supervision management model, and secondary classify the data in the data return flow; the cloud disk unit is used to build a cloud disk and form cloud disk data;
[0098] The output end of the model building unit is connected to the input end of the cloud disk unit.
[0099] The data supervision management module includes a feedback unit and a data hard destruction unit;
[0100] The feedback unit is used to feed back the first reflux data to the temporary storage cloud platform for project data, and store the cloud disk data in the external hard disk; the data hard destruction unit is used to monitor the project completion status corresponding to each project data in each external hard disk, and form data hard destruction;
[0101] The output end of the feedback unit is connected to the input end of the data hard destruction unit.
[0102] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0103] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for supervising and managing information data based on information processing, characterized in that: The method comprises the following steps: S1. Build an industrial project management platform, generate project data based on each project, aggregate the data to the temporary storage platform for project data, set a storage threshold, and activate an alarm when the amount of data stored in the temporary storage platform for project data exceeds the storage threshold; S2. The system receives the alarm signal, classifies and processes the project data of the temporary storage platform, and forms data reflux and data soft destruction based on the project completion status corresponding to each project data; S3. Obtain historical data on data destruction, build a data supervision management model, and reclassify the data in the data reflow to form the first reflow data and cloud disk data; S4, feeding back the first reflux data to the temporary storage cloud platform for project data, storing the cloud disk data in an external hard disk, and monitoring the project completion status corresponding to each project data in each external hard disk to form hard destruction of data; In steps S1-S2, the project data refers to the data generated during the operation of any project, and the project name is marked in the attributes of the data, and one item of data corresponds to one project; The project refers to the smallest unit in the industrial project management platform; The project completion status based on the project data corresponding to each project refers to: If the project and related projects corresponding to the project data have been completed, the project data will be soft-destroyed; if the project and related projects corresponding to the project data have not been completed, data reflux will be formed; The associated projects refer to the data connections between the projects; The data reflux refers to feeding the data back to the temporary storage platform of the project data for reclassification and processing; The data soft destruction refers to the use of data overwriting to write random non-confidential data into the project data to be processed, and the use of binary mode to repeatedly overwrite the binary form of the original project data with the binary form of meaningless and irregular random non-confidential data to achieve data soft destruction; The construction of the data supervision management model includes: Obtain historical data on data destruction, including the number of associated projects of the project data and the interval time when the project data is called, and form a set of record data for any destroyed project data A ,in, Refers to the number of associated data of project data A. Refers to the interval between project data being called, which is counted into the collection in chronological order; The number of associated items and the interval time between item data calls are obtained for any data in the data reflow, and item data with the same number of associated items are selected from the historical data for training, wherein the training includes: Randomly select N groups of project data as input samples, randomly select M initial cluster centers from the N groups of project data, where M is less than N; take the total duration of each group of project data as the first classification plan of the project data, and distribute the N groups of project data to the M initial cluster centers, wherein the first classification plan refers to performing a difference calculation between the total duration of each group of project data and each of the M initial cluster centers, and selecting the initial cluster center with the smallest absolute value of the difference as the initial distribution cluster center of the project data; Also includes: Calculate the minimum inter-class distance and the maximum intra-class distance among the assigned M initial cluster centers: ; ; in, , Represent the minimum inter-class distance and the maximum intra-class distance respectively; respectively Represents any two initial cluster centers among the M initial cluster centers; Respectively represent The average distance from the sample data in to other cluster centers; represent Sample data in ; If the current intra-class distance in a cluster center is greater than the maximum intra-class distance, the cluster center is split; when all cluster centers are no longer split, if the current inter-class distance in a cluster center is less than the minimum inter-class distance, all cluster centers that meet the conditions are merged; Output the final number of cluster centers, recorded as the initial number of centroids K, and feed it back to the system model. The system model randomly selects K project data from N groups of project data as cluster centers based on the initial number of centroids K. Calculate the distance between the input sample and each cluster center, and divide the sample into the cluster corresponding to the cluster center closest to it: ; Among them, y represents the distance from the input sample to the center of each cluster; Refers to the interval time at which the input sample project data is called; Refers to the interval time when the project data of the cluster center is called; Calculate the mean of all samples in each cluster, and use the mean to update the cluster center, calculate the minimum value of the sum of squared errors within the current cluster; set the threshold of the sum of squared errors within the cluster at the same time. If the minimum value of the sum of squared errors within the current cluster is greater than or equal to the threshold of the sum of squared errors within the cluster, redistribute the input samples with the updated cluster center. Each redistribution is recorded as an iteration. Stop when the threshold of the number of iterations is met or the minimum value of the sum of squared errors within all current clusters is less than the threshold of the sum of squared errors within the cluster, and output all current cluster centers. The data of any data reflow is distributed to the output cluster center. According to the sample data in the current cluster center, if the number of sample data in the cluster center that is called more than n times exceeds one-half of the number of sample data in the cluster, the current data reflow data is marked as the data to be analyzed. If it does not exceed one-half, it is sent to the cloud disk to form cloud disk data. The data to be analyzed is further processed, and the average value T of the n+1th interval time of the project data in which the sample data in the cluster center is called more than n times is calculated. At the same time, the difference between the last call time of the data to be analyzed and the current time is calculated. If the difference is greater than the average value T, it is sent to the cloud disk to form cloud disk data. If the difference is not greater than the average value T, the first reflow data is formed.
2. The information data supervision management method based on information processing according to claim 1 is characterized by: In step S4, it also includes: The monitoring of the project completion status corresponding to each project data in each external hard disk refers to: When the project and related projects corresponding to the project data have been completed, the project data will be hard destroyed; The data hard destruction refers to demagnetization, incineration and external force crushing.
3. An information data supervision and management system based on information processing, using the information data supervision and management method based on information processing as claimed in claim 1, characterized in that: The system includes: an industrial project data management module, a project data early warning prompt module, a data first processing module, a data return flow processing module and a data supervision management module; The industrial project data management module is used to build an industrial project management platform, form project data based on each project, and aggregate it to the project data temporary storage cloud platform; the project data early warning prompt module is used to set a storage threshold, and when the amount of data stored in the project data temporary storage cloud platform exceeds the storage threshold, an alarm is activated; the first data processing module is used to receive an alarm signal, classify and process the project data of the project data temporary storage cloud platform, and form data reflow and data soft destruction based on the project completion status corresponding to each project data; the data reflow processing module is used to receive the data provided by the data reflow, obtain historical data on data destruction, build a data supervision management model, and secondary classify the data in the data reflow to form the first reflow data and cloud disk data; the data supervision management module is used to feed back the first reflow data to the project data temporary storage cloud platform, store the cloud disk data to an external hard disk, and monitor the project completion status corresponding to each project data in each external hard disk to form data hard destruction; The output end of the industrial project data management module is connected to the input end of the project data early warning prompt module; the output end of the project data early warning prompt module is connected to the input end of the data first processing module; the output end of the data first processing module is connected to the input end of the data backflow processing module; the output end of the data backflow processing module is connected to the input end of the data supervision management module.
4. The information data supervision management system based on informatization processing according to claim 3 is characterized by: The industrial project data management module includes a platform management unit and a temporary storage unit; The platform management unit is used to construct an industrial project management platform and form project data based on each project; the temporary storage unit is used to receive the aggregated project data and construct a temporary storage platform for project data; The output end of the platform management unit is connected to the input end of the temporary storage unit.
5. The information data supervision management system based on informatization processing according to claim 3 is characterized by: The data first processing module includes a data reflow unit and a data soft destruction unit; The data backflow unit is used to receive the alarm signal, classify and process the project data of the temporary storage platform of the project data, and if the project corresponding to the project data and the associated project are not completed, data backflow is formed; The data soft destruction unit is used to soft destroy the project data when the project corresponding to the project data and the associated projects have been completed; The output end of the data backflow unit is connected to the input end of the data soft destruction unit.
6. The information data supervision management system based on information processing according to claim 3 is characterized by: The data backflow processing module includes a model building unit and a cloud disk unit; The model building unit is used to receive data provided by the data return flow, obtain historical data on data destruction, build a data supervision management model, and secondary classify the data in the data return flow; the cloud disk unit is used to build a cloud disk and form cloud disk data; The output end of the model building unit is connected to the input end of the cloud disk unit.
7. The information data supervision management system based on informatization processing according to claim 3 is characterized by: The data supervision management module includes a feedback unit and a data hard destruction unit; The feedback unit is used to feed back the first reflux data to the temporary storage cloud platform for project data, and store the cloud disk data in the external hard disk; the data hard destruction unit is used to monitor the project completion status corresponding to each project data in each external hard disk, and form data hard destruction; The output end of the feedback unit is connected to the input end of the data hard destruction unit.
Citation Information
Patent Citations
Storage information carrier destroying system
CN113610256A
Target type data recall method and device, electronic equipment and storage medium
CN113742580A